⚠️ [Orchestrator] Stage 2 FINAL_CONSENSUS: YES rejected: unit with tests: [] (forbidden — implementation + tests = same unit).
Requirements (strict):
=== IMPLEMENTATION_UNITS ===…
[Codex #2] Stage 2 simulation-plan review - IMP-32 #41
=== IMPLEMENTATION_UNITS ===
- id: u1 summary: Add private _application_candidates_for_unit(unit) for V4 candidate to application_mode…
[Claude #2] Stage 2 simulation-plan — IMP-32 #41 helper extraction
=== IMPLEMENTATION_UNITS ===
- id: u1
summary: Add private helper
_application_candidates_for_unit(unit)returning…
[Codex #1] Stage 1 problem-review - IMP-32 Step 9 application_plan helper extraction
Scope-lock review result: Claude #1 root cause is confirmed, with one planning note below.
Verified facts: -…
[Claude #1] Stage 1 problem-review — IMP-32 Step 9 application_plan unit assembly helper extraction
Root cause
Step 9 application_plan per-unit dict assembly is currently inline inside…
[Codex #9] Stage 6 final-close verification - IMP-31 (#40)
Final-close verdict: PASS. The audit-only IMP-31 cycle is complete and #40 is OK to close.
Goal-result conformance verified:
- Commit…
[Claude #10] Stage 6 final-close — IMP-31 (#40)
📌 Stage 6 최종 확인 / close — Round #1
■ 핵심 결정
- IMP-31 (#40) audit-only cycle 완료. Goal (issue body 10 axis) ↔ Result (audit…
[Codex #8] Stage 5 commit-push verification - IMP-31 (#40)
Stage 5 verification result: PASS.
I verified the commit and both remote refs directly. Local main, origin/main, and slide2/main…
[Claude #9] Stage 5 commit-push — IMP-31 (#40) Round #1
📌 Stage 5: commit / push 완료
■ 핵심 결정
- Stage 4 PASS verdict 기준 (Claude #8 / Codex #7 doc-only PASS) 으로 단일 commit 생성 +…
[Codex #7] Stage 4 test-verify Round #1 - IMP-31 (#40)
Verdict: PASS. Proceed to Stage 5 commit/push is OK for the scoped doc-only changes.
Scope verified against the Stage 2/3 contracts: -…
[Claude #8] Stage 4 test-verify Round #1 — IMP-31 (#40) doc-only PASS
📌 Stage 4 verdict : PASS (proceed to Stage 5 push).
Plan ↔ diff conformance
Stage 2 lock = doc-only u1 + u2 +…
[Codex #6] Stage 3 code-edit verification - IMP-31 u3
unit_verified: u3
Verdict: u3 is correct and scope-locked. The backlog row now points IMP-17 readers to IMP-31 (#40) as the activation…
[Claude #7] Stage 3 code-edit Round #2 — IMP-31 (#40) u3 backlog + status-board cross-ref
Executing unit: u3
unit_executed
u3 — cross-reference the IMP-31 audit doc from the IMP-17 backlog…
[Codex #5] Stage 3 code-edit verification - IMP-31 u2
unit_verified: u2
Verdict: u2 is correct and scope-locked. The audit doc now cites the calculate_fit evidence precisely: `src/phase_z2_pipe…
[Claude #6] Stage 3 code-edit Round #1 (rewind retry) — IMP-31 (#40) u2 calculate_fit anchor fix
Executing unit: u2
unit_executed
u2 — docs/architecture/IMP-31-GATE-AUDIT.md. Fix Codex…
[Codex #4] Stage 3 code-edit verification - IMP-31 u2
unit_verified: u2
Verdict: u2 is incomplete. The new audit doc covers the planned IMP-31 gate audit surface and stays doc-only, but one…
[Claude #5] Stage 3 R2 code-edit — IMP-31 (#40) u2 gate audit doc
unit_executed
u2 — Create docs/architecture/IMP-31-GATE-AUDIT.md (new doc). Full issue-body axis verdict (A1A8 + C1C2) +…
[Codex #3] Stage 3 code-edit verification - IMP-31 u1
unit_verified: u1
Verdict: u1 is correct and scope-locked. The executed change updates only the stale IMP-17 route-hint anchor bullet in…