CMPlanning/model/tunnel_skeleton_meta.json
T
Claude 56243b51a3 feat: axis-and-section skeleton GLB and three.js viewer (Task 7-8, skeleton LOD)
build_skeleton.py sweeps the confirmed standard section (R6982 inner, 300 mm
lining, R7402 excavation, crown 6.615 m above road) along the centreline for
4+745..5+480, road = 계획고, ground = 지반고 band. Walls and invert are
approximations and recorded in meta. Verified: inner radius identity, crown
height, chord length 799.9 m for 4+700..5+500. Viewer uses three.js 0.160.0.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01A5Cun3RHQKna9qxE6ybZ4A
2026-10-21 02:29:06 +00:00

33 lines
1.0 KiB
JSON

{
"model": "tunnel_skeleton.glb",
"scope": "4745~5480 (4+745~5+480)",
"units": "m",
"origin_plan_xy": [
151090.911,
483688.46
],
"sources": {
"centreline": "C0060302-001 CA-ALGN-STSM (side-tick midpoint)",
"road_grade_B": "C0060302-002 CR-TABL-TEX2 (계획고=노면)",
"GL_A": "C0060302-002 CR-TABL-TEX2 (지반고)",
"section": "C0060303-001 CS-TABL-TEX1/2, CS-CONC-MAJR, CS-EXCV"
},
"approximations": [
"walls vertical down to road; invert not modelled",
"lining band thickness at walls is radial-consistent but not as-built",
"centreline and grade linearly interpolated between nodes",
"superelevation sign convention assumed (z += S/100 * x, x = left of tangent)"
],
"layers": [
"lining_outer_R7282",
"lining_inner_R6982",
"excavation_R7402",
"road_surface_계획고",
"ground_GL_지반고"
],
"open": [
"4+700~4+745 and 5+480~5+500 excluded ([미확정])",
"pattern zones (03-003~008) pending Task 5",
"lining details (04-004~009) pending Task 6"
]
}