{ "model": "tunnel_skeleton.glb", "scope": "4745~5480 (4+745~5+480)", "units": "m", "origin_plan_xy": [ 151090.911, 483688.46 ], "sources": { "centreline": "C0060302-001 CA-ALGN-STSM (side-tick midpoint)", "road_grade_B": "C0060302-002 CR-TABL-TEX2 (계획고=노면)", "GL_A": "C0060302-002 CR-TABL-TEX2 (지반고)", "section": "C0060303-001 CS-TABL-TEX1/2, CS-CONC-MAJR, CS-EXCV" }, "approximations": [ "walls vertical down to road; invert not modelled", "lining band thickness at walls is radial-consistent but not as-built", "centreline and grade linearly interpolated between nodes", "superelevation sign convention assumed (z += S/100 * x, x = left of tangent)" ], "layers": [ "lining_outer_R7282", "lining_inner_R6982", "excavation_R7402", "road_surface_계획고", "ground_GL_지반고" ], "open": [ "4+700~4+745 and 5+480~5+500 excluded ([미확정])", "pattern zones (03-003~008) pending Task 5", "lining details (04-004~009) pending Task 6" ] }