ypshimandClaude Haiku 5.5 f37a0bf9ce fix(rebar): column heights Hc and h_cop from the model (Level underside, step top) instead of P1 constants
Hc = Level underside − footing top, and h_cop = step top at the column centre − Level underside. P1 gives 12703 and 2644,
unchanged. With taper h2 = 3000 the Level underside moves down, so Hc = 11203 and the P2 top (Level underside + l_d)
moves to 13039, while the P1 top stays at the step top (15147). The 3D and the 철근표 use the same heights.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-23 13:10:51 +09:00
S
Description
계획 모델링 성과품
106 MiB
0 Stars 14 Watchers 0 Forks
Languages
TypeScript 93%
CSS 3.3%
HTML 2.7%
JavaScript 0.9%