ypshimandClaude Haiku 5.5 26a5aff517 feat(ground): 하상 selectable; 설계홍수위 and 세굴 깊이 for 하상
- shape-options: a per-option "confirmed" flag; 하상 is confirmed, 해상 is not.
- The 위치 chips store the choice in the pier's draft; 선택 shows it.
- 하상: the groundwater inputs give way to 설계홍수위 DHWL (floodLevelEl) and
  세굴 깊이 (scourDepthM). The groundwater value is kept (남겨두기).
- Checks: G07 DHWL missing, G08 DHWL below the 지반고, G09 scour negative or
  the scour line below the footing bottom. The groundwater check is skipped for 하상.
- Section: the DHWL as a solid line and the 세굴선 dashed.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-26 11:06:10 +09:00
S
Description
계획 모델링 성과품
106 MiB
0 Stars 14 Watchers 0 Forks
Languages
TypeScript 93%
CSS 3.3%
HTML 2.7%
JavaScript 0.9%