Files
C.E.L_Slide_test2/docs
kyeongmin e60aacc3dc docs(IMP-19): zone ratio reference + cross-link -- documented-axis close
Stage 5 commit for IMP-19 (gitea #19) — docs-only, no runtime surface.

- new: docs/architecture/IMP-19-ZONE-RATIO-REFERENCE.md (header + A1 consumer
  + A2 producer + A3 Phase Z solver delta + A4 IMP-09 boundary + A5
  re-activation gate / GR1-GR4).
- update: PHASE-Z-IMPLEMENTATION-ISSUE-BACKLOG.md — IMP-19 row pending ->
  documented + reference doc link; IMP-09 row carries soft back-link to the
  IMP-19 reference doc.
- update: PHASE-Q-INSIGHT-TO-22STEP-MAP.md §3 I4 row — prepend IMP-19 anchor
  + reference doc link (step/classification preserved).

Guardrails (Stage 1/2 binding contract): src/ untouched, no role-based
["배경","본심"] hardcoding into Phase Z, IMP-09 solver ownership preserved,
soft-link integrity holds. IMP-19 remains dormant until the A5 gate fires.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-19 21:28:17 +09:00
..