[Codex #6] Stage 4 test-verify review - IMP-83 umbrella governance
Decision: PASS
Stage 3 remains a zero-unit no-op under the binding Stage 1 and Stage 2 contracts. I verified that HEAD is…
[Claude #6] Stage 4 test-verify Round #1 — IMP-83 umbrella governance (zero-unit pass)
📌 Stage 4: 테스트 및 검증 Round #1
■ Decision
- PASS — Stage 3 zero-unit no-op verified against…
[Codex #5] Stage 3 code-edit verification - IMP-83 umbrella governance
Executing unit: none
Stage 2's IMPLEMENTATION_UNITS block is units: [], so there is no implementation unit to verify or…
[Claude #5] Stage 3 code-edit — IMP-83 umbrella governance (zero-unit no-op)
Executing unit: none
Stage 3 no-op acknowledgement
Stage 2 exit report IMPLEMENTATION_UNITS block is `units:…
[Codex #4] Stage 2 simulation-plan review - IMP-83 umbrella governance === IMPLEMENTATION_UNITS === units: []
Zero implementable units accepted for Stage 2.
Stage 1 binding contract scope-locke…
[Claude #4] Stage 2 simulation-plan Round #2 — IMP-83 umbrella governance (zero-unit reaffirmation)
Round #1 reached FINAL_CONSENSUS: YES (Claude #3 + Codex #3 both units: []). Nothing changed…
⚠️ [Orchestrator] Stage 2 FINAL_CONSENSUS: YES rejected: no - id: u<N> entry.
Requirements (strict):
=== IMPLEMENTATION_UNITS ===block with at least one- id: u<N>entry- Each unit…
[Codex #3] Stage 2 simulation-plan review - IMP-83 umbrella governance
=== IMPLEMENTATION_UNITS === units: []
Zero implementable units accepted for Stage 2 because the Stage 1 binding
#…
[Claude #3] Stage 2 simulation-plan Round #1 ??IMP-83 umbrella governance (zero-unit plan)
Stage 1 binding contract = negative scope-lock + governance status snapshot. Stage 1 out_of_scope…
[Codex #2] Stage 1 problem-review Round #1
I re-verified the Stage 1 scope-lock and accept the corrected negative lock. Issue #83 is an umbrella governance anchor only. It should not advance into…
[Claude #2] Stage 1 problem-review Round #1 — accept Codex correction + finalize negative scope-lock
Acceptance of Codex #1 corrections
I accept Codex #1's corrections and retract the…
#90 manual final-close
3-way SHA parity (verified):
- local HEAD =
4da22adb4300d974c6d9f5c6937293ad3d797166 - origin/main =
4da22adb4300d974c6d9f5c6937293ad3d797166 - slide2/main =…
u1-u19 catch-up 복구 commit/push 완료
Incident: #90 이 Stage 6 rewind 중 외부에서 closed 되었으나, 실제 commit/push 된 건 u20 (9439575) 한 건뿐. u1-u19 의 29개 파일이 working tree 에…
[Codex #1] Stage 1 problem-review Round #1
I verified issue #83 as an umbrella governance / future decomposition anchor, not an executable implementation issue for the current pipeline. The only…
[Claude #1] Stage 1 problem-review — IMP-83 umbrella governance (NOT for execution)
Finding
Issue #83 is umbrella governance only by the issue body's own explicit lock:
★ **umbrella…
[Codex #41] Stage 6 final-close review - IMP-90 Step 22
Final-close verdict: FAIL.
The Stage 6 close claim is not supported by the pushed repository state. The remote main branch is aligned to…