이경민 Kyeongmin
  • Joined on 2025-12-30
Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 05:50:22 +09:00
IMP-04b Catalog extension to 32 frames

[Claude #10] Stage 2 simulation-plan IMP-04b Round #2

=== IMPLEMENTATION_UNITS === pre_flight_axes (READ before each Stage 3 unit; issue body Method): axis_1: src/phase_z2_mapper.py:97-104…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 05:36:56 +09:00
IMP-04b Catalog extension to 32 frames

[Codex #9] Stage 2 simulation-plan review IMP-04b Round #1

=== IMPLEMENTATION_UNITS === review_result: NO unit_size_check: PASS compact_body_check: PASS axis_coverage_check: FAIL baseline_test_che…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 05:30:56 +09:00
IMP-04b Catalog extension to 32 frames

[Claude #8] Stage 2 simulation-plan IMP-04b Round #1

=== IMPLEMENTATION_UNITS ===

  • {id: u1, summary: "21-row inventory {fid,frame#,tid,V4,group,partial,order,status,source_path}", files:…
Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 05:20:43 +09:00
IMP-04b Catalog extension to 32 frames

[Codex #8] Stage 2 simulation-plan review IMP-04b Round #2

=== IMPLEMENTATION_UNITS === review_result: NO unit_size_check: PASS compact_body_check: FAIL max_files_per_unit_seen: 2 max_estimate_lin…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 05:17:32 +09:00
IMP-04b Catalog extension to 32 frames

[Claude #9] Stage 2 simulation-plan IMP-04b — Round #2 (rewind R2 from Codex #6 NO)

Codex #6 blocking_gap = u11 deferred 12 TrackB instead of enumerating. Round #2 fix: ALL 12 TrackB enumerated…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 05:11:30 +09:00
IMP-04b Catalog extension to 32 frames

⚠️ [Orchestrator] Stage 2 FINAL_CONSENSUS: YES rejected: no - id: u<N> entry.

Requirements (strict):

  • === IMPLEMENTATION_UNITS === block with at least one - id: u<N> entry
  • Each unit…
Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 05:11:10 +09:00
IMP-04b Catalog extension to 32 frames

[Codex #7] Stage 2 simulation-plan review IMP-04b catalog extension Round #1

=== IMPLEMENTATION_UNITS === review_result: YES unit_size_check: PASS max_files_per_unit_seen: 2 max_estimate_lines_see…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 05:07:33 +09:00
IMP-04b Catalog extension to 32 frames

[Claude #8] Stage 2 simulation-plan IMP-04b — Round #7 (rewind R7)

Resolves Codex #6: (a) all 12 TrackB enumerated atomic (no deferral / PZ-4 shrink); (b) TrackB authored BEFORE index.html →…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 04:57:19 +09:00
IMP-04b Catalog extension to 32 frames

[Codex #6] Stage 2 simulation-plan review IMP-04b catalog extension Round #1

=== IMPLEMENTATION_UNITS === review_result: NO unit_size_check: PASS max_files_per_unit_seen: 2 max_estimate_lines_seen…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 04:54:30 +09:00
IMP-04b Catalog extension to 32 frames

[Claude #7] Stage 2 simulation-plan IMP-04b — Round #6 (rewind R6)

Resolves Codex #5: all 21 contracts as units; TrackB = contract-FIRST status:visual_pending + figma_source_path:null (Stage…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 04:23:13 +09:00
IMP-04b Catalog extension to 32 frames

[Codex #5] Stage 2 simulation-plan review IMP-04b catalog extension Round #1

=== IMPLEMENTATION_UNITS === reviewed_plan: units_present: [u1, u2, u3, u4, u5, u6, u7, u8, u9, u10, u11] …

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 04:20:55 +09:00
IMP-04b Catalog extension to 32 frames

[Claude #5] Stage 2 simulation-plan IMP-04b catalog extension — Round #1 (rewind R2)

Resolves Codex #4 gaps: (a) all 21 frames enumerated (TrackA 9 + TrackB 12), (b) TrackB sequencing locked =…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 04:11:44 +09:00
IMP-04b Catalog extension to 32 frames

[Codex #4] Stage 2 simulation-plan review IMP-04b catalog extension Round #1

=== IMPLEMENTATION_UNITS === reviewed_plan: units_present: [u1, u2, u3, u4, u5, u6, u7, u8, u9, u10, u11] …

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 04:07:29 +09:00
IMP-04b Catalog extension to 32 frames

[Claude #4] Stage 2 simulation-plan IMP-04b catalog extension — Round #1 (rewind)

Resolves Codex #3 gaps : (a) 1-commit = 1-contract (b) TrackB 4-layer detail (c) smoke_frame_render.py

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 03:57:58 +09:00
IMP-04b Catalog extension to 32 frames

[Codex #3] Stage 2 simulation-plan review IMP-04b catalog extension to 32 frames

=== IMPLEMENTATION_UNITS === reviewed_plan: units_present: [u1, u2, u3, u4, u5, u6, u7, u8, u9, u10] …

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 03:53:36 +09:00
IMP-04b Catalog extension to 32 frames

[Claude #3] Stage 2 simulation-plan — IMP-04b catalog extension to 32 frames

Scope (Stage 1 EXIT-locked): 21 uncontracted frames (Track A 9 index-present + Track B 12 visual-pending) + WIP 2…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 03:48:31 +09:00
IMP-04b Catalog extension to 32 frames

[Codex #2] Stage 1 problem-review verification - IMP-04b

Stage 1 is scope-locked with one mandatory correction to the issue body: remaining 21/32 is valid only as 9 Track A index-present inactive…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 03:44:48 +09:00
IMP-04b Catalog extension to 32 frames

[Claude #2] Stage 1 problem-review — IMP-04b catalog extension — Round #1 rewind response

Codex #1 rewind reason: issue body frame-count math (Track A 5 + Track B 12 + Track C 1 = 18) ≠…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 03:38:51 +09:00
IMP-04b Catalog extension to 32 frames

[Codex #1] Stage 1 problem-review verification - IMP-04b

Stage 1 is not scope-locked as written. Claude's pre-flight baseline is mostly verified, but the issue body contains a frame-count error…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#42 2026-05-21 03:35:44 +09:00
IMP-04b Catalog extension to 32 frames

[Claude #1] Stage 1 problem-review — IMP-04b catalog extension to 32 frames

📌 Stage 1 Round #1 — pre-flight 4-axis baseline + scope-lock proposal

=== PRE-FLIGHT 4-AXIS BASELINE READ ===