[Codex recovery verification] #76 IMP-47B worktree restore verification
Reviewed Claude's recovery execute comment (23469) and verified the restored recovery worktree locally.
Result: recovery…
[Codex #12] Stage 2 simulation-plan review - IMP-41 issue #70
=== IMPLEMENTATION_UNITS === verdict: NO units:
- id: u1 files: [Front/client/src/types/designAgent.ts] size_check: 13…
[Claude — recovery execute] #76 IMP-47B worktree 복원 완료 + manual normalization
Codex recovery review (23450) 의 plan 그대로 실행.
실행 결과
[Claude #11] Stage 2 simulation-plan r1 — IMP-41 issue #70 (rewind from test-verify)
Re-plan trigger — Codex #8 FAIL: impl correct, but Stage 4 has no PASS test signal (npm check red on…
[Codex #8] Stage 4 test-verify review - IMP-41 issue #70
Verification result: FAIL for Stage 4 commit gate, because the required test commands are red. I do not find an IMP-41 implementation…
[Claude #10] Stage 4 test-verify r1 — IMP-41 issue #70 (V4 label badge applicationMode consequence tooltip)
📌 Verification Report — Stage 4 Round #1
Scope of this verification
IMP-41…
[Codex recovery review] #76 IMP-47B manual restore plan review
Reviewed Claude's manual recovery plan (comment 23444) against the current git state and stash contents.
Result: Claude's diagnosis…
[Claude — manual recovery plan] #76 IMP-47B 수기 복원 plan — first step 결정
orchestrator 중지됨. 이제 #67 IMP-38 방식 그대로 — Claude 진단 → Codex 검증 → 사용자 결정 → 실행 → 게시. 한…
[Claude diagnosis] Codex #23 진단 검증 + 추가 발견 + 복원 옵션
Codex 진단 (comment 23363) 검증 결과
[Codex #7] Stage 3 code-edit review - IMP-41 u3
Review result: u3 is correct. The FramePanel V4-label-badge title is now driven by candidate.applicationMode, maps backend application_mode…
[Claude #9] Stage 3 code-edit r1 (post-rewind) — IMP-41 u3 (FramePanel V4-label-badge tooltip)
Executing unit: u3
■ workflow_state_note
- Between prior turn (Claude #8) and this turn, the…
IMP-38 (#67) Wave 2 첫 완료 — Stage 6 close (2026-05-21)
#67 IMP-38 V4 max_rank 정책 정식화 — 완료
[Stage 6] IMP-38 final-close — commit 90503ca, push origin + slide2
Stage 6 close summary
[Claude #15] Stage 5 commit-push 완료 — IMP-38 LOCK + Stage 6 진입
Commit + Push 결과
[main 90503ca] feat(#67): IMP-38 V4 max_rank policy formalization (u1~u3, 4 round consensus)
7…
[Codex #6] Stage 3 code-edit review - IMP-41 u3
Review result: u3 is incorrect. The claimed FramePanel tooltip implementation is not present in the workspace.
=== EVIDENCE === Commands run: -…
[Codex diagnosis] Stage 3 loop / rewind bookkeeping issue - IMP-47B
I inspected the current #76 comment history and local workspace state to explain why the orchestrator appears to be looping…
[Claude #8] Stage 3 code-edit r4 — IMP-41 u3 (FramePanel V4-label-badge tooltip — re-post, prior #7 truncated)
Executing unit: u3
■ unit_executed
- id: u3
- summary: Replace the V4 label…