kyeongmin
e60aacc3dc
docs(IMP-19): zone ratio reference + cross-link -- documented-axis close
Stage 5 commit for IMP-19 (gitea #19) — docs-only, no runtime surface.
- new: docs/architecture/IMP-19-ZONE-RATIO-REFERENCE.md (header + A1 consumer
+ A2 producer + A3 Phase Z solver delta + A4 IMP-09 boundary + A5
re-activation gate / GR1-GR4).
- update: PHASE-Z-IMPLEMENTATION-ISSUE-BACKLOG.md — IMP-19 row pending ->
documented + reference doc link; IMP-09 row carries soft back-link to the
IMP-19 reference doc.
- update: PHASE-Q-INSIGHT-TO-22STEP-MAP.md §3 I4 row — prepend IMP-19 anchor
+ reference doc link (step/classification preserved).
Guardrails (Stage 1/2 binding contract): src/ untouched, no role-based
["배경","본심"] hardcoding into Phase Z, IMP-09 solver ownership preserved,
soft-link integrity holds. IMP-19 remains dormant until the A5 gate fires.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-19 21:28:17 +09:00
..
2026-04-17 13:56:03 +09:00
2026-05-04 08:21:28 +09:00
2026-05-13 11:42:19 +09:00
2026-05-19 04:42:35 +09:00
2026-05-19 08:12:43 +09:00
2026-05-19 19:15:04 +09:00
2026-05-19 21:28:17 +09:00
2026-04-17 12:02:51 +09:00
2026-05-19 14:59:18 +09:00
2026-05-19 20:23:36 +09:00
2026-05-11 11:55:51 +09:00
2026-05-12 14:03:55 +09:00
2026-05-19 21:28:17 +09:00
2026-05-04 08:21:28 +09:00
2026-05-08 09:47:58 +09:00
2026-05-04 08:21:50 +09:00
2026-05-04 08:21:50 +09:00
2026-05-18 22:25:41 +09:00
2026-05-04 08:21:28 +09:00
2026-05-19 21:28:17 +09:00
2026-05-06 15:46:52 +09:00
2026-05-07 11:19:52 +09:00
2026-05-08 09:47:58 +09:00
2026-05-08 09:47:58 +09:00
2026-05-12 17:03:13 +09:00
2026-04-17 13:56:03 +09:00