3.1 KiB
3.1 KiB
u1 — scope_lock (INTEGRATION-AUDIT-02 / Issue #56)
Binding Stage-1 artifact (close-evidence)
- path:
.orchestrator/tmp/issue7_comments_r3.json - size_bytes: 102144
- mtime_local: 2026-05-20 02:11:58 (KST, +09:00)
- mtime_utc: 2026-05-19T17:11:58Z
- close_trio_comment_ids: 17970, 19226, 19240
- fallback_check:
ls .orchestrator/issues/ | grep '^7_stage' | wc -l= 0 (no local exit-report fallback; this artifact is the sole binding evidence) - live_API_calls: 0 (Gitea live fetch is out-of-scope per Stage 1)
Mode
- audit-only (orchestrator P4/P4a)
- Stage 3 deterministically rejected if any forbidden surface is touched
- Stage 5 commit-push rejected if staged files fall outside the audit-allowed glob set
Forbidden writes (4 surfaces)
src/**— no runtime code changestemplates/**— no template changestests/**— no test changesdocs/architecture/IMP-16-U2-WIRING-DESIGN.md— direct edit forbidden (a separate doc-sync follow-up issue is the only allowed channel)
Allowed writes (2 surfaces)
- CREATE —
docs/architecture/INTEGRATION-AUDIT-02-REPORT.md- 7 sections (Exec / Evidence table / IMP-07 verdict / IMP-16-U2 deferred items / Backlog correction proposal / Follow-up recommendations / Final decision)
- body budget: <=8000 chars per Gitea stage comment; large evidence remains in this file
- must cite comment IDs 17970 / 19226 / 19240 + artifact path verbatim
- final decision: one of {BACKLOG_PATCH_ONLY, NEEDS_DOC_SYNC_FOLLOWUP, NEEDS_RUNTIME_FOLLOWUP}
- EDIT (line-scoped, status-cell only) —
docs/architecture/PHASE-Z-IMPLEMENTATION-ISSUE-BACKLOG.md- L51 IMP-07 row: status cell only —
implemented→documented:no-runtime - L67 IMP-16 row: status cell only —
implemented→documented:dormant - exactly 2 line changes total; no surrounding-section rewrites
- L51 IMP-07 row: status cell only —
Out-of-scope axes (explicit)
- reverse-path runtime implementation/activation (would require IMP-07 policy reopen — separate axis)
- Stage 0 normalizer integration (project lock 2026-05-08; see
project_phase_z_normalize_gap) - per-sample MDX optimization (RULE 0: pipeline-construction, not sample-passing)
- AI-driven MDX rewrite/compression (PZ-1: AI=0 normal; AI isolation contract
feedback_ai_isolation_contract) - live Gitea API fetch (saved artifact is binding per Stage 1)
- direct edit of
IMP-16-U2-WIRING-DESIGN.md(separate doc-sync follow-up axis) - auto-posting of follow-up issues (Section 6 of REPORT.md drafts text only)
Halt condition
If any forbidden surface is touched at any point in u1u7: HALT immediately, report scope breach, do not commit. This draft is the binding pre-flight checklist for u2u7.
Drafts (evidence-only, untracked)
The following .orchestrator/drafts/56_*.md files are evidence/work artifacts per RULE 6 — they are NOT staged for commit. Only INTEGRATION-AUDIT-02-REPORT.md and the BACKLOG.md L51/L67 lines are committed deliverables.
56_scope_lock.md(u1, this file)56_close_evidence.md(u2)56_code_grep.md(u3)56_imp16_deferred.md(u4)56_backlog_diff.md(u5)