[Claude #2] Stage 2 simulation-plan - round 1 (post-rewind)
Axis enumeration (issue body, scope-locked at Stage 1)
[Codex #3] Stage 2 simulation-plan verification - round 2
Verdict: NO. The corrected frontend verification command is now right, but the implementation_units block is incomplete.
Blocker:
- u3…
[Claude #2] Stage 2 simulation-plan — Round #1 (re-attempt after Codex #2 NO rewind_target=stage_2_plan)
Rewind context
Codex #2 NO blocker (round 1): TypeScript verification command was…
[Codex #2] Stage 2 plan verification - round 1
Verdict: NO. The plan covers the scoped product axis and the implementation units are sized correctly, but the verification plan has a concrete…
📋 [Claude #2] Stage 2: 시뮬 기반 계획 수립 Round #1
1. Issue-body axis enumeration (full coverage)
[Codex #1] Stage 1 problem review + scope-lock verification (round 1)
Root cause verified: backend already emits step20_slide_status.json.data.filtered_section_ids and `step20_slide_status.json.…
[Claude #1] Stage 1 — problem review + scope-lock (round 1)
Root cause / current state
The backend already produces the artifact this issue wants exposed. The frontend already fetches it.…
[Codex #10] Stage 6 final independent verification
PASS. Close OK signal for issue #9.
I independently verified the Stage 6 close claims against the local repository and slide2 remote state. The…
[Claude #10] Stage 6 — 최종 확인 / close
📌 [오케스트레이터] Stage 6: 최종 확인 / close 완료
■ 핵심 결정
- IMP-09 PR 2 (2-D dynamic dispatch) Stage 6 PASS — issue #9 close 권고. -…
[Codex #9] Stage 5 push verification - PASS
I verified the commit/push facts for the Stage 5 report. The pushed Gitea target is slide2/main, and it resolves to the same commit as local HEAD:…
[Claude #9] Stage 5: 커밋 및 푸쉬 Round #1 — DONE
핵심 결과
- IMP-09 PR 2 (2-D dynamic dispatch) Stage 5 완료. 단일 commit으로 u1~u5 17 file bundle.
- Push target =
slide2(Gitea). origin…
[Codex #8] Stage 4 verification Round #1 - PASS
Decision: commit OK signal for IMP-09 PR 2. I independently re-ran the Stage 4 verification and the implementation satisfies the scoped contract.
S…
📌 [Claude #8] Stage 4: 테스트 및 검증 Round #1 — PASS
■ 핵심 결정
- IMP-09 PR 2 (2-D dynamic dispatch) Stage 4 PASS. Stage 3 산출물 (u1~u5) 검증 통과.
- 전체
tests= **104 passed / 0…
[Codex #7] Stage 3 Round #5 verification for unit u5: PASS.
The executed change is correctly scoped to the planned u5 lock-test retirement in tests/phase_z2/test_build_layout_css_pr1.py. The…
[Claude #7] Stage 3 Round #5 — unit u5 implemented.
unit_executed: u5
files_changed:
tests/phase_z2/test_build_layout_css_pr1.py(+8 / -8)
diff_summary:
- Renamed section…
[Codex #6] Stage 3 Round #4 verification for unit u4: PASS.
The executed change is correctly scoped to the planned u4 wiring and trace work in src/phase_z2_pipeline.py. The tracked target diff…
[Claude #6] Stage 3 Round #4 — unit u4 implemented.
unit_executed: u4
files_changed:
src/phase_z2_pipeline.py(net +21 / -6 from u4 alone; cumulative working tree +225 / -6…
[Codex #5] Stage 3 Round #3 verification for unit u3: PASS.
The executed change is correctly scoped to the planned u3 override-path builder. The tracked target diff now contains the previously…