untracked files on main: dceb101 feat(#63): IMP-34 R1 donor capacity measured bound (u1+u2)

This commit is contained in:
2026-05-21 22:07:41 +09:00
commit 8f085a28d3
3220 changed files with 985495 additions and 0 deletions
+60
View File
@@ -0,0 +1,60 @@
# u1 — scope_lock (INTEGRATION-AUDIT-02 / Issue #56)
## Binding Stage-1 artifact (close-evidence)
- path: `.orchestrator/tmp/issue7_comments_r3.json`
- size_bytes: 102144
- mtime_local: 2026-05-20 02:11:58 (KST, +09:00)
- mtime_utc: 2026-05-19T17:11:58Z
- close_trio_comment_ids: 17970, 19226, 19240
- fallback_check: `ls .orchestrator/issues/ | grep '^7_stage' | wc -l` = 0 (no local exit-report fallback; this artifact is the sole binding evidence)
- live_API_calls: 0 (Gitea live fetch is out-of-scope per Stage 1)
## Mode
- audit-only (orchestrator P4/P4a)
- Stage 3 deterministically rejected if any forbidden surface is touched
- Stage 5 commit-push rejected if staged files fall outside the audit-allowed glob set
## Forbidden writes (4 surfaces)
1. `src/**` — no runtime code changes
2. `templates/**` — no template changes
3. `tests/**` — no test changes
4. `docs/architecture/IMP-16-U2-WIRING-DESIGN.md` — direct edit forbidden (a separate doc-sync follow-up issue is the only allowed channel)
## Allowed writes (2 surfaces)
1. CREATE — `docs/architecture/INTEGRATION-AUDIT-02-REPORT.md`
- 7 sections (Exec / Evidence table / IMP-07 verdict / IMP-16-U2 deferred items / Backlog correction proposal / Follow-up recommendations / Final decision)
- body budget: <=8000 chars per Gitea stage comment; large evidence remains in this file
- must cite comment IDs 17970 / 19226 / 19240 + artifact path verbatim
- final decision: one of {BACKLOG_PATCH_ONLY, NEEDS_DOC_SYNC_FOLLOWUP, NEEDS_RUNTIME_FOLLOWUP}
2. EDIT (line-scoped, status-cell only) — `docs/architecture/PHASE-Z-IMPLEMENTATION-ISSUE-BACKLOG.md`
- L51 IMP-07 row: status cell only — `implemented``documented:no-runtime`
- L67 IMP-16 row: status cell only — `implemented``documented:dormant`
- exactly 2 line changes total; no surrounding-section rewrites
## Out-of-scope axes (explicit)
- reverse-path runtime implementation/activation (would require IMP-07 policy reopen — separate axis)
- Stage 0 normalizer integration (project lock 2026-05-08; see `project_phase_z_normalize_gap`)
- per-sample MDX optimization (RULE 0: pipeline-construction, not sample-passing)
- AI-driven MDX rewrite/compression (PZ-1: AI=0 normal; AI isolation contract `feedback_ai_isolation_contract`)
- live Gitea API fetch (saved artifact is binding per Stage 1)
- direct edit of `IMP-16-U2-WIRING-DESIGN.md` (separate doc-sync follow-up axis)
- auto-posting of follow-up issues (Section 6 of REPORT.md drafts text only)
## Halt condition
If any forbidden surface is touched at any point in u1~u7: HALT immediately, report scope breach, do not commit. This draft is the binding pre-flight checklist for u2~u7.
## Drafts (evidence-only, untracked)
The following `.orchestrator/drafts/56_*.md` files are evidence/work artifacts per RULE 6 — they are NOT staged for commit. Only `INTEGRATION-AUDIT-02-REPORT.md` and the BACKLOG.md L51/L67 lines are committed deliverables.
- `56_scope_lock.md` (u1, this file)
- `56_close_evidence.md` (u2)
- `56_code_grep.md` (u3)
- `56_imp16_deferred.md` (u4)
- `56_backlog_diff.md` (u5)