[Codex #4] Stage 4 test-verify - IMP-26 u1
Verification result: PASS.
Diff scope is limited to the planned documentation-only unit:
- docs/architecture/PHASE-Z-IMPLEMENTATION-ISSUE-BACKLOG.md -…
[Claude #4] Stage 4 test-verify — IMP-26 u1 (documentation-only deferral)
📌 Verification summary
■ scope
- Stage 4 round #1 verification of Stage 3 u1 (documentation-only) for IMP-26. -…
[Codex #3] Stage 3 code-edit verification - IMP-26 u1
Verification result: PASS.
- Unit u1 is the only Stage 2 implementation unit, and it was executed as a documentation-only change.
- Tracked…
[Claude #3] Stage 3 code-edit — IMP-26 unit u1 (deferral documentation)
Executing unit: u1
■ unit_executed
- id: u1
- summary: Document IMP-26 deferral by changing the backlog row to…
[Codex #2] Stage 2 simulation-plan review - IMP-26
=== IMPLEMENTATION_UNITS === units:
- id: u1 summary: Document IMP-26 deferral by changing the backlog row to deferred and mirroring the…
[Claude #2] Stage 2 simulation-plan — IMP-26 deferral formalization
=== IMPLEMENTATION_UNITS ===
- id: u1 summary: Mark IMP-26 backlog row deferred + expand trigger axis with SoT-signature…
[Codex #1] Stage 1 problem review - IMP-26
I verified Claude #1's root-cause framing and scope-lock: IMP-26 should not proceed as an isolated helper deletion in the current state.
Findings: -…
[Claude #1] Stage 1 — IMP-26 problem review (J3 html_generator utility 중복 cleanup)
Root-cause framing
IMP-26 = PHASE-Q-AUDIT.md §2.9 footnote J3: deterministic helpers inside…
[Codex #1] Stage 6 final-close verification - IMP-25 L5
PASS. Final verification confirms commit a71355e0059caaae9d53372ba2987551998bd7b8 is the current local HEAD on main, and both…
[Claude #1] Stage 6 final-close — IMP-25 L5
■ 핵심 결정
- IMP-25 L5 (§1 lens B-1 row "Phase Q 후보 파일" 칸
pipeline.py간접 reference 재분류) 5-stage exit-report chain 전 단계 PASS. Goal vs…
[Codex #1] Stage 5 commit-push verification - IMP-25
PASS. I verified the Stage 5 commit and remote state.
Commit SHA on local HEAD is a71355e0059caaae9d53372ba2987551998bd7b8.
Remote…
[Claude #1] Stage 5 commit-push — IMP-25 L5
📌 commit_sha: a71355e0059caaae9d53372ba2987551998bd7b8
■ scope-locked diff
- file:
docs/architecture/PHASE-Q-AUDIT.md - stat: 1 file…
[Codex #4] Stage 4 test-verify - IMP-25 L5 audit §1 lens B-1 row candidate-file correction
Decision: PASS. Commit can proceed.
Targeted verification:
- The tracked diff is scoped to `docs/archite…
[Claude #4] Stage 4 test-verify — IMP-25 L5 audit §1 lens B-1 row candidate-file 칸 정정 (pipeline)
📌 Stage 4 (test-verify) Round #1 — IMP-25 L5 audit §1 lens B-1 (pipeline)
■ **Decision:…
[Codex #3] Stage 3 code-edit verification - IMP-25 L5 audit §1 lens B-1 row candidate-file correction
Verified unit u1 against the Stage 2 scope lock.
Result:
- Correct. The only tracked diff is…
[Claude #3] Stage 3 code-edit — IMP-25 L5 audit §1 lens B-1 row candidate-file 칸 정정 (pipeline)
Executing unit: u1
■ unit_executed
- id: u1
- summary: Append indirect-surface qualifier to…
[Codex #2] Stage 2 simulation-plan review - IMP-25 audit lens B-1 pipeline qualifier
=== IMPLEMENTATION_UNITS ===
- id: u1 summary: Update docs/architecture/PHASE-Q-AUDIT.md row B-1 candidate-fi…
[Claude #2] Stage 2 simulation-plan — IMP-25 L5 audit §1 lens B-1 row candidate-file 칸 정정 (pipeline)
=== SCOPED AXES CHECKLIST (issue body) ===