Files
C.E.L_Slide_test2/.orchestrator/drafts/56_scope_lock.md
T

3.1 KiB

u1 — scope_lock (INTEGRATION-AUDIT-02 / Issue #56)

Binding Stage-1 artifact (close-evidence)

  • path: .orchestrator/tmp/issue7_comments_r3.json
  • size_bytes: 102144
  • mtime_local: 2026-05-20 02:11:58 (KST, +09:00)
  • mtime_utc: 2026-05-19T17:11:58Z
  • close_trio_comment_ids: 17970, 19226, 19240
  • fallback_check: ls .orchestrator/issues/ | grep '^7_stage' | wc -l = 0 (no local exit-report fallback; this artifact is the sole binding evidence)
  • live_API_calls: 0 (Gitea live fetch is out-of-scope per Stage 1)

Mode

  • audit-only (orchestrator P4/P4a)
  • Stage 3 deterministically rejected if any forbidden surface is touched
  • Stage 5 commit-push rejected if staged files fall outside the audit-allowed glob set

Forbidden writes (4 surfaces)

  1. src/** — no runtime code changes
  2. templates/** — no template changes
  3. tests/** — no test changes
  4. docs/architecture/IMP-16-U2-WIRING-DESIGN.md — direct edit forbidden (a separate doc-sync follow-up issue is the only allowed channel)

Allowed writes (2 surfaces)

  1. CREATE — docs/architecture/INTEGRATION-AUDIT-02-REPORT.md
    • 7 sections (Exec / Evidence table / IMP-07 verdict / IMP-16-U2 deferred items / Backlog correction proposal / Follow-up recommendations / Final decision)
    • body budget: <=8000 chars per Gitea stage comment; large evidence remains in this file
    • must cite comment IDs 17970 / 19226 / 19240 + artifact path verbatim
    • final decision: one of {BACKLOG_PATCH_ONLY, NEEDS_DOC_SYNC_FOLLOWUP, NEEDS_RUNTIME_FOLLOWUP}
  2. EDIT (line-scoped, status-cell only) — docs/architecture/PHASE-Z-IMPLEMENTATION-ISSUE-BACKLOG.md
    • L51 IMP-07 row: status cell only — implementeddocumented:no-runtime
    • L67 IMP-16 row: status cell only — implementeddocumented:dormant
    • exactly 2 line changes total; no surrounding-section rewrites

Out-of-scope axes (explicit)

  • reverse-path runtime implementation/activation (would require IMP-07 policy reopen — separate axis)
  • Stage 0 normalizer integration (project lock 2026-05-08; see project_phase_z_normalize_gap)
  • per-sample MDX optimization (RULE 0: pipeline-construction, not sample-passing)
  • AI-driven MDX rewrite/compression (PZ-1: AI=0 normal; AI isolation contract feedback_ai_isolation_contract)
  • live Gitea API fetch (saved artifact is binding per Stage 1)
  • direct edit of IMP-16-U2-WIRING-DESIGN.md (separate doc-sync follow-up axis)
  • auto-posting of follow-up issues (Section 6 of REPORT.md drafts text only)

Halt condition

If any forbidden surface is touched at any point in u1u7: HALT immediately, report scope breach, do not commit. This draft is the binding pre-flight checklist for u2u7.

Drafts (evidence-only, untracked)

The following .orchestrator/drafts/56_*.md files are evidence/work artifacts per RULE 6 — they are NOT staged for commit. Only INTEGRATION-AUDIT-02-REPORT.md and the BACKLOG.md L51/L67 lines are committed deliverables.

  • 56_scope_lock.md (u1, this file)
  • 56_close_evidence.md (u2)
  • 56_code_grep.md (u3)
  • 56_imp16_deferred.md (u4)
  • 56_backlog_diff.md (u5)