Revert "docs(IMP-04): clarify matrix tracks and review gates"
This reverts commit 6d338846b2.
This commit is contained in:
@@ -66,14 +66,12 @@
|
||||
|
||||
## §2. ACTIVE 4 frames (이미 Phase Z 등록)
|
||||
|
||||
| template_id | frame_id | fn | family / layout | builder | resource status (A/T/I/F/S) | partial |
|
||||
|---|---|---|---|---|---|---|
|
||||
| `three_parallel_requirements` | 1171281190 | 13 | list / 3-column | `items_with_role` + `pillar_item` | A T I F - | `f13b` (157 lines) |
|
||||
| `process_product_two_way` | 1171281210 | 29 | compare / banner-top-2col-bottom | `process_product_pair` | A T I F S | `f29b` (294 lines) |
|
||||
| `bim_issues_quadrant_four` | 1171281193 | 16 | cards / quadrant-4 | `quadrant_flat_slots` + `quadrant_item` | A T I F S | `f16b` (223 lines) |
|
||||
| `three_persona_benefits` | 1171281191 | 14 | cards / persona-3col | `items_with_role` + `quadrant_item` | A T I F S | `f14b` (110 lines, **refinement 필요** — index.html base 안 씀) |
|
||||
|
||||
> Clarification: ACTIVE means catalog-registered / runtime-active. It does not mean every active frame is `A+T+I+F+S` resource-complete. F13 is active but has no `assets/` directory.
|
||||
| template_id | frame_id | fn | family / layout | builder | partial |
|
||||
|---|---|---|---|---|---|
|
||||
| `three_parallel_requirements` | 1171281190 | 13 | list / 3-column | `items_with_role` + `pillar_item` | `f13b` (157 lines) |
|
||||
| `process_product_two_way` | 1171281210 | 29 | compare / banner-top-2col-bottom | `process_product_pair` | `f29b` (294 lines) |
|
||||
| `bim_issues_quadrant_four` | 1171281193 | 16 | cards / quadrant-4 | `quadrant_flat_slots` + `quadrant_item` | `f16b` (223 lines) |
|
||||
| `three_persona_benefits` | 1171281191 | 14 | cards / persona-3col | `items_with_role` + `quadrant_item` | `f14b` (110 lines, **refinement 필요** — index.html base 안 씀) |
|
||||
|
||||
---
|
||||
|
||||
@@ -131,8 +129,6 @@
|
||||
|
||||
priority 진행 순서 (자체 추천 — V4 신호 ↑ 순서) :
|
||||
|
||||
> Clarification: this priority list is an execution ordering, not a scope filter. All 16 reusable-now frames remain activation targets. The 11 weaker-V4-signal frames are still in scope; they are not dropped or deprioritized out of IMP-04. After the first refinement is reviewed, builder-family grouping may be used as secondary ordering when it reduces churn safely.
|
||||
|
||||
1. **`three_persona_benefits` refinement** (active 1, V4 use_as_is=1) — index.html base 재작성
|
||||
2. `dx_sw_necessity_three_perspectives` (LE=2 가장 높음, persona builder 재사용 가능)
|
||||
3. `construction_goals_three_circle_intersection` (UAI=1+LE=1+RS=1, V4 신호 강함, 단 새 builder 필요 — cycle-intersect)
|
||||
@@ -140,28 +136,15 @@ priority 진행 순서 (자체 추천 — V4 신호 ↑ 순서) :
|
||||
5. `bim_dx_comparison_table` (UAI=1, 새 builder — compare_table_2col)
|
||||
6. 잔여 11 reusable-now (V4 신호 0 — 단순 catalog 확보 목적, 진행 순서 임의)
|
||||
|
||||
Codex review granularity:
|
||||
|
||||
- Required: first refinement (`three_persona_benefits`), any new builder pattern, ambiguous mapping, and shared catalog/builder logic.
|
||||
- Allowed later: small grouped commits for low-risk repeated frames only after the pattern is proven by prior review.
|
||||
|
||||
Calibration failure modes for the first refinement:
|
||||
|
||||
- F1 small styling/wording issue: same-frame follow-up commit, then Codex re-review.
|
||||
- F2 approach-level problem: pause Track A, run an approach re-lock round, then retry refinement.
|
||||
- F3 scope/resource problem: reopen the relevant scope/resource axis, possibly route to IMP-04b, and block bulk activation until resolved.
|
||||
|
||||
These are review escalation paths, not an extra pre-implementation gate.
|
||||
|
||||
### Track B — visual-pending 12 frames
|
||||
|
||||
option (a/b/c) 결정 필요 (user 확인) :
|
||||
|
||||
- **(a)** figma_to_html agent 재실행 → 별 issue (IMP-04b "visual extraction")
|
||||
- **(b)** analysis.md + texts.md 만으로 minimal CSS partial 작성 (시각 디테일 손실 인정). Main path X; only an explicit temporary placeholder if separately approved.
|
||||
- **(c)** 본 issue 의 즉시 활성 범위는 visual base 있는 16 frame 으로 진행. 12 frame 은 IMP-04b 별 axis 에서 visual base 확보 후 활성.
|
||||
- **(b)** analysis.md + texts.md 만으로 minimal CSS partial 작성 (시각 디테일 손실 인정)
|
||||
- **(c)** 본 issue scope 외 — IMP-04b 로 분리, 본 issue 는 16 frame 만 활성
|
||||
|
||||
자체 추천 = **(c)** — Track B 는 exclusion / discard / scope reduction 이 아님. 12 visual-pending frames remain inside the 32-frame scope; only the visual-resource acquisition timing moves to a separate axis. scope 명확 + 진행 속도 ↑.
|
||||
자체 추천 = **(c)** — 본 issue 는 *visual base 있는 frame* 만 활성. 12 missing 은 별 axis. scope 명확 + 진행 속도 ↑.
|
||||
|
||||
### Track C — Matching schema canonical decision (Codex #15340)
|
||||
|
||||
@@ -224,7 +207,7 @@ option (a/b/c) 결정 필요 (user 확인) :
|
||||
|
||||
| status | count | template_ids |
|
||||
|---|---|---|
|
||||
| Full (A+T+I+F+S) | 19 | (16 reusable-now + active 4 중 3; F13 active lacks assets) |
|
||||
| Full (A+T+I+F+S) | 19 | (16 reusable-now 중 15 + active 4 중 4) |
|
||||
| index 있음, assets 없음 | 1 | `three_parallel_requirements` (F13 active) |
|
||||
| A+T+F (index 부재) | 1 | `sw_dependency_four_problems` (visual-pending, flat 만 있음) |
|
||||
| A+T (visual 모두 부재) | 11 | 위 §3.2 의 나머지 11 visual-pending |
|
||||
|
||||
Reference in New Issue
Block a user