이경민 Kyeongmin
  • Joined on 2025-12-30
Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#9 2026-05-17 17:24:56 +09:00
IMP-09 B-4 다른 layout zone-geometry

Executing unit: u3

[Claude #5] Stage 3 Round #3 — unit u3 implemented.

unit_executed: u3

files_changed:

  • src/phase_z2_pipeline.py (+99 / -0) — adds _override_to_grid_tracks
Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#9 2026-05-17 17:21:19 +09:00
IMP-09 B-4 다른 layout zone-geometry

[Codex #4] Stage 3 Round #2 verification for unit u2: PASS.

The executed change is correctly scoped to the planned u2 default-path builder. The tracked diff now contains the previously verified…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#9 2026-05-17 17:19:52 +09:00
IMP-09 B-4 다른 layout zone-geometry

Executing unit: u2

[Claude #4] Stage 3 Round #2 — unit u2 implemented.

unit_executed: u2

files_changed:

  • src/phase_z2_pipeline.py (+55 / -0) — adds _build_grid_dynamic_2d
Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#9 2026-05-17 17:16:30 +09:00
IMP-09 B-4 다른 layout zone-geometry

[Codex #3] Stage 3 Round #1 verification for unit u1: PASS.

The executed change is correctly scoped to the planned u1 helper. The diff adds _aggregate_zone_signals_per_track(preset, zones_data)

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#9 2026-05-17 17:14:55 +09:00
IMP-09 B-4 다른 layout zone-geometry

Executing unit: u1

[Claude #3] Stage 3 Round #1 — unit u1 implemented.

unit_executed: u1

files_changed:

  • src/phase_z2_pipeline.py (+50 / -0)

diff_summary:

  • Added `aggregate
Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#9 2026-05-17 17:10:23 +09:00
IMP-09 B-4 다른 layout zone-geometry

[Codex #2]

Stage 2 verification result: plan is complete for IMP-09 B-4 PR 2.

I verified the issue-body axes against the current plan and repo state:

  • build_layout_css dispatch expansion…
Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#9 2026-05-17 17:08:16 +09:00
IMP-09 B-4 다른 layout zone-geometry

[Claude #2] Stage 2 plan — IMP-09 B-4 PR 2 (2-D dynamic preset families)

Axis coverage checklist (from issue body)

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#9 2026-05-17 17:00:04 +09:00
IMP-09 B-4 다른 layout zone-geometry

[Codex #1]

Stage 1 root-cause / scope-lock verification against local HEAD.

Finding: Claude's scope-lock is correct. The IMP-09 B-4 gap is in src/phase_z2_pipeline.py::build_layout_css, not in…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#9 2026-05-17 16:57:41 +09:00
IMP-09 B-4 다른 layout zone-geometry

[Claude #1] Stage 1: 문제 검토 Round #1 — scope-lock draft

Fresh against current HEAD = 201099e feat(IMP-09): PR 1. Working tree clean (git diff --stat HEAD = 0 lines for `src/phase_z2_pip…

Kyeongmin pushed to main at Kyeongmin/C.E.L_Slide_test2 2026-05-16 12:03:37 +09:00
201099e53b feat(IMP-09): PR 1 — col-axis solver + per-zone geometry mapper + retry gate
Kyeongmin closed issue Kyeongmin/C.E.L_Slide_test2#8 2026-05-16 10:21:27 +09:00
IMP-08 B-3 Sub-section drag drop
Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#8 2026-05-16 10:21:27 +09:00
IMP-08 B-3 Sub-section drag drop

Stage 6 검증 요약을 이슈 #8 에 코멘트 #18444 로 게시했습니다.

[오케스트레이터 요약] Stage 6: 검증 완료

이슈 목표 vs 구현 결과 원 issue intent 4 축 모두 1:1 매핑 충족 — sub-section…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#8 2026-05-16 10:21:15 +09:00
IMP-08 B-3 Sub-section drag drop

[오케스트레이터 요약] Stage 6: 검증 완료

■ 이슈 목표 vs 구현 결과 원 issue intent 4 축 모두 1:1 매핑 충족 — (1) section_id schema 확장 sub-section 단위 (03-1-sub-2 형식) → aligner…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#8 2026-05-16 10:20:09 +09:00
IMP-08 B-3 Sub-section drag drop

[Codex #1] Stage 6 final verification - commit-scope review

I re-read the original issue body and the full prior issue discussion before responding. The paged API result has 132 unique comments;…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#8 2026-05-16 10:17:08 +09:00
IMP-08 B-3 Sub-section drag drop

[Claude #1] Stage 6 — final verification (commit-scope, AS-IS vs TO-BE)

본 round = Stage 6 최종 검증. Stage 5 R1~R35 의 23-round 동일 close motion 끝나고, 새 Stage 6 prompt 가 verification scope…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#8 2026-05-16 10:13:10 +09:00
IMP-08 B-3 Sub-section drag drop

🔨 [오케스트레이터 요약] Stage 5: 실행 완료

■ 변경된 파일 목록 IMP-08 execution range HEAD~4..HEAD = 4 atomic commit, 6 파일.

  • a422d72 U1 — schema helper + V4 alias resolver 4 lookup…
Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#8 2026-05-16 10:11:44 +09:00
IMP-08 B-3 Sub-section drag drop

[Codex #35] Stage 5 Round 35 execution verification at HEAD 8f6cffc2a7cbfbacb5f6bdeda5ac4d6eaccb22cb

I read the issue body and prior comment chain before responding. The API reports 129…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#8 2026-05-16 10:09:15 +09:00
IMP-08 B-3 Sub-section drag drop

[Claude #27] Stage 5 R35 (relay #406) — state delta R34 → R35 = 0. code 0, plan 0, commit 0, push 0. 23rd identical close motion. Refusing further redundant relay per PZ-2 / RULE 0 / RULE…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#8 2026-05-16 06:49:09 +09:00
IMP-08 B-3 Sub-section drag drop

[Codex #34] Stage 5 Round 34 execution verification at HEAD 8f6cffc2a7cbfbacb5f6bdeda5ac4d6eaccb22cb

I read the prior issue discussion before responding. The paged comments API resolves to 127…

Kyeongmin commented on issue Kyeongmin/C.E.L_Slide_test2#8 2026-05-16 06:46:45 +09:00
IMP-08 B-3 Sub-section drag drop

[Claude #26] Stage 5 R34 (relay #405) — state delta R33 → R34 = 0. code 0, plan 0, commit 0, push 0. 22nd identical close motion. Refusing further re-print per PZ-2 / RULE 0 / RULE 10.

1.…