[Claude #2] Stage 2 simulation-plan plan — IMP-84
=== AXIS_COVERAGE === Post-#92 amend, 2 production axes + 1 test-alignment axis:
- FramePanel reject window.confirm popup removal (FramePanel.ts…
[Codex #1] Stage 2 simulation-plan review - IMP-84
=== IMPLEMENTATION_UNITS === units:
- id: u1 summary: FramePanel handleFrameSelect removal of reject window.confirm; direct onFrameSelect(c…
[Claude #1] Stage 2 simulation-plan — IMP-#84 silent automation UI noise
=== COVERAGE CHECKLIST (every Stage-1 locked axis) ===
[Codex #4] Stage 1 problem-review IMP-84
Scope-lock verified against HEAD 4da22ad. The amended #84 scope is two implementation targets only: remove the reject-frame confirmation in `Front/client…
[Claude #4] Stage 1 problem-review — IMP-#84 silent-automation UI-noise removal (post-#92 amend)
📌 Evidence base
- HEAD:
4da22ad(main) - Amend reference: #92 commit
896f273(2026-05-23) —…
[Codex #32] Stage 6 final verify -- IMP-83 umbrella KEEP_OPEN terminal
Stage 6 independent verification result: PASS for the terminal umbrella disposition. I verify the Stage 2-5 binding contract…
[Claude #31] Stage 6 final close — IMP-83 umbrella, KEEP_OPEN terminal
📌 Stage 6 최종 확인 / close 결정
■ 핵심 결정
- DO NOT CLOSE. IMP-83 은 umbrella governance anchor —…
[Codex #30] Stage 5 commit-push verification - IMP-83 umbrella terminal path
Stage 5 verification confirms the no-source-change path. There is no commit to push, no staged change set, and HEAD…
[Claude #29] Stage 5 commit-push Round #1 — IMP-83 umbrella TERMINAL (no-source-change path)
Disposition
NO COMMIT, NO PUSH — Stage 2/3/4 binding contracts unanimously lock IMP-83 as a…
[Codex #28] Stage 4 test-verify review - IMP-83
PASS. I independently verified the Stage 2/3 binding contract for the IMP-83 umbrella terminal path. There is no tracked-source mutation under the…
[Claude #27] Stage 4 test-verify Round #1 — IMP-83 umbrella TERMINAL
📌 Stage 4: 테스트 및 검증 Round #1 — PASS (analyzer position)
Stage 2 binding contract (u1 = doc-only baseline at…
[Codex #26] Stage 3 code-edit review - IMP-83 no-op Round #3 verifier
Verified Claude #25 Round #3 against the Stage 2 binding contract and the prior completion result.
Verdict
Round #3 is…
[Claude #26] Stage 3 code-edit Round #4 — IMP-83 umbrella TERMINAL (all planned units complete; no-op acknowledgement)
status
- Stage 2 plan units:
[u1](single doc-only baseline…
⚠️ [Orchestrator] Stage 3 FINAL_CONSENSUS: YES requires a parseable line in the EVIDENCE block:
Remaining units: none (when all implementation_units complete)
Without this,…
[Codex #25] Stage 3 code-edit review - IMP-83 no-op Round #2 verifier
Verified Claude #24 Round #2 against the Stage 2 binding contract and prior Codex #23 completion result.
Verdict
Round…
[Claude #25] Stage 3 code-edit Round #3 — IMP-83 umbrella TERMINAL (all planned units complete; no-op acknowledgement)
status
- Stage 2 plan units:
[u1](single doc-only baseline…
[Claude #24] Stage 3 code-edit Round #2 — IMP-83 umbrella TERMINAL (all planned units complete; nothing to execute)
status
- Stage 2 plan units:
[u1](single doc-only baseline unit). -…
⚠️ [Orchestrator] Stage 3 FINAL_CONSENSUS: YES requires a parseable line in the EVIDENCE block:
Remaining units: none (when all implementation_units complete)
Without this,…
[Codex #23] Stage 3 code-edit review - IMP-83 u1 verifier
Verified the single executed unit u1 against the Stage 2 binding contract.
Verdict
u1 is complete and scope-correct.
- Created…