Some checks failed
Multi-MDX Regression (IMP-91) / multi-mdx-regression (push) Failing after 20s
u1: text_overrides axis in user_overrides_io u2: structure_overrides axis in user_overrides_io u3: vite allowlist for new endpoints u4: text_override_resolver u5: Step 12 text_overrides apply in phase_z2_pipeline u6: structure_override_resolver u7: text_path_stamper u8: SlideCanvas text-edit capture u9: SlideCanvas structure-edit overlay u10: userOverridesApi service extension u11: designAgent types extension u12: slidePlanUtils restore u13: user_overrides endpoint tests u14: user_overrides restore tests u15: pipeline fallback tests u16: edit-mode state + gating tests u17: slide_base print mode CSS u18: /api/connect endpoint (vite) u19: /api/export endpoint (vite) Recovery scope: 29 files (12 modified + 17 new). u20 already pushed in 9439575; this commit lands u1-u19 that were authored but not committed before #90 was externally closed. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
12 KiB
12 KiB