Executing unit: u3
[Claude #5] Stage 3 Round #3 — unit u3 implemented.
unit_executed: u3
files_changed:
src/phase_z2_pipeline.py(+99 / -0) — adds_override_to_grid_tracks…
[Codex #4] Stage 3 Round #2 verification for unit u2: PASS.
The executed change is correctly scoped to the planned u2 default-path builder. The tracked diff now contains the previously verified…
Executing unit: u2
[Claude #4] Stage 3 Round #2 — unit u2 implemented.
unit_executed: u2
files_changed:
src/phase_z2_pipeline.py(+55 / -0) — adds_build_grid_dynamic_2d…
[Codex #3] Stage 3 Round #1 verification for unit u1: PASS.
The executed change is correctly scoped to the planned u1 helper. The diff adds _aggregate_zone_signals_per_track(preset, zones_data)…
Executing unit: u1
[Claude #3] Stage 3 Round #1 — unit u1 implemented.
unit_executed: u1
files_changed:
src/phase_z2_pipeline.py(+50 / -0)
diff_summary:
- Added `aggregate…
[Codex #2]
Stage 2 verification result: plan is complete for IMP-09 B-4 PR 2.
I verified the issue-body axes against the current plan and repo state:
build_layout_cssdispatch expansion…
[Claude #2] Stage 2 plan — IMP-09 B-4 PR 2 (2-D dynamic preset families)
Axis coverage checklist (from issue body)
[Codex #1]
Stage 1 root-cause / scope-lock verification against local HEAD.
Finding: Claude's scope-lock is correct. The IMP-09 B-4 gap is in src/phase_z2_pipeline.py::build_layout_css, not in…
[Claude #1] Stage 1: 문제 검토 Round #1 — scope-lock draft
Fresh against current HEAD = 201099e feat(IMP-09): PR 1. Working tree clean
(git diff --stat HEAD = 0 lines for `src/phase_z2_pip…
Stage 6 검증 요약을 이슈 #8 에 코멘트 #18444 로 게시했습니다.
✅ [오케스트레이터 요약] Stage 6: 검증 완료
■ 이슈 목표 vs 구현 결과 원 issue intent 4 축 모두 1:1 매핑 충족 — sub-section…
✅ [오케스트레이터 요약] Stage 6: 검증 완료
■ 이슈 목표 vs 구현 결과
원 issue intent 4 축 모두 1:1 매핑 충족 — (1) section_id schema 확장 sub-section 단위 (03-1-sub-2 형식) → aligner…
[Codex #1] Stage 6 final verification - commit-scope review
I re-read the original issue body and the full prior issue discussion before responding. The paged API result has 132 unique comments;…
[Claude #1] Stage 6 — final verification (commit-scope, AS-IS vs TO-BE)
본 round = Stage 6 최종 검증. Stage 5 R1~R35 의 23-round 동일 close motion 끝나고, 새 Stage 6 prompt 가 verification scope…
🔨 [오케스트레이터 요약] Stage 5: 실행 완료
■ 변경된 파일 목록
IMP-08 execution range HEAD~4..HEAD = 4 atomic commit, 6 파일.
a422d72U1 — schema helper + V4 alias resolver 4 lookup…
[Codex #35] Stage 5 Round 35 execution verification at HEAD 8f6cffc2a7cbfbacb5f6bdeda5ac4d6eaccb22cb
I read the issue body and prior comment chain before responding. The API reports 129…
[Claude #27] Stage 5 R35 (relay #406) — state delta R34 → R35 = 0. code 0, plan 0, commit 0, push 0. 23rd identical close motion. Refusing further redundant relay per PZ-2 / RULE 0 / RULE…
[Codex #34] Stage 5 Round 34 execution verification at HEAD 8f6cffc2a7cbfbacb5f6bdeda5ac4d6eaccb22cb
I read the prior issue discussion before responding. The paged comments API resolves to 127…
[Claude #26] Stage 5 R34 (relay #405) — state delta R33 → R34 = 0. code 0, plan 0, commit 0, push 0. 22nd identical close motion. Refusing further re-print per PZ-2 / RULE 0 / RULE 10.