Files
C.E.L_Slide_test2/templates/phase_z2
kyeongmin 8f06a4c99f docs(IMP-52): reconcile Phase Z family count drift -- F-2 option (c)
Audit follow-up F-2 (INTEGRATION-AUDIT-01 §10.2). Phase Z families surface
showed 11 tracked / 11 contracted / 13 on disk. The 2 untracked WIP files
(app_sw_package_vs_solution.html, pre_construction_model_info_stacked.html)
are now declared in _WIP_FILES.md as uncontracted and out-of-scope for the
runtime matcher; promote/remove is gated on #42. The 11/11 tracked +
contracted baseline is unchanged. A new pytest enforces tracked families ↔
frame_contracts.yaml set-equality modulo the WIP allowlist parsed from
_WIP_FILES.md, so future drift fails fast in CI before #42 expands to 32
frames.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-19 19:15:04 +09:00
..