MemberNo,EntryTime,EntryPCode,EntryJobCode,EntryJob,LeaveTime,LeavePCode,LeaveJobCode,LeaveJob,OverTime,ConnectIP,OverWorkIP,EndWorkIP,SortKey,Note,modify,ConfirmDate
|
|
J07202,"2019-01-02 06:15:00",16-제조-04,b.기계,"산외교 Pre-Deck 반력대 조립","2019-01-03 07:16:00",16-제조-04,b.기계,"산외교 Pre-Deck 반력대 조립","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-01-02 06:32:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-01-02 07:04:00",17-시공-07,g.기타,"주천1교 인장계획서 작성","2019-01-02 18:10:00",17-시공-07,g.기타,"주천1교 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J13308,"2019-01-02 07:22:00",18-시공-15,b.시공,"1. 12월 기성내역서 제출
|
|
2. 왕림교 보수계획서 작성","2019-01-02 18:21:00",18-시공-15,b.시공,"1. 12월 기성내역서 제출
|
|
2. 왕림교 보수계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18202,"2019-01-02 07:22:00",07-교영-01,b.시공사,"새만금대교, 웅천~소호, 용상교리 현황 파악","2019-01-02 18:10:00",07-교영-01,b.시공사,"새만금대교, 웅천~소호, 용상교리 현황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
J14308,"2019-01-02 07:26:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-02 21:44:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-02 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
T04204,"2019-01-02 07:28:00",16-제조-02,a.생산관리," 원흥2교 가공,점접 철근 생산, 산외교 등 프리덱 가로보 철근가공 생산","2019-01-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09102,"2019-01-02 07:32:00",19-영업-01,b.시공사,"2019년 예상 수주&매출 분석 등 : 군장산단 철도교 외 5개교 계약 추진 중","2019-01-02 18:10:00",19-영업-01,b.시공사,"2019년 예상 수주&매출 분석 등 : 군장산단 철도교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
M02302,"2019-01-02 07:32:00",16-제조-02,a.생산관리,"시무식 및 생산라인 점검","2019-01-02 18:08:00",16-제조-02,a.생산관리,"생산2팀 생산관리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"16-제조-02<|>a.생산관리<|>시무식 및 안전기원제<|>01:00<|><br>16-제조-02<|>a.생산관리<|>공장 생산라인 점검 및 협의<|>04:00<|><br>16-제조-02<|>a.생산관리<|>Pre-Deck 철근 상세 검토 및 협의<|>03:00<|><br>",,
|
|
J18208,"2019-01-02 07:35:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-02 20:34:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-02 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-01-02 07:40:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","2019-01-02 18:11:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-01-02 07:48:00",18-시공-03,b.시공,"왕림교 솔 플레이트 설치오류 시공방안 설명","2019-01-02 18:06:00",18-시공-03,b.시공,"왕림교 솔 플레이트 설치오류 시공방안 설명","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
B15306,"2019-01-02 07:56:00",18-관리-02,e.기타,"비서업무 외","2019-01-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18204,"2019-01-02 08:03:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","2019-01-02 18:09:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J10313,"2019-01-02 08:05:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-01-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J18206,"2019-01-02 08:06:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-02 18:08:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J15202,"2019-01-02 08:14:00",18-설계-19,b.구조계산,"도림천교 구조계산","2019-01-02 18:05:00",18-설계-19,b.구조계산,"도림천교 구조계산","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J11305,"2019-01-02 08:15:00",18-시공-03,g.기타,"솔플레이트 검토서","2019-01-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C8,,,
|
|
J15307,"2019-01-02 08:17:00",18-교영-01,d.기타,"1. 충청내륙고속화 4공구 특정공법심의 견적
|
|
2. 황강 죽고지구 특정공법심의 견적
|
|
3. 산외교 Pre-Deck Shop Drawing","2019-01-02 18:05:00",18-교영-01,d.기타,"1. 충청내륙고속화 4공구 특정공법심의 견적
|
|
2. 황강 죽고지구 특정공법시의 견적
|
|
3. 산외교 Pre-Deck Shop Drawing","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J14306,"2019-01-02 08:19:00",18-관리-04,a.계약,"계약, 인사 외","2019-01-02 18:07:00",18-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J08201,"2019-01-02 08:21:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","2019-01-02 18:20:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11203,"2019-01-02 08:21:00",18-설계-19,b.구조계산,"대콘 교량3개 거더응력 계산서작성
|
|
","2019-01-02 18:04:00",18-설계-19,b.구조계산,"대콘 교량3개 거더응력 계산서작성
|
|
","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>c.도면<|>R-F1교 55m거더 강선 간섭검토<|>01:30<|><br>",,
|
|
J10301,"2019-01-02 08:21:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-02 18:14:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-01-02 08:23:00",18-설계-19,b.구조계산,"전동교 구조계산","2019-01-02 18:16:00",18-설계-19,b.구조계산,"전동교 구조계산","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J11202,"2019-01-02 08:23:00",18-시공-11,b.시공,공사관리,"2019-01-02 18:15:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15201,"2019-01-02 08:24:00",18-교영-30,c.설계사,"업무협의 및 대림산업 보고자료 작성 협의","2019-01-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J15302,"2019-01-02 08:26:00",18-설계-19,c.도면,거더도면작업,"2019-01-02 18:07:00",18-설계-19,c.도면,거더도면작업,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J09101,"2019-01-02 08:28:00",18-교영-01,c.설계사,과업진행상황조사,"2019-01-02 18:08:00",18-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15301,"2019-01-02 08:29:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
주요자재 거래명세표 검토
|
|
주천1교 시편 발송
|
|
주천1교 하도급지킴이 기성 청구서 작성
|
|
현장 정산서 작성
|
|
","2019-01-02 18:58:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
주요자재 거래명세표 검토
|
|
주천1교 시편 발송
|
|
주천1교 하도급지킴이 기성 청구서 작성
|
|
현장 정산서 작성
|
|
","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14201,"2019-01-02 08:30:00",17-시공-13,b.시공,업무시작,"2019-01-02 18:08:00",17-시공-13,b.시공,업무시작,"0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004E1,,,
|
|
J10314,"2019-01-02 08:30:00",14-교영-00,d.기타,"공릉천교외7개소(김포~파주) 시행견적서,
|
|
업체별 거더 공사비 (설계가) 검토자료","2019-01-02 18:07:00",14-교영-00,d.기타,"업체별 거더 공사비 (설계가) 검토자료,
|
|
공릉천교외7개소(김포~파주) 시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14302,"2019-01-02 08:30:00",17-시공-10,b.시공,"현장투입 준비작업","2019-01-02 18:02:00",17-시공-10,b.시공,"현장투입 준비작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004E2,,,
|
|
J07103,"2019-01-02 08:32:00",18-교영-01,d.기타,사업관리,"2019-01-02 18:09:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J17205,"2019-01-02 08:34:00",18-교영-01,c.설계사,.,"2019-01-02 18:11:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18205,"2019-01-02 08:34:00",18-설계-18,g.업무지원,"구조계산서 작성","2019-01-02 21:35:00",18-설계-18,g.업무지원,"구조계산서 작성","2019-01-02 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J07210,"2019-01-02 08:35:00",16-시공-20,g.기타,"당초 변경","2019-01-02 18:06:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J15305,"2019-01-02 08:41:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-02 21:32:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-02 18:31:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J16202,"2019-01-02 08:42:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-02 18:19:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14101,"2019-01-02 08:50:00",16-시공-20,출장,한양,"2019-01-02 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-01-03 06:10:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-01-03 07:16:00",16-제조-04,b.기계,"산외교 Pre-Deck 반력대 조립","2019-01-04 07:16:00",16-제조-04,b.기계,"산외교 Pre-Deck 반력대 조립","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-01-03 07:19:00",18-시공-15,b.시공,"1. 북수원1교 앵커 설치 도면 작성(빔런처 검토)
|
|
2. 12월 기성 내역서 작성 및 2019년 매출계획 작성","2019-01-03 18:08:00",18-시공-15,b.시공,"1. 북수원1교 앵커 설치 도면 작성(빔런처 검토)
|
|
2. 12월 기성 내역서 작성 및 2019년 매출계획 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J11302,"2019-01-03 07:22:00",17-시공-07,g.기타," 시화 JCT 가도 및 가설검토","2019-01-03 18:12:00",17-시공-07,g.기타," 시화 JCT 가도 및 가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J14308,"2019-01-03 07:30:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-03 23:06:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-03 18:54:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J16203,"2019-01-03 07:32:00",16-제조-02,a.생산관리,"주천1교, 산외교 ,데크생산 및 품질관리","2019-01-03 23:56:00",16-제조-02,a.생산관리,"주천1교, 산외교 ,데크생산 및 품질관리","2019-01-03 19:35:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18202,"2019-01-03 07:34:00",07-교영-01,b.시공사,"새만금대교, 웅천~소호, 용상교리 현황 파악","2019-01-03 18:05:00",07-교영-01,b.시공사,"새만금대교, 웅천~소호, 용상교리 현황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
J18207,"2019-01-03 07:36:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","2019-01-03 18:07:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18208,"2019-01-03 07:38:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-03 22:57:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-03 18:54:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-01-03 07:38:00",16-제조-02,a.생산관리," 원흥2교 가공,점접 철근 생산, 산외교 등 프리덱 가로보 철근가공 생산","2019-01-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-01-03 07:42:00",16-제조-02,a.생산관리,"Pre-Deck 생산 및 설비 검토","2019-01-03 20:34:00",16-제조-02,a.생산관리,"Pre-Deck 생산 및 설비 검토","2019-01-03 19:05:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"16-제조-02<|>a.생산관리<|>Cantilever Pre-Deck 철근상세 검토 및 생산협의<|>03:00<|><br>16-제조-02<|>a.생산관리<|>Dr Girder Shop Dwg. 검토 및 수정<|>03:00<|><br>16-제조-02<|>a.생산관리<|>반력대 제작 현장 협의<|>00:30<|><br>",1,
|
|
J09102,"2019-01-03 07:42:00",19-영업-01,b.시공사,"2018년 경영 실적 및 2019년 예상 수주&매출 분석 등 : 군장산단 철도교 외 5개교 계약 추진 중","2019-01-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
B15306,"2019-01-03 07:57:00",18-관리-02,e.기타,"비서업무 외","2019-01-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10315,"2019-01-03 07:58:00",18-설계-12,e.검토,가설검토,"2019-01-03 18:09:00",18-설계-12,e.검토,가설검토,"0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18206,"2019-01-03 07:59:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-03 18:14:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J11305,"2019-01-03 08:03:00",18-시공-03,g.기타,"솔플레이트 검토서","2019-01-03 18:03:00",18-시공-03,g.기타,"솔플레이트 검토서","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J18204,"2019-01-03 08:04:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","2019-01-03 18:08:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J14306,"2019-01-03 08:18:00",18-관리-04,a.계약,"계약, 인사 외","2019-01-03 18:27:00",18-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J15307,"2019-01-03 08:19:00",18-교영-01,d.기타,"1. 황강 죽고지구 특정공법심의 견적
|
|
","2019-01-03 18:04:00",18-교영-01,d.기타,"1. 황강 죽고지구 특정공법시의 견적
|
|
","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J10301,"2019-01-03 08:20:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-03 18:20:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-01-03 08:23:00",18-설계-19,b.구조계산,"도림천교 구조계산","2019-01-03 20:46:00",18-설계-19,b.구조계산,"도림천교 구조계산","2019-01-03 18:32:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10314,"2019-01-03 08:25:00",14-교영-00,d.기타,"개략공사비 검토,
|
|
거더 공사비 업체별 검토자료,
|
|
공릉천교외7개소(김포~파주) 시행견적서","2019-01-03 18:04:00",14-교영-00,d.기타,"거더 공사비 업체별 검토자료,
|
|
개략공사비 검토,
|
|
공릉천교외7개소(김포~파주) 시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15302,"2019-01-03 08:26:00",18-설계-19,c.도면,거더도면작업,"2019-01-03 18:03:00",18-설계-19,c.도면,거더도면작업,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J08201,"2019-01-03 08:26:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","2019-01-03 12:02:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J16202,"2019-01-03 08:28:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-03 18:13:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J13201,"2019-01-03 08:28:00",18-설계-19,b.구조계산,"DR거더 구조설계보고서 작성","2019-01-03 18:22:00",18-설계-19,b.구조계산,"DR거더 구조설계보고서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J10313,"2019-01-03 08:29:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-01-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15301,"2019-01-03 08:30:00",16-시공-20,b.시공,"감이교 하도급지킴이 기성 청구서 작성
|
|
산외교 정산서 작성
|
|
현장 정산서 작성","2019-01-03 18:09:00",16-시공-20,b.시공,"감이교 하도급지킴이 기성 청구서 작성
|
|
산외교 정산서 작성
|
|
현장 정산서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-01-03 08:30:00",18-교영-01,c.설계사,과업진행상황조사,"2019-01-03 18:02:00",18-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J18205,"2019-01-03 08:34:00",18-설계-18,g.업무지원,"구조계산서 작성","2019-01-03 21:41:00",18-설계-18,g.업무지원,"구조계산서 작성","2019-01-03 18:35:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J15305,"2019-01-03 08:34:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-03 22:00:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-03 19:00:00",14.32.4.116,NULL,NULL,008E5,,1,
|
|
J07210,"2019-01-03 08:35:00",16-시공-20,g.기타,"당초 변경","2019-01-03 20:45:00",16-시공-20,g.기타,"당초 변경","2019-01-03 18:33:00",172.16.9.162,172.16.9.155,172.16.9.162,008E2,,1,
|
|
J15201,"2019-01-03 08:36:00",18-교영-35,c.설계사,업무협의,"2019-01-03 18:01:00",18-교영-35,c.설계사,업무협의,"0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-01-03 08:37:00",18-교영-01,c.설계사,.,"2019-01-03 18:04:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
M05510,"2019-01-03 08:38:00",17-시공-07,b.시공,"주천1교 dr거더 제작 맟 설치공사
|
|
현장 장비 서류,안전,품질서류 작성
|
|
","2019-01-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004C8,,,
|
|
J11203,"2019-01-03 08:39:00",18-설계-19,b.구조계산,"대콘 교량3개 거더응력 계산서작성
|
|
","2019-01-03 18:03:00",18-설계-19,b.구조계산,"대콘 교량3개 거더응력 계산서작성
|
|
","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15206,"2019-01-03 08:25:00",18-시공-20,b.시공,"* 공사현황 및 설계서 검토","2019-01-03 18:18:18",NULL,NULL,"* 공사현황 및 설계서 검토","0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004C8,,,
|
|
J14101,"2019-01-03 08:50:00",16-시공-20,출장,한양,"2019-01-03 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14201,"2019-01-03 08:50:00",18-시공-03,출장,"[경기도 화성시 봉담읍일원]제작완료 거더 규격확인","2019-01-03 18:00:00",18-시공-03,출장,"[경기도 화성시 봉담읍일원]제작완료 거더 규격확인","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J14302,"2019-01-03 08:50:00",18-시공-03,출장,"[경기도 화성시 봉담읍일원]제작완료 거더 규격확인","2019-01-03 18:00:00",18-시공-03,출장,"[경기도 화성시 봉담읍일원]제작완료 거더 규격확인","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J12202,"2019-01-04 06:19:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
M02302,"2019-01-04 06:40:00",16-제조-02,a.생산관리,"관리직 업무 조정 검토","2019-01-04 18:03:00",16-제조-02,a.생산관리,"관리직 업무 조정 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-01-04 07:12:00",17-시공-07,g.기타," 시화 JCT 가도 및 가설검토","2019-01-04 18:10:00",17-시공-07,g.기타," 시화 JCT 가도 및 가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J07202,"2019-01-04 07:16:00",16-제조-04,b.기계,"산외교 Pre-Deck 반력대 조립","2019-01-04 18:07:00",16-제조-04,b.기계,"산외교 Pre-Deck 반력대 조립","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-01-04 07:27:00",18-시공-15,b.시공,"1. 북수원1교 앵커 설치 도면 작성(빔런처 검토)
|
|
2. 12월 기성 내역서 작성 및 2019년 매출계획 작성","2019-01-04 18:10:00",18-시공-15,b.시공,"1. 북수원1교 앵커 설치 도면 작성(빔런처 검토)
|
|
2. 12월 기성 내역서 작성 및 2019년 매출계획 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18202,"2019-01-04 07:34:00",07-교영-01,b.시공사,"새만금대교, 웅천~소호, 용상교리 현황 파악","2019-01-04 18:04:00",07-교영-01,b.시공사,"새만금대교, 웅천~소호, 용상교리 현황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
J14308,"2019-01-04 07:35:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-04 18:07:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J09102,"2019-01-04 07:41:00",19-영업-01,b.시공사,"2018년 경영 실적 및 2019년 예상 수주&매출 분석 등 : 군장산단 철도교 외 5개교 계약 추진 중","2019-01-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-01-04 07:41:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","2019-01-04 18:10:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09101,"2019-01-04 08:01:00",18-교영-01,c.설계사,과업진행상황조사,"2019-01-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J10315,"2019-01-04 08:02:00",18-시공-03,b.시공,"받침이동 검토서 작성","2019-01-04 18:01:00",18-시공-03,b.시공,"받침이동 검토서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18204,"2019-01-04 08:04:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","2019-01-04 18:02:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J18206,"2019-01-04 08:08:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-04 17:44:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
B15306,"2019-01-04 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-01-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15305,"2019-01-04 08:15:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-04 22:00:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-04 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J15206,"2019-01-04 08:16:00",18-시공-20,b.시공,"* 설계서 검토
|
|
* 안전관리계획서 작성 및 감독관 제출","2019-01-04 18:03:00",18-시공-20,b.시공,"* 설계서 검토
|
|
* 안전관리계획서 작성 및 감독관 제출","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J14306,"2019-01-04 08:18:00",18-관리-04,a.계약,"계약, 인사 외","2019-01-04 18:04:00",18-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J15307,"2019-01-04 08:22:00",18-교영-01,d.기타,"1. 황강 죽고지구 특정공법심의 견적
|
|
","2019-01-04 18:02:00",18-교영-01,d.기타,"1. 황강 죽고지구 특정공법심의 견적
|
|
","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J15202,"2019-01-04 08:22:00",18-설계-19,b.구조계산,"도림천교 구조계산","2019-01-04 18:01:00",18-설계-19,b.구조계산,"도림천교 구조계산","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J13201,"2019-01-04 08:22:00",18-설계-19,b.구조계산,"DR거더 구조설계보고서 작성","2019-01-04 18:04:00",18-설계-19,b.구조계산,"DR거더 구조설계보고서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
M05510,"2019-01-04 08:23:00",17-시공-07,b.시공,"주천1교 dr거더 제작 맟 설치공사
|
|
현장 장비 서류,안전,품질서류 작성
|
|
","2019-01-04 18:02:00",17-시공-07,b.시공,"주천1교 dr거더 제작 맟 설치공사
|
|
현장 장비 서류,안전,품질서류 작성
|
|
","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J10301,"2019-01-04 08:23:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-04 18:19:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J08201,"2019-01-04 08:23:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","2019-01-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J10314,"2019-01-04 08:24:00",14-교영-00,d.기타,"거더 공법별 공사비 검토자료,
|
|
삼남1교(밀양~울산7공구) 검토자료","2019-01-04 18:06:00",14-교영-00,d.기타,"삼남1교(밀양~울산7공구) 시행가 협의 및 검토자료,
|
|
거더 공사비 업체별 검토자료,
|
|
개략공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15302,"2019-01-04 08:26:00",18-설계-19,c.도면,거더도면작업,"2019-01-04 18:03:00",18-설계-19,c.도면,거더도면작업,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J14302,"2019-01-04 08:27:00",17-시공-10,b.시공,"현장투입 준비작업","2019-01-04 18:01:00",17-시공-10,b.시공,"현장투입 준비작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004E2,,,
|
|
J07103,"2019-01-04 08:27:00",18-교영-01,d.기타,사업관리,"2019-01-04 18:19:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10313,"2019-01-04 08:28:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-01-04 18:09:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J07210,"2019-01-04 08:29:00",16-시공-20,g.기타,"당초 변경","2019-01-04 18:03:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J11203,"2019-01-04 08:31:00",18-설계-19,b.구조계산,"대콘 교량3개 교각부 부모멘트부 계산서작성
|
|
","2019-01-04 18:02:00",18-설계-19,b.구조계산,"대콘 교량3개 교각부 부모멘트부 계산서작성
|
|
","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>e.검토<|>설계사요청:R-D교 거더본수 3본으로 검토<|>03:00<|><br>",,
|
|
J18205,"2019-01-04 08:31:00",18-설계-18,g.업무지원,"구조계산서 작성","2019-01-04 22:17:00",18-설계-18,g.업무지원,"구조계산서 작성","2019-01-04 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J16202,"2019-01-04 08:33:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-04 18:11:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-01-04 08:34:00",18-교영-35,c.설계사,업무협의,"2019-01-04 18:01:00",18-교영-35,c.설계사,업무협의,"0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15301,"2019-01-04 08:35:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
단장천2교 하도급지킴이 이체증 발송","2019-01-04 18:06:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
단장천2교 하도급지킴이 이체증 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J17205,"2019-01-04 08:35:00",18-교영-01,c.설계사,.,"2019-01-04 18:01:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18203,"2019-01-04 08:44:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","2019-01-04 18:03:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","0000-00-00 00:00:00",223.62.175.171,NULL,172.16.9.182,004C8,,,
|
|
J07210,"2019-01-08 08:21:00",16-시공-20,g.기타,"당초 변경","2019-01-08 20:40:00",16-시공-20,g.기타,"당초 변경","2019-01-08 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J18208,"2019-01-04 07:40:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop DWG","2019-01-04 18:15:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J14101,"2019-01-04 08:50:00",16-시공-20,출장,한양,"2019-01-04 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-01-05 07:17:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-05 15:30:00",13-설계-30,b.시공,"신규제작 런처 구조계산","2019-01-05 07:00:00",172.16.9.156,NULL,NULL,004E1,,1,
|
|
J14308,"2019-01-05 07:45:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-05 17:15:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,1,
|
|
J15305,"2019-01-05 09:55:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-05 16:13:00",18-설계-18,g.업무지원,"종평면도 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E5,,1,
|
|
J18205,"2019-01-05 09:58:00",18-설계-18,g.업무지원,"구조계산서 작성","2019-01-05 16:14:00",18-설계-18,g.업무지원,"구조계산서 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E2,,1,
|
|
J15305,"2019-01-06 09:33:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-06 14:50:00",18-설계-18,g.업무지원,"종평면도 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E5,,1,
|
|
J18205,"2019-01-06 09:34:00",18-설계-18,g.업무지원,"구조계산서 작성","2019-01-06 15:02:00",18-설계-18,g.업무지원,"구조계산서 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E2,,1,
|
|
J12202,"2019-01-07 06:02:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-07 18:18:18",16-시공-20,b.시공,NULL,"2019-01-07 19:54:00",172.16.9.156,172.16.9.156,NULL,004E1,,,
|
|
J16202,"2019-01-07 07:07:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-07 18:26:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11302,"2019-01-07 07:10:00",17-시공-07,g.기타," 시화 JCT 가도 및 가설검토","2019-01-07 18:08:00",17-시공-07,g.기타," 시화 JCT 가도 및 가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J07202,"2019-01-07 07:17:00",16-제조-04,b.기계,"산외교 Pre-Deck 반력대 인장 테스트를 위한 PC강봉 조립","2019-01-08 06:17:00",16-제조-04,b.기계,"산외교 Pre-Deck 반력대 인장 테스트를 위한 PC강봉 조립","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-01-07 07:22:00",18-시공-15,b.시공,"1. 북수원1교 앵커 설치 도면 작성(빔런처 검토)
|
|
2. 12월 기성 내역서 작성 및 2019년 매출계획 작성","2019-01-07 18:08:00",18-시공-15,b.시공,"1. 북수원1교 앵커 설치 도면 작성(빔런처 검토)
|
|
2. 12월 기성 내역서 작성 및 2019년 매출계획 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J14308,"2019-01-07 07:29:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-08 00:30:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-07 18:35:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J16203,"2019-01-07 07:33:00",16-제조-02,a.생산관리,"주천1교, 산외교 ,데크생산 및 품질관리","2019-01-07 21:00:00",16-제조-02,a.생산관리,"주천1교, 산외교 ,데크생산 및 품질관리","2019-01-07 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,,
|
|
T04204,"2019-01-07 07:38:00",16-제조-02,a.생산관리," 원흥2교 가공,점접 철근 생산, 산외교 등 프리덱 가로보 철근가공 생산","2019-01-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-01-07 07:39:00",16-제조-02,a.생산관리,"관리직 업무 조정 검토","2019-01-07 18:00:00",16-제조-02,a.생산관리,"관리직 업무 조정 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-01-07 07:39:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-07 18:10:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18202,"2019-01-07 07:41:00",07-교영-01,b.시공사,"새만금대교, 웅천~소호, 용상교리 현황 파악","2019-01-07 18:05:00",07-교영-01,b.시공사,"새만금대교, 웅천~소호, 용상교리 현황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
J09102,"2019-01-07 07:47:00",19-영업-01,b.시공사,"밀양~울산7 삼남1교 시행가, 2018년 경영 실적 및 2019년 예상 수주&매출 분석 등 : 군장산단 철도교 외 5개교 계약 추진 중","2019-01-07 18:35:00",19-영업-01,b.시공사,"밀양~울산7 삼남1교 시행가, 2018년 경영 실적 및 2019년 예상 수주&매출 분석 등 : 군장산단 철도교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J10315,"2019-01-07 08:00:00",18-시공-03,b.시공,"받침이동 검토서 작성","2019-01-07 18:07:00",18-시공-03,b.시공,"받침이동 검토서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18207,"2019-01-07 08:01:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","2019-01-07 18:26:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18203,"2019-01-07 08:01:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","2019-01-07 18:09:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C8,,,
|
|
M05510,"2019-01-07 08:01:00",17-시공-07,b.시공,"주천1교 dr거더 제작 맟 설치공사
|
|
현장 장비 서류,안전,품질서류 작성
|
|
","2019-01-07 18:09:00",17-시공-07,b.시공,"주천1교 dr거더 제작 맟 설치공사
|
|
현장 장비 서류,안전,품질서류 작성
|
|
","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
B15306,"2019-01-07 08:02:00",18-관리-02,e.기타,"비서업무 외","2019-01-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-01-07 08:05:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-07 18:07:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J15307,"2019-01-07 08:13:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
","2019-01-07 18:03:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18204,"2019-01-07 08:15:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","2019-01-07 18:09:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J08201,"2019-01-07 08:17:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","2019-01-07 18:52:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J07103,"2019-01-07 08:21:00",18-교영-01,d.기타,사업관리,"2019-01-08 08:13:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14306,"2019-01-07 08:22:00",18-관리-04,a.계약,"계약, 인사 외","2019-01-07 18:29:00",18-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J13201,"2019-01-07 08:23:00",18-설계-19,b.구조계산,"DR거더 구조설계보고서 작성","2019-01-07 18:26:00",18-설계-19,b.구조계산,"DR거더 구조설계보고서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J15202,"2019-01-07 08:24:00",18-설계-19,b.구조계산,"도림천교 구조계산","2019-01-07 20:44:00",18-설계-19,b.구조계산,"도림천교 구조계산","2019-01-07 18:33:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10301,"2019-01-07 08:24:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-07 19:02:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-01-07 08:25:00",18-시공-11,b.시공,공사관리,"2019-01-07 18:13:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15302,"2019-01-07 08:27:00",18-설계-19,c.도면,거더도면작업,"2019-01-07 20:34:00",18-설계-19,c.도면,거더도면작업,"2019-01-07 18:33:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"18-설계-15<|>e.검토<|>거더도면 오류 대안 작성<|>02:00<|><br>",1,
|
|
J11203,"2019-01-07 08:32:00",18-설계-19,b.구조계산,"대콘 r-d 횡방향 거더3본 검토(설계사요청사항)","2019-01-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J09101,"2019-01-07 08:33:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-07 18:19:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15301,"2019-01-07 08:35:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
단장천2교 하도급지킴이 이체증 발송","2019-01-07 18:15:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
단장천2교 하도급지킴이 이체증 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11305,"2019-01-07 08:36:00",18-시공-03,g.기타,"솔플레이트 검토서","2019-01-07 18:08:00",18-시공-03,g.기타,"솔플레이트 검토서","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J17205,"2019-01-07 08:36:00",18-교영-01,c.설계사,.,"2019-01-07 18:25:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-01-07 08:36:00",18-교영-35,c.설계사,업무협의,"2019-01-07 18:26:00",18-교영-35,c.설계사,업무협의,"0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-01-07 08:36:00",16-시공-20,g.기타,"당초 변경","2019-01-07 18:12:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J10313,"2019-01-07 08:38:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-01-07 18:00:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18205,"2019-01-07 08:39:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-07 21:53:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-07 18:32:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J15305,"2019-01-07 08:43:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-07 21:34:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-07 18:31:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J15206,"2019-01-07 08:50:00",19-시공-01,출장,"[태안군청]태안군 낙찰자통보에 따른 도급내역서 제출 관련 협의 및 설계도서 수령","2019-01-07 18:09:00",19-시공-01,b.시공,"* 태안군청 방문 (설계도서 1부 수령)","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J14101,"2019-01-07 08:50:00",16-시공-20,출장,한양,"2019-01-07 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14302,"2019-01-07 08:50:00",18-시공-03,출장,"[경기도 화성시 봉담읍 일원]왕림교 거더 인식표 부착 및 공사협의","2019-01-07 18:00:00",18-시공-03,출장,"[경기도 화성시 봉담읍 일원]왕림교 거더 인식표 부착 및 공사협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J07202,"2019-01-08 06:18:00",16-제조-04,b.기계,"반력대 인장 테스트를 위한 PC강봉 조립","2019-01-09 06:18:00",16-제조-04,b.기계,"반력대 인장 테스트를 위한 PC강봉 조립","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-01-08 06:37:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J13308,"2019-01-08 07:04:00",18-시공-15,b.시공,"1. 북수원1교 앵커 설치 도면 작성(빔런처 검토)
|
|
2. 12월 기성 내역서 작성 및 2019년 매출계획 작성","2019-01-08 18:04:00",18-시공-15,b.시공,"1. 북수원1교 앵커 설치 도면 작성(빔런처 검토)
|
|
2. 12월 기성 내역서 작성 및 2019년 매출계획 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J11302,"2019-01-08 07:16:00",17-시공-07,g.기타,"구안천교 가설검토","2019-01-08 18:17:00",17-시공-07,g.기타,"구안천교 가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J18202,"2019-01-08 07:29:00",07-교영-01,b.시공사,"새만금대교, 고덕대교 접속교 현황 파악","2019-01-08 18:07:00",07-교영-01,b.시공사,"새만금대교, 고덕대교 접속교 현황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
J18208,"2019-01-08 07:32:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-08 21:57:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-08 18:37:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-01-08 07:33:00",19-영업-01,b.시공사,"홍익기술단 방문예정, 2018년 경영 실적 및 2019년 예상 수주&매출 분석 등 : 군장산단 철도교 외 5개교 계약 추진 중","2019-01-08 18:01:00",19-영업-01,b.시공사,"홍익기술단 방문예정, 2018년 경영 실적 및 2019년 예상 수주&매출 분석 등 : 군장산단 철도교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J14308,"2019-01-08 07:35:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-08 21:46:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-08 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J16203,"2019-01-08 07:38:00",16-제조-02,a.생산관리,"주천1교, 산외교 ,데크생산 및 품질관리","2019-01-08 20:51:00",16-제조-02,a.생산관리,"주천1교, 산외교 ,데크생산 및 품질관리","2019-01-08 18:38:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
T04204,"2019-01-08 07:42:00",16-제조-02,a.생산관리," 원흥2교 가공,점접 철근 생산, 산외교 등 프리덱 가로보 철근가공 생산","2019-01-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-01-08 07:45:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","2019-01-08 18:05:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J15302,"2019-01-08 07:53:00",18-설계-19,c.도면,거더도면작업,"2019-01-08 18:05:00",18-설계-19,c.도면,거더도면작업,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,"14-설계-36<|>h.기타<|>성과품 정리<|>02:00<|><br>",,
|
|
J11305,"2019-01-08 07:54:00",18-시공-03,g.기타,"솔플레이트 검토서","2019-01-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C8,,,
|
|
J10315,"2019-01-08 07:58:00",18-시공-03,b.시공,"받침이동 검토서 작성","2019-01-08 18:10:00",18-시공-03,b.시공,"받침이동 검토서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18206,"2019-01-08 08:02:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-08 18:18:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
M05510,"2019-01-08 08:03:00",17-시공-07,b.시공,"주천1교 dr거더 제작 맟 설치공사
|
|
현장 장비 서류,안전,품질서류 작성
|
|
","2019-01-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004C8,,,
|
|
J18203,"2019-01-08 08:03:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","2019-01-08 18:25:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C8,,,
|
|
J18204,"2019-01-08 08:04:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","2019-01-08 18:05:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J15206,"2019-01-08 08:07:00",19-시공-01,b.시공,"* 도급내역서 작성
|
|
* 설계서 검토","2019-01-08 18:13:00",19-시공-01,b.시공,"* 도급내역서 작성
|
|
* 설계서 검토","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J14302,"2019-01-08 08:07:00",17-시공-10,b.시공,"현장투입 준비작업","2019-01-08 18:25:00",17-시공-10,b.시공,"현장투입 준비작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004E2,,,
|
|
J13201,"2019-01-08 08:10:00",18-설계-19,b.구조계산,"DR거더 구조설계보고서 작성","2019-01-08 18:21:00",18-설계-19,b.구조계산,"DR거더 구조설계보고서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J15307,"2019-01-08 08:10:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 안성~성남 동천안분기점4교 개략공사비","2019-01-08 18:04:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 안성~성남 동천안분기점4교 개략공사비","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J15301,"2019-01-08 08:11:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
단장천2교 하도급지킴이 이체증 발송","2019-01-08 18:07:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
단장천2교 하도급지킴이 이체증 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
B15306,"2019-01-08 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-01-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-01-08 08:13:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","2019-01-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J07103,"2019-01-08 08:13:00",18-교영-01,d.기타,사업관리,"2019-01-08 18:16:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10314,"2019-01-08 08:17:00",14-교영-00,d.기타,"개략공사비 검토,
|
|
삼남1교(밀양~울산7공구) 시행가 협의 및 검토자료,
|
|
거더 공사비 업체별 검토자료","2019-01-08 18:04:00",14-교영-00,d.기타,"삼남1교(밀양~울산7공구) 시행가 협의 및 검토자료,
|
|
거더 공사비 업체별 검토자료,
|
|
개략공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J09101,"2019-01-08 08:17:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14306,"2019-01-08 08:21:00",18-관리-04,a.계약,"계약, 인사 외","2019-01-08 18:44:00",18-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J10301,"2019-01-08 08:23:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-08 18:09:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11203,"2019-01-08 08:23:00",18-설계-19,b.구조계산,"대콘 r-f1 휨, 전단부분 계산서 작성","2019-01-08 18:05:00",18-설계-19,b.구조계산,"대콘 r-f1 휨, 전단부분 계산서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>a.계획 및 협의<|>전체회의, 업무회의(김es, 박bj, 류bj)<|>03:00<|><br>16-설계-17<|>h.기타<|>거더 바지선운반시 거더적정지간 응력검토<|>01:00<|><br>",,
|
|
J11202,"2019-01-08 08:23:00",18-시공-11,b.시공,공사관리,"2019-01-08 18:09:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-01-08 08:25:00",18-설계-19,b.구조계산,"도림천교 구조계산","2019-01-08 18:18:18",18-설계-19,b.구조계산,NULL,"2019-01-08 18:32:00",172.16.9.155,172.16.9.155,NULL,008E1,,1,
|
|
J15201,"2019-01-08 08:25:00",18-교영-35,c.설계사,업무협의,"2019-01-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J16202,"2019-01-08 08:25:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-08 18:10:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-01-08 08:30:00",18-교영-01,c.설계사,.,"2019-01-08 18:01:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15305,"2019-01-08 08:35:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-08 21:35:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-08 18:34:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J18205,"2019-01-08 08:36:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-08 22:39:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-08 18:34:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J10313,"2019-01-08 08:40:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-08 18:08:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14101,"2019-01-08 08:50:00",16-시공-20,출장,한양,"2019-01-08 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
M02302,"2019-01-08 08:50:00",16-제조-02,출장,한맥빌딩,"2019-01-08 18:00:00",16-제조-02,출장,한맥빌딩,"0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J07202,"2019-01-09 06:18:00",16-제조-04,b.기계,"반력대 인장 테스트를 위한 PC강봉 조립","2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J12202,"2019-01-09 06:18:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-01-09 07:19:00",17-시공-07,g.기타,"구안천교 가설검토 및 주천1교 인장계획서 작성","2019-01-09 18:10:00",17-시공-07,g.기타,"구안천교 가설검토 및 주천1교 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J13308,"2019-01-09 07:29:00",18-시공-15,b.시공,"1. 왕림교 솔플레이트 관련 도면 작성
|
|
2. 북수원1교 빔런처 용인 P2 앵커설치도 작성 및 일정 조율","2019-01-09 18:08:00",18-시공-15,b.시공,"1. 왕림교 솔플레이트 관련 도면 작성
|
|
2. 북수원1교 빔런처 용인 P2 앵커설치도 작성 및 일정 조율","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J14308,"2019-01-09 07:30:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-09 21:59:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-09 18:50:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J18202,"2019-01-09 07:32:00",07-교영-01,b.시공사,"새만금대교, 고덕대교 접속교 현황 파악","2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.181,NULL,NULL,004C7,,,
|
|
J18208,"2019-01-09 07:33:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-09 22:12:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-09 18:50:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-01-09 07:38:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","2019-01-09 18:14:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
T04204,"2019-01-09 07:40:00",16-제조-02,a.생산관리," 원흥2교 가공,점접 철근 생산, 산외교 등 프리덱 가로보 철근가공 생산","2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09102,"2019-01-09 07:45:00",19-영업-01,b.시공사,"화웅지구 한신공영 방문예정, 2018년 경영 실적 및 2019년 예상 수주&매출 분석 등 : 군장산단 철도교 외 5개교 계약 추진 중","2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18204,"2019-01-09 08:02:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","2019-01-09 18:06:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J18203,"2019-01-09 08:06:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C8,,,
|
|
J18206,"2019-01-09 08:07:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-09 18:28:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J15206,"2019-01-09 08:12:00",19-시공-01,b.시공,"* 금차분 도급내역서 작성
|
|
* 착공계 제출 관련 품질관리계획서 작성
|
|
* 설계서 검토","2019-01-09 18:15:00",19-시공-01,b.시공,"* 금차분 도급내역서 작성
|
|
* 착공계 제출 관련 품질관리계획서 작성
|
|
* 설계서 검토","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
B15306,"2019-01-09 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-01-09 08:17:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 안성~성남 동천안분기점4교 개략공사비","2019-01-09 18:01:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 안성~성남 동천안분기점4교 개략공사비","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J08201,"2019-01-09 08:18:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","2019-01-09 18:04:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J14306,"2019-01-09 08:21:00",18-관리-04,a.계약,"계약, 인사 외","2019-01-09 18:08:00",18-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J16202,"2019-01-09 08:22:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J10301,"2019-01-09 08:22:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-09 18:40:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-01-09 08:23:00",18-설계-19,b.구조계산,"도림천교 구조계산","2019-01-09 20:42:00",18-설계-19,b.구조계산,"도림천교 구조계산","2019-01-09 18:34:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J13201,"2019-01-09 08:24:00",18-설계-19,b.구조계산,"DR거더 구조설계보고서 작성","2019-01-09 18:35:00",18-설계-19,b.구조계산,"DR거더 구조설계보고서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J07103,"2019-01-09 08:24:00",18-교영-01,d.기타,사업관리,"2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
J15302,"2019-01-09 08:25:00",18-설계-19,c.도면,거더도면작업,"2019-01-09 20:34:00",18-설계-19,c.도면,거더도면작업,"2019-01-09 18:34:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"18-설계-15<|>c.도면<|>도면 오타 수정<|>06:00<|><br>",1,
|
|
J15301,"2019-01-09 08:26:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
옥산교, 옥산4교 출하요청서 발송","2019-01-09 18:14:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
옥산교, 옥산4교 출하요청서 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11202,"2019-01-09 08:27:00",18-시공-11,b.시공,공사관리,"2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J11305,"2019-01-09 08:28:00",18-시공-03,g.기타,"솔플레이트 검토서","2019-01-09 18:04:00",18-시공-03,g.기타,"솔플레이트 검토서","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,"18-설계-12<|>a.계획 및 협의<|>지산교 선형변경에 따른 교량계획 협의<|>06:00<|><br>",,
|
|
J14302,"2019-01-09 08:28:00",17-시공-10,b.시공,"현장투입 준비작업","2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004E2,,,
|
|
J10314,"2019-01-09 08:32:00",14-교영-00,d.기타,"공법별 거더 공사비 검토,
|
|
개략공사비 검토","2019-01-09 18:05:00",14-교영-00,d.기타,"공법별 거더 공사비 검토,
|
|
개략공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J09101,"2019-01-09 08:33:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-09 18:31:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15305,"2019-01-09 08:33:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-09 22:00:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-09 18:30:00",14.32.4.116,14.32.4.116,NULL,008E5,,1,
|
|
J18205,"2019-01-09 08:33:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-09 22:00:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-09 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J07210,"2019-01-09 08:33:00",16-시공-20,g.기타,"당초 변경","2019-01-09 20:42:00",16-시공-20,g.기타,"당초 변경","2019-01-09 18:34:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J11203,"2019-01-09 08:34:00",18-설계-19,b.구조계산,"대콘 r-f1 휨, 전단부분 계산서 작성","2019-01-09 18:06:00",18-설계-19,b.구조계산,"대콘 r-f1 휨, 전단부분 계산서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"16-설계-17<|>h.기타<|>거더 바지선운반시 거더적정지간응력검토<|>02:00<|><br>18-설계-15<|>h.기타<|>슬래브 도면 검토(설계사가 잘못한 것)<|>02:00<|><br>",,
|
|
J17205,"2019-01-09 08:34:00",18-교영-01,c.설계사,.,"2019-01-09 18:28:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-01-09 08:40:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15201,"2019-01-09 08:44:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-01-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J14101,"2019-01-09 08:50:00",16-시공-20,출장,한양,"2019-01-09 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
M02302,"2019-01-09 08:50:00",16-제조-02,출장,"산외교 현장","2019-01-09 18:00:00",16-제조-02,출장,"산외교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J10315,"2019-01-09 08:50:00",17-시공-21,출장,대림산업,"2019-01-09 18:00:00",17-시공-21,출장,대림산업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J12202,"2019-01-10 06:24:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-01-10 07:00:00",17-시공-07,g.기타,"구안천교 가설검토 및 주천1교 인장계획서 작성","2019-01-10 18:15:00",17-시공-07,g.기타,"구안천교 가설검토 및 주천1교 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J07202,"2019-01-10 07:14:00",16-제조-04,b.기계,"반력대 인장 테스트를 위한 PC강봉 조립","2019-01-11 06:18:00",16-제조-04,b.기계,"반력대 인장 테스트를 위한 PC강봉 조립","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J15201,"2019-01-10 07:17:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-01-10 18:03:00",19-교영-01,c.설계사,"신규과업 현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15206,"2019-01-10 07:28:00",19-시공-01,b.시공,"* 착공계 제출 관련 안전,환경관리계획서, 예정공정표 작성
|
|
* 설계서 검토","2019-01-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004C8,,,
|
|
J14308,"2019-01-10 07:31:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-10 18:01:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J09102,"2019-01-10 07:33:00",19-영업-01,b.시공사,"시화MTV 대림 방문예정, 2018년 경영 실적 및 2019년 예상 수주&매출 분석 등 : 군장산단 철도교 외 5개교 계약 추진 중","2019-01-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18208,"2019-01-10 07:36:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-10 18:35:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18207,"2019-01-10 07:39:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","2019-01-10 18:10:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
T04204,"2019-01-10 07:42:00",16-제조-02,a.생산관리," 원흥2교, 가산2교 가공,점접 철근 생산, 산외교 등 프리덱 가로보 철근가공 생산","2019-01-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09101,"2019-01-10 07:56:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-10 18:14:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10315,"2019-01-10 08:01:00",16-설계-17,e.검토,"바지선 및 크레인 적정성 검토","2019-01-10 18:06:00",16-설계-17,e.검토,"바지선 및 크레인 적정성 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18206,"2019-01-10 08:03:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-10 18:12:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
B15306,"2019-01-10 08:05:00",18-관리-02,e.기타,"비서업무 외","2019-01-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-01-10 08:11:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 확대관련 협의","2019-01-10 18:03:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 확대관련 협의","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J18203,"2019-01-10 08:12:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","2019-01-10 18:10:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C8,,,
|
|
J15307,"2019-01-10 08:18:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
","2019-01-10 18:01:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J15202,"2019-01-10 08:21:00",18-설계-19,b.구조계산,"청용천교 구조계산","2019-01-10 18:01:00",18-설계-19,b.구조계산,"청용천교 구조계산","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J08201,"2019-01-10 08:22:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","2019-01-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J07103,"2019-01-10 08:22:00",18-교영-01,d.기타,사업관리,"2019-01-10 18:10:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14306,"2019-01-10 08:23:00",18-관리-04,a.계약,"계약, 인사 외","2019-01-10 20:30:00",18-관리-04,a.계약,"계약, 인사 외","2019-01-10 18:30:00",172.16.9.175,172.16.9.175,172.16.9.175,004E5,,1,
|
|
J18205,"2019-01-10 08:24:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-10 21:34:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-10 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J15305,"2019-01-10 08:24:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-10 21:33:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-10 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J13201,"2019-01-10 08:25:00",18-설계-19,b.구조계산,"DR거더 구조설계보고서 작성","2019-01-10 18:27:00",18-설계-19,b.구조계산,"DR거더 구조설계보고서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J15302,"2019-01-10 08:25:00",18-설계-15,c.도면,"슬래브 배근도 수정","2019-01-10 18:03:00",18-설계-15,c.도면,"슬래브 배근도 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J10301,"2019-01-10 08:25:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-10 18:39:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-01-10 08:27:00",18-시공-11,b.시공,공사관리,"2019-01-10 18:18:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10314,"2019-01-10 08:29:00",14-교영-00,d.기타,"공법별 거더 공사비 비교표 및 검토자료,
|
|
개략공사비 검토","2019-01-10 18:04:00",14-교영-00,d.기타,"공법별 거더 공사비 비교표 및 검토자료,
|
|
개략공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15301,"2019-01-10 08:30:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
시화JCT 자재 공급원승인서 준비 (상신기공, 케이티에이, 은진, 세일콘)
|
|
산외교 정산서 작성
|
|
성주대교 투입내역서 작성","2019-01-10 18:12:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
시화JCT 자재 공급원승인서 준비 (상신기공, 케이티에이, 은진, 세일콘)
|
|
산외교 정산서 작성
|
|
성주대교 투입내역서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J07210,"2019-01-10 08:31:00",16-시공-20,g.기타,"당초 변경","2019-01-10 20:36:00",16-시공-20,g.기타,"당초 변경","2019-01-10 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J18204,"2019-01-10 08:36:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","2019-01-10 18:10:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J16202,"2019-01-10 08:38:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J14302,"2019-01-10 08:39:00",17-시공-10,b.시공,"현장투입 준비작업","2019-01-10 18:06:00",17-시공-10,b.시공,"현장투입 준비작업","0000-00-00 00:00:00",172.16.9.172,NULL,1.233.130.3,004E2,,,
|
|
J14201,"2019-01-10 08:39:00",17-시공-13,b.시공,업무시작,"2019-01-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004E1,,,
|
|
J10313,"2019-01-10 08:42:00",16-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","2019-01-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J11203,"2019-01-10 08:42:00",18-설계-19,b.구조계산,"대콘 승천천교(안성, 세종) 휨, 전단부분 계산서 작성","2019-01-10 18:03:00",18-설계-19,b.구조계산,"대콘 승천천교 휨, 전단부분 계산서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-21<|>g.기타<|>광교1,2,3교 도면 계산서 전산데이타 발송<|>00:30<|><br>18-설계-15<|>h.기타<|>슬래브도면, 거더도면 수정 후 발송<|>01:00<|><br>",,
|
|
J17205,"2019-01-10 08:48:00",18-교영-01,c.설계사,.,"2019-01-10 18:16:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J14101,"2019-01-10 08:50:00",16-시공-20,출장,한양,"2019-01-10 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
M02302,"2019-01-10 08:50:00",16-제조-02,출장,"산외교 현장","2019-01-10 18:00:00",16-제조-02,출장,"산외교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J18202,"2019-01-10 08:50:00",07-교영-01,출장,"[함양, 여수]함양~창녕 1,5 공구, 웅천~소호 해상교량 -새해인사 및 현황 파악","2019-01-10 18:00:00",07-교영-01,출장,"[함양, 여수]함양~창녕 1,5 공구, 웅천~소호 해상교량 -새해인사 및 현황 파악","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-01-11 06:18:00",16-제조-04,b.기계,"산외교 캔틸레버 PC강봉 인장 테스트","2019-01-12 07:01:00",16-제조-04,b.기계,"산외교 캔틸레버 PC강봉 인장 테스트","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-01-11 06:30:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-11 18:01:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J10315,"2019-01-11 06:39:00",18-시공-03,b.시공,"받침이동 검토서 보완 ","2019-01-11 18:04:00",18-시공-03,b.시공,"받침이동 검토서 보완 ","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J13308,"2019-01-11 07:08:00",18-시공-15,b.시공,"1. 왕림교 솔플레이트 관련 도면 작성
|
|
2. 북수원1교 빔런처 용인 P2 앵커설치도 작성 및 일정 조율","2019-01-11 18:01:00",18-시공-15,b.시공,"1. 왕림교 솔플레이트 관련 도면 작성
|
|
2. 북수원1교 빔런처 용인 P2 앵커설치도 작성 및 일정 조율","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18208,"2019-01-11 07:27:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-11 22:24:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-11 18:54:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-01-11 07:29:00",19-제조-02,a.생산관리,"관리부 업무 조정 검토","2019-01-11 21:01:00",16-제조-02,a.생산관리,"관리부 업무 조정 검토 및 생산직 인사평가","2019-01-11 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>현장 출장 보고서 작성<|>04:00<|><br>19-제조-02<|>a.생산관리<|> 생산직 인사평가 자료 취합<|>01:30<|><br>19-제조-02<|>a.생산관리<|>PTC 시험체 관련 협의<|>01:00<|><br>",1,
|
|
J14308,"2019-01-11 07:32:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-11 22:25:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-11 18:51:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
T04204,"2019-01-11 07:34:00",16-제조-02,a.생산관리," 원흥2교, 가산2교 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-01-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J16203,"2019-01-11 07:42:00",16-제조-02,a.생산관리,"주천1교, 산외교 ,데크생산 및 품질관리","2019-01-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J15206,"2019-01-11 07:45:00",19-시공-01,b.시공,"* 착공계 제출 관련 공종별 인력 및 장비투입계획서 작성
|
|
* 설계서 검토","2019-01-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004C8,,,
|
|
J09102,"2019-01-11 07:47:00",19-영업-01,b.시공사,"시화분기점 계룡 방문예정, 송산~시화MTV 시행가 분석 등 : 군장산단 철도교 외 5개교 계약 추진 중","2019-01-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18203,"2019-01-11 07:59:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","2019-01-11 18:03:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C8,,,
|
|
J18204,"2019-01-11 08:02:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","2019-01-11 18:02:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J11305,"2019-01-11 08:09:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 비교안","2019-01-11 18:05:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 비교안","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J18206,"2019-01-11 08:12:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-11 18:08:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
B15306,"2019-01-11 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-01-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18205,"2019-01-11 08:14:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-11 21:30:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-11 18:32:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J07103,"2019-01-11 08:16:00",18-교영-01,d.기타,사업관리,"2019-01-11 18:15:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15307,"2019-01-11 08:16:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 양평~이천 Pre-Deck 견적","2019-01-11 18:04:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 양평~이천 Pre-Deck 견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J15202,"2019-01-11 08:18:00",18-설계-19,b.구조계산,"청용천교 구조계산","2019-01-11 18:03:00",18-설계-19,b.구조계산,"청용천교 구조계산","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J16202,"2019-01-11 08:20:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-11 18:08:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-01-11 08:22:00",18-설계-19,b.구조계산,"대콘 정착구 검토분 계산서작성","2019-01-11 18:05:00",18-설계-19,b.구조계산,"대콘 정착구 검토분 계산서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J10314,"2019-01-11 08:24:00",14-교영-00,d.기타,"타사 공법별 거더 공사비 검토 및 비교검토자료,
|
|
개략공사비 검토","2019-01-11 18:04:00",14-교영-00,d.기타,"타사 공법별 거더 공사비 검토 및 비교검토자료,
|
|
개략공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15302,"2019-01-11 08:25:00",18-설계-19,c.도면,"거더도면 작업","2019-01-11 18:04:00",18-설계-19,c.도면,"거더도면 작업","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J08201,"2019-01-11 08:25:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","2019-01-11 18:08:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J14306,"2019-01-11 08:25:00",18-관리-04,a.계약,"계약, 인사 외","2019-01-11 18:02:00",18-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J10301,"2019-01-11 08:28:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-11 18:22:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-01-11 08:30:00",16-시공-20,g.기타,"당초 변경","2019-01-11 18:12:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J11202,"2019-01-11 08:30:00",18-시공-11,b.시공,공사관리,"2019-01-11 18:04:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15301,"2019-01-11 08:31:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
성주대교 투입내역서 작성
|
|
단장천2교 투입내역서 작성
|
|
현장AS파일 최신화","2019-01-11 18:04:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
성주대교 투입내역서 작성
|
|
단장천2교 투입내역서 작성
|
|
현장AS파일 최신화","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J13201,"2019-01-11 08:32:00",16-설계-02,e.검토,"왕림교 빔배치 검토","2019-01-11 18:25:00",16-설계-02,e.검토,"왕림교 빔배치 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J14302,"2019-01-11 08:33:00",17-시공-10,b.시공,"현장투입 준비작업","2019-01-11 18:03:00",17-시공-10,b.시공,"현장투입 준비작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004E2,,,
|
|
J15201,"2019-01-11 08:35:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-01-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J15305,"2019-01-11 08:35:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-11 21:30:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-11 18:33:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J17205,"2019-01-11 08:36:00",18-교영-01,c.설계사,.,"2019-01-11 18:56:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-01-11 08:40:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-11 18:01:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-01-11 08:46:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-01-11 08:50:00",16-시공-20,출장,한양,"2019-01-11 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-01-11 08:50:00",07-교영-01,출장,"[함양, 여수]함양~창녕 1,5 공구, 웅천~소호 해상교량 -새해인사 및 현황 파악","2019-01-11 18:00:00",07-교영-01,출장,"[함양, 여수]함양~창녕 1,5 공구, 웅천~소호 해상교량 -새해인사 및 현황 파악","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-01-12 07:00:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-12 14:00:00",13-설계-30,b.시공,"런처 구조계산","2019-01-12 07:00:00",172.16.9.156,NULL,NULL,004E1,,1,
|
|
J07202,"2019-01-12 07:02:00",16-제조-04,b.기계,"북수원 1교 런처 앵커 설치용 지그 제작(권선P2, 용인P3)","2019-01-12 16:20:00",16-제조-04,b.기계,"북수원 1교 런처 앵커 설치용 지그 제작(권선P2, 용인P3)","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-01-12 07:28:00",16-제조-02,a.생산관리," 원흥2교, 가산2교 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-01-12 16:00:00",16-제조-02,a.생산관리," 원흥2교, 가산2교 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-01-12 07:28:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-12 17:55:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,1,
|
|
J18208,"2019-01-12 07:36:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-12 16:10:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J16203,"2019-01-12 07:42:00",16-제조-02,a.생산관리,"주천1교, 산외교 ,데크생산 및 품질관리","2019-01-12 15:51:00",16-제조-02,a.생산관리,"주천1교, 산외교 ,데크생산 및 품질관리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
M02302,"2019-01-12 07:43:00",19-제조-02,a.생산관리,"공장 내외 청소 및 환경개선","2019-01-12 16:05:00",16-제조-02,a.생산관리,"관리부 업무 조정 검토 및 생산직 인사평가","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>사장님 업무 협의 및 보고<|>05:00<|><br>",1,
|
|
J15305,"2019-01-12 09:12:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-12 14:35:00",18-설계-18,g.업무지원,"종평면도 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E5,,1,
|
|
J18205,"2019-01-12 09:12:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-12 15:28:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E2,,1,
|
|
J10313,"2019-01-12 09:18:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-12 13:44:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
M05510,"2019-01-13 09:27:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.180.166,NULL,NULL,004C8,,,
|
|
J15305,"2019-01-13 09:29:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-13 14:59:00",18-설계-18,g.업무지원,"종평면도 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E5,,1,
|
|
J18205,"2019-01-13 09:29:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-13 15:00:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E2,,1,
|
|
J12202,"2019-01-14 06:19:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-01-14 06:30:00",16-제조-04,b.기계,"북수원 1교(권선방향P2) 런처 앵커 설치와 옥산4교 거푸집과 각재,철판 출하","2019-01-15 07:11:00",16-제조-04,b.기계,"북수원 1교(권선방향P2) 런처 앵커 설치와 옥산4교 거푸집과 각재,철판 출하","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-01-14 06:59:00",17-시공-07,g.기타,"구안천교 가설검토 및 주천1교 인장계획서 작성","2019-01-14 18:08:00",17-시공-07,g.기타,"구안천교 가설검토 및 주천1교 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J13308,"2019-01-14 07:21:00",18-시공-15,b.시공,"1. 왕림교 솔플레이트 관련 도면 작성
|
|
2. 북수원1교 빔런처 용인 P2 앵커설치도 작성 및 일정 조율","2019-01-14 18:05:00",18-시공-15,b.시공,"1. 왕림교 솔플레이트 관련 도면 작성
|
|
2. 북수원1교 빔런처 용인 P2 앵커설치도 작성 및 일정 조율","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
M05510,"2019-01-14 07:24:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-01-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.180.237,NULL,NULL,004C8,,,
|
|
J18202,"2019-01-14 07:28:00",07-교영-01,b.시공사,"[함양, 여수]함양~창녕 1,5 공구 발주현황 파악","2019-01-14 18:08:00",07-교영-01,b.시공사,"[함양, 여수]함양~창녕 1,5 공구 발주현황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
T04204,"2019-01-14 07:32:00",16-제조-02,a.생산관리," 원흥2교, 가산2교 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-01-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-01-14 07:38:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-14 18:01:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J18207,"2019-01-14 07:39:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","2019-01-14 18:25:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M02302,"2019-01-14 07:41:00",19-제조-02,a.생산관리,"골재장 지붕철거 관련 협의 및 준비","2019-01-14 18:01:00",16-제조-02,a.생산관리,"관리부 업무 조정 검토 및 생산직 인사평가","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>반장/조장 확대회의 준비자료 작성<|>02:00<|><br>19-제조-02<|>a.생산관리<|>Dr Girder Shop Dwg. 검토 및 업무 지시<|>01:30<|><br>19-제조-02<|>a.생산관리<|>PTC 말뚝시험체 협의 및 업무분장 회의<|>00:30<|><br>",,
|
|
J09102,"2019-01-14 07:41:00",19-영업-01,b.시공사,"이천~오산1 금호건설 방문예정, 화도~양평2 조안대교 시행가 등 : 군장산단 철도교 외 5개교 계약 추진 중","2019-01-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18208,"2019-01-14 07:45:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-14 18:02:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-01-14 07:51:00",16-제조-02,a.생산관리,"주천1교, 산외교 ,데크생산 및 품질관리","2019-01-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18204,"2019-01-14 08:02:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","2019-01-14 18:05:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J18206,"2019-01-14 08:06:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-14 18:30:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J10315,"2019-01-14 08:07:00",17-설계-09,"a.계획 및 협의","크레인 가설 적정성 검토 및 협의자료 작성 ","2019-01-14 18:03:00",17-설계-09,"a.계획 및 협의","크레인 가설 적정성 검토 및 협의자료 작성 ","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J15307,"2019-01-14 08:09:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 산외교 Pre-Deck Shop Drawing","2019-01-14 18:04:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 산외교 Pre-Deck Shop Drawing","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
B15306,"2019-01-14 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-01-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J14306,"2019-01-14 08:19:00",18-관리-04,a.계약,"계약, 인사 외","2019-01-14 18:12:00",18-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J10301,"2019-01-14 08:21:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-14 18:23:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J08201,"2019-01-14 08:22:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","2019-01-14 18:21:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J16202,"2019-01-14 08:24:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-14 18:19:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15302,"2019-01-14 08:26:00",18-설계-19,c.도면,"거더도면 작업","2019-01-14 20:35:00",18-설계-19,c.도면,"거더도면 작업","2019-01-14 18:35:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J07103,"2019-01-14 08:26:00",18-교영-01,d.기타,사업관리,"2019-01-14 18:26:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18203,"2019-01-14 08:28:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","2019-01-15 07:42:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C8,,,
|
|
J11202,"2019-01-14 08:28:00",18-시공-11,b.시공,공사관리,"2019-01-14 18:20:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-01-14 08:29:00",18-설계-19,b.구조계산,"청용천교 구조계산","2019-01-14 20:35:00",18-설계-19,b.구조계산,"청용천교 구조계산","2019-01-14 18:35:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-01-14 08:31:00",16-시공-20,g.기타,"당초 변경","2019-01-14 18:02:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J10314,"2019-01-14 08:31:00",14-교영-00,d.기타,"타사 공법별 비교검토자료 및 거더 공사비 검토,
|
|
개략공사비 검토","2019-01-14 18:06:00",14-교영-00,d.기타,"타사 공법별 비교검토자료 및 거더 공사비 검토,
|
|
개략공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15301,"2019-01-14 08:32:00",16-시공-20,b.시공,"단장천2교 투입내역서 작성
|
|
현장AS파일 최신화
|
|
부가세 신고 전표 복사
|
|
경안천교 노무비닷컴 기성 청구
|
|
산외교 12월 투입내역서 소급입력","2019-01-14 18:08:00",16-시공-20,b.시공,"단장천2교 투입내역서 작성
|
|
현장AS파일 최신화
|
|
부가세 신고 전표 복사
|
|
경안천교 노무비닷컴 기성 청구
|
|
산외교 12월 투입내역서 소급입력","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11203,"2019-01-14 08:32:00",18-설계-19,b.구조계산,"대콘 r-f1교 슬래브 배근도 작성","2019-01-14 18:01:00",18-설계-19,b.구조계산,"대콘 r-f1교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J13201,"2019-01-14 08:32:00",16-설계-02,e.검토,"왕림교 빔배치 검토","2019-01-14 18:38:00",16-설계-02,e.검토,"왕림교 빔배치 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J15201,"2019-01-14 08:35:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-01-14 18:02:00",19-교영-01,c.설계사,"신규과업 현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-01-14 08:35:00",18-교영-01,c.설계사,.,"2019-01-14 18:08:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11305,"2019-01-14 08:38:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 비교안","2019-01-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C8,,,
|
|
J15305,"2019-01-14 08:38:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-14 22:01:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-14 18:36:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J18205,"2019-01-14 08:38:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-14 22:44:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-14 18:36:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J10313,"2019-01-14 08:47:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J09101,"2019-01-14 08:50:00",19-교영-01,출장,상모건설,"2019-01-14 18:04:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-01-14 08:50:00",16-시공-20,출장,한양,"2019-01-14 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-01-15 06:07:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-15 18:06:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-01-15 07:13:00",16-제조-04,b.기계,"산외교 프리덱 거푸집 PC강봉 인장 테스트","2019-01-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J11302,"2019-01-15 07:21:00",17-시공-07,g.기타,"북수원1교 가설검토","2019-01-15 18:08:00",17-시공-07,g.기타,"북수원1교 가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
M05510,"2019-01-15 07:31:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-01-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.178.116,NULL,NULL,004C8,,,
|
|
J14308,"2019-01-15 07:34:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-15 21:42:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-15 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J18202,"2019-01-15 07:34:00",07-교영-01,b.시공사,"함양~창녕 , 웅천~소호 발주현황 파악","2019-01-15 18:11:00",07-교영-01,b.시공사,"함양~창녕 , 웅천~소호 발주현황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
J13308,"2019-01-15 07:36:00",18-시공-15,b.시공,"1. 왕림교 솔플레이트 관련 도면 작성
|
|
2. 북수원1교 빔런처 용인 P2 앵커설치도 작성 및 일정 조율","2019-01-15 18:06:00",18-시공-15,b.시공,"1. 왕림교 솔플레이트 관련 도면 작성
|
|
2. 북수원1교 빔런처 용인 P2 앵커설치도 작성 및 일정 조율","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18208,"2019-01-15 07:36:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-15 21:42:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-15 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-01-15 07:39:00",19-영업-01,b.시공사,"밀양~울산7 삼남1교, 화도~양평2 조안대교 시행가 등 : 군장산단 철도교 외 5개교 계약 추진 중","2019-01-15 18:12:00",19-영업-01,b.시공사,"밀양~울산7 삼남1교, 화도~양평2 조안대교 시행가 등 : 군장산단 철도교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
T04204,"2019-01-15 07:39:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가산2교 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-01-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-01-15 07:42:00",19-제조-02,a.생산관리,"당진시청 업무협의 및 골재장 지붕철거 협의","2019-01-15 20:24:00",16-제조-02,a.생산관리,"관리부 업무 조정 검토 및 생산직 인사평가","2019-01-15 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>골재장 지붕철거 검토 및 회의<|>02:00<|><br>19-제조-02<|>a.생산관리<|>반력대 시험 인장 및 인장결과 검토<|>04:00<|><br>",1,
|
|
J18203,"2019-01-15 07:43:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","2019-01-15 18:10:00",19-교휴-06,a.기타,"세천2교, 감이교 월간 정산","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C8,,,
|
|
J18207,"2019-01-15 07:44:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","2019-01-15 18:09:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-01-15 07:55:00",17-설계-09,"a.계획 및 협의","크레인 가설 적정성 검토 및 협의자료 작성 ","2019-01-15 18:07:00",17-설계-09,"a.계획 및 협의","크레인 가설 적정성 검토 및 협의자료 작성 ","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
B15306,"2019-01-15 08:00:00",18-관리-02,e.기타,"비서업무 외","2019-01-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-01-15 08:01:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-15 15:34:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J11305,"2019-01-15 08:17:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 비교안","2019-01-15 18:04:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 비교안","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J15307,"2019-01-15 08:18:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 산외교 Pre-Deck Shop Drawing","2019-01-15 18:13:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 산외교 Pre-Deck Shop Drawing","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18204,"2019-01-15 08:19:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","2019-01-15 18:07:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J10314,"2019-01-15 08:21:00",14-교영-00,d.기타,"삼남1교(밀양~울산7공구) 검토자료,
|
|
타사 공법별 비교검토자료 및 거더 공사비 검토","2019-01-15 18:16:00",14-교영-00,d.기타,"삼남1교(밀양~울산7공구) 검토자료,
|
|
타사 공법별 비교검토자료 및 거더 공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14306,"2019-01-15 08:22:00",18-관리-04,a.계약,"계약, 인사 외","2019-01-15 18:13:00",18-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J07103,"2019-01-15 08:26:00",18-교영-01,d.기타,사업관리,"2019-01-15 18:10:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J16202,"2019-01-15 08:26:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J15202,"2019-01-15 08:26:00",17-설계-06,e.검토,"원흥2교 비상주감리 지적사항 검토","2019-01-15 20:56:00",17-설계-06,e.검토,"원흥2교 비상주감리 지적사항 검토","2019-01-15 18:33:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10301,"2019-01-15 08:27:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-15 18:29:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15302,"2019-01-15 08:27:00",18-설계-19,c.도면,"거더도면 및 수량작업","2019-01-15 18:05:00",18-설계-19,c.도면,"거더도면 및 수량작업","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J07210,"2019-01-15 08:28:00",16-시공-20,g.기타,"당초 변경","2019-01-15 20:42:00",16-시공-20,g.기타,"당초 변경","2019-01-15 18:33:00",172.16.9.162,172.16.9.155,172.16.9.162,008E2,,1,
|
|
J11202,"2019-01-15 08:29:00",18-시공-11,b.시공,공사관리,"2019-01-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J11203,"2019-01-15 08:31:00",18-설계-19,b.구조계산,"대콘 r-f1교 슬래브 배근도 작성","2019-01-15 18:10:00",18-설계-19,b.구조계산,"대콘 r-f1교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15301,"2019-01-15 08:31:00",16-시공-20,b.시공,"산외교 12월 투입내역서 소급입력
|
|
안종기팀 정산서 작성","2019-01-15 18:10:00",16-시공-20,b.시공,"산외교 12월 투입내역서 소급입력
|
|
안종기팀 정산서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J13201,"2019-01-15 08:34:00",16-설계-02,e.검토,"왕림교 빔배치 검토","2019-01-15 18:06:00",16-설계-02,e.검토,"왕림교 빔배치 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J18205,"2019-01-15 08:37:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-15 21:12:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-15 18:32:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J15305,"2019-01-15 08:37:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-15 21:13:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-15 18:48:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J15201,"2019-01-15 08:38:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-01-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J09101,"2019-01-15 08:38:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-15 18:31:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J17205,"2019-01-15 08:38:00",18-교영-01,c.설계사,.,"2019-01-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J10313,"2019-01-15 08:45:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J08201,"2019-01-15 08:50:00",18-시공-15,경유,"시공상세변경 질의에 대한 시공사 회의참석","2019-01-15 18:10:00",17-시공-09,g.기타,"방음벽 변경 및 시공순서 변경에 따른 안전성 검토","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J14101,"2019-01-15 08:50:00",16-시공-20,출장,한양,"2019-01-15 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J16203,"2019-01-15 08:50:00",16-제조-02,출장,"[밀양(산외교)]산외교 배합확인(20-70-500)시험 ","2019-01-15 18:00:00",16-제조-02,출장,"[밀양(산외교)]산외교 배합확인(20-70-500)시험 ","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J12202,"2019-01-16 06:05:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-01-16 06:17:00",16-제조-04,b.기계,"생산 2팀 정리정돈 지원과 골재장 지붕 해체 지원","2019-01-17 06:17:00",16-제조-04,b.기계,"생산 2팀 정리정돈 지원과 골재장 지붕 해체 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-01-16 06:44:00",19-제조-02,a.생산관리,"골재장 지붕 철거 및 삼안 업무 협의","2019-01-16 20:51:00",16-제조-02,a.생산관리,"골재장 지붕 철거 및 삼안 업무 협의","2019-01-16 18:46:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>당진시청 및 서울사무실 업무 및 일정 조정<|>03:00<|><br>19-제조-02<|>a.생산관리<|>철근 절단치수 계산 검토 <|>05:00<|><br>",1,
|
|
J11302,"2019-01-16 07:16:00",17-시공-07,g.기타,"북수원1교 가설검토","2019-01-16 18:04:00",17-시공-07,g.기타,"북수원1교 가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
M05510,"2019-01-16 07:24:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-01-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.190.4,NULL,NULL,004C8,,,
|
|
J13308,"2019-01-16 07:29:00",18-시공-15,b.시공,"1. Precast 제품 동영상 시안 및 자료 수집
|
|
2. 2019 워크숍 초안작성","2019-01-16 18:04:00",18-시공-15,b.시공,"1. Precast 제품 동영상 시안 및 자료 수집
|
|
2. 2019 워크숍 초안작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J14308,"2019-01-16 07:34:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-16 22:32:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-16 18:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
T04204,"2019-01-16 07:38:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산,PTC 말뚝시험체 철근가공,골재장 천막, 빔철거 ","2019-01-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J10315,"2019-01-16 07:40:00",17-설계-09,"a.계획 및 협의","크레인 가설 적정성 검토 및 협의자료 작성 ","2019-01-16 18:06:00",17-설계-09,"a.계획 및 협의","크레인 가설 적정성 검토 및 협의자료 작성 ","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18207,"2019-01-16 07:42:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","2019-01-16 18:32:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18208,"2019-01-16 07:45:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-16 21:56:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-16 18:53:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18203,"2019-01-16 08:03:00",19-교휴-06,a.기타,"세천2교, 감이교 제작완료 보고서 작성","2019-01-16 18:11:00",19-교휴-06,a.기타,"세천2교, 감이교 제작완료 보고서 작성","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C8,,,
|
|
B15306,"2019-01-16 08:10:00",18-관리-02,e.기타,"비서업무 외","2019-01-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-01-16 08:14:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 비교안","2019-01-16 18:08:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 비교안","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J11203,"2019-01-16 08:18:00",18-설계-19,b.구조계산,업무회의,"2019-01-16 19:52:00",18-설계-19,b.구조계산,업무회의,"0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-관리-04<|>g.기타<|>설계업무회의(정es, 김es, 박bj, 류bj)<|>02:00<|><br>18-설계-19<|>h.기타<|>교량현황정리(변경분 반영) 후 회의(부장이하 총 5인)<|>02:30<|><br>19-관리-04<|>g.기타<|>설계시 검토해야 할 사항 정리<|>02:00<|><br>",,
|
|
J14306,"2019-01-16 08:18:00",18-관리-04,a.계약,"계약, 인사 외","2019-01-16 18:15:00",18-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J18204,"2019-01-16 08:19:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","2019-01-16 18:07:00",18-교휴-06,a.기타,"특수교 시공관리 manual 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J07103,"2019-01-16 08:20:00",18-교영-01,d.기타,사업관리,"2019-01-16 20:01:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J13201,"2019-01-16 08:20:00",18-설계-19,"f.보고서 및 시방서","구조설계보고서 작성","2019-01-16 18:27:00",16-설계-02,e.검토,"왕림교 빔배치 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J10301,"2019-01-16 08:21:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-16 18:11:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15307,"2019-01-16 08:23:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 산외교 Pre-Deck Shop Drawing","2019-01-16 18:04:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 산외교 Pre-Deck Shop Drawing","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J15302,"2019-01-16 08:24:00",18-설계-19,c.도면,"거더도면 및 수량작업","2019-01-16 19:51:00",18-설계-19,c.도면,"거더도면 및 수량작업","2019-01-16 19:51:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"18-설계-19<|>e.검토<|>변경교량 재빔배치<|>03:00<|><br>",1,
|
|
J08201,"2019-01-16 08:26:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-01-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J10314,"2019-01-16 08:26:00",14-교영-00,d.기타,"Nodular거더 공사비검토(설계가),
|
|
타사 공법별 비교검토자료 및 거더 공사비 검토","2019-01-16 18:10:00",14-교영-00,d.기타,"Nodular거더 공사비검토(설계가),
|
|
타사 공법별 비교검토자료 및 거더 공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15202,"2019-01-16 08:28:00",17-설계-06,e.검토,"원흥2교 비상주감리 지적사항 검토","2019-01-16 20:59:00",17-설계-06,e.검토,"원흥2교 비상주감리 지적사항 검토","2019-01-16 18:53:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J11202,"2019-01-16 08:29:00",18-시공-11,b.시공,공사관리,"2019-01-16 18:12:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-01-16 08:30:00",16-시공-20,g.기타,"당초 변경","2019-01-16 18:10:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J15301,"2019-01-16 08:32:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
산외교 12월 투입내역서 소급입력","2019-01-16 19:08:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
산외교 12월 투입내역서 소급입력","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J17205,"2019-01-16 08:34:00",18-교영-01,c.설계사,.,"2019-01-16 18:07:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-01-16 08:36:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-01-16 18:02:00",19-교영-01,c.설계사,"신규과업 현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J18205,"2019-01-16 08:39:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-16 22:15:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-16 18:35:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J15305,"2019-01-16 08:40:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-16 22:01:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-16 18:35:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J10313,"2019-01-16 08:41:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-16 18:00:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16202,"2019-01-16 08:45:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-16 18:09:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J09101,"2019-01-16 08:46:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-01-16 08:50:00",16-시공-20,출장,한양,"2019-01-16 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J16203,"2019-01-16 08:50:00",16-제조-02,출장,"[밀양(산외교)]산외교 배합확인(20-70-500)시험 ","2019-01-16 18:00:00",16-제조-02,출장,"[밀양(산외교)]산외교 배합확인(20-70-500)시험 ","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J09102,"2019-01-16 08:50:00",19-영업-01,출장,"한신공영, 동광건설","2019-01-16 18:00:00",19-영업-01,출장,"한신공영, 동광건설","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18202,"2019-01-16 08:50:00",07-교영-01,출장,"[광주, 합천]상부공 수주영업(남양건설 본사, 합천호교)","2019-01-16 18:00:00",07-교영-01,출장,"[광주, 합천]상부공 수주영업(남양건설 본사, 합천호교)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-01-17 06:17:00",16-제조-04,b.기계,"북수원 1교 런처 앵커 설치 작업과 고재통 제작","2019-01-18 06:13:00",16-제조-04,b.기계,"북수원 1교 런처 앵커 설치 작업과 고재통 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-01-17 06:42:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-01-17 07:19:00",17-시공-07,g.기타,"왕림교 가설계획서 작성","2019-01-17 18:07:00",17-시공-07,g.기타,"왕림교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
M05510,"2019-01-17 07:27:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-01-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.145.190,NULL,NULL,004C8,,,
|
|
J13308,"2019-01-17 07:29:00",18-시공-15,b.시공,"1. Precast 제품 동영상 시안 및 자료 수집
|
|
2. 2019 워크숍 초안작성","2019-01-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E4,,,
|
|
J18208,"2019-01-17 07:31:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-17 18:01:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-01-17 07:31:00",19-제조-02,a.생산관리,"골재장 지붕 가설건축물축조신고서 작성 및 근거자료 수집 및 작성","2019-01-17 21:32:00",16-제조-02,a.생산관리,"골재장 지붕 가설건축물축조신고서 작성 및 근거자료 수집 및 작성","2019-01-17 19:14:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>4헤드 절곡기 관련 업무 협의 및 조사<|>02:00<|><br>19-제조-02<|>a.생산관리<|>골재장 지붕철거 작업 현장 확인<|>00:30<|><br>19-제조-02<|>a.생산관리<|>공장 LAYOUT 현장 확인<|>01:00<|><br>",1,
|
|
J16203,"2019-01-17 07:32:00",19-제조-03,a.품질검사,"산외교, 주천1교 생산 품질관리,콘크리트시험","2019-01-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-01-17 07:40:00",19-영업-01,d.기타,"이서2교, 용암1교 수직형 Nodular거더 예상 시행가 등 : 옥산4교 외 5개교 계약 추진 중","2019-01-17 18:08:00",19-영업-01,d.기타,"이서2교, 용암1교 수직형 Nodular거더 예상 시행가 등 : 옥산4교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
T04204,"2019-01-17 07:41:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산,PTC 말뚝시험체 철근가공,골재장 천막, 빔철거 ","2019-01-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-01-17 07:44:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","2019-01-17 18:15:00",18-교휴-06,d.기타,"전현장 예산집행 및 현장관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J14308,"2019-01-17 07:44:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-17 22:20:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-17 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J10315,"2019-01-17 07:53:00",17-설계-09,"a.계획 및 협의","크레인 가설 적정성 검토 및 협의자료 작성 ","2019-01-17 18:05:00",17-설계-09,"a.계획 및 협의","크레인 가설 적정성 검토 및 협의자료 작성 ","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J11305,"2019-01-17 07:59:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 비교안","2019-01-17 18:05:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 비교안","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J18206,"2019-01-17 08:03:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-17 18:09:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J18204,"2019-01-17 08:05:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","2019-01-17 18:03:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J18203,"2019-01-17 08:08:00",19-교휴-06,a.기타,"세천2교, 감이교 제작완료 보고서 작성","2019-01-17 18:36:00",19-교휴-06,a.기타,"세천2교, 감이교 제작완료 보고서 작성","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C8,,,
|
|
J10301,"2019-01-17 08:14:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-17 18:17:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-01-17 08:21:00",14-설계-32,g.업무지원,"솟음관련 Count Weight하중 검토","2019-01-17 18:42:00",18-설계-19,"f.보고서 및 시방서","구조설계보고서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,"18-설계-19<|>h.기타<|>건설표준코드 시방서 검토<|>04:00<|><br>",,
|
|
B15306,"2019-01-17 08:22:00",18-관리-02,e.기타,"비서업무 외","2019-01-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-01-17 08:22:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 산외교 Pre-Deck Shop Drawing","2019-01-17 18:03:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 산외교 Pre-Deck Shop Drawing","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J16202,"2019-01-17 08:23:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-17 18:15:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10314,"2019-01-17 08:23:00",14-교영-00,d.기타,"공법별 비교검토자료,
|
|
조령천교(안성~성남1공구) 공사비검토,
|
|
Nodular거더 공사비검토(설계가)","2019-01-17 18:09:00",14-교영-00,d.기타,"조령천교(안성~성남1공구) 공사비검토,
|
|
Nodular거더 공사비검토(설계가),
|
|
타사 공법별 비교검토자료 및 거더 공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11203,"2019-01-17 08:25:00",18-설계-19,b.구조계산,"대콘교량 r-d교 r-f1교 빔배치","2019-01-17 18:04:00",18-설계-19,b.구조계산,"대콘교량 3개소 빔배치","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-관리-04<|>g.기타<|>설계시 검토해야 할 사항 정리<|>03:00<|><br>",,
|
|
J15202,"2019-01-17 08:26:00",17-설계-06,e.검토,"원흥2교 비상주감리 지적사항 검토","2019-01-17 18:06:00",17-설계-06,e.검토,"원흥2교 비상주감리 지적사항 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J15302,"2019-01-17 08:27:00",18-설계-19,c.도면,"일반도 및 빔배치작업","2019-01-17 18:04:00",18-설계-19,c.도면,"일반도 및 빔배치작업","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J11202,"2019-01-17 08:28:00",18-시공-11,b.시공,공사관리,"2019-01-17 18:17:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-01-17 08:29:00",16-시공-20,g.기타,"당초 변경","2019-01-17 18:07:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J07103,"2019-01-17 08:29:00",18-교영-01,d.기타,사업관리,"2019-01-17 18:12:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15305,"2019-01-17 08:33:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-17 22:02:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-17 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J18205,"2019-01-17 08:33:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-17 22:40:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-17 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J15201,"2019-01-17 08:34:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-01-17 18:02:00",19-교영-01,c.설계사,"신규과업 현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-01-17 08:35:00",18-교영-01,c.설계사,.,"2019-01-17 18:11:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15301,"2019-01-17 08:35:00",16-시공-20,b.시공,"주천1교 투입내역서 작성
|
|
월드컵대교 건설기계임대차계약 금액 취합
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
시화JCT 자재 공급원승인서 발송","2019-01-17 18:06:00",16-시공-20,b.시공,"주천1교 투입내역서 작성
|
|
월드컵대교 건설기계임대차계약 금액 취합
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
시화JCT 자재 공급원승인서 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-01-17 08:42:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-17 18:02:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10313,"2019-01-17 08:46:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-17 18:00:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14306,"2019-01-17 08:50:00",19-교휴-06,경유,"경유(쌍용건설(신기술활용실적신고서 원청 날인))","2019-01-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E5,,,
|
|
J14101,"2019-01-17 08:50:00",16-시공-20,출장,한양,"2019-01-17 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-01-17 08:50:00",07-교영-01,출장,"[광주, 합천]상부공 수주영업(남양건설 본사, 합천호교)","2019-01-17 18:00:00",07-교영-01,출장,"[광주, 합천]상부공 수주영업(남양건설 본사, 합천호교)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-01-18 06:05:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-18 18:03:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-01-18 06:15:00",16-제조-04,b.기계,"실험실 급수와 전기 공급대 설치와 생산1팀 고재통 제작","2019-01-18 18:10:00",16-제조-04,b.기계,"실험실 급수와 전기 공급대 설치와 생산1팀 고재통 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-01-18 07:12:00",18-시공-15,b.시공,"1. Precast 제품 동영상 시안 및 자료 수집
|
|
2. 2019 워크숍 초안작성","2019-01-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E4,,,
|
|
J11302,"2019-01-18 07:20:00",17-시공-07,g.기타,"왕림교 가설계획서 작성","2019-01-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E3,,,
|
|
J14308,"2019-01-18 07:31:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-18 21:05:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-18 18:51:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J18208,"2019-01-18 07:35:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-18 21:06:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-18 18:51:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18202,"2019-01-18 07:35:00",07-교영-01,b.시공사,"지곡교, 합천호교 상황 파악","2019-01-18 18:03:00",07-교영-01,b.시공사,"지곡교, 합천호교 상황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
M02302,"2019-01-18 07:36:00",19-제조-02,a.생산관리,"생산팀 업무 파악","2019-01-18 18:07:00",19-제조-02,a.생산관리,"생산팀 업무 파악","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>골재장 지붕 가설건축물축조신고서 작성 및 협의<|>03:00<|><br>19-제조-02<|>a.생산관리<|>UHPC 관련 협의 및 자료 조사<|>03:00<|><br>",,
|
|
M05510,"2019-01-18 07:40:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-01-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.146.74,NULL,NULL,004C8,,,
|
|
T04204,"2019-01-18 07:41:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산,골재장 빔철거 ","2019-01-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09102,"2019-01-18 07:41:00",19-영업-01,d.기타,"삼남1교 강연선 제외 시행가 등 : 옥산4교 외 5개교 계약 추진 중","2019-01-18 18:01:00",19-영업-01,d.기타,"조안대교 두산건설 방문예정, 삼남1교 강연선 제외 시행가 등 : 옥산4교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J16203,"2019-01-18 07:42:00",19-제조-03,a.품질검사,"산외교, 주천1교 생산 품질관리,콘크리트시험
|
|
UHPC배합검토","2019-01-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J10315,"2019-01-18 07:45:00",13-설계-33,"a.계획 및 협의","제작 및 가설 시공계획서 작성
|
|
","2019-01-18 18:00:00",13-설계-33,"a.계획 및 협의","제작 및 가설 시공계획서 작성
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J11305,"2019-01-18 08:08:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 비교안","2019-01-18 18:10:00",17-설계-09,"a.계획 및 협의","조령천교 교량연장 비교안","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
B15306,"2019-01-18 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-01-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-01-18 08:15:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 산외교 Pre-Deck Shop Drawing","2019-01-18 18:01:00",19-교영-01,d.기타,"1. 2019년도 상반기 EBS 갱신
|
|
2. 산외교 Pre-Deck Shop Drawing","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18206,"2019-01-18 08:16:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-18 17:19:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J08201,"2019-01-18 08:21:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-01-18 18:12:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15202,"2019-01-18 08:21:00",17-설계-06,e.검토,"원흥2교 비상주감리 지적사항 검토","2019-01-18 18:10:00",17-설계-06,e.검토,"원흥2교 비상주감리 지적사항 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J18204,"2019-01-18 08:22:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","2019-01-18 18:03:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J09101,"2019-01-18 08:25:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-18 18:02:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J13201,"2019-01-18 08:26:00",14-설계-32,g.업무지원," 솟음관련 Count Weight하중 검토 ","2019-01-18 12:31:00",14-설계-32,g.업무지원," 솟음관련 Count Weight하중 검토 ","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J15302,"2019-01-18 08:26:00",18-설계-19,c.도면,"일반도 및 빔배치작업","2019-01-18 18:05:00",18-설계-19,c.도면,"일반도 및 빔배치작업","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J16202,"2019-01-18 08:27:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-18 18:08:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11202,"2019-01-18 08:27:00",18-시공-11,b.시공,공사관리,"2019-01-18 18:12:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07103,"2019-01-18 08:28:00",18-교영-01,d.기타,사업관리,"2019-01-18 18:10:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J07210,"2019-01-18 08:30:00",16-시공-20,g.기타,"당초 변경","2019-01-18 18:14:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J11203,"2019-01-18 08:31:00",18-설계-19,b.구조계산,"대콘교량 승천천교 빔배치","2019-01-18 18:06:00",18-설계-19,b.구조계산,"대콘교량 승천천교 빔배치","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-관리-04<|>g.기타<|>동절기 워크삽 자료준비<|>03:00<|><br>",,
|
|
J10314,"2019-01-18 08:32:00",14-교영-00,d.기타,"조령천교(안성~성남1공구) 공사비검토,
|
|
Nodular거더 공사비검토(설계가),
|
|
타사 공법별 비교검토자료 및 거더 공사비 검토","2019-01-18 18:03:00",14-교영-00,d.기타,"조령천교(안성~성남1공구) 공사비검토,
|
|
Nodular거더 공사비검토(설계가),
|
|
타사 공법별 비교검토자료 및 거더 공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15305,"2019-01-18 08:32:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-18 21:12:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-18 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J18205,"2019-01-18 08:32:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-18 21:12:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-18 18:31:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J14306,"2019-01-18 08:33:00",19-관리-04,a.계약,"계약, 인사 외","2019-01-18 18:05:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J15301,"2019-01-18 08:34:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
시화JCT 자재 공급원승인서 발송
|
|
부가세신고 계산서 누락분 확인","2019-01-18 18:33:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
시화JCT 자재 공급원승인서 발송
|
|
부가세신고 계산서 누락분 확인","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15201,"2019-01-18 08:35:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-01-18 18:00:00",19-교영-01,c.설계사,"신규과업 현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-01-18 08:39:00",18-교영-01,c.설계사,.,"2019-01-18 18:05:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-01-18 08:47:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-18 18:03:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14101,"2019-01-18 08:50:00",16-시공-20,출장,한양,"2019-01-18 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18203,"2019-01-18 08:50:00",17-시공-08,출장,"[대구광역시 달성구]원청사 잔여 공정 추진 협의 요청(빔런쳐 제작 및 가설 공정 협의)","2019-01-18 18:00:00",17-시공-08,출장,"[대구광역시 달성구]원청사 잔여 공정 추진 협의 요청(빔런쳐 제작 및 가설 공정 협의)","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J18207,"2019-01-18 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","2019-01-18 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10301,"2019-01-18 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","2019-01-18 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M05510,"2019-01-19 07:20:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.153.128,NULL,NULL,004C8,,,
|
|
J18205,"2019-01-19 09:58:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-19 15:34:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E2,,1,
|
|
J15305,"2019-01-19 09:59:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-19 15:35:00",18-설계-18,g.업무지원,"종평면도 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E5,,1,
|
|
J18205,"2019-01-20 10:11:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-20 15:47:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E2,,1,
|
|
J15305,"2019-01-20 10:19:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-20 15:33:00",18-설계-18,g.업무지원,"종평면도 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E5,,1,
|
|
J07202,"2019-01-21 06:19:00",16-제조-04,b.기계,"PTC 업무 지원과 고재통 제작과 폐 자재 파쇄","2019-01-22 06:20:00",16-제조-04,b.기계,"PTC 업무 지원과 고재통 제작과 폐 자재 파쇄","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-01-21 06:51:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-01-21 07:08:00",17-시공-07,g.기타,"왕림교 가설계획서 작성","2019-01-21 18:15:00",17-시공-07,g.기타,"왕림교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
M05510,"2019-01-21 07:11:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-01-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.130.30,NULL,NULL,004C8,,,
|
|
J18208,"2019-01-21 07:29:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-21 18:05:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J13308,"2019-01-21 07:30:00",18-시공-15,b.시공,"1. Precast 제품 동영상 시안 및 자료 수집
|
|
2. 2019 워크숍 초안작성","2019-01-21 18:09:00",18-시공-15,b.시공,"1. Precast 제품 동영상 시안 및 자료 수집
|
|
2. 2019 워크숍 초안작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J14308,"2019-01-21 07:31:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-21 18:03:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
T04204,"2019-01-21 07:35:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산,골재장 빔정리","2019-01-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J16203,"2019-01-21 07:39:00",19-제조-03,a.품질검사,"산외교, 주천1교 생산 품질관리,콘크리트시험
|
|
UHPC배합검토","2019-01-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-01-21 07:43:00",19-영업-01,d.기타,"조안대교 두산건설 방문예정, 용상~교리1 교리교 외 시행가 등 : 옥산4교 외 5개교 계약 추진 중","2019-01-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M02302,"2019-01-21 07:52:00",19-제조-02,a.생산관리,"골재저장소 가건축물신고 자료 작성 및 협의","2019-01-21 18:03:00",19-제조-02,a.생산관리,"골재저장소 가건축물신고 자료 작성 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>철근 재고 파악 EXCEL Sheet 검토 및 수정<|>03:00<|><br>19-제조-02<|>a.생산관리<|>WAFFLE DECK자료 수집 및 개략 도면 작성<|>02:00<|><br>",,
|
|
J18206,"2019-01-21 07:59:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-21 18:13:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J10315,"2019-01-21 08:01:00",13-설계-33,"a.계획 및 협의","제작 및 가설 시공계획서 작성
|
|
","2019-01-21 18:13:00",13-설계-33,"a.계획 및 협의","제작 및 가설 시공계획서 작성
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18202,"2019-01-21 08:03:00",07-교영-01,b.시공사,"지곡교, 합천호교 상황 파악","2019-01-21 18:14:00",07-교영-01,b.시공사,"지곡교, 합천호교 상황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
J11305,"2019-01-21 08:09:00",17-시공-10,g.기타,"답변서 작성","2019-01-21 18:07:00",17-시공-10,g.기타,"답변서 작성","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J15307,"2019-01-21 08:13:00",19-교영-01,d.기타,"1. 2019년도 상반기 조견표 작성
|
|
2. 산외교 Pre-Deck Shop Drawing","2019-01-21 18:12:00",19-교영-01,d.기타,"1. 2019년도 상반기 조견표 작성
|
|
2. 산외교 Pre-Deck Shop Drawing","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J08201,"2019-01-21 08:14:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-01-21 19:14:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18204,"2019-01-21 08:14:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","2019-01-21 18:08:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J18203,"2019-01-21 08:17:00",19-교휴-06,a.기타,"세천2교 관련 현황파악","2019-01-21 18:14:00",19-교휴-06,a.기타,"세천2교 관련 현황파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C8,,,
|
|
J13201,"2019-01-21 08:20:00",14-설계-32,g.업무지원," 솟음관련 Count Weight하중 검토 ","2019-01-21 18:05:00",14-설계-32,g.업무지원," 솟음관련 Count Weight하중 검토 ","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,"16-설계-02<|>h.기타<|>왕림교 빔배치 수정<|>02:00<|><br>",,
|
|
B15306,"2019-01-21 08:22:00",18-관리-02,e.기타,"비서업무 외","2019-01-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J14306,"2019-01-21 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-01-21 18:11:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J11202,"2019-01-21 08:24:00",18-시공-11,b.시공,공사관리,"2019-01-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J16202,"2019-01-21 08:25:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-21 19:11:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15302,"2019-01-21 08:25:00",18-설계-19,c.도면,"일반도 및 빔배치작업","2019-01-21 12:25:00",18-설계-19,c.도면,"일반도 및 빔배치작업","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,"18-설계-19<|>e.검토<|>프리덱 피복에 따른 철근 간섭검토<|>02:00<|><br>",,
|
|
J10314,"2019-01-21 08:27:00",14-교영-00,d.기타,"삼남1교(밀양~울산 7공구) 시행견적서,
|
|
Nodular거더 공사비검토(설계가),
|
|
타사 공법별 비교검토자료 및 거더 공사비 검토","2019-01-21 18:20:00",14-교영-00,d.기타,"삼남1교(밀양~울산 7공구) 시행견적서,
|
|
Nodular거더 공사비검토(설계가),
|
|
타사 공법별 비교검토자료 및 거더 공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15202,"2019-01-21 08:27:00",17-설계-06,e.검토,"원흥2교 비상주감리 지적사항 검토","2019-01-21 21:00:00",17-설계-06,e.검토,"원흥2교 비상주감리 지적사항 검토","2019-01-21 18:34:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-01-21 08:28:00",16-시공-20,g.기타,"당초 변경","2019-01-21 18:12:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J07103,"2019-01-21 08:29:00",18-교영-01,d.기타,사업관리,"2019-01-21 18:13:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J09101,"2019-01-21 08:30:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-21 11:37:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14302,"2019-01-21 08:30:00",17-시공-10,b.시공,"현장투입 준비작업","2019-01-21 18:04:00",17-시공-10,b.시공,"현장투입 준비작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004E2,,,
|
|
J15301,"2019-01-21 08:31:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
시화JCT 자재 공급원승인서 발송
|
|
주천1교 투입내역서 및 이체증 발송","2019-01-21 18:12:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
시화JCT 자재 공급원승인서 발송
|
|
주천1교 투입내역서 및 이체증 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11203,"2019-01-21 08:36:00",18-설계-19,b.구조계산,"대콘교량 승천천교 세종방향 모델링","2019-01-21 18:19:00",18-설계-19,b.구조계산,"대콘교량 승천천교 빔배치","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-관리-04<|>g.기타<|>동절기 워크삽 자료 정리<|>03:00<|><br>",,
|
|
J15201,"2019-01-21 08:37:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-01-21 18:03:00",19-교영-01,c.설계사,"신규과업 현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-01-21 08:37:00",18-교영-01,c.설계사,.,"2019-01-21 18:56:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15305,"2019-01-21 08:40:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-21 22:03:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-21 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J18205,"2019-01-21 08:40:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-21 22:09:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-21 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J10313,"2019-01-21 08:40:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-21 18:02:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J10310,"2019-01-21 09:00:00",18-시공-12,b.시공,"경안천교 제작완료 보고서 작성","2019-01-21 18:08:00",18-시공-12,b.시공,"경안천교 제작완료 보고서 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J14101,"2019-01-21 08:50:00",16-시공-20,출장,한양,"2019-01-21 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18207,"2019-01-21 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","2019-01-21 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10301,"2019-01-21 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","2019-01-21 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J12202,"2019-01-22 06:18:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-22 18:01:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-01-22 06:21:00",16-제조-04,b.기계,"실험실 전기 및 세륜시설 설치와 PTC 업무 지원과 고재통 제작","2019-01-23 07:30:00",16-제조-04,b.기계,"실험실 전기 및 세륜시설 설치와 PTC 업무 지원과 고재통 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-01-22 07:04:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-01-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.213.92,NULL,NULL,004C8,,,
|
|
J11302,"2019-01-22 07:17:00",17-시공-07,g.기타,"왕림교 가설계획서 작성","2019-01-22 18:09:00",17-시공-07,g.기타,"왕림교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J13308,"2019-01-22 07:22:00",18-시공-15,b.시공,"1. Precast 제품 동영상 시안 및 자료 수집
|
|
2. 2019 워크숍 초안작성","2019-01-22 18:05:00",18-시공-15,b.시공,"1. Precast 제품 동영상 시안 및 자료 수집
|
|
2. 2019 워크숍 초안작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J14308,"2019-01-22 07:34:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-22 22:13:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-22 18:38:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J18208,"2019-01-22 07:35:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-22 22:13:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-22 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18202,"2019-01-22 07:35:00",07-교영-01,b.시공사,"지곡교, 합천호교 상황 파악","2019-01-22 18:09:00",07-교영-01,b.시공사,"지곡교, 합천호교 상황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
T04204,"2019-01-22 07:36:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산,골재장 빔정리","2019-01-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J16203,"2019-01-22 07:38:00",19-제조-03,a.품질검사,"산외교, 주천1교 생산 품질관리,콘크리트시험
|
|
UHPC배합검토","2019-01-22 23:04:00",19-제조-03,a.품질검사,"산외교, 주천1교 생산 품질관리,콘크리트시험
|
|
UHPC배합검토","2019-01-22 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-01-22 07:43:00",19-영업-01,d.기타,"주상천 대벌교, 용상~교리1 교리교 외 시행가 등 : 옥산4교 외 5개교 계약 추진 중","2019-01-22 18:10:00",19-영업-01,d.기타,"주상천 대벌교, 용상~교리1 교리교 외 시행가 등 : 옥산4교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J10315,"2019-01-22 07:44:00",18-설계-12,"a.계획 및 협의","지산교 가설자료작성 및 협의
|
|
","2019-01-22 18:04:00",18-설계-12,"a.계획 및 협의","지산교 가설자료작성 및 협의
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18206,"2019-01-22 08:03:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-22 17:30:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J18203,"2019-01-22 08:05:00",19-교휴-06,a.기타,"산외교 관련 현황파악","2019-01-22 18:04:00",19-교휴-06,a.기타,"산외교 관련 현황파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C8,,,
|
|
J11305,"2019-01-22 08:08:00",17-시공-10,g.기타,"답변서 작성","2019-01-22 18:05:00",17-시공-10,g.기타,"답변서 작성","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J15307,"2019-01-22 08:19:00",19-교영-01,d.기타,"1. 당진~천안(인주~염치) 특정공법심의 견적
|
|
2. 2019년도 상반기 조견표 작성
|
|
3. 순천 벌교~주암 3공구 단가기준 변경
|
|
4. 국지도84호선 실시설계 견적 재요청","2019-01-22 18:37:00",19-교영-01,d.기타,"1. 당진~천안(인주~염치) 특정공법심의 견적
|
|
2. 2019년도 상반기 조견표 작성
|
|
","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
B15306,"2019-01-22 08:19:00",18-관리-02,e.기타,"비서업무 외","2019-01-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15302,"2019-01-22 08:24:00",18-설계-19,c.도면,"일반도 및 빔배치작업","2019-01-22 18:06:00",18-설계-19,c.도면,"일반도 및 빔배치작업","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J14306,"2019-01-22 08:25:00",19-관리-04,a.계약,"계약, 인사 외","2019-01-22 18:14:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J15201,"2019-01-22 08:26:00",19-교영-02,c.설계사,"과업진행현황 파악","2019-01-22 18:13:00",19-교영-02,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10310,"2019-01-22 08:27:00",18-시공-12,b.시공,"경안천교 제작완료 보고서 작성","2019-01-22 18:03:00",18-시공-12,b.시공,"경안천교 제작완료 보고서 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J16202,"2019-01-22 08:28:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-22 18:55:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-22 18:34:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J11202,"2019-01-22 08:29:00",18-시공-11,b.시공,공사관리,"2019-01-22 18:13:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10314,"2019-01-22 08:29:00",14-교영-00,d.기타,"지산교 (평택동부고속도로) 가설비 검토,
|
|
김포~파주 2공구 거더 개략공사비,
|
|
조안대교(화도~양평 2공구) 시행견적서,
|
|
삼남1교(밀양~울산 7공구) 시행견적서,
|
|
","2019-01-22 18:36:00",14-교영-00,d.기타,"지산교 (평택동부고속도로) 가설비 검토,
|
|
김포~파주 2공구 거더 개략공사비,
|
|
조안대교(화도~양평 2공구) 시행견적서,
|
|
삼남1교(밀양~울산 7공구) 시행견적서,
|
|
","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11203,"2019-01-22 08:32:00",18-설계-19,b.구조계산,"대콘교량 승천천교 세종방향 모델링작성 후 반력 송부
|
|
","2019-01-22 18:03:00",18-설계-19,b.구조계산,"대콘교량 승천천교 세종방향 모델링","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-교영-01<|>d.기타<|>당진천안 교량수량산출<|>04:00<|><br>",,
|
|
J07103,"2019-01-22 08:32:00",18-교영-01,d.기타,사업관리,"2019-01-22 18:12:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14302,"2019-01-22 08:33:00",17-시공-10,b.시공,"현장투입 준비작업","2019-01-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004E2,,,
|
|
J17205,"2019-01-22 08:33:00",18-교영-01,c.설계사,.,"2019-01-22 18:30:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15301,"2019-01-22 08:33:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
시화JCT 자재 공급원승인서 발송
|
|
주천1교 투입내역서 및 이체증 발송","2019-01-22 18:08:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
시화JCT 자재 공급원승인서 발송
|
|
주천1교 투입내역서 및 이체증 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J07210,"2019-01-22 08:34:00",16-시공-20,g.기타,"당초 변경","2019-01-22 20:45:00",16-시공-20,g.기타,"당초 변경","2019-01-22 18:37:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J18204,"2019-01-22 08:34:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","2019-01-22 18:07:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J15305,"2019-01-22 08:36:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-22 21:37:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-22 18:38:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J13201,"2019-01-22 08:37:00",18-교영-11,c.설계사," 시화MTV 빔배치","2019-01-22 18:17:00",18-교영-11,c.설계사," 시화MTV 빔배치","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J15202,"2019-01-22 08:41:00",19-교영-03,d.기타,"공사비 산정","2019-01-22 20:45:00",19-교영-03,d.기타,"공사비 산정","2019-01-22 18:38:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J18205,"2019-01-22 08:43:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-22 21:55:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-22 18:38:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J10313,"2019-01-22 08:45:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-22 18:00:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-01-22 08:46:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-22 18:05:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
M02302,"2019-01-22 12:17:00",19-제조-02,a.생산관리,"골재저장소 가건축물신고 자료 작성 및 협의","2019-01-22 20:53:00",19-제조-02,a.생산관리,"골재저장소 가건축물신고 자료 작성 및 협의","2019-01-22 18:51:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,,1,
|
|
J14101,"2019-01-22 08:50:00",16-시공-20,출장,한양,"2019-01-22 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18207,"2019-01-22 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","2019-01-22 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10301,"2019-01-22 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","2019-01-22 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J12202,"2019-01-23 06:47:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-01-23 07:26:00",17-시공-07,g.기타,"지산교 제작장 수정 및 북수원1교 인장계획서 작성","2019-01-23 18:07:00",17-시공-07,g.기타,"지산교 제작장 수정 및 북수원1교 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J14308,"2019-01-23 07:30:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-24 07:30:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-23 19:53:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
M05510,"2019-01-23 07:30:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-01-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.181.248,NULL,NULL,004C8,,,
|
|
J13308,"2019-01-23 07:31:00",18-시공-15,b.시공,"1. Precast 제품 동영상 시안 및 자료 수집
|
|
2. 2019 워크숍 초안작성","2019-01-23 18:08:00",18-시공-15,b.시공,"1. Precast 제품 동영상 시안 및 자료 수집
|
|
2. 2019 워크숍 초안작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J07202,"2019-01-23 07:31:00",16-제조-04,b.기계,"북수원1교 런처 앵커 지그 제작 및 PTC 실험체 지원과 고재통 제작","2019-01-24 06:51:00",16-제조-04,b.기계,"북수원1교 런처 앵커 지그 제작 및 PTC 실험체 지원과 고재통 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-01-23 07:32:00",19-제조-02,a.생산관리,"waffle deck 초안 도면 작성","2019-01-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,"19-제조-02<|>a.생산관리<|>Pre-Deck 제작도 작성<|>02:00<|><br>19-제조-02<|>a.생산관리<|>업무분장 관련 회의 및 협의 <|>01:30<|><br>19-제조-02<|>a.생산관리<|>고강도 Deck 계획 및 구조 검토<|>03:00<|><br>",1,
|
|
J18208,"2019-01-23 07:32:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J16203,"2019-01-23 07:33:00",19-제조-03,a.품질검사,"실험실정리,산외교, 새천1교 생산 품질관리,콘크리트시험
|
|
UHPC배합검토","2019-01-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,1,
|
|
J18202,"2019-01-23 07:35:00",07-교영-01,b.시공사,"지곡교, 합천호교 상황 파악","2019-01-24 07:37:00",07-교영-01,b.시공사,"지곡교, 합천호교 상황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
T04204,"2019-01-23 07:37:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산,골재장 빔정리","2019-01-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
B15306,"2019-01-23 07:53:00",18-관리-02,e.기타,"비서업무 외","2019-01-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-01-23 08:02:00",17-시공-10,g.기타,"답변서 작성","2019-01-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C8,,,
|
|
J18206,"2019-01-23 08:10:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-23 18:14:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J13201,"2019-01-23 08:12:00",18-교영-11,c.설계사," 시화MTV 빔배치","2019-01-23 18:33:00",18-교영-11,c.설계사," 시화MTV 빔배치","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J07103,"2019-01-23 08:13:00",18-교영-01,d.기타,사업관리,"2019-01-23 18:23:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10310,"2019-01-23 08:15:00",17-시공-21,b.시공,"북수원1교 제작 준비자료 작성","2019-01-23 18:05:00",17-시공-21,b.시공,"북수원1교 제작 준비자료 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J18204,"2019-01-23 08:16:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","2019-01-23 18:06:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J18203,"2019-01-23 08:16:00",19-교휴-06,a.기타,"산외교 관련 현황파악","2019-01-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C8,,,
|
|
J08201,"2019-01-23 08:19:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-01-23 18:47:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-01-23 08:20:00",19-교영-01,d.기타,"1. 당진~천안(인주~염치) 특정공법심의 견적
|
|
2. 2019년도 상반기 조견표 작성
|
|
","2019-01-23 18:09:00",19-교영-01,d.기타,"1. 당진~천안(인주~염치) 특정공법심의 견적
|
|
2. 2019년도 상반기 조견표 작성
|
|
","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J11203,"2019-01-23 08:21:00",18-설계-19,b.구조계산,"대콘교량 승천천교 안성방향 모델링 수정 후 반력 송부","2019-01-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J16202,"2019-01-23 08:22:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-23 18:16:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15302,"2019-01-23 08:23:00",18-설계-19,c.도면,"일반도 및 빔배치작업","2019-01-23 20:30:00",18-설계-19,c.도면,"일반도 및 빔배치작업","2019-01-23 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J15201,"2019-01-23 08:24:00",19-교영-02,c.설계사,"과업진행현황 파악","2019-01-23 18:02:00",19-교영-02,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15202,"2019-01-23 08:27:00",16-설계-02,b.구조계산,"왕림교 구조계산서 작성","2019-01-23 20:40:00",16-설계-02,b.구조계산,"왕림교 구조계산서 작성","2019-01-23 18:31:00",172.16.9.155,172.16.9.173,172.16.9.155,008E1,,1,
|
|
J10314,"2019-01-23 08:27:00",14-교영-00,d.기타,"김포~파주 2공구 거더 개략공사비,
|
|
지산교 (평택동부고속도로) 가설비 검토,
|
|
조안대교(화도~양평 2공구) 시행견적서,
|
|
삼남1교(밀양~울산 7공구) 시행견적서,
|
|
","2019-01-23 18:09:00",14-교영-00,d.기타,"김포~파주 2공구 거더 개략공사비,
|
|
지산교 (평택동부고속도로) 가설비 검토,
|
|
조안대교(화도~양평 2공구) 시행견적서,
|
|
삼남1교(밀양~울산 7공구) 시행견적서,
|
|
","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14306,"2019-01-23 08:28:00",19-관리-04,a.계약,"계약, 인사 외","2019-01-23 18:51:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J14302,"2019-01-23 08:30:00",17-시공-10,b.시공,"현장투입 준비작업","2019-01-23 18:09:00",17-시공-10,b.시공,"현장투입 준비작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004E2,,,
|
|
J11202,"2019-01-23 08:31:00",18-시공-11,b.시공,공사관리,"2019-01-23 18:34:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15301,"2019-01-23 08:34:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
산외교 노듈러 런처 지급 내역 자료 준비
|
|
월드컵대교 내용증명 공문 발송
|
|
원흥2교 쏠플레이트 검토서 작성","2019-01-23 18:10:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
산외교 노듈러 런처 지급 내역 자료 준비
|
|
월드컵대교 내용증명 공문 발송
|
|
원흥2교 쏠플레이트 검토서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J17205,"2019-01-23 08:34:00",18-교영-01,c.설계사,.,"2019-01-23 18:40:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15305,"2019-01-23 08:37:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-23 21:57:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-23 18:49:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J07210,"2019-01-23 08:39:00",16-시공-20,g.기타,"당초 변경","2019-01-23 18:05:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J09101,"2019-01-23 08:40:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J18205,"2019-01-23 08:43:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-23 22:01:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-23 18:50:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J10313,"2019-01-23 08:47:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-23 18:03:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J10315,"2019-01-23 08:50:00",18-설계-12,출장,수성엔지니어링,"2019-01-23 18:00:00",18-설계-12,"a.계획 및 협의","지산교 가설자료작성 및 협의
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J14101,"2019-01-23 08:50:00",16-시공-20,출장,한양,"2019-01-23 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18207,"2019-01-23 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","2019-01-23 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10301,"2019-01-23 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","2019-01-23 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J09102,"2019-01-23 08:50:00",17-시공-07,출장,두산중공업,"2019-01-23 18:00:00",17-시공-07,출장,두산중공업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-01-24 06:37:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-01-24 06:52:00",16-제조-04,b.기계,"원흥2교 거푸집 보수와 북수원1교 런처 앵커 설치공사","2019-01-25 06:15:00",16-제조-04,b.기계,"원흥2교 거푸집 보수와 북수원1교 런처 앵커 설치공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-01-24 07:26:00",17-시공-07,g.기타,"지산교 제작장 수정 및 북수원1교 인장계획서 작성","2019-01-24 18:06:00",17-시공-07,g.기타,"지산교 제작장 수정 및 북수원1교 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J13308,"2019-01-24 07:26:00",18-시공-15,b.시공,"1. Precast 제품 동영상 시안 및 자료 수집
|
|
2. 2019 워크숍 초안작성","2019-01-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E4,,,
|
|
J14308,"2019-01-24 07:30:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-24 18:01:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
M05510,"2019-01-24 07:33:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-01-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.139.156,NULL,NULL,004C8,,,
|
|
J16203,"2019-01-24 07:33:00",19-제조-03,a.품질검사,"공무 거푸집 지원,새천1교 생산 품질관리,콘크리트시험
|
|
","2019-01-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18208,"2019-01-24 07:33:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-24 21:00:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-24 18:48:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-01-24 07:37:00",19-제조-02,a.생산관리,"UHPC deck 설계초안 작성","2019-01-24 21:00:00",19-제조-02,a.생산관리,"UHPC deck 설계초안 작성","2019-01-24 18:47:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>골재저장소 가건축물신고 자료 작성 및 협의<|>03:00<|><br>",,
|
|
J18202,"2019-01-24 07:38:00",07-교영-01,b.시공사,"고삼교, 용상대교 발주 현황 파악","2019-01-24 18:06:00",07-교영-01,b.시공사,"고삼교, 용상대교 발주 현황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
T04204,"2019-01-24 07:40:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산,골재장 빔정리","2019-01-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09102,"2019-01-24 07:42:00",19-영업-01,d.기타,"안성~구리 4공구 계룡 방문예정, 김포~파주 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-01-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18203,"2019-01-24 08:05:00",19-교휴-06,a.기타,"산외교 관련 현황파악","2019-01-24 18:05:00",19-교휴-06,a.기타,"산외교 관련 현황파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C8,,,
|
|
J11305,"2019-01-24 08:10:00",17-시공-10,g.기타,"답변서 작성","2019-01-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C8,,,
|
|
J18206,"2019-01-24 08:13:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-24 18:16:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J18204,"2019-01-24 08:14:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","2019-01-24 18:07:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
B15306,"2019-01-24 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-01-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10310,"2019-01-24 08:14:00",17-시공-21,b.시공,"북수원1교 제작 준비자료 작성","2019-01-24 18:06:00",17-시공-21,b.시공,"북수원1교 제작 준비자료 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J08201,"2019-01-24 08:16:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-01-24 18:31:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J13201,"2019-01-24 08:19:00",18-교영-11,c.설계사," 시화MTV 빔배치","2019-01-24 18:03:00",18-교영-11,c.설계사," 시화MTV 빔배치","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J15307,"2019-01-24 08:23:00",19-교영-01,d.기타,"1. 2019년도 상반기 조견표 작성
|
|
","2019-01-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.171,NULL,NULL,004E4,,,
|
|
J15302,"2019-01-24 08:24:00",18-설계-19,c.도면,"일반도 및 빔배치작업","2019-01-24 18:02:00",18-설계-19,c.도면,"일반도 및 빔배치작업","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J11203,"2019-01-24 08:24:00",18-설계-19,b.구조계산,"대콘교량r-d교 모델링 수정 후 반력 송부","2019-01-24 18:02:00",18-설계-19,b.구조계산,"대콘교량r-d교 모델링 수정 후 반력 송부","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"16-설계-02<|>b.구조계산<|>받침위치변경 왕림교 송산 BR1 거더계산석작성<|>03:00<|><br>17-설계-05<|>e.검토<|>시공사 검토사항 답변서 작성<|>01:00<|><br>",,
|
|
J07103,"2019-01-24 08:25:00",18-교영-01,d.기타,사업관리,"2019-01-24 18:21:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J16202,"2019-01-24 08:25:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-24 18:04:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10314,"2019-01-24 08:25:00",14-교영-00,d.기타,"당진~천안(인주~염치)1~2공구 견적서 및 내역서 수정,
|
|
군장산단 1공구 (옥산교, 옥산4교)검토자료,
|
|
거더 공법별 비교검토자료,
|
|
삼남1교(밀양~울산 7공구) 시행가 협의 및 검토자료
|
|
","2019-01-24 18:03:00",14-교영-00,d.기타,"당진~천안(인주~염치)1~2공구 견적서 및 내역서 수정,
|
|
군장산단 1공구 (옥산교, 옥산4교)검토자료,
|
|
거더 공법별 비교검토자료,
|
|
삼남1교(밀양~울산 7공구) 시행가 협의 및 검토자료
|
|
","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11202,"2019-01-24 08:25:00",18-시공-11,b.시공,공사관리,"2019-01-24 18:12:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J09101,"2019-01-24 08:28:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15202,"2019-01-24 08:28:00",16-설계-02,b.구조계산,"왕림교 구조계산서 작성","2019-01-24 18:02:00",16-설계-02,b.구조계산,"왕림교 구조계산서 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J07210,"2019-01-24 08:31:00",16-시공-20,g.기타,"당초 변경","2019-01-24 20:40:00",16-시공-20,g.기타,"당초 변경","2019-01-24 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J14302,"2019-01-24 08:31:00",17-시공-10,b.시공,"현장투입 준비작업","2019-01-24 18:03:00",17-시공-10,b.시공,"현장투입 준비작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004E2,,,
|
|
J15201,"2019-01-24 08:33:00",19-교영-02,c.설계사,"과업진행현황 파악","2019-01-24 18:03:00",19-교영-02,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-01-24 08:34:00",18-교영-01,c.설계사,.,"2019-01-24 18:01:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15301,"2019-01-24 08:36:00",16-시공-20,b.시공,"원흥2교 쏠플레이트 검토서 작성
|
|
부가세신고 세금계산서 재확인
|
|
강진광주3공구 프리덱 공급원승인서 발송","2019-01-24 18:12:00",16-시공-20,b.시공,"원흥2교 쏠플레이트 검토서 작성
|
|
부가세신고 세금계산서 재확인
|
|
강진광주3공구 프리덱 공급원승인서 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J18205,"2019-01-24 08:37:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-24 22:53:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-24 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J15305,"2019-01-24 08:43:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-24 22:06:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-24 18:30:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J10313,"2019-01-24 08:44:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J14306,"2019-01-24 08:50:00",19-교휴-06,경유,"경유(등기소(법인인감증명서 발급))","2019-01-24 18:12:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J14101,"2019-01-24 08:50:00",16-시공-20,출장,한양,"2019-01-24 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18207,"2019-01-24 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","2019-01-24 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10301,"2019-01-24 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","2019-01-24 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-01-24 08:50:00",16-시공-35,출장,"[경기도 화성시]동화교 받침변위 협의","2019-01-24 18:00:00",16-시공-35,출장,"[경기도 화성시]동화교 받침변위 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J07202,"2019-01-25 06:16:00",16-제조-04,b.기계,"원흥2교 거푸집 보수와 산외교 프리덱 상차와 폐콘크리트 반출","2019-01-25 18:01:00",16-제조-04,b.기계,"원흥2교 거푸집 보수와 산외교 프리덱 상차와 폐콘크리트 반출","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-01-25 06:20:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-01-25 07:05:00",17-시공-07,g.기타,"지산교 제작장 수정 및 북수원1교 인장계획서 작성","2019-01-25 18:04:00",17-시공-07,g.기타,"지산교 제작장 수정 및 북수원1교 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J13308,"2019-01-25 07:19:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 워크숍 발표자료 작성","2019-01-25 18:04:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 워크숍 발표자료 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18208,"2019-01-25 07:35:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-25 21:25:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-25 18:50:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-01-25 07:35:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-25 22:01:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-25 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
M02302,"2019-01-25 07:35:00",19-제조-02,a.생산관리,"철근 재고관리표 셈플 작성","2019-01-25 18:16:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|> 골재저장소 가건축물신고 관련 업체 물색<|>02:00<|><br>19-제조-02<|>a.생산관리<|>RCP FLOW CHART 작성<|>02:00<|><br>19-제조-02<|>a.생산관리<|>RCP 변수 정리<|>03:00<|><br>",,
|
|
J16203,"2019-01-25 07:36:00",19-제조-03,a.품질검사,"공무 거푸집 지원,새천1교 생산 품질관리,콘크리트시험
|
|
","2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
T04204,"2019-01-25 07:38:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산,골재장 빔정리","2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-01-25 07:54:00",07-교영-01,b.시공사,"고삼교, 용상대교 발주 현황 파악","2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.181,NULL,NULL,004C7,,,
|
|
B15306,"2019-01-25 07:58:00",18-관리-02,e.기타,"비서업무 외","2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-01-25 08:11:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-25 14:07:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J11305,"2019-01-25 08:17:00",17-시공-10,g.기타,"답변서 작성","2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C8,,,
|
|
J18203,"2019-01-25 08:18:00",19-교휴-06,a.기타,"산외교 관련 현황파악","2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C8,,,
|
|
J08201,"2019-01-25 08:19:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-01-25 18:07:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15201,"2019-01-25 08:23:00",19-교영-02,c.설계사,"과업진행현황 파악","2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J15202,"2019-01-25 08:23:00",16-설계-02,b.구조계산,"왕림교 구조계산서 작성","2019-01-25 18:06:00",16-설계-02,b.구조계산,"왕림교 구조계산서 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J15302,"2019-01-25 08:23:00",18-설계-19,c.도면,"일반도 및 빔배치작업","2019-01-25 18:02:00",18-설계-19,c.도면,"일반도 및 빔배치작업","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J07103,"2019-01-25 08:24:00",18-교영-01,d.기타,사업관리,"2019-01-25 18:20:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10314,"2019-01-25 08:27:00",14-교영-00,d.기타,"군장산단 1공구 (옥산교, 옥산4교)검토자료,
|
|
당진~천안(인주~염치) 설계내역서 및 견적 수정,
|
|
삼남1교(밀양~울산 7공구) 시행가 협의 및 검토자료
|
|
","2019-01-25 18:04:00",14-교영-00,d.기타,"군장산단 1공구 (옥산교, 옥산4교)검토자료,
|
|
당진~천안(인주~염치) 설계내역서 및 견적 수정,
|
|
삼남1교(밀양~울산 7공구) 시행가 협의 및 검토자료
|
|
","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07210,"2019-01-25 08:28:00",16-시공-20,g.기타,"당초 변경","2019-01-25 18:08:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J16202,"2019-01-25 08:29:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-25 18:37:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14306,"2019-01-25 08:31:00",19-관리-04,a.계약,"계약, 인사 외","2019-01-25 18:06:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J11203,"2019-01-25 08:31:00",18-설계-19,b.구조계산,"대콘교량r-d교 모델링 수정 후 반력 송부","2019-01-25 18:01:00",18-설계-19,b.구조계산,"대콘교량r-d교 모델링 수정 후 반력 송부","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"16-설계-02<|>b.구조계산<|>받침위치변경 왕림교 송산 BR2 거더계산서작성<|>03:00<|><br>",,
|
|
J11202,"2019-01-25 08:32:00",18-시공-11,b.시공,공사관리,"2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J18205,"2019-01-25 08:32:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-25 21:43:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-25 18:38:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J13201,"2019-01-25 08:32:00",18-교영-11,c.설계사," 시화MTV 빔배치","2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E3,,,
|
|
J14302,"2019-01-25 08:33:00",17-시공-10,b.시공,"현장투입 준비작업","2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004E2,,,
|
|
J17205,"2019-01-25 08:34:00",18-교영-01,c.설계사,.,"2019-01-25 21:02:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J09101,"2019-01-25 08:36:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15301,"2019-01-25 08:37:00",16-시공-20,b.시공,"원흥2교 쏠플레이트 검토서 작성
|
|
부가세신고 세금계산서 재확인
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
지급명령 이의신청건 확인 및 보정서 발송 준비","2019-01-25 18:03:00",16-시공-20,b.시공,"원흥2교 쏠플레이트 검토서 작성
|
|
부가세신고 세금계산서 재확인
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
지급명령 이의신청건 확인 및 보정서 발송 준비","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15305,"2019-01-25 08:40:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-25 21:44:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-25 18:37:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J10313,"2019-01-25 08:44:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-25 18:00:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18204,"2019-01-25 08:46:00",18-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출","2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.183,NULL,NULL,004E2,,,
|
|
J09102,"2019-01-25 08:50:00",17-교영-04,경유,"계룡건설 현장 경유","2019-01-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J14101,"2019-01-25 08:50:00",16-시공-20,출장,한양,"2019-01-25 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18207,"2019-01-25 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","2019-01-25 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10301,"2019-01-25 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","2019-01-25 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J07202,"2019-01-26 06:22:00",16-제조-04,b.기계,"원흥2교 거푸집 보수와 고재통 제작과 주변 정리정돈","2019-01-26 14:26:00",16-제조-04,b.기계,"원흥2교 거푸집 보수와 고재통 제작과 주변 정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-01-26 07:38:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-26 16:01:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M02302,"2019-01-26 07:38:00",19-제조-02,a.생산관리,"RCP 변수 정리","2019-01-26 16:01:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>사장님 보고 자료 준비<|>02:00<|><br>19-제조-02<|>a.생산관리<|>BOM 표준화 검토<|>02:30<|><br>19-제조-02<|>a.생산관리<|>공장 청소 상태 점검<|>01:30<|><br>",1,
|
|
T04204,"2019-01-26 07:39:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산,골재장 빔정리","2019-01-26 16:01:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산,골재장 빔정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J15305,"2019-01-26 10:07:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-26 15:25:00",18-설계-18,g.업무지원,"종평면도 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E5,,1,
|
|
J18205,"2019-01-26 10:11:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-26 15:26:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E2,,1,
|
|
J18205,"2019-01-27 09:06:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","2019-01-27 14:22:00",18-설계-18,g.업무지원,"구조계산서 및 보고서 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E2,,1,
|
|
J15305,"2019-01-27 09:21:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-27 14:23:00",18-설계-18,g.업무지원,"종평면도 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E5,,1,
|
|
M05510,"2019-01-27 10:36:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.160.240,NULL,NULL,004C8,,,
|
|
J12202,"2019-01-28 06:21:00",16-시공-20,b.시공,"노듈런쳐 제작, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-01-28 06:54:00",17-시공-07,g.기타,"지산교 제작장 수정 및 북수원1교 인장계획서 작성","2019-01-28 18:07:00",17-시공-07,g.기타,"지산교 제작장 수정 및 북수원1교 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J07202,"2019-01-28 07:07:00",16-제조-04,b.기계,"북수원1교 앵커설치와 원흥2교 거푸집 보수","2019-01-29 06:19:00",16-제조-04,b.기계,"북수원1교 앵커설치와 원흥2교 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J15201,"2019-01-28 07:13:00",19-교영-03,b.시공사,"과업진행현황 파악","2019-01-28 18:03:00",19-교영-03,b.시공사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10315,"2019-01-28 07:25:00",17-시공-09,b.시공,"제작 및 가설협의 자료 작성","2019-01-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C8,,,
|
|
J14308,"2019-01-28 07:37:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-28 22:24:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-28 18:53:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J09101,"2019-01-28 07:37:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-28 18:00:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
T04204,"2019-01-28 07:38:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-01-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-01-28 07:38:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-28 22:23:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-28 18:58:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-01-28 07:48:00",19-교휴-06,d.기타,"[경남 밀양]산외교 현장 실행점검","2019-01-28 18:20:00",19-교휴-06,d.기타,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M02302,"2019-01-28 07:51:00",19-제조-02,a.생산관리,"RCP 변수 정리 및 알고리즘 검토","2019-01-28 21:01:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","2019-01-28 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>RCP 알고리즘 검토 및 작성<|>03:30<|><br>19-제조-02<|>a.생산관리<|>골재저장소 가건축물신고 관련업체 조사<|>02:00<|><br>",1,
|
|
J09102,"2019-01-28 07:56:00",19-영업-01,d.기타,"안성~구리1,9공구 현장방문 예정, 남일~보은 예상 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-01-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-01-28 08:00:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 워크숍 발표자료 작성","2019-01-28 18:08:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 워크숍 발표자료 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18206,"2019-01-28 08:00:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-28 18:22:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
B15306,"2019-01-28 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-01-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-01-28 08:16:00",14-교영-00,d.기타,"당진~천안 설계내역서 및 견적 수정,
|
|
개략공사비 검토,
|
|
삼남1교(밀양~울산 7공구) 시행가 협의 및 검토자료
|
|
","2019-01-28 18:05:00",14-교영-00,d.기타,"당진~천안 설계내역서 및 견적 수정,
|
|
개략공사비 검토,
|
|
삼남1교(밀양~울산 7공구) 시행가 협의 및 검토자료
|
|
","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14306,"2019-01-28 08:18:00",19-관리-04,a.계약,"계약, 인사 외","2019-01-28 18:13:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J14302,"2019-01-28 08:21:00",17-시공-10,b.시공,"현장투입 준비작업","2019-01-28 18:04:00",17-시공-10,b.시공,"현장투입 준비작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004E2,,,
|
|
J11203,"2019-01-28 08:21:00",18-설계-19,b.구조계산,"대콘교량 승천천교 세종방향 거더계산서 작성","2019-01-28 18:11:00",18-설계-19,b.구조계산,"대콘교량 승천천교 세종방향 거더계산서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>b.구조계산<|>경동 전동교 연기 BR1 반력산출<|>04:00<|><br>",,
|
|
J10301,"2019-01-28 08:21:00",16-시공-20,d.자재,"[경남 밀양]산외교 현장 실행점검","2019-01-28 18:59:00",16-시공-20,d.자재,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J08201,"2019-01-28 08:22:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-01-28 18:12:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J16202,"2019-01-28 08:23:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-28 18:27:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15302,"2019-01-28 08:23:00",18-설계-19,c.도면,"일반도 및 빔배치작업","2019-01-28 18:10:00",18-설계-19,c.도면,"일반도 및 빔배치작업","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,"18-설계-19<|>e.검토<|>개략 배근도 및 수량산출<|>02:00<|><br>",,
|
|
J07103,"2019-01-28 08:24:00",18-교영-01,d.기타,사업관리,"2019-01-28 18:22:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15202,"2019-01-28 08:30:00",16-설계-02,b.구조계산,"왕림교 구조계산서 작성","2019-01-28 21:02:00",16-설계-02,b.구조계산,"왕림교 구조계산서 작성","2019-01-28 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J13201,"2019-01-28 08:30:00",16-설계-02,c.도면,"왕림교 도면수정","2019-01-28 18:38:00",18-교영-11,c.설계사," 시화MTV 빔배치","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J11305,"2019-01-28 08:31:00",17-시공-10,g.기타,"답변서 작성","2019-01-28 21:28:00",17-시공-10,g.기타,"답변서 작성","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J15301,"2019-01-28 08:31:00",16-시공-20,b.시공,"원흥2교 쏠플레이트 검토서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
지급명령 이의신청건 확인 및 보정서 발송 준비
|
|
원흥2교 공급원승인서 준비","2019-01-28 18:12:00",16-시공-20,b.시공,"원흥2교 쏠플레이트 검토서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
지급명령 이의신청건 확인 및 보정서 발송 준비
|
|
원흥2교 공급원승인서 준비","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J17205,"2019-01-28 08:33:00",18-교영-01,c.설계사,.,"2019-01-28 18:07:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11202,"2019-01-28 08:34:00",18-시공-11,b.시공,공사관리,"2019-01-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J18205,"2019-01-28 08:43:00",18-설계-18,g.업무지원,"성과품 수정 및 출력","2019-01-28 22:00:00",18-설계-18,g.업무지원,"성과품 수정 및 출력","2019-01-28 18:30:00",14.32.4.116,NULL,14.32.4.116,008E2,,1,
|
|
J15305,"2019-01-28 08:43:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-28 22:00:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-28 18:30:00",14.32.4.116,NULL,14.32.4.116,008E5,,1,
|
|
J10313,"2019-01-28 08:47:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-28 18:03:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16203,"2019-01-28 08:47:00",19-제조-03,a.품질검사,"공무 거푸집 지원,새천1교 생산 품질관리,콘크리트시험
|
|
","2019-01-28 22:53:00",19-제조-03,a.품질검사,"공무 거푸집 지원,새천1교 생산 품질관리,콘크리트시험
|
|
","2019-01-28 18:50:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
M05510,"2019-01-28 16:53:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-01-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.160.63,NULL,NULL,004C8,,,
|
|
J14101,"2019-01-28 08:50:00",16-시공-20,출장,한양,"2019-01-28 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18204,"2019-01-28 08:50:00",07-교영-01,출장,"[경북/안동]용상대교 현장설명회 참석","2019-01-28 18:00:00",07-교영-01,출장,"[경북/안동]용상대교 현장설명회 참석","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J18202,"2019-01-28 08:50:00",07-교영-01,출장,"[경북/안동]용상대교 현장설명회 참석","2019-01-29 07:37:00",07-교영-01,출장,"[경북/안동]용상대교 현장설명회 참석","0000-00-00 00:00:00",NULL,NULL,172.16.9.181,004C7,,,
|
|
J07202,"2019-01-29 06:20:00",19-제조-04,b.기계,"원흥2교 거푸집 보수과 진입로 방지턱 설치준비","2019-01-30 06:50:00",19-제조-04,b.기계,"원흥2교 거푸집 보수과 진입로 방지턱 설치준비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-01-29 07:27:00",17-시공-07,g.기타,"북수원1교 인장계획서 작성 및 인장결과서 작성","2019-01-29 18:09:00",17-시공-07,g.기타,"북수원1교 인장계획서 작성 및 인장결과서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J16203,"2019-01-29 07:30:00",19-제조-03,a.품질검사,"UHPC 배합시험, 새천1교 생산 품질관리,콘크리트시험
|
|
","2019-01-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18208,"2019-01-29 07:36:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-29 18:01:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-01-29 07:36:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-01-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M05510,"2019-01-29 07:36:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-01-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.130.71,NULL,NULL,004C8,,,
|
|
J14308,"2019-01-29 07:37:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-29 18:02:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
M02302,"2019-01-29 07:37:00",19-제조-02,a.생산관리,"UHPC 실험 참관 및 진행","2019-01-29 21:01:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","2019-01-29 18:55:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>태양광 발전 시설 시공관련 협의<|>01:30<|><br>19-제조-02<|>a.생산관리<|>UHPC 실험 참관 및 진행<|>02:00<|><br>",1,
|
|
J18202,"2019-01-29 07:38:00",07-교영-01,d.기타,"웅천~소호 해상교량 발주현황 파악","2019-01-29 18:11:00",07-교영-01,d.기타,"웅천~소호 해상교량 발주현황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
J13308,"2019-01-29 07:38:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 워크숍 발표자료 작성","2019-01-29 18:10:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 워크숍 발표자료 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18207,"2019-01-29 07:42:00",19-교휴-06,d.기타,"[경남 밀양]산외교 현장 실행점검","2019-01-29 18:12:00",19-교휴-06,d.기타,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-01-29 07:43:00",19-영업-01,d.기타,"포항~영덕, 남일~보은 예상 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-01-29 18:16:00",19-영업-01,d.기타,"포항~영덕, 남일~보은 예상 시행가 등 : 조안대교 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J18206,"2019-01-29 07:57:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-29 18:03:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J17205,"2019-01-29 08:06:00",18-교영-01,c.설계사,.,"2019-01-29 18:23:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15307,"2019-01-29 08:08:00",19-교영-01,d.기타,"1. 세종~안성 고속도로 Pre-Deck 특정공법심의 견적
|
|
","2019-01-29 18:06:00",19-교영-01,d.기타,"1. 세종~안성 고속도로 Pre-Deck 특정공법심의 견적
|
|
","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J11305,"2019-01-29 08:08:00",17-시공-10,g.기타,"답변서 작성","2019-01-29 20:52:00",17-시공-10,g.기타,"답변서 작성","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J11203,"2019-01-29 08:21:00",18-설계-19,b.구조계산,"대콘 3교량 응력부분 거더계산서작성","2019-01-29 18:08:00",18-설계-19,b.구조계산,"대콘 3교량 응력부분 거더계산서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>b.구조계산<|>경동 전동교 연기 BR1, BR2 반력산출<|>05:00<|><br>",,
|
|
J14306,"2019-01-29 08:21:00",19-관리-04,a.계약,"계약, 인사 외","2019-01-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E5,,,
|
|
B15306,"2019-01-29 08:22:00",18-관리-02,e.기타,"비서업무 외","2019-01-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-01-29 08:23:00",18-교영-01,d.기타,사업관리,"2019-01-29 18:17:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15302,"2019-01-29 08:23:00",18-설계-19,c.도면,"일반도 및 빔배치작업","2019-01-29 18:07:00",18-설계-19,c.도면,"일반도 및 빔배치작업","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J18205,"2019-01-29 08:24:00",18-설계-18,g.업무지원,"성과품 수정 및 출력","2019-01-29 22:42:00",18-설계-18,g.업무지원,"성과품 수정 및 출력","2019-01-29 19:05:00",14.32.4.116,14.32.4.116,14.32.4.116,008E2,,1,
|
|
J13201,"2019-01-29 08:25:00",16-설계-02,c.도면,"왕림교 도면수정","2019-01-29 18:08:00",16-설계-02,c.도면,"왕림교 도면수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J10301,"2019-01-29 08:26:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-29 18:19:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16202,"2019-01-29 08:26:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-29 18:17:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15301,"2019-01-29 08:26:00",16-시공-20,b.시공,"원흥2교 쏠플레이트 검토서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
지급명령 이의신청건 확인 및 보정서 발송","2019-01-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.172,NULL,NULL,004E4,,,
|
|
J15202,"2019-01-29 08:29:00",16-설계-02,b.구조계산,"왕림교 구조계산서 작성","2019-01-29 20:52:00",16-설계-02,b.구조계산,"왕림교 구조계산서 작성","2019-01-29 18:40:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J08201,"2019-01-29 08:30:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-01-29 19:30:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11202,"2019-01-29 08:30:00",18-시공-11,b.시공,공사관리,"2019-01-29 18:13:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-01-29 08:30:00",16-시공-20,g.기타,"당초 변경","2019-01-29 20:50:00",16-시공-20,g.기타,"당초 변경","2019-01-29 18:40:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J15201,"2019-01-29 08:35:00",19-교영-03,b.시공사,"과업진행현황 파악","2019-01-29 18:04:00",19-교영-03,b.시공사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J18204,"2019-01-29 08:36:00",19-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출 ","2019-01-29 18:05:00",19-교휴-06,a.기타,"고속국도 제14호선 함양-창녕간 건설공사 제5공구 합천호교 하부공 실행금액 산출 ","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J15305,"2019-01-29 08:38:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-29 22:29:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-29 19:05:00",14.32.4.116,14.32.4.116,14.32.4.116,008E5,,1,
|
|
J10313,"2019-01-29 08:47:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J09101,"2019-01-29 08:55:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-01-29 08:50:00",16-시공-20,출장,한양,"2019-01-29 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10314,"2019-01-29 08:50:00",17-시공-09,출장,"[울산 (삼남1교 현장사무실)]제작 및 가설협의, 계약금액 협의","2019-01-29 18:00:00",17-시공-09,출장,"[울산 (삼남1교 현장사무실)]제작 및 가설협의, 계약금액 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-01-29 08:50:00",17-시공-09,출장,"[울산 (삼남1교 현장사무실)]제작 및 가설협의, 계약금액 협의","2019-01-29 18:00:00",17-시공-09,출장,"[울산 (삼남1교 현장사무실)]제작 및 가설협의, 계약금액 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J14302,"2019-01-29 08:50:00",18-시공-15,출장,"[경기도 고양시 덕양구 화정동 일원]원흥2교 거더제작 및 가설협의","2019-01-29 18:00:00",18-시공-15,출장,"[경기도 고양시 덕양구 화정동 일원]원흥2교 거더제작 및 가설협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J12202,"2019-01-29 08:50:00",13-설계-30,출장,"[충남 서산]런처제작관련 업무협의","2019-01-29 18:00:00",13-설계-30,출장,"[충남 서산]런처제작관련 업무협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J12202,"2019-01-30 06:35:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-01-30 06:51:00",19-제조-04,b.기계,"진입로 방지턱 한쪽 설치와 원흥2교 거푸집 보수","2019-01-31 06:15:00",19-제조-04,b.기계,"진입로 방지턱 한쪽 설치와 원흥2교 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-01-30 07:15:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-01-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.213.197,NULL,NULL,004C8,,,
|
|
J11302,"2019-01-30 07:25:00",17-시공-07,g.기타,"북수원1교 인장계획서 작성 및 인장결과서 작성","2019-01-30 18:09:00",17-시공-07,g.기타,"북수원1교 인장계획서 작성 및 인장결과서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J18208,"2019-01-30 07:29:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-30 20:42:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-30 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-01-30 07:31:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-30 20:41:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-30 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
M02302,"2019-01-30 07:33:00",19-제조-02,a.생산관리," 골재장 지붕철거 관련 업체 협의","2019-01-30 18:02:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|> 골재장 지붕철거 관련 건축사 협의 <|>02:00<|><br>19-제조-02<|>a.생산관리<|>연봉 조정 검토<|>03:00<|><br>",,
|
|
J13308,"2019-01-30 07:37:00",18-시공-15,b.시공,"1. 원흥2교 투입준비 계획서작성
|
|
2. 성주대교 발/수신공문 리스트정리
|
|
3. 경안천교 기성내역서 작성 및 송부","2019-01-30 18:12:00",18-시공-15,b.시공,"1. 원흥2교 투입준비 계획서작성
|
|
2. 성주대교 발/수신공문 리스트정리
|
|
3. 경안천교 기성내역서 작성 및 송부","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J16203,"2019-01-30 07:38:00",19-제조-03,a.품질검사,"새천1교 생산및 품질관리, UHPC 배합강도시험, ","2019-01-30 20:42:00",19-제조-03,a.품질검사,"새천1교 생산및 품질관리, UHPC 배합강도시험, ","2019-01-30 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
T04204,"2019-01-30 07:39:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-01-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09102,"2019-01-30 07:49:00",19-영업-01,d.기타,"안성~구리 4공구 및 홍익기술단 방문예정, 포항~영덕 예상 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-01-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18202,"2019-01-30 07:49:00",07-교영-01,d.기타,"웅천~소호 해상교량 발주현황 파악","2019-01-30 18:13:00",07-교영-01,d.기타,"웅천~소호 해상교량 발주현황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
J18207,"2019-01-30 07:51:00",19-교휴-06,d.기타,"[경남 밀양]산외교 현장 실행점검","2019-01-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.10.246,NULL,NULL,004C7,,,
|
|
J18206,"2019-01-30 08:04:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-30 18:11:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J10315,"2019-01-30 08:06:00",17-시공-09,b.시공,"삼남1교 협의사항 검토( 제작장, 공기, 가설등)","2019-01-30 18:01:00",17-시공-09,b.시공,"삼남1교 협의사항 검토( 제작장, 공기, 가설등)","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J10314,"2019-01-30 08:07:00",14-교영-00,d.기타,"삼남1교(밀양~울산 7공구) 시행가 검토자료,
|
|
개략공사비 검토","2019-01-30 18:08:00",14-교영-00,d.기타,"삼남1교(밀양~울산 7공구) 시행가 검토자료,
|
|
개략공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15307,"2019-01-30 08:11:00",19-교영-01,d.기타,"1. 세종~안성 고속도로 Pre-Deck 특정공법심의 견적
|
|
","2019-01-30 18:04:00",19-교영-01,d.기타,"1. 세종~안성 고속도로 Pre-Deck 특정공법심의 견적
|
|
","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
B15306,"2019-01-30 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-01-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-01-30 08:12:00",17-시공-10,g.기타,"답변서 작성","2019-01-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C8,,,
|
|
J18205,"2019-01-30 08:15:00",18-설계-18,g.업무지원,"성과품 수정 및 출력","2019-01-30 18:04:00",18-설계-18,g.업무지원,"성과품 수정 및 출력","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E2,,,
|
|
J08201,"2019-01-30 08:19:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-01-30 18:02:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11203,"2019-01-30 08:20:00",18-설계-19,b.구조계산,"전동교 오송 BR1, 2 모델링수정 반력산출","2019-01-30 18:01:00",18-설계-19,b.구조계산,"전동교 오송 BR1, 2 모델링수정 반력산출","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J14302,"2019-01-30 08:22:00",18-시공-15,b.시공,"현장투입 준비작업","2019-01-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004E2,,,
|
|
J14306,"2019-01-30 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-01-30 18:16:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J18204,"2019-01-30 08:23:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","2019-01-30 18:14:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J15302,"2019-01-30 08:24:00",18-설계-19,c.도면,"전교량 부대도면 작성","2019-01-30 18:02:00",18-설계-19,c.도면,"전교량 부대도면 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J10301,"2019-01-30 08:25:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-30 18:09:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J17205,"2019-01-30 08:26:00",18-교영-01,c.설계사,.,"2019-01-31 08:43:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-01-30 08:28:00",16-설계-02,b.구조계산,"왕림교 구조계산서 작성","2019-01-30 19:06:00",16-설계-02,b.구조계산,"왕림교 구조계산서 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J11202,"2019-01-30 08:30:00",18-시공-11,b.시공,공사관리,"2019-01-30 18:11:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-01-30 08:31:00",16-시공-20,g.기타,"당초 변경","2019-01-30 18:03:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J13201,"2019-01-30 08:31:00",18-설계-12,c.도면,"지산교 빔배치 수정","2019-01-30 18:04:00",16-설계-02,c.도면,"왕림교 도면수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,"14-설계-23<|>h.기타<|>분쟁조정관련 업무<|>03:00<|><br>",,
|
|
J07103,"2019-01-30 08:32:00",18-교영-01,d.기타,사업관리,"2019-01-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
J15301,"2019-01-30 08:32:00",16-시공-20,b.시공,"원흥2교 쏠플레이트 검토서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
지급명령 이의신청건 확인 및 보정서 발송","2019-01-30 18:08:00",16-시공-20,b.시공,"원흥2교 쏠플레이트 검토서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
지급명령 이의신청건 확인 및 보정서 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15201,"2019-01-30 08:36:00",19-교영-01,b.시공사,"현대건설 공법설명","2019-01-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J15305,"2019-01-30 08:37:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-30 18:03:00",18-설계-18,g.업무지원,"종평면도 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E5,,,
|
|
J10313,"2019-01-30 08:49:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-30 18:00:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-01-30 08:56:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-30 18:01:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-01-30 08:50:00",16-시공-20,출장,한양,"2019-01-30 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-01-31 06:16:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-01-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-01-31 06:16:00",19-제조-04,b.기계,"원흥2교 거푸집 보수와 PC강연선 고정 틀 제작","2019-02-01 06:50:00",19-제조-04,b.기계,"원흥2교 거푸집 보수와 PC강연선 고정 틀 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-01-31 07:18:00",17-시공-07,g.기타,"북수원1교 인장계획서 작성 및 인장결과서 작성","2019-01-31 18:05:00",17-시공-07,g.기타,"북수원1교 인장계획서 작성 및 인장결과서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J14308,"2019-01-31 07:26:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-31 21:39:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-01-31 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J13308,"2019-01-31 07:29:00",18-시공-15,b.시공,"1. 원흥2교 투입준비 계획서작성
|
|
2. 성주대교 발/수신공문 리스트정리
|
|
3. 경안천교 기성내역서 작성 및 송부","2019-01-31 18:14:00",18-시공-15,b.시공,"1. 원흥2교 투입준비 계획서작성
|
|
2. 성주대교 발/수신공문 리스트정리
|
|
3. 경안천교 기성내역서 작성 및 송부","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J16203,"2019-01-31 07:30:00",19-제조-03,a.품질검사,"새천1교 생산 및 품질관리, 공무지원","2019-01-31 23:11:00",19-제조-03,a.품질검사,"새천1교 생산 및 품질관리, 공무지원","2019-01-31 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18208,"2019-01-31 07:34:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-31 22:37:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-01-31 19:07:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-01-31 07:37:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-01-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-01-31 07:40:00",07-교영-01,d.기타,"웅천~소호 해상교량 발주현황 파악","2019-01-31 18:08:00",07-교영-01,d.기타,"웅천~소호 해상교량 발주현황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
M02302,"2019-01-31 07:43:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","2019-01-31 21:00:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","2019-01-31 18:54:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공장내 시설 점검<|>03:00<|><br>19-제조-02<|>a.생산관리<|>철근 절곡기 spliced girder 용 개조 검토<|>01:30<|><br>",1,
|
|
J09102,"2019-01-31 07:45:00",19-영업-01,d.기타,"안성~구리 9공구 대림산업 방문예정, 포항~영덕 예상 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-01-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-01-31 07:51:00",19-교휴-06,d.기타,"[경남 밀양]산외교 현장 실행점검","2019-01-31 18:09:00",19-교휴-06,d.기타,"[경남 밀양]산외교 현장 실행점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
B15306,"2019-01-31 07:55:00",18-관리-02,e.기타,"비서업무 외","2019-01-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-01-31 08:02:00",17-시공-10,g.기타,"답변서 작성","2019-01-31 18:04:00",17-시공-10,g.기타,"답변서 작성","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J18206,"2019-01-31 08:02:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-01-31 18:16:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J08201,"2019-01-31 08:16:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-01-31 18:04:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J07103,"2019-01-31 08:17:00",18-교영-01,d.기타,사업관리,"2019-01-31 18:11:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10310,"2019-01-31 08:17:00",17-시공-21,b.시공,"북수원1교 제작도면 도서검토","2019-01-31 18:04:00",17-시공-21,b.시공,"북수원1교 제작도면 도서검토","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J10314,"2019-01-31 08:17:00",14-교영-00,d.기타,"검암2교(당진~서산) 시행견적서,
|
|
수직교(갈천~갈수) 시행견적서,
|
|
삼남1교(밀양~울산 7공구) 시행가 검토자료,
|
|
개략공사비 검토","2019-01-31 18:03:00",14-교영-00,d.기타,"검암2교(당진~서산) 시행견적서,
|
|
수직교(갈천~갈수) 시행견적서,
|
|
삼남1교(밀양~울산 7공구) 시행가 검토자료,
|
|
개략공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11203,"2019-01-31 08:20:00",18-설계-19,b.구조계산,"전동교 4개 BR 응력부분 계산서작성","2019-01-31 18:04:00",18-설계-19,b.구조계산,"전동교 4개 BR 응력부분 계산서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-설계-04<|>h.기타<|>감리단검토 답변작성 및 납품설계도서검토<|>04:00<|><br>",,
|
|
J14306,"2019-01-31 08:21:00",19-관리-04,a.계약,"계약, 인사 외","2019-01-31 18:13:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J15307,"2019-01-31 08:22:00",19-교영-01,d.기타,"1. 2019년 상반기 조견표 작성
|
|
","2019-01-31 18:02:00",19-교영-01,d.기타,"1. 2019년 상반기 조견표 작성
|
|
","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18204,"2019-01-31 08:23:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","2019-01-31 18:12:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J15302,"2019-01-31 08:24:00",18-설계-19,c.도면,"전교량 부대도면 작성","2019-01-31 18:01:00",18-설계-19,c.도면,"전교량 부대도면 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J16202,"2019-01-31 08:26:00",18-교영-01,c.설계사,신규사업현황조사,"2019-01-31 18:21:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10301,"2019-01-31 08:27:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-01-31 18:39:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-01-31 08:30:00",18-설계-19,b.구조계산,"구조계산서 작성","2019-01-31 18:06:00",18-설계-19,b.구조계산,"구조계산서 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J13201,"2019-01-31 08:30:00",18-설계-12,c.도면,"지산교 빔배치 수정","2019-01-31 18:05:00",18-설계-12,c.도면,"지산교 빔배치 수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J14302,"2019-01-31 08:32:00",18-시공-15,b.시공,"현장투입 준비작업","2019-01-31 18:01:00",18-시공-15,b.시공,"현장투입 준비작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004E2,,,
|
|
J15305,"2019-01-31 08:32:00",18-설계-18,g.업무지원,"종평면도 작성","2019-01-31 18:02:00",18-설계-18,g.업무지원,"종평면도 작성","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E5,,,
|
|
J07210,"2019-01-31 08:33:00",16-시공-20,g.기타,"당초 변경","2019-01-31 18:04:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J15201,"2019-01-31 08:33:00",19-교영-04,c.설계사,"확장가설 공법 설명","2019-01-31 18:08:00",19-교영-04,c.설계사,"확장가설 공법 설명","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15301,"2019-01-31 08:35:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
작업반 노무비 계산","2019-01-31 18:12:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
작업반 노무비 계산","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-01-31 08:37:00",19-교영-01,c.설계사,과업진행상황조사,"2019-01-31 18:04:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J11202,"2019-01-31 08:39:00",18-시공-11,b.시공,공사관리,"2019-01-31 18:14:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18205,"2019-01-31 08:41:00",18-설계-18,g.업무지원,"성과품 수정 및 출력","2019-01-31 18:02:00",18-설계-18,g.업무지원,"성과품 수정 및 출력","0000-00-00 00:00:00",14.32.4.116,NULL,14.32.4.116,008E2,,,
|
|
J17205,"2019-01-31 08:30:00",18-교영-01,c.설계사,.,"2019-01-31 18:12:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-01-31 08:49:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-01-31 18:02:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J10315,"2019-01-31 08:50:00",18-시공-03,출장,한화건설,"2019-01-31 18:04:00",17-시공-09,b.시공,"삼남1교 협의사항 검토( 제작장, 공기, 가설등)","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J14101,"2019-01-31 08:50:00",16-시공-20,출장,한양,"2019-01-31 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-02-01 06:24:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J10315,"2019-02-01 06:25:00",18-교영-11,c.설계사,"가설검토( 런쳐, 크레인, 해브리프팅 등)","2019-02-01 15:17:00",18-교영-11,c.설계사,"가설검토( 런쳐, 크레인, 해브리프팅 등)","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J07202,"2019-02-01 06:51:00",19-제조-04,b.기계,"원흥2교 거푸집 보수와 PC강연선 고정 틀 제작","2019-02-01 16:34:00",19-제조-04,b.기계,"원흥2교 거푸집 보수와 PC강연선 고정 틀 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-02-01 07:20:00",17-시공-07,g.기타,"북수원1교 인장계획서 작성 및 인장결과서 작성","2019-02-01 15:29:00",17-시공-07,g.기타,"북수원1교 인장계획서 작성 및 인장결과서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J14308,"2019-02-01 07:25:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
J16203,"2019-02-01 07:28:00",19-제조-03,a.품질검사,"새천1교 생산 및 품질관리, 공무지원","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
T04204,"2019-02-01 07:29:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-02-01 07:41:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
M02302,"2019-02-01 07:41:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","2019-02-01 16:23:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-02-01 07:51:00",17-시공-10,g.기타,"주두부균열관련 보강검토","2019-02-01 15:37:00",17-시공-10,g.기타,"주두부균열관련 보강검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-02-01 07:52:00",19-영업-01,d.기타,"갈천~가수 수직교, 당진~서산 검암2교 예상 입찰가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-01 15:29:00",19-영업-01,d.기타,"갈천~가수 수직교, 당진~서산 검암2교 예상 입찰가 등 : 조안대교 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
M05510,"2019-02-01 07:53:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.141.209,NULL,NULL,004C8,,,
|
|
J18206,"2019-02-01 07:59:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-01 15:54:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J11305,"2019-02-01 08:00:00",17-시공-10,g.기타,"답변서 작성","2019-02-01 15:30:00",17-시공-10,g.기타,"답변서 작성","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J18202,"2019-02-01 08:05:00",07-교영-01,d.기타,"웅천~소호 해상교량 발주현황 파악","2019-02-01 15:14:00",07-교영-01,d.기타,"웅천~소호 해상교량 발주현황 파악","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
J15302,"2019-02-01 08:13:00",18-설계-19,c.도면,"전교량 부대도면 작성","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.173,NULL,NULL,008E4,,,
|
|
J09101,"2019-02-01 08:14:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-01 15:47:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
B15306,"2019-02-01 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-02-01 08:15:00",14-교영-00,d.기타,"수직교(갈천~갈수) 시행견적서,
|
|
검암2교(당진~서산) 시행견적서,
|
|
삼남1교(밀양~울산 7공구) 검토자료","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J15307,"2019-02-01 08:18:00",19-교영-01,d.기타,"1. 도계~영월 특정공법심의 견적","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.171,NULL,NULL,004E4,,,
|
|
J08201,"2019-02-01 08:21:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J10310,"2019-02-01 08:22:00",18-시공-12,b.시공,"경안천교 스플라이스 도면 검토","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004C8,,,
|
|
J14306,"2019-02-01 08:25:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-01 16:03:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J18204,"2019-02-01 08:26:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","2019-02-01 15:29:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J17205,"2019-02-01 08:27:00",18-교영-01,c.설계사,.,"2019-02-01 15:34:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J13201,"2019-02-01 08:30:00",18-설계-12,c.도면,"지산교 빔배치 수정","2019-02-01 15:30:00",18-설계-12,c.도면,"지산교 빔배치 수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J11203,"2019-02-01 08:30:00",18-설계-19,b.구조계산,"전동교 4개 BR 응력부분 계산서작성","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J07103,"2019-02-01 08:32:00",18-교영-01,d.기타,사업관리,"2019-02-01 16:44:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-02-01 08:32:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J11202,"2019-02-01 08:33:00",18-시공-11,b.시공,공사관리,"2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J07210,"2019-02-01 08:33:00",16-시공-20,g.기타,"당초 변경","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.162,NULL,NULL,008E2,,,
|
|
J15201,"2019-02-01 08:33:00",19-교영-01,b.시공사,"GS건설 미얀마 ppp사업 관련 업무협의","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J15202,"2019-02-01 08:34:00",18-설계-19,b.구조계산,"구조계산서 작성","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.155,NULL,NULL,008E1,"18-설계-06<|>e.검토<|>설계사 요청사항 내용 정리<|>03:00<|><br>",,
|
|
J15301,"2019-02-01 08:34:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
작업반 노무비 계산","2019-02-01 15:29:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
작업반 노무비 계산","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J16202,"2019-02-01 08:35:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J15305,"2019-02-01 08:41:00",18-설계-18,g.업무지원,"종평면도 작성","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",14.32.4.116,NULL,NULL,008E5,,,
|
|
J18205,"2019-02-01 08:42:00",18-설계-18,g.업무지원,"성과품 수정 및 출력","2019-02-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",14.32.4.116,NULL,NULL,008E2,,,
|
|
J10313,"2019-02-01 08:47:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-02-01 18:12:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14101,"2019-02-01 08:50:00",16-시공-20,출장,한양,"2019-02-01 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14302,"2019-02-01 08:50:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열확인 및 업체 견적의뢰","2019-02-01 18:00:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열확인 및 업체 견적의뢰","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J10313,"2019-02-02 09:29:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-02-02 15:14:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,1,
|
|
J07103,"2019-01-03 08:50:00",16-시공-20,출장,"산외교 출장","2019-01-03 18:00:00",16-시공-20,출장,"산외교 출장","0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J16203,"2019-01-09 08:50:00",19-제조-02,출장,"[산외교(밀양)]콘크리트 배합시험","2019-01-09 18:00:00",19-제조-02,출장,"[산외교(밀양)]콘크리트 배합시험","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J16203,"2019-01-10 08:50:00",19-제조-02,출장,"[산외교(밀양)]콘크리트 배합시험","2019-01-10 18:00:00",19-제조-02,출장,"[산외교(밀양)]콘크리트 배합시험","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J13308,"2019-02-07 07:07:00",18-시공-15,b.시공,"1. 원흥2교 투입준비 계획서작성
|
|
2. 성주대교 발/수신공문 리스트정리
|
|
3. 경안천교 기성내역서 작성 및 송부","2019-02-07 18:02:00",18-시공-15,b.시공,"1. 원흥2교 투입준비 계획서작성
|
|
2. 성주대교 발/수신공문 리스트정리
|
|
3. 경안천교 기성내역서 작성 및 송부","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J16203,"2019-02-07 07:28:00",19-제조-03,a.품질검사,"실험실정리, 새천1교 생산 및 품질관리, 공무지원","2019-02-07 22:58:00",19-제조-03,a.품질검사,"실험실정리, 새천1교 생산 및 품질관리, 공무지원","2019-02-07 18:53:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18207,"2019-02-07 07:31:00",17-시공-10,g.기타,"주두부균열관련 보강검토","2019-02-07 18:06:00",17-시공-10,g.기타,"주두부균열관련 보강검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
T04204,"2019-02-07 07:33:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-02-07 21:52:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-02-07 07:37:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","2019-02-07 21:00:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","2019-02-07 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>서울보고자료 정리<|>02:00<|><br>19-제조-02<|>a.생산관리<|>당진시청 등록업체 방안 검토(최천환반장)<|>02:30<|><br>19-제조-02<|>a.생산관리<|>거푸집 관리 계획 방안 검토(강병흔 반장)<|>02:00<|><br>",1,
|
|
J14308,"2019-02-07 07:37:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-02-07 21:43:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-02-07 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J18208,"2019-02-07 07:38:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-07 22:15:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-07 18:59:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-02-07 07:41:00",19-영업-01,d.기타,"갈천~가수 수직교, 당진~서산 검암2교 예상 입찰가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-07 18:10:00",19-영업-01,d.기타,"갈천~가수 수직교, 당진~서산 검암2교 예상 입찰가 등 : 조안대교 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
B15306,"2019-02-07 08:02:00",18-관리-02,e.기타,"비서업무 외","2019-02-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J09101,"2019-02-07 08:03:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-07 18:02:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10315,"2019-02-07 08:05:00",17-시공-21,b.시공,"북수원1교 가설협의자료 작성","2019-02-07 18:02:00",17-시공-21,b.시공,"북수원1교 가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J11305,"2019-02-07 08:06:00",17-시공-10,g.기타,"답변서 작성","2019-02-07 18:03:00",17-시공-10,g.기타,"답변서 작성","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J18206,"2019-02-07 08:07:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-07 18:07:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J15307,"2019-02-07 08:20:00",19-교영-01,d.기타,"1. 시화MTV 시행견적
|
|
2. 도화~송학 시행견적","2019-02-07 18:06:00",19-교영-01,d.기타,"1. 시화MTV 시행견적
|
|
2. 도화~송학 시행견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J14306,"2019-02-07 08:21:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E5,,,
|
|
J15302,"2019-02-07 08:24:00",18-설계-19,c.도면,"전교량 바닥판 계산서 작성","2019-02-07 18:05:00",18-설계-19,c.도면,"전교량 바닥판 계산서 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J10301,"2019-02-07 08:25:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-07 18:07:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15301,"2019-02-07 08:25:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
율암교 실투입내역 정리
|
|
단장천2교 1월 투입내역서 작성","2019-02-07 19:01:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
율암교 실투입내역 정리
|
|
단장천2교 1월 투입내역서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-02-07 08:26:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-02-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.22.225,NULL,NULL,004C8,,,
|
|
J11202,"2019-02-07 08:27:00",18-시공-11,b.시공,공사관리,"2019-02-07 18:12:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15305,"2019-02-07 08:30:00",19-설계-01,c.도면,실시설계,"2019-02-07 18:05:00",19-설계-01,c.도면,실시설계,"0000-00-00 00:00:00",172.16.9.174,NULL,172.16.9.174,008E5,,,
|
|
J16202,"2019-02-07 08:30:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-07 18:12:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07103,"2019-02-07 08:31:00",18-교영-01,d.기타,사업관리,"2019-02-07 18:09:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J13201,"2019-02-07 08:32:00",16-교영-53,c.설계사,"제3연육교 빔배치","2019-02-07 18:08:00",18-설계-12,c.도면,"지산교 빔배치 수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J18204,"2019-02-07 08:32:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","2019-02-07 18:05:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J11203,"2019-02-07 08:32:00",17-설계-04,h.기타,"감리단 검토사항 답변작성, 설계도서 검토","2019-02-07 18:06:00",17-설계-04,h.기타,"감리단 검토사항 답변작성, 설계도서 검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15201,"2019-02-07 08:33:00",19-교영-01,b.시공사,"GS건설 미얀마 ppp사업 관련 업무협의","2019-02-07 18:06:00",19-교영-01,b.시공사,"GS건설 미얀마 ppp사업 관련 업무협의","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-02-07 08:33:00",16-시공-20,g.기타,"당초 변경","2019-02-07 18:08:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J10313,"2019-02-07 08:49:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-02-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J14101,"2019-02-07 08:50:00",16-시공-20,출장,한양,"2019-02-07 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-02-07 08:50:00",07-교영-01,출장,"[안동]용상교리2(용상대교) 현장사무실 및 숙소 임대 관련","2019-02-07 18:00:00",07-교영-01,출장,"[안동]용상교리2(용상대교) 현장사무실 및 숙소 임대 관련","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-02-08 06:40:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-02-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-02-08 07:09:00",19-제조-04,b.기계,"원흥2교 거푸집 보수와 PC강연선 고정 틀 제작","2019-02-09 06:23:00",19-제조-04,b.기계,"원흥2교 거푸집 보수와 PC강연선 고정 틀 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-02-08 07:16:00",17-시공-07,g.기타,"왕림교 가설계획서 수정 및 용접이음가로보 산출","2019-02-08 18:05:00",17-시공-07,g.기타,"북수원1교 인장계획서 작성 및 인장결과서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J13308,"2019-02-08 07:25:00",18-시공-15,b.시공,"1. 프리캐스트 제품 동영상 제작
|
|
2. Work Shop 발표자료 정리","2019-02-08 18:07:00",18-시공-15,b.시공,"1. 프리캐스트 제품 동영상 제작
|
|
2. Work Shop 발표자료 정리","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J14308,"2019-02-08 07:28:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-02-08 20:40:00",16-제조-02,a.생산관리,"- Shop Drawing
|
|
- Shop Drawing 도곽 수정 작업 ","2019-02-08 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J18202,"2019-02-08 07:35:00",07-교영-01,b.시공사,"융천~소호 해상교량 발주 현황 파악, 용상대교 견적","2019-02-08 18:11:00",07-교영-01,b.시공사,"융천~소호 해상교량 발주 현황 파악, 용상대교 견적","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.181,004C7,,,
|
|
T04204,"2019-02-08 07:35:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-02-08 21:28:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-02-08 07:36:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-08 22:37:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-08 19:15:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-02-08 07:38:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","2019-02-08 21:04:00",19-제조-02,a.생산관리,"인사평가 검토 및 연봉안 작성","2019-02-08 18:55:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공장홍보 동영상관련 회의<|>01:30<|><br>19-제조-02<|>a.생산관리<|>서울회의 회의자료 준비<|>01:30<|><br>",1,
|
|
J16203,"2019-02-08 07:42:00",19-제조-03,a.품질검사,"콘크리트시험, 새천1교 생산 및 품질관리, 공무지원","2019-02-08 22:51:00",19-제조-03,a.품질검사,"콘크리트시험, 새천1교 생산 및 품질관리, 공무지원","2019-02-08 19:05:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-02-08 07:45:00",19-영업-01,d.기타,"송산~시화MTV 빔런처 시행가, 제천시 국도대처 우회도로 예상 입찰가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M05510,"2019-02-08 07:55:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-02-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004C8,,,
|
|
B15306,"2019-02-08 08:06:00",18-관리-02,e.기타,"비서업무 외","2019-02-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-02-08 08:07:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-08 18:19:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J10315,"2019-02-08 08:08:00",17-시공-21,b.시공,"북수원1교 가설협의자료 작성","2019-02-08 18:04:00",17-시공-21,b.시공,"북수원1교 가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J11305,"2019-02-08 08:11:00",17-시공-10,g.기타,"답변서 작성","2019-02-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C8,,,
|
|
J08201,"2019-02-08 08:14:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-08 18:05:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18207,"2019-02-08 08:17:00",17-시공-10,g.기타,"주두부균열관련 보강검토","2019-02-08 18:25:00",17-시공-10,g.기타,"주두부균열관련 보강검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J07103,"2019-02-08 08:19:00",18-교영-01,d.기타,사업관리,"2019-02-08 18:22:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15307,"2019-02-08 08:20:00",19-교영-01,d.기타,"1. 시화MTV 시행견적
|
|
2. 도화~송학 시행견적","2019-02-08 18:04:00",19-교영-01,d.기타,"1. 시화MTV 시행견적
|
|
2. 도화~송학 시행견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J14306,"2019-02-08 08:21:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-08 18:06:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J15302,"2019-02-08 08:24:00",18-설계-19,c.도면,"전교량 바닥판 계산서 작성","2019-02-08 18:02:00",18-설계-19,c.도면,"전교량 바닥판 계산서 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15202,"2019-02-08 08:29:00",17-설계-06,b.구조계산,"정착구 FEM해석","2019-02-08 18:01:00",17-설계-06,b.구조계산,"정착구 FEM해석","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"14-설계-23<|>g.업무지원<|>주두부 균열체크 도면작성<|>01:30<|><br>",,
|
|
J11202,"2019-02-08 08:29:00",18-시공-11,b.시공,공사관리,"2019-02-08 18:18:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J11203,"2019-02-08 08:32:00",17-설계-04,h.기타,"감리단 검토사항 답변작성, 설계도서 검토","2019-02-08 18:04:00",17-설계-04,h.기타,"감리단 검토사항 답변작성, 설계도서 검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-10<|>g.기타<|>주두부 응력검토<|>04:00<|><br>",,
|
|
J10301,"2019-02-08 08:33:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-08 18:30:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-02-08 08:34:00",16-시공-20,g.기타,"당초 변경","2019-02-08 18:04:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J15301,"2019-02-08 08:36:00",16-시공-20,b.시공,"단장천2교 1월 투입내역서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
원흥2교 자재발주서 발송","2019-02-08 18:11:00",16-시공-20,b.시공,"단장천2교 1월 투입내역서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
원흥2교 자재발주서 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15201,"2019-02-08 08:36:00",19-교영-01,b.시공사,"GS건설 미얀마 ppp사업 관련 업무협의","2019-02-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J16202,"2019-02-08 08:36:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-08 18:17:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-02-08 08:37:00",18-교영-01,c.설계사,.,"2019-02-08 18:01:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J13201,"2019-02-08 08:40:00",16-교영-53,c.설계사,"제3연육교 빔배치","2019-02-08 18:18:00",16-교영-53,c.설계사,"제3연육교 빔배치","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J10313,"2019-02-08 08:52:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-02-08 18:14:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18204,"2019-02-08 08:55:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","2019-02-08 18:10:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J09101,"2019-02-08 09:29:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
M02302,"2019-02-09 07:30:00",19-제조-02,a.생산관리,"거푸집 관리 계획 ","2019-02-09 17:01:00",,,"거푸집 관리 계획 ","0000-00-00 00:00:00",NULL,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>사장님 공장 순시 수행및 관련업체 방문/회의<|>06:00<|><br>",1,
|
|
J14308,"2019-02-09 07:30:00",16-제조-02,a.생산관리,"- Shop Drawing- Shop Drawing 도곽 수정 작업 ","2019-02-09 17:11:00",,,"- Shop Drawing- Shop Drawing 도곽 수정 작업 ","0000-00-00 00:00:00",NULL,NULL,175.203.206.128,006E3,,1,
|
|
J14101,"2019-02-08 08:50:00",16-시공-20,출장,한양,"2019-02-08 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-02-09 06:24:00",19-제조-04,b.기계,"원흥2교 거푸집 도색과 고재통 제작 및 정리정돈 ","2019-02-09 16:46:00",19-제조-04,b.기계,"원흥2교 거푸집 도색과 고재통 제작 및 정리정돈 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-02-09 07:33:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-09 16:55:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
T04204,"2019-02-09 07:40:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-02-09 16:52:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-02-09 07:42:00",19-제조-03,a.품질검사,"산외교 데크출하, 새천1교 생산 및 품질관리, 공무지원","2019-02-09 16:52:00",19-제조-03,a.품질검사,"산외교 데크출하, 새천1교 생산 및 품질관리, 공무지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
J07202,"2019-02-11 06:15:00",19-제조-04,b.기계,"단장천2교 각재 출하와 원흥2교 거푸집 도색 및 강연선 고정틀 제작","2019-02-12 07:30:00",19-제조-04,b.기계,"단장천2교 각재 출하와 원흥2교 거푸집 도색 및 강연선 고정틀 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-02-11 06:57:00",17-시공-07,g.기타,"주천1교 가설계획서 및 용접이음가로보 수량산출","2019-02-11 18:17:00",17-시공-07,g.기타,"북수원1교 인장계획서 작성 및 인장결과서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
T04204,"2019-02-11 07:26:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-02-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-02-11 07:30:00",18-시공-15,b.시공,"1. 프리캐스트 제품 동영상 제작
|
|
2. Work Shop 발표자료 정리","2019-02-11 18:18:00",18-시공-15,b.시공,"1. 프리캐스트 제품 동영상 제작
|
|
2. Work Shop 발표자료 정리","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J16203,"2019-02-11 07:33:00",19-제조-03,a.품질검사,"새천1교 생산 및 품질관리, 공무지원","2019-02-11 20:34:00",19-제조-03,a.품질검사,"새천1교 생산 및 품질관리, 공무지원","2019-02-11 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,,
|
|
M02302,"2019-02-11 07:37:00",19-제조-02,a.생산관리,"연봉안 조정 ","2019-02-11 18:03:00",19-제조-02,a.생산관리,"연봉안 조정 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>연봉안 조정 <|>01:30<|><br>19-제조-02<|>a.생산관리<|>실험실 공사 공장등록변경 협의<|>00:30<|><br>19-제조-02<|>a.생산관리<|>실험실 및 골재저장소 변경 회의<|>02:30<|><br>",,
|
|
J14308,"2019-02-11 07:40:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업 ","2019-02-11 22:28:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업 ","2019-02-11 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J09102,"2019-02-11 07:40:00",19-영업-01,d.기타,"송산~시화MTV 빔런처 시행가, 제천시 국도대처 우회도로 예상 입찰가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18202,"2019-02-11 07:47:00",07-교영-01,b.시공사,"융천~소호 해상교량 발주 현황 파악, 용상대교 견적","2019-02-11 18:12:00",07-교영-01,b.시공사,"융천~소호 해상교량 발주 현황 파악, 용상대교 견적","0000-00-00 00:00:00",172.16.9.181,NULL,172.16.9.182,004C7,,,
|
|
J10315,"2019-02-11 07:57:00",17-시공-21,b.시공,"북수원1교 가설협의","2019-02-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C8,,,
|
|
M05510,"2019-02-11 08:04:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","2019-02-11 19:51:00",17-시공-24,b.시공,"wdr 철도 거더 제작공사
|
|
안전,품질 공사관리","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J15307,"2019-02-11 08:04:00",19-교영-01,d.기타,"1. 시화MTV 시행견적
|
|
2. 도화~송학 시행견적","2019-02-11 18:03:00",19-교영-01,d.기타,"1. 시화MTV 시행견적
|
|
2. 도화~송학 시행견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18206,"2019-02-11 08:10:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-11 16:36:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
B15306,"2019-02-11 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-02-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18204,"2019-02-11 08:13:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","2019-02-11 18:12:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J18205,"2019-02-11 08:14:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-11 20:50:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-11 18:39:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J11305,"2019-02-11 08:14:00",17-시공-10,g.기타,"답변서 작성","2019-02-11 18:19:00",17-시공-10,g.기타,"답변서 작성","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J12202,"2019-02-11 08:16:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-02-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J10314,"2019-02-11 08:16:00",14-교영-00,d.기타,"삼남1교 시행가 검토자료,,
|
|
수직교(갈천~갈수) 시행견적서,
|
|
검암2교(당진~서산) 시행견적서
|
|
","2019-02-11 18:05:00",14-교영-00,d.기타,"삼남1교(밀양~울산 7공구) 검토자료,
|
|
수직교(갈천~갈수) 시행견적서,
|
|
검암2교(당진~서산) 시행견적서
|
|
","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-02-11 08:18:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-11 20:19:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J14306,"2019-02-11 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-11 18:28:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J15301,"2019-02-11 08:25:00",16-시공-20,b.시공,"단장천2교 1월 투입내역서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
원흥2교 자재발주서 발송","2019-02-11 18:25:00",16-시공-20,b.시공,"단장천2교 1월 투입내역서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
원흥2교 자재발주서 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J10301,"2019-02-11 08:25:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-11 20:29:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15201,"2019-02-11 08:27:00",19-교영-01,b.시공사,"GS건설 미얀마 ppp사업 관련 업무협의","2019-02-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J15302,"2019-02-11 08:27:00",18-설계-19,c.도면,"전교량 바닥판 계산서 작성","2019-02-11 20:30:00",18-설계-19,c.도면,"전교량 바닥판 계산서 작성","2019-02-11 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J10313,"2019-02-11 08:30:00",16-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","2019-02-11 18:04:00",16-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11202,"2019-02-11 08:31:00",18-시공-11,b.시공,공사관리,"2019-02-11 18:25:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-02-11 08:36:00",17-설계-06,b.구조계산,"정착구 FEM해석","2019-02-11 20:49:00",17-설계-06,b.구조계산,"정착구 FEM해석","2019-02-11 18:34:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J13201,"2019-02-11 08:36:00",16-설계-11,b.구조계산,"경간변경에 따른 성과품수정","2019-02-11 18:16:00",16-설계-11,b.구조계산,"경간변경에 따른 성과품수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J16202,"2019-02-11 08:39:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-11 18:31:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-02-11 08:39:00",17-설계-04,h.기타,"감리단 검토사항 답변작성, 설계도서 검토","2019-02-11 20:33:00",17-설계-04,h.기타,"감리단 검토사항 답변작성, 설계도서 검토","2019-02-11 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"17-시공-10<|>g.기타<|>주두부 전단검토<|>06:00<|><br>",1,
|
|
J17205,"2019-02-11 08:40:00",18-교영-01,c.설계사,.,"2019-02-11 18:28:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-02-11 08:45:00",16-시공-20,g.기타,"당초 변경","2019-02-11 18:10:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J09101,"2019-02-11 08:51:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-11 18:22:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-02-11 08:50:00",16-시공-20,출장,한양,"2019-02-11 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10310,"2019-02-11 08:50:00",17-시공-10,출장,"[경북 성주군 ]성주대교 균열조사","2019-02-11 18:00:00",17-시공-10,출장,"[경북 성주군 ]성주대교 균열조사","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J07103,"2019-02-11 08:50:00",17-시공-10,출장,현장,"2019-02-11 18:00:00",17-시공-10,출장,현장,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J18207,"2019-02-11 08:50:00",17-시공-10,출장,"[경북 성주군]성주대교 균열관련 협의","2019-02-11 18:00:00",17-시공-10,출장,"[경북 성주군]성주대교 균열관련 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-02-12 06:08:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-02-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-02-12 07:15:00",17-시공-07,g.기타,"시화JCT확장 가설검토 및 제작장 검토","2019-02-12 18:17:00",17-시공-07,g.기타,"북수원1교 인장계획서 작성 및 인장결과서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J13308,"2019-02-12 07:28:00",18-시공-15,b.시공,"1. 프리캐스트 제품 동영상 제작
|
|
2. Work Shop 발표자료 정리","2019-02-12 18:29:00",18-시공-15,b.시공,"1. 프리캐스트 제품 동영상 제작
|
|
2. Work Shop 발표자료 정리","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J07202,"2019-02-12 07:31:00",19-제조-04,b.기계,"원흥2교 거푸집 도색 및 강연선 고정틀 제작","2019-02-13 07:20:00",19-제조-04,b.기계,"원흥2교 거푸집 도색 및 강연선 고정틀 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-02-12 07:34:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-02-12 21:09:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-02-12 07:36:00",07-교영-01,b.시공사,"융천~소호 해상교량 발주 현황 파악, 용상대교 견적","2019-02-12 18:25:00",07-교영-01,b.시공사,"융천~소호 해상교량 발주 현황 파악, 용상대교 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J14308,"2019-02-12 07:38:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업 ","2019-02-13 00:14:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업 ","2019-02-12 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J16203,"2019-02-12 07:40:00",19-제조-03,a.품질검사,"산외교 데크 생산 및 품질관리, 공무지원","2019-02-12 21:59:00",19-제조-03,a.품질검사,"산외교 데크 생산 및 품질관리, 공무지원","2019-02-12 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-02-12 07:43:00",19-영업-01,d.기타,"시화분기점, 송산그린시티 계룡 강산건설 방문예정, 제천시 국도대처 우회도로 예상 입찰가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M05510,"2019-02-12 07:52:00",18-시공-15,b.시공,"도면검토 및 제작장 배치도작성 ,실행검토","2019-02-12 20:08:00",18-시공-15,b.시공,"도면검토 및 제작장 배치도작성 ,실행검토","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J11305,"2019-02-12 07:59:00",17-시공-10,g.기타,"답변서 작성","2019-02-12 18:41:00",17-시공-10,g.기타,"답변서 작성","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J15307,"2019-02-12 08:02:00",19-교영-01,d.기타,"1. ERP개선 회의자료 작성
|
|
2. 2019년 워크샵 발표자료 작성","2019-02-12 18:05:00",19-교영-01,d.기타,"1. ERP개선 회의자료 작성
|
|
2. 2019년 워크샵 발표자료 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J09101,"2019-02-12 08:05:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J08201,"2019-02-12 08:07:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-12 19:06:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-02-12 08:10:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-12 18:29:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J10314,"2019-02-12 08:12:00",14-교영-00,d.기타,"삼남1교 시행 단가산출서,
|
|
수직교(갈천~갈수) 시행견적서,
|
|
검암2교(당진~서산) 시행견적서
|
|
","2019-02-12 18:22:00",14-교영-00,d.기타,"삼남1교(밀양~울산 7공구) 검토자료,
|
|
수직교(갈천~갈수) 시행견적서,
|
|
검암2교(당진~서산) 시행견적서
|
|
","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-02-12 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-02-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18205,"2019-02-12 08:13:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-12 20:39:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-12 18:34:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J18204,"2019-02-12 08:19:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","2019-02-12 18:16:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J11203,"2019-02-12 08:24:00",17-설계-04,h.기타,"설계도서 검토","2019-02-12 20:31:00",17-설계-04,h.기타,"설계도서 검토","2019-02-12 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"18-설계-19<|>b.구조계산<|>대콘 승천천교 거더계산서작성<|>04:00<|><br>",1,
|
|
J15201,"2019-02-12 08:25:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","2019-02-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J15301,"2019-02-12 08:25:00",16-시공-20,b.시공,"단장천2교 1월 투입내역서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
원흥2교 자재발주서 발송","2019-02-12 18:25:00",16-시공-20,b.시공,"단장천2교 1월 투입내역서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
원흥2교 자재발주서 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14306,"2019-02-12 08:26:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-12 18:18:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J15302,"2019-02-12 08:27:00",18-설계-19,c.도면,"3개교량 도면 작성","2019-02-12 18:04:00",18-설계-19,c.도면,"3개교량 도면 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15202,"2019-02-12 08:29:00",17-설계-06,b.구조계산,"정착구 FEM해석","2019-02-12 18:18:18",17-설계-06,b.구조계산,NULL,"2019-02-12 18:33:00",172.16.9.155,172.16.9.155,NULL,008E1,,1,
|
|
J10301,"2019-02-12 08:29:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-12 20:09:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-12 18:58:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,,
|
|
J16202,"2019-02-12 08:30:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-12 18:37:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11202,"2019-02-12 08:32:00",18-시공-11,b.시공,공사관리,"2019-02-12 18:34:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-02-12 08:34:00",16-시공-20,g.기타,"당초 변경","2019-02-12 20:39:00",16-시공-20,g.기타,"당초 변경","2019-02-12 18:34:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J13201,"2019-02-12 08:34:00",16-설계-11,b.구조계산,"경간변경에 따른 성과품수정","2019-02-12 20:39:00",16-설계-11,b.구조계산,"경간변경에 따른 성과품수정","2019-02-12 18:34:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,,1,
|
|
J17205,"2019-02-12 08:37:00",18-교영-01,c.설계사,.,"2019-02-12 18:11:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-02-12 08:40:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-02-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
Tadmin,"2019-02-12 17:09:00",19-제조-01,a.자재,테스트,"2019-02-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.2,NULL,NULL,000E1,,,
|
|
J18208,"2019-02-12 07:40:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-02-12 20:33:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-12 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14101,"2019-02-12 08:50:00",16-시공-20,출장,한양,"2019-02-12 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10310,"2019-02-12 08:50:00",17-시공-10,출장,"[경북 성주군 ]성주대교 균열조사","2019-02-12 18:00:00",17-시공-10,출장,"[경북 성주군 ]성주대교 균열조사","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J18207,"2019-02-12 08:50:00",17-시공-10,출장,"[경북 성주군]성주대교 균열관련 협의","2019-02-12 18:00:00",17-시공-10,출장,"[경북 성주군]성주대교 균열관련 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07103,"2019-02-12 08:50:00",17-시공-10,출장,"[경북 성주군]성주대교 균열관련 협의","2019-02-12 18:00:00",17-시공-10,출장,"[경북 성주군]성주대교 균열관련 협의","0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
M02302,"2019-02-12 08:50:00",19-제조-02,출장,한맥빌딩,"2019-02-12 18:00:00",19-제조-02,출장,한맥빌딩,"0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J11302,"2019-02-13 07:03:00",17-시공-07,g.기타,"수원교 가설계획서 및 조령천교 가설 및 제작장 검토 수정","2019-02-13 18:06:00",17-시공-07,g.기타,"수원교 가설계획서 및 조령천교 가설 및 제작장 검토 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J13308,"2019-02-13 07:18:00",18-시공-15,b.시공,"1. 프리캐스트 제품 동영상 제작
|
|
2. Work Shop 발표자료 정리","2019-02-13 18:03:00",18-시공-15,b.시공,"1. 프리캐스트 제품 동영상 제작
|
|
2. Work Shop 발표자료 정리","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J07202,"2019-02-13 07:21:00",19-제조-04,b.기계,"북수원1교 런처 앵커 설치와 원흥2교 거푸집 도색 및 강연선 고정틀 제작","2019-02-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
T04204,"2019-02-13 07:32:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-02-13 21:20:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-02-13 07:33:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업 ","2019-02-13 20:43:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업 ","2019-02-13 18:41:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J10315,"2019-02-13 07:34:00",16-설계-17,"a.계획 및 협의","제작 및 가설관련 협의자료 작성 및 시공사협의","2019-02-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C8,,,
|
|
J12202,"2019-02-13 07:39:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-02-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J18208,"2019-02-13 07:39:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-13 21:04:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-13 18:41:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-02-13 07:41:00",19-제조-03,a.품질검사,"산외교 데크 생산 및 품질관리, 공무지원","2019-02-13 23:51:00",19-제조-03,a.품질검사,"산외교 데크 생산 및 품질관리, 공무지원","2019-02-13 19:22:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-02-13 07:42:00",19-영업-01,d.기타,"2019년 일반건설업 수주관련 재검토, 검단산업단지 예상 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-13 18:07:00",19-영업-01,d.기타,"2019년 일반건설업 수주관련 재검토, 검단산업단지 예상 시행가 등 : 조안대교 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J18202,"2019-02-13 07:45:00",07-교영-01,b.시공사,"융천~소호 해상교량 발주 현황 파악, 용상대교 견적","2019-02-13 12:18:00",07-교영-01,b.시공사,"융천~소호 해상교량 발주 현황 파악, 용상대교 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-02-13 07:47:00",19-제조-02,a.생산관리,"서울회의 결과 자료 정리","2019-02-13 21:04:00",19-제조-02,a.생산관리,"서울회의 결과 자료 정리","2019-02-13 19:02:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>2팀 반장 면담<|>01:00<|><br>19-제조-02<|>a.생산관리<|>1팀 팀장/반장 면담<|>02:00<|><br>19-제조-02<|>a.생산관리<|>원종윤 기사 면담<|>01:30<|><br>",1,
|
|
J11305,"2019-02-13 08:00:00",17-시공-10,g.기타,"답변서 작성","2019-02-13 18:09:00",17-시공-10,g.기타,"답변서 작성","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J15307,"2019-02-13 08:02:00",19-교영-01,d.기타,"1. ERP개선 회의자료 작성
|
|
2. 2019년 워크샵 발표자료 작성","2019-02-13 18:01:00",19-교영-01,d.기타,"1. ERP개선 회의자료 작성
|
|
2. 2019년 워크샵 발표자료 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
M05510,"2019-02-13 08:05:00",18-시공-15,b.시공,"도면검토 및 제작장 배치도작성 ,실행검토","2019-02-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004C8,,,
|
|
J18206,"2019-02-13 08:13:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-13 18:06:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J10314,"2019-02-13 08:14:00",14-교영-00,d.기타,"삼남1교(밀양~울산 7공구) 검토자료,
|
|
개략공사비 검토","2019-02-13 18:07:00",14-교영-00,d.기타,"삼남1교(밀양~울산 7공구) 검토자료,
|
|
개략공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-02-13 08:16:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-13 18:06:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-02-13 08:17:00",18-관리-02,e.기타,"비서업무 외","2019-02-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11203,"2019-02-13 08:20:00",17-설계-04,h.기타,"설계도서 검토(본선, 55+37, 정착구)","2019-02-13 19:59:00",17-설계-04,h.기타,"설계도서 검토(본선, 55+37, 정착구)","2019-02-13 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"18-설계-19<|>b.구조계산<|>대콘 승천천교 정착구 검토 계산서작성<|>03:00<|><br>",1,
|
|
J18204,"2019-02-13 08:21:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","2019-02-13 18:05:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J18205,"2019-02-13 08:22:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-13 20:54:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-13 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J10310,"2019-02-13 08:22:00",17-시공-10,b.시공,"균열조사 정리작업","2019-02-13 18:08:00",17-시공-10,b.시공,"균열조사 정리작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J14306,"2019-02-13 08:25:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-13 18:07:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J15301,"2019-02-13 08:25:00",16-시공-20,b.시공,"단장천2교 1월 투입내역서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
원흥2교 자재발주서 발송","2019-02-13 18:06:00",16-시공-20,b.시공,"단장천2교 1월 투입내역서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
주요자재 출금전표 작성
|
|
원흥2교 자재발주서 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J10301,"2019-02-13 08:26:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-13 18:03:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16202,"2019-02-13 08:26:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-13 20:16:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15302,"2019-02-13 08:26:00",18-설계-19,c.도면,"3개교량 도면 작성","2019-02-13 19:58:00",18-설계-19,c.도면,"3개교량 도면 작성","2019-02-13 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J15202,"2019-02-13 08:26:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-13 20:41:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-13 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07103,"2019-02-13 08:28:00",19-교영-01,d.기타,사업관리,"2019-02-13 18:11:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J07210,"2019-02-13 08:29:00",16-시공-20,g.기타,"당초 변경","2019-02-13 18:05:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J13201,"2019-02-13 08:31:00",16-설계-11,b.구조계산,"경간변경에 따른 성과품수정","2019-02-13 18:06:00",16-설계-11,b.구조계산,"경간변경에 따른 성과품수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J11202,"2019-02-13 08:33:00",18-시공-11,b.시공,공사관리,"2019-02-13 18:06:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15201,"2019-02-13 08:37:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","2019-02-13 18:08:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-02-13 08:37:00",18-교영-01,c.설계사,.,"2019-02-13 18:10:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J09101,"2019-02-13 08:40:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-13 18:35:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10313,"2019-02-13 08:42:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-02-13 18:04:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18207,"2019-02-13 07:50:00",17-시공-10,b.시공,"[경북 성주군]성주대교 균열관련 협의","2019-02-13 18:08:00",17-시공-10,b.시공,"[경북 성주군]성주대교 균열관련 협의","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J14101,"2019-02-13 08:50:00",16-시공-20,출장,한양,"2019-02-13 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14302,"2019-02-13 08:50:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열 조사 및 임수보수","2019-02-13 18:00:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열 조사 및 임수보수","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J07202,"2019-02-14 06:17:00",19-제조-04,b.기계,"원흥2교 거푸집 도색 및 강연선 고정틀 제작","2019-02-14 18:01:00",19-제조-04,b.기계,"원흥2교 거푸집 도색 및 강연선 고정틀 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-02-14 06:49:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-02-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-02-14 07:09:00",17-시공-07,g.기타,"수원교 가설계획서 및 조령천교 가설 및 제작장 검토 수정","2019-02-14 18:10:00",17-시공-07,g.기타,"수원교 가설계획서 및 조령천교 가설 및 제작장 검토 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
T04204,"2019-02-14 07:33:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-02-14 21:14:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-02-14 07:34:00",19-제조-03,a.품질검사,"산외교 데크 생산 및 품질관리, 공무지원","2019-02-14 21:58:00",19-제조-03,a.품질검사,"산외교 데크 생산 및 품질관리, 공무지원","2019-02-14 18:44:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18208,"2019-02-14 07:36:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J14308,"2019-02-14 07:37:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-14 20:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-14 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
M02302,"2019-02-14 07:38:00",19-제조-02,a.생산관리,"Pre-Beam 개선 거푸집 고안","2019-02-14 21:03:00",19-제조-02,a.생산관리,"Pre-Beam 개선 거푸집 고안","2019-02-14 18:59:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,,1,
|
|
J18207,"2019-02-14 07:42:00",17-시공-10,b.시공,"[경북 성주군]성주대교 균열관련 협의","2019-02-14 18:09:00",17-시공-10,b.시공,"[경북 성주군]성주대교 균열관련 협의","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18202,"2019-02-14 07:49:00",07-교영-01,b.시공사,"융천~소호 해상교량 발주 현황 파악, 용상대교 견적","2019-02-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J09102,"2019-02-14 07:50:00",19-영업-01,d.기타,"안성~구리 1공구 한신공영 방문예정, 2019년 일반건설업 수주관련 재검토 등 : 조안대교 외 4개교 계약 추진 중","2019-02-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M05510,"2019-02-14 07:58:00",18-시공-15,b.시공,"도면검토 및 제작장 배치도작성 ,실행검토","2019-02-14 18:10:00",18-시공-15,b.시공,"도면검토 및 제작장 배치도작성 ,실행검토","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J13308,"2019-02-14 08:00:00",18-시공-15,b.시공,"1. 세천2교 빔런처 시공계획서 작성
|
|
2. 빔런처 순서도 작성","2019-02-14 18:12:00",18-시공-15,b.시공,"1. 세천2교 빔런처 시공계획서 작성
|
|
2. 빔런처 순서도 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J10315,"2019-02-14 08:03:00",16-설계-17,"a.계획 및 협의","제작장 및 가설검토","2019-02-14 18:09:00",16-설계-17,"a.계획 및 협의","제작장 및 가설검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18204,"2019-02-14 08:07:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","2019-02-14 18:06:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J15307,"2019-02-14 08:09:00",19-교영-01,d.기타,"1. 김포~파주 T/K 개략공사비
|
|
2. 월령보연결교량 경간장 변경 재견적","2019-02-14 18:09:00",19-교영-01,d.기타,"1. 김포~파주 T/K 개략공사비
|
|
2. 월령보연결교량 경간장 변경 재견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18206,"2019-02-14 08:14:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-14 18:16:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J11305,"2019-02-14 08:15:00",17-시공-10,g.기타,검토,"2019-02-14 18:11:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J18205,"2019-02-14 08:15:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-14 21:21:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-14 18:31:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J08201,"2019-02-14 08:18:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-14 18:25:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J13201,"2019-02-14 08:19:00",19-설계-01,b.구조계산,"신평교 반력산정","2019-02-14 20:41:00",19-설계-01,b.구조계산,"신평교 반력산정","2019-02-14 18:31:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,"14-설계-23<|>g.업무지원<|>복부균열 검토서 작성 지원<|>04:00<|><br>",1,
|
|
J14306,"2019-02-14 08:22:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-14 18:12:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J07103,"2019-02-14 08:22:00",19-교영-01,d.기타,사업관리,"2019-02-14 18:19:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J07210,"2019-02-14 08:24:00",16-시공-20,g.기타,"당초 변경","2019-02-14 20:41:00",16-시공-20,g.기타,"당초 변경","2019-02-14 18:32:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J10301,"2019-02-14 08:24:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-14 18:13:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15302,"2019-02-14 08:25:00",18-설계-19,c.도면,"3개교량 도면 작성","2019-02-14 18:01:00",18-설계-19,c.도면,"3개교량 도면 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J11202,"2019-02-14 08:25:00",18-시공-11,b.시공,공사관리,"2019-02-14 18:16:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10310,"2019-02-14 08:25:00",17-시공-21,b.시공,"조원교 프리데크 설치 준비작업","2019-02-14 18:03:00",17-시공-21,b.시공,"조원교 프리데크 설치 준비작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J15202,"2019-02-14 08:27:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-14 20:58:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-14 18:32:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10314,"2019-02-14 08:29:00",14-교영-00,d.기타,"삼남1교 시행 검토자료 및 협의자료,
|
|
공사비 검토","2019-02-14 18:09:00",14-교영-00,d.기타,"삼남1교 시행 검토자료 및 협의자료,
|
|
공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J16202,"2019-02-14 08:33:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-14 18:09:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15301,"2019-02-14 08:35:00",16-시공-20,b.시공,"현장정산서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
신리고가교 투입내역서 작성
|
|
단장천2교 투입내역서 작성","2019-02-15 08:24:00",16-시공-20,b.시공,"현장정산서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
신리고가교 투입내역서 작성
|
|
단장천2교 투입내역서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11203,"2019-02-14 08:37:00",17-설계-04,h.기타,"설계도서 검토","2019-02-14 20:32:00",17-설계-04,h.기타,"설계도서 검토","2019-02-14 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"07-교영-01<|>d.기타<|>스플라이스 거더 수량산출<|>01:30<|><br>16-설계-11<|>e.검토<|>성과품 검토<|>03:00<|><br>",1,
|
|
B15306,"2019-02-14 08:10:00",18-관리-02,e.기타,"비서업무 외","2019-02-14 18:18:18",NULL,NULL,"비서업무 외","0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J17205,"2019-02-14 08:43:00",18-교영-01,c.설계사,.,"2019-02-14 18:08:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-02-14 08:44:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,부동산방문(관리직숙소)","2019-02-14 18:05:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,부동산방문(관리직숙소)","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15201,"2019-02-14 08:45:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","2019-02-14 18:02:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J09101,"2019-02-14 08:58:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-14 18:04:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-02-14 08:50:00",16-시공-20,출장,한양,"2019-02-14 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14302,"2019-02-14 08:50:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열 조사 및 임수보수","2019-02-14 18:00:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열 조사 및 임수보수","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J12202,"2019-02-15 06:05:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-02-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-02-15 06:52:00",19-제조-04,b.기계,"고재통과 강연선 고정틀 제작 및 원흥2교 거푸집 도색","2019-02-15 18:20:00",19-제조-04,b.기계,"고재통과 강연선 고정틀 제작 및 원흥2교 거푸집 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-02-15 07:38:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-15 18:00:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J09102,"2019-02-15 07:41:00",19-영업-01,d.기타,"서부내륙 민자 포스코 사업단 방문예정, 조령천교 계약관련 한신공영 등 : 조안대교 외 4개교 계약 추진 중","2019-02-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
T04204,"2019-02-15 07:42:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-02-15 18:13:00",16-제조-02,a.생산관리," 산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-02-15 07:43:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-15 18:48:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J18207,"2019-02-15 08:02:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","2019-02-15 18:13:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
B15306,"2019-02-15 08:06:00",18-관리-02,e.기타,"비서업무 외","2019-02-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-02-15 08:07:00",19-교영-01,d.기타,"1. 김포~파주 T/K 개략공사비
|
|
2. 월령보연결교량 경간장 변경 재견적","2019-02-15 18:02:00",19-교영-01,d.기타,"1. 김포~파주 T/K 개략공사비
|
|
2. 월령보연결교량 경간장 변경 재견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J10310,"2019-02-15 08:08:00",17-시공-10,b.시공,"균열조사 균열대장 작성","2019-02-15 18:03:00",17-시공-10,b.시공,"균열조사 균열대장 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J11305,"2019-02-15 08:09:00",17-시공-10,g.기타,검토,"2019-02-15 18:11:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J18206,"2019-02-15 08:09:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-15 17:07:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
M05510,"2019-02-15 08:13:00",18-시공-15,b.시공,"도면검토 및 제작장 배치도작성 ,실행검토","2019-02-15 18:07:00",18-시공-15,b.시공,"도면검토 및 제작장 배치도작성 ,실행검토","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J14302,"2019-02-15 08:15:00",17-시공-10,b.시공,"현장투입 준비작업","2019-02-15 18:00:00",17-시공-10,b.시공,"현장투입 준비작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004E2,,,
|
|
J13308,"2019-02-15 08:17:00",18-시공-15,b.시공,"1. 세천2교 빔런처 시공계획서 작성
|
|
2. 빔런처 순서도 작성","2019-02-15 18:14:00",18-시공-15,b.시공,"1. 세천2교 빔런처 시공계획서 작성
|
|
2. 빔런처 순서도 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J07103,"2019-02-15 08:21:00",19-교영-01,d.기타,사업관리,"2019-02-15 18:15:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10315,"2019-02-15 08:23:00",16-설계-17,"a.계획 및 협의","제작장 및 가설검토","2019-02-15 18:02:00",16-설계-17,"a.계획 및 협의","제작장 및 가설검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18204,"2019-02-15 08:23:00",19-교휴-06,a.기타,"안동시관내국도대체우회도로(용상-교리2) 건설공사 용상대교 입찰견적 작성","2019-02-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.183,NULL,NULL,004E2,,,
|
|
J15301,"2019-02-15 08:24:00",16-시공-20,b.시공,"현장정산서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
단장천2교 투입내역서 작성
|
|
산외교 하도급지킴이 작성
|
|
동호산업 기성 지급
|
|
","2019-02-15 10:59:00",16-시공-20,b.시공,"현장정산서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
단장천2교 투입내역서 작성
|
|
산외교 하도급지킴이 작성
|
|
동호산업 기성 지급
|
|
","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11203,"2019-02-15 08:25:00",18-설계-19,b.구조계산,"r-d r-f1교 거더계산서작성","2019-02-15 18:05:00",18-설계-19,b.구조계산,"r-d r-f1교 거더계산서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15302,"2019-02-15 08:26:00",18-설계-19,c.도면,"3개교량 도면 작성","2019-02-15 18:07:00",18-설계-19,c.도면,"3개교량 도면 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15202,"2019-02-15 08:26:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-15 21:06:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-15 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J14306,"2019-02-15 08:29:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E5,,,
|
|
J10314,"2019-02-15 08:30:00",14-교영-00,d.기타,"곡천교(안성~성남2공구) 협의자료검토,
|
|
삼남1교 시행 검토자료 및 협의자료,
|
|
공사비 검토","2019-02-15 18:05:00",14-교영-00,d.기타,"곡천교(안성~성남2공구) 협의자료검토,
|
|
삼남1교 시행 검토자료 및 협의자료,
|
|
공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J10301,"2019-02-15 08:30:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-15 18:30:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-02-15 08:31:00",18-시공-11,b.시공,공사관리,"2019-02-15 18:15:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J13201,"2019-02-15 08:31:00",19-설계-01,b.구조계산,"신평교 반력산정","2019-02-15 18:12:00",19-설계-01,b.구조계산,"신평교 반력산정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J18205,"2019-02-15 08:32:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-15 21:55:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-15 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J17205,"2019-02-15 08:34:00",18-교영-01,c.설계사,.,"2019-02-15 18:02:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-02-15 08:35:00",16-시공-20,g.기타,"당초 변경","2019-02-15 18:08:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J16202,"2019-02-15 08:39:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-15 18:15:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-02-15 08:44:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","2019-02-15 18:03:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-02-15 08:51:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-02-15 18:04:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14101,"2019-02-15 08:50:00",16-시공-20,출장,한양,"2019-02-15 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-02-15 08:50:00",07-교영-01,출장,"[여수시 화양면]웅천~소호 해상교량 현장설명회(남양건설)","2019-02-15 18:00:00",07-교영-01,출장,"[여수시 화양면]웅천~소호 해상교량 현장설명회(남양건설)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
T04204,"2019-02-16 08:15:00",16-제조-02,a.생산관리,"공장 수변전설비 차폐기(ASS) 교체공사","2019-02-16 13:33:00",16-제조-02,a.생산관리,"공장 수변전설비 차폐기(ASS) 교체공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-02-16 08:31:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,1,
|
|
J08201,"2019-02-16 08:59:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-16 16:16:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,1,
|
|
J07210,"2019-02-16 09:50:00",16-시공-20,g.기타,"당초 변경","2019-02-16 16:16:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,1,
|
|
J11302,"2019-02-18 07:03:00",17-시공-07,g.기타,"수원교 가설계획서 및 조령천교 가설 및 제작장 검토 수정","2019-02-18 18:06:00",17-시공-07,g.기타,"수원교 가설계획서 및 조령천교 가설 및 제작장 검토 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J12202,"2019-02-18 07:05:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-02-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-02-18 07:27:00",19-제조-04,b.기계,"고재통과 강연선 고정틀 제작 및 원흥2교 거푸집 도색","2019-02-19 07:09:00",19-제조-04,b.기계,"고재통과 강연선 고정틀 제작 및 원흥2교 거푸집 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-02-18 07:29:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-02-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-02-18 07:33:00",18-시공-15,b.시공,"1. 세천2교 빔런처 시공계획서 작성
|
|
2. 빔런처 순서도 작성","2019-02-18 18:11:00",18-시공-15,b.시공,"1. 세천2교 빔런처 시공계획서 작성
|
|
2. 빔런처 순서도 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18208,"2019-02-18 07:33:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-18 21:33:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-18 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-02-18 07:34:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-18 22:03:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-18 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
M02302,"2019-02-18 07:39:00",19-제조-02,a.생산관리,"Pre-Beam 개선 거푸집 고안","2019-02-18 17:58:00",19-제조-02,a.생산관리,"Pre-Beam 개선 거푸집 고안","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-02-18 07:44:00",19-영업-01,d.기타,"조령천교 계약관련 한신공영 본사방문 예정, 형산강 월령보교 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-18 18:02:00",19-영업-01,d.기타,"조령천교 계약관련 한신공영 본사방문 예정, 형산강 월령보교 시행가 등 : 조안대교 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J18202,"2019-02-18 07:46:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","2019-02-18 18:11:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J10310,"2019-02-18 07:58:00",17-시공-21,b.시공,"조원교 데크설치 및 2차 인장준비","2019-02-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004C8,,,
|
|
J08201,"2019-02-18 08:02:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-18 20:04:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-02-18 08:05:00",19-교영-01,d.기타,"1. EBS 표준내역 자재조서 갱신","2019-02-18 18:05:00",19-교영-01,d.기타,"1. EBS 표준내역 자재조서 갱신","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18205,"2019-02-18 08:08:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-18 20:53:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-18 18:33:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J10315,"2019-02-18 08:09:00",17-시공-21,b.시공,"북수원1교 가설협의","2019-02-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C8,,,
|
|
J18206,"2019-02-18 08:11:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-18 18:09:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J11305,"2019-02-18 08:13:00",17-시공-10,g.기타,검토,"2019-02-18 18:35:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
B15306,"2019-02-18 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-02-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18204,"2019-02-18 08:15:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","2019-02-18 18:05:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J14306,"2019-02-18 08:19:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-18 18:16:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J13201,"2019-02-18 08:20:00",19-설계-01,b.구조계산,"신평교_BR1 구조계산","2019-02-18 20:53:00",19-설계-01,b.구조계산,"신평교_BR1 구조계산","2019-02-18 18:34:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,"16-설계-11<|>b.구조계산<|>월령보 연결교량 성과품 수정<|>04:00<|><br>",1,
|
|
J10314,"2019-02-18 08:20:00",14-교영-00,d.기타,"삼남1교 시행 검토자료 및 협의자료,
|
|
곡천교(안성~성남2공구) 협의자료검토,
|
|
공사비 검토","2019-02-18 18:03:00",14-교영-00,d.기타,"삼남1교 시행 검토자료 및 협의자료,
|
|
곡천교(안성~성남2공구) 협의자료검토,
|
|
공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J09101,"2019-02-18 08:25:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15302,"2019-02-18 08:26:00",18-설계-19,c.도면,"3개교량 도면 작성","2019-02-18 20:30:00",18-설계-19,c.도면,"3개교량 도면 작성","2019-02-18 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J10301,"2019-02-18 08:26:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-18 18:26:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16203,"2019-02-18 08:26:00",19-제조-03,a.품질검사,"산외교 데크 생산 및 품질관리, 공무지원","2019-02-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J11202,"2019-02-18 08:28:00",18-시공-11,b.시공,공사관리,"2019-02-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J15201,"2019-02-18 08:29:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","2019-02-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J15202,"2019-02-18 08:29:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-18 21:07:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-18 18:34:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07103,"2019-02-18 08:30:00",19-교영-01,d.기타,사업관리,"2019-02-18 18:37:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11203,"2019-02-18 08:33:00",18-설계-19,b.구조계산,"전동교 연기방향 거더계산서작성","2019-02-18 20:31:00",18-설계-19,b.구조계산,"전동교 연기방향 BR1 거더계산서작성","2019-02-18 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J07210,"2019-02-18 08:34:00",16-시공-20,g.기타,"당초 변경","2019-02-18 20:48:00",16-시공-20,g.기타,"당초 변경","2019-02-18 18:35:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J16202,"2019-02-18 08:36:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-18 18:10:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-02-18 08:36:00",18-교영-01,c.설계사,.,"2019-02-18 18:06:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18207,"2019-02-18 08:38:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","2019-02-18 18:09:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10313,"2019-02-18 08:48:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-02-18 18:00:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
M05510,"2019-02-18 08:50:00",17-시공-07,출장,"[김해시]주천1교 1차인장","2019-02-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.139.215,NULL,NULL,004C8,,,
|
|
J14101,"2019-02-18 08:50:00",16-시공-20,출장,한양,"2019-02-18 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14302,"2019-02-18 08:50:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 2차강선 인장 및 그라우팅","2019-02-18 18:00:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 2차강선 인장 및 그라우팅","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J13308,"2019-02-19 06:55:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 work shop 발표자료 작성","2019-02-19 18:26:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 work shop 발표자료 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J11302,"2019-02-19 06:58:00",17-시공-07,g.기타,"수원교 가설계획서 및 조령천교 가설 및 제작장 검토 수정","2019-02-19 18:09:00",17-시공-07,g.기타,"수원교 가설계획서 및 조령천교 가설 및 제작장 검토 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J07202,"2019-02-19 07:10:00",19-제조-04,b.기계,"프리덱 단독 거푸집 보수 및 강연선 고정틀 제작","2019-02-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-02-19 07:20:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-19 22:00:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-19 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
T04204,"2019-02-19 07:30:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-02-19 21:05:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-02-19 07:33:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-19 18:04:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-02-19 07:34:00",19-제조-02,a.생산관리,"Shop-Dwg. 개선 검토","2019-02-19 18:02:00",19-제조-02,a.생산관리,"Pre-Beam 개선 거푸집 고안","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-02-19 07:40:00",19-영업-01,d.기타,"서부내륙관련 포스코본사, 조령천교관련 한신공영 본사방문 예정, 형산강 월령보교 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-02-19 08:01:00",17-시공-21,b.시공,"북수원1교 가설검토","2019-02-19 18:04:00",17-시공-21,b.시공,"북수원1교 가설검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18202,"2019-02-19 08:04:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","2019-02-20 07:40:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J15307,"2019-02-19 08:05:00",19-교영-01,d.기타,"1. EBS 표준내역 자재조서 갱신","2019-02-19 18:01:00",19-교영-01,d.기타,"1. EBS 표준내역 자재조서 갱신","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J10310,"2019-02-19 08:08:00",17-시공-21,b.시공,"수원교 1차인장 준비 및 가설계획서 작성협의","2019-02-19 18:04:00",17-시공-21,b.시공,"수원교 1차인장 준비 및 가설계획서 작성협의","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
B15306,"2019-02-19 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-02-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-02-19 08:19:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-19 18:22:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J18204,"2019-02-19 08:20:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","2019-02-19 18:05:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J13201,"2019-02-19 08:20:00",19-설계-01,b.구조계산,"신평교_BR2 구조계산","2019-02-19 20:40:00",19-설계-01,b.구조계산,"신평교_BR2 구조계산","2019-02-19 18:33:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,,1,
|
|
J18205,"2019-02-19 08:21:00",17-시공-10,f.A/S,"주두부 상세해석","2019-02-19 18:09:00",17-시공-10,f.A/S,"주두부 상세해석","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J08201,"2019-02-19 08:21:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-19 18:27:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11202,"2019-02-19 08:23:00",18-시공-11,b.시공,공사관리,"2019-02-19 18:12:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14306,"2019-02-19 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-19 18:26:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J15302,"2019-02-19 08:25:00",18-설계-19,c.도면,"3개교량 도면 작성","2019-02-19 18:03:00",18-설계-19,c.도면,"3개교량 도면 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J10314,"2019-02-19 08:25:00",14-교영-00,d.기타,"삼남1교 시행 검토자료 및 협의자료,
|
|
개략공사비 검토","2019-02-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J10313,"2019-02-19 08:26:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","2019-02-19 18:00:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15202,"2019-02-19 08:29:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-19 20:56:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-19 18:34:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10301,"2019-02-19 08:29:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-19 18:01:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07103,"2019-02-19 08:30:00",19-교영-01,d.기타,사업관리,"2019-02-19 18:19:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J09101,"2019-02-19 08:31:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J16202,"2019-02-19 08:31:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-19 18:18:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15301,"2019-02-19 08:32:00",16-시공-20,b.시공,"현장정산서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
단장천2교 투입내역서 작성
|
|
산외교 하도급지킴이 작성
|
|
동호산업 기성 지급
|
|
","2019-02-19 18:07:00",16-시공-20,b.시공,"현장정산서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
단장천2교 투입내역서 작성
|
|
산외교 하도급지킴이 작성
|
|
동호산업 기성 지급
|
|
","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J07210,"2019-02-19 08:32:00",16-시공-20,g.기타,"당초 변경","2019-02-19 20:40:00",16-시공-20,g.기타,"당초 변경","2019-02-19 18:33:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J11203,"2019-02-19 08:33:00",18-설계-19,b.구조계산,"전동교 오송방향 거더계산서작성","2019-02-19 20:32:00",18-설계-19,b.구조계산,"전동교 오송방향 거더계산서작성","2019-02-19 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"17-설계-04<|>h.기타<|>감리단 검토 별첨자료 작성<|>03:00<|><br>",1,
|
|
J15201,"2019-02-19 08:36:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","2019-02-19 18:07:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-02-19 08:37:00",17-시공-10,g.기타,검토,"2019-02-19 18:06:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J17205,"2019-02-19 08:37:00",18-교영-01,c.설계사,.,"2019-02-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J18207,"2019-02-19 08:45:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","2019-02-19 18:16:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M05510,"2019-02-19 08:50:00",17-시공-07,출장,"[김해시]주천1교 1차인장","2019-02-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",121.176.54.29,NULL,NULL,004C8,,,
|
|
J14101,"2019-02-19 08:50:00",16-시공-20,출장,한양,"2019-02-19 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14302,"2019-02-19 08:50:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 2차강선 인장 및 그라우팅","2019-02-19 18:00:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 2차강선 인장 및 그라우팅","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
B15306,"2019-02-20 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-02-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07202,"2019-02-20 06:42:00",19-제조-04,b.기계,"원흥2교 각재, 철판, 마구리판과 가공철근 상차 및 골재장 지붕공사","2019-02-21 06:15:00",19-제조-04,b.기계,"원흥2교 각재, 철판, 마구리판과 가공철근 상차 및 골재장 지붕공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-02-20 06:50:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-02-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-02-20 07:11:00",17-시공-07,g.기타,"왕림교 교통통제 및 지장물 현황도 작성","2019-02-20 18:08:00",17-시공-07,g.기타,"수원교 가설계획서 및 조령천교 가설 및 제작장 검토 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
M05510,"2019-02-20 07:15:00",17-시공-07,b.시공,"[김해시]주천1교 1차인장","2019-02-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.131.49,NULL,NULL,004C8,,,
|
|
J14308,"2019-02-20 07:18:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-20 22:40:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-20 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J13308,"2019-02-20 07:24:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 work shop 발표자료 작성","2019-02-20 18:06:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 work shop 발표자료 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18208,"2019-02-20 07:29:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-20 21:15:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-20 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-02-20 07:32:00",19-제조-02,a.생산관리,"Shop-Dwg. 개선 검토","2019-02-20 17:56:00",19-제조-02,a.생산관리,"Pre-Beam 개선 거푸집 고안","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>홍보동영상 Intro 검토 및 수정<|>02:00<|><br>19-제조-02<|>a.생산관리<|>Shop Dwg. 표준화 검토<|>01:30<|><br>19-제조-02<|>a.생산관리<|>관리자 업무 분석<|>00:30<|><br>",,
|
|
J18207,"2019-02-20 07:36:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","2019-02-20 18:02:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
T04204,"2019-02-20 07:39:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-02-20 21:04:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-02-20 07:41:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","2019-02-20 18:07:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-02-20 07:59:00",19-영업-01,d.기타,"형산강 월령보교 계약가, 검단산업단지 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J15307,"2019-02-20 08:08:00",19-교영-01,d.기타,"1. EBS 표준내역 자재조서 갱신
|
|
2. 안성~구리2공구 SK건설 방문","2019-02-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.171,NULL,NULL,004E4,,,
|
|
J08201,"2019-02-20 08:09:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-20 18:16:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10301,"2019-02-20 08:09:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-20 18:12:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10314,"2019-02-20 08:10:00",14-교영-00,d.기타,"곡천교(안성~성남2공구) 협의자료검토,
|
|
삼남1교 시행 검토자료 및 협의자료,
|
|
개략공사비 검토","2019-02-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J11305,"2019-02-20 08:10:00",17-시공-10,g.기타,검토,"2019-02-20 18:09:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J10315,"2019-02-20 08:13:00",17-시공-21,b.시공,"북수원1교 가설검토","2019-02-20 18:05:00",17-시공-21,b.시공,"북수원1교 가설검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18205,"2019-02-20 08:15:00",17-시공-10,f.A/S,"주두부 결과정리","2019-02-20 18:05:00",17-시공-10,f.A/S,"주두부 결과정리","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J18206,"2019-02-20 08:16:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-20 18:19:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J13201,"2019-02-20 08:19:00",19-설계-01,b.구조계산,"신평교_BR2 구조계산","2019-02-20 21:46:00",19-설계-01,b.구조계산,"신평교_BR2 구조계산","2019-02-20 19:36:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,,1,
|
|
J10310,"2019-02-20 08:20:00",17-시공-21,b.시공,"수원교 1차인장 준비 및 가설계획서 작성협의","2019-02-20 18:05:00",17-시공-21,b.시공,"수원교 1차인장 준비 및 가설계획서 작성협의","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J11203,"2019-02-20 08:22:00",17-설계-04,h.기타,"시공사 검토 : 별첨자료 작성, 설게도서 수정","2019-02-20 19:49:00",17-설계-04,h.기타,"시공사 검토 : 별첨자료 작성, 설게도서 수정","2019-02-20 19:38:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"18-교영-01<|>d.기타<|>영동고속도로확장 거더 수량산출<|>02:30<|><br>",,
|
|
J15302,"2019-02-20 08:24:00",18-설계-19,c.도면,"3개교량 도면 작성","2019-02-20 21:45:00",18-설계-19,c.도면,"3개교량 도면 작성","2019-02-20 19:37:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J11202,"2019-02-20 08:24:00",18-시공-11,b.시공,공사관리,"2019-02-20 18:16:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18204,"2019-02-20 08:24:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","2019-02-20 18:11:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J15201,"2019-02-20 08:28:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","2019-02-20 18:03:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,"19-교영-01<|>b.시공사<|>Silo 프라캐스트 제품화 관련 포스코 건설 협의<|>04:00<|><br>",,
|
|
J16202,"2019-02-20 08:28:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-20 18:18:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07103,"2019-02-20 08:30:00",19-교영-01,d.기타,사업관리,"2019-02-20 18:11:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15301,"2019-02-20 08:31:00",16-시공-20,b.시공,"현장정산서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
조안대교 자재공급원승인서 준비 (디비닥, 피씨에스)
|
|
봉담-송산 기술자료 요구서 발송
|
|
워크샵 식순 작성","2019-02-20 19:04:00",16-시공-20,b.시공,"현장정산서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
조안대교 자재공급원승인서 준비 (디비닥, 피씨에스)
|
|
봉담-송산 기술자료 요구서 발송
|
|
워크샵 식순 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J10313,"2019-02-20 08:34:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","2019-02-20 18:00:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J07210,"2019-02-20 08:34:00",16-시공-20,g.기타,"당초 변경","2019-02-20 21:44:00",16-시공-20,g.기타,"당초 변경","2019-02-20 19:33:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J17205,"2019-02-20 08:36:00",18-교영-01,c.설계사,.,"2019-02-20 18:11:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J09101,"2019-02-20 12:15:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-20 18:15:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-02-20 08:50:00",16-시공-20,출장,한양,"2019-02-20 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14302,"2019-02-20 08:50:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 2차강선 인장 및 그라우팅","2019-02-20 18:00:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 2차강선 인장 및 그라우팅","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J07202,"2019-02-21 06:16:00",19-제조-04,b.기계,"북수원1교 앵커 해체와 쉬스 마감 및 골재장 지붕공사","2019-02-22 10:14:00",19-제조-04,b.기계,"북수원1교 앵커 해체와 쉬스 마감 및 골재장 지붕공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-02-21 07:17:00",17-시공-07,g.기타,"수원교 가설계획서 및 조령천교 가설 및 제작장 검토 수정","2019-02-21 12:56:00",17-시공-07,g.기타,"수원교 가설계획서 및 조령천교 가설 및 제작장 검토 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J14308,"2019-02-21 07:27:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-21 18:02:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J13308,"2019-02-21 07:28:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 work shop 발표자료 작성","2019-02-21 18:10:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 work shop 발표자료 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
T04204,"2019-02-21 07:28:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-02-21 21:39:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-02-21 07:31:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-21 22:20:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-21 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-02-21 07:32:00",19-제조-02,a.생산관리,"철근 절단 프로그램 UI 작성","2019-02-21 21:12:00",19-제조-02,a.생산관리,"Pre-Beam 개선 거푸집 고안","2019-02-21 19:06:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>Pre-Beam Mold 검토<|>03:30<|><br>19-제조-02<|>a.생산관리<|>인사이동 면담 및 작업자 업무 분석<|>02:00<|><br>",1,
|
|
J18207,"2019-02-21 07:33:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","2019-02-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.10.246,NULL,NULL,004C7,,,
|
|
J16203,"2019-02-21 07:37:00",19-제조-03,a.품질검사,"산외교 데크 생산 및 품질관리, 공무지원","2019-02-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-02-21 07:42:00",19-영업-01,d.기타,"진접~내촌 수자원기술 현장방문 예정, 형산강 월령보교, 검단산업단지 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18202,"2019-02-21 07:47:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","2019-02-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J10315,"2019-02-21 08:08:00",17-시공-21,b.시공,"북수원1교 가설검토","2019-02-21 18:16:00",17-시공-21,b.시공,"북수원1교 가설검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J15307,"2019-02-21 08:12:00",19-교영-01,d.기타,"1. 영동고속도로(서창~안산)간 확장공사 특정공법심의","2019-02-21 18:10:00",19-교영-01,d.기타,"1. 영동고속도로(서창~안산)간 확장공사 특정공법심의","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
B15306,"2019-02-21 08:15:00",18-관리-02,e.기타,"비서업무 외","2019-02-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-02-21 08:19:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-21 18:10:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J08201,"2019-02-21 08:20:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-21 18:08:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-02-21 08:21:00",17-시공-10,f.A/S,"주두부 결과정리","2019-02-21 21:11:00",17-시공-10,f.A/S,"주두부 결과정리","2019-02-21 18:32:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J14306,"2019-02-21 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-21 18:17:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J15302,"2019-02-21 08:24:00",18-설계-19,c.도면,"6개교량 배근도 작성","2019-02-21 18:04:00",18-설계-19,c.도면,"6개교량 배근도 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J11203,"2019-02-21 08:25:00",17-설계-04,h.기타,"시공사 검토 : 별첨자료 작성, 설게도서 수정","2019-02-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J10301,"2019-02-21 08:26:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J16202,"2019-02-21 08:26:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-21 18:18:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10314,"2019-02-21 08:27:00",14-교영-00,d.기타,"삼남1교 시행 검토자료 및 협의자료검토,
|
|
공사비 검토","2019-02-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J07103,"2019-02-21 08:28:00",19-교영-01,d.기타,사업관리,"2019-02-21 18:13:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J07210,"2019-02-21 08:29:00",16-시공-20,g.기타,"당초 변경","2019-02-21 20:40:00",16-시공-20,g.기타,"당초 변경","2019-02-21 18:32:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J15202,"2019-02-21 08:29:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-21 21:09:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-21 18:32:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J11202,"2019-02-21 08:29:00",18-시공-11,b.시공,공사관리,"2019-02-21 18:17:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10310,"2019-02-21 08:50:00",19-교휴-01,교육,"건걸안전 보건 책임자교육","2019-02-21 18:00:00",19-교휴-01,교육,"건걸안전 보건 책임자교육","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J13201,"2019-02-21 08:33:00",19-설계-01,b.구조계산,"신평교_슬래브 도면작성","2019-02-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E3,,,
|
|
J15201,"2019-02-21 08:38:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","2019-02-21 18:06:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-02-21 08:38:00",18-교영-01,c.설계사,.,"2019-02-21 18:30:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15301,"2019-02-21 08:40:00",16-시공-20,b.시공,"현장정산서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
조안대교 자재공급원승인서 준비 (디비닥, 피씨에스)
|
|
봉담-송산 기술자료 요구서 발송
|
|
워크샵 식순 작성","2019-02-21 18:08:00",16-시공-20,b.시공,"현장정산서 작성
|
|
강진광주3공구 프리덱 공급원승인서 발송
|
|
조안대교 자재공급원승인서 준비 (디비닥, 피씨에스)
|
|
봉담-송산 기술자료 요구서 발송
|
|
워크샵 식순 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J10313,"2019-02-21 08:43:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","2019-02-21 18:01:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-02-21 09:01:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-21 18:11:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J11305,"2019-02-21 08:20:00",,,,"2019-02-21 19:15:00",,,,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J18204,"2019-02-21 08:30:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","2019-02-21 18:11:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J14101,"2019-02-21 08:50:00",16-시공-20,출장,한양,"2019-02-21 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14302,"2019-02-21 08:50:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 2차강선 인장 및 그라우팅","2019-02-21 18:00:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 2차강선 인장 및 그라우팅","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J12202,"2019-02-21 08:50:00",13-설계-30,출장,"[충남 서산]런처 신규제작 공정확인, 안전인증용 런처 모델링 도면과 일치화 및 구조검토","2019-02-21 18:00:00",13-설계-30,출장,"[충남 서산]런처 신규제작 공정확인, 안전인증용 런처 모델링 도면과 일치화 및 구조검토","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J13308,"2019-02-22 07:27:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 work shop 발표자료 작성","2019-02-22 18:19:00",18-시공-15,b.시공,"1. Precast 제품 동영상 제작
|
|
2. 2019 work shop 발표자료 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18208,"2019-02-22 07:34:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
M02302,"2019-02-22 07:34:00",19-제조-02,a.생산관리,"Pre-Beam 개선 거푸집 고안","2019-02-22 10:04:00",19-제조-02,a.생산관리,"Pre-Beam 개선 거푸집 고안","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-02-22 07:37:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
J16203,"2019-02-22 07:38:00",19-제조-03,a.품질검사,"재하시험(산외교),
|
|
산외교 데크 생산 및 품질관리, 공무지원","2019-02-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-02-22 07:39:00",19-영업-01,d.기타,"진접~내촌 예상 계약가, 검단산업단지 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-22 18:13:00",19-영업-01,d.기타,"진접~내촌 예상 계약가, 검단산업단지 시행가 등 : 조안대교 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J18207,"2019-02-22 07:40:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","2019-02-22 18:14:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
T04204,"2019-02-22 07:41:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-02-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J15307,"2019-02-22 07:42:00",19-교영-01,d.기타,"1. 양구~원통 특정공법심의","2019-02-22 18:20:00",19-교영-01,d.기타,"1. 영동고속도로(서창~안산)간 확장공사 특정공법심의","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
B15306,"2019-02-22 08:00:00",18-관리-02,e.기타,"비서업무 외","2019-02-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10315,"2019-02-22 08:10:00",17-시공-21,b.시공,"북수원1교 가설검토","2019-02-22 18:12:00",17-시공-21,b.시공,"북수원1교 가설검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J08201,"2019-02-22 08:14:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J18206,"2019-02-22 08:17:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-22 18:14:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J10310,"2019-02-22 08:17:00",17-시공-21,b.시공,"수원교 1차인장 준비 서류작업","2019-02-22 18:12:00",17-시공-21,b.시공,"수원교 1차인장 준비 서류작업","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J11203,"2019-02-22 08:22:00",17-설계-04,h.기타,"시공사 검토 : 별첨자료 작성, 설게도서 수정","2019-02-22 18:12:00",17-설계-04,h.기타,"시공사 검토 : 별첨자료 작성, 설게도서 수정","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-교영-01<|>d.기타<|>양구원통 거더 수량 산출<|>01:30<|><br>",,
|
|
J14302,"2019-02-22 08:23:00",17-시공-10,b.시공,"현장투입 준비작업","2019-02-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004E2,,,
|
|
J15302,"2019-02-22 08:24:00",18-설계-19,c.도면,"6개교량 배근도 작성","2019-02-22 18:21:00",18-설계-19,c.도면,"6개교량 배근도 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J18205,"2019-02-22 08:24:00",17-시공-10,f.A/S,"주두부 결과정리","2019-02-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,008E2,,,
|
|
J18204,"2019-02-22 08:25:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","2019-02-22 18:12:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J14306,"2019-02-22 08:25:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E5,,,
|
|
J15202,"2019-02-22 08:26:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","2019-02-22 18:15:00",15-설계-31,e.검토,"경안천교 시공전 성과품 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J07103,"2019-02-22 08:28:00",19-교영-01,d.기타,사업관리,"2019-02-22 18:12:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10314,"2019-02-22 08:28:00",14-교영-00,d.기타,"삼남1교 협의자료검토, 공사비 검토
|
|
","2019-02-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J10301,"2019-02-22 08:29:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-22 18:17:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-02-22 08:29:00",16-시공-20,g.기타,"당초 변경","2019-02-22 18:15:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J15301,"2019-02-22 08:32:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
조안대교 자재공급원승인서 준비 (디비닥, 피씨에스)
|
|
북수원1교 쏠플레이트 검토서 작성
|
|
시화JCT 자재 규격표 작성
|
|
단장천2교 빔런처 관련 자료 발송","2019-02-22 18:20:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
조안대교 자재공급원승인서 준비 (디비닥, 피씨에스)
|
|
북수원1교 쏠플레이트 검토서 작성
|
|
시화JCT 자재 규격표 작성
|
|
단장천2교 빔런처 관련 자료 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-02-22 08:33:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-22 18:14:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J16202,"2019-02-22 08:33:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-22 18:14:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-02-22 08:38:00",18-교영-01,c.설계사,.,"2019-02-22 18:17:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-02-22 08:38:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","2019-02-22 18:12:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-02-22 08:40:00",17-시공-10,g.기타,검토,"2019-02-22 18:13:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J10313,"2019-02-22 08:42:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","2019-02-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J11302,"2019-02-22 08:49:00",17-시공-07,g.기타,"북수원1교 가설검토 및 제작장 검토","2019-02-22 18:16:00",17-시공-07,g.기타,"수원교 가설계획서 및 조령천교 가설 및 제작장 검토 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J18202,"2019-02-22 09:08:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","2019-02-22 18:13:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J07202,"2019-02-22 10:15:00",19-제조-04,b.기계,"골재장 지붕공사와 북수원1교 앵커 지그 제작 및 진입로 방지턱 철거","2019-02-23 06:15:00",19-제조-04,b.기계,"골재장 지붕공사와 북수원1교 앵커 지그 제작 및 진입로 방지턱 철거","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11202,"2019-02-22 13:08:00",18-시공-11,b.시공,공사관리,"2019-02-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J14101,"2019-02-22 08:50:00",16-시공-20,출장,한양,"2019-02-22 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-02-22 08:50:00",13-설계-30,출장,"[충남 서산]런처 신규제작 공정확인, 안전인증용 런처 모델링 도면과 일치화 및 구조검토","2019-02-22 18:00:00",13-설계-30,출장,"[충남 서산]런처 신규제작 공정확인, 안전인증용 런처 모델링 도면과 일치화 및 구조검토","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J07202,"2019-02-23 06:16:00",19-제조-04,b.기계,"거더 거푸집 보수와 인양고리 교체 및 야적장 정리","2019-02-23 16:00:00",19-제조-04,b.기계,"거더 거푸집 보수와 인양고리 교체 및 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-02-23 07:24:00",17-시공-07,b.시공,"[김해시]주천1교 1차인장","2019-02-23 07:26:00",17-시공-07,b.시공,"[김해시]주천1교 1차인장","0000-00-00 00:00:00",223.33.165.227,NULL,223.33.165.227,004C8,,,
|
|
J18208,"2019-02-23 07:29:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-23 16:11:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J14308,"2019-02-23 07:29:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-23 18:04:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,1,
|
|
J16203,"2019-02-23 07:30:00",19-제조-03,a.품질검사,"후정철육교, 새천2교, 데크 생산 및 품질관리, 공무지원","2019-02-23 18:36:00",19-제조-03,a.품질검사,"주천1교, 새천2교, 데크 생산 및 품질관리, 공무지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
M02302,"2019-02-23 08:13:00",19-제조-02,a.생산관리,"보고자료 준비","2019-02-23 16:00:00",19-제조-02,a.생산관리,"Pre-Beam 개선 거푸집 고안","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>철근 절단 프로그램 UI 작성<|>02:00<|><br>",1,
|
|
M05510,"2019-02-24 07:32:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.27.212,NULL,NULL,004C8,,,
|
|
J07202,"2019-02-25 06:52:00",19-제조-04,b.기계,"북수원1교(권선P4) 런처 앵커 설치 작업과 거더 거푸집 보수","2019-02-26 06:49:00",19-제조-04,b.기계,"북수원1교(권선P4) 런처 앵커 설치 작업과 거더 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-02-25 07:02:00",17-시공-07,g.기타,"인장계획서 성적서 변경 및 동용교 가설계획서 작성
|
|
","2019-02-25 18:09:00",17-시공-07,g.기타,"인장계획서 성적서 변경 및 동용교 가설계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J14308,"2019-02-25 07:19:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-25 22:15:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-25 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
M05510,"2019-02-25 07:20:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-02-25 19:16:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.62.204.251,NULL,219.251.108.253,004C8,,,
|
|
T04204,"2019-02-25 07:29:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-02-25 21:20:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-02-25 07:33:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-25 21:56:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-25 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J13308,"2019-02-25 07:38:00",18-시공-15,b.시공,"1. 2월 기성내역서 작성
|
|
2. 2019년 워크숍 취합","2019-02-25 18:09:00",18-시공-15,b.시공,"1. 2월 기성내역서 작성
|
|
2. 2019년 워크숍 취합","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
M02302,"2019-02-25 07:39:00",19-제조-02,a.생산관리,"업무내용정리 및 작업지시","2019-02-25 20:32:00",19-제조-02,a.생산관리,"Pre-Beam 개선 거푸집 고안","2019-02-25 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>철근 절단 프로그램 문서양식정리<|>03:00<|><br>19-제조-02<|>a.생산관리<|>Silo Hopper 프리캐스트 검토<|>01:30<|><br>19-제조-02<|>a.생산관리<|>건축PC 관련 업무 협의<|>00:30<|><br>",1,
|
|
J18202,"2019-02-25 07:41:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","2019-02-25 18:09:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J16203,"2019-02-25 07:42:00",19-제조-03,a.품질검사,"후정철 육교, 새천2교, 데크 생산 및 품질관리, 공무지원","2019-02-25 22:58:00",19-제조-03,a.품질검사,"주천1교, 새천2교, 데크 생산 및 품질관리, 공무지원","2019-02-25 18:45:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-02-25 07:49:00",19-영업-01,d.기타,"용상~교리 교리교 외 2개교, 진접~내촌 예상 계약가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J15307,"2019-02-25 07:55:00",19-교영-01,d.기타,"1. 영동고속도로(서창~안산)간 확장공사 특정공법심의","2019-02-25 18:07:00",19-교영-01,d.기타,"1. 영동고속도로(서창~안산)간 확장공사 특정공법심의","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18206,"2019-02-25 08:00:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-25 18:20:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J10315,"2019-02-25 08:02:00",17-시공-21,b.시공,"북수원1교 가설협의자료 작성","2019-02-25 18:13:00",17-시공-21,b.시공,"북수원1교 가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J18207,"2019-02-25 08:09:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","2019-02-25 18:11:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J08201,"2019-02-25 08:10:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-25 18:10:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-02-25 08:18:00",17-시공-10,g.기타,검토,"2019-02-25 18:08:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J18205,"2019-02-25 08:21:00",18-설계-19,d.산출서,"구조계산서 정리","2019-02-25 21:35:00",18-설계-19,d.산출서,"구조계산서 정리","2019-02-25 18:32:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J14302,"2019-02-25 08:22:00",17-시공-10,b.시공,"현장투입 준비작업","2019-02-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004E2,,,
|
|
J13201,"2019-02-25 08:24:00",19-설계-01,b.구조계산,"신평교_슬래브 도면작성","2019-02-25 20:41:00",19-설계-01,b.구조계산,"신평교_슬래브 도면작성","2019-02-25 18:31:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,"18-설계-06<|>c.도면<|>신촌교 선형변경에 따른 빔배치수정<|>03:00<|><br>",1,
|
|
J15302,"2019-02-25 08:24:00",18-설계-19,c.도면,"6개교량 배근도 작성","2019-02-25 20:30:00",18-설계-19,c.도면,"6개교량 배근도 작성","2019-02-25 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J10314,"2019-02-25 08:25:00",14-교영-00,d.기타,"금곡교(진접~내촌 1공구) 시행견적서,
|
|
전동교(세종~안성 4공구) 가설공사비 (개략공사비)검토,
|
|
삼남1교(밀양~울산 7공구) 협의자료,
|
|
공사비 검토","2019-02-25 18:08:00",14-교영-00,d.기타,"금곡교(진접~내촌 1공구) 시행견적서,
|
|
전동교(세종~안성 4공구) 가설공사비 (개략공사비)검토,
|
|
삼남1교(밀양~울산 7공구) 협의자료,
|
|
공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07210,"2019-02-25 08:25:00",16-시공-20,g.기타,"당초 변경","2019-02-25 18:01:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J18204,"2019-02-25 08:26:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","2019-02-25 18:09:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J07103,"2019-02-25 08:27:00",19-교영-01,d.기타,사업관리,"2019-02-25 13:35:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J09101,"2019-02-25 08:30:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J16202,"2019-02-25 08:31:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-25 18:16:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-02-25 08:31:00",17-설계-01,e.검토,"5공구 시공사 지적사항 검토","2019-02-25 20:57:00",17-설계-01,e.검토,"5공구 시공사 지적사항 검토","2019-02-25 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J11203,"2019-02-25 08:34:00",17-설계-04,h.기타,"시공사 검토 : 본선DR구간 설계도서 수정","2019-02-25 20:43:00",17-설계-04,h.기타,"시공사 검토 : 본선DR구간 설계도서 수정","2019-02-25 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J15201,"2019-02-25 08:36:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","2019-02-25 18:07:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14306,"2019-02-25 08:40:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-25 18:10:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J10313,"2019-02-25 08:52:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","2019-02-25 18:00:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11202,"2019-02-25 08:53:00",18-시공-11,b.시공,공사관리,"2019-02-25 18:13:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14101,"2019-02-25 08:50:00",16-시공-20,출장,한양,"2019-02-25 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-02-25 08:50:00",13-설계-30,출장,"[충남 서산]런처 신규제작 공정확인, 안전인증용 런처 모델링 도면과 일치화 및 구조검토","2019-02-25 18:00:00",13-설계-30,출장,"[충남 서산]런처 신규제작 공정확인, 안전인증용 런처 모델링 도면과 일치화 및 구조검토","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10301,"2019-02-25 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 END-BLOCK 철근 조립대 제작관련 협의","2019-02-25 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 END-BLOCK 철근 조립대 제작관련 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10310,"2019-02-25 08:50:00",13-교영-43,출장,"[수원]수원교 1차인장, 조원교 2차인장","2019-02-25 18:00:00",13-교영-43,출장,"[수원]수원교 1차인장, 조원교 2차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J07202,"2019-02-26 06:51:00",19-제조-04,b.기계,"거더 거푸집 보수 및 크레인 안전검사 준비","2019-02-27 07:24:00",19-제조-04,b.기계,"거더 거푸집 보수 및 크레인 안전검사 준비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-02-26 07:16:00",17-시공-07,g.기타,"인장계획서 성적서 변경 및 동용교 가설계획서 작성
|
|
","2019-02-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E3,,,
|
|
M05510,"2019-02-26 07:21:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-02-26 18:37:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.62.11.131,NULL,223.62.11.49,004C8,,,
|
|
T04204,"2019-02-26 07:25:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-02-26 21:12:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-02-26 07:26:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-26 18:24:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-02-26 07:29:00",19-제조-02,a.생산관리,"원자재 및 설비 이력 정리","2019-02-26 20:49:00",19-제조-02,a.생산관리,"원자재 및 설비 이력 정리","2019-02-26 18:46:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>Silo Hopper 프리캐스트 검토 및 협의<|>02:30<|><br>19-제조-02<|>a.생산관리<|>도하4교 운송 및 도면 검토<|>02:30<|><br>19-제조-02<|>a.생산관리<|>손님 접견(한주상)<|>02:00<|><br>",1,
|
|
J18202,"2019-02-26 07:35:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","2019-02-26 18:15:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J14308,"2019-02-26 07:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-26 19:20:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J13308,"2019-02-26 07:40:00",18-시공-15,b.시공,"1. 2019년 2월 기성 신청
|
|
2. 진접~내촌 금곡교 시공 투입준비","2019-02-26 18:06:00",18-시공-15,b.시공,"1. 2019년 2월 기성 신청
|
|
2. 진접~내촌 금곡교 시공 투입준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J16203,"2019-02-26 07:42:00",19-제조-03,a.품질검사,"후정철육교, 새천2교, 데크 생산 및 품질관리, ","2019-02-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-02-26 07:44:00",19-영업-01,d.기타,"이천~문경 9 문경3교, 용상~교리 교리교 외 2개교 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-02-26 07:54:00",17-시공-21,b.시공,"북수원1교 크레인, 런쳐 가설공법별 공정표 및 협의자료 작성","2019-02-26 18:10:00",17-시공-21,b.시공,"북수원1교 크레인, 런쳐 가설공법별 공정표 및 협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
B15306,"2019-02-26 08:07:00",18-관리-02,e.기타,"비서업무 외","2019-02-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-02-26 08:08:00",19-교영-01,d.기타,"1. 영동고속도로(서창~안산)간 확장공사 특정공법심의","2019-02-26 18:13:00",19-교영-01,d.기타,"1. 영동고속도로(서창~안산)간 확장공사 특정공법심의","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18206,"2019-02-26 08:10:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-26 18:47:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J11305,"2019-02-26 08:10:00",17-시공-10,g.기타,검토,"2019-02-26 18:14:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J10314,"2019-02-26 08:14:00",14-교영-00,d.기타,"삼남1교(밀양~울산 7공구) 공사비 검토자료,
|
|
전동교(세종~안성 4공구) 가설공사비(개략공사비)검토,
|
|
DR거더(송산그린시티~시화멀티테크노밸리) 개략공사비","2019-02-26 18:15:00",14-교영-00,d.기타,"삼남1교(밀양~울산 7공구) 공사비 검토자료,
|
|
전동교(세종~안성 4공구) 가설공사비(개략공사비)검토,
|
|
DR거더(송산그린시티~시화멀티테크노밸리) 개략공사비","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18204,"2019-02-26 08:16:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","2019-02-26 18:18:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J08201,"2019-02-26 08:19:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-26 19:13:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-02-26 08:21:00",18-설계-19,d.산출서,"구조계산서 정리","2019-02-26 21:08:00",18-설계-19,d.산출서,"구조계산서 정리","2019-02-26 18:39:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J13201,"2019-02-26 08:21:00",19-설계-01,b.구조계산,"신평교_슬래브 도면작성","2019-02-26 18:04:00",19-설계-01,b.구조계산,"신평교_슬래브 도면작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J14306,"2019-02-26 08:22:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-26 18:03:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J11203,"2019-02-26 08:24:00",17-설계-04,h.기타,"시공사 검토사항 처리 : DR구간(r-a), E-BEAM구간(r-b, 두계천교) 프리덱관련 설계도서수정","2019-02-26 20:42:00",17-설계-04,h.기타,"시공사 검토사항 처리 : DR구간(r-a), E-BEAM구간(r-b, 두계천교) 프리덱관련 설계도서수정","2019-02-26 18:38:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J15202,"2019-02-26 08:24:00",17-설계-01,e.검토,"5공구 시공사 지적사항 검토","2019-02-26 18:18:18",17-설계-01,e.검토,NULL,"2019-02-26 18:38:00",172.16.9.155,172.16.9.155,NULL,008E1,"18-설계-06<|>b.구조계산<|>신촌교 설계사 지적사항 수정<|>07:00<|><br>",1,
|
|
J10301,"2019-02-26 08:26:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J16202,"2019-02-26 08:27:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-26 20:45:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-26 18:42:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J15302,"2019-02-26 08:27:00",18-설계-19,c.도면,"6개교량 배근도 작성","2019-02-26 18:02:00",18-설계-19,c.도면,"6개교량 배근도 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J07210,"2019-02-26 08:34:00",16-시공-20,g.기타,"당초 변경","2019-02-26 18:02:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J15201,"2019-02-26 08:36:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","2019-02-26 18:16:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J18207,"2019-02-26 08:41:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","2019-02-26 18:12:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J17205,"2019-02-26 08:44:00",18-교영-01,c.설계사,.,"2019-02-26 18:33:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J09101,"2019-02-26 08:45:00",19-교영-01,c.설계사,과업진행상황조사,"2019-02-26 18:03:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10313,"2019-02-26 08:47:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","2019-02-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J11202,"2019-02-26 09:06:00",18-시공-11,b.시공,공사관리,"2019-02-26 18:09:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07103,"2019-02-26 08:50:00",17-시공-10,출장,성주대교현장,"2019-02-26 20:54:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14302,"2019-02-27 08:50:00",19-교휴-01,교육,"관리책임자 보수교육","2019-02-27 18:00:00",19-교휴-01,교육,"관리책임자 보수교육","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J14101,"2019-02-26 08:50:00",16-시공-20,출장,한양,"2019-02-26 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-02-26 08:50:00",13-설계-30,출장,"[충남 서산]런처 신규제작 공정확인, 안전인증용 런처 모델링 도면과 일치화 및 구조검토","2019-02-26 18:00:00",13-설계-30,출장,"[충남 서산]런처 신규제작 공정확인, 안전인증용 런처 모델링 도면과 일치화 및 구조검토","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10310,"2019-02-26 08:50:00",13-교영-43,출장,"[수원]수원교 1차인장, 조원교 2차인장","2019-02-26 18:00:00",13-교영-43,출장,"[수원]수원교 1차인장, 조원교 2차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J14302,"2019-02-26 08:50:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열 원인분석 의견서 제출","2019-02-26 18:00:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열 원인분석 의견서 제출","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J11302,"2019-02-27 07:17:00",17-시공-07,g.기타,"인장계획서 성적서 변경 및 동용교 가설계획서 작성
|
|
","2019-02-27 18:09:00",17-시공-07,g.기타,"인장계획서 성적서 변경 및 동용교 가설계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
M05510,"2019-02-27 07:20:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-02-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.11.123,NULL,NULL,004C8,,,
|
|
T04204,"2019-02-27 07:21:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-02-27 18:24:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-02-27 07:24:00",19-제조-02,a.생산관리,"원자재 및 설비 이력 정리","2019-02-27 18:13:00",19-제조-02,a.생산관리,"원자재 및 설비 이력 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-02-27 07:25:00",19-제조-04,b.기계,"북수원1교 런처 앵커(권선P5) 설치 및 거더 거푸집 보수","2019-02-28 06:23:00",19-제조-04,b.기계,"북수원1교 런처 앵커(권선P5) 설치 및 거더 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-02-27 07:26:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-27 18:24:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J14308,"2019-02-27 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-27 18:26:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J18206,"2019-02-27 07:33:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-27 07:39:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J16203,"2019-02-27 07:34:00",19-제조-03,a.품질검사,"후정철 육교, 새천2교, 데크,가로보 생산 및 품질관리, ","2019-02-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J13308,"2019-02-27 07:36:00",18-시공-15,b.시공,"1. 2019년 2월 기성 신청
|
|
2. 진접~내촌 금곡교 시공 투입준비","2019-02-27 18:16:00",18-시공-15,b.시공,"1. 2019년 2월 기성 신청
|
|
2. 진접~내촌 금곡교 시공 투입준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18202,"2019-02-27 07:39:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","2019-02-27 18:10:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-02-27 07:40:00",19-영업-01,d.기타,"이천~문경 9 문경3교, 용상~교리 교리교 외 2개교 시행가 등 : 조안대교 외 4개교 계약 추진 중","2019-02-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J15307,"2019-02-27 08:02:00",19-교영-01,d.기타,"1. 자활1 재해위험개선지구 특정공법심의","2019-02-27 18:14:00",19-교영-01,d.기타,"1. 자활1 재해위험개선지구 특정공법심의","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J11305,"2019-02-27 08:09:00",17-시공-10,g.기타,검토,"2019-02-27 18:10:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J10314,"2019-02-27 08:09:00",14-교영-00,d.기타,"DR거더(송산그린시티~시화멀티테크노밸리) 개략공사비,
|
|
전동교(세종~안성 4공구) 가설공사비(개략공사비)검토,
|
|
삼남1교(밀양~울산 7공구) 공사비 검토자료","2019-02-27 18:15:00",14-교영-00,d.기타,"전동교(세종~안성 4공구) 가설공사비(개략공사비)검토,
|
|
삼남1교(밀양~울산 7공구) 공사비 검토자료,
|
|
DR거더(송산그린시티~시화멀티테크노밸리) 개략공사비","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-02-27 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-02-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-02-27 08:13:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-27 18:49:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J16202,"2019-02-27 08:20:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-27 20:34:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-27 18:32:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J15202,"2019-02-27 08:22:00",17-설계-01,e.검토,"5공구 시공사 지적사항 검토","2019-02-27 18:44:00",17-설계-01,e.검토,"5공구 시공사 지적사항 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J14306,"2019-02-27 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-27 18:36:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J11203,"2019-02-27 08:24:00",17-설계-04,h.기타,"시공사 검토사항 처리 : E-BEAM구간(두계천교) 프리덱관련 설계도서수정","2019-02-27 19:30:00",17-설계-04,h.기타,"시공사 검토사항 처리 : E-BEAM구간(두계천교) 프리덱관련 설계도서수정","2019-02-27 18:46:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J10301,"2019-02-27 08:25:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-27 18:45:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-02-27 08:26:00",18-시공-11,b.시공,공사관리,"2019-02-27 18:17:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15302,"2019-02-27 08:27:00",18-설계-19,c.도면,"6개교량 배근도 작성","2019-02-27 19:31:00",18-설계-19,c.도면,"6개교량 배근도 작성","2019-02-27 19:09:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J15301,"2019-02-27 08:31:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
조안대교 자재공급원승인서 준비 (디비닥, 피씨에스)
|
|
북수원1교 쏠플레이트 검토서 작성
|
|
시화JCT 자재 규격표 작성
|
|
단장천2교 빔런처 관련 자료 발송","2019-02-27 18:17:00",16-시공-20,b.시공,"강진광주3공구 프리덱 공급원승인서 발송
|
|
조안대교 자재공급원승인서 준비 (디비닥, 피씨에스)
|
|
북수원1교 쏠플레이트 검토서 작성
|
|
시화JCT 자재 규격표 작성
|
|
단장천2교 빔런처 관련 자료 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J13201,"2019-02-27 08:32:00",19-설계-01,b.구조계산,"신평교_슬래브 도면작성","2019-02-27 20:48:00",19-설계-01,b.구조계산,"신평교_슬래브 도면작성","2019-02-27 18:50:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,,1,
|
|
J18204,"2019-02-27 08:32:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","2019-02-27 18:13:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J07103,"2019-02-27 08:34:00",19-교영-01,d.기타,사업관리,"2019-02-28 08:29:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J07210,"2019-02-27 08:36:00",16-시공-20,g.기타,"당초 변경","2019-02-27 20:48:00",16-시공-20,g.기타,"당초 변경","2019-02-27 18:47:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J15201,"2019-02-27 08:36:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","2019-02-27 18:07:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-02-27 08:37:00",18-교영-01,c.설계사,.,"2019-02-27 19:32:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-02-27 08:43:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","2019-02-27 18:09:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-02-27 08:50:00",19-교영-01,출장,화경종합건설,"2019-02-27 18:15:00",19-교영-01,c.설계사,과업진행상황조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-02-27 08:50:00",16-시공-20,출장,한양,"2019-02-27 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10310,"2019-02-27 08:50:00",13-교영-43,출장,"[수원]수원교 1차인장, 조원교 2차인장","2019-02-27 18:00:00",13-교영-43,출장,"[수원]수원교 1차인장, 조원교 2차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J12202,"2019-02-27 08:50:00",17-시공-08,출장,"[충남 서산]런처 신규제작 공정확인, 안전인증용 런처 모델링 도면과 일치화 및 구조검토","2019-02-27 18:00:00",17-시공-08,출장,"[충남 서산]런처 신규제작 공정확인, 안전인증용 런처 모델링 도면과 일치화 및 구조검토","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-02-27 08:50:00",17-설계-01,출장,GS건설,"2019-02-27 18:00:00",17-설계-01,출장,GS건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J07202,"2019-02-28 06:23:00",19-제조-04,b.기계,"배치플랜트 믹서 팁과 드럼 교체 및 거더 거푸집 보수","2019-02-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M05510,"2019-02-28 07:07:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-02-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.204.75,NULL,NULL,004C8,,,
|
|
T04204,"2019-02-28 07:17:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-02-28 18:03:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-02-28 07:19:00",17-시공-07,g.기타,"후정철육교 중량물취급계획서 작성 및 동용교 인장계획서 수정
|
|
","2019-02-28 18:13:00",17-시공-07,g.기타,"후정철육교 중량물취급계획서 작성 및 동용교 인장계획서 수정
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J18208,"2019-02-28 07:30:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-02-28 18:03:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-02-28 07:31:00",19-제조-02,a.생산관리,"silo hopper 프리캐스트화 검토","2019-02-28 18:02:00",19-제조-02,a.생산관리,"silo hopper 프리캐스트화 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-02-28 07:33:00",18-시공-15,b.시공,"1. 새만금~전주 실행 검토서 작성
|
|
2. 진접~내촌 금곡교 시공 투입준비","2019-02-28 18:04:00",18-시공-15,b.시공,"1. 새만금~전주 실행 검토서 작성
|
|
2. 진접~내촌 금곡교 시공 투입준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J14308,"2019-02-28 07:39:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-28 22:51:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-02-28 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J18202,"2019-02-28 07:40:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","2019-02-28 18:13:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J16203,"2019-02-28 07:41:00",19-제조-03,a.품질검사,"B/P 믹서수리 및 정비, 산외교 셋팅, 후정철 육교 셋팅","2019-02-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J10315,"2019-02-28 07:51:00",18-시공-03,b.시공,"가설협의자료 작성","2019-02-28 18:29:00",18-시공-03,b.시공,"가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C8,,,
|
|
J15307,"2019-02-28 08:05:00",19-교영-01,d.기타,"1. 자활1 재해위험개선지구 특정공법심의","2019-02-28 18:01:00",19-교영-01,d.기타,"1. 자활1 재해위험개선지구 특정공법심의","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J10314,"2019-02-28 08:09:00",14-교영-00,d.기타,"삼남1교(밀양~울산 7공구) 공사비 검토자료,
|
|
전동교(세종~안성 4공구) 가설공사비(개략공사비)검토,
|
|
DR거더(송산그린시티~시화멀티테크노밸리) 개략공사비","2019-02-28 18:06:00",14-교영-00,d.기타,"전동교(세종~안성 4공구) 가설공사비(개략공사비)검토,
|
|
삼남1교(밀양~울산 7공구) 공사비 검토자료,
|
|
DR거더(송산그린시티~시화멀티테크노밸리) 개략공사비","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-02-28 08:16:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-02-28 18:22:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-02-28 08:16:00",17-시공-10,g.기타,검토,"2019-02-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C8,,,
|
|
B15306,"2019-02-28 08:21:00",18-관리-02,e.기타,"비서업무 외","2019-02-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11203,"2019-02-28 08:21:00",14-설계-38,"f.보고서 및 시방서","송평1교 보고서작성","2019-02-28 18:04:00",14-설계-38,"f.보고서 및 시방서","송평1교 보고서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J09101,"2019-02-28 09:05:00",19-교영-01,c.설계사,과업조사,"2019-02-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J18205,"2019-02-28 08:22:00",18-설계-19,d.산출서,"구조계산서 정리","2019-02-28 18:23:00",18-설계-19,d.산출서,"구조계산서 정리","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J18204,"2019-02-28 08:22:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","2019-02-28 18:06:00",19-교휴-06,a.기타,"웅천-소호간 도로개설공사 입찰견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J14306,"2019-02-28 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-02-28 18:13:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J13201,"2019-02-28 08:24:00",19-설계-01,b.구조계산,"신평교_거더 및 부대공 도면작성","2019-02-28 18:06:00",19-설계-01,b.구조계산,"신평교_거더 및 부대공 도면작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J15302,"2019-02-28 08:26:00",18-설계-19,c.도면,"6개교량 배근도 작성","2019-02-28 18:04:00",18-설계-19,c.도면,"6개교량 배근도 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J11202,"2019-02-28 08:26:00",18-시공-11,b.시공,공사관리,"2019-02-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J16202,"2019-02-28 08:29:00",18-교영-01,c.설계사,신규사업현황조사,"2019-02-28 18:15:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07103,"2019-02-28 08:29:00",19-교영-01,d.기타,사업관리,"2019-02-28 18:22:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15202,"2019-02-28 08:29:00",17-설계-01,e.검토,"5공구 시공사 지적사항 검토","2019-02-28 18:04:00",17-설계-01,e.검토,"5공구 시공사 지적사항 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J15301,"2019-02-28 08:31:00",16-시공-20,b.시공,"북수원1교 쏠플레이트 검토서 작성
|
|
조안대교 자재 공급원승인서 발송
|
|
금곡교 자재 공급원승인서 발송 (케이티에이)","2019-02-28 18:12:00",16-시공-20,b.시공,"북수원1교 쏠플레이트 검토서 작성
|
|
조안대교 자재 공급원승인서 발송
|
|
금곡교 자재 공급원승인서 발송 (케이티에이)","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15201,"2019-02-28 08:37:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","2019-02-28 18:02:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-02-28 08:37:00",18-교영-01,c.설계사,.,"2019-02-28 22:23:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-02-28 08:47:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","2019-02-28 18:02:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈,한라산업개발 요청전표 복사및 스캔, ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J10301,"2019-02-28 08:23:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-02-28 18:38:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J18207,"2019-02-28 08:50:00",19-시공-01,경유,경유,"2019-02-28 18:15:00",19-제조-01,d.기타,"건설본부현장시공 및 예산집행관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18206,"2019-02-28 09:51:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-02-28 18:33:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J14101,"2019-02-28 08:50:00",16-시공-20,출장,한양,"2019-02-28 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-02-28 08:50:00",17-시공-08,출장,"[충남 서산]런처 신규제작 공정확인, 안전인증용 런처 모델링 도면과 일치화 및 구조검토","2019-02-28 18:00:00",17-시공-08,출장,"[충남 서산]런처 신규제작 공정확인, 안전인증용 런처 모델링 도면과 일치화 및 구조검토","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J14302,"2019-02-28 08:50:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열게이지 부착","2019-02-28 18:00:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열게이지 부착","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J16203,"2019-03-01 07:15:00",19-제조-03,a.품질검사,"B/P 믹서수리 및 정비, ","2019-03-01 18:51:00",19-제조-03,a.품질검사,"B/P 믹서수리 및 정비, ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
M05510,"2019-03-01 07:30:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-02 07:31:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.62.212.191,NULL,223.62.212.206,004C8,,,
|
|
M05510,"2019-03-02 07:32:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.212.206,NULL,NULL,004C8,,,
|
|
J14101,"2019-02-04 08:50:00",16-시공-20,출장,한양,"2019-02-04 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14101,"2019-02-05 08:50:00",16-시공-20,출장,한양,"2019-02-05 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
M02302,"2019-02-05 08:50:00",19-제조-02,출장,한맥빌딩,"2019-02-05 18:00:00",19-제조-02,출장,한맥빌딩,"0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J14101,"2019-02-06 08:50:00",16-시공-20,출장,한양,"2019-02-06 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14302,"2019-02-11 08:50:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열 조사 및 임수보수","2019-02-11 18:00:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열 조사 및 임수보수","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J14302,"2019-02-12 08:50:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열 조사 및 임수보수","2019-02-12 18:00:00",17-시공-10,출장,"[대구시 달성군 하빈면 하산리 일원]성주대교 주두부 균열 조사 및 임수보수","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J17205,"2019-03-03 12:50:00",18-교영-01,c.설계사,.,"2019-03-03 18:09:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07202,"2019-03-04 07:20:00",19-제조-04,b.기계,"배치플랜트 믹서 팁과 드럼 교체 및 거더 거푸집 보수","2019-03-05 07:33:00",19-제조-04,b.기계,"배치플랜트 믹서 팁과 드럼 교체 및 거더 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-03-04 07:25:00",19-제조-03,a.품질검사,"후정철육교 데크, 산외교 켄틸생산 및 품질관리","2019-03-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J13308,"2019-03-04 07:25:00",18-시공-15,b.시공,"1. 새만금~전주 실행 검토서 작성
|
|
2. 진접~내촌 금곡교 시공 투입준비","2019-03-04 18:28:00",18-시공-15,b.시공,"1. 새만금~전주 실행 검토서 작성
|
|
2. 진접~내촌 금곡교 시공 투입준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18208,"2019-03-04 07:29:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-03-04 21:56:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-03-04 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-03-04 07:31:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-04 22:44:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-04 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
T04204,"2019-03-04 07:34:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-03-04 18:37:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-03-04 07:45:00",19-시공-01,b.시공,경유,"2019-03-04 18:17:00",19-시공-01,b.시공,경유,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18202,"2019-03-04 07:45:00",07-교영-01,b.시공사,"[여수시 화양면]웅천~소호 해상교량 견적","2019-03-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J10310,"2019-03-04 08:02:00",13-교영-43,b.시공사,"[수원]수원교 1차인장, 결과정리","2019-03-04 18:05:00",13-교영-43,b.시공사,"[수원]수원교 1차인장, 결과정리","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J15307,"2019-03-04 08:06:00",19-교영-01,d.기타,"1. 자활1 재해위험개선지구 특정공법심의","2019-03-04 18:16:00",19-교영-01,d.기타,"1. 자활1 재해위험개선지구 특정공법심의","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J10314,"2019-03-04 08:09:00",14-교영-00,d.기타,"전동교(세종~안성 4공구) 가설공사비(개략공사비)검토,
|
|
삼남1교(밀양~울산 7공구) 공사비 검토자료","2019-03-04 18:16:00",14-교영-00,d.기타,"전동교(세종~안성 4공구) 가설공사비(개략공사비)검토,
|
|
삼남1교(밀양~울산 7공구) 공사비 검토자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-03-04 08:11:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-04 18:38:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
B15306,"2019-03-04 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-03-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-03-04 08:18:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-03-04 18:29:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J07103,"2019-03-04 08:20:00",19-교영-01,d.기타,사업관리,"2019-03-04 18:25:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14306,"2019-03-04 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-04 18:17:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J13201,"2019-03-04 08:24:00",19-설계-01,b.구조계산,"신평교_일반수량 및 거더수량 산출","2019-03-04 20:33:00",19-설계-01,b.구조계산,"신평교_일반수량 및 거더수량 산출","2019-03-04 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,"12-설계-24<|>b.구조계산<|>삼남1교 가설벤트 계획<|>05:00<|><br>",1,
|
|
J15302,"2019-03-04 08:24:00",18-설계-19,c.도면,"6개교량 수량산출서 작성","2019-03-04 20:30:00",18-설계-19,c.도면,"6개교량 수량산출","2019-03-04 18:30:00",172.16.9.173,NULL,172.16.9.173,008E4,,1,
|
|
J10301,"2019-03-04 08:25:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-04 18:23:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-03-04 08:28:00",18-설계-06,c.도면,"받침이격거리 변동에 따른 성과품 수정","2019-03-04 20:50:00",18-설계-06,c.도면,"받침이격거리 변동에 따른 성과품 수정","2019-03-04 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J11202,"2019-03-04 08:29:00",18-시공-11,b.시공,공사관리,"2019-03-04 18:26:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-03-04 08:31:00",16-시공-20,g.기타,"당초 변경","2019-03-04 20:43:00",16-시공-20,g.기타,"당초 변경","2019-03-04 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J15301,"2019-03-04 08:32:00",16-시공-20,b.시공,"북수원1교 쏠플레이트 검토서 작성
|
|
조안대교 자재 공급원승인서 발송
|
|
금곡교 자재 공급원승인서 발송 (케이티에이)","2019-03-04 18:12:00",16-시공-20,b.시공,"북수원1교 쏠플레이트 검토서 작성
|
|
조안대교 자재 공급원승인서 발송
|
|
금곡교 자재 공급원승인서 발송 (케이티에이)","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-03-04 08:32:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.22.235,NULL,NULL,004C8,,,
|
|
J16202,"2019-03-04 08:32:00",18-교영-01,c.설계사,신규사업현황조사,"2019-03-04 18:33:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J09101,"2019-03-04 08:34:00",19-교영-01,c.설계사,과업조사,"2019-03-04 18:32:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J11305,"2019-03-04 08:36:00",17-시공-10,g.기타,검토,"2019-03-04 18:13:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C8,,,
|
|
J15201,"2019-03-04 08:36:00",19-교영-06,c.설계사,"과업진행현황 파악
|
|
","2019-03-04 18:07:00",19-교영-06,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-03-04 08:37:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-03-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J11203,"2019-03-04 08:38:00",14-설계-38,"f.보고서 및 시방서","송평1교 보고서작성","2019-03-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J18205,"2019-03-04 13:29:00",18-설계-19,d.산출서,"부품도 작성","2019-03-04 20:32:00",18-설계-19,d.산출서,"부품도 작성","2019-03-04 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J17205,"2019-03-04 13:30:00",18-교영-01,c.설계사,.,"2019-03-04 18:03:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J14101,"2019-03-04 08:50:00",16-시공-20,출장,한양,"2019-03-04 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18204,"2019-03-04 08:50:00",07-교영-01,출장,"[광주광역시]웅천-소호 입찰견적 제출","2019-03-04 18:00:00",07-교영-01,출장,"[광주광역시]웅천-소호 입찰견적 제출","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J10315,"2019-03-04 08:50:00",18-시공-10,출장,보성건설,"2019-03-04 18:00:00",18-시공-10,출장,보성건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-03-05 06:43:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-03-05 07:01:00",17-시공-07,g.기타,"후정철육교 중량물취급계획서 작성 및 동용교 인장계획서 수정
|
|
","2019-03-05 18:11:00",17-시공-07,g.기타,"후정철육교 중량물취급계획서 작성 및 동용교 인장계획서 수정
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J14308,"2019-03-05 07:20:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
M05510,"2019-03-05 07:28:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.173.2,NULL,NULL,004C8,,,
|
|
J16203,"2019-03-05 07:30:00",19-제조-03,a.품질검사,"후정철육교 데크, 산외교 켄틸생산 및 품질관리","2019-03-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18202,"2019-03-05 07:31:00",07-교영-01,b.시공사,"서울~세종,함양~창녕 고속도로 발주 현황 파악","2019-03-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J18207,"2019-03-05 07:33:00",18-시공-11,g.기타,경유,"2019-03-05 18:07:00",18-시공-11,g.기타,경유,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J07202,"2019-03-05 07:34:00",19-제조-04,b.기계,"원흥2교 주두부 받침 제작 및 거더 거푸집 보수","2019-03-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-03-05 07:43:00",18-시공-15,b.시공,"1. 삼간교 철근 신청 내역서 수정 및 제출
|
|
2. 2019 현장 점검 계획서 작성","2019-03-05 18:10:00",18-시공-15,b.시공,"1. 삼간교 철근 신청 내역서 수정 및 제출
|
|
2. 2019 현장 점검 계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
T04204,"2019-03-05 07:44:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-03-05 18:19:00",16-제조-02,a.생산관리,"산외교(노들러),원흥2교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
B15306,"2019-03-05 08:06:00",18-관리-02,e.기타,"비서업무 외","2019-03-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10310,"2019-03-05 08:10:00",13-교영-43,b.시공사,"수원교 가설.가로보 작업 위험성평가 서 작성","2019-03-05 18:02:00",13-교영-43,b.시공사,"수원교 가설.가로보 작업 위험성평가 서 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J11305,"2019-03-05 08:10:00",17-시공-10,g.기타,검토,"2019-03-05 18:05:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-03-05 08:12:00",19-교영-01,d.기타,"1. 신안산선 복선전철 개략공사비","2019-03-05 18:01:00",19-교영-01,d.기타,"1. 신안산선 복선전철 개략공사비","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18206,"2019-03-05 08:12:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-05 18:27:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J10314,"2019-03-05 08:17:00",14-교영-00,d.기타,"삼남1교 공사비 검토자료,
|
|
전동교 가설공사비(개략공사비)검토
|
|
","2019-03-05 18:06:00",14-교영-00,d.기타,"삼남1교 공사비 검토자료,
|
|
전동교 가설공사비(개략공사비)검토
|
|
","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-03-05 08:17:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-03-05 18:13:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J14306,"2019-03-05 08:20:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-05 18:06:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J15201,"2019-03-05 08:21:00",19-교영-06,c.설계사,"과업진행현황 파악
|
|
","2019-03-05 18:05:00",19-교영-06,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10301,"2019-03-05 08:23:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-05 19:14:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15302,"2019-03-05 08:23:00",18-설계-19,c.도면,"6개교량 수량산출서 작성","2019-03-05 18:03:00",18-설계-19,c.도면,"6개교량 수량산출서 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J07103,"2019-03-05 08:24:00",19-교영-01,d.기타,사업관리,"2019-03-05 18:13:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18205,"2019-03-05 08:25:00",18-설계-19,d.산출서,"부품도 작성","2019-03-05 20:48:00",18-설계-19,d.산출서,"부품도 작성","2019-03-05 18:35:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J15202,"2019-03-05 08:26:00",18-설계-06,c.도면,"받침이격거리 변동에 따른 성과품 수정","2019-03-05 20:48:00",18-설계-06,c.도면,"받침이격거리 변동에 따른 성과품 수정","2019-03-05 18:35:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J13201,"2019-03-05 08:27:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 계산","2019-03-05 20:49:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 계산","2019-03-05 18:35:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,,1,
|
|
J09101,"2019-03-05 08:27:00",19-교영-01,c.설계사,과업조사,"2019-03-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J07210,"2019-03-05 08:30:00",16-시공-20,g.기타,"당초 변경","2019-03-05 18:02:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J15302,"2019-03-03 18:30:00",18-설계-19,d.산출서,"안성~세종 6개교량 수량산출","2019-03-03 18:30:00",18-설계-19,,"안성~세종 6개교량 수량산출","2019-03-03 00:00:00",NULL,NULL,NULL,008E4,,,
|
|
J15301,"2019-03-05 08:32:00",16-시공-20,b.시공,"북수원1교 쏠플레이트 검토서 작성
|
|
조안대교 자재 공급원승인서 발송
|
|
금곡교 자재 공급원승인서 발송 (케이티에이)","2019-03-05 18:06:00",16-시공-20,b.시공,"북수원1교 쏠플레이트 검토서 작성
|
|
조안대교 자재 공급원승인서 발송
|
|
금곡교 자재 공급원승인서 발송 (케이티에이)","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11202,"2019-03-05 08:32:00",18-시공-11,b.시공,공사관리,"2019-03-05 18:17:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J16202,"2019-03-05 08:32:00",18-교영-01,c.설계사,신규사업현황조사,"2019-03-05 18:12:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-03-05 08:34:00",18-교영-01,c.설계사,.,"2019-03-05 21:24:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18204,"2019-03-05 08:36:00",19-교휴-06,a.기타,"견적 자료정리","2019-03-05 18:08:00",19-교휴-06,a.기타,"견적 자료정리","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J10313,"2019-03-05 08:43:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-03-05 18:01:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18208,"2019-03-05 08:20:00",19-제조-02,a.생산관리,생산관리,"2019-03-05 18:22:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J14101,"2019-03-05 08:50:00",16-시공-20,출장,한양,"2019-03-05 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-03-05 08:50:00",18-시공-10,출장,보성건설,"2019-03-05 18:00:00",18-시공-10,출장,보성건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-03-06 06:21:00",19-제조-04,b.기계,"원흥2교 주두부 받침 제작 및 거더 거푸집 보수","2019-03-07 06:23:00",19-제조-04,b.기계,"원흥2교 주두부 받침 제작 및 거더 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-03-06 06:37:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J13308,"2019-03-06 07:27:00",18-시공-15,b.시공,"1. 삼간교 철근 신청 내역서 수정 및 제출
|
|
2. 2019 현장 점검 계획서 작성","2019-03-06 18:06:00",18-시공-15,b.시공,"1. 삼간교 철근 신청 내역서 수정 및 제출
|
|
2. 2019 현장 점검 계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J11302,"2019-03-06 07:27:00",17-시공-07,g.기타,"치악교 제작장, 가설검토 및 동용교 인장계획서 수정
|
|
","2019-03-06 18:07:00",17-시공-07,g.기타,"치악교 제작장, 가설검토 및 동용교 인장계획서 수정
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J14308,"2019-03-06 07:31:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-06 22:14:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-06 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J18208,"2019-03-06 07:32:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-03-06 20:47:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-03-06 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-03-06 07:34:00",19-제조-03,a.품질검사," 산외교데크, 켄틸생산 및 품질관리
|
|
단장천데크 출하(3대)","2019-03-06 23:03:00",19-제조-03,a.품질검사," 산외교데크, 켄틸생산 및 품질관리
|
|
단장천데크 출하(3대)","2019-03-06 18:45:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
T04204,"2019-03-06 07:34:00",16-제조-02,a.생산관리,"북수원1교,삼간교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-03-06 18:10:00",16-제조-02,a.생산관리,"북수원1교,삼간교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-03-06 07:36:00",07-교영-01,b.시공사,"서울~세종,함양~창녕 고속도로 발주 현황 파악","2019-03-06 18:04:00",07-교영-01,b.시공사,"서울~세종,함양~창녕 고속도로 발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-03-06 07:43:00",19-영업-01,d.기타,"송산~시화MTV 예상 시행가 , 갈천~가수 예상 계약가 등 : 조안대교 외 5개교 계약 추진 중","2019-03-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-03-06 07:47:00",18-시공-11,g.기타,"실행예산 및 공동운영협약서검토","2019-03-06 18:06:00",18-시공-11,g.기타,"실행예산 및 공동운영협약서검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J11305,"2019-03-06 08:04:00",17-시공-10,g.기타,검토,"2019-03-06 18:06:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-03-06 08:06:00",19-교영-01,d.기타,"1. 신안산선 복선전철 개략공사비","2019-03-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.171,NULL,NULL,004E4,,,
|
|
J10314,"2019-03-06 08:12:00",14-교영-00,d.기타,"전동교 가설공사비(개략공사비)검토,
|
|
옥산4교 및 옥산교(군장산단 인입철도) 시행내역서,
|
|
삼남1교 공사비 검토자료","2019-03-06 18:02:00",14-교영-00,d.기타,"옥산4교 및 옥산교(군장산단 인입철도) 시행내역서,
|
|
전동교 가설공사비(개략공사비)검토,
|
|
삼남1교 공사비 검토자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J10301,"2019-03-06 08:12:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-06 18:08:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
B15306,"2019-03-06 08:15:00",18-관리-02,e.기타,"비서업무 외","2019-03-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-03-06 08:16:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-03-06 18:31:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-03-06 08:21:00",18-설계-19,d.산출서,"부품도 작성","2019-03-06 21:44:00",18-설계-19,d.산출서,"부품도 작성","2019-03-06 18:39:00",1.233.130.3,172.16.9.155,1.233.130.3,008E2,,1,
|
|
J13201,"2019-03-06 08:22:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 계산","2019-03-06 18:01:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 계산","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J18206,"2019-03-06 08:22:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-06 18:17:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J18204,"2019-03-06 08:23:00",19-교휴-06,a.기타,"견적 자료정리","2019-03-06 18:02:00",19-교휴-06,a.기타,"견적 자료정리","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J15201,"2019-03-06 08:24:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","2019-03-06 18:03:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15202,"2019-03-06 08:26:00",18-설계-06,c.도면,"받침이격거리 변동에 따른 성과품 수정","2019-03-06 20:59:00",18-설계-06,c.도면,"받침이격거리 변동에 따른 성과품 수정","2019-03-06 18:37:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J15302,"2019-03-06 08:28:00",18-설계-19,c.도면,"6개교량 수량산출서 작성","2019-03-06 20:42:00",18-설계-19,c.도면,"6개교량 수량산출서 작성","2019-03-06 18:40:00",172.16.9.173,172.16.9.155,172.16.9.173,008E4,,1,
|
|
J11202,"2019-03-06 08:30:00",18-시공-11,b.시공,공사관리,"2019-03-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J07210,"2019-03-06 08:37:00",16-시공-20,g.기타,"당초 변경","2019-03-06 21:06:00",16-시공-20,g.기타,"당초 변경","2019-03-06 18:38:00",172.16.9.162,172.16.9.155,172.16.9.162,008E2,,1,
|
|
J17205,"2019-03-06 08:40:00",18-교영-01,c.설계사,.,"2019-03-06 18:23:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11203,"2019-03-06 08:42:00",17-설계-05,e.검토,"시공사 검토사항 정리 및 DR구간 도서검토","2019-03-06 18:03:00",17-설계-05,e.검토,"시공사 검토사항 정리 및 DR구간 도서검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J10313,"2019-03-06 08:45:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-03-06 18:16:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15301,"2019-03-06 08:31:00",16-시공-20,b.시공,"조안대교 자재 공급원승인서 발송
|
|
금곡교 자재 공급원승인서 발송 (케이티에이)
|
|
주요 자재 거래명세표 검토
|
|
현장정산서 작성","2019-03-06 18:08:00",16-시공-20,b.시공,"조안대교 자재 공급원승인서 발송
|
|
금곡교 자재 공급원승인서 발송 (케이티에이)
|
|
주요 자재 거래명세표 검토
|
|
현장정산서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-03-06 08:52:00",19-교영-01,c.설계사,과업조사,"2019-03-06 18:17:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14306,"2019-03-06 08:50:00",19-교휴-06,경유,"경유(쌍용건설,전문건설공제조합(선금보증이행완료확인원 날인,제출))","2019-03-06 18:10:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
M02302,"2019-03-06 08:50:00",19-제조-02,출장,"건축PC 시공현장","2019-03-06 18:00:00",19-제조-02,a.생산관리,"silo hopper 프리캐스트화 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>현장 견학 보고서 작성 및 자료 정리<|>03:00<|><br>",1,
|
|
J14101,"2019-03-06 08:50:00",16-시공-20,출장,한양,"2019-03-06 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07103,"2019-03-06 08:50:00",17-시공-10,출장,성주대교현장,"2019-03-06 18:00:00",17-시공-10,출장,성주대교현장,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J10315,"2019-03-06 08:50:00",17-시공-09,출장,"[울산]삼남1교 가설 및 제작장 협의","2019-03-06 18:00:00",17-시공-09,출장,"[울산]삼남1교 가설 및 제작장 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-03-07 06:25:00",19-제조-04,b.기계,"충청대학교 토목공학과 실험실 방문(김승국이사동행)과 원흥2교 주두부 받침 제작 및 거더 거푸집 보수","2019-03-08 06:19:00",19-제조-04,b.기계,"충청대학교 토목공학과 실험실 방문(김승국이사동행)과 원흥2교 주두부 받침 제작 및 거더 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-03-07 07:28:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-07 20:47:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-07 18:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J18208,"2019-03-07 07:29:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-03-07 20:27:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J11302,"2019-03-07 07:29:00",17-시공-07,g.기타,"치악교 제작장, 가설검토 및 동용교 인장계획서 수정
|
|
","2019-03-07 20:33:00",17-시공-07,g.기타,"치악교 제작장, 가설검토 및 동용교 인장계획서 수정
|
|
","2019-03-07 18:30:00",172.16.9.166,172.16.9.166,172.16.9.166,004E3,,1,
|
|
M05510,"2019-03-07 07:30:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.175.191,NULL,NULL,004C8,,,
|
|
M02302,"2019-03-07 07:32:00",19-제조-02,a.생산관리,"재고파악 및 충청대학교 출장","2019-03-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,"19-제조-02<|>a.생산관리<|>충정대학교 견학 보고서 작성 및 자료 정리<|>04:00<|><br>19-제조-02<|>a.생산관리<|>야적장 경계측량 장비 섭외<|>01:30<|><br>",,
|
|
J13308,"2019-03-07 07:33:00",18-시공-15,b.시공,"1. 2019 현장 점검 계획서 작성
|
|
2. 세천2교 가설계획서 수정 및 제작장 부지조성 검토 및 공문발송","2019-03-07 18:05:00",18-시공-15,b.시공,"1. 2019 현장 점검 계획서 작성
|
|
2. 세천2교 가설계획서 수정 및 제작장 부지조성 검토 및 공문발송","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J16203,"2019-03-07 07:41:00",19-제조-03,a.품질검사," 산외교데크, 켄틸생산 및 품질관리
|
|
","2019-03-07 23:54:00",19-제조-03,a.품질검사," 산외교데크, 켄틸생산 및 품질관리
|
|
","2019-03-07 19:06:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-03-07 07:42:00",19-영업-01,d.기타,"송산~시화MTV 예상 시행가 , 갈천~가수 예상 계약가 등 : 조안대교 외 5개교 계약 추진 중","2019-03-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-03-07 07:53:00",17-시공-21,b.시공,"거더가설방법 및 문제점검토","2019-03-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.10.246,NULL,NULL,004C7,,,
|
|
J11305,"2019-03-07 07:58:00",17-시공-10,g.기타,검토,"2019-03-07 18:05:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-03-07 08:01:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-07 18:18:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J15307,"2019-03-07 08:03:00",19-교영-01,d.기타,"1. 세종~안성 용암1교 실시설계 견적","2019-03-07 18:07:00",19-교영-01,d.기타,"1. 세종~안성 용암1교 실시설계 견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
B15306,"2019-03-07 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-03-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10315,"2019-03-07 08:12:00",17-시공-27,b.시공,"제작및 가설협의","2019-03-07 18:14:00",17-시공-27,b.시공,"제작및 가설협의","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J10314,"2019-03-07 08:16:00",14-교영-00,d.기타,"옥산4교 및 옥산교(군장산단 인입철도) 시행견적서 및 협의,
|
|
삼남1교 공사비 검토자료","2019-03-07 18:10:00",14-교영-00,d.기타,"옥산4교 및 옥산교(군장산단 인입철도) 시행견적서 및 협의,
|
|
삼남1교 공사비 검토자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-03-07 08:16:00",19-교영-01,d.기타,사업관리,"2019-03-07 18:14:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18205,"2019-03-07 08:17:00",18-설계-19,d.산출서,"부품도 작성","2019-03-07 21:32:00",18-설계-19,d.산출서,"부품도 작성","2019-03-07 18:31:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J13201,"2019-03-07 08:18:00",19-설계-01,d.산출서,"신평교 수량산출","2019-03-07 18:10:00",19-설계-01,d.산출서,"신평교 수량산출","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J08201,"2019-03-07 08:18:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-03-07 18:23:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18204,"2019-03-07 08:19:00",19-교휴-06,a.기타,"견적 자료정리","2019-03-07 18:03:00",19-교휴-06,a.기타,"견적 자료정리","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J15302,"2019-03-07 08:24:00",18-설계-19,c.도면,"6개교량 수량산출서 작성","2019-03-07 18:03:00",18-설계-19,c.도면,"6개교량 수량산출서 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J14306,"2019-03-07 08:24:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-07 18:09:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J10301,"2019-03-07 08:25:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-07 18:20:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J17205,"2019-03-07 08:26:00",18-교영-01,c.설계사,.,"2019-03-07 18:05:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-03-07 08:27:00",15-설계-31,e.검토,"현장감리 지적사항 검토","2019-03-07 19:08:00",15-설계-31,e.검토,"현장감리 지적사항 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J12202,"2019-03-07 08:29:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J15301,"2019-03-07 08:31:00",16-시공-20,b.시공,"금곡교 자재 공급원승인서 발송 (케이티에이)
|
|
현장정산서 작성
|
|
원흥2교 도면 제본
|
|
단장천2교 1차 인장 자재 및 가로보 출하요청서 작성","2019-03-07 18:30:00",16-시공-20,b.시공,"금곡교 자재 공급원승인서 발송 (케이티에이)
|
|
현장정산서 작성
|
|
원흥2교 도면 제본
|
|
단장천2교 1차 인장 자재 및 가로보 출하요청서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11203,"2019-03-07 08:31:00",17-설계-05,e.검토,"구안천교 시공사 검토사항 정리 및 DR구간 도서검토","2019-03-07 18:03:00",17-설계-05,e.검토,"시공사 검토사항 정리 및 DR구간 도서검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>b.구조계산<|>한맥교량 전단부분 수정<|>02:00<|><br>",,
|
|
J10313,"2019-03-07 08:35:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-07 18:03:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J07210,"2019-03-07 08:37:00",16-시공-20,g.기타,"당초 변경","2019-03-07 20:43:00",16-시공-20,g.기타,"당초 변경","2019-03-07 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J16202,"2019-03-07 08:37:00",18-교영-01,c.설계사,신규사업현황조사,"2019-03-07 18:20:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J09101,"2019-03-07 08:40:00",19-교영-01,c.설계사,과업조사,"2019-03-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15201,"2019-03-07 08:42:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","2019-03-07 18:00:00",19-교영-04,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14101,"2019-03-07 08:50:00",16-시공-20,출장,한양,"2019-03-07 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-03-07 08:50:00",07-교영-01,출장,"[광주, 여수(본사,현장)]웅천~소호 해상교량 관련 마무리( 내역설명 요청 및 인사)","2019-03-07 18:00:00",07-교영-01,출장,"[광주, 여수(본사,현장)]웅천~소호 해상교량 관련 마무리( 내역설명 요청 및 인사)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-03-08 06:20:00",19-제조-04,b.기계,"북수원1교 앵커(권선P4) 설치와 원흥2교 주두부 받침 제작 및 거더 거푸집 보수","2019-03-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J12202,"2019-03-08 06:47:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J16203,"2019-03-08 07:19:00",19-제조-03,a.품질검사," 산외교데크, 켄틸생산 및 품질관리
|
|
","2019-03-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
M05510,"2019-03-08 07:23:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.175.122,NULL,NULL,004C8,,,
|
|
J13308,"2019-03-08 07:30:00",18-시공-15,b.시공,"1. 2019 현장 점검 계획서 작성
|
|
2. 세천2교 가설계획서 수정 및 제작장 부지조성 검토 및 공문발송","2019-03-08 18:09:00",18-시공-15,b.시공,"1. 2019 현장 점검 계획서 작성
|
|
2. 세천2교 가설계획서 수정 및 제작장 부지조성 검토 및 공문발송","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J14308,"2019-03-08 07:30:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-08 20:47:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-08 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
T04204,"2019-03-08 07:39:00",16-제조-02,a.생산관리,"북수원1교,삼간교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-03-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09102,"2019-03-08 07:46:00",19-영업-01,d.기타,"함안천 양포교 예상 계약가, 송산~시화MTV 예상 시행가 등 : 조안대교 외 5개교 계약 추진 중","2019-03-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-03-08 07:46:00",17-시공-21,b.시공,"거더가설방법 및 문제점검토","2019-03-08 18:13:00",17-시공-21,b.시공,"거더가설방법 및 문제점검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J15307,"2019-03-08 08:09:00",19-교영-01,d.기타,"1. 세종~안성 용암1교 실시설계 견적
|
|
2. Saman India 기술협약서 번역","2019-03-08 18:00:00",19-교영-01,d.기타,"1. 세종~안성 용암1교 실시설계 견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J10314,"2019-03-08 08:10:00",14-교영-00,d.기타,"화정1교(영동고속도로)특공 공법별 공사비비교,
|
|
삼남1교 (밀양~울산 7공구) 공사비 검토자료,
|
|
거더 개략공사비 검토","2019-03-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
B15306,"2019-03-08 08:10:00",18-관리-02,e.기타,"비서업무 외","2019-03-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-03-08 08:15:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-03-08 18:05:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-03-08 08:17:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-08 18:06:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J11305,"2019-03-08 08:17:00",17-시공-10,g.기타,검토,"2019-03-08 18:05:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18205,"2019-03-08 08:20:00",18-설계-19,d.산출서,"부품도 작성","2019-03-08 18:08:00",18-설계-19,d.산출서,"부품도 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J13201,"2019-03-08 08:21:00",19-설계-01,d.산출서,"신평교 수량산출","2019-03-08 18:07:00",19-설계-01,d.산출서,"신평교 수량산출","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J18204,"2019-03-08 08:22:00",19-교휴-06,a.기타,"견적 자료정리","2019-03-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.183,NULL,NULL,004E2,,,
|
|
J14306,"2019-03-08 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E5,,,
|
|
J15202,"2019-03-08 08:23:00",15-설계-31,e.검토,"현장감리 지적사항 검토","2019-03-08 18:04:00",15-설계-31,e.검토,"현장감리 지적사항 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J15302,"2019-03-08 08:23:00",18-설계-19,c.도면,"6개교량 수량산출서 작성","2019-03-08 18:03:00",18-설계-19,c.도면,"6개교량 수량산출서 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J17205,"2019-03-08 08:24:00",18-교영-01,c.설계사,.,"2019-03-08 18:09:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10301,"2019-03-08 08:26:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-08 18:14:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07103,"2019-03-08 08:28:00",19-교영-01,d.기타,사업관리,"2019-03-08 18:09:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11202,"2019-03-08 08:29:00",18-시공-11,b.시공,공사관리,"2019-03-08 18:09:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18208,"2019-03-08 08:29:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-03-08 20:47:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-03-08 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-03-08 08:30:00",19-제조-02,a.생산관리,"반장확대 회의 준비 및 공장 경계측량","2019-03-08 18:00:00",19-제조-02,a.생산관리,"반장확대 회의 준비 및 공장 경계측량","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>야적장 경계측량 협의<|>01:00<|><br>19-제조-02<|>a.생산관리<|>반장확대회의 자료 작성<|>01:00<|><br>19-제조-02<|>a.생산관리<|>팀장회의 자료 작성 및 회의<|>02:30<|><br>",,
|
|
J11203,"2019-03-08 08:30:00",18-설계-19,b.구조계산,"한맥 청룡천교 전단부분 수정, DR부분 성과품 정리, 발송","2019-03-08 18:03:00",18-설계-19,b.구조계산,"한맥 청룡천교 전단부분 수정, DR부분 성과품 정리, 발송","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15301,"2019-03-08 08:31:00",16-시공-20,b.시공,"금곡교 자재 공급원승인서 발송 (케이티에이)
|
|
현장정산서 작성
|
|
원흥2교 도면 제본
|
|
단장천2교 1차 인장 자재 및 가로보 출하요청서 작성","2019-03-08 18:04:00",16-시공-20,b.시공,"금곡교 자재 공급원승인서 발송 (케이티에이)
|
|
현장정산서 작성
|
|
원흥2교 도면 제본
|
|
단장천2교 1차 인장 자재 및 가로보 출하요청서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15201,"2019-03-08 08:32:00",18-교영-11,c.설계사,"과업진행현황 파악
|
|
","2019-03-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J07210,"2019-03-08 08:33:00",16-시공-20,g.기타,"당초 변경","2019-03-08 18:01:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J10313,"2019-03-08 08:41:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-08 18:05:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16202,"2019-03-08 08:44:00",18-교영-01,c.설계사,신규사업현황조사,"2019-03-08 18:11:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J09101,"2019-03-08 08:59:00",19-교영-01,c.설계사,과업조사,"2019-03-08 18:04:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J11302,"2019-03-08 10:45:00",17-시공-07,g.기타,"치악교 제작장, 가설검토 및 동용교 인장계획서 수정
|
|
","2019-03-08 20:35:00",17-시공-07,g.기타,"치악교 제작장, 가설검토 및 동용교 인장계획서 수정
|
|
","2019-03-08 18:32:00",172.16.9.166,172.16.9.166,172.16.9.166,004E3,,1,
|
|
J14101,"2019-03-08 08:50:00",16-시공-20,출장,한양,"2019-03-08 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-03-08 08:50:00",07-교영-01,출장,"[광주, 여수(본사,현장)]웅천~소호 해상교량 관련 마무리( 내역설명 요청 및 인사)","2019-03-08 18:00:00",07-교영-01,출장,"[광주, 여수(본사,현장)]웅천~소호 해상교량 관련 마무리( 내역설명 요청 및 인사)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10315,"2019-03-08 08:50:00",18-시공-03,출장,한화건설,"2019-03-08 18:00:00",18-시공-03,출장,한화건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J09101,"2019-03-11 08:27:00",19-교영-01,c.설계사,과업조사,"2019-03-11 18:07:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J07202,"2019-03-09 06:56:00",19-제조-04,b.기계,"원흥2교 주두부(3) 받침 제작 및 거더 거푸집 보수","2019-03-09 16:00:00",19-제조-04,b.기계,"원흥2교 주두부(3) 받침 제작 및 거더 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-03-09 07:10:00",16-제조-02,a.생산관리,"북수원1교,삼간교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-03-09 16:07:00",16-제조-02,a.생산관리,"북수원1교,삼간교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-03-09 07:23:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.162.226,NULL,NULL,004C8,,,
|
|
J14308,"2019-03-09 07:33:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-09 18:04:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,1,
|
|
J18208,"2019-03-09 07:34:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","2019-03-09 16:03:00",16-제조-02,a.생산관리,"생산관리 및 산외교 Shop Drwaing","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M02302,"2019-03-09 07:35:00",19-제조-02,a.생산관리,"공장설비 점검 및 보고","2019-03-09 16:04:00",19-제조-02,a.생산관리,"공장설비 점검 및 보고","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
J16203,"2019-03-09 07:37:00",19-제조-03,a.품질검사," 산외교데크, 켄틸생산 및 품질관리
|
|
","2019-03-09 12:59:00",19-제조-03,a.품질검사," 산외교데크, 켄틸생산 및 품질관리
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
J10315,"2019-03-09 08:01:00",17-시공-21,b.시공,"북수원1교 협의자료 작성","2019-03-09 13:46:00",17-시공-21,b.시공,"북수원1교 협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,1,
|
|
J07202,"2019-03-11 07:03:00",19-제조-04,b.기계,"원흥2교 주두부(4) 받침 제작 및 거더 거푸집 보수","2019-03-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J11302,"2019-03-11 07:12:00",17-시공-07,g.기타,"치악교 제작장, 가설검토 및 동용교 인장계획서 수정
|
|
","2019-03-11 18:19:00",17-시공-07,g.기타,"치악교 제작장, 가설검토 및 동용교 인장계획서 수정
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
M05510,"2019-03-11 07:18:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.18.120,NULL,NULL,004C8,,,
|
|
T04204,"2019-03-11 07:24:00",16-제조-02,a.생산관리,"북수원1교,삼간교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-03-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-03-11 07:26:00",18-시공-15,b.시공,"1. 지경천교 시공계획서 및 철근 신청서 작성
|
|
2. 세천2교 가설계획서 수정 및 제작장 부지조성 검토 및 공문발송","2019-03-11 18:15:00",18-시공-15,b.시공,"1. 지경천교 시공계획서 및 철근 신청서 작성
|
|
2. 세천2교 가설계획서 수정 및 제작장 부지조성 검토 및 공문발송","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18208,"2019-03-11 07:34:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-11 20:54:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-11 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-03-11 07:37:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-11 20:54:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-11 19:07:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,,
|
|
J16203,"2019-03-11 07:40:00",19-제조-03,a.품질검사," 산외교데크, 켄틸생산 및 품질관리
|
|
산외교 강봉 200개 출하","2019-03-11 20:54:00",19-제조-03,a.품질검사," 산외교데크, 켄틸생산 및 품질관리
|
|
산외교 강봉 100개 출하","2019-03-11 18:35:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18202,"2019-03-11 07:46:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 현황 파악
|
|
","2019-03-11 18:09:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-03-11 07:46:00",19-제조-02,a.생산관리,"업무 정리 및 공장 점검","2019-03-11 18:01:00",19-제조-02,a.생산관리,"업무 정리 및 공장 점검","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-03-11 07:48:00",19-영업-01,d.기타,"함안천 양포교 예상 계약가, 송산~시화MTV 예상 시행가 등 : 조안대교 외 5개교 계약 추진 중","2019-03-11 18:25:00",19-영업-01,d.기타,"함안천 양포교 예상 계약가, 송산~시화MTV 예상 시행가 등 : 조안대교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J10315,"2019-03-11 07:50:00",17-시공-21,b.시공,"북수원1교 협의자료 작성","2019-03-11 18:17:00",17-시공-21,b.시공,"북수원1교 협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18207,"2019-03-11 07:52:00",17-시공-21,b.시공,"거더가설방법 및 문제점검토","2019-03-11 18:25:00",17-시공-21,b.시공,"거더가설방법 및 문제점검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18206,"2019-03-11 07:54:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-12 08:05:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J12202,"2019-03-11 07:57:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J10301,"2019-03-11 08:04:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-11 18:43:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
B15306,"2019-03-11 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-03-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-03-11 08:13:00",19-교영-01,d.기타,"1. 세종~안성 용암1교 실시설계 견적
|
|
2. 양평~이천 2공구 신천교 내역 작성","2019-03-11 20:46:00",19-교영-01,d.기타,"1. 세종~안성 용암1교 실시설계 견적
|
|
2. 양평~이천 2공구 신천교 내역 작성","2019-03-11 18:36:00",172.16.9.171,172.16.9.171,172.16.9.171,004E4,,1,
|
|
J08201,"2019-03-11 08:13:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-03-11 19:03:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J07103,"2019-03-11 08:15:00",19-교영-01,d.기타,사업관리,"2019-03-11 18:15:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18205,"2019-03-11 08:20:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-11 20:58:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-11 18:44:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J13201,"2019-03-11 08:21:00",19-설계-01,d.산출서,"신평교 배근도 작성","2019-03-11 20:57:00",19-설계-01,d.산출서,"신평교 배근도 작성","2019-03-11 18:44:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,,1,
|
|
J18204,"2019-03-11 08:22:00",19-교휴-06,a.기타,"견적 자료정리","2019-03-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.183,NULL,NULL,004E2,,,
|
|
J10314,"2019-03-11 08:23:00",14-교영-00,d.기타,"접속교 거더(송산그린시티~시화멀티테크노밸리) 시행견적서,
|
|
삼남1교 (밀양~울산 7공구) 공사비 검토자료 및 시행견적서,
|
|
거더 개략공사비 검토","2019-03-11 18:31:00",14-교영-00,d.기타,"접속교 거더(송산그린시티~시화멀티테크노밸리) 시행견적서,
|
|
삼남1교 (밀양~울산 7공구) 공사비 검토자료 및 시행견적서,
|
|
거더 개략공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11202,"2019-03-11 08:23:00",18-시공-11,b.시공,공사관리,"2019-03-11 18:26:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-03-11 08:32:00",15-설계-31,e.검토,"현장감리 지적사항 검토","2019-03-11 18:04:00",15-설계-31,e.검토,"현장감리 지적사항 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J11203,"2019-03-11 08:33:00",19-설계-02,b.구조계산,"치악교 모델링, 반력산출","2019-03-11 21:02:00",19-설계-02,b.구조계산,"모델링, 반력산출","2019-03-11 18:45:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"18-설계-19<|>d.산출서<|>DR거더 설계내역 장헌단가팀 발송<|>00:30<|><br>",1,
|
|
J07210,"2019-03-11 08:33:00",16-시공-20,g.기타,"당초 변경","2019-03-11 18:26:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J15201,"2019-03-11 08:38:00",18-교영-11,c.설계사,"과업진행현황 파악
|
|
","2019-03-11 18:05:00",18-교영-11,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-03-11 08:38:00",17-시공-10,g.기타,검토,"2019-03-11 18:06:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J17205,"2019-03-11 08:39:00",18-교영-01,c.설계사,.,"2019-03-11 21:30:00",18-설계-12,c.설계사,.,"2019-03-11 18:30:00",172.16.9.180,NULL,172.16.9.180,008E2,,1,
|
|
J16202,"2019-03-11 08:39:00",18-교영-01,c.설계사,신규사업현황조사,"2019-03-11 18:05:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10313,"2019-03-11 08:44:00",16-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","2019-03-11 18:04:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14101,"2019-03-11 08:50:00",16-시공-20,출장,한양,"2019-03-11 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-03-12 06:55:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-12 18:19:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J11302,"2019-03-12 07:13:00",17-시공-07,g.기타,"전동교 철도횡단검토, 삼남1교, 새만금 전주 가설검토
|
|
","2019-03-12 18:10:00",17-시공-07,g.기타,"전동교 철도횡단검토, 삼남1교, 새만금 전주 가설검토
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
T04204,"2019-03-12 07:25:00",16-제조-02,a.생산관리,"북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-03-12 20:10:00",16-제조-02,a.생산관리,"북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-03-12 07:25:00",19-제조-02,a.생산관리,"철근 재고 절단관리 bom 검토","2019-03-13 07:35:00",19-제조-02,a.생산관리,"철근 재고 절단관리 bom 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>그라우트 댐 적용 EPS 관련 업체 협의<|>03:30<|><br>19-제조-02<|>a.생산관리<|>그라우트 댐 적용 EPS 자료검색<|>02:00<|><br>",,
|
|
M05510,"2019-03-12 07:26:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-13 07:20:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.8.92,NULL,223.38.28.71,004C8,,,
|
|
J14308,"2019-03-12 07:33:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-12 22:26:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-12 18:46:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J18208,"2019-03-12 07:34:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J16203,"2019-03-12 07:40:00",19-제조-03,a.품질검사," 산외교데크, 켄틸생산 및 품질관리
|
|
산외교 켄틸 10장, 강봉 800개 출하","2019-03-12 23:52:00",19-제조-03,a.품질검사," 산외교데크, 켄틸생산 및 품질관리
|
|
산외교 켄틸 10장, 강봉 800개 출하","2019-03-12 18:51:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-03-12 07:43:00",19-영업-01,d.기타,"이천~문경 문경3교 예상 계약가, 송산~시화MTV 예상 시행가 등 : 조안대교 외 5개교 계약 추진 중","2019-03-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-03-12 07:44:00",18-시공-15,b.시공,"1. 지경천교 시공계획서 및 철근 신청서 작성
|
|
2. 세천2교 가설계획서 수정 및 제작장 부지조성 검토 및 공문발송","2019-03-12 18:13:00",18-시공-15,b.시공,"1. 지경천교 시공계획서 및 철근 신청서 작성
|
|
2. 세천2교 가설계획서 수정 및 제작장 부지조성 검토 및 공문발송","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18207,"2019-03-12 07:46:00",16-시공-20,g.기타,"엔드브럭 조립대 제작 진행사항검토","2019-03-12 18:16:00",16-시공-20,g.기타,"엔드브럭 조립대 제작 진행사항검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-03-12 07:55:00",17-시공-21,b.시공,"북수원1교 협의자료 작성","2019-03-12 18:09:00",17-시공-21,b.시공,"북수원1교 협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J15307,"2019-03-12 08:04:00",19-교영-01,d.기타,"1. CP프로젝트 단가 갱신
|
|
2. 양평~이천 2공구 신천교 내역 작성","2019-03-12 18:06:00",19-교영-01,d.기타,"1. CP프로젝트 단가 갱신
|
|
2. 양평~이천 2공구 신천교 내역 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
,"2019-03-12 08:08:00",17-시공-21,b.시공,"북수원1교 가설 검토","2019-03-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.146,NULL,NULL,,,,
|
|
J18206,"2019-03-12 08:08:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-12 18:15:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
B15306,"2019-03-12 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-03-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-03-12 08:15:00",17-시공-10,g.기타,검토,"2019-03-12 18:08:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-03-12 08:18:00",18-설계-19,"a.계획 및 협의","계획 조정","2019-03-12 18:59:00",18-설계-19,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-03-12 08:19:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-12 20:38:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-12 18:33:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J13201,"2019-03-12 08:21:00",19-설계-01,d.산출서,"신평교 배근도 작성","2019-03-12 20:39:00",19-설계-01,d.산출서,"신평교 배근도 작성","2019-03-12 18:33:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,,1,
|
|
J11202,"2019-03-12 08:24:00",18-시공-11,b.시공,공사관리,"2019-03-12 18:22:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10314,"2019-03-12 08:24:00",14-교영-00,d.기타,"공릉천교외 7개소(김포~파주3공구) 시행견적서,
|
|
삼남1교 (밀양~울산 7공구) 공사비 검토자료 및 시행견적서,
|
|
접속교 거더(송산그린시티~시화멀티테크노밸리) 시행견적서, 거더 개략공사비 검토","2019-03-12 18:14:00",14-교영-00,d.기타,"공릉천교외 7개소(김포~파주3공구) 시행견적서,
|
|
삼남1교 (밀양~울산 7공구) 공사비 검토자료 및 시행견적서,
|
|
접속교 거더(송산그린시티~시화멀티테크노밸리) 시행견적서, 거더 개략공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14306,"2019-03-12 08:25:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-12 18:10:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J07103,"2019-03-12 08:25:00",19-교영-01,d.기타,사업관리,"2019-03-12 18:17:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-03-12 08:26:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-12 18:34:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-03-12 08:30:00",18-설계-12,c.도면,"지산교 거더도면 작성(선형변경)","2019-03-12 20:49:00",18-설계-12,c.도면,"지산교 거더도면 작성(선형변경)","2019-03-12 18:32:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-03-12 08:31:00",16-시공-20,g.기타,"당초 변경","2019-03-12 20:34:00",16-시공-20,g.기타,"당초 변경","2019-03-12 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J11203,"2019-03-12 08:32:00",19-설계-02,b.구조계산,"치악교 모델링, 반력산출","2019-03-12 20:35:00",19-설계-02,b.구조계산,"모델링, 반력산출","2019-03-12 18:34:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"16-설계-18<|>b.구조계산<|>8공구 광시생태육교 모델링 반력산출<|>04:00<|><br>",1,
|
|
J17205,"2019-03-12 08:35:00",18-교영-01,c.설계사,.,"2019-03-12 21:35:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-03-12 08:36:00",18-교영-11,c.설계사,"과업진행현황 파악
|
|
","2019-03-12 18:06:00",18-교영-11,c.설계사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-03-12 08:42:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J16202,"2019-03-12 08:45:00",18-교영-01,c.설계사,신규사업현황조사,"2019-03-12 18:21:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J18204,"2019-03-12 08:47:00",19-교휴-06,a.기타,"함양-창녕간 고속도로 건설공사 제1공구 지곡교 공사금액 검토","2019-03-12 18:07:00",19-교휴-06,a.기타,"함양-창녕간 고속도로 건설공사 제1공구 지곡교 공사금액 검토","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J09101,"2019-03-12 09:02:00",19-교영-01,c.설계사,과업조사,"2019-03-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-03-12 08:50:00",16-시공-20,출장,한양,"2019-03-12 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-03-13 06:08:00",16-시공-20,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-03-13 06:54:00",19-제조-04,b.기계,"거더 거푸집 보수와 원흥2교 주두부 4조분 상차","2019-03-13 17:58:00",19-제조-04,b.기계,"거더 거푸집 보수와 원흥2교 주두부 4조분 상차","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-03-13 07:11:00",17-시공-07,g.기타,"전동교 철도횡단검토, 삼남1교, 새만금 전주 가설검토
|
|
","2019-03-13 18:12:00",17-시공-07,g.기타,"전동교 철도횡단검토, 삼남1교, 새만금 전주 가설검토
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
M05510,"2019-03-13 07:21:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.28.71,NULL,NULL,004C8,,,
|
|
T04204,"2019-03-13 07:21:00",16-제조-02,a.생산관리,"북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","2019-03-13 21:22:00",16-제조-02,a.생산관리,"북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산, 골재장 공사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-03-13 07:27:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-13 18:03:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J18208,"2019-03-13 07:32:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-13 22:13:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-13 18:56:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18202,"2019-03-13 07:35:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 현황 파악","2019-03-13 18:08:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J13308,"2019-03-13 07:35:00",18-시공-15,b.시공,"1. 지경천교 시공계획서 및 철근 신청서 작성
|
|
2. 세천2교 가설계획서 수정 및 제작장 부지조성 검토 및 공문발송","2019-03-13 18:13:00",18-시공-15,b.시공,"1. 지경천교 시공계획서 및 철근 신청서 작성
|
|
2. 세천2교 가설계획서 수정 및 제작장 부지조성 검토 및 공문발송","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18207,"2019-03-13 07:36:00",16-시공-20,g.기타,"엔드브럭 조립대 제작 진행사항검토","2019-03-13 18:13:00",16-시공-20,g.기타,"엔드브럭 조립대 제작 진행사항검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M02302,"2019-03-13 07:36:00",19-제조-02,a.생산관리,"철근 재고 절단관리 bom 검토","2019-03-13 20:59:00",19-제조-02,a.생산관리,"철근 재고 절단관리 bom 검토","2019-03-13 18:54:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공장동내 시설 점검 및 생산직 현장 면담<|>06:00<|><br>",1,
|
|
J16203,"2019-03-13 07:43:00",19-제조-03,a.품질검사,"콘크리트 물성시험, 산외교데크, 켄틸생산 및 품질관리
|
|
","2019-03-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J11305,"2019-03-13 08:05:00",17-시공-10,g.기타,검토,"2019-03-13 18:10:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-03-13 08:08:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적","2019-03-13 18:05:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
B15306,"2019-03-13 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-03-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-03-13 08:13:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-13 18:11:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J08201,"2019-03-13 08:17:00",19-설계-02,b.구조계산,"계획 조정","2019-03-13 19:13:00",19-설계-02,b.구조계산,"계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18204,"2019-03-13 08:20:00",19-교휴-06,a.기타,"함양-창녕간 고속도로 건설공사 제1공구 지곡교 공사금액 검토","2019-03-13 18:06:00",19-교휴-06,a.기타,"함양-창녕간 고속도로 건설공사 제1공구 지곡교 공사금액 검토","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J18205,"2019-03-13 08:24:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-13 21:36:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-13 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J13201,"2019-03-13 08:26:00",19-설계-01,d.산출서,"신평교 배근도 작성","2019-03-13 18:12:00",19-설계-01,d.산출서,"신평교 배근도 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J14306,"2019-03-13 08:28:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-13 18:13:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J17205,"2019-03-13 08:28:00",18-교영-01,c.설계사,.,"2019-03-13 21:32:00",18-교영-01,c.설계사,.,"2019-03-13 18:33:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J10301,"2019-03-13 08:29:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-13 18:52:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16202,"2019-03-13 08:29:00",18-교영-01,c.설계사,신규사업현황조사,"2019-03-13 18:16:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11202,"2019-03-13 08:29:00",18-시공-11,b.시공,공사관리,"2019-03-13 18:14:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07103,"2019-03-13 08:30:00",19-교영-01,d.기타,사업관리,"2019-03-13 18:16:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15202,"2019-03-13 08:32:00",18-설계-12,c.도면,"지산교 거더도면 작성(선형변경)","2019-03-13 20:33:00",18-설계-12,c.도면,"지산교 거더도면 작성(선형변경)","2019-03-13 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-03-13 08:32:00",16-시공-20,g.기타,"당초 변경","2019-03-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.162,NULL,NULL,008E2,,,
|
|
J11203,"2019-03-13 08:33:00",19-설계-02,b.구조계산,"치악교 상부 구조계산서 작성","2019-03-13 18:03:00",19-설계-02,b.구조계산,"구조계산서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-21<|>g.기타<|>광교1교, 3교 슬래브계산서작성<|>04:00<|><br>",,
|
|
J15201,"2019-03-13 08:35:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","2019-03-13 18:02:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-03-13 08:39:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-13 18:01:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-03-13 08:40:00",19-교영-01,c.설계사,과업조사,"2019-03-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-03-13 08:50:00",16-시공-20,출장,한양,"2019-03-13 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J09102,"2019-03-13 08:50:00",19-영업-01,출장,두산건설,"2019-03-13 18:00:00",19-영업-01,출장,두산건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10315,"2019-03-13 08:50:00",17-시공-21,출장,대림산업,"2019-03-13 18:00:00",17-시공-21,출장,대림산업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
T04204,"2019-03-14 07:18:00",16-제조-02,a.생산관리,"북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J11302,"2019-03-14 07:18:00",17-시공-07,g.기타,"서울~세종 가설검토
|
|
","2019-03-14 18:16:00",17-시공-07,g.기타,"서울~세종 가설검토
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J14308,"2019-03-14 07:30:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-14 20:45:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-14 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J18208,"2019-03-14 07:34:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-14 22:34:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-14 18:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J10315,"2019-03-14 07:35:00",17-시공-09,b.시공,"제작 및 가설 일정 및 협의자료 작성","2019-03-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J18202,"2019-03-14 07:39:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 현황 파악","2019-03-14 18:09:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-03-14 07:42:00",19-제조-02,a.생산관리,"공장동내 환경개선 검토","2019-03-14 18:13:00",19-제조-02,a.생산관리,"공장동내 환경개선 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공장동내 환경 점검<|>03:00<|><br>19-제조-02<|>a.생산관리<|>진급자 인사평가 및 면담<|>00:30<|><br>",1,
|
|
J18207,"2019-03-14 07:43:00",19-시공-02,g.기타,"실행예산 및 공사참여방법검토","2019-03-14 18:17:00",19-시공-02,g.기타,"실행예산 및 공사참여방법검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M05510,"2019-03-14 07:43:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-14 18:50:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.30.138,NULL,223.38.8.4,004C8,,,
|
|
J16203,"2019-03-14 07:44:00",19-제조-03,a.품질검사,"콘크리트 물성시험, 산외교데크, 켄틸생산 및 품질관리
|
|
후정철 육교 출하","2019-03-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J13308,"2019-03-14 07:44:00",18-시공-15,b.시공,"1. 지경천교 시공계획서 및 철근 신청서 작성
|
|
2. 세천2교 가설계획서 수정 및 제작장 부지조성 검토 및 공문발송","2019-03-14 18:10:00",18-시공-15,b.시공,"1. 지경천교 시공계획서 및 철근 신청서 작성
|
|
2. 세천2교 가설계획서 수정 및 제작장 부지조성 검토 및 공문발송","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J09102,"2019-03-14 07:45:00",19-영업-01,d.기타,"김포~파주 3공구(KCC) 예상 시행가, 문경3교 예상 계약가 등 : 조안대교 외 6개교 계약 추진 중","2019-03-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10314,"2019-03-14 08:04:00",14-교영-00,d.기타,"문경3교(이천~문경) 시행견적서 및 시행내역서,
|
|
공릉천교외 7개소(김포~파주3공구) 시행견적서,
|
|
삼남1교 (밀양~울산 7공구) 공사비 검토자료 및 시행견적서,
|
|
접속교 거더(송산그린시티~시화멀티테크노밸리) 시행견적서, 거더 거더공사비 검토","2019-03-14 18:03:00",14-교영-00,d.기타,"문경3교(이천~문경) 시행견적서 및 시행내역서,
|
|
공릉천교외 7개소(김포~파주3공구) 시행견적서,
|
|
삼남1교 (밀양~울산 7공구) 공사비 검토자료 및 시행견적서,
|
|
접속교 거더(송산그린시티~시화멀티테크노밸리) 시행견적서, 거더 거더공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11305,"2019-03-14 08:07:00",17-시공-10,g.기타,검토,"2019-03-14 18:07:00",17-시공-10,g.기타,검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-03-14 08:10:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적","2019-03-14 18:06:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18206,"2019-03-14 08:13:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-14 18:17:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J07103,"2019-03-14 08:20:00",19-교영-01,d.기타,사업관리,"2019-03-14 18:16:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18204,"2019-03-14 08:21:00",19-교휴-06,a.기타,"함양-창녕간 고속도로 건설공사 제1공구 지곡교 공사금액 검토","2019-03-14 18:08:00",19-교휴-06,a.기타,"함양-창녕간 고속도로 건설공사 제1공구 지곡교 공사금액 검토","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J14306,"2019-03-14 08:22:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-14 18:16:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J18205,"2019-03-14 08:23:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-14 20:36:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-14 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J10301,"2019-03-14 08:24:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J13201,"2019-03-14 08:24:00",19-설계-01,d.산출서,"신평교 배근도 작성","2019-03-14 20:37:00",19-설계-01,d.산출서,"신평교 배근도 작성","2019-03-14 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,,1,
|
|
J11202,"2019-03-14 08:25:00",18-시공-11,b.시공,공사관리,"2019-03-14 18:14:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J08201,"2019-03-14 08:25:00",19-설계-02,b.구조계산,"계획 조정","2019-03-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
B15306,"2019-03-14 08:10:00",18-관리-02,e.기타,"비서업무 외","2019-03-14 18:18:18",NULL,NULL,"비서업무 외","0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J17205,"2019-03-14 08:29:00",18-교영-01,c.설계사,.,"2019-03-14 18:08:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11203,"2019-03-14 08:32:00",16-설계-18,b.구조계산,"광시생태육교 구조계산서 수량산출서작성 성과물 정리","2019-03-14 18:06:00",16-설계-18,b.구조계산,"광시생태육교 구조계산서 수량산출서작성 성과물 정리","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-21<|>g.기타<|>광교1교 거더, 광교2교 슬래브 거더 계산서작성<|>03:30<|><br>18-설계-19<|>h.기타<|>안성세종 DR거더교량 가설검토 자료 공사팀발송<|>00:30<|><br>",,
|
|
J15202,"2019-03-14 08:32:00",18-설계-12,c.도면,"지산교 거더도면 작성(선형변경)","2019-03-14 20:54:00",18-설계-12,c.도면,"지산교 거더도면 작성(선형변경)","2019-03-14 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-03-14 08:34:00",16-시공-20,g.기타,"당초 변경","2019-03-14 18:07:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J16202,"2019-03-14 08:35:00",18-교영-01,c.설계사,신규사업현황조사,"2019-03-14 18:14:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-03-14 08:35:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","2019-03-14 18:03:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-03-14 08:39:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J09101,"2019-03-14 08:49:00",19-교영-01,c.설계사,과업조사,"2019-03-14 18:03:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-03-14 08:50:00",16-시공-20,출장,한양,"2019-03-14 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-03-14 08:50:00",17-시공-08,출장,"[대구광역시]장비관련 사업단 보고","2019-03-14 18:00:00",17-시공-08,출장,"[대구광역시]장비관련 사업단 보고","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J12202,"2019-03-15 06:37:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-03-15 07:00:00",19-제조-04,b.기계,"거더 거푸집 보수와 원흥2교 주두부 4조분 상차","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J11302,"2019-03-15 07:20:00",17-시공-07,g.기타,"서울~세종 가설검토
|
|
","2019-03-15 18:03:00",17-시공-07,g.기타,"서울~세종 가설검토
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
M05510,"2019-03-15 07:24:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-16 07:40:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.27.118,NULL,223.62.212.170,004C8,,,
|
|
T04204,"2019-03-15 07:26:00",16-제조-02,a.생산관리,"북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-03-15 07:29:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-15 18:07:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J18202,"2019-03-15 07:35:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 현황 파악","2019-03-15 18:07:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J13308,"2019-03-15 07:37:00",18-시공-15,b.시공,"1. 인천시항접속교 하자보수 계획서 및 착공계 제출 및 협의
|
|
2. 주52시간제 근무에 따른 산외교 검토(안) 작성","2019-03-15 18:02:00",18-시공-15,b.시공,"1. 인천시항접속교 하자보수 계획서 및 착공계 제출 및 협의
|
|
2. 주52시간제 근무에 따른 산외교 검토(안) 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18208,"2019-03-15 07:37:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-15 18:04:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-03-15 07:38:00",19-제조-02,a.생산관리,"공장동내 환경개선 검토","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-03-15 07:39:00",19-시공-02,g.기타,"실행예산 및 공사참여방법검토","2019-03-15 18:06:00",19-시공-02,g.기타,"실행예산 및 공사참여방법검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-03-15 07:40:00",19-제조-03,a.품질검사,"산외교데크, 켄틸생산 및 품질관리
|
|
광교1 1-1. 1-5 쪽판 코아작업","2019-03-15 22:46:00",19-제조-03,a.품질검사,"산외교데크, 켄틸생산 및 품질관리
|
|
광교1 1-1. 1-5 쪽판 코아작업","2019-03-15 19:25:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-03-15 07:43:00",19-계약-01,b.시공사,"시화MTV 현장설명회, 김포~파주 3공구(KCC) 예상 시행가, 문경3교 예상 계약가 등 : 조안대교 외 6개교 계약 추진 중","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-03-15 08:00:00",16-시공-35,b.시공,"받침변위 확인 및 조치방안 검토","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J11305,"2019-03-15 08:02:00",17-시공-21,g.기타,"방음터널 설치 검토","2019-03-15 18:06:00",17-시공-21,g.기타,"방음터널 설치 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-03-15 08:06:00",18-관리-02,e.기타,"비서업무 외","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10310,"2019-03-15 08:13:00",17-시공-21,b.시공,"안전관리비 정산 및 북수원1교 슈배치도 작성 ","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,004C8,,,
|
|
J11203,"2019-03-15 08:14:00",19-설계-02,c.도면,"거더 도면작성(L=45m, h=2.2m, 단경간)","2019-03-15 18:03:00",19-설계-02,c.도면,"거더 도면작성(L=45m, h=2.2m, 단경간)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J14306,"2019-03-15 08:16:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E5,,,
|
|
J13201,"2019-03-15 08:20:00",19-설계-01,d.산출서,"신평교 배근도 작성","2019-03-15 18:03:00",19-설계-01,d.산출서,"신평교 배근도 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J10301,"2019-03-15 08:20:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J18204,"2019-03-15 08:21:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.183,NULL,NULL,004E2,,,
|
|
J18205,"2019-03-15 08:21:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-15 18:03:00",19-설계-01,b.구조계산,"구조계산서 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J08201,"2019-03-15 08:23:00",19-설계-02,b.구조계산,"계획 조정","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J18206,"2019-03-15 08:23:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-15 18:06:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J15307,"2019-03-15 08:25:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적","2019-03-15 18:03:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J07103,"2019-03-15 08:27:00",19-교영-01,d.기타,사업관리,"2019-03-15 18:20:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J16202,"2019-03-15 08:28:00",18-교영-01,c.설계사,신규사업현황조사,"2019-03-15 18:12:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11202,"2019-03-15 08:29:00",18-시공-11,b.시공,공사관리,"2019-03-15 18:09:00",18-시공-11,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-03-15 08:31:00",18-설계-12,c.도면,"지산교 거더도면 작성(선형변경)","2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.155,NULL,NULL,008E1,,,
|
|
J07210,"2019-03-15 08:36:00",16-시공-20,g.기타,"당초 변경","2019-03-15 18:05:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J15201,"2019-03-15 08:37:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","2019-03-15 18:04:00",19-교영-03,b.시공사,"과업진행현황 파악
|
|
","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-03-15 08:38:00",18-교영-01,c.설계사,.,"2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J10313,"2019-03-15 08:40:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-15 12:59:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-03-15 08:44:00",19-교영-01,c.설계사,과업조사,"2019-03-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-03-15 08:50:00",16-시공-20,출장,한양,"2019-03-15 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
M05510,"2019-03-16 07:40:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.212.170,NULL,NULL,004C8,,,
|
|
J07202,"2019-03-18 06:19:00",19-제조-04,b.기계,"거더 거푸집 보수와 프리덱 단독거푸집 경사판 조립","2019-03-19 07:28:00",19-제조-04,b.기계,"거더 거푸집 보수와 프리덱 단독거푸집 경사판 조립","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-03-18 06:43:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-03-18 07:12:00",17-시공-07,g.기타,"서울~세종 가설검토, 주천1교 중량물취급계획서 작성
|
|
","2019-03-18 18:04:00",17-시공-07,g.기타,"서울~세종 가설검토, 주천1교 중량물취급계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
T04204,"2019-03-18 07:23:00",16-제조-02,a.생산관리,"북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J16203,"2019-03-18 07:34:00",19-제조-03,a.품질검사,"산외교 데크 출하
|
|
산외교데크, 켄틸생산 및 품질관리
|
|
","2019-03-18 21:37:00",19-제조-03,a.품질검사,"수원교 가로보 데크 출하
|
|
산외교데크, 켄틸생산 및 품질관리
|
|
","2019-03-18 18:39:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14308,"2019-03-18 07:35:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-18 21:31:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-18 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
M02302,"2019-03-18 07:41:00",19-제조-02,a.생산관리,"노듈러 거더 철근 검토","2019-03-18 18:01:00",19-제조-02,a.생산관리,"공장동내 환경개선 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>노듈러 거더 1헤드 절곡기 적용 철근 검토<|>04:00<|><br>19-제조-02<|>a.생산관리<|>B/P 품질관련 협의 및 조사<|>02:00<|><br>",,
|
|
J18207,"2019-03-18 07:43:00",19-시공-02,g.기타,"실행예산 및 공사참여방법검토","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.10.246,NULL,NULL,004C7,,,
|
|
J09102,"2019-03-18 07:48:00",19-계약-01,b.시공사,"송산~시화MTV 시행가, 김포~파주 3공구(KCC) 예상 시행가 등 : 조안대교 외 6개교 계약 추진 중","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-03-18 07:53:00",16-시공-35,b.시공,"받침변위 적정성 검토 및 협의","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J13308,"2019-03-18 07:53:00",18-시공-15,b.시공,"1. 인천시항접속교 하자보수 계획서 및 착공계 제출 및 협의
|
|
2. 주52시간제 근무에 따른 산외교 검토(안) 작성","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E4,,,
|
|
J10310,"2019-03-18 08:04:00",17-시공-21,b.시공,"안전관리비 정산 및 북수원1교 슈배치도 작성 ","2019-03-18 18:01:00",17-시공-21,b.시공,"안전관리비 정산 및 북수원1교 슈배치도 작성 ","0000-00-00 00:00:00",1.233.130.3,NULL,39.7.47.141,004C8,,,
|
|
J09101,"2019-03-18 08:07:00",19-교영-01,c.설계사,과업조사,"2019-03-19 08:16:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10314,"2019-03-18 08:10:00",14-교영-00,d.기타,"구안천교(충청내륙고속화2공구) 시행견적서,
|
|
공릉천교외 7개소(김포~파주3공구) 시행견적서,
|
|
삼남1교 (밀양~울산 7공구) 공사비 검토자료 및 시행견적서,
|
|
접속교 거더(송산그린시티~시화멀티테크노밸리) 시행견적서, 거더 공사비 검토","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J18206,"2019-03-18 08:12:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.146,NULL,NULL,001C5,,,
|
|
J08201,"2019-03-18 08:14:00",19-설계-02,b.구조계산,"계획 조정","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
B15306,"2019-03-18 08:20:00",18-관리-02,e.기타,"비서업무 외","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J14306,"2019-03-18 08:20:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E5,,,
|
|
J18205,"2019-03-18 08:23:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,008E2,,,
|
|
J13201,"2019-03-18 08:24:00",19-설계-01,d.산출서,"신평교 배근도 작성","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E3,,,
|
|
J10301,"2019-03-18 08:24:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J11202,"2019-03-18 08:26:00",18-시공-11,b.시공,공사관리,"2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J15202,"2019-03-18 08:31:00",18-설계-12,c.도면,"진위천교 교량계획 검토","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.155,NULL,NULL,008E1,,,
|
|
J11203,"2019-03-18 08:32:00",19-설계-02,c.도면,"거더 , 프리덱도면, 거더수량, 보고서작성(L=45m, h=2.2m, 단경간)","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,"19-설계-02<|>a.계획 및 협의<|>설계사요청 종단선형 검토<|>03:00<|><br>17-시공-21<|>g.기타<|>광교1,2,3교 슬래브계산서 동성에 발송<|>00:30<|><br>",,
|
|
J10313,"2019-03-18 08:32:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-18 18:01:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J07210,"2019-03-18 08:33:00",16-시공-20,g.기타,"당초 변경","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.162,NULL,NULL,008E2,,,
|
|
J18204,"2019-03-18 08:34:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","2019-03-18 18:04:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J15201,"2019-03-18 08:36:00",19-교영-06,c.설계사,"과업진행현황 파악
|
|
","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J17205,"2019-03-18 08:36:00",18-교영-01,c.설계사,.,"2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J11305,"2019-03-18 08:37:00",17-시공-21,g.기타,"방음터널 설치 검토","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J16202,"2019-03-18 08:42:00",18-교영-01,c.설계사,신규사업현황조사,"2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
M05510,"2019-03-18 11:30:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.29.39,NULL,NULL,004C8,,,
|
|
J14101,"2019-03-18 08:50:00",16-시공-20,출장,한양,"2019-03-18 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07103,"2019-03-18 08:50:00",17-시공-10,출장,성주대교현장,"2019-03-18 18:00:00",17-시공-10,출장,성주대교현장,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J18205,"2019-03-25 08:23:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-25 21:09:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-25 18:31:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
T04204,"2019-03-19 07:24:00",16-제조-02,a.생산관리,"북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M05510,"2019-03-19 07:25:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.30.221,NULL,NULL,004C8,,,
|
|
J07202,"2019-03-19 07:29:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블럭 제작과 거더 거푸집 보수","2019-03-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-03-19 07:33:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-19 18:04:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J14308,"2019-03-19 07:39:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
M02302,"2019-03-19 07:42:00",19-제조-02,a.생산관리,"B/P 품질관련 협의 및 조사","2019-03-19 18:02:00",19-제조-02,a.생산관리,"공장동내 환경개선 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>생산직 업무 관련 회의 및 조사<|>03:00<|><br>19-제조-02<|>a.생산관리<|>직원 숙소 청소<|>04:00<|><br>",,
|
|
J08201,"2019-03-19 08:09:00",19-설계-02,b.구조계산,"계획 조정","2019-03-19 18:20:00",19-설계-02,b.구조계산,"계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J09101,"2019-03-19 08:16:00",19-교영-01,c.설계사,과업조사,"2019-03-19 18:25:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J11305,"2019-03-19 08:16:00",17-시공-21,g.기타,"방음터널 설치 검토","2019-03-19 18:09:00",17-시공-21,g.기타,"방음터널 설치 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18205,"2019-03-19 08:19:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-19 21:14:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-19 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J13201,"2019-03-19 08:19:00",14-설계-36,c.도면,"광교3교 배근도 수정","2019-03-19 21:15:00",14-설계-36,c.도면,"광교3교 배근도 수정","2019-03-19 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,,1,
|
|
J13308,"2019-03-19 08:22:00",18-시공-15,b.시공,"1. 시공계획서 작성(삼남1교)
|
|
2. 철근소요량 신청서 작성(북수원2교)","2019-03-19 18:02:00",18-시공-15,b.시공,"1. 시공계획서 작성(삼남1교)
|
|
2. 철근소요량 신청서 작성(북수원2교)","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18204,"2019-03-19 08:24:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","2019-03-19 18:04:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J15307,"2019-03-19 08:22:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적
|
|
2. 세천2교 데크, 가로보 공급원승인서 준비","2019-03-19 18:08:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적
|
|
2. 세천2교 데크, 가로보 공급원승인서 준비","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J14306,"2019-03-19 08:22:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E5,,,
|
|
B15306,"2019-03-19 08:23:00",18-관리-02,e.기타,"비서업무 외","2019-03-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J09102,"2019-03-19 08:23:00",19-계약-01,b.시공사,"송산~시화MTV 시행가, 김포~파주 3공구(KCC) 예상 시행가 등 : 조안대교 외 6개교 계약 추진 중","2019-03-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J11302,"2019-03-19 08:24:00",17-시공-07,g.기타,"서울~세종 가설검토, 주천1교 중량물취급계획서 작성
|
|
","2019-03-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E3,,,
|
|
J10301,"2019-03-19 08:24:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-19 18:19:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10314,"2019-03-19 08:24:00",14-교영-00,d.기타,"접속교 거더(송산그린시티~시화멀티테크노밸리) 시행산출근거, 삼남1교 (밀양~울산 7공구) 공사비 검토자료 및 시행견적서, 거더공사비 검토","2019-03-19 18:04:00",14-교영-00,d.기타,"접속교 거더(송산그린시티~시화멀티테크노밸리) 시행산출근거, 삼남1교 (밀양~울산 7공구) 공사비 검토자료 및 시행견적서, 거더 거더공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15202,"2019-03-19 08:25:00",18-설계-12,c.도면,"진위천교 교량계획 검토","2019-03-19 20:49:00",18-설계-12,c.도면,"진위천교 교량계획 검토","2019-03-19 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J18202,"2019-03-19 08:25:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 현황 파악","2019-03-19 18:08:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J07210,"2019-03-19 08:27:00",16-시공-20,g.기타,"당초 변경","2019-03-19 20:50:00",16-시공-20,g.기타,"당초 변경","2019-03-19 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J10313,"2019-03-19 08:36:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-19 18:01:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11203,"2019-03-19 08:30:00",19-설계-02,"f.보고서 및 시방서","치악교 보고서작성, 슬래브수량산출","2019-03-19 18:04:00",19-설계-02,"f.보고서 및 시방서","치악교 보고서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-21<|>g.기타<|>광교3교(권선구, 용인) 거더계산서작성<|>02:00<|><br>19-관리-04<|>g.기타<|>전직원회의<|>01:30<|><br>17-설계-09<|>e.검토<|>시공사요청사항 2@50검토<|>01:00<|><br>",,
|
|
J15201,"2019-03-19 08:30:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-03-19 18:08:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-03-19 08:30:00",18-교영-01,c.설계사,.,"2019-03-19 18:22:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J16202,"2019-03-19 08:30:00",18-교영-01,c.설계사,신규사업현황조사,"2019-03-19 18:28:00",18-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14101,"2019-03-19 08:50:00",16-시공-20,출장,한양,"2019-03-19 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07103,"2019-03-19 08:50:00",17-시공-10,출장,성주대교현장,"2019-03-19 18:00:00",17-시공-10,출장,성주대교현장,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J18207,"2019-03-19 08:50:00",19-시공-02,출장,"[전북김제 남광토건]새만금-전주 4공구 공동운영협의회의 참석","2019-03-19 18:00:00",19-시공-02,출장,"[전북김제 남광토건]새만금-전주 4공구 공동운영협의회의 참석","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11202,"2019-03-19 08:50:00",19-시공-02,출장,"[전북김제 남광토건]새만금-전주 4공구 공동운영협의회의 참석","2019-03-19 18:00:00",19-시공-02,출장,"[전북김제 남광토건]새만금-전주 4공구 공동운영협의회의 참석","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10310,"2019-03-19 08:50:00",17-시공-21,출장,"[수원]가로보,패널 자재반입 및 검수 안전팀협의","2019-03-19 18:00:00",17-시공-21,출장,"[수원]가로보,패널 자재반입 및 검수 안전팀협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J10315,"2019-03-19 08:50:00",17-시공-07,출장,두산중공업,"2019-03-19 18:00:00",17-시공-07,출장,두산중공업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-03-19 08:50:00",17-시공-08,출장,"[충남 서산]안전인증 진행과정 협의","2019-03-19 18:00:00",17-시공-08,출장,"[충남 서산]안전인증 진행과정 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J12202,"2019-03-20 07:03:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-03-20 07:21:00",17-시공-07,g.기타,"주천1교 중량물취급계획서 작성,치악교 가설검토
|
|
","2019-03-20 18:07:00",17-시공-07,g.기타,"주천1교 중량물취급계획서 작성,치악교 가설검토
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
T04204,"2019-03-20 07:26:00",16-제조-02,a.생산관리,"북수원1교,한포1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-03-20 07:29:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-20 21:40:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-20 18:39:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-03-20 07:32:00",19-제조-02,a.생산관리,"생산직 인사관련 회의","2019-03-20 18:01:00",19-제조-02,a.생산관리,"공장동내 환경개선 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>직원숙소 청소<|>01:30<|><br>19-제조-02<|>a.생산관리<|>Pre-Deck Shop Dwg.<|>04:00<|><br>",,
|
|
J18202,"2019-03-20 07:35:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 견적","2019-03-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J13308,"2019-03-20 07:38:00",18-시공-15,b.시공,"1. 시공계획서 작성(삼남1교)
|
|
2. 철근소요량 신청서 작성(북수원2교)","2019-03-20 18:06:00",18-시공-15,b.시공,"1. 시공계획서 작성(삼남1교)
|
|
2. 철근소요량 신청서 작성(북수원2교)","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J14308,"2019-03-20 07:40:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-20 21:49:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-20 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J16203,"2019-03-20 08:20:00",19-제조-03,a.품질검사,"데크생산 및 품질관리","2019-03-20 22:49:00",19-제조-03,a.품질검사,"산외교데크, 켄틸생산 및 품질관리
|
|
","2019-03-20 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,,
|
|
J09102,"2019-03-20 07:44:00",19-계약-01,b.시공사,"남일~보은 예상 계약가, 영업활동 협약서 보완, 시화MTV 접속교 시행가 등 : 조안대교 외 6개교 계약 추진 중","2019-03-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-03-20 07:46:00",17-시공-21,b.시공,시공방법검토,"2019-03-20 18:11:00",17-시공-21,b.시공,시공방법검토,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J11305,"2019-03-20 08:07:00",17-시공-21,g.기타,"방음터널 설치 검토","2019-03-20 18:07:00",17-시공-21,g.기타,"방음터널 설치 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-03-20 08:08:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적
|
|
2. 대구외곽2 특정공법심의 견적
|
|
3. 세천2교 데크, 가로보 공급원승인서 준비","2019-03-20 18:05:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적
|
|
2. 대구외곽2 특정공법심의 견적
|
|
3. 세천2교 데크, 가로보 공급원승인서 준비","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J10310,"2019-03-20 08:09:00",17-시공-21,b.시공,"북수원2교 철근신청 및 자재신청 검토","2019-03-20 18:02:00",17-시공-21,b.시공,"북수원2교 철근신청 및 자재신청 검토","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J08201,"2019-03-20 08:11:00",19-설계-02,b.구조계산,"계획 조정","2019-03-20 18:34:00",19-설계-02,b.구조계산,"계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-03-20 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-03-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-03-20 08:16:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-20 18:26:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J10314,"2019-03-20 08:18:00",14-교영-00,d.기타,"석현천교외 1개소(충청내륙고속화1-1공구) 재노경 내역서(시행가), 갈산교외 17개소(서부내륙고속도로)설계내역서수정, 접속교 거더(송산그린시티~시화멀티테크노밸리) 시행가산출근거, 삼남1교 (밀양~울산 7공구) 공사비 검토자료, 거더공사비 검토","2019-03-20 18:06:00",14-교영-00,d.기타,"석현천교외 1개소(충청내륙고속화1-1공구) 재노경 내역서(시행가), 갈산교외 17개소(서부내륙고속도로)설계내역서수정, 접속교 거더(송산그린시티~시화멀티테크노밸리) 시행가산출근거, 삼남1교 (밀양~울산 7공구) 공사비 검토자료, 거더 거더공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18205,"2019-03-20 08:21:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",1.233.130.3,NULL,NULL,008E2,,,
|
|
J13201,"2019-03-20 08:22:00",14-설계-36,c.도면,"광교3교 배근도 수정","2019-03-20 18:01:00",14-설계-36,c.도면,"광교3교 배근도 수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,"18-교영-11<|>c.설계사<|>송산-시화 빔배치<|>04:00<|><br>",,
|
|
J14306,"2019-03-20 08:24:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-20 19:00:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J07210,"2019-03-20 08:25:00",16-시공-20,g.기타,"당초 변경","2019-03-20 18:05:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J07103,"2019-03-20 08:27:00",19-교영-01,d.기타,사업관리,"2019-03-20 18:26:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J17205,"2019-03-20 08:27:00",18-교영-01,c.설계사,.,"2019-03-20 18:04:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10301,"2019-03-20 08:28:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-20 18:42:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-03-20 08:29:00",19-시공-02,b.시공,공사관리,"2019-03-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J16202,"2019-03-20 08:30:00",18-교영-01,c.설계사,신규사업현황조사,"2019-03-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J15202,"2019-03-20 08:34:00",18-설계-12,c.도면,"진위천교 교량계획 검토","2019-03-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.155,NULL,NULL,008E1,,,
|
|
J15201,"2019-03-20 08:35:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-03-20 18:04:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11203,"2019-03-20 08:35:00",17-설계-09,h.기타,"설계사요청 2@50 H=2.5M 구조검토","2019-03-20 18:06:00",17-설계-09,h.기타,"설계사요청 2@50 H=2.5M 구조검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"16-설계-18<|>h.기타<|>광시생태육교 설계사 발송<|>00:30<|><br>18-교영-11<|>d.기타<|>접속교 3@55 모델링 기본적인것 세팅<|>03:00<|><br>",,
|
|
J10313,"2019-03-20 08:36:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-20 18:00:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18204,"2019-03-20 08:37:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","2019-03-20 18:05:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J09101,"2019-03-20 08:46:00",19-교영-01,c.설계사,과업조사,"2019-03-20 10:19:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J07202,"2019-03-20 13:35:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블럭 제작과 거더 거푸집 보수","2019-03-21 06:38:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블럭 제작과 거더 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14101,"2019-03-20 08:50:00",16-시공-20,출장,한양,"2019-03-20 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-03-20 08:50:00",17-시공-07,출장,두산중공업,"2019-03-20 18:00:00",17-시공-07,출장,두산중공업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-03-21 06:39:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블럭 제작과 거더 거푸집 보수","2019-03-22 07:29:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블럭 제작과 거더 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-03-21 06:48:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
M05510,"2019-03-21 07:18:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.28.165,NULL,NULL,004C8,,,
|
|
J11302,"2019-03-21 07:19:00",17-시공-07,g.기타,"삼남1교 가설검토 및 원흥2교 인장계획서 작성
|
|
","2019-03-21 18:09:00",17-시공-07,g.기타,"삼남1교 가설검토 및 원흥2교 인장계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
T04204,"2019-03-21 07:26:00",16-제조-02,a.생산관리,"북수원1교,한포1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-03-21 07:27:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-21 22:24:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-21 18:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J18208,"2019-03-21 07:28:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-21 22:25:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-21 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-03-21 07:29:00",19-제조-02,a.생산관리,"Pre-Deck Shop Dwg. ","2019-03-21 18:54:00",19-제조-02,a.생산관리,"Pre-Deck Shop Dwg. ","2019-03-21 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>이은재 기사 면담<|>02:00<|><br>19-제조-02<|>a.생산관리<|>윤승근 기사/석길원기사 면담<|>03:00<|><br>",1,
|
|
J13308,"2019-03-21 07:35:00",18-시공-15,b.시공,"1. 시공계획서 작성(삼남1교)
|
|
2. 철근소요량 신청서 작성(북수원2교)","2019-03-21 18:04:00",18-시공-15,b.시공,"1. 시공계획서 작성(삼남1교)
|
|
2. 철근소요량 신청서 작성(북수원2교)","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J16203,"2019-03-21 08:20:00",19-제조-03,a.품질검사,"데크생산 및 품질관리","2019-03-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18202,"2019-03-21 07:41:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 견적","2019-03-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J18207,"2019-03-21 07:42:00",17-시공-21,b.시공,시공방법검토,"2019-03-21 18:02:00",17-시공-21,b.시공,시공방법검토,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-03-21 07:49:00",19-계약-01,b.시공사,"남일~보은 예상 계약가, 영업활동 협약서 보완, 시화MTV 접속교 시행가 등 : 조안대교 외 6개교 계약 추진 중","2019-03-21 18:02:00",19-계약-01,b.시공사,"남일~보은 예상 계약가, 영업활동 협약서 보완, 시화MTV 접속교 시행가 등 : 조안대교 외 6개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
B15306,"2019-03-21 08:01:00",18-관리-02,e.기타,"비서업무 외","2019-03-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-03-21 08:05:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-21 18:09:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J10310,"2019-03-21 08:05:00",17-시공-21,b.시공,"가로보.프리캐스트 시공 준비작업 및 안전서류 작성","2019-03-21 18:01:00",17-시공-21,b.시공,"가로보.프리캐스트 시공 준비작업 및 안전서류 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,004C8,,,
|
|
J11305,"2019-03-21 08:09:00",17-시공-21,g.기타,"방음터널 설치 검토","2019-03-21 18:01:00",17-시공-21,g.기타,"방음터널 설치 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-03-21 08:10:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적
|
|
2. 대구외곽2 특정공법심의 견적
|
|
3. 세천2교 데크, 가로보 공급원승인서 준비","2019-03-21 18:09:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적
|
|
2. 대구외곽2 특정공법심의 견적
|
|
3. 세천2교 데크, 가로보 공급원승인서 준비","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J10314,"2019-03-21 08:10:00",14-교영-00,d.기타,"곡천교 세종-포천(안성-성남) 2공구 시행견적서, 석현천교외 1개소(충청내륙고속화 1-1공구) 시행견적서, 명덕교외 4개소(포항~안동 2공구) 시행견적서, 장절2교외 3개소(광명~서울) 시행견적서, 갈산교외 17개소(서부내륙고속도로)설계내역서수정, 접속교 거더(송산그린시티~시화멀티테크노밸리) 시행가산출근거, 삼남1교 (밀양~울산 7공구) 공사비 검토자료, 거더공사비 검토","2019-03-21 18:09:00",14-교영-00,d.기타,"곡천교 세종-포천(안성-성남) 2공구 시행견적서, 석현천교외 1개소(충청내륙고속화 1-1공구) 시행견적서, 명덕교외 4개소(포항~안동 2공구) 시행견적서, 장절2교외 3개소(광명~서울) 시행견적서, 갈산교외 17개소(서부내륙고속도로)설계내역서수정, 접속교 거더(송산그린시티~시화멀티테크노밸리) 시행가산출근거, 삼남1교 (밀양~울산 7공구) 공사비 검토자료, 거더 거더공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18205,"2019-03-21 08:18:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-21 21:35:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-21 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J08201,"2019-03-21 08:19:00",19-설계-02,b.구조계산,"계획 조정","2019-03-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J18204,"2019-03-21 08:22:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","2019-03-21 18:08:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J14306,"2019-03-21 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-21 18:11:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J10301,"2019-03-21 08:24:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-21 18:22:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-03-21 08:24:00",19-시공-02,b.시공,공사관리,"2019-03-21 18:11:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07103,"2019-03-21 08:26:00",19-교영-01,d.기타,사업관리,"2019-03-21 18:04:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J17205,"2019-03-21 08:27:00",18-교영-01,c.설계사,.,"2019-03-21 18:08:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-03-21 08:28:00",16-시공-20,g.기타,"당초 변경","2019-03-21 20:42:00",16-시공-20,g.기타,"당초 변경","2019-03-21 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J11203,"2019-03-21 08:34:00",18-교영-11,d.기타,"모델링 3@55 기본적인것 세팅","2019-03-21 20:44:00",18-교영-11,d.기타,"모델링 3@55","2019-03-21 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"17-시공-21<|>g.기타<|>광교1,2,3교 설계도서 검토, 정리<|>01:30<|><br>",1,
|
|
J15201,"2019-03-21 08:36:00",19-교영-04,c.설계사,"과업진행현황 파악","2019-03-21 18:01:00",19-교영-04,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J13201,"2019-03-21 08:40:00",18-교영-11,c.설계사,"송산-시화 빔배치","2019-03-21 20:31:00",18-교영-11,c.설계사,"송산-시화 빔배치","2019-03-21 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,,1,
|
|
J15202,"2019-03-21 08:41:00",18-설계-12,c.도면,"진위천교 교량계획 검토","2019-03-21 18:18:18",18-설계-12,c.도면,NULL,"2019-03-21 18:30:00",172.16.9.155,172.16.9.155,NULL,008E1,,1,
|
|
J10313,"2019-03-21 08:45:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J14101,"2019-03-21 08:50:00",16-시공-20,출장,한양,"2019-03-21 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J16202,"2019-03-21 08:50:00",19-교영-01,출장,"[광주시청]신기술 전시회(광주시청)","2019-03-21 18:00:00",19-교영-01,출장,"[광주시청]신기술 전시회(광주시청)","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J09101,"2019-03-21 08:50:00",19-교영-01,출장,"[광주시청]신기술 전시회(광주시청)","2019-03-21 18:00:00",19-교영-01,출장,"[광주시청]신기술 전시회(광주시청)","0000-00-00 00:00:00",NULL,NULL,NULL,008C7,,,
|
|
J12202,"2019-03-22 06:47:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-22 18:42:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J11302,"2019-03-22 07:16:00",17-시공-07,g.기타,"삼남1교 가설검토 및 원흥2교 인장계획서 작성
|
|
","2019-03-22 18:08:00",17-시공-07,g.기타,"삼남1교 가설검토 및 원흥2교 인장계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
T04204,"2019-03-22 07:25:00",16-제조-02,a.생산관리,"삼간교,북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-22 22:19:00",16-제조-02,a.생산관리,"삼간교,북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-03-22 07:27:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.33.46,NULL,NULL,004C8,,,
|
|
J16203,"2019-03-22 08:20:00",19-제조-03,a.품질검사,"데크생산 및 품질관리","2019-03-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18208,"2019-03-22 07:29:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J07202,"2019-03-22 07:30:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블럭 제작과 거더 거푸집 보수","2019-03-23 06:43:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블럭 제작과 거더 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-03-22 07:33:00",19-제조-02,a.생산관리,"기술인 교육관련 행사 준비","2019-03-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,"19-제조-02<|>a.생산관리<|>기술인 교육 준비<|>03:00<|><br>19-제조-02<|>a.생산관리<|>1헤드 절곡기 사용 철근 파악<|>03:00<|><br>",1,
|
|
J13308,"2019-03-22 07:36:00",18-시공-15,b.시공,"1. 시공계획서 작성(삼남1교)
|
|
2. 철근소요량 신청서 작성(북수원2교)","2019-03-22 17:30:00",18-시공-15,b.시공,"1. 시공계획서 작성(삼남1교)
|
|
2. 철근소요량 신청서 작성(북수원2교)","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J14308,"2019-03-22 07:39:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-22 22:29:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-22 19:27:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J09102,"2019-03-22 07:56:00",19-계약-01,b.시공사,"광명~서울, 포항~안동 예상 계약가, 시화MTV 접속교 시행가 등 : 조안대교 외 6개교 계약 추진 중","2019-03-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J15307,"2019-03-22 08:05:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적
|
|
","2019-03-22 18:15:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적
|
|
","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18206,"2019-03-22 08:10:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-22 18:15:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
B15306,"2019-03-22 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-03-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11203,"2019-03-22 08:17:00",18-교영-11,d.기타,"시점부 BR1 13본 모델링 3@55 반력산출","2019-03-22 18:05:00",18-교영-11,d.기타,"모델링 3@55","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J18205,"2019-03-22 08:18:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-22 18:12:00",19-설계-01,b.구조계산,"구조계산서 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J08201,"2019-03-22 08:18:00",19-설계-02,b.구조계산,"계획 조정","2019-03-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J10314,"2019-03-22 08:19:00",14-교영-00,d.기타,"명덕교외 4개소(포항~안동 2공구) 시행견적서, 장절2교외 3개소(광명~서울) 시행견적서, 곡천교 세종-포천(안성-성남) 2공구 시행견적서, 갈산교외 17개소(서부내륙고속도로)설계내역서수정, 접속교 거더(송산그린시티~시화멀티테크노밸리) 시행가산출근거, 삼남1교 (밀양~울산 7공구) 공사비 검토자료, 거더공사비 검토","2019-03-22 18:16:00",14-교영-00,d.기타,"명덕교외 4개소(포항~안동 2공구) 시행견적서, 장절2교외 3개소(광명~서울) 시행견적서, 곡천교 세종-포천(안성-성남) 2공구 시행견적서, 갈산교외 17개소(서부내륙고속도로)설계내역서수정, 접속교 거더(송산그린시티~시화멀티테크노밸리) 시행가산출근거, 삼남1교 (밀양~울산 7공구) 공사비 검토자료, 거더 거더공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J13201,"2019-03-22 08:19:00",18-교영-11,c.설계사,"송산-시화 빔배치","2019-03-22 18:13:00",18-교영-11,c.설계사,"송산-시화 빔배치","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J07103,"2019-03-22 08:20:00",19-교영-01,d.기타,사업관리,"2019-03-22 18:09:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10315,"2019-03-22 08:21:00",15-시공-14,b.시공,"동용교 가설검토(기 가설교량 츄레라 이동 적정성 검토)","2019-03-22 18:16:00",15-시공-14,b.시공,"동용교 가설검토(기 가설교량 츄레라 이동 적정성 검토)","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J17205,"2019-03-22 08:26:00",18-교영-01,c.설계사,.,"2019-03-22 18:26:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J14306,"2019-03-22 08:28:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E5,,,
|
|
J11202,"2019-03-22 08:29:00",19-시공-02,b.시공,공사관리,"2019-03-22 18:04:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-03-22 08:32:00",18-교영-11,b.시공사,구조계산,"2019-03-22 18:05:00",18-교영-11,b.시공사,구조계산,"0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"18-설계-12<|>a.계획 및 협의<|>진위천교 교량계획<|>02:00<|><br>",,
|
|
J16202,"2019-03-22 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-03-22 18:49:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J18204,"2019-03-22 08:36:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","2019-03-22 18:04:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J10313,"2019-03-22 08:36:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J18202,"2019-03-22 08:37:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 견적","2019-03-22 18:02:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J07210,"2019-03-22 08:37:00",16-시공-20,g.기타,"당초 변경","2019-03-22 18:04:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J11305,"2019-03-22 08:39:00",17-시공-21,g.기타,"방음터널 설치 검토","2019-03-22 18:07:00",17-시공-21,g.기타,"방음터널 설치 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J09101,"2019-03-22 08:46:00",19-교영-01,c.설계사,과업조사,"2019-03-22 18:15:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15201,"2019-03-22 08:30:00",19-교영-04,c.설계사,"과업진행현황 파악","2019-03-22 18:19:00",19-교영-04,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14101,"2019-03-22 08:50:00",16-시공-20,출장,한양,"2019-03-22 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-03-23 06:44:00",19-제조-04,b.기계,"거더 거푸집 보수와 원흥2교 주두부 받침 블럭 제작","2019-03-23 13:19:00",19-제조-04,b.기계,"거더 거푸집 보수와 원흥2교 주두부 받침 블럭 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-03-23 07:03:00",19-제조-02,a.생산관리,"기술인 교육관련 행사 준비","2019-03-23 16:07:00",19-제조-02,a.생산관리,"bom 표준화","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>1헤드 절곡기 사용 철근 파악 <|>05:00<|><br>",1,
|
|
M05510,"2019-03-23 07:26:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-24 07:50:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.29.196,NULL,223.38.30.114,004C8,,,
|
|
T04204,"2019-03-23 07:27:00",16-제조-02,a.생산관리,"삼간교,북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-23 16:07:00",16-제조-02,a.생산관리,"삼간교,북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
J14308,"2019-03-23 07:39:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-23 16:05:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,1,
|
|
J16203,"2019-03-23 07:40:00",19-제조-03,a.품질검사,"수원교, 단장천2교 출하
|
|
산외교데크, 켄틸생산 및 품질관리
|
|
","2019-03-23 16:06:00",19-제조-03,a.품질검사,"수원교, 단장천2교 출하
|
|
산외교데크, 켄틸생산 및 품질관리
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
J10313,"2019-03-23 08:09:00",16-제조-01,b.총무,"기술인 교육관련 준비","2019-03-23 15:16:00",16-제조-01,b.총무,"기술인 교육관련 준비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,1,
|
|
M05510,"2019-03-24 07:51:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-25 07:28:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.30.114,NULL,223.38.30.199,004C8,,,
|
|
J11302,"2019-03-25 07:02:00",17-시공-07,g.기타,"삼남1교 가설검토 및 원흥2교 인장계획서 작성
|
|
","2019-03-25 18:10:00",17-시공-07,g.기타,"삼남1교 가설검토 및 원흥2교 인장계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J07202,"2019-03-25 07:08:00",19-제조-04,b.기계,"한포제2교 거더 거푸집 보수와 원흥2교 주두부 받침 블록 제작","2019-03-26 06:42:00",19-제조-04,b.기계,"한포제2교 거더 거푸집 보수와 원흥2교 주두부 받침 블록 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-03-25 07:11:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-25 20:24:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등","2019-03-25 18:45:00",172.16.9.156,172.16.9.156,172.16.9.156,004E1,,1,
|
|
T04204,"2019-03-25 07:27:00",16-제조-02,a.생산관리,"삼간교,북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M05510,"2019-03-25 07:28:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-26 07:16:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.30.199,NULL,223.38.29.81,004C8,,,
|
|
M02302,"2019-03-25 07:29:00",19-제조-02,a.생산관리,"평택동부 거더 관련 제작 검토","2019-03-25 18:00:00",19-제조-02,a.생산관리,"평택동부 거더 관련 제작 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-03-25 07:29:00",18-시공-15,b.시공,"1. 시화 MTV 예정공정표 작성
|
|
2. W.Dr 거더 동영상제작","2019-03-25 18:10:00",18-시공-15,b.시공,"1. 시화 MTV 예정공정표 작성
|
|
2. W.Dr 거더 동영상제작","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J14308,"2019-03-25 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-25 22:07:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-25 18:37:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
J16203,"2019-03-25 07:37:00",19-제조-03,a.품질검사," 단장천2교 출하
|
|
산외교 데크, 켄틸생산 및 품질관리
|
|
","2019-03-25 21:00:00",19-제조-03,a.품질검사," 단장천2교 출하
|
|
산외교 데크, 켄틸생산 및 품질관리
|
|
","2019-03-25 18:38:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-03-25 07:45:00",19-계약-01,b.시공사,"광명~서울, 포항~안동 예상 계약가, 시화MTV 접속교 시행가 등 : 조안대교 외 6개교 계약 추진 중","2019-03-25 18:12:00",19-계약-01,b.시공사,"광명~서울, 포항~안동 예상 계약가, 시화MTV 접속교 시행가 등 : 조안대교 외 6개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J18202,"2019-03-25 07:53:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 견적","2019-03-25 18:09:00",07-교영-01,b.시공사,"구미산단 진입도로 1공구 롯데건설 괴평교 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J10315,"2019-03-25 08:00:00",17-시공-09,b.시공,"삼남1교 제작 및 가설 협의자료 작성","2019-03-25 18:02:00",17-시공-09,b.시공,"삼남1교 제작 및 가설 협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18207,"2019-03-25 08:07:00",17-시공-21,b.시공,시공방법검토,"2019-03-25 18:07:00",17-시공-21,b.시공,시공방법검토,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J15307,"2019-03-25 08:10:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적
|
|
","2019-03-25 18:04:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적
|
|
","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J08201,"2019-03-25 08:11:00",19-설계-02,b.구조계산,"계획 조정","2019-03-25 18:29:00",19-설계-02,b.구조계산,"계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-03-25 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-03-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-03-25 08:18:00",19-교영-01,d.기타,사업관리,"2019-03-25 18:22:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10314,"2019-03-25 08:20:00",14-교영-00,d.기타,"접속교 거더(송산그린시티~시화멀티테크노밸리) 시행가산출근거, 갈산교외 17개소(서부내륙고속도로)설계내역서수정, 명덕교외 4개소(포항~안동 2공구) 시행가 협의 및 검토자료, 곡천교 세종-포천(안성-성남) 2공구 시행견적서, 삼남1교 (밀양~울산 7공구) 공사비 검토자료, 거더 개략공사비 검토","2019-03-25 18:11:00",14-교영-00,d.기타,"갈산교외 17개소(서부내륙고속도로)설계내역서수정, 접속교 거더(송산그린시티~시화멀티테크노밸리) 시행가산출근거, 명덕교외 4개소(포항~안동 2공구) 시행가 협의 및 검토자료, 곡천교 세종-포천(안성-성남) 2공구 시행견적서, 삼남1교 (밀양~울산 7공구) 공사비 검토자료, 거더 개략공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J13201,"2019-03-25 08:23:00",18-교영-11,c.설계사,"송산-시화 빔배치도 작성","2019-03-25 21:07:00",18-교영-11,c.설계사,"송산-시화 빔배치도 작성","2019-03-25 18:31:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,,1,
|
|
J14306,"2019-03-25 08:27:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-25 18:18:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J10301,"2019-03-25 08:28:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-25 20:20:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-25 18:44:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J11202,"2019-03-25 08:31:00",19-시공-02,b.시공,공사관리,"2019-03-25 18:18:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J17205,"2019-03-25 08:31:00",18-교영-01,c.설계사,.,"2019-03-25 18:25:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11203,"2019-03-25 08:32:00",18-교영-11,d.기타,"시점부 BR2 분리, 종점부 BR1 분리 모델링 3@55 반력산출","2019-03-25 18:01:00",18-교영-11,d.기타,"시점부 BR2 분리, 종점부 BR1 분리 모델링 3@55 반력산출","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-설계-04<|>e.검토<|>감리단(상주, 비상주)검토의견서 답변작성<|>03:00<|><br>",,
|
|
J11305,"2019-03-25 08:35:00",17-시공-21,g.기타,"방음터널 설치 검토","2019-03-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J18204,"2019-03-25 08:35:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","2019-03-25 18:05:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J07210,"2019-03-25 08:36:00",16-시공-20,g.기타,"당초 변경","2019-03-25 18:04:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J10313,"2019-03-25 08:40:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J16203,"2019-03-19 08:20:00",19-제조-03,a.품질검사,"데크생산 및 품질관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J09101,"2019-03-25 08:48:00",19-교영-01,c.설계사,과업조사,"2019-03-25 18:14:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J16202,"2019-03-25 08:50:00",19-교영-01,c.설계사,신규사업현황조사,"2019-03-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J15202,"2019-03-25 08:52:00",18-교영-11,b.시공사,구조계산,"2019-03-25 22:08:00",18-교영-11,b.시공사,구조계산,"2019-03-25 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"16-설계-02<|>e.검토<|>방음벽 변경 성과품 작성<|>03:00<|><br>",1,
|
|
J18206,"2019-03-25 08:30:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-25 18:19:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J18208,"2019-03-25 07:40:00",19-제조-02,a.생산관리,"생산관리 및 세천2교 Shop DWG","2019-03-25 21:07:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-25 18:57:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14101,"2019-03-25 08:50:00",16-시공-20,출장,한양,"2019-03-25 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J15201,"2019-03-25 08:50:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","2019-03-25 18:00:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J07202,"2019-03-26 06:42:00",19-제조-04,b.기계,"한포제2교 거더 거푸집 보수와 원흥2교 주두부 받침 블록 제작","2019-03-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J11302,"2019-03-26 07:12:00",17-시공-07,g.기타,"원흥2교 인장계획서 작성
|
|
동용교 시험인장계획서 작성
|
|
","2019-03-26 18:18:00",17-시공-07,g.기타,"원흥2교 인장계획서 작성
|
|
동용교 시험인장계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
M05510,"2019-03-26 07:17:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-27 07:23:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.29.81,NULL,223.38.29.114,004C8,,,
|
|
T04204,"2019-03-26 07:22:00",16-제조-02,a.생산관리,"삼간교,북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-03-26 07:29:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
J18208,"2019-03-26 07:30:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-26 18:28:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-03-26 07:30:00",19-제조-03,a.품질검사," 단장천2교 출하
|
|
산외교 데크, 켄틸생산 및 품질관리
|
|
","2019-03-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18207,"2019-03-26 07:52:00",17-시공-21,b.시공,시공방법검토,"2019-03-26 18:14:00",17-시공-21,b.시공,시공방법검토,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-03-26 08:01:00",14-설계-38,"a.계획 및 협의","수리티교 가설검토 및 협의자료 작성
|
|
","2019-03-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J18206,"2019-03-26 08:03:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","2019-03-27 09:33:00",16-시공-20,b.시공,"산외교 / 새만금전주 실행 검토","0000-00-00 00:00:00",172.16.9.146,NULL,172.16.9.146,001C5,,,
|
|
J15307,"2019-03-26 08:05:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적
|
|
2. 신림~판부2 실시설계 견적
|
|
3. 학봉~공암 특정공법심의","2019-03-26 18:04:00",19-교영-01,d.기타,"1. 세종~안성 실시설계 견적
|
|
2. 신림~판부2 실시설계 견적
|
|
3. 학봉~공암 특정공법심의","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J11305,"2019-03-26 08:11:00",17-시공-21,g.기타,"방음터널 설치 검토","2019-03-26 18:23:00",17-시공-21,g.기타,"방음터널 설치 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-03-26 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-03-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-03-26 08:15:00",19-설계-02,b.구조계산,"계획 조정","2019-03-26 19:35:00",19-설계-02,b.구조계산,"계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J14306,"2019-03-26 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-26 18:12:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J10301,"2019-03-26 08:24:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-26 18:43:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J18205,"2019-03-26 08:24:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-26 20:45:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-26 18:32:00",1.233.130.3,172.16.9.155,1.233.130.3,008E2,,1,
|
|
J13201,"2019-03-26 08:25:00",18-교영-11,c.설계사,"송산-시화 빔배치도 작성","2019-03-26 20:45:00",18-교영-11,c.설계사,"송산-시화 빔배치도 작성","2019-03-26 18:32:00",172.16.9.165,172.16.9.155,172.16.9.165,008E3,,1,
|
|
J07103,"2019-03-26 08:26:00",19-교영-01,d.기타,사업관리,"2019-03-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
J07210,"2019-03-26 08:28:00",16-시공-20,g.기타,"당초 변경","2019-03-26 20:49:00",16-시공-20,g.기타,"당초 변경","2019-03-26 18:31:00",172.16.9.162,172.16.9.155,172.16.9.162,008E2,,1,
|
|
J11202,"2019-03-26 08:30:00",19-시공-02,b.시공,공사관리,"2019-03-26 18:15:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J17205,"2019-03-26 08:33:00",18-교영-01,c.설계사,.,"2019-03-26 21:51:00",18-교영-01,c.설계사,.,"2019-03-26 18:50:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J18204,"2019-03-26 08:33:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","2019-03-26 18:07:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J11203,"2019-03-26 08:33:00",18-교영-11,d.기타,"3@55 3개교 요약계산서작성","2019-03-26 20:42:00",18-교영-11,d.기타,"3@55 3개교 요약계산서작성","2019-03-26 18:33:00",172.16.9.160,172.16.9.155,172.16.9.160,008E1,,1,
|
|
J15202,"2019-03-26 08:38:00",18-교영-11,b.시공사,구조계산,"2019-03-26 20:43:00",18-교영-11,b.시공사,구조계산,"2019-03-26 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10313,"2019-03-26 08:39:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J09101,"2019-03-26 08:41:00",19-교영-01,c.설계사,과업조사,"2019-03-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-03-26 08:50:00",16-시공-20,출장,한양,"2019-03-26 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J09102,"2019-03-26 08:50:00",19-계약-01,출장,대림산업,"2019-03-26 18:00:00",19-계약-01,출장,대림산업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J16202,"2019-03-26 08:50:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","2019-03-26 18:00:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J15201,"2019-03-26 08:50:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","2019-03-26 18:00:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J12202,"2019-03-26 08:50:00",17-시공-08,출장,"[충남 서산]런처 신규제작 공장검수 및 구조계산","2019-03-26 18:00:00",17-시공-08,출장,"[충남 서산]런처 신규제작 공장검수 및 구조계산","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18202,"2019-03-26 08:50:00",19-교휴-06,출장,"[산외교 외]현장정기점검","2019-03-26 18:00:00",19-교휴-06,출장,"[산외교 외]현장정기점검","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J13308,"2019-03-26 08:50:00",19-교휴-06,출장,"[산외교 외]현장정기점검","2019-03-26 18:00:00",19-교휴-06,출장,"[산외교 외]현장정기점검","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J11302,"2019-03-27 07:12:00",17-시공-07,g.기타,"후정철육교 2차인장결과서 작성
|
|
북수원1교 예정공정표 작성
|
|
안성~세종 제작장 사이즈 검토
|
|
동용교 시험인장계획서 작성
|
|
","2019-03-27 18:04:00",17-시공-07,g.기타,"후정철육교 2차인장결과서 작성
|
|
북수원1교 예정공정표 작성
|
|
안성~세종 제작장 사이즈 검토
|
|
동용교 시험인장계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
T04204,"2019-03-27 07:22:00",16-제조-02,a.생산관리,"성주대교(주두부),삼간교,북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M05510,"2019-03-27 07:23:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-28 07:04:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.29.114,NULL,223.38.29.53,004C8,,,
|
|
M02302,"2019-03-27 07:31:00",19-제조-02,a.생산관리,"평택동부 거더 관련 제작 검토","2019-03-27 18:01:00",19-제조-02,a.생산관리,"평택동부 거더 관련 제작 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-03-27 07:32:00",17-시공-10,b.시공,"주두부시공 및 균열보수수 관리","2019-03-27 18:06:00",17-시공-10,b.시공,"주두부시공 및 균열보수수 관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18208,"2019-03-27 07:34:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","2019-03-27 18:00:00",16-제조-02,a.생산관리,"생산관리 및 옥산교 Pre-Deck Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J14308,"2019-03-27 07:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-27 18:00:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J16203,"2019-03-27 07:37:00",19-제조-03,a.품질검사,"산외교 데크, 켄틸생산 및 품질관리
|
|
","2019-03-27 22:40:00",19-제조-03,a.품질검사,"산외교 데크, 켄틸생산 및 품질관리
|
|
","2019-03-27 18:51:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-03-27 07:41:00",19-계약-01,b.시공사,"광명~서울 1공구 포스코본사 방문 예정, 시화MTV 예상 시행가 등 : 조안대교 외 5개교 계약 추진 중","2019-03-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-03-27 07:51:00",17-시공-21,b.시공,"북수원1교 제작 및 가설 협의
|
|
","2019-03-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J08201,"2019-03-27 08:09:00",19-설계-02,b.구조계산,"계획 조정","2019-03-27 20:56:00",19-설계-02,b.구조계산,"계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-03-27 08:11:00",14-교영-00,d.기타,"삼남1교 (밀양~울산 7공구) 시행견적서 및 투입단가산출서, 생태이동통로(학봉~공암) 설계견적서, 갈산교외 17개소(서부내륙고속도로)설계내역서수정, 접속교 거더(송산그린시티~시화멀티테크노밸리) 시행가산출근거","2019-03-27 18:11:00",14-교영-00,d.기타,"삼남1교 (밀양~울산 7공구) 시행견적서 및 투입단가산출서, 생태이동통로(학봉~공암) 설계견적서, 갈산교외 17개소(서부내륙고속도로)설계내역서수정, 접속교 거더(송산그린시티~시화멀티테크노밸리) 시행가산출근거","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18205,"2019-03-27 08:20:00",19-설계-01,b.구조계산,"견적요청에 대한 수량산출(온천교)","2019-03-27 21:33:00",19-설계-01,b.구조계산,"구조계산서 작성","2019-03-27 18:33:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J14306,"2019-03-27 08:20:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E5,,,
|
|
J13201,"2019-03-27 08:21:00",13-설계-26,b.구조계산,"지정천교 방음벽기초 변경 검토","2019-03-27 21:35:00",18-교영-11,c.설계사,"송산-시화 빔배치도 작성","2019-03-27 18:37:00",172.16.9.165,172.16.9.165,172.16.9.165,008E3,,1,
|
|
J07103,"2019-03-27 08:22:00",19-교영-01,d.기타,사업관리,"2019-03-27 18:07:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-03-27 08:24:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-27 18:21:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-03-27 08:28:00",19-시공-02,b.시공,공사관리,"2019-03-27 18:06:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-03-27 08:29:00",18-교영-11,b.시공사,구조계산,"2019-03-27 20:49:00",18-교영-11,b.시공사,구조계산,"2019-03-27 18:38:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J17205,"2019-03-27 08:32:00",18-교영-01,c.설계사,.,"2019-03-27 21:51:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18204,"2019-03-27 08:32:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","2019-03-27 18:05:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J11203,"2019-03-27 08:34:00",17-설계-04,h.기타," 감리검토사항:e-beam구간 상부 슬래브 종방향철근 수정","2019-03-27 18:02:00",17-설계-04,h.기타," 감리검토사항:e-beam구간 상부 슬래브 종방향철근 수정","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>c.도면<|>DR거더(크레인) 가설도 정리 발송 도림, 승천, rR-D, R-F1<|>03:00<|><br>18-교영-11<|>d.기타<|>거더수량 단가팀에 발송, 성과품 정리<|>00:30<|><br>17-설계-05<|>h.기타<|>시공사요청: 신축이음 블럭아웃 통일요청<|>02:00<|><br>",,
|
|
J07210,"2019-03-27 08:36:00",16-시공-20,g.기타,"당초 변경","2019-03-27 20:47:00",16-시공-20,g.기타,"당초 변경","2019-03-27 18:38:00",172.16.9.162,172.16.9.162,172.16.9.162,008E2,,1,
|
|
J10313,"2019-03-27 08:40:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-27 18:00:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-03-27 08:55:00",19-교영-01,c.설계사,과업조사,"2019-03-27 20:56:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
B15306,"2019-03-27 08:10:00",18-관리-02,e.기타,"비서업무 외","2019-03-27 18:18:18",NULL,NULL,"비서업무 외","0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-03-27 08:30:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","2019-03-27 18:18:18",NULL,NULL,"새만금전주 시행계획 검토 / 성주대교 업무","0000-00-00 00:00:00",172.16.9.146,NULL,NULL,001C5,,,
|
|
J11305,"2019-03-27 08:50:00",18-교영-30,출장,수원,"2019-03-27 18:19:00",17-시공-21,g.기타,"방음터널 설치 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-03-27 08:50:00",18-설계-05,출장,"[LH 동탄사업본부]기술사용협약 관련 회의 참석","2019-03-27 18:08:00",19-교영-01,d.기타,"1. 신림~판부2 실시설계 견적
|
|
2. 학봉~공암 특정공법심의","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J14101,"2019-03-27 08:50:00",16-시공-20,출장,한양,"2019-03-27 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J16202,"2019-03-27 08:50:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","2019-03-27 18:00:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J15201,"2019-03-27 08:50:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","2019-03-27 18:00:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J12202,"2019-03-27 08:50:00",17-시공-08,출장,"[충남 서산]런처 신규제작 공장검수 및 구조계산","2019-03-27 18:00:00",17-시공-08,출장,"[충남 서산]런처 신규제작 공장검수 및 구조계산","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18202,"2019-03-27 08:50:00",19-교휴-06,출장,"[산외교 외]현장정기점검","2019-03-27 18:00:00",19-교휴-06,출장,"[산외교 외]현장정기점검","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J13308,"2019-03-27 08:50:00",19-교휴-06,출장,"[산외교 외]현장정기점검","2019-03-27 18:00:00",19-교휴-06,출장,"[산외교 외]현장정기점검","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J07202,"2019-03-28 06:22:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블록 제작과 거푸집 보수","2019-03-29 07:27:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블록 제작과 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-03-28 07:05:00",17-시공-07,g.기타,"북수원1교 예정공정표 작성
|
|
안성~세종 제작장 사이즈 검토
|
|
동용교 시험인장계획서 작성
|
|
","2019-03-28 18:11:00",17-시공-07,g.기타,"북수원1교 예정공정표 작성
|
|
안성~세종 제작장 사이즈 검토
|
|
동용교 시험인장계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
M05510,"2019-03-28 07:05:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-29 08:42:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.29.53,NULL,223.38.30.84,004C8,,,
|
|
T04204,"2019-03-28 07:19:00",16-제조-02,a.생산관리,"성주대교(주두부),삼간교,북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-28 19:56:00",16-제조-02,a.생산관리,"성주대교(주두부),삼간교,북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-03-28 07:26:00",16-제조-02,a.생산관리,"생산관리 및 세천2교 Cross Beam Shop DWG","2019-03-28 22:05:00",16-제조-02,a.생산관리,"생산관리 및 세천2교 Cross Beam Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J18207,"2019-03-28 07:27:00",17-시공-10,b.시공,"주두부시공 및 균열보수 관리","2019-03-28 18:23:00",17-시공-10,b.시공,"주두부시공 및 균열보수 관리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-03-28 07:29:00",19-시공-04,b.시공,"1. 현장점검 보고서 작성
|
|
2. 시화 MTV 예정공정표 작성
|
|
3. 가산2교 시공상세변경 및 도면검토","2019-03-28 18:24:00",19-시공-04,b.시공,"1. 현장점검 보고서 작성
|
|
2. 시화 MTV 예정공정표 작성
|
|
3. 가산2교 시공상세변경 및 도면검토","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E4,,,
|
|
J18202,"2019-03-28 07:34:00",07-교영-01,b.시공사,"구미산업단지 진입도로 괴평교 견적","2019-03-28 18:13:00",07-교영-01,b.시공사,"구미산업단지 진입도로 괴평교 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J16203,"2019-03-28 07:39:00",19-제조-03,a.품질검사,"광교1교, 광교3교 가로보 데크
|
|
산외교 데크, 켄틸생산 및 품질관리
|
|
","2019-03-28 22:16:00",19-제조-03,a.품질검사,"광교1교, 광교3교 가로보 데크
|
|
산외교 데크, 켄틸생산 및 품질관리
|
|
","2019-03-28 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J11305,"2019-03-28 07:40:00",19-설계-01,h.기타,계획,"2019-03-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
M02302,"2019-03-28 07:53:00",19-제조-02,a.생산관리,"L동 옹벽 현황 검토","2019-03-28 18:03:00",19-제조-02,a.생산관리,"평택동부 거더 관련 제작 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>L동 옹벽 측량 및 도면 작성<|>04:00<|><br>19-제조-02<|>a.생산관리<|>태양광 시설 관련 회의 (삼안)<|>01:30<|><br>",,
|
|
J10315,"2019-03-28 08:03:00",14-설계-38,"a.계획 및 협의","수리티교 가설협의자료 작성
|
|
","2019-03-28 18:08:00",14-설계-38,"a.계획 및 협의","수리티교 가설협의자료 작성
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J15307,"2019-03-28 08:06:00",19-교영-01,d.기타,"1. 입장~진천 특정공법심의 견적
|
|
2. 무심동로~오창IC 실시설계 견적","2019-03-28 18:09:00",19-교영-01,d.기타,"1. 입장~진천 특정공법심의 견적
|
|
2. 무심동로~오창IC 실시설계 견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18206,"2019-03-28 08:07:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","2019-03-28 18:12:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-03-28 08:12:00",14-교영-00,d.기타,"서부내륙고속도로 설계내역서수정, 야노1,2교 (입장~진천) 가설공사비 검토, 삼남1교 (밀양~울산 7공구) 시행견적서 및 투입단가산출서, 접속교 거더(송산그린시티~시화멀티테크노밸리) 시행가산출근거","2019-03-28 18:14:00",14-교영-00,d.기타,"갈산교외 17개소(서부내륙고속도로)설계내역서수정, 야노1,2교 (입장~진천) 가설공사비 검토, 삼남1교 (밀양~울산 7공구) 시행견적서 및 투입단가산출서, 접속교 거더(송산그린시티~시화멀티테크노밸리) 시행가산출근거","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14306,"2019-03-28 08:17:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-28 18:20:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J10301,"2019-03-28 08:18:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J11202,"2019-03-28 08:19:00",19-시공-02,b.시공,공사관리,"2019-03-28 18:21:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J08201,"2019-03-28 08:19:00",19-설계-02,b.구조계산,"계획 조정","2019-03-28 18:08:00",19-설계-02,b.구조계산,"계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J07103,"2019-03-28 08:20:00",19-교영-01,d.기타,사업관리,"2019-03-28 17:23:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18205,"2019-03-28 08:21:00",19-설계-01,b.구조계산,"견적요청에 대한 수량산출(학봉~공안)","2019-03-28 18:04:00",19-설계-01,b.구조계산,"견적요청에 대한 수량산출","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J13201,"2019-03-28 08:22:00",13-설계-26,b.구조계산,"지정천교 방음벽기초 변경 검토","2019-03-28 18:08:00",13-설계-26,b.구조계산,"지정천교 방음벽기초 변경 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
B15306,"2019-03-28 08:23:00",18-관리-02,e.기타,"비서업무 외","2019-03-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J09101,"2019-03-28 08:25:00",19-교영-01,c.설계사,과업조사,"2019-03-28 18:27:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15202,"2019-03-28 08:29:00",18-설계-12,b.구조계산,"성과품 정리","2019-03-28 20:38:00",18-설계-12,b.구조계산,"성과품 정리","2019-03-28 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-03-28 08:31:00",16-시공-20,g.기타,"당초 변경","2019-03-28 18:02:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J17205,"2019-03-28 08:32:00",18-교영-01,c.설계사,.,"2019-03-28 18:22:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11203,"2019-03-28 08:34:00",17-설계-04,h.기타," 감리검토사항:e-beam구간 상부 슬래브 종방향철근 수정","2019-03-28 18:01:00",17-설계-04,h.기타," 감리검토사항:e-beam구간 상부 슬래브 종방향철근 수정","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-교영-11<|>d.기타<|>계산서 도면 정리 후 김진부장에게 발송<|>01:00<|><br>19-관리-04<|>g.기타<|>SP거더 개선 자료수집관련 정리<|>04:00<|><br>",,
|
|
J18204,"2019-03-28 08:35:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","2019-03-28 18:05:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J10313,"2019-03-28 08:41:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-03-28 18:02:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14101,"2019-03-28 08:50:00",16-시공-20,출장,한양,"2019-03-28 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J16202,"2019-03-28 08:50:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","2019-03-28 18:00:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J15201,"2019-03-28 08:50:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","2019-03-28 18:00:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J09102,"2019-03-28 08:50:00",19-영업-01,출장,"창원 지사","2019-03-28 18:00:00",19-영업-01,출장,"창원 지사","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-03-28 08:50:00",17-시공-08,출장,"[충남 서산]런처 신규제작 공장검수 및 구조계산","2019-03-28 18:00:00",17-시공-08,출장,"[충남 서산]런처 신규제작 공장검수 및 구조계산","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11302,"2019-03-29 07:00:00",17-시공-07,g.기타,"북수원1교 예정공정표 작성
|
|
안성~세종 제작장 사이즈 검토
|
|
동용교 시험인장계획서 작성
|
|
","2019-03-29 18:11:00",17-시공-07,g.기타,"북수원1교 예정공정표 작성
|
|
안성~세종 제작장 사이즈 검토
|
|
동용교 시험인장계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E3,,,
|
|
J14308,"2019-03-29 07:25:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-29 21:33:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-03-29 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
T04204,"2019-03-29 07:25:00",16-제조-02,a.생산관리,"성주대교(주두부),삼간교,북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-03-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-03-29 07:27:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블록 제작과 거푸집 보수","2019-03-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-03-29 07:27:00",19-제조-02,a.생산관리,"쉬스관 실험 계획 및 도면작성","2019-03-29 17:01:00",19-제조-02,a.생산관리,"평택동부 거더 관련 제작 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>쉬스관 실험 도면작성<|>03:00<|><br>19-제조-02<|>a.생산관리<|>쿨링 타워 사업 검토 및 협의<|>04:00<|><br>",,
|
|
J18208,"2019-03-29 07:35:00",16-제조-02,a.생산관리,"생산관리 및 세천2교 Cross Beam Shop DWG","2019-03-29 18:06:00",16-제조-02,a.생산관리,"생산관리 및 세천2교 Cross Beam Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18202,"2019-03-29 07:35:00",07-교영-01,b.시공사,"구미산업단지 진입도로 괴평교 견적","2019-03-29 18:01:00",07-교영-01,b.시공사,"구미산업단지 진입도로 괴평교 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18207,"2019-03-29 07:35:00",16-시공-20,b.시공,시공관리,"2019-03-29 18:00:00",16-시공-20,b.시공,시공관리,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-03-29 07:39:00",19-제조-03,a.품질검사,"단장천 데크출하
|
|
산외교 데크, 켄틸생산 및 품질관리
|
|
","2019-03-29 20:58:00",19-제조-03,a.품질검사,"단장천 데크출하
|
|
산외교 데크, 켄틸생산 및 품질관리
|
|
","2019-03-29 18:47:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,,
|
|
J09102,"2019-03-29 07:48:00",19-계약-01,d.기타,"송산~시화MTV 대림산업 본사 입찰가 제출, 광명~서울 1공구 예상 시행가 등 : 조안대교 외 5개교 계약 추진 중","2019-03-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
B15306,"2019-03-29 08:07:00",18-관리-02,e.기타,"비서업무 외","2019-03-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-03-29 08:08:00",14-교영-00,d.기타,"야노1,2교 (입장~진천) 설계견적서 및 가설공사비 검토, Pre-Deck(추포~암태, 강교) 설계 및 시행견적서, 갈산교외 17개소(서부내륙고속도로)설계내역서수정, 금곡교)진접~내촌 1공구) 시행가 협의","2019-03-29 18:03:00",14-교영-00,d.기타,"야노1,2교 (입장~진천) 설계견적서 및 가설공사비 검토, Pre-Deck(추포~암태, 강교) 설계 및 시행견적서, 갈산교외 17개소(서부내륙고속도로)설계내역서수정, 금곡교)진접~내촌 1공구) 시행가 협의","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-03-29 08:10:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","2019-03-29 17:03:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-03-29 08:13:00",19-설계-01,h.기타,계획,"2019-03-29 18:04:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J14306,"2019-03-29 08:19:00",19-관리-04,a.계약,"계약, 인사 외","2019-03-29 18:17:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J18205,"2019-03-29 08:19:00",19-설계-01,b.구조계산,"견적요청에 대한 수량산출(야노1,2교)","2019-03-29 18:07:00",19-설계-01,b.구조계산,"견적요청에 대한 수량산출","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J13201,"2019-03-29 08:20:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 구조계산","2019-03-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E3,,,
|
|
J08201,"2019-03-29 08:21:00",19-설계-02,b.구조계산,"계획 조정","2019-03-29 18:02:00",19-설계-02,b.구조계산,"계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10301,"2019-03-29 08:22:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-03-29 18:28:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J17205,"2019-03-29 08:26:00",18-교영-01,c.설계사,.,"2019-03-29 18:22:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-03-29 08:28:00",16-시공-20,g.기타,"당초 변경","2019-03-29 18:07:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J15202,"2019-03-29 08:28:00",18-설계-12,b.구조계산,"성과품 정리","2019-03-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.155,NULL,NULL,008E1,,,
|
|
J11202,"2019-03-29 08:29:00",19-시공-02,b.시공,공사관리,"2019-03-29 18:13:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J11203,"2019-03-29 08:33:00",17-설계-04,h.기타," 감리검토사항:e-beam구간 상부 슬래브 종방향철근 수정","2019-03-29 18:05:00",17-설계-04,h.기타," 감리검토사항:e-beam구간 상부 슬래브 종방향철근 수정","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-설계-04<|>c.도면<|>감리검토사항반영 부모멘트 종방향철근 수정<|>04:00<|><br>",,
|
|
J09101,"2019-03-29 08:34:00",19-교영-01,c.설계사,과업조사,"2019-03-29 18:07:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
M05510,"2019-03-29 08:42:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-03-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.30.84,NULL,NULL,004C8,,,
|
|
J10315,"2019-03-29 08:50:00",18-시공-03,출장,한화건설,"2019-03-29 18:02:00",14-설계-38,"a.계획 및 협의","수리티교 가설협의자료 작성
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J14101,"2019-03-29 08:50:00",16-시공-20,출장,한양,"2019-03-29 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J16202,"2019-03-29 08:50:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","2019-03-29 18:00:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J15201,"2019-03-29 08:50:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","2019-03-29 18:00:00",19-교영-01,출장,"[(충청남도청, 부산시청)]신기술 전시회(충청남도청, 부산시청)","0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J12202,"2019-03-29 08:50:00",17-시공-08,출장,"[충남 서산]런처 신규제작 공장검수 및 구조계산","2019-03-29 18:00:00",17-시공-08,출장,"[충남 서산]런처 신규제작 공장검수 및 구조계산","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J07103,"2019-03-29 08:50:00",16-시공-20,출장,현장사무소,"2019-03-29 18:00:00",16-시공-20,출장,현장사무소,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
M05510,"2019-03-30 07:26:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.29.88,NULL,NULL,004C8,,,
|
|
J07202,"2019-04-01 06:24:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블록 제작과 북수원1교 거푸집 보수","2019-04-02 06:17:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블록 제작과 북수원1교 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-04-01 07:02:00",17-시공-07,g.기타,"동용교 시험인장계획서 작성
|
|
목동교 인장계획서 작성
|
|
성주대교 강봉인장계획서 작성
|
|
","2019-04-01 20:47:00",17-시공-07,g.기타,"동용교 시험인장계획서 작성
|
|
목동교 인장계획서 작성
|
|
성주대교 강봉인장계획서 작성
|
|
","2019-04-01 18:47:00",172.16.9.166,172.16.9.166,172.16.9.166,004E3,,1,
|
|
J14308,"2019-04-01 07:24:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-01 22:06:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-01 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006E3,,1,
|
|
T04204,"2019-04-01 07:27:00",16-제조-02,a.생산관리,"북수원2교,성주대교(주두부),북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-01 19:32:00",16-제조-02,a.생산관리,"북수원2교,성주대교(주두부),북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-04-01 07:30:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-02 07:25:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.30.4,NULL,223.38.29.39,004C8,,,
|
|
J16203,"2019-04-01 07:31:00",19-제조-03,a.품질검사,"산외교 데크, 켄틸생산 및 품질관리
|
|
","2019-04-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,1,
|
|
J18207,"2019-04-01 07:43:00",16-시공-20,b.시공,시공관리,"2019-04-01 18:08:00",16-시공-20,b.시공,시공관리,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M02302,"2019-04-01 07:44:00",19-제조-02,a.생산관리,"서울임원 회의 자료 준비 및 월 보고 자료 작성","2019-04-01 18:00:00",19-제조-02,a.생산관리,"평택동부 거더 관련 제작 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>연구개발 심사자료 준비<|>04:30<|><br>19-제조-02<|>a.생산관리<|>공장동 지붕 강재휀 시공 관리 및 협의<|>01:30<|><br>",,
|
|
J12202,"2019-04-01 07:49:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J09102,"2019-04-01 07:51:00",19-계약-01,d.기타,"화웅지구, 송산그린시티 한신공영, 강산건설 방문 예정, 광명~서울 1공구 예상 시행가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-01 18:06:00",19-계약-01,d.기타,"화웅지구, 송산그린시티 한신공영, 강산건설 방문 예정, 광명~서울 1공구 예상 시행가 등 : 조안대교 외 7개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J13308,"2019-04-01 07:54:00",19-시공-04,b.시공,"1. 현장점검 보고서 작성
|
|
2. 시화 MTV 예정공정표 작성
|
|
3. 가산2교 시공상세변경 및 도면검토","2019-04-01 20:50:00",19-시공-04,b.시공,"1. 현장점검 보고서 작성
|
|
2. 시화 MTV 예정공정표 작성
|
|
3. 가산2교 시공상세변경 및 도면검토","2019-04-01 18:47:00",172.16.8.170,172.16.8.170,172.16.8.170,004E4,,1,
|
|
J18202,"2019-04-01 07:55:00",07-교영-01,b.시공사,"구미산업단지 진입도로 괴평교 견적","2019-04-01 18:08:00",07-교영-01,b.시공사,"구미산업단지 진입도로 괴평교 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J10315,"2019-04-01 08:04:00",17-시공-09,b.시공,"가설협의자료 작성","2019-04-01 18:05:00",17-시공-09,b.시공,"가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
B15306,"2019-04-01 08:10:00",18-관리-02,e.기타,"비서업무 외","2019-04-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-04-01 08:12:00",14-교영-00,d.기타,"석현천교외 1개소(충청내륙고속화 1-1공구) 시행견적서(예정계약가), 금곡교(진접~내촌 1공구) 시행가 협의 및 시행견적서, Pre-Deck(추포~암태, 강교) 설계 및 시행견적서, 갈산교외 17개소(서부내륙고속도로)설계내역서수정","2019-04-01 18:06:00",14-교영-00,d.기타,"석현천교외 1개소(충청내륙고속화 1-1공구) 시행견적서(예정계약가), 금곡교(진접~내촌 1공구) 시행가 협의 및 시행견적서, Pre-Deck(추포~암태, 강교) 설계 및 시행견적서, 갈산교외 17개소(서부내륙고속도로)설계내역서수정","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-04-01 08:12:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","2019-04-01 18:13:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-04-01 08:16:00",19-교영-01,d.기타,"1. 입장~진천 특정공법심의 견적
|
|
2. 무심동로~오창IC 실시설계 견적","2019-04-01 18:32:00",19-교영-01,d.기타,"1. 입장~진천 특정공법심의 견적
|
|
2. 무심동로~오창IC 실시설계 견적","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J08201,"2019-04-01 08:17:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-01 18:23:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18204,"2019-04-01 08:20:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","2019-04-01 18:09:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J18205,"2019-04-01 08:22:00",18-시공-12,g.기타,"성과품 검토","2019-04-01 18:22:00",19-설계-01,b.구조계산,"견적요청에 대한 수량산출","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J13201,"2019-04-01 08:22:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 구조계산","2019-04-01 18:29:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 구조계산","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E3,,,
|
|
J15201,"2019-04-01 08:24:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-04-01 18:03:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11202,"2019-04-01 08:24:00",19-시공-02,b.시공,공사관리,"2019-04-01 18:12:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14306,"2019-04-01 08:27:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-01 18:11:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E5,,,
|
|
J09101,"2019-04-01 08:29:00",19-교영-01,c.설계사,과업조사,"2019-04-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J10301,"2019-04-01 08:29:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-01 18:23:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-04-01 08:30:00",16-시공-20,g.기타,"당초 변경","2019-04-01 18:21:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E2,,,
|
|
J07103,"2019-04-01 08:34:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-01 18:16:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11305,"2019-04-01 08:38:00",19-설계-01,h.기타,계획,"2019-04-01 18:03:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15202,"2019-04-01 08:38:00",18-설계-12,b.구조계산,"성과품 정리","2019-04-01 18:06:00",18-설계-12,b.구조계산,"성과품 정리","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J17205,"2019-04-01 08:39:00",18-교영-01,c.설계사,.,"2019-04-01 19:04:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-04-01 08:41:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감,운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-01 18:00:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감,운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16202,"2019-04-01 08:42:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-01 20:49:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-01 18:30:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J14101,"2019-04-01 08:50:00",16-시공-20,출장,한양,"2019-04-01 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18208,"2019-04-01 08:50:00",19-제조-02,출장,"[산외교]산외교 Pre-Deck 현황측량","2019-04-01 18:00:00",19-제조-02,출장,"[산외교]산외교 Pre-Deck 현황측량","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J07202,"2019-04-02 06:18:00",19-제조-04,b.기계,"도하4교 런처 앵커설치 작업과 각재 정리","2019-04-03 07:09:00",19-제조-04,b.기계,"도하4교 런처 앵커설치 작업과 각재 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-04-02 07:11:00",17-시공-07,g.기타,"동용교 시험인장계획서 작성
|
|
목동교 인장계획서 작성
|
|
성주대교 강봉인장계획서 작성
|
|
","2019-04-02 18:01:00",17-시공-07,g.기타,"동용교 시험인장계획서 작성
|
|
목동교 인장계획서 작성
|
|
성주대교 강봉인장계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J12202,"2019-04-02 07:13:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-02 18:06:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
M05510,"2019-04-02 07:26:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.29.39,NULL,NULL,004C8,,,
|
|
J18207,"2019-04-02 07:26:00",16-시공-20,b.시공,시공관리,"2019-04-02 18:03:00",16-시공-20,b.시공,시공관리,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
T04204,"2019-04-02 07:28:00",16-제조-02,a.생산관리,"북수원2교,성주대교(주두부),북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-02 19:29:00",16-제조-02,a.생산관리,"북수원2교,성주대교(주두부),북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-04-02 07:36:00",19-시공-04,b.시공,"1. 현장점검 보고서 작성
|
|
2. 시화 MTV 예정공정표 작성
|
|
3. 가산2교 시공상세변경 및 도면검토","2019-04-02 18:03:00",19-시공-04,b.시공,"1. 현장점검 보고서 작성
|
|
2. 시화 MTV 예정공정표 작성
|
|
3. 가산2교 시공상세변경 및 도면검토","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J14308,"2019-04-02 07:40:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-02 21:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-02 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-04-02 07:42:00",19-계약-01,d.기타,"시화분기점, 송산그린시티 계룡건설, 강산건설 방문 예정, 벌교~주암 예상 입찰가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18202,"2019-04-02 07:51:00",07-교영-01,b.시공사,"구미산업단지 진입도로 괴평교 견적","2019-04-02 18:08:00",07-교영-01,b.시공사,"구미산업단지 진입도로 괴평교 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J10314,"2019-04-02 08:02:00",14-교영-00,d.기타,"Nodular 거더 공사비 검토, 갈산교외 17개소(서부내륙고속도로)설계내역서수정, 치악교(국도5호선 신림~판부2) 설계내역서 초안작업, 신평교(무심동로~오창) 설계내역서 초안작업","2019-04-02 18:05:00",14-교영-00,d.기타,"갈산교외 17개소(서부내륙고속도로)설계내역서수정, Nodular 거더 공사비 검토, 치악교(국도5호선 신림~판부2) 설계내역서 초안작업, 신평교(무심동로~오창) 설계내역서 초안작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J10315,"2019-04-02 08:05:00",17-시공-09,b.시공,"가설협의자료 작성","2019-04-02 18:05:00",17-시공-09,b.시공,"가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18206,"2019-04-02 08:06:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","2019-04-02 18:10:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-04-02 08:08:00",18-관리-02,e.기타,"비서업무 외","2019-04-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-04-02 08:13:00",19-교영-01,d.기타,"1. 설계팀 업무 파악","2019-04-02 18:11:00",19-교영-01,d.기타,"1. 설계팀 업무 파악","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J08201,"2019-04-02 08:13:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-02 19:06:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-04-02 08:14:00",19-설계-01,h.기타,계획,"2019-04-02 18:08:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07103,"2019-04-02 08:14:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-02 18:19:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18204,"2019-04-02 08:16:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","2019-04-02 18:02:00",19-교휴-06,a.기타,"구미국가산업단지 제5단지 진입도로 건설공사 실행견적 작성","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J09101,"2019-04-02 08:16:00",19-교영-01,c.설계사,과업조사,"2019-04-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14306,"2019-04-02 08:16:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-02 18:02:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J13201,"2019-04-02 08:20:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 EL산정","2019-04-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E2,,,
|
|
J18205,"2019-04-02 08:20:00",19-교영-03,c.설계사,"거더 배치 및 일반도 작성","2019-04-02 21:36:00",18-시공-12,g.기타,"성과품 검토","2019-04-02 18:31:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J10301,"2019-04-02 08:22:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-02 18:12:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15201,"2019-04-02 08:24:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-04-02 18:02:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-04-02 08:28:00",18-교영-01,c.설계사,.,"2019-04-02 18:15:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-04-02 08:28:00",16-시공-20,g.기타,"당초 변경","2019-04-02 20:44:00",16-시공-20,g.기타,"당초 변경","2019-04-02 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15202,"2019-04-02 08:31:00",18-설계-12,b.구조계산,"성과품 정리","2019-04-02 21:22:00",18-설계-12,b.구조계산,"성과품 정리","2019-04-02 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J16202,"2019-04-02 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-02 18:14:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-04-02 08:33:00",17-설계-04,h.기타," 감리검토사항:e-beam구간 상부 슬래브 종방향철근 수정","2019-04-02 18:07:00",17-설계-04,h.기타," 감리검토사항:e-beam구간 상부 슬래브 종방향철근 수정","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-설계-01<|>e.검토<|>도서검토<|>03:00<|><br>18-설계-19<|>f.보고서 및 시방서<|>9공구 보고서작성<|>02:00<|><br>",,
|
|
J10313,"2019-04-02 08:36:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감,운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J11202,"2019-04-02 08:43:00",19-시공-02,b.시공,공사관리,"2019-04-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J16203,"2019-04-02 07:20:00",19-제조-03,a.품질검사,"단장천데크출하, 데크생산 및 품질관리","2019-04-02 22:54:00",19-제조-03,a.품질검사,"산외교 데크, 켄틸생산 및 품질관리
|
|
","2019-04-02 18:53:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18208,"2019-04-02 08:50:00",19-제조-02,출장,"[산외교]산외교 Pre-Deck 현황측량","2019-04-02 21:59:00",19-제조-02,a.생산관리,"[산외교]산외교 Pre-Deck 현황측량","2019-04-02 18:54:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14101,"2019-04-02 08:50:00",16-시공-20,출장,한양,"2019-04-02 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
M02302,"2019-04-02 08:50:00",19-제조-02,출장,"장헌산업 서울사무실","2019-04-02 18:00:00",19-제조-02,출장,"장헌산업 서울사무실","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J15301,"2019-04-02 08:50:00",16-시공-20,출장,"[경남 밀양시]산외교 현장 견학 및 점검","2019-04-02 18:00:00",16-시공-20,출장,"[경남 밀양시]산외교 현장 견학 및 점검","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J14101,"2019-03-01 08:50:00",16-시공-20,출장,한양,"2019-03-01 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-03-12 08:50:00",07-교영-01,출장,"[구미]구미 산단 진입도로 1공구(괴평교-FCM 583m)-롯데건설","2019-03-12 18:00:00",07-교영-01,출장,"[구미]구미 산단 진입도로 1공구(괴평교-FCM 583m)-롯데건설","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10315,"2019-03-21 08:50:00",17-시공-07,출장,두산중공업,"2019-03-21 18:00:00",17-시공-07,출장,두산중공업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-04-03 07:06:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-04-03 07:10:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블럭 제작과 북수원1교 거푸집 보수","2019-04-04 06:31:00",19-제조-04,b.기계,"원흥2교 주두부 받침 블럭 제작과 북수원1교 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-04-03 07:13:00",17-시공-07,g.기타,"동용교 시험인장계획서 작성
|
|
목동교 인장계획서 작성
|
|
성주대교 강봉인장계획서 작성
|
|
","2019-04-03 18:09:00",17-시공-07,g.기타,"동용교 시험인장계획서 작성
|
|
목동교 인장계획서 작성
|
|
성주대교 강봉인장계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J14308,"2019-04-03 07:24:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-03 18:07:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-04-03 07:27:00",19-제조-02,a.생산관리,"생산관리 및 산외교 Cantilever Shop DWG","2019-04-03 18:06:00",19-제조-02,a.생산관리,"생산관리 및 산외교 Cantilever Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J13308,"2019-04-03 07:29:00",19-시공-04,b.시공,"1. 현장점검 보고서 작성
|
|
2. 시화 MTV 예정공정표 작성
|
|
3. 가산2교 시공상세변경 및 도면검토","2019-04-03 18:13:00",19-시공-04,b.시공,"1. 현장점검 보고서 작성
|
|
2. 시화 MTV 예정공정표 작성
|
|
3. 가산2교 시공상세변경 및 도면검토","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18207,"2019-04-03 07:34:00",17-시공-10,b.시공,시공관리,"2019-04-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.10.246,NULL,NULL,004C7,,,
|
|
T04204,"2019-04-03 07:36:00",16-제조-02,a.생산관리,"북수원2교,성주대교(주두부),북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J16203,"2019-04-03 07:40:00",19-제조-03,a.품질검사,"수원교 데크출하(8대)
|
|
산외교 데크, 켄틸생산 및 품질관리
|
|
","2019-04-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-04-03 07:46:00",19-계약-01,d.기타,"갈천~가수, 당진~서산 예상 계약가, 벌교~주암 예상 입찰가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
B15306,"2019-04-03 07:55:00",18-관리-02,e.기타,"비서업무 외","2019-04-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-04-03 08:08:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","2019-04-03 18:11:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
M05510,"2019-04-03 08:14:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.30.180,NULL,NULL,004C8,,,
|
|
J11305,"2019-04-03 08:15:00",19-설계-01,h.기타,계획,"2019-04-03 18:13:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-04-03 08:16:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-03 19:15:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-04-03 08:16:00",14-교영-00,d.기타,"갈산교외 17개소(서부내륙고속도로)설계내역서수정, Nodular 거더 공사비 검토, 치악교(국도5호선 신림~판부2) 설계내역서 초안작업, 신평교(무심동로~오창) 설계내역서 초안작업","2019-04-03 18:11:00",14-교영-00,d.기타,"갈산교외 17개소(서부내륙고속도로)설계내역서수정, Nodular 거더 공사비 검토, 치악교(국도5호선 신림~판부2) 설계내역서 초안작업, 신평교(무심동로~오창) 설계내역서 초안작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J10315,"2019-04-03 08:17:00",17-시공-09,b.시공,"가설협의자료 작성","2019-04-03 18:13:00",17-시공-09,b.시공,"가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J15307,"2019-04-03 08:17:00",19-교영-01,d.기타,"1. 설계팀 업무 파악","2019-04-03 18:09:00",19-교영-01,d.기타,"1. 설계팀 업무 파악","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J18205,"2019-04-03 08:18:00",19-교영-03,c.설계사,"거더 배치 및 일반도 작성","2019-04-03 21:37:00",19-교영-03,c.설계사,"거더 배치 및 일반도 작성","2019-04-03 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J14306,"2019-04-03 08:19:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-03 18:13:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-04-03 08:22:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-03 18:11:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11203,"2019-04-03 08:22:00",18-설계-19,"f.보고서 및 시방서","9공구 보고서 작성","2019-04-03 18:06:00",18-설계-19,"f.보고서 및 시방서","9공구 보고서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>e.검토<|>청용천교 런처가설 교각코핑폭 다름 확인후 한맥알림<|>01:00<|><br>19-교영-03<|>d.기타<|>3@50 h=2.6m, 횡 9본 모델링, 반력<|>05:00<|><br>17-시공-21<|>g.기타<|>시공사요청 광교1교 중앙가로보검토<|>00:30<|><br>",,
|
|
J11202,"2019-04-03 08:50:00",16-시공-20,출장,"산외교 현장 견학","2019-04-03 18:00:00",16-시공-20,출장,"산외교 현장 견학","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J15301,"2019-04-03 08:50:00",16-시공-20,출장,"산외교 현장 견학","2019-04-03 18:00:00",16-시공-20,출장,"산외교 현장 견학","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J17205,"2019-04-03 08:27:00",18-교영-01,c.설계사,.,"2019-04-03 18:14:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18204,"2019-04-03 08:27:00",19-교휴-06,a.기타,"함양-창녕간 고속도로 건설공사 제1공구 지곡교 공사금액 검토","2019-04-03 18:08:00",19-교휴-06,a.기타,"함양-창녕간 고속도로 건설공사 제1공구 지곡교 공사금액 검토","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J10301,"2019-04-03 08:29:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-03 18:12:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-04-03 08:30:00",16-시공-20,g.기타,"당초 변경","2019-04-03 20:57:00",16-시공-20,g.기타,"당초 변경","2019-04-03 18:33:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15201,"2019-04-03 08:33:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-04-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J15202,"2019-04-03 08:34:00",19-교영-03,b.시공사,"SP Girder 구조계산","2019-04-03 21:36:00",19-교영-03,b.시공사,"SP Girder 구조계산","2019-04-03 18:32:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10313,"2019-04-03 08:40:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감,운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-03 18:07:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감,운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-04-03 08:44:00",19-교영-01,c.설계사,과업조사,"2019-04-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J16202,"2019-04-03 08:47:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
M02302,"2019-04-03 08:50:00",19-제조-02,출장,"삼안 영업 및 수원외곽순환도로 현장","2019-04-03 18:05:00",19-제조-02,a.생산관리,"합도초 사거리 시공 계획 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14101,"2019-04-03 08:50:00",16-시공-20,출장,한양,"2019-04-03 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J13201,"2019-04-03 08:50:00",16-시공-20,출장,"[경남 밀양시]산외교 현장 견학 및 점검","2019-04-03 18:00:00",16-시공-20,출장,"[경남 밀양시]산외교 현장 견학 및 점검","0000-00-00 00:00:00",NULL,NULL,NULL,008E2,,,
|
|
J18202,"2019-04-03 08:50:00",07-교영-01,출장,"[구미시 해평면]구미국가산업5단지 도로공사-괴평교","2019-04-03 18:00:00",07-교영-01,출장,"[구미시 해평면]구미국가산업5단지 도로공사-괴평교","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-04-04 06:32:00",19-제조-04,b.기계,"북수원1교 거푸집 도색과 도하4교 런처 앵커설치 작업","2019-04-04 21:41:00",19-제조-04,b.기계,"북수원1교 거푸집 도색과 도하4교 런처 앵커설치 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-04-04 06:52:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-04 18:10:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J11302,"2019-04-04 07:17:00",17-시공-07,g.기타,"원흥2교 인장계획서 작성
|
|
금곡교 가설검토","2019-04-04 18:06:00",17-시공-07,g.기타,"원흥2교 인장계획서 작성
|
|
금곡교 가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-04-04 07:25:00",16-제조-02,a.생산관리,"북수원2교,성주대교(주두부),북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-04 21:52:00",16-제조-02,a.생산관리,"북수원2교,성주대교(주두부),북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-04-04 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-04 21:40:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-04 18:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18208,"2019-04-04 07:34:00",19-제조-02,a.생산관리,"생산관리 및 산외교 Cantilever Shop DWG","2019-04-04 21:43:00",19-제조-02,a.생산관리,"생산관리 및 산외교 Cantilever Shop DWG","2019-04-04 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-04-04 07:35:00",19-제조-02,a.생산관리,"스트롱백 실험 계획 검토","2019-04-04 20:58:00",19-제조-02,a.생산관리,"스트롱백 실험 계획 검토","2019-04-04 18:54:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>스트롱백 실험 앵커 위치 조사 및 도면 작성<|>01:30<|><br>19-제조-02<|>a.생산관리<|>반장확대 회의 준비 및 회의<|>03:00<|><br>19-제조-02<|>a.생산관리<|>합도초 사거리 공사 관련자 회의<|>01:30<|><br>",1,
|
|
J18207,"2019-04-04 07:37:00",17-시공-10,b.시공,시공관리,"2019-04-04 18:09:00",17-시공-10,b.시공,시공관리,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-04-04 07:37:00",19-시공-04,b.시공,"1. 현장투입준비[석현천교 외]
|
|
2. 성주대교 주두부제작 검토","2019-04-04 18:05:00",19-시공-04,b.시공,"1. 현장투입준비[석현천교 외]
|
|
2. 성주대교 주두부제작 검토","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J09102,"2019-04-04 07:39:00",19-계약-01,d.기타,"갈천~가수, 당진~서산 예상 계약가, 벌교~주암 예상 입찰가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-04 18:03:00",19-계약-01,d.기타,"갈천~가수, 당진~서산 예상 계약가, 벌교~주암 예상 입찰가 등 : 조안대교 외 7개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J16203,"2019-04-04 07:41:00",19-제조-03,a.품질검사,"산외교 데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-04 23:41:00",19-제조-03,a.품질검사,"산외교 데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-04 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18202,"2019-04-04 07:44:00",07-교영-01,b.시공사,"상부공 프로젝트 관련 현황 파악","2019-04-04 18:13:00",07-교영-01,b.시공사,"상부공 프로젝트 관련 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18206,"2019-04-04 08:02:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","2019-04-04 18:17:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-04-04 08:12:00",19-설계-01,h.기타,계획,"2019-04-04 18:03:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-04-04 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-04-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-04-04 08:17:00",14-교영-00,d.기타,"광시생태육교, 갈산교외 16개소(서부내륙고속도로)설계내역서, 개략공사비 검토, 치악교(국도5호선 신림~판부2) 설계내역서 초안작업, 신평교(무심동로~오창) 설계내역서 초안작업","2019-04-04 18:08:00",14-교영-00,d.기타,"광시생태육교, 갈산교외 16개소(서부내륙고속도로)설계내역서, 개략공사비 검토, 치악교(국도5호선 신림~판부2) 설계내역서 초안작업, 신평교(무심동로~오창) 설계내역서 초안작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-04-04 08:21:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-04 18:16:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14306,"2019-04-04 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-04 18:08:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18204,"2019-04-04 08:23:00",19-교휴-06,a.기타,"함양-창녕간 고속도로 건설공사 제1공구 지곡교 공사금액 검토","2019-04-04 18:06:00",19-교휴-06,a.기타,"함양-창녕간 고속도로 건설공사 제1공구 지곡교 공사금액 검토","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J15201,"2019-04-04 08:23:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-04-04 18:04:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15307,"2019-04-04 08:24:00",19-교영-01,d.기타,"1. 삼남1교 가설벤트 도면작업","2019-04-04 18:00:00",19-교영-01,d.기타,"1. 삼남1교 가설벤트 도면작업","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J11203,"2019-04-04 08:26:00",19-교영-03,d.기타,"9@50 H=2.6 8본 모델링, 반력","2019-04-04 18:06:00",19-교영-03,d.기타,"9@50 H=2.6 8본 모델링, 반력","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J18205,"2019-04-04 08:28:00",19-교영-03,c.설계사,"거더 배치 및 일반도 작성","2019-04-04 21:36:00",19-교영-03,c.설계사,"거더 배치 및 일반도 작성","2019-04-04 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J13201,"2019-04-04 08:29:00",19-교영-03,c.설계사,"김포-파주 수량산출","2019-04-04 18:18:18",19-교영-03,c.설계사,NULL,"2019-04-04 18:30:00",172.16.9.165,172.16.9.165,NULL,008E2,,1,
|
|
J15202,"2019-04-04 08:30:00",19-교영-03,b.시공사,"SP Girder 구조계산","2019-04-04 21:24:00",19-교영-03,b.시공사,"SP Girder 구조계산","2019-04-04 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"18-설계-12<|>e.검토<|>진위천교 런처가설을 위한 교각규격 검토<|>04:00<|><br>",1,
|
|
J10301,"2019-04-04 08:30:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-04 18:01:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16202,"2019-04-04 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-04 18:17:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11202,"2019-04-04 08:34:00",19-시공-02,b.시공,공사관리,"2019-04-04 18:17:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-04-04 08:34:00",16-시공-20,g.기타,"당초 변경","2019-04-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.162,NULL,NULL,008E1,,,
|
|
J17205,"2019-04-04 08:34:00",18-교영-01,c.설계사,.,"2019-04-04 18:30:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-04-04 08:39:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감,운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-04 18:12:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감,운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-04-04 08:51:00",19-교영-01,c.설계사,과업조사,"2019-04-04 18:05:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
M05510,"2019-04-04 18:19:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-04 18:57:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.30.90,NULL,223.38.30.90,004C8,,,
|
|
J14101,"2019-04-04 08:50:00",16-시공-20,출장,한양,"2019-04-04 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-04-04 08:50:00",17-시공-09,출장,"삼남1교 현장(대림산업)","2019-04-04 18:00:00",17-시공-09,출장,"삼남1교 현장(대림산업)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-04-05 07:06:00",19-제조-04,b.기계,"북수원1교 거푸집 도색과 원흥2교 주두부 받침 블럭 탈형","2019-04-05 18:06:00",19-제조-04,b.기계,"북수원1교 거푸집 도색과 원흥2교 주두부 받침 블럭 탈형","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-04-05 07:09:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-04-05 07:19:00",17-시공-07,g.기타,"삼남1교 제작장 검토 및 예정공정표 검토
|
|
시공실적 정리","2019-04-05 18:05:00",17-시공-07,g.기타,"삼남1교 제작장 검토 및 예정공정표 검토
|
|
시공실적 정리","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
M05510,"2019-04-05 07:28:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.34.43,NULL,NULL,004C8,,,
|
|
T04204,"2019-04-05 07:31:00",16-제조-02,a.생산관리,"북수원2교,성주대교(주두부),북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-04-05 07:31:00",17-시공-10,b.시공,"시공관리 및 재시공예산편성","2019-04-05 18:10:00",17-시공-10,b.시공,"시공관리 및 재시공예산편성","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J14308,"2019-04-05 07:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-05 22:16:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-05 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J13308,"2019-04-05 07:37:00",19-시공-04,b.시공,"1. 현장투입준비[석현천교 외]
|
|
2. 성주대교 주두부제작 검토","2019-04-05 18:04:00",19-시공-04,b.시공,"1. 현장투입준비[석현천교 외]
|
|
2. 성주대교 주두부제작 검토","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
M02302,"2019-04-05 07:38:00",19-제조-02,a.생산관리," 신축동(L동) 옹벽 점검 및 보강 대책 협의","2019-04-05 18:01:00",19-제조-02,a.생산관리," 신축동(L동) 옹벽 점검 및 보강 대책 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-04-05 07:42:00",19-제조-03,a.품질검사,"성주대교, 수원교 데크 출하,
|
|
산외교 데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-05 21:38:00",19-제조-03,a.품질검사,"성주대교, 수원교 데크 출하,
|
|
산외교 데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-05 18:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-04-05 07:43:00",19-계약-01,d.기타,"충청내륙고속화 1-1공구 2개교 예상 계약가, 벌교~주암 예상 입찰가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18202,"2019-04-05 07:50:00",07-교영-01,b.시공사,"상부공 프로젝트 관련 현황 파악","2019-04-05 18:08:00",07-교영-01,b.시공사,"상부공 프로젝트 관련 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18206,"2019-04-05 08:10:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","2019-04-05 18:08:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-04-05 08:10:00",18-관리-02,e.기타,"비서업무 외","2019-04-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-04-05 08:12:00",14-교영-00,d.기타,"DR거더 (김포~파주 TK) 개략공사비 검토, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로)설계내역서, 치악교(국도5호선 신림~판부2) 설계내역서초안작업, 신평교(무심동로~오창) 설계내역서 초안작업","2019-04-05 18:06:00",14-교영-00,d.기타,"DR거더 (김포~파주 TK) 개략공사비 검토, 치악교(국도5호선 신림~판부2) 설계내역서, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로)설계내역서, 신평교(무심동로~오창) 설계내역서 초안작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-04-05 08:15:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-05 18:06:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-04-05 08:18:00",19-설계-01,h.기타,계획,"2019-04-05 18:07:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J14306,"2019-04-05 08:19:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-05 18:35:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J13201,"2019-04-05 08:20:00",19-교영-03,c.설계사,"김포-파주 수량산출","2019-04-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E2,,,
|
|
J10301,"2019-04-05 08:21:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J15307,"2019-04-05 08:24:00",19-교영-01,d.기타,"1. 삼남1교 가설벤트 도면작업","2019-04-05 18:03:00",19-교영-01,d.기타,"1. 삼남1교 가설벤트 도면작업","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,004E4,,,
|
|
J07103,"2019-04-05 08:25:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-05 18:12:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15202,"2019-04-05 08:29:00",19-교영-03,b.시공사,"SP Girder 구조계산","2019-04-05 18:03:00",19-교영-03,b.시공사,"SP Girder 구조계산","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"17-설계-01<|>e.검토<|>시공사 지적사항 답변 및 별첨 작성<|>04:00<|><br>",,
|
|
J11202,"2019-04-05 08:30:00",19-시공-02,b.시공,공사관리,"2019-04-05 18:11:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18205,"2019-04-05 08:31:00",19-교영-03,c.설계사,"거더 배치 및 일반도 작성","2019-04-05 18:02:00",19-교영-03,c.설계사,"거더 배치 및 일반도 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J11203,"2019-04-05 08:31:00",19-교영-03,d.기타,"9@50 H=2.6 8본 모델링, 반력","2019-04-05 18:06:00",19-교영-03,d.기타,"9@50 H=2.6 8본 모델링, 반력","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-설계-05<|>e.검토<|>별첨자료 추가요청 발송<|>02:00<|><br>18-설계-19<|>f.보고서 및 시방서<|>4공구 5공구 보고서작성<|>03:00<|><br>",,
|
|
J16202,"2019-04-05 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-05 18:15:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-04-05 08:34:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-04-05 18:05:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-04-05 08:34:00",18-교영-01,c.설계사,.,"2019-04-05 19:03:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18204,"2019-04-05 08:35:00",19-교휴-06,a.기타,"삼간교, 금곡교 도면, 시공계획서 검토","2019-04-05 18:07:00",19-교휴-06,a.기타,"삼간교, 금곡교 도면, 시공계획서 검토","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J10313,"2019-04-05 08:42:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감,운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-05 18:06:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감,운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-04-05 09:03:00",19-교영-01,c.설계사,과업조사,"2019-04-05 18:10:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-04-05 08:50:00",16-시공-20,출장,한양,"2019-04-05 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-04-08 06:50:00",17-시공-07,g.기타,"삼남1교 제작장 검토 및 예정공정표 검토
|
|
시공실적 정리","2019-04-08 18:08:00",17-시공-07,g.기타,"삼남1교 제작장 검토 및 예정공정표 검토
|
|
시공실적 정리","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J07202,"2019-04-08 07:01:00",19-제조-04,b.기계,"산외교 프리덱 지그 홀가공과 거더 거푸집 보수 및 PC강봉 헤딩 보조대 제작","2019-04-09 06:22:00",19-제조-04,b.기계,"산외교 프리덱 지그 홀가공과 거더 거푸집 보수 및 PC강봉 헤딩 보조대 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-04-08 07:18:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-09 07:19:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.30.20,NULL,223.38.30.7,004C8,,,
|
|
T04204,"2019-04-08 07:28:00",16-제조-02,a.생산관리,"북수원2교,성주대교(주두부),북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-04-08 07:34:00",19-제조-02,a.생산관리," 생산직 임금 관련 협의 및 검토","2019-04-08 18:01:00",19-제조-02,a.생산관리," 생산직 임금 관련 협의 및 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-04-08 07:44:00",19-계약-01,d.기타,"충청내륙고속화 1-1공구 2개교 예상 계약가, 벌교~주암 예상 입찰가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-04-08 07:51:00",19-시공-02,b.시공,"시공관리 및 예산편성검토","2019-04-08 18:04:00",19-시공-02,b.시공,"시공관리 및 예산편성검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-04-08 07:53:00",19-시공-04,b.시공,"1. 현장투입준비[석현천교 외]
|
|
2. 성주대교 주두부제작 검토","2019-04-08 18:05:00",19-시공-04,b.시공,"1. 현장투입준비[석현천교 외]
|
|
2. 성주대교 주두부제작 검토","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10315,"2019-04-08 07:57:00",17-시공-09,b.시공,"스트롱백 검토","2019-04-08 18:03:00",17-시공-09,b.시공,"스트롱백 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J08201,"2019-04-08 08:09:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-08 19:27:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-04-08 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-04-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-04-08 08:18:00",19-교영-01,d.기타,"1. 삼남1교 가설벤트 도면작업
|
|
2. 용암1교 도곽수정작업","2019-04-08 18:02:00",19-교영-01,d.기타,"1. 삼남1교 가설벤트 도면작업
|
|
2. 용암1교 도곽수정작업","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J07103,"2019-04-08 08:19:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-08 18:12:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10314,"2019-04-08 08:19:00",14-교영-00,d.기타,"생태이동통로 거더 및 Pre-Deck(학봉~공암) 설계견적서, DR거더 (김포~파주 TK) 개략공사비 검토, 치악교(국도5호선 신림~판부2) 설계내역서, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로)설계내역서, 신평교(무심동로~오창) 설계내역서 초안작업","2019-04-08 18:04:00",14-교영-00,d.기타,"생태이동통로 거더 및 Pre-Deck(학봉~공암) 설계견적서, DR거더 (김포~파주 TK) 개략공사비 검토, 치악교(국도5호선 신림~판부2) 설계내역서, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로)설계내역서, 신평교(무심동로~오창) 설계내역서 초안작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14306,"2019-04-08 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-08 18:08:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-04-08 08:26:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-08 18:14:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-04-08 08:27:00",19-시공-02,b.시공,공사관리,"2019-04-08 18:06:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18205,"2019-04-08 08:28:00",16-설계-19,h.기타,"슬래브 익스텐션 관련 수정","2019-04-08 20:51:00",19-교영-03,c.설계사,"거더 배치 및 일반도 작성","2019-04-08 18:42:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J13201,"2019-04-08 08:28:00",19-교영-03,c.설계사,"김포-파주 수량산출","2019-04-08 20:48:00",19-교영-03,c.설계사,"김포-파주 수량산출","2019-04-08 18:42:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J15202,"2019-04-08 08:29:00",19-교영-03,b.시공사,"SP Girder 구조계산","2019-04-08 20:48:00",19-교영-03,b.시공사,"SP Girder 구조계산","2019-04-08 18:42:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"18-설계-06<|>f.보고서 및 시방서<|>보고서 양식변경 작성<|>04:00<|><br>",1,
|
|
J16202,"2019-04-08 08:34:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-08 18:04:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07210,"2019-04-08 08:36:00",16-시공-20,g.기타,"당초 변경","2019-04-08 20:50:00",16-시공-20,g.기타,"당초 변경","2019-04-08 18:42:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J11305,"2019-04-08 08:38:00",19-설계-01,h.기타,계획,"2019-04-08 18:05:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15201,"2019-04-08 08:38:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-04-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J11203,"2019-04-08 08:39:00",19-교영-03,d.기타,"DR구간(BR2, BR3) 계산서작성","2019-04-08 18:03:00",19-교영-03,d.기타,"DR구간(BR2, BR3) 계산서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J10313,"2019-04-08 08:40:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J17205,"2019-04-08 08:41:00",18-교영-01,c.설계사,.,"2019-04-08 18:04:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J16203,"2019-04-08 08:41:00",19-제조-03,a.품질검사,"합도초교 공사시작, 산외교 데크 출하,
|
|
산외교 데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09101,"2019-04-08 08:44:00",19-교영-01,c.설계사,과업조사,"2019-04-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J18206,"2019-04-08 08:50:00",17-시공-10,출장,금광기업,"2019-04-08 18:00:00",19-시공-02,g.기타,"새만금전주 시행계획 검토 / 성주대교 업무","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J14101,"2019-04-08 08:50:00",16-시공-20,출장,한양,"2019-04-08 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-04-08 08:50:00",17-시공-08,출장,"[충남서산]신규제작 런처장비 안전인증 업무협의 및 제작공정 확인","2019-04-08 18:00:00",17-시공-08,출장,"[충남서산]신규제작 런처장비 안전인증 업무협의 및 제작공정 확인","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18204,"2019-04-08 08:50:00",18-시공-19,출장,"[전북/부안, 충북/충주, 경기/남양주]제작(제작장) 일정 협의(삼간교, 한포2교, 금곡교)","2019-04-08 18:00:00",18-시공-19,출장,"[전북/부안, 충북/충주, 경기/남양주]제작(제작장) 일정 협의(삼간교, 한포2교, 금곡교)","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J07202,"2019-04-09 06:22:00",19-제조-04,b.기계,"거더 거푸집 보수 및 PC강봉 헤딩 보조대 제작과 산외교 프리덱 지그 홀가공","2019-04-10 07:06:00",19-제조-04,b.기계,"거더 거푸집 보수 및 PC강봉 헤딩 보조대 제작과 산외교 프리덱 지그 홀가공","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-04-09 07:09:00",17-시공-07,g.기타,"제3연륙교 예정공정표 작성
|
|
동용교 시험인장결과보고서 정리","2019-04-09 18:07:00",17-시공-07,g.기타,"제3연륙교 예정공정표 작성
|
|
동용교 시험인장결과보고서 정리","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J12202,"2019-04-09 07:09:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
M05510,"2019-04-09 07:19:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.30.7,NULL,NULL,004C8,,,
|
|
T04204,"2019-04-09 07:28:00",16-제조-02,a.생산관리,"북수원2교,성주대교(주두부),북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-04-09 07:28:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-09 20:34:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-09 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18202,"2019-04-09 07:32:00",07-교영-01,b.시공사,"상부공 프로젝트 관련 현황 파악","2019-04-09 18:08:00",07-교영-01,b.시공사,"상부공 프로젝트 관련 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J13308,"2019-04-09 07:34:00",19-시공-04,b.시공,"1. 일반공사 주간업무 취합
|
|
2. 하자보수 품의서 작성 및 계획서 작성","2019-04-09 18:09:00",19-시공-04,b.시공,"1. 일반공사 주간업무 취합
|
|
2. 하자보수 품의서 작성 및 계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
M02302,"2019-04-09 07:37:00",19-제조-02,a.생산관리,"L동 옹벽 검토 및 협의","2019-04-09 18:02:00",19-제조-02,a.생산관리,"L동 옹벽 검토 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공장내 점검 및 작업자 면담<|>02:00<|><br>19-제조-02<|>a.생산관리<|>관리자 인사고과표 작성<|>02:00<|><br>",,
|
|
J18207,"2019-04-09 07:40:00",17-시공-10,b.시공,"시공관리 및 예산편성검토","2019-04-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.10.246,NULL,NULL,004C7,,,
|
|
J16203,"2019-04-09 07:40:00",19-제조-03,a.품질검사,"단장천 데크 출하,
|
|
산외교 데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-09 22:54:00",19-제조-03,a.품질검사,"단장천 데크 출하,
|
|
산외교 데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-09 19:06:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-04-09 07:45:00",19-계약-01,d.기타,"조안대교 두산건설, 화웅지구 한신공영 방문예정, 벌교~주암 예상 입찰가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-04-09 07:54:00",17-시공-09,b.시공,"스트롱백 검토","2019-04-09 18:07:00",17-시공-09,b.시공,"스트롱백 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
B15306,"2019-04-09 08:04:00",18-관리-02,e.기타,"비서업무 외","2019-04-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-04-09 08:10:00",19-설계-01,h.기타,계획,"2019-04-09 18:10:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-04-09 08:14:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-09 18:08:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-04-09 08:15:00",19-교영-01,d.기타,"1. 용암1교 도곽수정 작업
|
|
2. 김포~파주 T/K 슬래브 일반도 작업","2019-04-09 18:02:00",19-교영-01,d.기타,"1. 용암1교 도곽수정 작업
|
|
2. 김포~파주 T/K 슬래브 일반도 작업","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J11202,"2019-04-09 08:19:00",19-시공-02,b.시공,공사관리,"2019-04-09 18:16:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10314,"2019-04-09 08:20:00",14-교영-00,d.기타,"DECK 개략공사비, 김포~파주 고속도로 2공구 (T/K) 거더 설계내역서, 치악교(국도5호선 신림~판부2) 설계내역서, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로)설계내역서, 신평교(무심동로~오창) 설계내역서 초안작업","2019-04-09 18:06:00",14-교영-00,d.기타,"DECK 개략공사비, 김포~파주 고속도로 2공구 (T/K) 거더 설계내역서, 치악교(국도5호선 신림~판부2) 설계내역서, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로)설계내역서, 신평교(무심동로~오창) 설계내역서 초안작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18205,"2019-04-09 08:20:00",16-설계-19,h.기타,"슬래브 익스텐션 관련 수정","2019-04-10 02:51:00",16-설계-19,h.기타,"슬래브 익스텐션 관련 수정","2019-04-09 18:30:00",1.233.130.3,1.233.130.3,211.176.125.70,008E2,,1,
|
|
J13201,"2019-04-09 08:21:00",19-교영-03,c.설계사,"김포-파주 수량산출","2019-04-09 18:15:00",19-교영-03,c.설계사,"김포-파주 수량산출","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11203,"2019-04-09 08:21:00",18-시공-15,g.기타,"가설밴트 설치 위치 검토 밴트와 거더간섭확인(2개안 제시)","2019-04-09 18:04:00",18-시공-15,g.기타,"가설밴트 설치 위치 검토 밴트와 거더간섭확인","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-관리-04<|>g.기타<|>업무 협의(정SM, 김ES, 박BJ, 류BJ)<|>01:00<|><br>",,
|
|
J15201,"2019-04-09 08:25:00",19-교영-04,c.설계사,"설계일정 협의","2019-04-09 18:05:00",19-교영-04,c.설계사,"설계일정 협의","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07103,"2019-04-09 08:27:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-09 18:16:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15202,"2019-04-09 08:30:00",19-교영-03,b.시공사,"SP Girder 구조계산","2019-04-09 20:52:00",19-교영-03,b.시공사,"SP Girder 구조계산","2019-04-09 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"17-설계-01<|>g.업무지원<|>이서2교 시공사 지적사항 자료작성<|>06:00<|><br>",1,
|
|
J16202,"2019-04-09 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-09 18:16:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14306,"2019-04-09 08:32:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-09 18:05:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J17205,"2019-04-09 08:36:00",18-교영-01,c.설계사,.,"2019-04-09 18:19:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-04-09 08:39:00",16-시공-20,g.기타,"당초 변경","2019-04-09 18:02:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-04-09 08:41:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-09 18:02:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-04-09 08:41:00",19-교영-01,c.설계사,과업조사,"2019-04-09 18:08:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J18204,"2019-04-09 08:20:00",19-교휴-06,a.기타,"삼간교, 금곡교 도면, 시공계획서 검토","2019-04-09 18:05:00",19-교휴-06,a.기타,"삼간교, 금곡교 도면, 시공계획서 검토","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J18206,"2019-04-09 08:50:00",19-제조-01,출장,당진공장,"2019-04-09 13:12:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 업무","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10301,"2019-04-09 08:50:00",19-계약-01,출장,"[원하종합건설 본사]행복도시-조치원 도로확장공사 종심(3등급) 입찰참여","2019-04-09 18:18:00",16-시공-20,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J14101,"2019-04-09 08:50:00",16-시공-20,출장,한양,"2019-04-09 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
M05510,"2019-04-10 06:44:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-11 07:16:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.29.227,NULL,223.38.30.56,004C8,,,
|
|
J12202,"2019-04-10 07:01:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-04-10 07:07:00",19-제조-04,b.기계,"PC강봉 헤딩 보조대 제작과 북수원2교 거더 거푸집 보수","2019-04-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-04-10 07:24:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-10 21:45:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-10 18:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J11302,"2019-04-10 07:25:00",17-시공-07,g.기타,"제3연륙교 예정공정표 작성
|
|
동용교 시험인장결과보고서 정리","2019-04-10 18:11:00",17-시공-07,g.기타,"제3연륙교 예정공정표 작성
|
|
동용교 시험인장결과보고서 정리","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-04-10 07:25:00",16-제조-02,a.생산관리,"북수원2교,성주대교(주두부),북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-04-10 07:27:00",17-시공-09,b.시공,"시공관리 및 제작공정검토","2019-04-10 18:09:00",17-시공-09,b.시공,"시공관리 및 제작공정검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M02302,"2019-04-10 07:27:00",19-제조-02,a.생산관리,"PSC 단독몰드 생산 검토 및 인장결과 검토","2019-04-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-04-10 07:33:00",07-교영-01,b.시공사,"상부공 프로젝트 관련 현황 파악","2019-04-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J13308,"2019-04-10 07:35:00",19-시공-04,b.시공,"1. 일반공사 주간업무 취합
|
|
2. 하자보수 품의서 작성 및 계획서 작성","2019-04-10 18:05:00",19-시공-04,b.시공,"1. 일반공사 주간업무 취합
|
|
2. 하자보수 품의서 작성 및 계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J16203,"2019-04-10 07:39:00",19-제조-03,a.품질검사,"산외교 데크 출하,
|
|
산외교 데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-10 22:06:00",19-제조-03,a.품질검사,"산외교 데크 출하,
|
|
산외교 데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-10 18:45:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-04-10 07:40:00",19-계약-01,d.기타,"남일~보은 일정관련 흥우건설 방문예정, 벌교~주암 예상 입찰가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-04-10 07:52:00",18-시공-06,b.시공,"운곡교 제작 및 가설협의자료 작성","2019-04-10 13:14:00",18-시공-06,b.시공,"운곡교 제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18206,"2019-04-10 08:08:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-10 18:10:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-04-10 08:08:00",14-교영-00,d.기타,"광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 설계견적서, 김포~파주 고속도로 2공구 (T/K) 거더 설계내역서, DECK 개략공사비, 치악교(국도5호선 신림~판부2) 설계내역서, 신평교(무심동로~오창) 설계내역서 초안작업","2019-04-10 18:03:00",14-교영-00,d.기타,"김포~파주 고속도로 2공구 (T/K) 거더 설계내역서, DECK 개략공사비, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 설계견적서, 치악교(국도5호선 신림~판부2) 설계내역서, 신평교(무심동로~오창) 설계내역서 초안작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15307,"2019-04-10 08:18:00",19-교영-01,d.기타,"1. 김포~파주 T/K 슬래브 일반도 작업","2019-04-10 18:06:00",19-교영-01,d.기타,"1. 김포~파주 T/K 슬래브 일반도 작업","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J18205,"2019-04-10 08:21:00",16-설계-19,h.기타,"슬래브 구조계산","2019-04-10 20:49:00",16-설계-19,h.기타,"슬래브 익스텐션 관련 수정","2019-04-10 18:35:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J11305,"2019-04-10 08:21:00",19-설계-01,h.기타,계획,"2019-04-10 18:25:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J13201,"2019-04-10 08:22:00",12-설계-24,c.도면,"삼남1교 가설벤트 검토","2019-04-10 20:48:00",12-설계-24,c.도면,"삼남1교 가설벤트 검토","2019-04-10 18:35:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J14306,"2019-04-10 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
B15306,"2019-04-10 08:24:00",18-관리-02,e.기타,"비서업무 외","2019-04-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-04-10 08:24:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-10 13:01:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J07103,"2019-04-10 08:26:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-10 15:59:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-04-10 08:27:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-10 18:17:00",17-시공-09,d.자재,"[원하종합건설 본사]행복도시-조치원 도로확장공사 종심(3등급) 입찰참여","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J17205,"2019-04-10 08:29:00",18-교영-01,c.설계사,.,"2019-04-10 18:10:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-04-10 08:31:00",12-설계-24,e.검토,"스트롱백 시험시공 자료 작성","2019-04-10 21:28:00",12-설계-24,e.검토,"스트롱백 시험시공 자료 작성","2019-04-10 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J16202,"2019-04-10 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-10 18:11:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-04-10 08:32:00",18-시공-15,g.기타,"가설밴트 설치 위치 검토 밴트와 거더간섭확인","2019-04-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J18204,"2019-04-10 08:34:00",19-교휴-06,a.기타,"삼간교, 금곡교 도면, 시공계획서 검토","2019-04-10 18:04:00",19-교휴-06,a.기타,"삼간교, 금곡교 도면, 시공계획서 검토","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J07210,"2019-04-10 08:36:00",16-시공-20,g.기타,"당초 변경","2019-04-10 20:45:00",16-시공-20,g.기타,"당초 변경","2019-04-10 18:36:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15201,"2019-04-10 08:37:00",19-교영-04,c.설계사,"설계일정 협의","2019-04-10 18:02:00",19-교영-04,c.설계사,"설계일정 협의","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-04-10 08:43:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-10 18:08:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-04-10 09:09:00",19-교영-01,c.설계사,과업조사,"2019-04-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J18208,"2019-04-10 19:06:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-10 22:06:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-10 19:06:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14101,"2019-04-10 08:50:00",16-시공-20,출장,한양,"2019-04-10 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-04-10 08:50:00",18-교영-11,출장,"[서울 서초구]시화MTV교량 공정 관련 회의","2019-04-10 18:00:00",18-교영-11,출장,"[서울 서초구]시화MTV교량 공정 관련 회의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J07202,"2019-04-11 06:32:00",19-제조-04,b.기계,"생산2팀 진열대 제작과 북수원2교 거더 거푸집 보수","2019-04-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J12202,"2019-04-11 07:01:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
M05510,"2019-04-11 07:17:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-12 07:17:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.30.56,NULL,223.38.30.254,004C8,,,
|
|
J11302,"2019-04-11 07:21:00",17-시공-07,g.기타,"제3연륙교 예정공정표 작성
|
|
동용교 시험인장결과보고서 정리","2019-04-11 18:05:00",17-시공-07,g.기타,"제3연륙교 예정공정표 작성
|
|
동용교 시험인장결과보고서 정리","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18208,"2019-04-11 07:27:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-11 18:03:00",19-제조-02,a.생산관리,"산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-04-11 07:28:00",16-제조-02,a.생산관리,"북수원2교,성주대교(주두부),북수원1교,산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-04-11 07:31:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-11 18:03:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-04-11 07:37:00",19-제조-03,a.품질검사,"산외교 데크 출하,
|
|
산외교 데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
M02302,"2019-04-11 07:37:00",19-제조-02,a.생산관리," 삼남1교 도면 오류검토 및 서울사무실 협의","2019-04-11 18:01:00",19-제조-02,a.생산관리," 삼남1교 도면 오류검토 및 서울사무실 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>생산직 수당 규정 정리 및 협의<|>03:00<|><br>19-제조-02<|>a.생산관리<|>동화교 면보수 관련 협의<|>01:00<|><br>",,
|
|
J13308,"2019-04-11 07:38:00",19-시공-04,b.시공,"1. 일반공사 주간업무 취합
|
|
2. 하자보수 품의서 작성 및 계획서 작성","2019-04-11 18:03:00",19-시공-04,b.시공,"1. 일반공사 주간업무 취합
|
|
2. 하자보수 품의서 작성 및 계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J09102,"2019-04-11 07:47:00",19-계약-01,d.기타,"조령천교 계약 일정관련 한신공영 방문예정, 벌교~주암 예상 입찰가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
B15306,"2019-04-11 08:02:00",18-관리-02,e.기타,"비서업무 외","2019-04-11 18:18:18",NULL,NULL,"비서업무 외","0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10315,"2019-04-11 08:08:00",18-시공-06,b.시공,"운곡교 제작 및 가설협의자료 작성","2019-04-11 18:03:00",18-시공-06,b.시공,"운곡교 제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18207,"2019-04-11 08:09:00",17-시공-21,b.시공,"시공관리예산 및 제작공정검토","2019-04-11 18:05:00",17-시공-21,b.시공,"시공관리예산 및 제작공정검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10314,"2019-04-11 08:09:00",14-교영-00,d.기타,"김포~파주 고속도로 2공구 (T/K) 거더 설계 및 시행가, 동림교(오포~포곡) 변경계약 견적서, 교암교외 2개소(남일~보은) 시행견적서, DECK 개략공사비, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 설계견적서, 치악교(국도5호선 신림~판부2) 설계내역서, 신평교(무심동로~오창) 설계내역서 초안작업","2019-04-11 18:04:00",14-교영-00,d.기타,"김포~파주 고속도로 2공구 (T/K) 거더 설계 및 시행가, 동림교(오포~포곡) 변경계약 견적서, 교암교외 2개소(남일~보은) 시행견적서, DECK 개략공사비, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 설계견적서, 치악교(국도5호선 신림~판부2) 설계내역서, 신평교(무심동로~오창) 설계내역서 초안작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11305,"2019-04-11 08:12:00",19-설계-01,h.기타,계획,"2019-04-11 18:07:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-04-11 08:14:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-11 18:05:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10313,"2019-04-11 08:17:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-11 18:00:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14306,"2019-04-11 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-11 18:11:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18204,"2019-04-11 08:25:00",19-교휴-06,a.기타,"삼간교, 금곡교 도면, 시공계획서 검토","2019-04-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.183,NULL,NULL,004E2,,,
|
|
J07103,"2019-04-11 08:26:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-11 18:16:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-04-11 08:26:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-11 18:11:00",17-시공-09,d.자재,"[원하종합건설 본사]행복도시-조치원 도로확장공사 종심(3등급) 입찰참여","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J17205,"2019-04-11 08:27:00",18-교영-01,c.설계사,.,"2019-04-11 18:22:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-04-11 08:28:00",12-설계-24,e.검토,"스트롱백 시험시공 자료 작성","2019-04-11 20:48:00",12-설계-24,e.검토,"스트롱백 시험시공 자료 작성","2019-04-11 18:36:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J16202,"2019-04-11 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J13201,"2019-04-11 08:31:00",12-설계-24,c.도면,"삼남1교 가설벤트 검토","2019-04-11 18:08:00",12-설계-24,c.도면,"삼남1교 가설벤트 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J07210,"2019-04-11 08:31:00",16-시공-20,g.기타,"당초 변경","2019-04-11 20:47:00",16-시공-20,g.기타,"당초 변경","2019-04-11 18:37:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,,
|
|
J11202,"2019-04-11 08:32:00",19-시공-02,b.시공,공사관리,"2019-04-11 18:07:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15307,"2019-04-11 08:32:00",19-교영-01,d.기타,"1. 김포~파주 T/K 슬래브 일반도 작업","2019-04-11 18:03:00",19-교영-01,d.기타,"1. 김포~파주 T/K 슬래브 일반도 작업","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J18205,"2019-04-11 08:34:00",16-설계-19,h.기타,"슬래브 익스텐션 관련 수정","2019-04-11 21:43:00",16-설계-19,h.기타,"슬래브 익스텐션 관련 수정","2019-04-11 18:36:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J11203,"2019-04-11 08:35:00",18-시공-15,g.기타,"가설밴트 설치 일반도작성","2019-04-11 18:01:00",18-시공-15,g.기타,"가설밴트 설치 일반도작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15201,"2019-04-11 08:40:00",19-교영-08,d.기타,"과업진행현황 파악 및 현장방문","2019-04-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J09101,"2019-04-11 08:47:00",19-교영-01,c.설계사,과업조사,"2019-04-11 18:05:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-04-11 08:50:00",16-시공-20,출장,한양,"2019-04-11 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-04-11 08:50:00",07-교영-01,출장,"[경남의령,]함양~창녕 11공구 의령,낙동대교(F.C.M, 사장교) 미팅","2019-04-11 18:00:00",07-교영-01,출장,"[경남의령,]함양~창녕 11공구 의령,낙동대교(F.C.M, 사장교) 미팅","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-04-12 07:13:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-04-12 07:14:00",17-시공-07,g.기타,"삼남1교 제작장 배치 및 가설검토 수정","2019-04-12 18:04:00",17-시공-07,g.기타,"삼남1교 제작장 배치 및 가설검토 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
M05510,"2019-04-12 07:17:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.30.254,NULL,NULL,004C8,,,
|
|
J07202,"2019-04-12 07:27:00",19-제조-04,b.기계,"한포제2교 거푸집 보수와 상차준비 및 생산2팀 PC강봉 절단가공대 제작","2019-04-13 06:56:00",19-제조-04,b.기계,"한포제2교 거푸집 보수와 상차준비 및 생산2팀 PC강봉 절단가공대 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-04-12 07:27:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-04-12 07:33:00",17-시공-21,b.시공,"시공관리예산 및 제작공정검토","2019-04-12 16:59:00",17-시공-21,b.시공,"시공관리예산 및 제작공정검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M02302,"2019-04-12 07:35:00",19-제조-02,a.생산관리,"관리자 면담","2019-04-12 18:00:00",19-제조-02,a.생산관리,"관리자 면담","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-04-12 07:37:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-12 22:41:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-12 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-04-12 07:37:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-12 23:18:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-12 18:38:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-04-12 07:39:00",19-제조-03,a.품질검사,"단장천 데크 출하,
|
|
산외교 데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-12 22:52:00",19-제조-03,a.품질검사,"단장천 데크 출하,
|
|
산외교 데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-12 18:41:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18202,"2019-04-12 07:39:00",07-교영-01,b.시공사,"구미국가산업단지 진입도로 관련 담당자 미팅(롯데건설)","2019-04-12 18:04:00",07-교영-01,b.시공사,"구미국가산업단지 진입도로 관련 담당자 미팅(롯데건설)","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-04-12 07:45:00",19-계약-01,d.기타,"안성~구리 1,2공구 한신공영, SK건설 방문예정, 벌교~주암 예상 입찰가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-04-12 07:46:00",19-시공-04,b.시공,"1. 삼남1교 도면검토 및 현장 투입준비
|
|
2. 하자보수 품의서 작성 및 계획서 작성","2019-04-12 18:04:00",19-시공-04,b.시공,"1. 삼남1교 도면검토 및 현장 투입준비
|
|
2. 하자보수 품의서 작성 및 계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10315,"2019-04-12 08:02:00",18-시공-06,b.시공,"운곡교 제작 및 가설협의자료 작성","2019-04-12 17:58:00",18-시공-06,b.시공,"운곡교 제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J10301,"2019-04-12 08:04:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-12 18:32:00",17-시공-09,d.자재,"[원하종합건설 본사]행복도시-조치원 도로확장공사 종심(3등급) 입찰참여","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10314,"2019-04-12 08:08:00",14-교영-00,d.기타,"교암교외 2개소(남일~보은) 시행견적서, 김포~파주 고속도로 2공구 (T/K) Pre-Deck 설계 및 시행가, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 설계견적서, DECK 개략공사비, 치악교(국도5호선 신림~판부2) 설계내역서, 신평교(무심동로~오창) 설계내역서 초안작업","2019-04-12 18:02:00",14-교영-00,d.기타,"교암교외 2개소(남일~보은) 시행견적서, 김포~파주 고속도로 2공구 (T/K) Pre-Deck 설계 및 시행가, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 설계견적서, DECK 개략공사비, 치악교(국도5호선 신림~판부2) 설계내역서, 신평교(무심동로~오창) 설계내역서 초안작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-04-12 08:09:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-12 18:09:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-04-12 08:11:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-12 18:08:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-04-12 08:14:00",19-교영-01,d.기타,"1. 김포~파주 T/K 슬래브 일반도 작업","2019-04-12 18:00:00",19-교영-01,d.기타,"1. 김포~파주 T/K 슬래브 일반도 작업","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
B15306,"2019-04-12 08:19:00",18-관리-02,e.기타,"비서업무 외","2019-04-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-04-12 08:23:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-12 17:20:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J13201,"2019-04-12 08:25:00",12-설계-24,c.도면,"삼남1교 가설벤트 검토","2019-04-12 18:04:00",12-설계-24,c.도면,"삼남1교 가설벤트 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11202,"2019-04-12 08:25:00",19-시공-02,b.시공,공사관리,"2019-04-12 18:05:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18205,"2019-04-12 08:25:00",16-설계-19,h.기타,"슬래브 익스텐션 관련 수정","2019-04-12 18:05:00",16-설계-19,h.기타,"슬래브 익스텐션 관련 수정","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J16202,"2019-04-12 08:26:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-12 19:03:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-04-12 08:29:00",18-교영-01,c.설계사,.,"2019-04-12 19:05:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-04-12 08:31:00",12-설계-24,e.검토,"스트롱백 시험시공 자료 작성","2019-04-12 18:04:00",12-설계-24,e.검토,"스트롱백 시험시공 자료 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"18-설계-19<|>e.검토<|>청룡천교 반력 수정하여 계산서 넘김<|>01:00<|><br>",,
|
|
J11203,"2019-04-12 08:35:00",18-시공-15,g.기타,"가설밴트 설치 일반도작성","2019-04-12 18:03:00",18-시공-15,g.기타,"가설밴트 설치 일반도작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15201,"2019-04-12 08:38:00",19-교영-08,d.기타,"과업진행현황 파악 및 현장방문","2019-04-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J07210,"2019-04-12 08:44:00",16-시공-20,g.기타,"당초 변경","2019-04-12 18:05:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J09101,"2019-04-12 08:46:00",19-교영-01,c.설계사,과업조사,"2019-04-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J10313,"2019-04-12 08:47:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-12 18:03:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14306,"2019-04-12 08:50:00",19-시공-08,출장,[천안시청],"2019-04-12 18:09:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11305,"2019-04-12 08:50:00",19-교영-01,출장,다우,"2019-04-12 18:03:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J14101,"2019-04-12 08:50:00",16-시공-20,출장,한양,"2019-04-12 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-04-13 06:56:00",19-제조-04,b.기계,"한포제2교 각재, 철판, 거푸집 상차와 생산2팀 PC강봉 절단가공대 제작","2019-04-13 16:04:00",19-제조-04,b.기계,"한포제2교 각재, 철판, 거푸집 상차와 생산2팀 PC강봉 절단가공대 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-04-13 07:28:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-13 16:07:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J18208,"2019-04-13 07:33:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-13 17:59:00",19-제조-02,a.생산관리,"산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M02302,"2019-04-13 07:35:00",19-제조-02,a.생산관리,생산관리,"2019-04-13 16:01:00",19-제조-02,a.생산관리,생산관리,"0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>철근 재고 및 절단 프로그램 ui 기획<|>03:00<|><br>",1,
|
|
J07202,"2019-04-15 06:25:00",19-제조-04,b.기계,"부수원2교 거푸집 상차와 생산2팀 PC강봉 절단가공대 제작","2019-04-16 07:05:00",19-제조-04,b.기계,"부수원2교 거푸집 상차와 생산2팀 PC강봉 절단가공대 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-04-15 06:30:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-04-15 07:12:00",17-시공-07,g.기타,"삼남1교 제작장 배치 및 가설검토 수정","2019-04-15 09:29:00",17-시공-07,g.기타,"삼남1교 제작장 배치 및 가설검토 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-04-15 07:22:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-15 19:10:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-04-15 07:26:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-15 21:45:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-15 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-04-15 07:30:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-15 22:06:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-15 18:37:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-04-15 07:33:00",19-제조-03,a.품질검사,"산외교 켄틸데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-15 20:31:00",19-제조-03,a.품질검사,"산외교 켄틸데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-15 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18207,"2019-04-15 07:47:00",17-시공-21,b.시공,"시공관리예산 및 제작공정검토","2019-04-15 18:08:00",17-시공-21,b.시공,"시공관리예산 및 제작공정검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-04-15 07:49:00",19-시공-04,b.시공,"1. 삼남1교 도면검토 및 현장 투입준비
|
|
2. 하자보수 품의서 작성 및 계획서 작성","2019-04-15 18:08:00",19-시공-04,b.시공,"1. 삼남1교 도면검토 및 현장 투입준비
|
|
2. 하자보수 품의서 작성 및 계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
M05510,"2019-04-15 07:51:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-16 07:25:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.33.20,NULL,223.38.33.195,004C8,,,
|
|
J09102,"2019-04-15 07:54:00",19-계약-01,d.기타,"벌교~주암 예상 입찰가, 남일~보은 예상 계약가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-15 18:32:00",19-계약-01,d.기타,"벌교~주암 예상 입찰가, 남일~보은 예상 계약가 등 : 조안대교 외 7개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J18202,"2019-04-15 07:56:00",07-교영-01,b.시공사,"양근대교 관련 현황 파악","2019-04-15 18:07:00",07-교영-01,b.시공사,"양근대교 관련 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18206,"2019-04-15 08:07:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-15 18:00:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-04-15 08:10:00",19-교영-01,d.기타,"1. 김포~파주 T/K 슬래브 일반도 작업","2019-04-15 18:01:00",19-교영-01,d.기타,"1. 김포~파주 T/K 슬래브 일반도 작업","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
B15306,"2019-04-15 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-04-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-04-15 08:16:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-15 18:04:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-04-15 08:18:00",19-교영-03,c.설계사,"상부 도면 작성","2019-04-15 20:47:00",19-교영-03,c.설계사,"상부 도면 작성","2019-04-15 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J13201,"2019-04-15 08:19:00",12-설계-24,c.도면,"삼남1교 가설벤트 도면작성","2019-04-15 20:43:00",12-설계-24,c.도면,"삼남1교 가설벤트 도면작성","2019-04-15 18:34:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10314,"2019-04-15 08:21:00",14-교영-00,d.기타,"치악교(국도5호선 신림~판부2) 설계내역서 및 견적서, 장동교(순천벌교~주암 3-2공구) 시행견적서, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 시행견적서, 거더 개략공사비, DECK 개략공사비, 신평교(무심동로~오창) 설계내역서 초안작업","2019-04-15 18:08:00",14-교영-00,d.기타,"치악교(국도5호선 신림~판부2) 설계내역서 및 견적서, 장동교(순천벌교~주암 3-2공구) 시행견적서, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 시행견적서, 거더 개략공사비, DECK 개략공사비, 신평교(무심동로~오창) 설계내역서 초안작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-04-15 08:21:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-15 18:26:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14306,"2019-04-15 08:22:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-15 18:15:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-04-15 08:24:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-15 18:30:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-04-15 08:25:00",16-시공-20,g.기타,"당초 변경","2019-04-15 18:06:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11202,"2019-04-15 08:29:00",19-시공-02,b.시공,공사관리,"2019-04-15 18:13:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-04-15 08:31:00",19-교영-03,b.시공사,"Sp Girder 계산서 작성","2019-04-15 20:40:00",19-교영-03,b.시공사,"Sp Girder 계산서 작성","2019-04-15 18:33:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J16202,"2019-04-15 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-15 18:22:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-04-15 08:33:00",18-시공-15,g.기타,"가설밴트높이 재수정 2.0m -> 3.0m 공사팀요정","2019-04-15 18:05:00",18-시공-15,g.기타,"가설밴트설치(높이 2m->3m변경 공사팀 요청)일반도 재작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-10<|>g.기타<|>전도방지공 분석(도아기업, 특허)<|>02:00<|><br>",,
|
|
J09101,"2019-04-15 08:37:00",19-교영-01,c.설계사,과업조사,"2019-04-15 18:02:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15201,"2019-04-15 08:38:00",19-교영-08,d.기타,"과업진행현황 파악 및 현장방문","2019-04-15 18:05:00",19-교영-08,d.기타,"과업진행현황 파악 및 현장방문","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-04-15 08:38:00",18-교영-01,c.설계사,.,"2019-04-15 18:37:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11305,"2019-04-15 08:38:00",19-설계-01,h.기타,계획,"2019-04-15 18:02:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10313,"2019-04-15 08:40:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
M02302,"2019-04-15 08:50:00",19-교휴-01,교육,"관리책임자 교육(대한안전협회) 대전-AM10:00~PM5:00","2019-04-15 18:00:00",19-교휴-01,교육,"관리책임자 교육(대한안전협회) 대전-AM10:00~PM5:00","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J19201,"2019-04-15 08:30:00",19-설계-02,c.도면,업무파악,"2019-04-15 18:05:00",19-설계-02,c.도면,업무파악,"0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J14101,"2019-04-15 08:50:00",16-시공-20,출장,한양,"2019-04-15 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-04-15 08:50:00",18-시공-06,출장,"포스코 건설","2019-04-15 18:00:00",18-시공-06,출장,"포스코 건설","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-04-16 06:47:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-16 18:03:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-04-16 07:08:00",19-제조-04,b.기계,"삼간교 거푸집 보수와 생산2팀 PC강봉 절단가공대 제작","2019-04-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
T04204,"2019-04-16 07:23:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-16 19:28:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-04-16 07:26:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-17 07:16:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.38.33.195,NULL,223.38.34.2,004C8,,,
|
|
J18202,"2019-04-16 07:28:00",07-교영-01,b.시공사,"의령낙동대교 관련 현황 파악","2019-04-16 18:09:00",07-교영-01,b.시공사,"의령낙동대교 관련 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-04-16 07:35:00",19-제조-02,a.생산관리,"전력구 세그먼트 관련 협의(삼안)","2019-04-16 18:03:00",19-제조-02,a.생산관리,"생산직 근로계약서 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>전력구 세그먼트 관련 회의<|>03:00<|><br>19-제조-02<|>a.생산관리<|>생산직 근로계약서 관련 준비 및 검토<|>04:00<|><br>",1,
|
|
J14308,"2019-04-16 07:38:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-16 18:31:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-04-16 07:38:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-16 22:04:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-16 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,,
|
|
J16203,"2019-04-16 07:39:00",19-제조-03,a.품질검사,"주천1교 데크출하,
|
|
산외교 켄틸데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-16 22:52:00",19-제조-03,a.품질검사,"주천1교 데크출하,
|
|
산외교 켄틸데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-16 18:51:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18207,"2019-04-16 07:41:00",17-시공-21,b.시공,"시공관리예산 및 제작공정검토","2019-04-16 18:11:00",17-시공-21,b.시공,"시공관리예산 및 제작공정검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-04-16 07:53:00",19-계약-01,d.기타,"조안대교관련 두산건설 방문, 서부내륙민자관련 포스코건설 방문 등 : 조안대교 외 7개교 계약 추진 중","2019-04-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J17205,"2019-04-16 08:07:00",18-교영-01,c.설계사,.,"2019-04-16 18:15:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15307,"2019-04-16 08:08:00",19-교영-01,d.기타,"1. 마이다스 따라하기","2019-04-16 18:05:00",19-교영-01,d.기타,"1. 마이다스 따라하기","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J10314,"2019-04-16 08:12:00",14-교영-00,d.기타,"장동교(순천벌교~주암 3-2공구) 시행견적서, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 시행견적서, 거더 개략공사비, DECK 개략공사비, 신평교(무심동로~오창) 설계내역서 초안작업","2019-04-16 18:06:00",14-교영-00,d.기타,"장동교(순천벌교~주암 3-2공구) 시행견적서, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 시행견적서, 거더 개략공사비, DECK 개략공사비, 신평교(무심동로~오창) 설계내역서 초안작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-04-16 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-04-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-04-16 08:16:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-16 18:03:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-04-16 08:18:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.179,NULL,NULL,001C5,,,
|
|
J11305,"2019-04-16 08:18:00",19-설계-01,h.기타,계획,"2019-04-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J15202,"2019-04-16 08:20:00",19-교영-08,d.기타,설계업무협의,"2019-04-16 18:05:00",19-교영-08,d.기타,설계업무협의,"0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J18205,"2019-04-16 08:21:00",19-교영-03,c.설계사,"상부 도면 작성","2019-04-16 18:08:00",19-교영-03,c.설계사,"상부 도면 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J13201,"2019-04-16 08:21:00",12-설계-24,c.도면,"삼남1교 가설벤트 도면작성","2019-04-16 18:06:00",12-설계-24,c.도면,"삼남1교 가설벤트 도면작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11202,"2019-04-16 08:22:00",19-시공-02,b.시공,공사관리,"2019-04-16 18:08:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J16202,"2019-04-16 08:23:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-16 18:16:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14306,"2019-04-16 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-16 18:02:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-04-16 08:25:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-16 18:20:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-04-16 08:27:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-16 18:25:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-04-16 08:32:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-16 18:01:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15201,"2019-04-16 08:35:00",19-교영-07,c.설계사,"과업진행현황 파악 및 현장방문","2019-04-16 18:05:00",19-교영-07,c.설계사,"과업진행현황 파악 및 현장방문","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-04-16 08:36:00",16-시공-20,g.기타,"당초 변경","2019-04-16 18:07:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J09101,"2019-04-16 08:43:00",19-교영-01,c.설계사,과업조사,"2019-04-16 18:05:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J19201,"2019-04-16 08:58:00",19-설계-02,c.도면,업무파악,"2019-04-16 18:05:00",19-설계-02,c.도면,업무파악,"0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J13308,"2019-04-16 08:50:00",19-시공-08,출장,"[천안시청, 안성-구리(용인)]천안시청 발주처 협의 및 안성-구리 사업단 전시회 관련 업무","2019-04-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
J10315,"2019-04-16 08:50:00",15-시공-14,출장,"동용교 현장","2019-04-16 18:05:00",18-시공-19,b.시공,"제작 및 가설검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J11203,"2019-04-16 08:19:00",18-시공-15,g.기타,"가설밴트설치(높이관련 협의) 허sm, 김es, 최,bj","2019-04-16 18:06:00",18-시공-15,g.기타,"가설밴트설치(높이관련 협의) 허sm, 김es, 최,bj","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>b.구조계산<|>구조계산서 요약도 작...<|>02:00<|><br>",,
|
|
J14101,"2019-04-16 08:50:00",16-시공-20,출장,한양,"2019-04-16 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-04-16 08:50:00",17-시공-21,출장,"[수원시 장안구 하광교동]수원교 2차인장","2019-04-16 18:00:00",17-시공-21,출장,"[수원시 장안구 하광교동]수원교 2차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J12202,"2019-04-17 06:12:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
M05510,"2019-04-17 07:17:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.34.2,NULL,NULL,004C8,,,
|
|
J18202,"2019-04-17 07:19:00",07-교영-01,b.시공사,"의령낙동대교 견적준비","2019-04-17 18:08:00",07-교영-01,b.시공사,"의령낙동대교 견적준비","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J07202,"2019-04-17 07:20:00",19-제조-04,b.기계,"삼간교 거푸집 보수와 생산1팀 진열대 제작","2019-04-18 06:32:00",19-제조-04,b.기계,"삼간교 거푸집 보수와 생산1팀 진열대 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-04-17 07:22:00",17-시공-21,b.시공,"수원교 2차인장결과서 정리 및 광교2교 인장결과서 수정","2019-04-17 18:10:00",17-시공-21,b.시공,"수원교 2차인장결과서 정리 및 광교2교 인장결과서 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-04-17 07:24:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-17 20:40:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-04-17 07:28:00",19-제조-02,a.생산관리,"생산직 근로계약서 작성","2019-04-17 20:50:00",19-제조-02,a.생산관리,"생산직 근로계약서 작성","2019-04-17 18:46:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,,,
|
|
J18208,"2019-04-17 07:28:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-17 18:11:00",19-제조-02,a.생산관리,"산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J14308,"2019-04-17 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-17 20:33:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-17 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J13308,"2019-04-17 07:40:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 현장 출장 보고
|
|
2. 인천-김포 심곡천교 하자보수 일정 협의 ","2019-04-17 18:06:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 현장 출장 보고
|
|
2. 인천-김포 심곡천교 하자보수 일정 협의 ","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J09102,"2019-04-17 07:42:00",19-계약-01,d.기타,"이천~오산 1공구 금호건설, 서부내륙민자관련 포스코건설 방문 등 : 조안대교 외 7개교 계약 추진 중","2019-04-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-04-17 07:52:00",16-시공-20,b.시공,"가설공정 및 전방지지대공정검토","2019-04-17 18:08:00",16-시공-20,b.시공,"가설공정 및 전방지지대공정검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-04-17 08:05:00",18-시공-19,b.시공,"제작 및 가설검토","2019-04-17 18:06:00",18-시공-19,b.시공,"제작 및 가설검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J08201,"2019-04-17 08:11:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-17 18:05:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-04-17 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-04-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-04-17 08:18:00",14-교영-00,d.기타,"조안대교(화도~양평 2공구) 시행견적서, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 시행견적서, R-A3교외 1개소( 동이천IC 건설공사) 설계내역서 및 견적서(특공), 장동교(순천벌교~주암 3-2공구) 시행견적서, 거더 개략공사비, DECK 개략공사비, 신평교(무심동로~오창) 설계내역서","2019-04-17 18:05:00",14-교영-00,d.기타,"조안대교(화도~양평 2공구) 시행견적서, 광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 시행견적서, R-A3교외 1개소( 동이천IC 건설공사) 설계내역서 및 견적서(특공), 장동교(순천벌교~주암 3-2공구) 시행견적서, 거더 개략공사비, DECK 개략공사비, 신평교(무심동로~오창) 설계내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14306,"2019-04-17 08:22:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-17 18:44:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18205,"2019-04-17 08:23:00",19-교영-03,c.설계사,"상부 도면 작성","2019-04-17 18:04:00",19-교영-03,c.설계사,"상부 도면 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J10301,"2019-04-17 08:24:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-17 18:07:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-04-17 08:24:00",12-설계-24,c.도면,"삼남1교 가설벤트 수량산출","2019-04-17 18:07:00",12-설계-24,c.도면,"삼남1교 가설벤트 수량산출","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J07210,"2019-04-17 08:26:00",16-시공-20,g.기타,"당초 변경","2019-04-17 18:15:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J17205,"2019-04-17 08:28:00",18-교영-01,c.설계사,.,"2019-04-17 18:17:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11202,"2019-04-17 08:29:00",19-시공-02,b.시공,공사관리,"2019-04-17 18:03:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10313,"2019-04-17 08:30:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J16202,"2019-04-17 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-17 18:10:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07103,"2019-04-17 08:31:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-17 18:10:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15201,"2019-04-17 08:35:00",18-교영-26,c.설계사,"과업진행현황 파악","2019-04-17 18:02:00",18-교영-26,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J16203,"2019-04-17 08:55:00",19-제조-03,a.품질검사,"주천1교 데크출하,
|
|
산외교 켄틸데크, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09101,"2019-04-17 09:02:00",19-교영-01,c.설계사,과업조사,"2019-04-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J18206,"2019-04-17 08:30:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-17 18:08:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J14101,"2019-04-17 08:50:00",16-시공-20,출장,한양,"2019-04-17 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11305,"2019-04-17 08:50:00",16-시공-20,출장,"산외교 현장","2019-04-17 18:00:00",16-시공-20,출장,"산외교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,008C7,,,
|
|
J07202,"2019-04-18 06:33:00",19-제조-04,b.기계,"삼간교 거푸집 보수와 바닥철판 절단가공","2019-04-19 06:28:00",19-제조-04,b.기계,"삼간교 거푸집 보수와 바닥철판 절단가공","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-04-18 06:47:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
M05510,"2019-04-18 07:23:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.29.245,NULL,NULL,004C8,,,
|
|
J14308,"2019-04-18 07:24:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-18 22:55:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-18 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-04-18 07:25:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-18 18:26:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-04-18 07:29:00",17-시공-21,b.시공,"수원교 2차인장결과서 정리 및 광교2교 인장결과서 수정","2019-04-18 18:09:00",17-시공-21,b.시공,"수원교 2차인장결과서 정리 및 광교2교 인장결과서 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
M02302,"2019-04-18 07:33:00",19-제조-02,a.생산관리,"생산직 근로계약서 작성","2019-04-18 18:03:00",19-제조-02,a.생산관리,"생산직 근로계약서 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-04-18 07:34:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-18 18:06:00",19-제조-02,a.생산관리,"산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J09102,"2019-04-18 07:38:00",19-계약-01,d.기타,"서부내륙민자 18개교 예상 시행가 제출등 : 조안대교 외 7개교 계약 추진 중","2019-04-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-04-18 07:39:00",19-시공-04,b.시공,"실행예산 및 운영방법검토","2019-04-18 18:00:00",19-시공-04,b.시공,"실행예산 및 운영방법검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-04-18 07:45:00",19-시공-08,b.시공,"1. 인천-김포 심곡천교 하자보수 일정 및 착공 협의
|
|
2. 회사소개동영상 콘티 제작","2019-04-18 13:02:00",19-시공-08,b.시공,"1. 인천-김포 심곡천교 하자보수 일정 및 착공 협의
|
|
2. 회사소개동영상 콘티 제작","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10315,"2019-04-18 08:02:00",14-설계-38,"a.계획 및 협의","수리티교 런쳐 및 크레인 가설 적정성 협의자료 작성(시공사)","2019-04-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
B15306,"2019-04-18 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-04-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-04-18 08:17:00",14-교영-00,d.기타,"광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 시행견적서, R-A3교외 1개소( 동이천IC 건설공사) 설계내역서 및 견적서(특공), 장동교(순천벌교~주암 3-2공구) 시행견적서, 거더 개략공사비, DECK 개략공사비","2019-04-18 18:06:00",14-교영-00,d.기타,"R-A3교외 1개소( 동이천IC 건설공사) 설계내역서 및 견적서(특공), 광시생태육교 및 갈산교외 16개소(서부내륙고속도로) 시행견적서, 장동교(순천벌교~주암 3-2공구) 시행견적서, 거더 개략공사비, DECK 개략공사비, 신평교(무심동로~오창) 설계내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-04-18 08:18:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-18 18:04:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J14306,"2019-04-18 08:21:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-18 18:05:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J08201,"2019-04-18 08:21:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-18 18:04:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10301,"2019-04-18 08:24:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-18 18:22:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07103,"2019-04-18 08:24:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-18 18:04:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J07210,"2019-04-18 08:26:00",16-시공-20,g.기타,"당초 변경","2019-04-18 20:38:00",16-시공-20,g.기타,"당초 변경","2019-04-18 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J18205,"2019-04-18 08:28:00",19-설계-01,b.구조계산,"모델링 및 구조계산서 작성(하중변경)","2019-04-18 20:36:00",19-설계-01,b.구조계산,"모델링 및 구조계산서 작성(하중변경)","2019-04-18 18:31:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J15202,"2019-04-18 08:28:00",19-교영-08,d.기타,"설계기준 정리","2019-04-18 20:59:00",19-교영-08,d.기타,"설계기준 정리","2019-04-18 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J13201,"2019-04-18 08:28:00",12-설계-24,c.도면,"삼남1교 가설벤트 수량산출","2019-04-18 20:36:00",12-설계-24,c.도면,"삼남1교 가설벤트 수량산출","2019-04-18 18:31:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J17205,"2019-04-18 08:28:00",18-교영-01,c.설계사,.,"2019-04-18 18:29:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11202,"2019-04-18 08:33:00",19-시공-02,b.시공,공사관리,"2019-04-18 18:07:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15201,"2019-04-18 08:34:00",18-교영-26,c.설계사,"과업진행현황 파악","2019-04-18 18:03:00",18-교영-26,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J16202,"2019-04-18 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-18 18:19:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J09101,"2019-04-18 08:41:00",19-교영-01,c.설계사,과업조사,"2019-04-18 18:02:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10313,"2019-04-18 08:43:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-18 18:03:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14101,"2019-04-18 08:50:00",16-시공-20,출장,한양,"2019-04-18 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11305,"2019-04-18 08:50:00",16-시공-20,출장,"산외교 현장","2019-04-18 18:00:00",16-시공-20,출장,"산외교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,008C7,,,
|
|
J18202,"2019-04-18 08:50:00",07-교영-01,출장,"[구미시 해평면]구미 국가산업단지 진입도로 건설공사 1공구 (괴평교-FCM) 견적관련","2019-04-18 18:00:00",07-교영-01,출장,"[구미시 해평면]구미 국가산업단지 진입도로 건설공사 1공구 (괴평교-FCM) 견적관련","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-04-19 06:28:00",19-제조-04,b.기계,"삼간교 거푸집 보수와 바닥철판 절단가공","2019-04-19 18:02:00",19-제조-04,b.기계,"삼간교 거푸집 보수와 바닥철판 절단가공","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-04-19 06:49:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-04-19 07:08:00",17-시공-21,b.시공,"수원교 2차인장결과서 정리 및 광교2교 인장결과서 수정","2019-04-19 18:05:00",17-시공-21,b.시공,"수원교 2차인장결과서 정리 및 광교2교 인장결과서 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J16203,"2019-04-19 07:22:00",19-제조-03,a.품질검사,"A동 보일러 정비,
|
|
산외교 켄틸데크,옥산교, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-19 21:07:00",19-제조-03,a.품질검사,"A동 보일러 정비,
|
|
산외교 켄틸데크,옥산교, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-19 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
T04204,"2019-04-19 07:25:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-19 18:37:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-04-19 07:29:00",07-교영-01,d.기타,"낙동의령대교 견적준비","2019-04-19 18:13:00",07-교영-01,d.기타,"낙동의령대교 견적준비","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-04-19 07:29:00",19-제조-02,a.생산관리,"생산직 근로계약서 작성","2019-04-19 18:01:00",19-제조-02,a.생산관리,"생산직 근로계약서 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>RCP 프로그램 시제품 검토 <|>01:00<|><br>19-제조-02<|>a.생산관리<|>이기철 기사 퇴사 관련 면담<|>01:30<|><br>",,
|
|
M05510,"2019-04-19 07:31:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.219.108,NULL,NULL,004C8,,,
|
|
J14308,"2019-04-19 07:31:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-19 21:52:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-19 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18208,"2019-04-19 07:32:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-19 18:06:00",19-제조-02,a.생산관리,"산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18207,"2019-04-19 07:42:00",19-시공-04,b.시공,"실행예산 및 운영방법검토","2019-04-19 11:03:00",19-시공-04,b.시공,"실행예산 및 운영방법검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-04-19 07:42:00",19-계약-01,d.기타,"연산~두마 예상 계약가, 김포~파주 2공구 교량 예상시행가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-19 18:02:00",19-계약-01,d.기타,"연산~두마 예상 계약가, 김포~파주 2공구 교량 예상시행가 등 : 조안대교 외 7개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J13308,"2019-04-19 07:42:00",19-시공-08,b.시공,"1. 회사소개동영상 콘티 제작
|
|
2. 하자보수 협의 (심곡천교, 설악산교)
|
|
3. 기성내역 준비","2019-04-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
J10315,"2019-04-19 07:51:00",14-설계-38,"a.계획 및 협의","수리티교 런쳐 및 크레인 가설 적정성 협의자료 작성(시공사)","2019-04-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J08201,"2019-04-19 08:11:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
B15306,"2019-04-19 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-04-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-04-19 08:14:00",19-교영-01,d.기타,"1. 2016년도 설계도서 마무리 파일 작성","2019-04-19 18:03:00",19-교영-01,d.기타,"1. 2016년도 설계도서 마무리 파일 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J18206,"2019-04-19 08:17:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-19 12:25:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-04-19 08:17:00",19-설계-01,h.기타,계획,"2019-04-19 18:07:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10314,"2019-04-19 08:21:00",14-교영-00,d.기타,"R-A3교외 1개소( 동이천IC 건설공사) 설계내역서 및 견적서(특공), 장동교(순천벌교~주암 3-2공구) 시행견적서, 거더 개략공사비, DECK 개략공사비, 신평교(무심동로~오창) 설계내역서","2019-04-19 18:11:00",14-교영-00,d.기타,"R-A3교외 1개소( 동이천IC 건설공사) 설계내역서 및 견적서(특공), 장동교(순천벌교~주암 3-2공구) 시행견적서, 거더 개략공사비, DECK 개략공사비, 신평교(무심동로~오창) 설계내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-04-19 08:23:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-19 18:16:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18205,"2019-04-19 08:24:00",19-설계-01,b.구조계산,"모델링 및 구조계산서 작성(하중변경)","2019-04-19 18:05:00",19-설계-01,b.구조계산,"모델링 및 구조계산서 작성(하중변경)","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J14306,"2019-04-19 08:26:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-19 18:13:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J19201,"2019-04-19 08:28:00",19-설계-02,c.도면,업무파악,"2019-04-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.185,NULL,NULL,008E3,,,
|
|
J10301,"2019-04-19 08:28:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-19 18:14:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-04-19 08:29:00",19-시공-02,b.시공,공사관리,"2019-04-19 18:12:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J09101,"2019-04-19 08:29:00",19-교영-01,c.설계사,과업조사,"2019-04-19 18:11:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J16202,"2019-04-19 08:30:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-19 18:16:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-04-19 08:30:00",19-설계-03,e.검토,"설계기준 정리","2019-04-19 18:07:00",19-교영-08,d.기타,"설계기준 정리","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"18-설계-12<|>e.검토<|>가설계획도 요청 정리<|>01:00<|><br>12-설계-24<|>e.검토<|>스트롱백 제작도 작성<|>02:00<|><br>",,
|
|
J15201,"2019-04-19 08:30:00",19-교영-07,c.설계사,"과업진행현황 파악","2019-04-19 18:08:00",19-교영-07,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-04-19 08:31:00",18-교영-01,c.설계사,.,"2019-04-19 18:18:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11203,"2019-04-19 08:32:00",17-시공-07,g.기타,"전도방지시설(안) 도면작성","2019-04-19 18:05:00",17-시공-07,g.기타,"전도방지시설(안) 도면작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"16-시공-20<|>g.기타<|>현장견학보고서작성<|>02:30<|><br>18-설계-19<|>h.기타<|>설계사에서 받은자료 거더공사비 차이, 영업부넘김<|>00:30<|><br>19-교휴-05<|>e.기타<|>대외 경쟁력확보~, S/P거더개선 1/4분기 보고서작성<|>03:00<|><br>",,
|
|
J07210,"2019-04-19 08:34:00",16-시공-20,g.기타,"당초 변경","2019-04-19 18:08:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-04-19 08:36:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-19 18:03:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11203,"2019-04-17 08:50:00",16-시공-20,출장,"산외교 등 현장견학","2019-04-17 18:00:00",16-시공-20,출장,"산외교 등 현장견학","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J19201,"2019-04-17 08:50:00",16-시공-20,출장,"산외교 등 현장견학","2019-04-17 18:00:00",16-시공-20,출장,"산외교 등 현장견학","0000-00-00 00:00:00",NULL,NULL,NULL,008E3,,,
|
|
J11203,"2019-04-18 08:50:00",16-시공-20,출장,"산외교 등 현장견학","2019-04-18 18:00:00",16-시공-20,출장,"산외교 등 현장견학","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J19201,"2019-04-18 08:50:00",16-시공-20,출장,"산외교 등 현장견학","2019-04-18 18:00:00",16-시공-20,출장,"산외교 등 현장견학","0000-00-00 00:00:00",NULL,NULL,NULL,008E3,,,
|
|
J14101,"2019-04-19 08:50:00",16-시공-20,출장,한양,"2019-04-19 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-04-22 06:37:00",19-제조-04,b.기계,"삼간교와 북수원1교 거푸집 보수와 가공철근 출하 및 동용교 프리덱 상차","2019-04-23 06:50:00",19-제조-04,b.기계,"삼간교와 북수원1교 거푸집 보수와 가공철근 출하 및 동용교 프리덱 상차","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>b.출하<|>한맥기술 예산현장 책장 큰것 출하<|>00:30<|><br>19-제조-02<|>b.출하<|>삼안 본사에서 책장 작은 것 입고<|>00:30<|><br>",,
|
|
J11302,"2019-04-22 07:03:00",17-시공-21,b.시공,"지산교 수정가설검토","2019-04-22 18:05:00",17-시공-21,b.시공,"지산교 수정가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
M05510,"2019-04-22 11:11:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.188.169,NULL,NULL,004C8,,,
|
|
J16203,"2019-04-22 07:24:00",19-제조-03,a.품질검사,"동용교 데크,가로보 출하, A동 보일러 전기배선 수리
|
|
산외교 켄틸데크,옥산교, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-22 22:38:00",19-제조-03,a.품질검사,"동용교 데크,가로보 출하, A동 보일러 전기배선 수리
|
|
산외교 켄틸데크,옥산교, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-22 19:29:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
T04204,"2019-04-22 07:30:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-22 18:44:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-04-22 07:35:00",07-교영-01,d.기타,"낙동의령대교 견적준비","2019-04-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J14308,"2019-04-22 07:39:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-22 18:01:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-04-22 07:39:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-22 22:37:00",19-제조-02,a.생산관리,"산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J13308,"2019-04-22 07:41:00",19-시공-08,b.시공,"1. 회사소개동영상 콘티 제작
|
|
2. 하자보수 협의 (심곡천교, 설악산교)
|
|
3. 기성내역 준비","2019-04-22 20:48:00",19-시공-08,b.시공,"1. 회사소개동영상 콘티 제작
|
|
2. 하자보수 협의 (심곡천교, 설악산교)
|
|
3. 기성내역 준비","2019-04-22 18:41:00",172.16.8.170,172.16.8.170,172.16.8.170,004E3,,1,
|
|
M02302,"2019-04-22 07:43:00",19-제조-02,a.생산관리,"생산직 및 관리직 업무 조정","2019-04-22 18:11:00",19-제조-02,a.생산관리,"생산직 및 관리직 업무 조정","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>생산2팀 팀장 업무 조정관련 회의<|>01:30<|><br>19-제조-02<|>a.생산관리<|>공무팀 생산직 면담<|>02:00<|><br>",1,
|
|
J10315,"2019-04-22 07:51:00",14-설계-38,"a.계획 및 협의","수리티교 런쳐 및 크레인 가설 적정성 협의자료 작성(시공사)","2019-04-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J09102,"2019-04-22 07:52:00",19-계약-01,d.기타,"연산~두마 예상 계약가, 김포~파주 2공구 교량 예상시행가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-22 18:05:00",19-계약-01,d.기타,"연산~두마 예상 계약가, 김포~파주 2공구 교량 예상시행가 등 : 조안대교 외 7개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J18207,"2019-04-22 08:12:00",19-시공-04,b.시공,"실행예산 및 운영방법검토","2019-04-22 18:06:00",19-시공-04,b.시공,"실행예산 및 운영방법검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10301,"2019-04-22 08:12:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-22 18:20:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J08201,"2019-04-22 08:12:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-22 18:06:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-04-22 08:13:00",14-교영-00,d.기타,"도림교외 (세종~안성) 공사비증가 사유 검토자료, 장동교(순천벌교~주암 3-2공구) 시행견적서, 거더 개략공사비, DECK 개략공사비, 신평교(무심동로~오창) 설계내역서","2019-04-22 18:13:00",14-교영-00,d.기타,"도림교외 (세종~안성) 공사비증가 사유 검토자료, 장동교(순천벌교~주암 3-2공구) 시행견적서, 거더 개략공사비, DECK 개략공사비, 신평교(무심동로~오창) 설계내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-04-22 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-04-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-04-22 08:18:00",19-교영-01,d.기타,"1. 2016년도 설계도서 마무리 파일 작성","2019-04-22 21:03:00",19-교영-01,d.기타,"1. 2016년도 설계도서 마무리 파일 작성","2019-04-22 19:05:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J18206,"2019-04-22 08:21:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-22 18:07:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11203,"2019-04-22 08:24:00",17-시공-07,g.기타,"전도방지시설(안) 도면작성","2019-04-22 18:07:00",17-시공-07,g.기타,"전도방지시설(안) 도면작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-관리-04<|>g.기타<|>설계팀 서버정리(참조자료/경쟁사자료 1차정리)<|>02:00<|><br>",,
|
|
J18205,"2019-04-22 08:28:00",19-설계-01,b.구조계산,"모델링 및 구조계산서 작성(하중변경)","2019-04-22 19:50:00",19-설계-01,b.구조계산,"모델링 및 구조계산서 작성(하중변경)","2019-04-22 19:05:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,"18-시공-02<|>g.기타<|>구조계산서 수정(슬래브 항복강도변경)<|>02:00<|><br>",1,
|
|
J13201,"2019-04-22 08:28:00",12-설계-24,c.도면,"삼남1교 가설벤트 수량산출","2019-04-22 19:54:00",12-설계-24,c.도면,"삼남1교 가설벤트 수량산출","2019-04-22 19:05:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J07103,"2019-04-22 08:29:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-22 18:07:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J16202,"2019-04-22 08:30:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-22 18:04:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J19201,"2019-04-22 08:31:00",19-설계-02,c.도면,"설계도서 요약정리","2019-04-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.185,NULL,NULL,008E3,,,
|
|
J11202,"2019-04-22 08:32:00",19-시공-02,b.시공,공사관리,"2019-04-22 18:17:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J11305,"2019-04-22 08:36:00",19-설계-01,h.기타,계획,"2019-04-22 18:04:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15201,"2019-04-22 08:37:00",19-교영-07,c.설계사,"과업진행현황 파악","2019-04-22 18:02:00",19-교영-07,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-04-22 08:37:00",16-시공-20,g.기타,"당초 변경","2019-04-22 18:04:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-04-22 08:41:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J09101,"2019-04-22 08:48:00",19-교영-01,c.설계사,과업조사,"2019-04-22 18:03:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15202,"2019-04-22 08:52:00",19-설계-03,e.검토,빔배치,"2019-04-22 20:48:00",19-교영-08,d.기타,빔배치,"2019-04-22 19:06:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"12-설계-35<|>e.검토<|>스트롱백 시험제작<|>02:00<|><br>",1,
|
|
J10301,"2019-04-23 08:27:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-23 21:02:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-23 18:53:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J14101,"2019-04-22 08:50:00",16-시공-20,출장,한양,"2019-04-22 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-04-23 06:48:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-23 18:03:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-04-23 06:52:00",19-제조-04,b.기계,"삼간교와 북수원1교 거푸집과 산외교 프리덱 상차 및 가공철근과 프리덱 이적 및 야적","2019-04-23 17:59:00",19-제조-04,b.기계,"삼간교와 북수원1교 거푸집과 산외교 프리덱 상차 및 가공철근과 프리덱 이적 및 야적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-04-23 07:14:00",07-교영-01,d.기타,"낙동의령대교 견적준비","2019-04-23 18:10:00",07-교영-01,d.기타,"낙동의령대교 견적준비","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J11302,"2019-04-23 07:20:00",17-시공-21,b.시공,"갈산교 인장계획서 수정","2019-04-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E2,,,
|
|
M05510,"2019-04-23 07:20:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-24 11:25:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.62.169.183,NULL,223.62.212.250,004C8,,,
|
|
J14308,"2019-04-23 07:21:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-23 20:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-23 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-04-23 07:25:00",16-제조-02,a.생산관리,"금곡교,성주대교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-04-23 07:27:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-23 22:27:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-23 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-04-23 07:29:00",19-제조-02,a.생산관리,"철근절단프로그램 Story Board 검토","2019-04-23 18:01:00",19-제조-02,a.생산관리,"철근절단프로그램 Story Board 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공무반장 면담<|>00:30<|><br>19-제조-02<|>a.생산관리<|>서울사무실 협의(남점권 부사장)<|>06:00<|><br>",,
|
|
J18207,"2019-04-23 07:32:00",17-시공-08,b.시공,"빔런쳐제작 및 운영방법검토","2019-04-23 18:11:00",17-시공-08,b.시공,"빔런쳐제작 및 운영방법검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-04-23 07:34:00",19-제조-03,a.품질검사,"산외교 데크출하(6대)
|
|
산외교 켄틸데크,옥산교, 새천1교 데크 생산 및 품질관리
|
|
","2019-04-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J13308,"2019-04-23 07:41:00",19-시공-08,b.시공,"1. 회사소개동영상 제작
|
|
2. 하자보수 협의 (심곡천교, 설악산교)
|
|
3. 기성내역 준비","2019-04-23 19:35:00",19-시공-08,b.시공,"1. 회사소개동영상 제작
|
|
2. 하자보수 협의 (심곡천교, 설악산교)
|
|
3. 기성내역 준비","2019-04-23 18:40:00",172.16.8.170,172.16.8.170,172.16.8.170,004E3,,1,
|
|
J10315,"2019-04-23 07:47:00",14-설계-38,"a.계획 및 협의","수리티교 런쳐 및 크레인 가설 적정성 협의자료 작성(시공사)","2019-04-23 18:02:00",14-설계-38,"a.계획 및 협의","수리티교 런쳐 및 크레인 가설 적정성 협의자료 작성(시공사)","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J09102,"2019-04-23 07:50:00",19-계약-01,d.기타,"새만금~전주5 고려개발 본사, 서부내륙민자관련 포스코 합사 방문 등 : 조안대교 외 7개교 계약 추진 중","2019-04-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18206,"2019-04-23 08:10:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-24 08:27:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-04-23 08:13:00",19-교영-01,d.기타,"1. 감이교 슬래브 배근도 수정
|
|
2. 2016년도 설계도서 마무리 파일 작성","2019-04-23 18:01:00",19-교영-01,d.기타,"1. 감이교 슬래브 배근도 수정
|
|
2. 2016년도 설계도서 마무리 파일 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
B15306,"2019-04-23 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-04-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-04-23 08:15:00",14-교영-00,d.기타,"장동교(순천벌교~주암 3-2공구) 시행견적서, 도림교외 (세종~안성) 공사비증가 사유 검토자료, R-A2교(회덕IC 연결도로) 설계견적서 및 내역서, 마야위천교(포천~화도 2공구) 시행견적서, 거더 개략공사비, 아중교(용진~우아2) 시행견적서","2019-04-23 18:16:00",14-교영-00,d.기타,"장동교(순천벌교~주암 3-2공구) 시행견적서, 도림교외 (세종~안성) 공사비증가 사유 검토자료, R-A2교(회덕IC 연결도로) 설계견적서 및 내역서, 마야위천교(포천~화도 2공구) 시행견적서, 거더 개략공사비, 아중교(용진~우아2) 시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-04-23 08:18:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-23 18:06:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-04-23 08:21:00",19-설계-01,h.기타,계획,"2019-04-23 18:05:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J14306,"2019-04-23 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-23 18:11:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18205,"2019-04-23 08:24:00",19-설계-01,b.구조계산,"모델링 및 구조계산서 작성(하중변경)","2019-04-23 21:43:00",19-설계-01,b.구조계산,"모델링 및 구조계산서 작성(하중변경)","2019-04-23 18:41:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J13201,"2019-04-23 08:25:00",12-설계-24,c.도면,"삼남1교 가설벤트 구조검토","2019-04-23 18:04:00",12-설계-24,c.도면,"삼남1교 가설벤트 구조검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,"19-교영-01<|>b.시공사<|>추포-암태 프리데크 바닥판 구조검토<|>03:00<|><br>",,
|
|
J11203,"2019-04-23 08:25:00",18-시공-15,g.기타,"가설밴트 구조계산(조합 3m x 1m)","2019-04-23 18:03:00",18-시공-15,g.기타,"가설밴트 구조계산","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J19201,"2019-04-23 08:28:00",19-설계-02,c.도면,"설계도서 요약정리","2019-04-23 18:02:00",19-설계-02,c.도면,"설계도서 요약정리","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J11202,"2019-04-23 08:28:00",19-시공-02,b.시공,공사관리,"2019-04-23 18:13:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-04-23 08:30:00",19-설계-03,e.검토,빔배치,"2019-04-23 21:03:00",19-교영-08,d.기타,빔배치,"2019-04-23 18:42:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"12-설계-24<|>e.검토<|>스트롱백 시험제작<|>02:00<|><br>",1,
|
|
J07210,"2019-04-23 08:31:00",16-시공-20,g.기타,"당초 변경","2019-04-23 20:51:00",16-시공-20,g.기타,"당초 변경","2019-04-23 18:42:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15201,"2019-04-23 08:35:00",19-교영-07,c.설계사,"과업진행현황 파악","2019-04-23 18:45:00",19-교영-07,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-04-23 08:36:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-23 18:02:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J07103,"2019-04-23 08:37:00",19-교영-01,d.기타,"사업관리
|
|
","2019-04-23 18:15:00",19-교영-01,d.기타,"사업관리
|
|
","0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J17205,"2019-04-23 08:39:00",18-교영-01,c.설계사,.,"2019-04-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J16202,"2019-04-23 08:40:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-23 20:34:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-23 18:31:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J09101,"2019-04-23 08:41:00",19-교영-01,c.설계사,과업조사,"2019-04-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-04-23 08:50:00",16-시공-20,출장,한양,"2019-04-23 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-04-24 06:42:00",19-제조-04,b.기계,"금곡교 거푸집 보수와 산외교 프리덱 상차 및 가공철근과 프리덱 이적 및 야적","2019-04-25 07:32:00",19-제조-04,b.기계,"금곡교 거푸집 보수와 산외교 프리덱 상차 및 가공철근과 프리덱 이적 및 야적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-04-24 06:48:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J18208,"2019-04-24 07:09:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-24 18:53:00",19-제조-02,a.생산관리,"산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-04-24 07:31:00",16-제조-02,a.생산관리,"삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-04-24 07:34:00",19-시공-04,b.시공,"공동도급운영위원회회의 및 운영방법검토","2019-04-24 18:11:00",19-시공-04,b.시공,"공동도급운영위원회회의 및 운영방법검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J14308,"2019-04-24 07:34:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-24 18:18:18",19-제조-02,a.생산관리,NULL,"2019-04-24 18:31:00",175.203.206.128,175.203.206.128,NULL,006E2,,,
|
|
J18202,"2019-04-24 07:39:00",07-교영-01,d.기타,"낙동의령대교 견적준비","2019-04-24 18:09:00",07-교영-01,d.기타,"낙동의령대교 견적준비","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-04-24 07:42:00",19-계약-01,d.기타,"조안대교 계약관련 현장, 안성~구리 4공구 계룡건설 방문 등 : 조안대교 외 7개교 계약 추진 중","2019-04-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-04-24 07:44:00",19-제조-03,a.품질검사,"산외교 데크출하(3대)
|
|
산외교 켄틸데크,옥산교, 데크 생산 및 품질관리
|
|
","2019-04-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J13308,"2019-04-24 07:54:00",19-시공-08,b.시공,"1. 회사소개동영상 제작
|
|
2. 하자보수 협의 (심곡천교, 설악산교)
|
|
3. 기성내역 준비","2019-04-24 18:08:00",19-시공-08,b.시공,"1. 회사소개동영상 제작
|
|
2. 하자보수 협의 (심곡천교, 설악산교)
|
|
3. 기성내역 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10315,"2019-04-24 08:02:00",19-설계-03,"a.계획 및 협의","런쳐가설 적정성 검토","2019-04-24 18:10:00",19-설계-03,"a.계획 및 협의","런쳐가설 적정성 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
B15306,"2019-04-24 08:08:00",18-관리-02,e.기타,"비서업무 외","2019-04-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-04-24 08:09:00",19-설계-01,h.기타,계획,"2019-04-24 18:04:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10314,"2019-04-24 08:15:00",14-교영-00,d.기타,"장동교(순천벌교~주암 3-2공구) 시행견적서, 도림교외 (세종~안성) 공사비증가 사유 검토자료, R-A2교(회덕IC 연결도로) 설계견적서 및 내역서, 마야위천교(포천~화도 2공구) 시행견적서, 거더 개략공사비, 아중교(용진~우아2) 시행견적서","2019-04-24 18:23:00",14-교영-00,d.기타,"장동교(순천벌교~주암 3-2공구) 시행견적서, 도림교외 (세종~안성) 공사비증가 사유 검토자료, R-A2교(회덕IC 연결도로) 설계견적서 및 내역서, 마야위천교(포천~화도 2공구) 시행견적서, 거더 개략공사비, 아중교(용진~우아2) 시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15307,"2019-04-24 08:18:00",19-교영-01,d.기타,"1. 감이교 슬래브 배근도 수정
|
|
2. 2016년도 설계도서 정리 작성","2019-04-24 18:06:00",19-교영-01,d.기타,"1. 감이교 슬래브 배근도 수정
|
|
2. 2016년도 설계도서 정리 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J11203,"2019-04-24 08:21:00",18-시공-15,g.기타,"가설밴트 구조계산(조합 2.5m x 2.5m)","2019-04-24 18:06:00",18-시공-15,g.기타,"가설밴트 구조계산(조합 2.5m x 2.5m)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J14306,"2019-04-24 08:21:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-24 18:10:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-04-24 08:23:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-24 18:34:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11202,"2019-04-24 08:25:00",19-시공-02,b.시공,공사관리,"2019-04-24 18:14:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18206,"2019-04-24 08:27:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-24 18:28:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10301,"2019-04-24 08:27:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-24 21:03:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-24 18:35:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J17205,"2019-04-24 08:28:00",18-교영-01,c.설계사,.,"2019-04-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J19201,"2019-04-24 08:29:00",19-설계-02,c.도면,"설계도서 요약정리","2019-04-24 18:05:00",19-설계-02,c.도면,"설계도서 요약정리","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J07210,"2019-04-24 08:31:00",16-시공-20,g.기타,"당초 변경","2019-04-24 18:09:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-04-24 08:36:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-24 18:01:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15202,"2019-04-24 08:39:00",19-설계-03,e.검토,교량계획,"2019-04-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.155,NULL,NULL,008E1,"12-설계-24<|>e.검토<|>스트롱백 시험제작<|>02:00<|><br>18-설계-12<|>e.검토<|>지산교 가설계획도 작성<|>01:00<|><br>",,
|
|
J09101,"2019-04-24 08:39:00",19-교영-01,c.설계사,과업조사,"2019-04-24 18:20:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J13201,"2019-04-24 08:40:00",12-설계-24,c.도면,"삼남1교 가설벤트 구조검토","2019-04-24 18:05:00",12-설계-24,c.도면,"삼남1교 가설벤트 구조검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
M05510,"2019-04-24 11:27:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-25 08:17:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.62.212.250,NULL,223.62.163.23,004C8,,,
|
|
J14101,"2019-04-24 08:50:00",16-시공-20,출장,한양,"2019-04-24 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07103,"2019-04-24 08:50:00",16-시공-20,출장,현장,"2019-04-24 18:00:00",16-시공-20,출장,현장,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J11302,"2019-04-24 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장견학","2019-04-24 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장견학","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
M02302,"2019-04-25 07:26:00",19-제조-02,a.생산관리,"공무팀 생산직 개별면담","2019-04-25 18:04:00",19-제조-02,a.생산관리,"공무팀 생산직 개별면담","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>L동 옹벽 보강 관련협의(한국구조안전)<|>01:30<|><br>19-제조-02<|>a.생산관리<|>철근가공 스케줄 관련 협의(세진이씨에스,동원영사장)<|>01:30<|><br>",,
|
|
T04204,"2019-04-25 07:27:00",16-제조-02,a.생산관리,"삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-04-25 07:33:00",07-교영-01,d.기타,"낙동의령대교 견적준비","2019-04-25 18:06:00",07-교영-01,d.기타,"낙동의령대교 견적준비","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J07202,"2019-04-25 07:33:00",19-제조-04,b.기계,"금곡교 거푸집 보수와 산외교 프리덱 상차 및 가공철근과 프리덱 이적 및 야적","2019-04-26 06:33:00",19-제조-04,b.기계,"금곡교 거푸집 보수와 산외교 프리덱 상차 및 가공철근과 프리덱 이적 및 야적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J10315,"2019-04-25 07:37:00",19-설계-03,"a.계획 및 협의","런쳐가설 적정성 검토","2019-04-25 18:07:00",19-설계-03,"a.계획 및 협의","런쳐가설 적정성 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J14308,"2019-04-25 07:42:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-25 22:21:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-25 19:10:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-04-25 07:44:00",19-제조-03,a.품질검사,"산외교 데크출하(3대)
|
|
산외교 켄틸데크,옥산교, 데크 생산 및 품질관리
|
|
","2019-04-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-04-25 07:52:00",19-계약-01,d.기타,"농어촌공사 충북지역본부 방문예정, 남일~보은 예상 계약가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J11305,"2019-04-25 08:04:00",19-설계-01,h.기타,계획,"2019-04-25 18:06:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J19201,"2019-04-25 08:06:00",19-설계-02,c.도면,"설계도서 요약정리","2019-04-25 18:01:00",19-설계-02,c.도면,"설계도서 요약정리","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J18206,"2019-04-25 08:11:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-25 18:22:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-04-25 08:15:00",14-교영-00,d.기타,"세종~안성 2, 9공구 공사비증가 사유 검토자료, 장동교(순천벌교~주암 3-2공구) 시행견적서, R-A2교(회덕IC 연결도로) 설계견적서 및 내역서, 거더 개략공사비, 아중교(용진~우아2) 시행견적서","2019-04-25 18:07:00",14-교영-00,d.기타,"세종~안성 2, 9공구 공사비증가 사유 검토자료, 장동교(순천벌교~주암 3-2공구) 시행견적서, R-A2교(회덕IC 연결도로) 설계견적서 및 내역서, 거더 개략공사비, 아중교(용진~우아2) 시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
M05510,"2019-04-25 08:18:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.163.23,NULL,NULL,004C8,,,
|
|
B15306,"2019-04-25 08:19:00",18-관리-02,e.기타,"비서업무 외","2019-04-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J14306,"2019-04-25 08:22:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-25 18:03:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-04-25 08:27:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-25 19:51:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-25 18:49:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J16202,"2019-04-25 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-25 18:27:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-04-25 08:33:00",18-시공-15,g.기타,"가설밴트 도면정리","2019-04-25 18:02:00",18-시공-15,g.기타,"가설밴트 도면정리","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J13201,"2019-04-25 08:33:00",18-설계-12,c.도면,"청룡2교 도면수정 확인","2019-04-25 18:10:00",18-설계-12,c.도면,"청룡2교 도면수정 확인","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,"18-설계-06<|>b.구조계산<|>신촌교 받침이력 작성<|>04:00<|><br>",,
|
|
J07210,"2019-04-25 08:34:00",16-시공-20,g.기타,"당초 변경","2019-04-25 20:47:00",16-시공-20,g.기타,"당초 변경","2019-04-25 18:36:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15202,"2019-04-25 08:35:00",19-설계-03,e.검토,교량계획,"2019-04-25 20:48:00",19-교영-08,d.기타,교량계획,"2019-04-25 18:36:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"18-설계-06<|>e.검토<|>받침이력표 작성<|>02:00<|><br>12-설계-24<|>e.검토<|>스트롱백 시험제작 작성<|>01:30<|><br>",1,
|
|
J15307,"2019-04-25 08:35:00",19-교영-01,d.기타,"1. 감이교 슬래브 배근도 수정
|
|
2. 2016년도 설계도서 정리 작성","2019-04-25 18:04:00",19-교영-01,d.기타,"1. 감이교 슬래브 배근도 수정
|
|
2. 2016년도 설계도서 정리 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J15201,"2019-04-25 08:37:00",19-교영-07,c.설계사,"과업진행현황 파악","2019-04-25 18:02:00",19-교영-07,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-04-25 08:38:00",18-교영-01,c.설계사,.,"2019-04-25 12:21:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-04-25 08:39:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-25 18:02:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J13308,"2019-04-25 08:50:00",19-시공-08,출장,"[천안시청]공사 착공계제출 및 발주처 협의","2019-04-25 19:31:00",19-시공-08,b.시공,"1. 회사소개동영상 제작
|
|
2. 하자보수 협의 (심곡천교, 설악산교)
|
|
3. 기성내역 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18208,"2019-04-25 07:30:00",,,"생산관리 및 산외교 Shop DWG","2019-04-25 21:53:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-25 18:43:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,,
|
|
J14101,"2019-04-25 08:50:00",16-시공-20,출장,한양,"2019-04-25 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-04-25 08:50:00",16-시공-20,출장,"[경남 밀양]산외교 현장견학","2019-04-25 18:00:00",16-시공-20,출장,"[경남 밀양]산외교 현장견학","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J11202,"2019-04-25 08:50:00",17-시공-08,출장,"[대구광역시 달성군]세천2교 빔런처 제작 관련 공정협의","2019-04-25 18:00:00",17-시공-08,출장,"[대구광역시 달성군]세천2교 빔런처 제작 관련 공정협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18207,"2019-04-25 08:50:00",17-시공-08,출장,"[대구광역시 달성군]세천2교 빔런처 제작 관련 공정협의","2019-04-25 18:00:00",17-시공-08,출장,"[대구광역시 달성군]세천2교 빔런처 제작 관련 공정협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-04-25 08:50:00",17-시공-08,출장,"[대구광역시 달성군]세천2교 빔런처 제작 관련 공정협의","2019-04-25 18:00:00",17-시공-08,출장,"[대구광역시 달성군]세천2교 빔런처 제작 관련 공정협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J07202,"2019-04-26 06:34:00",19-제조-04,b.기계,"북수원1교 거푸집 상차와 금곡교 거푸집 보수 및 가공철근과 프리덱 이적 및 야적","2019-04-27 06:18:00",19-제조-04,b.기계,"북수원1교 거푸집 상차와 금곡교 거푸집 보수 및 가공철근과 프리덱 이적 및 야적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-04-26 06:49:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-04-26 07:23:00",17-시공-21,g.기타,"광교2교, 주천1교 2차인장결과서 정리
|
|
갈산교 2차인장결과보고서 작성","2019-04-26 18:04:00",17-시공-21,g.기타,"광교2교, 주천1교 2차인장결과서 정리
|
|
갈산교 2차인장결과보고서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18208,"2019-04-26 07:28:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-26 21:05:00",19-제조-02,a.생산관리,"산외교 Shop DWG","2019-04-26 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-04-26 07:31:00",19-제조-02,a.생산관리,"공무팀 생산직 개별면담","2019-04-26 21:05:00",19-제조-02,a.생산관리,"공무팀 생산직 개별면담","2019-04-26 18:58:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,,1,
|
|
T04204,"2019-04-26 07:31:00",16-제조-02,a.생산관리,"삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-04-26 07:35:00",17-시공-08,b.시공,"세천2교 빔런처 제작 관련 공정협의","2019-04-26 19:06:00",17-시공-08,b.시공,"세천2교 빔런처 제작 관련 공정협의","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-04-26 07:37:00",19-제조-03,a.품질검사,"산외교 켄틀출하(1대)
|
|
산외교 켄틸데크,옥산교, 데크 생산 및 품질관리
|
|
","2019-04-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-04-26 07:39:00",19-계약-01,d.기타,"대림산업 사업현장 List, 남일~보은 예상 계약가 등 : 조안대교 외 7개교 계약 추진 중","2019-04-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J14308,"2019-04-26 07:40:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-26 20:35:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-26 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J10315,"2019-04-26 07:44:00",19-설계-03,"a.계획 및 협의","런쳐가설 적정성 검토","2019-04-26 18:02:00",19-설계-03,"a.계획 및 협의","런쳐가설 적정성 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18202,"2019-04-26 07:44:00",07-교영-01,d.기타,"낙동의령대교 견적준비","2019-04-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J13308,"2019-04-26 07:51:00",19-시공-08,b.시공,"1. 도급내역서 작성
|
|
2. 업체 견적 및 품의","2019-04-26 18:04:00",19-시공-08,b.시공,"1. 도급내역서 작성
|
|
2. 업체 견적 및 품의","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10314,"2019-04-26 08:07:00",14-교영-00,d.기타,"수리티교(남일~보은 2공구) 가설 설계내역서, R-A2교(회덕IC 연결도로) 설계내역서, 감이교 및 목동교 공사비 검토, 세종~안성 5공구 공사비증가 사유 검토자료, 거더 개략공사비, 아중교(용진~우아2) 시행견적서","2019-04-26 18:04:00",14-교영-00,d.기타,"수리티교(남일~보은 2공구) 가설 설계내역서, R-A2교(회덕IC 연결도로) 설계내역서, 감이교 및 목동교 공사비 검토, 세종~안성 5공구 공사비증가 사유 검토자료, 거더 개략공사비, 아중교(용진~우아2) 시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-04-26 08:09:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-26 18:08:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-04-26 08:10:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-26 17:46:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-04-26 08:15:00",19-교영-01,d.기타,"1. 청룡2교 슬래브도, 거더도 변경
|
|
2. 2016년도 설계도서 정리 작성","2019-04-26 18:00:00",19-교영-01,d.기타,"1. 청룡2교 슬래브도, 거더도 변경
|
|
2. 2016년도 설계도서 정리 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
B15306,"2019-04-26 08:15:00",18-관리-02,e.기타,"비서업무 외","2019-04-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-04-26 08:17:00",19-설계-01,h.기타,계획,"2019-04-26 18:03:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18205,"2019-04-26 08:20:00",19-설계-01,b.구조계산,"모델링 및 구조계산서 작성(하중변경)","2019-04-26 18:03:00",19-설계-01,b.구조계산,"모델링 및 구조계산서 작성(하중변경)","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J13201,"2019-04-26 08:21:00",19-설계-03,c.도면,"송산~시화 연결교 빔배치","2019-04-26 18:04:00",19-설계-03,c.도면,"송산~시화 연결교 빔배치","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11203,"2019-04-26 08:22:00",18-시공-15,g.기타,"가설밴트 도면정리","2019-04-26 18:02:00",18-시공-15,g.기타,"가설밴트 도면정리","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-관리-04<|>g.기타<|>업무회의(김ES, 박BJ, 류BJ)<|>01:00<|><br>17-시공-10<|>g.기타<|>주두부 동바리제거시 거더안전성검토(자료수집 및 모델링)<|>03:00<|><br>",,
|
|
J14306,"2019-04-26 08:24:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-26 18:53:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-04-26 08:25:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-26 18:07:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16202,"2019-04-26 08:26:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-26 18:07:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J19201,"2019-04-26 08:27:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","2019-04-26 18:01:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J11202,"2019-04-26 08:27:00",19-시공-02,b.시공,공사관리,"2019-04-26 18:11:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-04-26 08:30:00",19-설계-03,e.검토,"교량계획 및 검토","2019-04-26 20:39:00",19-설계-03,e.검토,"교량계획 및 검토","2019-04-26 18:32:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J09101,"2019-04-26 08:30:00",19-교영-01,c.설계사,과업조사,"2019-04-26 18:03:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J07210,"2019-04-26 08:31:00",16-시공-20,g.기타,"당초 변경","2019-04-26 18:02:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15201,"2019-04-26 08:37:00",19-교영-07,c.설계사,"과업진행현황 파악","2019-04-26 18:06:00",19-교영-07,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-04-26 08:37:00",18-교영-01,c.설계사,.,"2019-04-26 18:31:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
M05510,"2019-04-26 09:36:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.188.222,NULL,NULL,004C8,,,
|
|
J07103,"2019-04-26 08:30:00",19-교영-01,d.기타,사업관리,"2019-04-26 20:59:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J16203,"2019-04-29 08:50:00",19-교휴-01,교육,"품질관리 담당자 교육(KS)-한국표준협회","2019-04-29 18:00:00",19-교휴-01,교육,"품질관리 담당자 교육(KS)-한국표준협회","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J16203,"2019-04-30 08:50:00",19-교휴-01,교육,"품질관리 담당자 교육(KS)-한국표준협회","2019-04-30 18:00:00",19-교휴-01,교육,"품질관리 담당자 교육(KS)-한국표준협회","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J14101,"2019-04-26 08:50:00",16-시공-20,출장,한양,"2019-04-26 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-04-27 06:18:00",19-제조-04,b.기계,"금곡교 거푸집 보수 및 가공철근과 프리덱 이적 및 야적","2019-04-27 13:26:00",19-제조-04,b.기계,"금곡교 거푸집 보수 및 가공철근과 프리덱 이적 및 야적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-04-27 07:25:00",16-제조-02,a.생산관리,"삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-27 16:04:00",16-제조-02,a.생산관리,"삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-04-27 07:31:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-04-27 16:01:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M02302,"2019-04-27 07:32:00",19-제조-02,a.생산관리,"산외교 Pre-Deck Shop 지원","2019-04-27 16:03:00",19-제조-02,a.생산관리,"산외교 Pre-Deck Shop 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
J14308,"2019-04-27 07:35:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-27 16:03:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M05510,"2019-04-27 07:48:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-28 07:18:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.62.188.60,NULL,223.62.188.116,004C8,,,
|
|
M05510,"2019-04-28 07:19:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.188.116,NULL,NULL,004C8,,,
|
|
J07202,"2019-04-29 06:38:00",19-제조-04,b.기계,"도하4교 앵커 해체와 금곡교 거푸집 보수 및 가공철근과 프리덱 이적 및 야적","2019-04-30 06:29:00",19-제조-04,b.기계,"도하4교 앵커 해체와 금곡교 거푸집 보수 및 가공철근과 프리덱 이적 및 야적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-04-29 06:55:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-04-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
M05510,"2019-04-29 07:06:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-04-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.169.148,NULL,NULL,004C8,,,
|
|
T04204,"2019-04-29 07:22:00",16-제조-02,a.생산관리,"삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-04-29 07:24:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-04-29 21:42:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-04-29 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J11302,"2019-04-29 07:24:00",17-시공-21,g.기타,"제3연륙교 예정공정표 수정
|
|
시화MTV 가설검토","2019-04-29 18:03:00",17-시공-21,g.기타,"제3연륙교 예정공정표 수정
|
|
시화MTV 가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J14308,"2019-04-29 07:31:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-29 21:25:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-29 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18202,"2019-04-29 07:33:00",07-교영-01,d.기타,"낙동의령대교 견적준비","2019-04-29 18:05:00",07-교영-01,d.기타,"낙동의령대교 견적준비","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-04-29 07:41:00",19-제조-02,a.생산관리,"현장창고 가설건축물 신고 관련 시청협의","2019-04-29 18:01:00",19-제조-02,a.생산관리,"현장창고 가설건축물 신고 관련 시청협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>산외교 Pre-Deck Shop 지원<|>03:00<|><br>",,
|
|
J10315,"2019-04-29 07:41:00",13-설계-33,"a.계획 및 협의","제작 및 가설협의자료 작성","2019-04-29 18:02:00",13-설계-33,"a.계획 및 협의","제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J13308,"2019-04-29 07:47:00",19-시공-08,b.시공,"1. 업체 견적 및 품의
|
|
2. 심곡천교 하자보수 결과지 작성","2019-04-29 18:03:00",19-시공-08,b.시공,"1. 업체 견적 및 품의
|
|
2. 심곡천교 하자보수 결과지 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18207,"2019-04-29 07:48:00",19-시공-08,b.시공,"공사착공을위한 예산편성 및 집행검토","2019-04-29 18:02:00",19-시공-08,b.시공,"공사착공을위한 예산편성 및 집행검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10314,"2019-04-29 08:08:00",14-교영-00,d.기타,"R-A2교(회덕IC 연결도로) 설계내역서 및 견적서, 감이교 및 목동교 공사비 검토, 수리티교(남일~보은 2공구) 가설 설계내역서, 세종~안성 5공구 공사비증가 사유 검토자료, 거더 개략공사비, 아중교(용진~우아2) 시행견적서(입찰)","2019-04-29 18:05:00",14-교영-00,d.기타,"R-A2교(회덕IC 연결도로) 설계내역서 및 견적서, 감이교 및 목동교 공사비 검토, 수리티교(남일~보은 2공구) 가설 설계내역서, 세종~안성 5공구 공사비증가 사유 검토자료, 거더 개략공사비, 아중교(용진~우아2) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-04-29 08:10:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.179,NULL,NULL,001C5,,,
|
|
B15306,"2019-04-29 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-04-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J09101,"2019-04-29 08:21:00",19-교영-01,c.설계사,과업조사,"2019-04-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J11203,"2019-04-29 08:23:00",17-시공-10,g.기타,"주두부 동바리제거시 거더안전성검토 (모델링)","2019-04-29 18:05:00",17-시공-10,g.기타,"주두부 동바리제거시 거더안전성검토 (모델링)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-관리-04<|>g.기타<|>설계팀회의(김ES 이하 7인)<|>01:30<|><br>",,
|
|
J18205,"2019-04-29 08:25:00",19-설계-01,b.구조계산,"도면 및 수량 수정(가설계획도 작성)","2019-04-29 18:07:00",19-설계-01,b.구조계산,"도면 및 수량 수정(가설계획도 작성)","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,"18-시공-02<|>g.기타<|>슬래브 항복강도 변경 검토(성과품검토)<|>02:00<|><br>",,
|
|
J13201,"2019-04-29 08:25:00",19-설계-03,c.도면,"송산~시화 연결교 EL산출근거표 작성","2019-04-29 18:06:00",19-설계-03,c.도면,"송산~시화 연결교 빔배치","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J14306,"2019-04-29 08:26:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-29 18:03:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-04-29 08:28:00",19-시공-02,b.시공,공사관리,"2019-04-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J10301,"2019-04-29 08:29:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-29 18:19:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-04-29 08:30:00",19-설계-03,e.검토,모델링,"2019-04-29 18:06:00",19-설계-03,e.검토,모델링,"0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"19-설계-03<|>h.기타<|>일정회의 및 계획<|>02:00<|><br>18-설계-12<|>e.검토<|>지산교 가설계획도 검토<|>02:00<|><br>",,
|
|
J15307,"2019-04-29 08:30:00",19-교영-01,d.기타,"1. 청룡2교 슬래브도, 거더도 변경
|
|
2. 2016년도 설계도서 정리 작성","2019-04-29 18:02:00",19-교영-01,d.기타,"1. 청룡2교 슬래브도, 거더도 변경
|
|
2. 2016년도 설계도서 정리 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J16202,"2019-04-29 08:34:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-29 18:06:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-04-29 08:34:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-04-29 18:03:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07103,"2019-04-29 08:34:00",19-교영-01,d.기타,사업관리,"2019-04-29 18:24:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J07210,"2019-04-29 08:37:00",16-시공-20,g.기타,"당초 변경","2019-04-29 18:06:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J19201,"2019-04-29 08:37:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","2019-04-29 18:06:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J10313,"2019-04-29 08:40:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-29 18:03:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J17205,"2019-04-29 08:42:00",18-교영-01,c.설계사,.,"2019-04-29 18:31:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J09102,"2019-04-29 08:50:00",19-계약-01,경유,"대림산업 본사 외주실 : 협력사 계약관련 면담","2019-04-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J08201,"2019-04-29 08:20:00",19-설계-01,"a.계획 및 협의","설계변경 자료 협의","2019-04-29 19:49:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J14101,"2019-04-29 08:50:00",16-시공-20,출장,한양,"2019-04-29 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-04-30 06:30:00",19-제조-04,b.기계,"금곡교 거푸집(H1.7m) 보수 및 가공철근과 프리덱 이적 및 야적","2019-04-30 19:23:00",19-제조-04,b.기계,"금곡교 거푸집(H1.7m) 보수 및 가공철근과 프리덱 이적 및 야적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-04-30 07:04:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-30 21:52:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-04-30 18:37:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J11302,"2019-04-30 07:11:00",17-시공-21,g.기타,"제3연륙교 예정공정표 수정
|
|
시화MTV 가설검토","2019-04-30 18:04:00",17-시공-21,g.기타,"제3연륙교 예정공정표 수정
|
|
시화MTV 가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18202,"2019-04-30 07:15:00",07-교영-01,d.기타,"낙동의령대교 견적준비","2019-04-30 18:08:00",07-교영-01,d.기타,"낙동의령대교 견적준비","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
T04204,"2019-04-30 07:20:00",16-제조-02,a.생산관리,"삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-04-30 18:38:00",16-제조-02,a.생산관리,"삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-04-30 07:29:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-04-30 18:28:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-04-30 07:31:00",19-제조-02,a.생산관리,"산외교 데크 Shop Dwg지원","2019-04-30 18:06:00",19-제조-02,a.생산관리,"현장창고 가설건축물 신고 관련 시청협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>생산동 내 환경관리 지시<|>01:30<|><br>19-제조-02<|>a.생산관리<|>공무팀 관련 면담<|>02:00<|><br>",,
|
|
J10315,"2019-04-30 07:36:00",18-설계-19,e.검토,"전동교 가설관련 보고서 및 도면 작성","2019-04-30 12:18:00",18-설계-19,e.검토,"전동교 가설관련 보고서 및 도면 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J13308,"2019-04-30 07:40:00",19-시공-08,b.시공,"1. 업체 견적 및 품의
|
|
2. 심곡천교 하자보수 결과지 작성","2019-04-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
J18207,"2019-04-30 07:44:00",19-시공-08,b.시공,"공사착공을위한 예산편성 및 집행검토","2019-04-30 18:22:00",19-시공-08,b.시공,"공사착공을위한 예산편성 및 집행검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-04-30 07:55:00",19-계약-01,d.기타,"수원외곽순환 민자 변경 계약가 등 : 조안대교 외 2개교 계약 추진 중","2019-04-30 18:02:00",19-계약-01,d.기타,"수원외곽순환 민자 변경 계약가 등 : 조안대교 외 2개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J10314,"2019-04-30 08:06:00",14-교영-00,d.기타,"세종~안성 공사비증가 사유 검토자료, R-A2교(회덕IC 연결도로) 설계내역서 및 견적서, 수리티교(남일~보은 2공구) 가설 설계내역서, 거더 개략공사비, 아중교(용진~우아2) 시행견적서(입찰)","2019-04-30 18:05:00",14-교영-00,d.기타,"세종~안성 공사비증가 사유 검토자료, R-A2교(회덕IC 연결도로) 설계내역서 및 견적서, 수리티교(남일~보은 2공구) 가설 설계내역서, 거더 개략공사비, 아중교(용진~우아2) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-04-30 08:14:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-04-30 18:16:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-04-30 08:15:00",18-관리-02,e.기타,"비서업무 외","2019-04-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-04-30 08:18:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-04-30 18:14:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J13201,"2019-04-30 08:23:00",16-설계-19,c.도면,"감이교 슬래브 간소화 도면으로 변경","2019-04-30 18:15:00",16-설계-19,c.도면,"감이교 슬래브 간소화 도면으로 변경","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J18205,"2019-04-30 08:23:00",19-설계-01,b.구조계산,"도면 및 수량 수정(가설계획도 작성)","2019-04-30 18:15:00",19-설계-01,b.구조계산,"도면 및 수량 수정(가설계획도 작성)","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,"17-시공-09<|>g.기타<|>거더 구조도 검토<|>04:00<|><br>",,
|
|
J19201,"2019-04-30 08:24:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","2019-04-30 18:04:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J15202,"2019-04-30 08:25:00",19-설계-03,e.검토,모델링,"2019-04-30 18:15:00",19-설계-03,e.검토,모델링,"0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,1,
|
|
J14306,"2019-04-30 08:28:00",19-관리-04,a.계약,"계약, 인사 외","2019-04-30 18:06:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-04-30 08:28:00",19-교영-01,c.설계사,신규사업현황조사,"2019-04-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J15307,"2019-04-30 08:29:00",19-교영-01,d.기타,"1. 청룡2교 슬래브도, 거더도 변경","2019-04-30 18:02:00",19-교영-01,d.기타,"1. 청룡2교 슬래브도, 거더도 변경","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J10301,"2019-04-30 08:29:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-04-30 18:27:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-04-30 08:31:00",19-시공-02,b.시공,공사관리,"2019-04-30 18:08:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10313,"2019-04-30 08:31:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-04-30 18:07:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15201,"2019-04-30 08:36:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-04-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J11305,"2019-04-30 08:36:00",19-설계-01,h.기타,계획,"2019-04-30 18:02:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J17205,"2019-04-30 08:37:00",18-교영-01,c.설계사,.,"2019-04-30 19:55:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-04-30 08:39:00",16-시공-20,g.기타,"당초 변경","2019-04-30 18:07:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11203,"2019-04-30 08:40:00",17-시공-10,g.기타,"주두부 동바리제거시 거더안전성검토서작성","2019-04-30 18:03:00",17-시공-10,g.기타,"주두부 동바리제거시 거더안전성검토서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-09<|>g.기타<|>주두부 동바리제거시 거더안전성검토서작성<|>03:00<|><br>",,
|
|
J09101,"2019-04-30 08:54:00",19-교영-01,c.설계사,과업조사,"2019-04-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J07103,"2019-04-30 08:30:00",19-교영-01,d.기타,사업관리,"2019-04-30 18:34:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14101,"2019-04-30 08:50:00",16-시공-20,출장,한양,"2019-04-30 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-04-30 08:50:00",17-시공-08,출장,"[충북 옥천군외 10개 업체]런처제작 외주업체 공정 체크","2019-04-30 18:00:00",17-시공-08,출장,"[충북 옥천군외 10개 업체]런처제작 외주업체 공정 체크","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J07202,"2019-05-02 06:45:00",19-제조-04,b.기계,"산외교 가공철근 상차와 성주대교 프리덱 상차와 금곡교 거푸집(H1.7m) 보수와 가공철근과 프리덱 이적 및 야적","2019-05-03 07:30:00",19-제조-04,b.기계,"산외교 가공철근 상차와 성주대교 프리덱 상차와 금곡교 거푸집(H1.7m) 보수와 가공철근과 프리덱 이적 및 야적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-05-02 07:09:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-05-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J14308,"2019-05-02 07:17:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-02 20:34:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-02 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M05510,"2019-05-02 07:21:00",18-시공-15,b.시공,"spliced girder 제작 (형고=2.0M)
|
|
측경간 A L=32.13M 14본 ,측경간 B L=43.14M 14본
|
|
주두부 14본 L=25M
|
|
안전,품질 공사관리","2019-05-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.190.208,NULL,NULL,004C8,,,
|
|
T04204,"2019-05-02 07:24:00",16-제조-02,a.생산관리,"삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-02 20:22:00",16-제조-02,a.생산관리,"삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-05-02 07:28:00",17-시공-21,g.기타,"제3연륙교 예정공정표 수정
|
|
시화MTV 가설검토","2019-05-02 18:05:00",17-시공-21,g.기타,"제3연륙교 예정공정표 수정
|
|
시화MTV 가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18208,"2019-05-02 07:28:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-02 22:09:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-02 19:29:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-05-02 07:30:00",19-제조-03,a.품질검사,"성주대교 출하, 산외교 켄틸, 목산교 데크생산 및 품질관리","2019-05-02 20:55:00",19-제조-03,a.품질검사,"성주대교 출하, 산외교 켄틸, 목산교 데크생산 및 품질관리","2019-05-02 18:40:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J13308,"2019-05-02 07:32:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 업체 견적 및 품의
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성","2019-05-02 18:01:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 업체 견적 및 품의
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18207,"2019-05-02 07:39:00",19-시공-08,b.시공,"공사착공을위한 예산편성 및 집행검토","2019-05-02 18:07:00",19-시공-08,b.시공,"공사착공을위한 예산편성 및 집행검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18202,"2019-05-02 07:41:00",07-교영-01,d.기타,"괴평교 관련 현황 파악","2019-05-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
M02302,"2019-05-02 07:41:00",19-제조-02,a.생산관리,"서울임원회의 자료준비","2019-05-02 18:02:00",19-제조-02,a.생산관리,"서울임원회의 자료준비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>PTC 제작 스케줄 협의 및 조정<|>02:00<|><br>19-제조-02<|>a.생산관리<|>산외교 Pre-Deck Shop Dwg.지원<|>02:00<|><br>",,
|
|
J09102,"2019-05-02 07:47:00",19-계약-01,d.기타,"조령천교관련 한신공영, 삼남1교 변경계약관련 대림산업 본사 방문 예정 등 : 조안대교 외 3개교 계약 추진 중","2019-05-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-05-02 07:50:00",18-설계-19,e.검토,"전동교 가설관련 보고서 및 도면 작성","2019-05-02 18:02:00",18-설계-19,e.검토,"전동교 가설관련 보고서 및 도면 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18206,"2019-05-02 08:03:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-05-02 18:46:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-05-02 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-05-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-05-02 08:13:00",14-교영-00,d.기타,"청룡2교(평택동부) 설계내역서, 검암2교(당진~서산) 시행견적서, 세종~안성 공사비증가 사유 검토자료, 수리티교(남일~보은 2공구) 가설 설계내역서, 거더 개략공사비, 아중교(용진~우아2) 시행견적서(입찰)","2019-05-02 18:06:00",14-교영-00,d.기타,"검암2교(당진~서산) 시행견적서, 청룡2교(평택동부) 설계내역서, 세종~안성 공사비증가 사유 검토자료, 수리티교(남일~보은 2공구) 가설 설계내역서, 거더 개략공사비, 아중교(용진~우아2) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-05-02 08:14:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-05-02 18:41:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-05-02 08:22:00",17-시공-09,g.기타,"거더 구조도 철근 검토","2019-05-02 21:51:00",17-시공-09,g.기타,"거더 구조도 철근 검토","2019-05-02 18:41:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J14306,"2019-05-02 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-02 18:44:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15201,"2019-05-02 08:24:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-05-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J10301,"2019-05-02 08:26:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-02 18:34:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-05-02 08:26:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-05-02 18:02:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J13201,"2019-05-02 08:27:00",16-설계-19,c.도면,"감이교 슬래브 간소화 도면으로 변경","2019-05-02 21:51:00",16-설계-19,c.도면,"감이교 슬래브 간소화 도면으로 변경","2019-05-02 18:41:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J11202,"2019-05-02 08:28:00",19-시공-02,b.시공,공사관리,"2019-05-02 18:43:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15307,"2019-05-02 08:29:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 거더 일반도, 배근도 작성","2019-05-02 21:11:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 거더 일반도, 배근도 작성","2019-05-02 18:41:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J07103,"2019-05-02 08:30:00",19-교영-01,d.기타,사업관리,"2019-05-02 18:43:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J07210,"2019-05-02 08:31:00",16-시공-20,g.기타,"당초 변경","2019-05-02 18:44:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J19201,"2019-05-02 08:32:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","2019-05-02 21:39:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","2019-05-02 18:41:00",172.16.9.185,172.16.9.185,172.16.9.185,008E3,,1,
|
|
J11203,"2019-05-02 08:32:00",17-시공-10,g.기타,"주두부 동바리제거시 거더안전성검토서작성","2019-05-02 18:12:00",17-시공-10,g.기타,"주두부 동바리제거시 거더안전성검토서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J11305,"2019-05-02 08:32:00",19-설계-01,h.기타,계획,"2019-05-02 18:03:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J17205,"2019-05-02 08:35:00",18-교영-01,c.설계사,.,"2019-05-02 21:00:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J16202,"2019-05-02 08:40:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-02 18:59:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J09101,"2019-05-02 08:56:00",19-교영-01,c.설계사,과업조사,"2019-05-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15202,"2019-05-02 09:05:00",19-설계-03,e.검토,모델링,"2019-05-02 21:51:00",19-설계-03,e.검토,모델링,"2019-05-02 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J14101,"2019-05-02 08:50:00",16-시공-20,출장,한양,"2019-05-02 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18208,"2019-04-08 08:50:00",19-제조-02,출장,"[성주대교]성주대교 측량","2019-04-08 18:00:00",19-제조-02,출장,"[성주대교]성주대교 측량","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J18208,"2019-04-09 08:50:00",19-제조-02,출장,"[성주대교]성주대교 측량","2019-04-09 18:00:00",19-제조-02,출장,"[성주대교]성주대교 측량","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J15307,"2019-04-17 08:50:00",16-시공-20,출장,"[밀양]산외교 등 현장견학","2019-04-17 18:00:00",16-시공-20,출장,"[밀양]산외교 등 현장견학","0000-00-00 00:00:00",NULL,NULL,NULL,008E4,,,
|
|
J16203,"2019-04-18 08:50:00",19-제조-03,출장,"[동화교(화성 비봉)]거더 균욜보수","2019-04-18 18:00:00",19-제조-03,출장,"[동화교(화성 비봉)]거더 균욜보수","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J15307,"2019-04-18 08:50:00",16-시공-20,출장,"[밀양]산외교 등 현장견학","2019-04-18 18:00:00",16-시공-20,출장,"[밀양]산외교 등 현장견학","0000-00-00 00:00:00",NULL,NULL,NULL,008E4,,,
|
|
J08201,"2019-04-24 08:50:00",16-시공-20,출장,산외교,"2019-04-24 18:00:00",16-시공-20,출장,산외교,"0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J08201,"2019-04-25 08:50:00",16-시공-20,출장,산외교,"2019-04-25 18:00:00",16-시공-20,출장,산외교,"0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J12202,"2019-05-03 06:40:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-05-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J18207,"2019-05-03 07:20:00",16-시공-20,b.시공,"공사 시공관리 및 집행검토","2019-05-03 18:17:00",16-시공-20,b.시공,"공사 시공관리 및 집행검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J07202,"2019-05-03 07:30:00",19-제조-04,b.기계,"가공철근과 프리덱 이적 및 야적과 금곡교 거푸집(H1.7m) 도색","2019-05-03 18:03:00",19-제조-04,b.기계,"가공철근과 프리덱 이적 및 야적과 금곡교 거푸집(H1.7m) 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-05-03 07:34:00",16-제조-02,a.생산관리,"삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-05-03 07:36:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-03 18:04:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-05-03 07:44:00",19-제조-03,a.품질검사,"성주대교 출하, 산외교 켄틸, 목산교 데크생산 및 품질관리","2019-05-03 22:28:00",19-제조-03,a.품질검사,"성주대교 출하, 산외교 켄틸, 목산교 데크생산 및 품질관리","2019-05-03 18:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14308,"2019-05-03 07:44:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-03 18:56:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J09102,"2019-05-03 07:51:00",19-계약-01,d.기타,"전주시관내 아중교 시행견적가, 검단산업단지 남양건설 방문 예정 등 : 조안대교 외 3개교 계약 추진 중","2019-05-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-05-03 07:57:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 업체 견적 및 품의
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성","2019-05-03 18:05:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 업체 견적 및 품의
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J19201,"2019-05-03 08:08:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","2019-05-03 18:05:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J10314,"2019-05-03 08:08:00",14-교영-00,d.기타,"검암2교(당진~서산) 시행견적서, 수리티교(남일~보은 2공구) 가설 설계내역서, 거더 개략공사비, 아중교(용진~우아2) 시행견적서(입찰)","2019-05-03 18:12:00",14-교영-00,d.기타,"검암2교(당진~서산) 시행견적서, 청룡2교 및 지산교(평택동부) 설계내역서, 수리티교(남일~보은 2공구) 가설 설계내역서, 거더 개략공사비, 아중교(용진~우아2) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J10315,"2019-05-03 08:10:00",18-설계-12,"a.계획 및 협의","지산교 sp거더 시공계획 및 공정 협의자료 작성","2019-05-03 18:02:00",18-설계-12,"a.계획 및 협의","지산교 sp거더 시공계획 및 공정 협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J15307,"2019-05-03 08:12:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 거더 일반도, 배근도 작성","2019-05-03 18:04:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 거더 일반도, 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J11305,"2019-05-03 08:19:00",19-설계-01,h.기타,계획,"2019-05-03 18:09:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-05-03 08:19:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-05-03 18:15:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-05-03 08:19:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-05-03 18:10:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-05-03 08:20:00",18-관리-02,e.기타,"비서업무 외","2019-05-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18205,"2019-05-03 08:20:00",17-시공-09,g.기타,"거더 구조도 철근 및 강연선 수정","2019-05-03 21:44:00",17-시공-09,g.기타,"거더 구조도 철근 및 강연선 수정","2019-05-03 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J10313,"2019-05-03 08:21:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-05-03 18:02:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11202,"2019-05-03 08:23:00",19-시공-02,b.시공,공사관리,"2019-05-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J14306,"2019-05-03 08:27:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J16202,"2019-05-03 08:28:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-03 18:17:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10301,"2019-05-03 08:28:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-03 18:18:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-05-03 08:29:00",19-설계-03,e.검토,모델링,"2019-05-03 21:44:00",19-설계-03,e.검토,모델링,"2019-05-03 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J11203,"2019-05-03 08:32:00",19-설계-03,e.검토,"종점부 라멘교 개략검토(내진시 거더 응력)","2019-05-03 18:01:00",19-설계-03,e.검토,"종점부 라멘교 개략검토(내진시 거더 응력)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J07210,"2019-05-03 08:33:00",16-시공-20,g.기타,"당초 변경","2019-05-03 18:16:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15201,"2019-05-03 08:37:00",19-교영-03,c.설계사,"답변자료 작성","2019-05-03 18:16:00",19-교영-03,c.설계사,"답변자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-05-03 08:37:00",18-교영-01,c.설계사,.,"2019-05-03 19:53:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J09101,"2019-05-03 08:37:00",19-교영-01,c.설계사,과업조사,"2019-05-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J13201,"2019-05-03 08:39:00",19-설계-05,"a.계획 및 협의","야노1, 2교 빔배치 및 캔틸레버 검토","2019-05-03 20:46:00",19-설계-05,"a.계획 및 협의","야노1, 2교 빔배치 및 캔틸레버 검토","2019-05-03 18:31:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J07103,"2019-05-03 08:59:00",19-교영-01,d.기타,사업관리,"2019-05-03 18:25:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14101,"2019-05-03 08:50:00",16-시공-20,출장,한양,"2019-05-03 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
M02302,"2019-05-03 08:50:00",19-제조-02,출장,"산외교 현장","2019-05-03 18:00:00",19-제조-02,출장,"산외교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J18202,"2019-05-03 08:50:00",07-교영-01,출장,"[김제 ]김제 SK 건설 권순철 소장 미팅","2019-05-03 18:00:00",07-교영-01,출장,"[김제 ]김제 SK 건설 권순철 소장 미팅","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-05-07 06:36:00",19-제조-04,b.기계,"자동차 4027정기검사와 엔진오일교환 및 4289엔진오일교환, 가공철근과 프리덱 이적 및 야적과 금곡교 거푸집(H1.7m) 도색","2019-05-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J16203,"2019-05-07 07:19:00",19-제조-03,a.품질검사,"간외교 출하(3대), 산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-07 22:19:00",19-제조-03,a.품질검사,"간외교 출하(3대), 산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-07 18:46:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18208,"2019-05-07 07:23:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-07 22:18:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-07 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M05510,"2019-05-07 07:29:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-08 16:01:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.39.141.121,NULL,223.39.152.251,004C8,,,
|
|
J18202,"2019-05-07 07:33:00",07-교영-01,d.기타,현황파악,"2019-05-07 18:08:00",07-교영-01,d.기타,현황파악,"0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
T04204,"2019-05-07 07:38:00",16-제조-02,a.생산관리,"태안배수문교,삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09102,"2019-05-07 07:42:00",19-계약-01,d.기타,"검단산업단지 남양건설 방문 예정, 성주대교 변경 계약가 등 : 조안대교 외 3개교 계약 추진 중","2019-05-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-05-07 07:45:00",16-시공-20,b.시공,"공사 시공관리 및 집행검토","2019-05-07 11:54:00",16-시공-20,b.시공,"공사 시공관리 및 집행검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
B15306,"2019-05-07 07:51:00",18-관리-02,e.기타,"비서업무 외","2019-05-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J13308,"2019-05-07 07:57:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 업체 견적 및 품의
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성","2019-05-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
J08201,"2019-05-07 08:01:00",19-설계-02,"a.계획 및 협의","계획 조정","2019-05-07 18:23:00",19-설계-02,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10315,"2019-05-07 08:02:00",13-설계-33,"a.계획 및 협의","조안대교 제작협의","2019-05-07 18:05:00",13-설계-33,"a.계획 및 협의","조안대교 제작협의","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18206,"2019-05-07 08:07:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-05-07 11:42:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J09101,"2019-05-07 08:13:00",19-교영-01,c.설계사,과업조사,"2019-05-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J16202,"2019-05-07 08:16:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-07 18:09:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-05-07 08:16:00",19-교영-03,c.설계사,"답변자료 작성","2019-05-07 18:03:00",19-교영-03,c.설계사,"답변자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-05-07 08:17:00",19-설계-01,h.기타,계획,"2019-05-07 18:05:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-05-07 08:19:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 거더 일반도, 배근도 작성","2019-05-07 21:03:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 거더 일반도, 배근도 작성","2019-05-07 18:37:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J07103,"2019-05-07 08:20:00",19-교영-01,d.기타,사업관리,"2019-05-07 18:20:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10314,"2019-05-07 08:21:00",14-교영-00,d.기타,"아중교(용진~우아2) 시행견적서(입찰), 수리티교(남일~보은 2공구) 시행견적서(계약), 거더 개략공사비, 새방교(상리동~새방골간) 설계견적서 및 내역서","2019-05-07 18:07:00",14-교영-00,d.기타,"아중교(용진~우아2) 시행견적서(입찰), 수리티교(남일~보은 2공구) 시행견적서(계약), 청룡2교 및 지산교(평택동부) 설계내역서, 거더 개략공사비, 새방교(상리동~새방골간) 설계견적서 및 내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11202,"2019-05-07 08:22:00",19-시공-02,b.시공,공사관리,"2019-05-07 18:22:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10313,"2019-05-07 08:26:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-05-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J14306,"2019-05-07 08:27:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J10301,"2019-05-07 08:30:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-07 18:10:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-05-07 08:31:00",16-시공-20,g.기타,"당초 변경","2019-05-07 18:16:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11203,"2019-05-07 08:33:00",19-설계-03,e.검토,"라멘교 시점부교각연결검토(강결, 신축이음)","2019-05-07 18:05:00",19-설계-03,e.검토,"라멘교 시점부교각연결검토(강결, 신축이음)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J18205,"2019-05-07 08:33:00",17-시공-09,g.기타,"거더 구조도 철근 및 강연선 수정","2019-05-07 21:41:00",17-시공-09,g.기타,"거더 구조도 철근 및 강연선 수정","2019-05-07 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J13201,"2019-05-07 08:35:00",19-설계-05,b.구조계산,"야노1, 2교 모델링","2019-05-07 21:41:00",19-설계-05,"a.계획 및 협의","야노1, 2교 모델링","2019-05-07 18:36:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J19201,"2019-05-07 08:39:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","2019-05-07 18:06:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J17205,"2019-05-07 08:41:00",18-교영-01,c.설계사,.,"2019-05-07 20:25:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-05-07 08:48:00",19-설계-03,e.검토,모델링,"2019-05-07 21:37:00",19-설계-03,e.검토,모델링,"2019-05-07 18:37:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J14101,"2019-05-07 08:50:00",16-시공-20,출장,한양,"2019-05-07 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-05-08 06:41:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-05-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J14308,"2019-05-08 07:18:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-08 21:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-08 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18202,"2019-05-08 07:22:00",07-교영-01,d.기타,현황파악,"2019-05-09 07:23:00",07-교영-01,d.기타,현황파악,"0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J11302,"2019-05-08 07:22:00",17-시공-21,g.기타,"삼남1교 예정공정표 및 제작장 배치도 수정
|
|
원흥1교 가설계획서 작성","2019-05-08 18:07:00",17-시공-21,g.기타,"삼남1교 예정공정표 및 제작장 배치도 수정
|
|
원흥1교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-05-08 07:26:00",16-제조-02,a.생산관리,"태안배수문교,삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-05-08 07:29:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 업체 견적 및 품의
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성","2019-05-08 20:02:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 업체 견적 및 품의
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18208,"2019-05-08 07:29:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-08 20:59:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-08 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-05-08 07:34:00",19-제조-02,a.생산관리,"생산 스케줄 조정 및 협의","2019-05-08 18:06:00",19-제조-02,a.생산관리,"생산 스케줄 조정 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-05-08 07:38:00",19-제조-03,a.품질검사,"산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-08 23:07:00",19-제조-03,a.품질검사,"산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-08 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-05-08 07:44:00",19-계약-01,d.기타,"광명~서울 1공구 포스코 방문예정, 시화MTV 대림합사 방문 등 : 조안대교 외 3개교 계약 추진 중","2019-05-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-05-08 07:51:00",19-시공-08,b.시공,"공사 시공관리 및 집행검토","2019-05-08 18:27:00",19-시공-08,b.시공,"공사 시공관리 및 집행검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-05-08 07:52:00",13-설계-33,"a.계획 및 협의","조안대교 제작장 검토","2019-05-08 18:02:00",13-설계-33,"a.계획 및 협의","조안대교 제작장 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
B15306,"2019-05-08 08:04:00",18-관리-02,e.기타,"비서업무 외","2019-05-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-05-08 08:07:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-05-08 21:07:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-05-08 08:12:00",19-설계-01,h.기타,계획,"2019-05-08 18:07:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-05-08 08:17:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-08 18:12:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-05-08 08:19:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 거더 일반도, 배근도 작성","2019-05-08 18:04:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 거더 일반도, 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J14306,"2019-05-08 08:19:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-08 18:08:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-05-08 08:21:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-08 18:19:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10301,"2019-05-08 08:22:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-08 21:05:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-08 18:52:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J11202,"2019-05-08 08:23:00",19-시공-02,b.시공,공사관리,"2019-05-08 18:24:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18205,"2019-05-08 08:23:00",17-시공-09,g.기타,"텐던도 수정","2019-05-08 21:43:00",17-시공-09,g.기타,"텐던도 수정","2019-05-08 19:27:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J17205,"2019-05-08 08:24:00",18-교영-01,c.설계사,.,"2019-05-08 18:47:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J13201,"2019-05-08 08:24:00",19-설계-05,b.구조계산,"야노1, 2교 반력산정","2019-05-08 21:44:00",19-설계-05,b.구조계산,"야노1, 2교 반력산정","2019-05-08 19:27:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J07103,"2019-05-08 08:25:00",19-교영-01,d.기타,사업관리,"2019-05-08 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11203,"2019-05-08 08:33:00",19-설계-03,e.검토,"라멘교 시점부교각연결검토(강결, 신축이음)","2019-05-08 18:03:00",19-설계-03,e.검토,"라멘교 시점부교각연결검토(강결, 신축이음)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J07210,"2019-05-08 08:34:00",16-시공-20,g.기타,"당초 변경","2019-05-08 21:35:00",16-시공-20,g.기타,"당초 변경","2019-05-08 19:27:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15201,"2019-05-08 08:39:00",19-교영-03,c.설계사,"답변자료 작성","2019-05-08 18:03:00",19-교영-03,c.설계사,"답변자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-05-08 08:40:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-05-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J09101,"2019-05-08 08:42:00",19-교영-01,c.설계사,과업조사,"2019-05-08 18:17:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10314,"2019-05-08 08:50:00",19-교휴-06,경유,"경유(진접~내촌, 수자원기술 직불합의서 (과천정부청사))","2019-05-08 18:13:00",14-교영-00,d.기타,"갈산교외 17개소 (서부내륙) 사업단요청 거더제작 설계견적서, 아중교(용진~우아2) 시행견적서(입찰), 새방교(상리동~새방골간) 설계견적서 및 내역서, 청룡2교 및 지산교(평택동부) 설계내역서, 거더 개략공사비","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J19201,"2019-05-08 08:10:00",19-설계-04,c.도면,"새방교 배근도","2019-05-08 18:03:00",19-설계-04,c.도면,"슬래브 일반도 및 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
M05510,"2019-05-08 16:02:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.152.251,NULL,NULL,004C8,,,
|
|
J14101,"2019-05-08 08:50:00",16-시공-20,출장,한양,"2019-05-08 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-05-09 06:55:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-05-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J13308,"2019-05-09 07:20:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","2019-05-09 18:25:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J14308,"2019-05-09 07:21:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-09 20:37:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-09 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18202,"2019-05-09 07:23:00",07-교영-01,d.기타,현황파악,"2019-05-09 18:19:00",07-교영-01,d.기타,현황파악,"0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J11302,"2019-05-09 07:24:00",17-시공-21,g.기타,"삼남1교 예정공정표 및 제작장 배치도 수정
|
|
원흥1교 가설계획서 작성","2019-05-09 18:56:00",17-시공-21,g.기타,"삼남1교 예정공정표 및 제작장 배치도 수정
|
|
원흥1교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-05-09 07:25:00",16-제조-02,a.생산관리,"태안배수문교,삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-05-09 07:33:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-09 20:32:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-09 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-05-09 07:33:00",19-제조-02,a.생산관리,"산외교 Dhop Dwg 지원","2019-05-09 18:05:00",19-제조-02,a.생산관리,"산외교 Dhop Dwg 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-05-09 07:37:00",16-시공-20,b.시공,"공사 시공관리 및 집행검토","2019-05-09 18:20:00",16-시공-20,b.시공,"공사 시공관리 및 집행검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-05-09 07:38:00",13-설계-33,"a.계획 및 협의","조안대교 제작장 검토","2019-05-09 18:20:00",13-설계-33,"a.계획 및 협의","조안대교 제작장 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J09102,"2019-05-09 07:50:00",19-계약-01,d.기타,"Pre-Deck관련시화MTV 대림합사 방문, 검단천교 예가사정률 검토 등 : 조안대교 외 3개교 계약 추진 중","2019-05-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
B15306,"2019-05-09 08:04:00",18-관리-02,e.기타,"비서업무 외","2019-05-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-05-09 08:09:00",19-설계-01,h.기타,계획,"2019-05-09 18:22:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-05-09 08:13:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 거더 일반도, 배근도 작성","2019-05-09 20:54:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 거더 일반도, 배근도 작성","2019-05-09 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J08201,"2019-05-09 08:14:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-09 18:09:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J16202,"2019-05-09 08:15:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-09 18:28:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14306,"2019-05-09 08:21:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-09 20:30:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-09 18:30:00",172.16.9.175,172.16.9.175,172.16.9.175,004E4,,1,
|
|
J11202,"2019-05-09 08:22:00",19-시공-02,b.시공,공사관리,"2019-05-09 18:37:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10301,"2019-05-09 08:23:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-09 18:24:00",17-시공-09,d.자재,"산외교 공사 시행계획 재검토일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15201,"2019-05-09 08:26:00",19-교영-03,c.설계사,"답변자료 작성","2019-05-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J10314,"2019-05-09 08:26:00",18-설계-12,h.기타,"청룡2교 (평택동부) 설계내역서, 새방교(상리동~새방골간) 설계견적서 및 내역서, 옥실천교(양남~감포) 설계견적서 및 내역서(특공), 양근대교 거더공사비 검토, 아중교(용진~우아2) 시행견적서(입찰)","2019-05-09 18:26:00",18-설계-12,h.기타,"청룡2교 및 지산교(평택동부) 설계내역서, 새방교(상리동~새방골간) 설계견적서 및 내역서, 옥실천교(양남~감포) 설계견적서 및 내역서(특공), 양근대교 거더공사비 검토, 아중교(용진~우아2) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15202,"2019-05-09 08:28:00",19-설계-03,e.검토,모델링,"2019-05-09 20:59:00",19-설계-03,e.검토,모델링,"2019-05-09 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07103,"2019-05-09 08:29:00",19-교영-01,d.기타,사업관리,"2019-05-09 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J13201,"2019-05-09 08:29:00",19-설계-05,b.구조계산,"야노1, 2교 반력산정","2019-05-09 20:55:00",19-설계-05,b.구조계산,"야노1, 2교 반력산정","2019-05-09 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J18205,"2019-05-09 08:30:00",17-시공-09,g.기타,"텐던도 수정","2019-05-09 20:57:00",17-시공-09,g.기타,"텐던도 수정","2019-05-09 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J19201,"2019-05-09 08:32:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","2019-05-09 20:40:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","2019-05-09 18:30:00",172.16.9.185,172.16.9.185,172.16.9.185,008E3,,1,
|
|
J11203,"2019-05-09 08:32:00",19-설계-03,e.검토,"라멘교 시종점 강결 구조계산서 하중부분 정리","2019-05-09 18:18:00",19-설계-03,e.검토,"라멘교 시종점 강결 모델링","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J07210,"2019-05-09 08:34:00",16-시공-20,g.기타,"당초 변경","2019-05-09 20:49:00",16-시공-20,g.기타,"당초 변경","2019-05-09 18:33:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,,
|
|
J17205,"2019-05-09 08:35:00",18-교영-01,c.설계사,.,"2019-05-09 20:01:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18206,"2019-05-09 08:37:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-05-09 18:25:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J09101,"2019-05-09 08:37:00",19-교영-01,c.설계사,과업조사,"2019-05-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J10313,"2019-05-09 08:44:00",16-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-05-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J14101,"2019-05-09 08:50:00",16-시공-20,출장,한양,"2019-05-09 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-05-10 06:42:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-05-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J11302,"2019-05-10 07:06:00",17-시공-21,g.기타,"원흥1교 가설계획서 작성","2019-05-10 18:03:00",17-시공-21,g.기타,"원흥1교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-05-10 07:18:00",16-제조-02,a.생산관리,"태안배수문교,삼남1교(주두부),산외교(노들러), 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-05-10 07:20:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-10 20:41:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-10 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J13308,"2019-05-10 07:21:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","2019-05-10 18:07:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18207,"2019-05-10 07:28:00",18-시공-15,b.시공,"가밴트시공관리 및 집행검토","2019-05-10 18:00:00",18-시공-15,b.시공,"가밴트시공관리 및 집행검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18202,"2019-05-10 07:32:00",07-교영-01,d.기타,현황파악,"2019-05-10 18:00:00",07-교영-01,d.기타,현황파악,"0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18208,"2019-05-10 07:34:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-10 18:03:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-05-10 07:35:00",19-제조-02,a.생산관리,"산외교 Dhop Dwg 지원","2019-05-10 18:05:00",19-제조-02,a.생산관리,"산외교 Dhop Dwg 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-05-10 07:41:00",19-제조-03,a.품질검사,"실크로드 고강도회의, 신평중 하자확인, 함도초교 공사확인,
|
|
산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-10 20:41:00",19-제조-03,a.품질검사,"실크로드 고강도회의, 신평중 하자확인, 함도초교 공사확인,
|
|
산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-10 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,,
|
|
J10315,"2019-05-10 07:43:00",14-설계-38,"a.계획 및 협의","수리티교 런쳐가설 적정성에 관한 시공사 검토내용 답변서 작성","2019-05-10 18:01:00",14-설계-38,"a.계획 및 협의","수리티교 런쳐가설 적정성에 관한 시공사 검토내용 답변서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J09102,"2019-05-10 07:47:00",19-계약-01,d.기타,"서부내륙 민자 포스코 방문, Pre-Deck관련시화MTV 대림합사 방문 등 : 조안대교 외 3개교 계약 추진 중","2019-05-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
B15306,"2019-05-10 08:05:00",18-관리-02,e.기타,"비서업무 외","2019-05-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-05-10 08:07:00",19-설계-04,h.기타,"새방교(상리동~새방골간) 설계견적서 및 내역서, 옥실천교(양남~감포) 설계견적서 및 내역서(특공), Pre-Deck 및 프리캐스트가로보(송산~시화MTV) 시행견적서, 이탄2교외 17개소(서부내륙고속도로) 시행견적서, 청룡2교 및 지산교(평택동부) 설계내역서, 양근대교 거더공사비 검토, 아중교(용진~우아2) 시행견적서(입찰)","2019-05-10 18:04:00",19-설계-04,h.기타,"새방교(상리동~새방골간) 설계견적서 및 내역서, 옥실천교(양남~감포) 설계견적서 및 내역서(특공), Pre-Deck 및 프리캐스트가로보(송산~시화MTV) 시행견적서, 이탄2교외 17개소(서부내륙고속도로) 시행견적서, 청룡2교 및 지산교(평택동부) 설계내역서, 양근대교 거더공사비 검토, 아중교(용진~우아2) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18205,"2019-05-10 08:14:00",19-설계-03,c.도면,"종점부 슬래브 일반도 작성","2019-05-10 21:40:00",19-설계-03,c.도면,"종점부 슬래브 일반도 작성","2019-05-10 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J07103,"2019-05-10 08:16:00",19-교영-01,d.기타,사업관리,"2019-05-10 18:15:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18206,"2019-05-10 08:19:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","2019-05-10 17:35:00",19-시공-02,b.시공,"시행계획 검토 / 성주대교 , 산외교","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11203,"2019-05-10 08:22:00",19-설계-03,e.검토,"라멘교 시종점 강결 모델링","2019-05-10 18:03:00",19-설계-03,e.검토,"라멘교 시종점 강결 모델링","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J11305,"2019-05-10 08:23:00",19-설계-01,h.기타,계획,"2019-05-10 18:02:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-05-10 08:23:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 일반도 작성","2019-05-10 18:01:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 일반도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J13201,"2019-05-10 08:23:00",19-설계-05,b.구조계산,"야노1, 2교 바닥판계산서 작성","2019-05-10 18:18:00",19-설계-05,b.구조계산,"야노1, 2교 바닥판계산서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J08201,"2019-05-10 08:23:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-10 18:03:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15201,"2019-05-10 08:25:00",19-교영-03,c.설계사,"답변자료 작성","2019-05-10 18:01:00",19-교영-03,c.설계사,"답변자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14306,"2019-05-10 08:27:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-10 18:23:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-05-10 08:28:00",19-시공-02,b.시공,공사관리,"2019-05-10 18:08:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-05-10 08:28:00",19-설계-03,e.검토,모델링,"2019-05-10 20:36:00",19-설계-03,e.검토,모델링,"2019-05-10 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J19201,"2019-05-10 08:30:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","2019-05-10 18:13:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J16202,"2019-05-10 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-10 18:14:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07210,"2019-05-10 08:38:00",16-시공-20,g.기타,"당초 변경","2019-05-10 18:07:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,1,
|
|
J17205,"2019-05-10 08:43:00",18-교영-01,c.설계사,.,"2019-05-10 20:15:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J09101,"2019-05-10 08:49:00",19-교영-01,c.설계사,과업조사,"2019-05-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-05-10 08:50:00",16-시공-20,출장,한양,"2019-05-10 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10301,"2019-05-10 08:50:00",18-시공-15,출장,"[충북 충주시]전도방지용 임시가로보 제작관련 검수 및 확인, 한포제1,2교 거더 현장 ","2019-05-10 18:00:00",18-시공-15,출장,"[충북 충주시]전도방지용 임시가로보 제작관련 검수 및 확인, 한포제1,2교 거더 현장 ","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M02302,"2019-05-11 07:34:00",19-제조-02,a.생산관리,"공장관리 및 산외교SHop Dwg 지원","2019-05-11 16:02:00",19-제조-02,a.생산관리,"공장관리 및 산외교SHop Dwg 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
J16203,"2019-05-11 07:36:00",19-제조-03,a.품질검사,"산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-11 16:06:00",19-제조-03,a.품질검사,"산외교 켄틸, 옥산교 데크생산 및 품질관리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
J14308,"2019-05-11 07:37:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-11 16:34:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M05510,"2019-05-11 08:46:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.138.164,NULL,NULL,004C8,,,
|
|
J18208,"2019-05-11 09:52:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-11 16:00:00",19-제조-02,a.생산관리,"생산 및 배차관리, 삼간교 Shop DWG","2019-05-11 07:30:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J11302,"2019-05-13 06:58:00",17-시공-21,g.기타,"원흥1교 가설계획서 작성","2019-05-13 18:11:00",17-시공-21,g.기타,"원흥1교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J07202,"2019-05-13 07:05:00",19-제조-04,b.기계,"거푸집 보수와 도하4교 앵커설치 점검과 호이스트 철거","2019-05-14 07:27:00",19-제조-04,b.기계,"거푸집 보수와 도하4교 앵커설치 점검과 호이스트 철거","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J10315,"2019-05-13 07:21:00",15-설계-31,"a.계획 및 협의","중리2교외 1개교량 제적 및 가설협의","2019-05-13 15:38:00",15-설계-31,"a.계획 및 협의","중리2교외 1개교량 제적 및 가설협의","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
T04204,"2019-05-13 07:23:00",16-제조-02,a.생산관리,"북수원1교(용인방향),태안배수문교, 가공,점접 철근 생산, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-05-13 07:25:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-13 18:01:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-05-13 07:30:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-13 18:01:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-05-13 07:40:00",19-제조-03,a.품질검사,"단장천2교 방청, 산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J13308,"2019-05-13 07:42:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","2019-05-13 18:08:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18202,"2019-05-13 07:44:00",07-교영-01,b.시공사,"상부공 관련 현황 파악","2019-05-13 18:10:00",07-교영-01,b.시공사,"상부공 관련 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-05-13 07:49:00",19-제조-02,a.생산관리,"계약직 사직서 수령","2019-05-13 18:00:00",19-제조-02,a.생산관리,"공장관리 및 산외교SHop Dwg 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>산외교 SHOP DWG 지원<|>04:00<|><br>19-제조-02<|>a.생산관리<|>확대회의 준비 및 회의<|>02:30<|><br>",,
|
|
M05510,"2019-05-13 07:53:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.158.28,NULL,NULL,004C8,,,
|
|
J18207,"2019-05-13 08:01:00",18-시공-15,b.시공,"가밴트시공관리 및 집행검토","2019-05-13 18:13:00",18-시공-15,b.시공,"가밴트시공관리 및 집행검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-05-13 08:02:00",19-계약-01,d.기타,"검단산업단지 검단천교관련 남양건설, 연산~두마관련 코오롱본사 방문 예정, 두계천교 외 1개교 예상 시행가 등 : 조안대교 외 3개교 계약 추진 중","2019-05-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J08201,"2019-05-13 08:11:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-13 18:35:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-05-13 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-05-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11202,"2019-05-13 08:16:00",19-시공-02,b.시공,공사관리,"2019-05-13 18:18:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15307,"2019-05-13 08:18:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 일반도 작성","2019-05-13 21:14:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 일반도 작성","2019-05-13 18:32:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10314,"2019-05-13 08:22:00",16-설계-01,h.기타,"검단천교(검단산업단지~검단IC간) 시행견적서, 아중교(용진~우아2) 시행견적서(입찰), 새방교(상리동~새방골간) 설계견적서 및 내역서, 이탄2교외 17개소(서부내륙고속도로) 시행견적서, 청룡2교 및 지산교(평택동부) 설계내역서, 양근대교 거더공사비 검토,","2019-05-13 18:03:00",16-설계-01,h.기타,"검단천교(검단산업단지~검단IC간) 시행견적서, 아중교(용진~우아2) 시행견적서(입찰), 새방교(상리동~새방골간) 설계견적서 및 내역서, 이탄2교외 17개소(서부내륙고속도로) 시행견적서, 청룡2교 및 지산교(평택동부) 설계내역서, 양근대교 거더공사비 검토,","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14306,"2019-05-13 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-13 18:05:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18205,"2019-05-13 08:24:00",19-설계-03,c.도면,"종점부 슬래브 일반도 작성","2019-05-13 21:53:00",19-설계-03,c.도면,"종점부 슬래브 일반도 작성","2019-05-13 18:31:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J10313,"2019-05-13 08:25:00",16-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","2019-05-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J13201,"2019-05-13 08:25:00",19-설계-05,b.구조계산,"야노1교 배근도 초안작성","2019-05-13 20:32:00",19-설계-05,b.구조계산,"야노1교 배근도 초안작성","2019-05-13 18:32:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10301,"2019-05-13 08:27:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-13 18:21:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11305,"2019-05-13 08:28:00",19-설계-01,h.기타,계획,"2019-05-13 18:06:00",19-설계-01,h.기타,계획,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07210,"2019-05-13 08:28:00",16-시공-20,g.기타,"당초 변경","2019-05-13 20:37:00",16-시공-20,g.기타,"당초 변경","2019-05-13 18:32:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J07103,"2019-05-13 08:29:00",19-교영-01,d.기타,사업관리,"2019-05-13 18:31:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11203,"2019-05-13 08:30:00",19-설계-03,e.검토,"라멘교(시종점 강결) 모델링 교각코핑부 수정","2019-05-13 18:10:00",19-설계-03,e.검토,"라멘교 시종점 강결 모델링","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J16202,"2019-05-13 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-13 18:12:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-05-13 08:35:00",18-교영-01,c.설계사,.,"2019-05-13 18:31:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-05-13 08:35:00",19-교영-01,c.설계사,"신규과업현황 조사","2019-05-13 18:02:00",19-교영-01,c.설계사,"신규과업현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J19201,"2019-05-13 08:42:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","2019-05-13 20:34:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","2019-05-13 18:31:00",172.16.9.185,172.16.9.185,172.16.9.185,008E3,,1,
|
|
J15202,"2019-05-13 08:44:00",19-설계-03,e.검토,모델링,"2019-05-13 21:54:00",19-설계-03,e.검토,모델링,"2019-05-13 18:32:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"12-설계-24<|>b.구조계산<|>스트롱백 시험시공 콘크리트 단면 검토 <|>02:00<|><br>",1,
|
|
J14101,"2019-05-13 08:50:00",16-시공-20,출장,한양,"2019-05-13 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-05-13 08:50:00",16-시공-20,출장,"[중국 허베이성 한단시 HCR본사]노듈러 런처 제작하자 관련 협의","2019-05-13 18:00:00",16-시공-20,출장,"[중국 허베이성 한단시 HCR본사]노듈러 런처 제작하자 관련 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18206,"2019-05-13 08:50:00",16-시공-20,출장,"[중국 허베이성 한단시 HCR본사]노듈러 런처 제작하자 관련 협의","2019-05-13 18:00:00",16-시공-20,출장,"[중국 허베이성 한단시 HCR본사]노듈러 런처 제작하자 관련 협의","0000-00-00 00:00:00",NULL,NULL,NULL,001C5,,,
|
|
M05510,"2019-05-14 07:25:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-15 08:12:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.39.157.155,NULL,223.33.153.70,004C8,,,
|
|
J11302,"2019-05-14 07:25:00",17-시공-21,g.기타,"원흥1교 가설계획서 작성
|
|
옥산교 인장결과서 작성","2019-05-14 18:06:00",17-시공-21,g.기타,"원흥1교 가설계획서 작성
|
|
옥산교 인장결과서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18208,"2019-05-14 07:28:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-14 22:35:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-14 19:22:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-05-14 07:28:00",19-제조-02,a.생산관리,"강연선 인입시헙 계획 도면 작성","2019-05-14 18:02:00",19-제조-02,a.생산관리,"공장관리 및 산외교SHop Dwg 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-05-14 07:28:00",19-제조-04,b.기계,"태안배수문교 거푸집 보수와 PTC 함평교 분절거더거푸집 점검","2019-05-15 07:26:00",19-제조-04,b.기계,"태안배수문교 거푸집 보수와 PTC 함평교 분절거더거푸집 점검","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-04<|>b.기계<|>삼남1교 주두부 받침용 블럭 목대거푸집 제작<|>04:00<|><br>",,
|
|
J13308,"2019-05-14 07:29:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","2019-05-14 18:12:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
T04204,"2019-05-14 07:31:00",16-제조-02,a.생산관리,"북수원1교(용인방향) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-05-14 07:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-14 21:03:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-14 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-05-14 07:36:00",19-제조-03,a.품질검사,"단장천2교 방청, 산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-14 20:42:00",19-제조-03,a.품질검사,"단장천2교 방청, 산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-14 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J10315,"2019-05-14 07:40:00",15-설계-31,"a.계획 및 협의","중리2교 제작장 부지 적정성 검토","2019-05-14 18:06:00",15-설계-31,"a.계획 및 협의","중리2교 제작장 부지 적정성 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J09102,"2019-05-14 07:41:00",19-계약-01,d.기타,"연산~두마 두계천교 외 2개교관련 코오롱현장 방문 예정 등 : 조안대교 외 3개교 계약 추진 중","2019-05-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-05-14 07:53:00",19-시공-04,b.시공,"공동운영협약서 및 실행예산 , 집행방법검토","2019-05-14 12:15:00",19-시공-04,b.시공,"공동운영협약서 및 실행예산 , 집행방법검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10314,"2019-05-14 08:14:00",18-설계-12,h.기타,"청룡2교 및 지산교(평택동부) 설계내역서, 검단천교(검단산업단지~검단IC) 시행견적서, 양근대교 거더공사비 검토, 새방교(상리동~새방골간) 설계견적서 및 내역서","2019-05-14 18:07:00",18-설계-12,h.기타,"청룡2교 및 지산교(평택동부) 설계내역서, 검단천교(검단산업단지~검단IC) 시행견적서, 양근대교 거더공사비 검토, 새방교(상리동~새방골간) 설계견적서 및 내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11305,"2019-05-14 08:15:00",19-설계-03,e.검토,계획검토,"2019-05-14 18:07:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-05-14 08:18:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-14 19:26:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J14306,"2019-05-14 08:18:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J15307,"2019-05-14 08:18:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 일반도 작성
|
|
2. 마이다스 FEA교육 참가(오후)","2019-05-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.171,NULL,NULL,008E4,,,
|
|
J10313,"2019-05-14 08:22:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-05-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J10301,"2019-05-14 08:22:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
B15306,"2019-05-14 08:23:00",18-관리-02,e.기타,"비서업무 외","2019-05-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18205,"2019-05-14 08:27:00",19-설계-03,c.도면,"거더 및 텐던도 작성","2019-05-14 21:36:00",19-설계-03,c.도면,"거더 및 텐던도 작성","2019-05-14 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J16202,"2019-05-14 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-14 18:15:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-05-14 08:33:00",19-설계-03,e.검토,"라멘교(시종점 강결) 모델링 강선량 정착구 수 관련 검토","2019-05-14 18:10:00",19-설계-03,e.검토,"라멘교 시종점 강결 모델링","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J07103,"2019-05-14 08:34:00",19-교영-01,d.기타,사업관리,"2019-05-14 18:24:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15201,"2019-05-14 08:36:00",19-교영-01,c.설계사,"신규과업현황 조사","2019-05-14 18:03:00",19-교영-01,c.설계사,"신규과업현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-05-14 08:36:00",16-시공-20,g.기타,"당초 변경","2019-05-14 20:48:00",16-시공-20,g.기타,"당초 변경","2019-05-14 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J17205,"2019-05-14 08:41:00",18-교영-01,c.설계사,.,"2019-05-14 18:16:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-05-14 08:43:00",19-설계-03,e.검토,모델링,"2019-05-14 20:57:00",19-설계-03,e.검토,모델링,"2019-05-14 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"12-설계-24<|>b.구조계산<|>스트롱백 시험시공 콘크리트 단면 검토<|>02:00<|><br>",1,
|
|
J19201,"2019-05-14 08:45:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","2019-05-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.185,NULL,NULL,008E3,,,
|
|
J09101,"2019-05-14 08:48:00",19-교영-01,c.설계사,과업조사,"2019-05-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J18204,"2019-05-14 08:30:00",19-교휴-06,a.기타,"삼간교, 금곡교 투입비 정리","2019-05-14 18:04:00",19-교휴-06,a.기타,"삼간교, 금곡교 투입비 정리","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J14101,"2019-05-14 08:50:00",16-시공-20,출장,한양,"2019-05-14 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-05-14 08:50:00",16-시공-20,출장,"[중국 허베이성 한단시 HCR본사]노듈러 런처 제작하자 관련 협의","2019-05-14 18:00:00",16-시공-20,출장,"[중국 허베이성 한단시 HCR본사]노듈러 런처 제작하자 관련 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18206,"2019-05-14 08:50:00",16-시공-20,출장,"[중국 허베이성 한단시 HCR본사]노듈러 런처 제작하자 관련 협의","2019-05-14 18:00:00",16-시공-20,출장,"[중국 허베이성 한단시 HCR본사]노듈러 런처 제작하자 관련 협의","0000-00-00 00:00:00",NULL,NULL,NULL,001C5,,,
|
|
J18202,"2019-05-14 08:50:00",07-교영-01,출장,"[경남 거창, 밀양]함양~합천 고속도로 5공구(합천호교) 관련","2019-05-14 18:00:00",07-교영-01,출장,"[경남 거창, 밀양]함양~합천 고속도로 5공구(합천호교) 관련","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11202,"2019-05-14 08:50:00",17-시공-08,출장,"[충남 서산시]빔런처 제작 공장 검수(예정공정표 점검)","2019-05-14 18:00:00",17-시공-08,출장,"[충남 서산시]빔런처 제작 공장 검수(예정공정표 점검)","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11302,"2019-05-15 07:14:00",17-시공-21,g.기타,"원흥2교 가설계획서 수정
|
|
원흥2교 PCM 작성","2019-05-15 18:03:00",17-시공-21,g.기타,"원흥2교 가설계획서 수정
|
|
원흥2교 PCM 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-05-15 07:20:00",16-제조-02,a.생산관리,"북수원1교(용인방향) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-15 20:22:00",16-제조-02,a.생산관리,"북수원1교(용인방향) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-05-15 07:27:00",19-제조-04,b.기계,"삼남1교 주두부 받침 블럭 거푸집제작 및 태안배수문교 거푸집 보수","2019-05-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-05-15 07:29:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-15 18:02:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-05-15 07:29:00",19-제조-02,a.생산관리,"강연선 인입시헙 계획 및 예상 비용분석","2019-05-15 18:01:00",19-제조-02,a.생산관리,"공장관리 및 산외교SHop Dwg 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>부성운순 면담 및 후속조치 논의<|>02:00<|><br>19-제조-02<|>a.생산관리<|>평촌교 시공관련 협의<|>01:30<|><br>",,
|
|
J13308,"2019-05-15 07:29:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","2019-05-15 18:07:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18208,"2019-05-15 07:30:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-15 18:34:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J10315,"2019-05-15 07:41:00",15-설계-31,"a.계획 및 협의","중리2교 제작장 부지 적정성 검토","2019-05-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J09102,"2019-05-15 07:41:00",19-계약-01,d.기타,"시화분기점 계룡건설, 광명~서울1공구 포스코건설 방문 예정 등 : 조안대교 외 3개교 계약 추진 중","2019-05-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-05-15 07:45:00",19-시공-04,b.시공,"공동운영협약서 및 실행예산 , 집행방법검토","2019-05-15 18:09:00",19-시공-04,b.시공,"공동운영협약서 및 실행예산 , 집행방법검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-05-15 07:47:00",19-제조-03,a.품질검사," 산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J19201,"2019-05-15 08:10:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","2019-05-15 18:04:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J11305,"2019-05-15 08:12:00",19-설계-03,e.검토,계획검토,"2019-05-15 18:17:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-05-15 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-05-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
M05510,"2019-05-15 08:13:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.153.70,NULL,NULL,004C8,,,
|
|
J10314,"2019-05-15 08:15:00",18-설계-12,h.기타,"양근대교 거더공사비 검토, 청룡2교외 4개소(평택동부) 설계견적서 및내역서, 새방교(상리동~새방골간) 설계견적서 및 내역서","2019-05-15 18:10:00",18-설계-12,h.기타,"양근대교 거더공사비 검토, 청룡2교외 4개소(평택동부) 설계견적서 및내역서, 새방교(상리동~새방골간) 설계견적서 및 내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-05-15 08:17:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-15 18:18:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J13201,"2019-05-15 08:20:00",19-설계-05,b.구조계산,"야노2교 구조계산서 작성","2019-05-15 21:38:00",19-설계-05,b.구조계산,"야노2교 구조계산서 작성","2019-05-15 19:14:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J15202,"2019-05-15 08:21:00",19-설계-03,e.검토,모델링,"2019-05-15 21:21:00",19-설계-03,e.검토,모델링,"2019-05-15 19:03:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J18204,"2019-05-15 08:22:00",19-교휴-06,a.기타,"삼간교, 금곡교 투입비 정리","2019-05-15 18:02:00",19-교휴-06,a.기타,"삼간교, 금곡교 투입비 정리","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J14306,"2019-05-15 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-15 18:45:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15307,"2019-05-15 08:24:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 일반도 작성
|
|
","2019-05-15 21:17:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 일반도 작성
|
|
","2019-05-15 19:13:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J11202,"2019-05-15 08:25:00",19-시공-02,b.시공,공사관리,"2019-05-15 18:11:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07103,"2019-05-15 08:26:00",19-교영-01,d.기타,사업관리,"2019-05-15 19:56:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-05-15 08:28:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-15 18:01:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16202,"2019-05-15 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-15 18:08:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10313,"2019-05-15 08:32:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-05-15 18:01:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11203,"2019-05-15 08:33:00",19-설계-03,e.검토,"라멘교(시종점 강결) 계산서 하중결과값 정리 ","2019-05-15 18:03:00",19-설계-03,e.검토,"라멘교(시종점 강결) 계산서 하중결과값 정리 ","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J18205,"2019-05-15 08:34:00",19-설계-03,c.도면,"상부 수량산출","2019-05-15 21:37:00",19-설계-03,c.도면,"상부 수량산출","2019-05-15 19:12:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J15201,"2019-05-15 08:38:00",19-교영-01,c.설계사,"신규과업현황 조사","2019-05-15 18:04:00",19-교영-01,c.설계사,"신규과업현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-05-15 08:38:00",18-교영-01,c.설계사,.,"2019-05-15 18:46:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-05-15 08:39:00",16-시공-20,g.기타,"당초 변경","2019-05-15 21:23:00",16-시공-20,g.기타,"당초 변경","2019-05-15 19:11:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J09101,"2019-05-15 08:55:00",19-교영-01,c.설계사,과업조사,"2019-05-15 18:05:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-05-15 08:50:00",16-시공-20,출장,한양,"2019-05-15 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-05-15 08:50:00",16-시공-20,출장,"[중국 허베이성 한단시 HCR본사]노듈러 런처 제작하자 관련 협의","2019-05-15 18:00:00",16-시공-20,출장,"[중국 허베이성 한단시 HCR본사]노듈러 런처 제작하자 관련 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18206,"2019-05-15 08:50:00",16-시공-20,출장,"[중국 허베이성 한단시 HCR본사]노듈러 런처 제작하자 관련 협의","2019-05-15 18:00:00",16-시공-20,출장,"[중국 허베이성 한단시 HCR본사]노듈러 런처 제작하자 관련 협의","0000-00-00 00:00:00",NULL,NULL,NULL,001C5,,,
|
|
J18202,"2019-05-15 08:50:00",07-교영-01,출장,"[경남 거창, 밀양]함양~합천 고속도로 5공구(합천호교) 관련","2019-05-15 18:00:00",07-교영-01,출장,"[경남 거창, 밀양]함양~합천 고속도로 5공구(합천호교) 관련","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-05-16 06:44:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-05-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J14308,"2019-05-16 07:20:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-16 20:49:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-16 18:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J11302,"2019-05-16 07:21:00",17-시공-21,g.기타,"원흥2교 가설계획서 수정
|
|
원흥2교 PCM 작성","2019-05-16 18:09:00",17-시공-21,g.기타,"원흥2교 가설계획서 수정
|
|
원흥2교 PCM 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-05-16 07:21:00",16-제조-02,a.생산관리,"성주대교(주두부),북수원1교(용인방향) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-05-16 07:26:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","2019-05-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
J07202,"2019-05-16 07:26:00",19-제조-04,b.기계,"삼남1교 주두부 받침 블럭 거푸집제작과 주두부 거푸집 보수","2019-05-17 07:00:00",19-제조-04,b.기계,"삼남1교 주두부 받침 블럭 거푸집제작과 주두부 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-05-16 07:31:00",07-교영-01,b.시공사,"발주 현황 파악","2019-05-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J10315,"2019-05-16 07:33:00",16-시공-41,b.시공,"가설계획서 작성","2019-05-16 18:05:00",16-시공-41,b.시공,"가설계획서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18208,"2019-05-16 07:36:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-16 18:00:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-05-16 07:40:00",19-제조-03,a.품질검사," 산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-16 20:35:00",19-제조-03,a.품질검사," 산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-16 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,,
|
|
J18207,"2019-05-16 07:42:00",17-시공-08,b.시공,"빔런쳐제작공정지연에 따른 가설공정 검토","2019-05-16 18:12:00",17-시공-08,b.시공,"빔런쳐제작공정지연에 따른 가설공정 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M02302,"2019-05-16 07:45:00",19-제조-02,a.생산관리,"철근 절단 프로그램 기획","2019-05-16 18:02:00",19-제조-02,a.생산관리,"철근 절단 프로그램 기획","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>생산스케줄 조정 및 협의<|>04:30<|><br>19-제조-02<|>a.생산관리<|>남점권 부사장님 보고자료 작성<|>02:30<|><br>",,
|
|
M05510,"2019-05-16 07:51:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.213.125,NULL,NULL,004C8,,,
|
|
J11305,"2019-05-16 08:09:00",19-설계-03,e.검토,계획검토,"2019-05-16 18:03:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-05-16 08:12:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-16 20:34:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-05-16 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-05-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-05-16 08:17:00",19-설계-04,h.기타,"새방교(상리동~새방골간) 설계견적서 및 내역서, 양근대교 거더공사비 검토, 신평교(무심동로~오창) 설계내역서, 청룡2교외 4개소(평택동부) 설계견적서 및 내역서","2019-05-16 18:05:00",19-설계-04,h.기타,"새방교(상리동~새방골간) 설계견적서 및 내역서, 양근대교 거더공사비 검토, 신평교(무심동로~오창) 설계내역서, 청룡2교외 4개소(평택동부) 설계견적서 및 내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J19201,"2019-05-16 08:17:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","2019-05-16 18:02:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J16202,"2019-05-16 08:21:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-16 18:14:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J18206,"2019-05-16 08:21:00",17-시공-08,b.시공,"산외교 제작및가설공정 체크
|
|
인도네시아PJT 및 양근대교 검토","2019-05-16 18:14:00",17-시공-08,b.시공,"산외교 제작및가설공정 체크
|
|
인도네시아PJT 및 양근대교 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J18205,"2019-05-16 08:22:00",19-설계-03,c.도면,"상부 수량산출","2019-05-16 21:58:00",19-설계-03,c.도면,"상부 수량산출","2019-05-16 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J11202,"2019-05-16 08:22:00",19-시공-02,b.시공,공사관리,"2019-05-16 18:32:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J13201,"2019-05-16 08:23:00",19-설계-05,b.구조계산,"야노1,2교 거더도면 작성","2019-05-16 18:05:00",19-설계-05,b.구조계산,"야노1,2교 거더도면 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15202,"2019-05-16 08:29:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","2019-05-16 21:37:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","2019-05-16 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J17205,"2019-05-16 08:32:00",18-교영-01,c.설계사,.,"2019-05-16 18:18:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07103,"2019-05-16 08:34:00",19-교영-01,d.기타,사업관리,"2019-05-16 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11203,"2019-05-16 08:39:00",19-설계-03,e.검토,"라멘교(시종점 강결) 계산서 거더응력편 작성","2019-05-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J07210,"2019-05-16 08:40:00",16-시공-20,g.기타,"당초 변경","2019-05-16 20:47:00",16-시공-20,g.기타,"당초 변경","2019-05-16 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15201,"2019-05-16 08:45:00",19-교영-01,c.설계사,"신규과업현황 조사","2019-05-16 18:03:00",19-교영-01,c.설계사,"신규과업현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J18204,"2019-05-16 08:45:00",19-교휴-06,a.기타,"삼간교, 금곡교 투입비 정리","2019-05-16 18:01:00",19-교휴-06,a.기타,"삼간교, 금곡교 투입비 정리","0000-00-00 00:00:00",172.16.9.183,NULL,172.16.9.183,004E2,,,
|
|
J09101,"2019-05-16 08:50:00",19-교영-01,c.설계사,과업조사,"2019-05-16 18:06:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14306,"2019-05-16 08:50:00",19-교휴-06,경유,"경유(쌍용건설,전문건설공제조합(선금보증이행완료확인원 날인,제출))","2019-05-16 18:19:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15307,"2019-05-16 08:50:00",19-교휴-01,교육,"한길아이티 AAbutpier 교육 참가","2019-05-16 18:00:00",19-교휴-01,교육,"한길아이티 AAbutpier 교육 참가","0000-00-00 00:00:00",NULL,NULL,NULL,008E4,,,
|
|
J14101,"2019-05-16 08:50:00",16-시공-20,출장,한양,"2019-05-16 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-05-17 07:02:00",19-제조-04,b.기계,"삼남1교 주두부 받침 블럭 거푸집제작과 주두부 거푸집 보수와 북수원1교 및 태안배수문교 거푸집 상차","2019-05-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-05-17 07:19:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-17 18:03:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18207,"2019-05-17 07:28:00",17-시공-09,b.시공,"거더제작 공정 따른 가설방법 검토","2019-05-17 18:08:00",17-시공-09,b.시공,"거더제작 공정 따른 가설방법 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
T04204,"2019-05-17 07:29:00",16-제조-02,a.생산관리,"성주대교(주두부),북수원1교(용인방향) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-05-17 07:32:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","2019-05-17 18:03:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 하도급 계약준비
|
|
2. 석현천교, 용강IC교 시공계획서 작성
|
|
3. 석현천교, 용강IC교 철근신청서 작성
|
|
4. 밀양~울산4 기성 투입내역서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J09102,"2019-05-17 07:37:00",19-계약-01,d.기타,"안성~구리 1,4공구 한신공영, 계룡건설 계약관련 방문예정 등 : 수리티교 외 3개교 계약 추진 중","2019-05-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-05-17 07:41:00",16-시공-41,b.시공,"가설계획서 작성","2019-05-17 18:04:00",16-시공-41,b.시공,"가설계획서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18202,"2019-05-17 07:48:00",07-교영-01,b.시공사,"발주 현황 파악","2019-05-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J16203,"2019-05-17 07:50:00",19-제조-03,a.품질검사," 산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-17 22:50:00",19-제조-03,a.품질검사," 산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-17 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
M05510,"2019-05-17 08:01:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.146.24,NULL,NULL,004C8,,,
|
|
J18206,"2019-05-17 08:07:00",17-시공-08,b.시공,"산외교 제작및가설공정 체크
|
|
인도네시아PJT 및 양근대교 검토","2019-05-17 18:16:00",17-시공-08,b.시공,"산외교 제작및가설공정 체크
|
|
인도네시아PJT 및 양근대교 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11203,"2019-05-17 08:11:00",19-설계-03,e.검토,"라멘교(시종점 강결) 거더 계산서(휨, 전단, 기타)작성","2019-05-17 20:31:00",19-설계-03,e.검토,"라멘교(시종점 강결) 거더 계산서(휨, 전단, 기타)작성","2019-05-17 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"18-설계-19<|>e.검토<|>VE자료 작성 5공구 승천천교, R-F1교 거더횡갯수 축소관련<|>01:00<|><br>18-설계-19<|>a.계획 및 협의<|>도림교 안성방향 빔배치 측점오류 수정 발송<|>00:30<|><br>17-시공-09<|>g.기타<|>삼남1교 스트롱백 시험시공 계산서 수정<|>02:30<|><br>",1,
|
|
J08201,"2019-05-17 08:12:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-17 18:11:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-05-17 08:20:00",19-설계-04,h.기타,"양근대교 거더공사비 검토, 새방교(상리동~새방골간) 설계견적서 및 내역서, 신평교(무심동로~오창) 설계내역서, 청룡2교외 4개소(평택동부) 설계견적서 및 내역서, 제3연륙교 가설공사비 검토","2019-05-17 18:05:00",19-설계-04,h.기타,"양근대교 거더공사비 검토, 새방교(상리동~새방골간) 설계견적서 및 내역서, 신평교(무심동로~오창) 설계내역서, 청룡2교외 4개소(평택동부) 설계견적서 및 내역서, 제3연륙교 가설공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J19201,"2019-05-17 08:21:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","2019-05-17 18:06:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J15307,"2019-05-17 08:21:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 일반도 작성
|
|
2. 송산그린시티~시화MTV 접속교 슬래브 수량 작성","2019-05-17 20:40:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 일반도 작성
|
|
2. 송산그린시티~시화MTV 접속교 슬래브 수량 작성","2019-05-17 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J18205,"2019-05-17 08:23:00",19-설계-03,c.도면,"상부 수량산출","2019-05-17 21:00:00",19-설계-03,c.도면,"상부 수량산출","2019-05-17 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J07103,"2019-05-17 08:23:00",19-교영-01,d.기타,사업관리,"2019-05-17 18:15:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J13201,"2019-05-17 08:25:00",19-설계-05,b.구조계산,"야노1교 배근도 작성","2019-05-17 18:09:00",19-설계-05,b.구조계산,"야노1교 배근도 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J14306,"2019-05-17 08:27:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-17 18:08:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15202,"2019-05-17 08:28:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","2019-05-17 20:59:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","2019-05-17 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,19-설계-03<|>e.검토<|>가축도계획<|>01:00<|><br>,1,
|
|
J07210,"2019-05-17 08:28:00",16-시공-20,g.기타,"당초 변경","2019-05-17 18:05:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11202,"2019-05-17 08:28:00",19-시공-02,b.시공,공사관리,"2019-05-17 18:10:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J16202,"2019-05-17 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-17 18:12:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
B15306,"2019-05-17 08:09:00",18-관리-02,e.기타,"비서업무 외","2019-05-17 18:18:18",NULL,NULL,"비서업무 외","0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J17205,"2019-05-17 08:36:00",18-교영-01,c.설계사,.,"2019-05-17 21:20:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11305,"2019-05-17 08:37:00",19-설계-03,e.검토,계획검토,"2019-05-17 18:07:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15201,"2019-05-17 08:38:00",19-교영-01,c.설계사,"신규과업현황 조사","2019-05-17 18:39:00",19-교영-01,c.설계사,"신규과업현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J09101,"2019-05-17 08:42:00",19-교영-01,c.설계사,과업조사,"2019-05-17 18:42:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
M02302,"2019-05-17 08:50:00",19-제조-02,출장,서울사무실,"2019-05-17 18:00:00",19-제조-02,a.생산관리,"철근 절단 프로그램 기획","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14101,"2019-05-17 08:50:00",16-시공-20,출장,한양,"2019-05-17 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-05-17 08:50:00",18-시공-15,출장,"[고양시 덕양구 화정동]원흥2교 경간부 1차인장","2019-05-17 18:00:00",18-시공-15,출장,"[고양시 덕양구 화정동]원흥2교 경간부 1차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J12202,"2019-05-17 08:50:00",17-시공-08,출장,"[경기도 화성, 구로동, 충남서산]런처 제작관련 인증협의, 공정파악 및 비파괴검사 참관","2019-05-17 18:00:00",17-시공-08,출장,"[경기도 화성, 구로동, 충남서산]런처 제작관련 인증협의, 공정파악 및 비파괴검사 참관","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M05510,"2019-05-18 07:13:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.222.26,NULL,NULL,004C8,,,
|
|
M05510,"2019-05-19 12:59:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.138.182,NULL,NULL,004C8,,,
|
|
J07202,"2019-05-20 06:45:00",19-제조-04,b.기계,"도하4교 앵커설치 공사 출장","2019-05-21 07:28:00",19-제조-04,b.기계,"도하4교 앵커설치 공사 출장","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-05-20 07:20:00",18-시공-15,g.기타,"원흥2교 1차인장결과서 작성 및 시험인장결과보고서 작성","2019-05-20 18:06:00",18-시공-15,g.기타,"원흥2교 1차인장결과서 작성 및 시험인장결과보고서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J13308,"2019-05-20 07:20:00",19-시공-08,b.시공,"1. 석현천교, 용강IC교 시공계획서 작성
|
|
2. 석현천교, 용강IC교 철근신청서 작성
|
|
3. 2019년 5월 격월제 발표준비","2019-05-20 20:35:00",19-시공-08,b.시공,"1. 석현천교, 용강IC교 시공계획서 작성
|
|
2. 석현천교, 용강IC교 철근신청서 작성
|
|
3. 2019년 5월 격월제 발표준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J16203,"2019-05-20 07:21:00",19-제조-03,a.품질검사," 산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-20 20:34:00",19-제조-03,a.품질검사," 산외교 켄틸, 옥산교 데크생산 및 품질관리","2019-05-20 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14308,"2019-05-20 07:23:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-20 20:44:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-20 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-05-20 07:31:00",16-제조-02,a.생산관리,"성주대교(주두부),삼남1교,북수원1교(용인방향) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-20 20:35:00",16-제조-02,a.생산관리,"성주대교(주두부),삼남1교,북수원1교(용인방향) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-05-20 07:32:00",19-제조-02,a.생산관리,"Pre-Deck 거푸집 제작 원가 분석","2019-05-20 18:02:00",19-제조-02,a.생산관리,"Pre-Deck 거푸집 제작 원가 분석","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>직급별 세미나 계획 검토<|>02:00<|><br>19-제조-02<|>a.생산관리<|>팀/반장 정기회의 계획 검토<|>00:30<|><br>",,
|
|
J18207,"2019-05-20 07:40:00",17-시공-09,b.시공,"거더제작 공정 따른 가설방법 검토","2019-05-20 18:05:00",17-시공-09,b.시공,"거더제작 공정 따른 가설방법 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18202,"2019-05-20 07:45:00",07-교영-01,b.시공사,"발주 현황 파악","2019-05-20 18:05:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-05-20 07:46:00",19-계약-01,d.기타,"평택동부우회도로 시행가, 포항~영덕3 지경천교 시행가 등 : 수리티교 외 3개교 계약 추진 중","2019-05-20 19:02:00",19-계약-01,d.기타,"평택동부우회도로 시행가, 포항~영덕3 지경천교 시행가 등 : 수리티교 외 3개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J19201,"2019-05-20 07:55:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","2019-05-20 18:14:00",19-설계-05,c.도면,"슬래브 일반도 및 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J18206,"2019-05-20 08:07:00",17-시공-08,b.시공,"산외교 제작및가설공정 체크
|
|
인도네시아PJT 및 양근대교 검토","2019-05-20 18:22:00",17-시공-08,b.시공,"산외교 제작및가설공정 체크
|
|
인도네시아PJT 및 양근대교 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-05-20 08:13:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 수량 작성","2019-05-20 21:31:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 수량 작성","2019-05-20 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J08201,"2019-05-20 08:17:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-20 20:03:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11202,"2019-05-20 08:20:00",19-시공-02,b.시공,공사관리,"2019-05-20 21:29:00",19-시공-02,b.시공,공사관리,"2019-05-20 18:45:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
B15306,"2019-05-20 08:21:00",18-관리-02,e.기타,"비서업무 외","2019-05-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J14306,"2019-05-20 08:21:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-20 18:18:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-05-20 08:26:00",19-교영-01,d.기타,사업관리,"2019-05-20 18:22:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10314,"2019-05-20 08:27:00",19-교영-08,d.기타,"DR거더 개략공사비 (시화MTV중 1-117호선), 웅동교(창녕~밀양 3공구) 설계견적서 및 내역서(특정공법심의), 신평교(무심동로~오창) 설계내역서 및 견적서,양근대교 거더공사비 검토, 청룡2교외 4개소(평택동부) 설계견적서 및 내역서","2019-05-20 18:15:00",19-교영-08,d.기타,"DR거더 개략공사비 (시화MTV중 1-117호선), 웅동교(창녕~밀양 3공구) 설계견적서 및 내역서(특정공법심의), 신평교(무심동로~오창) 설계내역서 및 견적서,양근대교 거더공사비 검토, 청룡2교외 4개소(평택동부) 설계견적서 및 내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J10301,"2019-05-20 08:29:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-20 21:00:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-20 18:43:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J18205,"2019-05-20 08:29:00",19-설계-03,c.도면,"상부 도면 작성","2019-05-20 20:56:00",19-설계-03,c.도면,"상부 도면 작성","2019-05-20 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J13201,"2019-05-20 08:30:00",19-설계-05,b.구조계산,"야노1,2교 수량산출","2019-05-20 18:06:00",19-설계-05,b.구조계산,"야노1,2교 수량산출","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J10313,"2019-05-20 08:30:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-05-20 18:01:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11203,"2019-05-20 08:31:00",19-설계-03,e.검토,"라멘교(시종점 강결) 벽체 계산서 작성","2019-05-20 19:03:00",19-설계-03,e.검토,"라멘교(시종점 강결) 벽체 계산서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-교영-01<|>d.기타<|>창녕~밀양 웅동교 거더, 엔드다이어프램 수량 산출<|>02:00<|><br>",,
|
|
J15201,"2019-05-20 08:32:00",19-교영-01,c.설계사,"신규과업현황 조사","2019-05-20 18:05:00",19-교영-01,c.설계사,"신규과업현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15202,"2019-05-20 08:34:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","2019-05-20 21:02:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","2019-05-20 18:43:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"19-교영-08<|>c.설계사<|>횡단면도 검토<|>01:00<|><br>",1,
|
|
J09101,"2019-05-20 08:36:00",19-교영-01,c.설계사,과업조사,"2019-05-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J16202,"2019-05-20 08:37:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-20 18:11:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11305,"2019-05-20 08:38:00",19-설계-03,e.검토,계획검토,"2019-05-20 18:31:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J17205,"2019-05-20 08:38:00",18-교영-01,c.설계사,.,"2019-05-20 18:32:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-05-20 08:39:00",16-시공-20,g.기타,"당초 변경","2019-05-20 20:54:00",16-시공-20,g.기타,"당초 변경","2019-05-20 18:44:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J14101,"2019-05-20 08:50:00",16-시공-20,출장,한양,"2019-05-20 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-05-20 08:50:00",17-시공-08,출장,"[경기도 화성, 구로동, 충남서산]런처 제작관련 인증협의, 공정파악 및 비파괴검사 참관","2019-05-20 18:00:00",17-시공-08,출장,"[경기도 화성, 구로동, 충남서산]런처 제작관련 인증협의, 공정파악 및 비파괴검사 참관","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-05-20 08:50:00",17-시공-09,출장,대림산업,"2019-05-20 18:00:00",17-시공-09,출장,대림산업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11302,"2019-05-21 07:21:00",18-시공-15,g.기타,"원흥2교 PCM작성
|
|
옥산교 가설계획서 작성","2019-05-21 20:36:00",18-시공-15,g.기타,"원흥2교 PCM작성
|
|
옥산교 가설계획서 작성","2019-05-21 18:32:00",172.16.9.166,172.16.9.166,172.16.9.166,004E2,,1,
|
|
T04204,"2019-05-21 07:21:00",16-제조-02,a.생산관리,"성주대교(주두부),삼남1교,북수원1교(용인방향) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-21 19:54:00",16-제조-02,a.생산관리,"성주대교(주두부),삼남1교,북수원1교(용인방향) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-05-21 07:25:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-21 20:56:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-21 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-05-21 07:27:00",19-시공-04,b.시공,"실행예산 및 공사방법검토","2019-05-21 18:10:00",19-시공-04,b.시공,"실행예산 및 공사방법검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J07202,"2019-05-21 07:29:00",19-제조-04,b.기계,"거푸집 보수와 삼남1교 주두부 블럭 생산","2019-05-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-05-21 07:32:00",19-시공-08,b.시공,"1. 석현천교, 용강IC교 시공계획서 작성
|
|
2. 석현천교, 용강IC교 철근신청서 작성
|
|
3. 2019년 5월 격월제 발표준비","2019-05-21 18:10:00",19-시공-08,b.시공,"1. 석현천교, 용강IC교 시공계획서 작성
|
|
2. 석현천교, 용강IC교 철근신청서 작성
|
|
3. 2019년 5월 격월제 발표준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
M02302,"2019-05-21 07:33:00",19-제조-02,a.생산관리,"L동 옹벽 보강 관련 협의 및 품의","2019-05-21 18:05:00",19-제조-02,a.생산관리,"Pre-Deck 거푸집 제작 원가 분석","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>월 매출 분석 및 팀장 면담<|>03:00<|><br>19-제조-02<|>a.생산관리<|>팔레트 대용 고임목 검토<|>02:00<|><br>",,
|
|
J18202,"2019-05-21 07:37:00",07-교영-01,b.시공사,"발주 현황 파악","2019-05-21 18:04:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J15307,"2019-05-21 07:38:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 수량 작성","2019-05-21 18:05:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 수량 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J16203,"2019-05-21 07:40:00",19-제조-03,a.품질검사," 옥산교 데크생산 및 품질관리","2019-05-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-05-21 07:48:00",19-계약-01,d.기타,"새만금~전주5 고려개발 본사, 광명~서울1 포스코건설 본사 방문 예정 등 : 수리티교 외 3개교 계약 추진 중","2019-05-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J11305,"2019-05-21 07:52:00",19-설계-03,e.검토,계획검토,"2019-05-21 18:07:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J17205,"2019-05-21 07:53:00",18-교영-01,c.설계사,.,"2019-05-21 18:27:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
B15306,"2019-05-21 07:59:00",18-관리-02,e.기타,"비서업무 외","2019-05-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-05-21 08:02:00",17-시공-08,b.시공,"산외교 제작및가설공정 체크
|
|
인도네시아PJT 및 양근대교 검토","2019-05-21 18:08:00",17-시공-08,b.시공,"산외교 제작및가설공정 체크
|
|
인도네시아PJT 및 양근대교 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15202,"2019-05-21 08:09:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","2019-05-21 22:17:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","2019-05-21 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"12-설계-24<|>e.검토<|>스트롱백 시험시공 도면 검토<|>01:00<|><br>19-교휴-01<|>d.기타<|>격월제 발표<|>01:30<|><br>",1,
|
|
J07103,"2019-05-21 08:18:00",19-교영-01,d.기타,사업관리,"2019-05-21 18:15:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J08201,"2019-05-21 08:19:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-21 21:00:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11203,"2019-05-21 08:19:00",19-설계-03,e.검토,"라멘교(시종점 강결) 벽체 계산서 작성","2019-05-21 20:30:00",19-설계-03,e.검토,"라멘교(시종점 강결) 벽체 계산서 작성","2019-05-21 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"18-설계-19<|>f.보고서 및 시방서<|>DR거더 시방서 작성<|>03:00<|><br>18-설계-19<|>e.검토<|>VE중, 슬래브철근최적화관련자료 작성<|>01:00<|><br>",1,
|
|
J11202,"2019-05-21 08:19:00",19-시공-02,b.시공,공사관리,"2019-05-21 18:14:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14306,"2019-05-21 08:20:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-21 18:05:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-05-21 08:22:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-21 21:11:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-21 18:33:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J18205,"2019-05-21 08:22:00",19-설계-03,c.도면,"상부 도면 작성","2019-05-21 21:04:00",19-설계-03,c.도면,"상부 도면 작성","2019-05-21 18:30:00",1.233.130.3,1.233.130.3,1.233.130.3,008E2,,1,
|
|
J16202,"2019-05-21 08:23:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-21 18:10:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J13201,"2019-05-21 08:24:00",19-설계-03,c.도면,"송산~시화 빔배치 수정","2019-05-21 21:05:00",19-설계-03,c.도면,"송산~시화 빔배치 수정","2019-05-21 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10314,"2019-05-21 08:25:00",19-설계-01,h.기타,"웅동교(창녕~밀양 3공구) 설계견적서 및 내역서(특정공법심의), 신평교(무심동로~오창) 설계내역서 및 견적서,양근대교 거더공사비 검토, 청룡2교외 4개소(평택동부) 설계견적서 및 내역서","2019-05-21 18:35:00",19-설계-01,h.기타,"웅동교(창녕~밀양 3공구) 설계견적서 및 내역서(특정공법심의), 신평교(무심동로~오창) 설계내역서 및 견적서,양근대교 거더공사비 검토, 청룡2교외 4개소(평택동부) 설계견적서 및 내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15201,"2019-05-21 08:25:00",19-교영-01,c.설계사,"신규과업현황 조사","2019-05-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J10313,"2019-05-21 08:41:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-05-21 18:03:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-05-21 08:44:00",19-교영-01,c.설계사,과업조사,"2019-05-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J18208,"2019-05-21 08:50:00",19-제조-02,출장,"[성주대교(대구 달성군 하빈면)]성주대교 가설밴트 측량","2019-05-21 21:45:00",19-제조-02,a.생산관리,"2팀 생산관리 및 산외교 Shop DWG","2019-05-21 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14101,"2019-05-21 08:50:00",16-시공-20,출장,한양,"2019-05-21 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-05-21 08:50:00",17-시공-09,출장,대림산업,"2019-05-21 18:00:00",17-시공-09,출장,대림산업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-05-21 08:50:00",17-시공-08,출장,"[선진정공 외]런처 제작관련 인증협의, 공정파악 및 비파괴검사 참관","2019-05-21 18:00:00",17-시공-08,출장,"[선진정공 외]런처 제작관련 인증협의, 공정파악 및 비파괴검사 참관","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J12202,"2019-05-22 06:52:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-05-22 18:24:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J16203,"2019-05-22 07:17:00",19-제조-03,a.품질검사," 옥산교 데크생산 및 품질관리","2019-05-22 20:34:00",19-제조-03,a.품질검사," 옥산교 데크생산 및 품질관리","2019-05-22 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J11302,"2019-05-22 07:20:00",18-시공-15,g.기타,"원흥2교 PCM작성
|
|
옥산교 가설계획서 작성","2019-05-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E2,,,
|
|
J14308,"2019-05-22 07:22:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-22 19:12:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-05-22 07:28:00",16-제조-02,a.생산관리,"성주대교(주두부),삼남1교,북수원1교(용인방향) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-22 20:00:00",16-제조-02,a.생산관리,"성주대교(주두부),삼남1교,북수원1교(용인방향) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-05-22 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-22 22:19:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-22 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J13308,"2019-05-22 07:33:00",19-시공-08,b.시공,"1. 석현천교, 용강IC교 시공계획서 작성
|
|
2. 석현천교, 용강IC교 철근신청서 작성
|
|
3. 2019년 5월 격월제 발표준비","2019-05-22 18:16:00",19-시공-08,b.시공,"1. 석현천교, 용강IC교 시공계획서 작성
|
|
2. 석현천교, 용강IC교 철근신청서 작성
|
|
3. 2019년 5월 격월제 발표준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
M02302,"2019-05-22 07:33:00",19-제조-02,a.생산관리,"Pre-Beam 생산 설비 검토","2019-05-22 18:08:00",19-제조-02,a.생산관리,"Pre-Deck 거푸집 제작 원가 분석","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>Pre-Beam 생산 설비 검수 및 작업<|>03:00<|><br>19-제조-02<|>a.생산관리<|>직원교육 자료 취합<|>02:00<|><br>",,
|
|
J18207,"2019-05-22 07:33:00",19-시공-04,b.시공,"실행예산 및 공사방법검토","2019-05-22 18:09:00",19-시공-04,b.시공,"실행예산 및 공사방법검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-05-22 07:38:00",19-계약-01,d.기타,"신평교 예상 시행가, 송산그린시티 남측 강산건설 현장 방문 예정 등 : 수리티교 외 3개교 계약 추진 중","2019-05-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-05-22 07:41:00",17-시공-09,b.시공,"가설밴트 및 스트롱백 계산서 검토 및 대림산업 협의자료 작성","2019-05-22 18:02:00",17-시공-09,b.시공,"가설밴트 및 스트롱백 계산서 검토 및 대림산업 협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18202,"2019-05-22 07:44:00",07-교영-01,b.시공사,"발주 현황 파악","2019-05-22 18:07:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18205,"2019-05-22 08:10:00",19-설계-03,c.도면,"상부 도면 작성","2019-05-22 20:27:00",19-설계-03,c.도면,"상부 도면 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,1,
|
|
J11305,"2019-05-22 08:12:00",19-설계-03,e.검토,계획검토,"2019-05-22 18:06:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J19201,"2019-05-22 08:13:00",19-설계-05,c.도면,"말레이시아 도면작업","2019-05-22 18:01:00",19-설계-05,c.도면,"말레이시아 도면작업","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J10301,"2019-05-22 08:13:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-22 18:28:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J18206,"2019-05-22 08:15:00",17-시공-08,b.시공,"산외교 제작및가설공정 체크
|
|
인도네시아PJT 및 양근대교 검토","2019-05-22 18:18:00",17-시공-08,b.시공,"산외교 제작및가설공정 체크
|
|
인도네시아PJT 및 양근대교 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-05-22 08:17:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-22 19:28:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-05-22 08:20:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 수량 작성","2019-05-22 20:25:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 수량 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
B15306,"2019-05-22 08:21:00",18-관리-02,e.기타,"비서업무 외","2019-05-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J13201,"2019-05-22 08:21:00",19-교영-06,c.설계사,"빔배치 검토","2019-05-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E2,,,
|
|
J10314,"2019-05-22 08:21:00",19-설계-01,h.기타,"신평교(무심동로~오창) 설계내역서 및 견적서, 이탄2교외17개소(서부내륙) 시행견적서(현대엔지니어링), 야노1,2교(입장~진천) 설계내역서 및 견적서, 양근대교 거더공사비 검토, 청룡2교외 4개소(평택동부) 설계견적서 및 내역서, 제3연륙교 가설공사비 검토","2019-05-22 18:16:00",19-설계-01,h.기타,"신평교(무심동로~오창) 설계내역서 및 견적서, 이탄2교외17개소(서부내륙) 시행견적서(현대엔지니어링), 야노1,2교(입장~진천) 설계내역서 및 견적서, 양근대교 거더공사비 검토, 청룡2교외 4개소(평택동부) 설계견적서 및 내역서, 제3연륙교 가설공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-05-22 08:24:00",19-교영-01,d.기타,사업관리,"2019-05-22 18:09:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15201,"2019-05-22 08:26:00",19-교영-01,c.설계사,"신규과업현황 조사","2019-05-22 18:03:00",19-교영-01,c.설계사,"신규과업현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11202,"2019-05-22 08:29:00",19-시공-02,b.시공,공사관리,"2019-05-22 18:28:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J16202,"2019-05-22 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-22 18:17:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-05-22 08:33:00",19-설계-03,e.검토,"라멘교(시종점 강결) A2기초 계산서 작성","2019-05-22 20:28:00",19-설계-03,e.검토,"라멘교(시종점 강결) A2기초 계산서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>b.구조계산<|>슬래브계산서 오타수정(설계사 자체검토)<|>01:00<|><br>",1,
|
|
J17205,"2019-05-22 08:35:00",18-교영-01,c.설계사,.,"2019-05-22 18:09:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-05-22 08:39:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","2019-05-22 18:03:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J10313,"2019-05-22 08:40:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-05-22 18:05:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-05-22 08:50:00",19-교영-01,c.설계사,과업조사,"2019-05-22 18:02:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
M05510,"2019-05-22 10:29:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.130.181,NULL,NULL,,,,
|
|
J14101,"2019-05-22 08:50:00",16-시공-20,출장,한양,"2019-05-22 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-05-23 06:34:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-05-23 14:49:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-05-23 07:05:00",19-제조-04,b.기계,"삼남1교 주두부 거푸집과 블럭 상차 및 현장입고 각재 정리","2019-05-23 18:58:00",19-제조-04,b.기계,"삼남1교 주두부 거푸집과 블럭 상차 및 현장입고 각재 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-05-23 07:10:00",19-시공-08,b.시공,"1. 석현천교, 용강IC교 시공계획서 작성
|
|
2. 석현천교, 용강IC교 철근신청서 작성
|
|
3. 2019년 5월 격월제 발표준비","2019-05-23 18:02:00",19-시공-08,b.시공,"1. 석현천교, 용강IC교 시공계획서 작성
|
|
2. 석현천교, 용강IC교 철근신청서 작성
|
|
3. 2019년 5월 격월제 발표준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
T04204,"2019-05-23 07:24:00",16-제조-02,a.생산관리,"성주대교(주두부),삼남1교 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-23 19:22:00",16-제조-02,a.생산관리,"성주대교(주두부),삼남1교 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-05-23 07:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-23 18:59:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J10315,"2019-05-23 07:35:00",17-시공-09,b.시공,"가설밴트 및 스트롱백 계산서 검토 및 대림산업 협의자료 작성","2019-05-23 18:02:00",17-시공-09,b.시공,"가설밴트 및 스트롱백 계산서 검토 및 대림산업 협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
M02302,"2019-05-23 07:36:00",19-제조-02,a.생산관리,"RCP/BOM 프로그램 시연 및 회의","2019-05-23 18:05:00",19-제조-02,a.생산관리,"Pre-Deck 거푸집 제작 원가 분석","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>RCP/BOM 프로그램 담당자 회의<|>02:00<|><br>19-제조-02<|>a.생산관리<|>생산2팀 작업자 면담 및 후속 조치<|>02:00<|><br>",,
|
|
J14308,"2019-05-23 07:41:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-23 21:49:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-23 18:35:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-05-23 07:43:00",19-제조-03,a.품질검사,"고강도 배합설계(아산, 실크로드 연구소)","2019-05-23 22:53:00",19-제조-03,a.품질검사,"고강도 배합설계(아산, 실크로드 연구소)","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,,
|
|
J18206,"2019-05-23 07:59:00",17-시공-08,b.시공,"산외교 제작및가설공정 체크
|
|
인도네시아PJT 및 양근대교 검토","2019-05-23 18:10:00",17-시공-08,b.시공,"산외교 제작및가설공정 체크
|
|
인도네시아PJT 및 양근대교 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-05-23 08:14:00",19-설계-05,h.기타,"제3연륙교 가설공사비 검토, 야노1,2교(입장~진천) 설계내역서 및 견적서, 양근대교 거더공사비 검토, 청룡2교외 4개소(평택동부) 설계견적서 및 내역서","2019-05-23 18:08:00",19-설계-05,h.기타,"제3연륙교 가설공사비 검토, 야노1,2교(입장~진천) 설계내역서 및 견적서, 양근대교 거더공사비 검토, 청룡2교외 4개소(평택동부) 설계견적서 및 내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J19201,"2019-05-23 08:16:00",19-설계-03,b.구조계산,"바닥판 구조계산","2019-05-23 18:09:00",19-설계-03,b.구조계산,"바닥판 구조계산","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
B15306,"2019-05-23 08:19:00",18-관리-02,e.기타,"비서업무 외","2019-05-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-05-23 08:22:00",19-교영-01,d.기타,사업관리,"2019-05-23 18:23:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15307,"2019-05-23 08:22:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 배근도 작성","2019-05-23 18:05:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
M05510,"2019-05-23 08:23:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.157.129,NULL,NULL,004C8,,,
|
|
J08201,"2019-05-23 08:23:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J11202,"2019-05-23 08:24:00",19-시공-02,b.시공,공사관리,"2019-05-23 18:06:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J17205,"2019-05-23 08:25:00",18-교영-01,c.설계사,.,"2019-05-23 18:21:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J14306,"2019-05-23 08:26:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-23 18:09:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-05-23 08:26:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-23 18:09:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-05-23 08:27:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","2019-05-23 21:13:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","2019-05-23 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J13201,"2019-05-23 08:28:00",19-교영-06,c.설계사,"빔배치 검토","2019-05-23 18:09:00",19-교영-06,c.설계사,"빔배치 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J18205,"2019-05-23 08:28:00",19-설계-03,c.도면,"상부 도면 작성","2019-05-23 18:12:00",19-설계-03,c.도면,"상부 도면 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,1,
|
|
J10301,"2019-05-23 08:28:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-23 18:00:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-05-23 08:32:00",16-시공-20,g.기타,"당초 변경","2019-05-23 18:06:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-05-23 08:44:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-05-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15201,"2019-05-23 08:45:00",19-교영-01,c.설계사,"신규과업현황 조사","2019-05-23 18:05:00",19-교영-01,c.설계사,"신규과업현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11203,"2019-05-23 08:46:00",19-설계-03,e.검토,"라멘교(시종점 강결) A2 말뚝 계산서 작성","2019-05-23 18:08:00",19-설계-03,e.검토,"라멘교(시종점 강결) A2 말뚝 계산서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J09101,"2019-05-23 08:51:00",19-교영-01,c.설계사,과업조사,"2019-05-23 18:06:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J11305,"2019-05-23 08:00:00",19-설계-03,e.검토,,"2019-05-23 18:04:00",19-설계-03,e.검토,,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J14101,"2019-05-23 08:50:00",16-시공-20,출장,한양,"2019-05-23 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J09102,"2019-05-23 08:50:00",19-계약-01,출장,대림산업,"2019-05-23 18:00:00",19-계약-01,출장,대림산업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18202,"2019-05-23 08:50:00",07-교영-01,출장,"[함양, 여수]남양건설 직원 미팅 및 씨앤에스씨 박성일 부장 미팅","2019-05-23 18:00:00",07-교영-01,출장,"[함양, 여수]남양건설 직원 미팅 및 씨앤에스씨 박성일 부장 미팅","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18207,"2019-05-23 08:50:00",16-시공-20,출장,"[밀양 및 울산현장]산외교 및 단장천2교 삼남1교 현장공정협의","2019-05-23 18:00:00",16-시공-20,출장,"[밀양 및 울산현장]산외교 및 단장천2교 삼남1교 현장공정협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-05-24 06:56:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-05-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
T04204,"2019-05-24 07:10:00",16-제조-02,a.생산관리,"평촌교,성주대교(주두부),삼남1교 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-24 20:45:00",16-제조-02,a.생산관리,"평촌교,성주대교(주두부),삼남1교 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-05-24 07:19:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-24 23:03:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-24 18:38:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-05-24 07:33:00",19-제조-03,a.품질검사,"산외교 켄틸, 옥산교 데크 제작 및 생산 품질관리","2019-05-24 23:05:00",19-제조-03,a.품질검사,"산외교 켄틸, 옥산교 데크 제작 및 생산 품질관리","2019-05-24 18:46:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-05-24 07:36:00",19-계약-01,d.기타,"용두교 Spliced거더 예상 계약가, 전주시국대 아중교 예상 시행가 등 : 수리티교 외 4개교 계약 추진 中","2019-05-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M02302,"2019-05-24 07:36:00",19-제조-02,a.생산관리,"직원 교육자료 준비(보구조의 이해)","2019-05-24 20:54:00",19-제조-02,a.생산관리,"직원 교육자료 준비(보구조의 이해)","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>기술자 PQ교육행사 지원<|>03:00<|><br>",1,
|
|
J18208,"2019-05-24 07:40:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-24 13:05:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J11305,"2019-05-24 08:05:00",19-설계-03,e.검토,계획검토,"2019-05-24 18:04:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-05-24 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-05-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-05-24 08:14:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-24 18:05:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-05-24 08:19:00",19-교영-06,d.기타,"야노1,2교(입장~진천) 설계내역서 및 견적서, 제3연륙교 가설공사비 검토, 양근대교 거더공사비 검토","2019-05-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J14306,"2019-05-24 08:21:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-24 18:04:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18205,"2019-05-24 08:23:00",19-설계-03,c.도면,"상부 도면 작성","2019-05-24 18:10:00",19-설계-03,c.도면,"상부 도면 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J10301,"2019-05-24 08:23:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-24 18:47:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-05-24 08:24:00",17-설계-06,c.도면,"솟음도 수정(보정값 적용)","2019-05-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E2,,,
|
|
J15307,"2019-05-24 08:24:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 배근도 작성","2019-05-24 18:01:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J15201,"2019-05-24 08:26:00",19-교영-01,c.설계사,"신규과업현황 조사","2019-05-24 18:03:00",19-교영-01,c.설계사,"신규과업현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07103,"2019-05-24 08:27:00",19-교영-01,d.기타,사업관리,"2019-05-24 18:08:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15202,"2019-05-24 08:28:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","2019-05-24 18:14:00",18-설계-12,b.구조계산,"지산교 설계사 지적사항 반영","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J16202,"2019-05-24 08:28:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-24 18:05:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10313,"2019-05-24 08:29:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-05-24 18:03:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11203,"2019-05-24 08:33:00",19-설계-03,e.검토,"라멘교(시종점 강결) A2 기초철근량 산정, 기초 스트럿타이계산서작성","2019-05-24 18:09:00",19-설계-03,e.검토,"라멘교(시종점 강결) A2 기초철근량 산정, 기초 스트럿타이계산서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J19201,"2019-05-24 08:35:00",19-설계-03,b.구조계산,"바닥판 구조계산","2019-05-24 18:03:00",19-설계-03,b.구조계산,"바닥판 구조계산","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J17205,"2019-05-24 08:36:00",18-교영-01,c.설계사,.,"2019-05-24 18:13:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J09101,"2019-05-24 08:49:00",19-교영-01,c.설계사,과업조사,"2019-05-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J07202,"2019-05-24 12:04:00",19-제조-04,b.기계,"삼남1교 주두부 거푸집과 블럭 상차 및 콘크리트 타설","2019-05-25 07:16:00",19-제조-04,b.기계,"삼남1교 주두부 거푸집과 블럭 상차 및 콘크리트 타설","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-05-24 16:22:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.158.146,NULL,NULL,,,,
|
|
J14101,"2019-05-24 08:50:00",16-시공-20,출장,한양,"2019-05-24 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-05-24 08:50:00",07-교영-01,출장,"[함양, 여수]남양건설 직원 미팅 및 씨앤에스씨 박성일 부장 미팅","2019-05-24 18:00:00",07-교영-01,출장,"[함양, 여수]남양건설 직원 미팅 및 씨앤에스씨 박성일 부장 미팅","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18207,"2019-05-24 08:50:00",16-시공-20,출장,"[밀양 및 울산현장]산외교 및 단장천2교 삼남1교 현장공정협의","2019-05-24 18:00:00",16-시공-20,출장,"[밀양 및 울산현장]산외교 및 단장천2교 삼남1교 현장공정협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18206,"2019-05-24 08:50:00",17-시공-08,출장,당진공장/선진정공,"2019-05-24 18:00:00",17-시공-08,출장,당진공장/선진정공,"0000-00-00 00:00:00",NULL,NULL,NULL,001C5,,,
|
|
J13308,"2019-05-24 08:50:00",19-시공-08,출장,"[천안시]중앙거리(대흥로) 가로환경 정비공사 현장 관리 및 발주처 협의","2019-05-24 18:00:00",19-시공-08,출장,"[천안시]중앙거리(대흥로) 가로환경 정비공사 현장 관리 및 발주처 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E3,,,
|
|
T04204,"2019-05-25 07:14:00",16-제조-02,a.생산관리,"평촌교,성주대교(주두부),삼남1교 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-25 17:03:00",16-제조-02,a.생산관리,"평촌교,성주대교(주두부),삼남1교 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-05-25 07:17:00",19-제조-04,b.기계,"삼남1교 주두부 거푸집과 블럭 생산과 야적장 정리","2019-05-25 16:37:00",19-제조-04,b.기계,"삼남1교 주두부 거푸집과 블럭 생산과 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-05-25 07:42:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-25 18:24:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J16203,"2019-05-25 07:44:00",19-제조-03,a.품질검사,"산외교 켄틸, 옥산교 데크 제작 및 생산 품질관리","2019-05-25 17:30:00",19-제조-03,a.품질검사,"산외교 켄틸, 옥산교 데크 제작 및 생산 품질관리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
M02302,"2019-05-25 07:45:00",19-제조-02,a.생산관리,"공장관리 및 PQ교육 지원","2019-05-25 16:48:00",19-제조-02,a.생산관리,"공장관리 및 PQ교육 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J10313,"2019-05-25 08:34:00",16-제조-01,b.총무,"기술인 교육관련 준비","2019-05-25 14:19:00",16-제조-01,b.총무,"기술인 교육관련 준비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
M05510,"2019-05-26 14:02:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.150.148,NULL,NULL,004C8,,,
|
|
J07202,"2019-05-27 06:32:00",19-제조-04,b.기계,"삼남1교 주두부 거푸집과 블럭 생산","2019-05-28 06:25:00",19-제조-04,b.기계,"삼남1교 주두부 거푸집과 블럭 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-05-27 06:54:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-05-27 18:10:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
T04204,"2019-05-27 07:20:00",16-제조-02,a.생산관리,"평촌교,성주대교(주두부) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-05-27 07:28:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-27 18:05:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-05-27 07:31:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-27 19:05:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-05-27 07:33:00",19-제조-02,a.생산관리,"공장행사 기획","2019-05-27 18:04:00",19-제조-02,a.생산관리,"공장행사 기획","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>rcp 양식 검토<|>04:00<|><br>19-제조-02<|>a.생산관리<|>운송회사 처리방안 검토<|>02:00<|><br>",,
|
|
J18207,"2019-05-27 07:39:00",17-시공-09,b.시공,삼남1교공정관리,"2019-05-27 18:04:00",17-시공-09,b.시공,삼남1교공정관리,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-05-27 07:40:00",14-설계-38,"a.계획 및 협의","수리티교 크레인가설 적정성 검토서 보완","2019-05-27 18:06:00",14-설계-38,"a.계획 및 협의","수리티교 크레인가설 적정성 검토서 보완","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18202,"2019-05-27 07:51:00",07-교영-01,b.시공사,"발주 현황 파악","2019-05-27 18:05:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J07103,"2019-05-27 08:10:00",19-교영-01,d.기타,사업관리,"2019-05-27 18:20:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10314,"2019-05-27 08:12:00",18-설계-06,h.기타,"신촌교(양평~이천) 신기술 사용협약관련 자료, 야노1,2교(입장~진천) 설계내역서 및 견적서, 제3연륙교 가설공사비 검토, 양근대교 거더공사비 검토","2019-05-27 18:43:00",18-설계-06,h.기타,"신촌교(양평~이천) 신기술 사용협약관련 자료, 야노1,2교(입장~진천) 설계내역서 및 견적서, 제3연륙교 가설공사비 검토, 양근대교 거더공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-05-27 08:13:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-05-27 18:01:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-05-27 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-05-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-05-27 08:19:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-27 18:03:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J13308,"2019-05-27 08:22:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 작업사항 보고
|
|
2. 일반공사 작업 및 금주 진행사항 보고
|
|
3. 5월 기성 내역 및 신청","2019-05-27 18:05:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 작업사항 보고
|
|
2. 일반공사 작업 및 금주 진행사항 보고
|
|
3. 5월 기성 내역 및 신청","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J14306,"2019-05-27 08:22:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-27 18:09:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15307,"2019-05-27 08:25:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 배근도 작성","2019-05-27 18:07:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J18205,"2019-05-27 08:27:00",19-설계-03,c.도면,"합성라멘 배근도 작성","2019-05-27 18:06:00",19-설계-03,c.도면,"합성라멘 배근도 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J10301,"2019-05-27 08:28:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-27 21:01:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-27 18:44:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J11202,"2019-05-27 08:29:00",19-시공-02,b.시공,공사관리,"2019-05-27 18:10:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J13201,"2019-05-27 08:29:00",18-설계-12,c.도면,"지산교 솟음도수정(보정값적용)","2019-05-27 18:08:00",18-설계-12,c.도면,"지산교 솟음도수정(보정값적용)","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J16202,"2019-05-27 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-27 18:09:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-05-27 08:34:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑에 재하하는 라멘하중 정리","2019-05-27 18:04:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑에 재하하는 라멘하중 정리","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15202,"2019-05-27 08:34:00",19-설계-03,b.구조계산,"계산서 작성","2019-05-27 18:05:00",19-설계-03,b.구조계산,"계산서 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J15201,"2019-05-27 08:38:00",19-교영-01,c.설계사,"신규과업현황 조사","2019-05-27 18:02:00",19-교영-01,c.설계사,"신규과업현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-05-27 08:39:00",18-교영-01,c.설계사,.,"2019-05-27 18:05:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11305,"2019-05-27 08:39:00",19-설계-03,e.검토,계획검토,"2019-05-27 18:04:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10313,"2019-05-27 08:41:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-05-27 18:11:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-05-27 08:44:00",19-교영-01,c.설계사,과업조사,"2019-05-27 18:04:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J07210,"2019-05-27 08:50:00",16-시공-20,g.기타,"당초 변경","2019-05-27 18:04:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J19201,"2019-05-27 08:58:00",19-설계-03,b.구조계산,"슬래브 배근도","2019-05-27 18:03:00",19-설계-03,b.구조계산,"슬래브 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J14101,"2019-05-27 08:50:00",16-시공-20,출장,한양,"2019-05-27 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J16203,"2019-05-27 08:50:00",19-제조-03,출장,"[산외교, 성주대교]산외교 데크 가설 현황 파악 및 배합확인, 성주대교 공사 현황파악 ","2019-05-27 18:00:00",19-제조-03,출장,"[산외교, 성주대교]산외교 데크 가설 현황 파악 및 배합확인, 성주대교 공사 현황파악 ","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J09102,"2019-05-27 08:50:00",17-시공-07,출장,두산중공업,"2019-05-27 18:00:00",17-시공-07,출장,두산중공업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-05-28 06:26:00",19-제조-04,b.기계,"평촌교 거더 거푸집 보수와 삼남1교 주두부 거푸집과 블럭 생산 및 폐콘크리트 반출","2019-05-29 07:29:00",19-제조-04,b.기계,"평촌교 거더 거푸집 보수와 삼남1교 주두부 거푸집과 블럭 생산 및 폐콘크리트 반출","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J10315,"2019-05-28 07:22:00",14-설계-38,"a.계획 및 협의","수리티교 크레인가설 적정성 검토서 보완","2019-05-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J18202,"2019-05-28 07:29:00",07-교영-01,b.시공사,"발주 현황 파악","2019-05-28 18:08:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18208,"2019-05-28 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-28 21:38:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-28 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J13308,"2019-05-28 07:34:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 작업사항 보고
|
|
2. 일반공사 작업 및 금주 진행사항 보고
|
|
3. 5월 기성 내역 및 신청","2019-05-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
M02302,"2019-05-28 07:34:00",19-제조-02,a.생산관리,"BOM/RCP 양식 초안작업 ","2019-05-28 18:03:00",19-제조-02,a.생산관리,"BOM/RCP 양식 초안작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>세진(동원영사장, 김갑성 사장) 면담 및 업무 회의<|>02:00<|><br>19-제조-02<|>a.생산관리<|>생산 계약직 사직서 수령<|>00:30<|><br>",,
|
|
J18207,"2019-05-28 07:36:00",19-시공-02,b.시공,실행예산및공사관리검토,"2019-05-28 18:19:00",19-시공-02,b.시공,실행예산및공사관리검토,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-05-28 07:42:00",19-계약-01,d.기타,"벌교~주암 3-2공구, 용진~우아2 예상 시행가 등 : 수리티교 외 5개교 계약 추진 중","2019-05-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J14308,"2019-05-28 07:43:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-28 21:58:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-28 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J19201,"2019-05-28 07:45:00",19-설계-03,b.구조계산,"슬래브 배근도","2019-05-28 18:04:00",19-설계-03,b.구조계산,"슬래브 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J11305,"2019-05-28 07:52:00",19-설계-03,e.검토,계획검토,"2019-05-28 18:10:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-05-28 08:09:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-05-28 17:34:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-05-28 08:13:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-28 18:05:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-05-28 08:19:00",18-관리-02,e.기타,"비서업무 외","2019-05-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J14306,"2019-05-28 08:21:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-28 18:00:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15307,"2019-05-28 08:24:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 배근도 작성","2019-05-28 20:44:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J10301,"2019-05-28 08:24:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-28 20:40:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-28 18:35:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J07103,"2019-05-28 08:24:00",19-교영-01,d.기타,사업관리,"2019-05-28 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18205,"2019-05-28 08:26:00",19-설계-03,c.도면,"합성라멘 배근도 작성","2019-05-28 20:46:00",19-설계-03,c.도면,"합성라멘 배근도 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,1,
|
|
J13201,"2019-05-28 08:26:00",18-설계-12,c.도면,"지산교 솟음도수정(보정값적용)","2019-05-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E2,,,
|
|
J10314,"2019-05-28 08:27:00",19-설계-03,h.기타,"접속교 DR거더 (송산그린시티~시화멀티테크노밸리) 설계가, 신촌교(양평~이천) 신기술 사용협약관련 자료, 제3연륙교 가설공사비 검토, 양근대교 거더공사비 검토","2019-05-28 18:16:00",19-설계-03,h.기타,"접속교 DR거더 (송산그린시티~시화멀티테크노밸리) 설계가, 신촌교(양평~이천) 신기술 사용협약관련 자료, 제3연륙교 가설공사비 검토, 양근대교 거더공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11202,"2019-05-28 08:28:00",19-시공-02,b.시공,공사관리,"2019-05-28 18:21:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-05-28 08:30:00",19-설계-03,b.구조계산,"계산서 작성","2019-05-28 21:12:00",19-설계-03,b.구조계산,"계산서 작성","2019-05-28 18:43:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J16202,"2019-05-28 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J11203,"2019-05-28 08:33:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑 스트럿타이 전산데이타 수정","2019-05-28 18:06:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑 스트럿타이 전산데이타 수정","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J07210,"2019-05-28 08:35:00",16-시공-20,g.기타,"당초 변경","2019-05-28 21:04:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15201,"2019-05-28 08:36:00",18-교영-26,c.설계사,"과업진행현황 조사
|
|
","2019-05-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J17205,"2019-05-28 08:37:00",18-교영-01,c.설계사,.,"2019-05-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J10313,"2019-05-28 08:42:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-05-28 18:01:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-05-28 08:50:00",19-교영-01,c.설계사,과업조사,"2019-05-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
M05510,"2019-05-28 10:28:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-29 08:00:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.39.149.43,NULL,223.62.222.151,004C8,,,
|
|
J14101,"2019-05-28 08:50:00",16-시공-20,출장,한양,"2019-05-28 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J16203,"2019-05-28 08:50:00",19-제조-03,출장,"[산외교, 성주대교]산외교 데크 가설 현황 파악 및 배합확인, 성주대교 공사 현황파악 ","2019-05-28 18:00:00",19-제조-03,출장,"[산외교, 성주대교]산외교 데크 가설 현황 파악 및 배합확인, 성주대교 공사 현황파악 ","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J12202,"2019-05-28 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-05-28 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J14308,"2019-05-29 07:13:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-29 20:34:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-29 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J10315,"2019-05-29 07:16:00",17-시공-07,b.시공,"가산2교 제작장 및 가설관련 협의자료 작성","2019-05-29 18:07:00",17-시공-07,b.시공,"가산2교 제작장 및 가설관련 협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
T04204,"2019-05-29 07:27:00",16-제조-02,a.생산관리,"평촌교,성주대교(주두부) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-29 19:20:00",16-제조-02,a.생산관리,"평촌교,성주대교(주두부) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-05-29 07:30:00",19-제조-04,b.기계,"평촌교 거더 거푸집 보수와 삼남1교 주두부 거푸집과 블럭 생산","2019-05-30 07:30:00",19-제조-04,b.기계,"평촌교 거더 거푸집 보수와 삼남1교 주두부 거푸집과 블럭 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-05-29 07:31:00",19-제조-02,a.생산관리,"철근 절단 프로그램 story board 검토","2019-05-29 18:03:00",19-제조-02,a.생산관리,"철근 절단 프로그램 story board 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-05-29 07:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-29 20:36:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-29 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J13308,"2019-05-29 07:40:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 작업사항 보고
|
|
2. 일반공사 작업 및 금주 진행사항 보고
|
|
3. 5월 기성 내역 및 신청","2019-05-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
J18207,"2019-05-29 07:47:00",16-시공-20,b.시공,현장시공개선사항및공사관리검토,"2019-05-29 18:45:00",16-시공-20,b.시공,현장시공개선사항및공사관리검토,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-05-29 07:47:00",19-계약-01,d.기타,"오포~포곡 SK건설 방문예정, 벌교~주암 3-2공구, 용진~우아2 예상 시행가 등 : 수리티교 외 5개교 계약 추진 중","2019-05-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M05510,"2019-05-29 08:00:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.222.151,NULL,NULL,004C8,,,
|
|
J18206,"2019-05-29 08:11:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-05-29 18:44:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-05-29 08:13:00",19-설계-03,e.검토,계획검토,"2019-05-29 18:02:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-05-29 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-05-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-05-29 08:19:00",16-설계-14,h.기타,"수직교(갈천~갈수) 시행견적서, 접속교 DR거더 (송산그린시티~시화멀티테크노밸리) 설계가, 제3연륙교 가설공사비 검토, 양근대교 거더공사비 검토","2019-05-29 18:20:00",16-설계-14,h.기타,"수직교(갈천~갈수) 시행견적서, 접속교 DR거더 (송산그린시티~시화멀티테크노밸리) 설계가, 제3연륙교 가설공사비 검토, 양근대교 거더공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18205,"2019-05-29 08:21:00",19-설계-03,c.도면,"합성라멘 배근도 작성","2019-05-29 18:02:00",19-설계-03,c.도면,"합성라멘 배근도 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J08201,"2019-05-29 08:21:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J11203,"2019-05-29 08:22:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑 스트럿타이부분 계산서 작성","2019-05-29 18:05:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑 스트럿타이부분 계산서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J14306,"2019-05-29 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-29 18:51:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-05-29 08:25:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-29 18:53:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-05-29 08:25:00",18-설계-12,c.도면,"지산교 가설벤트 도면작성","2019-05-29 18:00:00",18-설계-12,c.도면,"지산교 가설벤트 도면작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J07103,"2019-05-29 08:25:00",19-교영-01,d.기타,사업관리,"2019-05-29 18:42:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15202,"2019-05-29 08:29:00",19-설계-03,b.구조계산,"계산서 작성","2019-05-29 18:02:00",19-설계-03,b.구조계산,"계산서 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J09101,"2019-05-29 08:32:00",19-교영-01,c.설계사,과업조사,"2019-05-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J17205,"2019-05-29 08:34:00",18-교영-01,c.설계사,.,"2019-05-29 18:05:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-05-29 08:34:00",16-시공-20,g.기타,"당초 변경","2019-05-29 18:18:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J19201,"2019-05-29 08:42:00",19-설계-03,b.구조계산,"슬래브 배근도","2019-05-29 18:01:00",19-설계-03,b.구조계산,"슬래브 배근도","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
J10313,"2019-05-29 08:44:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-05-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J11202,"2019-05-29 08:45:00",19-시공-02,b.시공,공사관리,"2019-05-29 21:00:00",17-시공-09,b.시공,"스트롱백 공정계획 및 실행검토합도초교사거리 회전교차로공사 외주기성 작성","2019-05-29 19:00:00",172.16.9.159,172.16.9.159,NULL,004E1,,1,
|
|
J16203,"2019-05-29 08:50:00",19-제조-03,출장,"[산외교, 성주대교]산외교 데크 가설 현황 파악 및 배합확인, 성주대교 공사 현황파악 ","2019-05-29 20:35:00",19-제조-03,a.품질검사,"[산외교, 성주대교]산외교 데크 가설 현황 파악 및 배합확인, 성주대교 공사 현황파악 ","2019-05-29 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14101,"2019-05-29 08:50:00",16-시공-20,출장,한양,"2019-05-29 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-05-29 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-05-29 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J15201,"2019-05-29 08:50:00",19-교영-01,출장,"건설신기술대전 참여","2019-05-29 18:00:00",19-교영-01,출장,"건설신기술대전 참여","0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J16202,"2019-05-29 08:50:00",19-교영-01,출장,"건설신기술대전 참여","2019-05-29 18:00:00",19-교영-01,출장,"건설신기술대전 참여","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J16203,"2019-05-30 07:14:00",19-제조-03,a.품질검사,"산외교, 옥산교 데크 생산 및 품질관리, 레미콘 시험","2019-05-30 21:25:00",19-제조-03,a.품질검사,"산외교, 옥산교 데크 생산 및 품질관리, 레미콘 시험","2019-05-30 19:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
T04204,"2019-05-30 07:17:00",16-제조-02,a.생산관리,"평촌교,성주대교(주두부) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-30 18:54:00",16-제조-02,a.생산관리,"평촌교,성주대교(주두부) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-05-30 07:29:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-30 21:24:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-30 18:42:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18208,"2019-05-30 07:30:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-30 21:22:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-30 18:45:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J07202,"2019-05-30 07:30:00",19-제조-04,b.기계,"공장내 제초작업과 평촌교 거더 거푸집 보수(그라인더)","2019-05-31 07:26:00",19-제조-04,b.기계,"공장내 제초작업과 평촌교 거더 거푸집 보수(그라인더)","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-05-30 07:33:00",19-제조-02,a.생산관리,"생산본부 워크샵 준비 및 진행","2019-05-30 18:39:00",19-제조-02,a.생산관리,"철근 절단 프로그램 story board 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>김병길 기사 사직서 수령<|>01:00<|><br>19-제조-02<|>a.생산관리<|>팀/반/조장 워크샵진행<|>01:00<|><br>19-제조-02<|>a.생산관리<|>삽겹살 파티<|>02:00<|><br>",,
|
|
J18205,"2019-05-30 08:21:00",19-설계-03,c.도면,"합성라멘 배근도 작성","2019-05-30 18:09:00",19-설계-03,c.도면,"합성라멘 배근도 작성","0000-00-00 00:00:00",61.98.205.242,NULL,1.233.130.3,008E2,,,
|
|
J11305,"2019-05-30 08:24:00",19-설계-03,e.검토,계획검토,"2019-05-30 18:09:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",61.98.205.242,NULL,172.16.9.148,008C7,,,
|
|
J15202,"2019-05-30 08:30:00",19-설계-03,b.구조계산,"계산서 작성","2019-05-30 18:07:00",19-설계-03,b.구조계산,"계산서 작성","0000-00-00 00:00:00",61.98.205.242,NULL,172.16.9.155,008E1,,,
|
|
J15307,"2019-05-30 08:31:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 배근도 작성","2019-05-30 18:04:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 배근도 작성","0000-00-00 00:00:00",61.98.205.242,NULL,172.16.9.171,008E4,,,
|
|
J11202,"2019-05-30 08:32:00",19-시공-02,b.시공,공사관리,"2019-05-30 18:15:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J11203,"2019-05-30 08:32:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 Apier 계산서 정리 1차","2019-05-30 18:10:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑 스트럿타이부분 계산서 작성","0000-00-00 00:00:00",61.98.205.242,NULL,172.16.9.160,008E1,,,
|
|
J13201,"2019-05-30 08:32:00",18-설계-12,c.도면,"지산교 가설벤트 도면작성","2019-05-30 18:09:00",18-설계-12,c.도면,"지산교 가설벤트 도면작성","0000-00-00 00:00:00",61.98.205.242,NULL,172.16.9.165,008E2,,,
|
|
J08201,"2019-05-30 08:33:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-05-30 18:07:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J13308,"2019-05-30 08:33:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 작업사항 보고
|
|
2. 일반공사 작업 및 금주 진행사항 보고
|
|
3. 5월 기성 내역 및 신청","2019-05-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
J07210,"2019-05-30 08:34:00",16-시공-20,g.기타,"당초 변경","2019-05-30 18:09:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J18207,"2019-05-30 08:37:00",16-시공-20,b.시공,현장시공개선사항및공사관리검토,"2019-05-30 18:06:00",16-시공-20,b.시공,현장시공개선사항및공사관리검토,"0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10314,"2019-05-30 08:40:00",16-설계-14,h.기타,"양근대교 거더공사비 검토, 수직교(갈천~갈수) 시행견적서, 접속교 DR거더 (송산그린시티~시화멀티테크노밸리) 설계가, 제3연륙교 가설공사비 검토","2019-05-30 18:18:00",16-설계-14,h.기타,"양근대교 거더공사비 검토, 수직교(갈천~갈수) 시행견적서, 접속교 DR거더 (송산그린시티~시화멀티테크노밸리) 설계가, 제3연륙교 가설공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J10313,"2019-05-30 08:42:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-05-30 18:42:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J19201,"2019-05-30 09:55:00",19-설계-03,b.구조계산,"상부 가로보 계산","2019-05-30 18:02:00",19-설계-03,b.구조계산,"상부 가로보 계산","0000-00-00 00:00:00",172.16.9.185,NULL,172.16.9.185,008E3,,,
|
|
B15306,"2019-05-30 08:05:00",18-관리-02,e.기타,"비서업무 외","2019-05-30 18:18:18",NULL,NULL,"비서업무 외","0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15201,"2019-05-30 08:30:00",19-교영-12,c.설계사,"과업진행현황 파악","2019-05-30 18:08:00",19-교영-12,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J16202,"2019-05-30 08:30:00",19-교영-01,c.설계사,신규사업현황조사,"2019-05-30 18:09:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14306,"2019-05-30 08:50:00",19-교휴-06,경유,"경유(등기소(법인인감증명서 발급))","2019-05-30 18:10:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18206,"2019-05-30 08:30:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-05-30 18:16:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10301,"2019-05-30 08:30:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-30 18:17:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07103,"2019-05-30 08:50:00",19-교영-01,경유,"일산 킨택스 전시회 참가","2019-05-30 18:11:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18202,"2019-05-30 08:30:00",07-교영-01,b.시공사,"발주 현황 파악","2019-05-30 18:12:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J14101,"2019-05-30 08:50:00",16-시공-20,출장,한양,"2019-05-30 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-05-30 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-05-30 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J09101,"2019-05-30 08:50:00",19-교영-01,출장,일산,"2019-05-30 18:00:00",19-교영-01,출장,일산,"0000-00-00 00:00:00",NULL,NULL,NULL,008C7,,,
|
|
J10315,"2019-05-30 08:50:00",17-시공-07,출장,두산건설,"2019-05-30 18:00:00",17-시공-07,출장,두산건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11302,"2019-05-31 07:10:00",18-시공-15,g.기타,"원흥2교 투입비 정리 및 밴트 좌표 정리
|
|
한포제1,2교 가설계획서 작성 및 가로보 수량 산출","2019-05-31 18:18:18",18-시공-15,g.기타,NULL,"2019-05-31 18:34:00",172.16.9.166,172.16.9.166,NULL,004E2,,1,
|
|
T04204,"2019-05-31 07:20:00",16-제조-02,a.생산관리,"평촌교,삼남1교(측,중앙경간) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-05-31 19:32:00",16-제조-02,a.생산관리,"평촌교,삼남1교(측,중앙경간) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-05-31 07:28:00",19-제조-04,b.기계,"공장내 제초작업과 평촌교 거더 거푸집 보수(그라인더)","2019-05-31 18:00:00",19-제조-04,b.기계,"공장내 제초작업과 평촌교 거더 거푸집 보수(그라인더)","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-05-31 07:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-31 20:46:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-05-31 18:39:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-05-31 07:31:00",19-제조-02,a.생산관리,"스트롱백 실험계획 및 협의","2019-05-31 18:02:00",19-제조-02,a.생산관리,"스트롱백 실험계획 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-05-31 07:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-05-31 18:04:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J10315,"2019-05-31 07:37:00",16-시공-33,b.시공,"가설검토 및 협의","2019-05-31 18:02:00",16-시공-33,b.시공,"가설검토 및 협의","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J09102,"2019-05-31 07:39:00",19-계약-01,d.기타,"서울~광명 1공구 포스코 본사 방문, 5월말 건설본부 수주 및 기성, 용진~우아2 예상 시행가 등 : 수리티교 외 5개교 계약 추진 중","2019-05-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-05-31 07:41:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 작업사항 보고
|
|
2. 일반공사 작업 및 금주 진행사항 보고
|
|
3. 5월 기성 내역 및 신청","2019-05-31 18:18:18",19-시공-08,b.시공,NULL,"2019-05-31 18:33:00",172.16.8.170,172.16.8.170,NULL,004E3,,1,
|
|
J19201,"2019-05-31 08:01:00",19-설계-03,b.구조계산,"상부 가로보 계산","2019-05-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.185,NULL,NULL,008E3,,,
|
|
J18207,"2019-05-31 08:08:00",19-시공-08,b.시공,"선금급청구관련 발주처협의 및 청담천공사관리검토","2019-05-31 18:01:00",19-시공-08,b.시공,"선금급청구관련 발주처협의 및 청담천공사관리검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
B15306,"2019-05-31 08:09:00",18-관리-02,e.기타,"비서업무 외","2019-05-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-05-31 08:10:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-05-31 18:06:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J07103,"2019-05-31 08:11:00",19-교영-01,d.기타,사업관리,"2019-05-31 12:03:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-05-31 08:14:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-05-31 18:23:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-05-31 08:21:00",18-설계-12,c.도면,"지산교 가설벤트 계산","2019-05-31 18:00:00",18-설계-12,c.도면,"지산교 가설벤트 계산","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J18205,"2019-05-31 08:21:00",19-설계-03,c.도면,"교각 일반도 및 배근도 작성","2019-05-31 18:02:00",19-설계-03,c.도면,"교각 일반도 및 배근도 작성","0000-00-00 00:00:00",1.233.130.3,NULL,1.233.130.3,008E2,,,
|
|
J10314,"2019-05-31 08:24:00",19-교영-04,d.기타,"양근대교 거더공사비 검토, Pre-Deck (영동고속도로 서창~안산~북수원간) 설계견적서(특정공법심의), 제3연륙교 가설공사비 검토","2019-05-31 18:06:00",19-교영-04,d.기타,"양근대교 거더공사비 검토, Pre-Deck (영동고속도로 서창~안산~북수원간) 설계견적서(특정공법심의), 제3연륙교 가설공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18202,"2019-05-31 08:24:00",07-교영-01,b.시공사,"발주 현황 파악","2019-05-31 18:02:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J15307,"2019-05-31 08:25:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 배근도 작성","2019-05-31 18:01:00",19-설계-03,c.도면,"1. 송산그린시티~시화MTV 접속교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J14306,"2019-05-31 08:31:00",19-관리-04,a.계약,"계약, 인사 외","2019-05-31 18:09:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11203,"2019-05-31 08:32:00",19-설계-03,e.검토,"라멘교(시종점 강결) 종점부 기초 극단상황1 부분 계산서 수정","2019-05-31 18:01:00",19-설계-03,e.검토,"라멘교(시종점 강결) 종점부 기초 극단상황1 부분 계산서 수정","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J10313,"2019-05-31 08:39:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","2019-05-31 18:02:00",16-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인,문서정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11202,"2019-05-31 08:39:00",19-시공-02,b.시공,공사관리,"2019-05-31 18:11:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-05-31 12:31:00",16-시공-20,g.기타,"당초 변경","2019-05-31 18:07:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
M05510,"2019-05-31 15:10:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-05-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.131.2,NULL,NULL,004C8,,,
|
|
J16203,"2019-05-31 07:20:00",19-제조-03,a.품질검사,"산외교, 옥산교 데크 품질관리, 레미콘 시험","2019-05-31 22:31:00",19-제조-03,a.품질검사,"산외교, 옥산교 데크 생산 및 품질관리, 레미콘 시험","2019-05-31 18:39:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14101,"2019-05-31 08:50:00",16-시공-20,출장,한양,"2019-05-31 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-05-31 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-05-31 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J09101,"2019-05-31 08:50:00",19-교영-01,출장,일산,"2019-05-31 18:00:00",19-교영-01,출장,일산,"0000-00-00 00:00:00",NULL,NULL,NULL,008C7,,,
|
|
J15201,"2019-05-31 08:50:00",19-교영-01,출장,킨텍스,"2019-05-31 18:00:00",19-교영-01,출장,킨텍스,"0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
M05510,"2019-06-02 08:00:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.160.103,NULL,NULL,004C8,,,
|
|
J14101,"2019-05-01 08:50:00",16-시공-20,출장,한양,"2019-05-01 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14101,"2019-05-06 08:50:00",16-시공-20,출장,한양,"2019-05-06 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18208,"2019-05-20 08:50:00",19-제조-02,출장,"[성주대교(대구 달성군 하빈면)]성주대교 가설밴트 측량","2019-05-20 18:00:00",19-제조-02,출장,"[성주대교(대구 달성군 하빈면)]성주대교 가설밴트 측량","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J11202,"2019-05-24 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 벤트 측량지원","2019-05-24 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 벤트 측량지원","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11302,"2019-06-03 06:39:00",18-시공-15,g.기타,"원흥2교 밴트 좌표 및 도면 정리
|
|
왕림교 가로보프리데크 설치계획서 작성","2019-06-03 18:19:00",18-시공-15,g.기타,"원흥2교 밴트 좌표 및 도면 정리
|
|
왕림교 가로보프리데크 설치계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J07202,"2019-06-03 06:45:00",19-제조-04,b.기계,"삼남 1교 주두부 블럭 생산과 공장내 제초작업 및 평촌교 거더 거푸집 보수(페인트 도색)","2019-06-04 07:28:00",19-제조-04,b.기계,"삼남 1교 주두부 블럭 생산과 공장내 제초작업 및 평촌교 거더 거푸집 보수(페인트 도색)","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-06-03 07:15:00",16-제조-02,a.생산관리,"평촌교,삼남1교(측,중앙경간) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-03 19:05:00",16-제조-02,a.생산관리,"평촌교,삼남1교(측,중앙경간) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-06-03 07:29:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-04 01:24:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-03 19:04:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18208,"2019-06-03 07:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-03 19:05:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J16203,"2019-06-03 07:36:00",19-제조-03,a.품질검사,"산외교, 옥산교 데크 생산 및 품질관리, 레미콘 시험","2019-06-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-06-03 07:37:00",19-계약-01,d.기타,"조안대교 상세계약 내역서 작성 및 두산건설 방문 , 벌교~주암 예상 시행가 등 : 수리티교 외 5개교 계약 추진 중","2019-06-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M02302,"2019-06-03 07:39:00",19-제조-02,a.생산관리,"원가분석 자료조사","2019-06-03 18:02:00",19-제조-02,a.생산관리,"원가분석 자료조사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>BOM 오류 정리(서울협의 자료)<|>02:00<|><br>19-제조-02<|>a.생산관리<|>임원회의 자료 준비<|>03:00<|><br>",,
|
|
J18207,"2019-06-03 07:42:00",17-시공-09,b.시공,"스트롱백백시공관련 시험시공검토","2019-06-03 18:19:00",17-시공-09,b.시공,"스트롱백백시공관련 시험시공검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18202,"2019-06-03 07:47:00",07-교영-01,b.시공사,"발주 현황 파악","2019-06-03 18:12:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J10315,"2019-06-03 07:50:00",17-설계-09,"a.계획 및 협의","조령천교 제작협의","2019-06-03 18:06:00",17-설계-09,"a.계획 및 협의","조령천교 제작협의","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J10314,"2019-06-03 08:13:00",19-교영-04,d.기타,"Pre-Deck (영동고속도로 서창~안산~북수원간) 설계견적서(특정공법심의), 양근대교 거더공사비 검토, 제3연륙교 가설공사비 검토","2019-06-03 18:07:00",19-교영-04,d.기타,"Pre-Deck (영동고속도로 서창~안산~북수원간) 설계견적서(특정공법심의), 양근대교 거더공사비 검토, 제3연륙교 가설공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-06-03 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-06-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-06-03 08:13:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-06-03 18:25:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
M05510,"2019-06-03 08:13:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-06-04 07:30:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.33.160.53,NULL,223.39.149.187,004C8,,,
|
|
J18206,"2019-06-03 08:18:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-06-03 18:23:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J18205,"2019-06-03 08:18:00",19-설계-03,c.도면,"교각 일반도 및 배근도 작성","2019-06-03 21:13:00",19-설계-03,c.도면,"교각 일반도 및 배근도 작성","2019-06-03 18:36:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-06-03 08:20:00",18-설계-12,c.도면,"지산교 가설벤트 계산","2019-06-03 21:14:00",18-설계-12,c.도면,"지산교 가설벤트 계산","2019-06-03 18:36:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J11203,"2019-06-03 08:24:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑 STM계산서 작성","2019-06-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J14306,"2019-06-03 08:25:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-03 18:16:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-06-03 08:27:00",19-교영-01,d.기타,사업관리,"2019-06-03 18:24:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-06-03 08:27:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-03 18:31:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J09101,"2019-06-03 08:28:00",19-교영-01,c.설계사,과업조사,"2019-06-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15202,"2019-06-03 08:29:00",19-설계-03,b.구조계산,"계산서 작성","2019-06-03 21:13:00",19-설계-03,b.구조계산,"계산서 작성","2019-06-03 18:36:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J15201,"2019-06-03 08:30:00",19-교영-14,c.설계사,"과업진행현황 파악","2019-06-03 18:08:00",19-교영-14,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-06-03 08:33:00",19-설계-03,e.검토,계획검토,"2019-06-03 18:05:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J11202,"2019-06-03 08:35:00",19-시공-02,b.시공,공사관리,"2019-06-03 18:16:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J16202,"2019-06-03 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-03 18:15:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07210,"2019-06-03 08:36:00",16-시공-20,g.기타,"당초 변경","2019-06-03 18:11:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-06-03 08:40:00",16-제조-01,b.총무,"월 마감, 생산직 직원 급여","2019-06-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J17205,"2019-06-03 08:42:00",18-교영-01,c.설계사,.,"2019-06-03 18:32:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J14101,"2019-06-03 08:50:00",16-시공-20,출장,한양,"2019-06-03 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-03 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-03 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J13308,"2019-06-03 08:50:00",19-시공-08,출장,"[천안시]발주처 선급금 신청 및 공사협의","2019-06-03 18:00:00",19-시공-08,출장,"[천안시]발주처 선급금 신청 및 공사협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E3,,,
|
|
J15307,"2019-06-03 08:50:00",18-설계-06,출장,"[한국도로공사(김천)]신기술(특허) 사용협약","2019-06-03 18:00:00",18-설계-06,출장,"[한국도로공사(김천)]신기술(특허) 사용협약","0000-00-00 00:00:00",NULL,NULL,NULL,008E4,,,
|
|
J11302,"2019-06-04 07:18:00",18-시공-15,g.기타,"원흥2교 밴트 좌표 및 도면 정리
|
|
왕림교 가로보프리데크 설치계획서 작성","2019-06-04 18:16:00",18-시공-15,g.기타,"원흥2교 밴트 좌표 및 도면 정리
|
|
왕림교 가로보프리데크 설치계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18208,"2019-06-04 07:22:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-04 22:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-04 18:41:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-06-04 07:26:00",16-제조-02,a.생산관리,"평촌교,삼남1교(측,중앙경간) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J10315,"2019-06-04 07:28:00",17-설계-09,"a.계획 및 협의","조령천교 제작장 검토","2019-06-04 18:02:00",17-설계-09,"a.계획 및 협의","조령천교 제작장 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J07202,"2019-06-04 07:30:00",19-제조-04,b.기계,"삼남 1교 주두부 블럭 생산과 평촌교 거더 거푸집 보수(페인트 도색)","2019-06-05 07:28:00",19-제조-04,b.기계,"삼남 1교 주두부 블럭 생산과 평촌교 거더 거푸집 보수(페인트 도색)","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-06-04 07:31:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-06-05 08:10:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.39.149.187,NULL,223.39.150.140,004C8,,,
|
|
J18207,"2019-06-04 07:33:00",16-시공-20,b.시공,"산외교현장 울산방향 캠버관리검토","2019-06-04 18:41:00",16-시공-20,b.시공,"산외교현장 울산방향 캠버관리검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-06-04 07:35:00",19-시공-08,b.시공,"1. 회사실적 및 특수교량관련 개인이력 정리
|
|
2. 중앙거리(대흥로) 선급금신청
|
|
3. 주천1교 시공상세변경 및 철근신청서 작성","2019-06-04 18:19:00",19-시공-08,b.시공,"1. 회사실적 및 특수교량관련 개인이력 정리
|
|
2. 중앙거리(대흥로) 선급금신청
|
|
3. 주천1교 시공상세변경 및 철근신청서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J14308,"2019-06-04 07:35:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-04 22:01:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-04 18:55:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-06-04 07:36:00",19-제조-03,a.품질검사,"산외교, 옥산교 데크 생산 및 품질관리, 레미콘 시험","2019-06-04 21:00:00",19-제조-03,a.품질검사,"산외교, 옥산교 데크 생산 및 품질관리, 레미콘 시험","2019-06-04 18:56:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-06-04 07:43:00",19-계약-01,d.기타,"안성~구리 4공구 계룡건설, 화도~양평 4공구 계약관련 두산건설 방문 , 벌교~주암 예상 시행가 등 : 수리티교 외 5개교 계약 추진 중","2019-06-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18202,"2019-06-04 07:45:00",07-교영-01,b.시공사,"발주 현황 파악","2019-06-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J08201,"2019-06-04 08:02:00",19-설계-05,"a.계획 및 협의","계획 조정","2019-06-04 18:25:00",19-설계-05,"a.계획 및 협의","계획 조정","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J17205,"2019-06-04 08:09:00",18-교영-01,c.설계사,.,"2019-06-04 18:12:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18206,"2019-06-04 08:10:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-06-04 18:39:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-06-04 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-06-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-06-04 08:14:00",19-설계-03,e.검토,계획검토,"2019-06-04 18:06:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10314,"2019-06-04 08:16:00",19-교영-06,d.기타,"제3연륙교 가설공사비 검토, 양근대교 거더공사비 검토, Pre-Deck (영동고속도로 서창~안산~북수원간) 설계견적서(특정공법심의)","2019-06-04 18:31:00",19-교영-06,d.기타,"제3연륙교 가설공사비 검토, 양근대교 거더공사비 검토, Pre-Deck (영동고속도로 서창~안산~북수원간) 설계견적서(특정공법심의)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J09101,"2019-06-04 08:17:00",19-교영-01,c.설계사,과업조사,"2019-06-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14306,"2019-06-04 08:17:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-04 18:01:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-06-04 08:18:00",19-교영-01,d.기타,사업관리,"2019-06-04 18:21:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-06-04 08:21:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-04 18:07:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16202,"2019-06-04 08:23:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-04 18:09:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15307,"2019-06-04 08:25:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-04 21:32:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-04 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J11202,"2019-06-04 08:25:00",19-시공-02,b.시공,공사관리,"2019-06-04 18:37:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18205,"2019-06-04 08:27:00",19-설계-03,c.도면,"교각 일반도 및 배근도 작성","2019-06-04 21:03:00",19-설계-03,c.도면,"교각 일반도 및 배근도 작성","2019-06-04 18:31:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-06-04 08:28:00",19-설계-03,c.도면,"송산~시화 도면작성","2019-06-04 21:03:00",19-설계-03,c.도면,"송산~시화 도면작성","2019-06-04 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10313,"2019-06-04 08:29:00",16-제조-01,b.총무,"월 마감, 생산직 직원 급여","2019-06-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J11203,"2019-06-04 08:35:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑 STM계산서작성","2019-06-04 20:33:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑 STM계산서작성","2019-06-04 18:31:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"18-설계-19<|>d.산출서<|>연속지점부 콘크리트 35->45 수량수정 대콘(5공구), 경동(4공구)만발송<|>01:00<|><br>16-설계-14<|>e.검토<|>수직교 시공사검토사항 계산서 오타부분 수정 후 극동eng발송<|>01:00<|><br>",1,
|
|
J15202,"2019-06-04 08:39:00",19-설계-03,b.구조계산,"계산서 작성","2019-06-04 21:04:00",19-설계-03,b.구조계산,"계산서 작성","2019-06-04 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-06-04 08:40:00",16-시공-20,g.기타,"당초 변경","2019-06-04 20:40:00",16-시공-20,g.기타,"당초 변경","2019-06-04 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15201,"2019-06-04 08:30:00",19-교영-14,c.설계사,"과업진행현황 파악","2019-06-04 18:02:00",19-교영-14,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14101,"2019-06-04 08:50:00",16-시공-20,출장,한양,"2019-06-04 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-04 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-04 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M02302,"2019-06-04 08:50:00",19-제조-02,출장,서울사무소(한맥빌딩),"2019-06-04 18:00:00",19-제조-02,출장,서울사무소(한맥빌딩),"0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J14308,"2019-06-05 07:22:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-05 21:06:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-05 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-06-05 07:26:00",16-시공-33,b.시공,"거더인장가설관련 현장 품질점검","2019-06-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.10.246,NULL,NULL,004C7,,,
|
|
J18208,"2019-06-05 07:26:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-05 18:00:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-06-05 07:27:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),내산2천교,생태수로1,2 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-05 21:35:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),내산2천교,생태수로1,2 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-06-05 07:28:00",19-제조-04,b.기계,"삼남 1교 주두부 블럭 생산과 평촌교 거더 거푸집(2조) 출하","2019-06-05 18:00:00",19-제조-04,b.기계,"삼남 1교 주두부 블럭 생산과 평촌교 거더 거푸집(2조) 출하","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-06-05 07:30:00",18-시공-15,g.기타,"원흥2교 위험성평가 작성 및 측량준비
|
|
성주대교 가설계획서 작성","2019-06-05 18:18:00",18-시공-15,g.기타,"원흥2교 위험성평가 작성 및 측량준비
|
|
성주대교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
M02302,"2019-06-05 07:30:00",19-제조-02,a.생산관리,"내산천2교 공정 협의","2019-06-05 18:03:00",19-제조-02,a.생산관리,"내산천2교 공정 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>폐레미콘 주두부 가설 기초 작업 관련 협의<|>01:30<|><br>19-제조-02<|>a.생산관리<|>빈런처 입고 관련 야적장 검토<|>01:00<|><br>19-제조-02<|>a.생산관리<|>분절거더 제작 인원 검토<|>02:30<|><br>",,
|
|
J13308,"2019-06-05 07:35:00",19-시공-08,b.시공,"1. 주천2교 시공상세변경 및 철근신청서 작성
|
|
2. 주천2교 시공계획서 작성","2019-06-05 18:01:00",19-시공-08,b.시공,"1. 주천2교 시공상세변경 및 철근신청서 작성
|
|
2. 주천2교 시공계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10315,"2019-06-05 07:42:00",18-시공-15,b.시공,"가설밴트 Level 적정성 검토","2019-06-05 18:17:00",18-시공-15,b.시공,"가설밴트 Level 적정성 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J16203,"2019-06-05 07:49:00",19-제조-03,a.품질검사,"산외교, 옥산교 데크 생산 및 품질관리, 레미콘 시험","2019-06-05 20:39:00",19-제조-03,a.품질검사,"산외교, 옥산교 데크 생산 및 품질관리, 레미콘 시험","2019-06-05 18:37:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,,
|
|
J07103,"2019-06-05 07:54:00",19-교영-01,d.기타,사업관리,"2019-06-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
B15306,"2019-06-05 08:01:00",18-관리-02,e.기타,"비서업무 외","2019-06-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J17205,"2019-06-05 08:15:00",18-교영-01,c.설계사,.,"2019-06-05 18:13:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18206,"2019-06-05 08:15:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-06-05 19:17:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J09101,"2019-06-05 08:17:00",19-교영-01,c.설계사,과업조사,"2019-06-05 18:10:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J11305,"2019-06-05 08:18:00",19-설계-03,e.검토,계획검토,"2019-06-05 18:18:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10314,"2019-06-05 08:19:00",19-설계-03,h.기타,"양근대교 거더 설계가 공사비 검토 및 시행가, 거더 설계가 (송산그린시티~시화멀티테크노밸리), 제3연륙교 가설공사비 검토","2019-06-05 18:22:00",19-설계-03,h.기타,"거더 설계가 (송산그린시티~시화멀티테크노밸리), 양근대교 거더 설계가 공사비 검토 및 시행가, 제3연륙교 가설공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
M05510,"2019-06-05 08:19:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-06-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.150.140,NULL,NULL,004C8,,,
|
|
J14306,"2019-06-05 08:20:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-05 18:27:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18205,"2019-06-05 08:23:00",19-설계-03,c.도면,"교각 일반도 및 배근도 작성","2019-06-05 21:36:00",19-설계-03,c.도면,"교각 일반도 및 배근도 작성","2019-06-05 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J10301,"2019-06-05 08:23:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-05 18:49:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11203,"2019-06-05 08:23:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑 STM계산서작성","2019-06-05 18:04:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑 STM계산서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>h.기타<|>설계도서검토 심의 심의의견 작성 후 설계사전달<|>01:00<|><br>18-시공-15<|>g.기타<|>벤드상단 EL검토<|>02:00<|><br>",,
|
|
J15307,"2019-06-05 08:24:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-05 21:32:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-05 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J16202,"2019-06-05 08:24:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-05 18:28:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11202,"2019-06-05 08:27:00",19-시공-02,b.시공,공사관리,"2019-06-05 20:03:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-06-05 08:31:00",19-설계-03,b.구조계산,"계산서 작성","2019-06-05 20:50:00",19-설계-03,b.구조계산,"계산서 작성","2019-06-05 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J13201,"2019-06-05 08:32:00",19-설계-03,c.도면,"송산~시화 부대공 도면작성","2019-06-05 18:03:00",19-설계-03,c.도면,"송산~시화 부대공 도면작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15201,"2019-06-05 08:35:00",19-교영-14,c.설계사,"과업진행현황 파악","2019-06-05 18:08:00",19-교영-14,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-06-05 08:35:00",16-시공-20,g.기타,"당초 변경","2019-06-05 20:45:00",16-시공-20,g.기타,"당초 변경","2019-06-05 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J10313,"2019-06-05 08:43:00",16-제조-01,b.총무,"월 마감, 생산직 직원 급여","2019-06-05 18:01:00",16-제조-01,b.총무,"월 마감, 생산직 직원 급여","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14101,"2019-06-05 08:50:00",16-시공-20,출장,한양,"2019-06-05 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-05 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-05 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J08201,"2019-06-05 08:50:00",18-설계-19,출장,한국도로공사,"2019-06-05 18:00:00",18-설계-19,출장,한국도로공사,"0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J09102,"2019-06-05 08:50:00",19-계약-01,출장,동광건설,"2019-06-05 18:00:00",19-계약-01,출장,동광건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18202,"2019-06-05 08:50:00",07-교영-01,출장,"[구미시 해평면]구미국가산업단지 진입도로 (괴평교-롯데건설)","2019-06-05 18:00:00",07-교영-01,출장,"[구미시 해평면]구미국가산업단지 진입도로 (괴평교-롯데건설)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M05510,"2019-06-06 07:49:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.141.46,NULL,NULL,004C8,,,
|
|
J14308,"2019-06-06 08:25:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-06 16:11:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J07202,"2019-06-07 06:52:00",19-제조-04,b.기계,"스트롱백 테스트용 콘크리트 거푸집 제작과 삼남1교 주두부 블럭 생산","2019-06-08 07:29:00",19-제조-04,b.기계,"스트롱백 테스트용 콘크리트 거푸집 제작과 삼남1교 주두부 블럭 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-06-07 07:12:00",18-시공-15,g.기타,"원흥2교 측량준비
|
|
및 중량물취급계획서 작성","2019-06-07 18:13:00",18-시공-15,g.기타,"원흥2교 측량준비
|
|
및 중량물취급계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J14308,"2019-06-07 07:23:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
T04204,"2019-06-07 07:25:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),내산2천교,생태수로1,2 옥산교(1본) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-07 19:11:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),내산2천교,생태수로1,2 옥산교(1본) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-06-07 07:31:00",19-제조-03,a.품질검사,"신축동 옹벽공사준비,
|
|
산외교, 옥산교 데크 생산 및 품질관리, ","2019-06-07 19:42:00",19-제조-03,a.품질검사,"신축동 옹벽공사준비,
|
|
산외교, 옥산교 데크 생산 및 품질관리, ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,,
|
|
J18208,"2019-06-07 07:39:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-07 21:20:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18207,"2019-06-07 07:40:00",16-시공-41,b.시공,"거더가설관련 검토","2019-06-07 18:03:00",16-시공-41,b.시공,"거더가설관련 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-06-07 07:44:00",19-계약-01,d.기타,"시화MTV L=80m 연결교 예상 시행가, 계룡건설 & 강산건설 방문 예정 등 : 남일~보은 수리티교 외 5개교 계약 추진 중","2019-06-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M02302,"2019-06-07 07:44:00",19-제조-02,a.생산관리,"내산천2교 공정 협의","2019-06-07 18:18:00",19-제조-02,a.생산관리,"내산천2교 공정 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11305,"2019-06-07 07:56:00",19-설계-03,e.검토,계획검토,"2019-06-07 18:10:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-06-07 08:04:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-07 21:41:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-07 18:40:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J07103,"2019-06-07 08:09:00",19-교영-01,d.기타,사업관리,"2019-06-07 18:05:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18206,"2019-06-07 08:11:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-06-07 18:02:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-06-07 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-06-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-06-07 08:14:00",19-설계-05,"a.계획 및 협의",계획협의,"2019-06-07 18:17:00",19-설계-05,"a.계획 및 협의",계획협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-06-07 08:19:00",19-설계-03,h.기타,"거더 설계가 및 시행가 (송산그린시티~시화멀티테크노밸리), 양근대교 거더 설계가 공사비 검토 및 시행가, 제3연륙교 가설공사비 검토","2019-06-07 18:03:00",19-설계-03,h.기타,"거더 설계가 및 시행가 (송산그린시티~시화멀티테크노밸리), 양근대교 거더 설계가 공사비 검토 및 시행가, 제3연륙교 가설공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14306,"2019-06-07 08:22:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-07 18:11:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-06-07 08:22:00",19-시공-02,b.시공,공사관리,"2019-06-07 18:10:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10301,"2019-06-07 08:27:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-07 18:08:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J09101,"2019-06-07 08:28:00",19-교영-01,c.설계사,과업조사,"2019-06-07 19:21:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J18205,"2019-06-07 08:31:00",19-설계-03,c.도면,"거더 일반도 및 배근도 작성","2019-06-07 21:35:00",19-설계-03,c.도면,"거더 일반도 및 배근도 작성","2019-06-07 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07210,"2019-06-07 08:31:00",16-시공-20,g.기타,"당초 변경","2019-06-07 18:26:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11203,"2019-06-07 08:33:00",19-설계-03,e.검토,"라멘교(시종점 강결) 시점부 교각 코핑 STM계산서작성","2019-06-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J17205,"2019-06-07 08:41:00",18-교영-01,c.설계사,.,"2019-06-07 18:26:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-06-07 08:50:00",19-교휴-06,경유,경유(커피메이커수리(필립스서비스센터서해점)),"2019-06-07 18:06:00",16-제조-01,b.총무,"월 마감, 생산직 직원 급여","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
M05510,"2019-06-07 12:38:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-06-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.141.80,NULL,NULL,004C8,,,
|
|
J14101,"2019-06-07 08:50:00",16-시공-20,출장,한양,"2019-06-07 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-07 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-07 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M02302,"2019-06-08 06:47:00",19-제조-02,a.생산관리,"내산천2교 공정 협의","2019-06-08 17:26:00",19-제조-02,a.생산관리,"내산천2교 공정 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
M05510,"2019-06-08 07:21:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.141.172,NULL,NULL,004C8,,,
|
|
J07202,"2019-06-08 07:33:00",19-제조-04,b.기계,"거더 거푸집 보수와 삼남1교 주두부 블럭 생산과 야적장 정리","2019-06-08 16:06:00",19-제조-04,b.기계,"거더 거푸집 보수와 삼남1교 주두부 블럭 생산과 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-06-08 07:37:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),내산2천교,생태수로1,2 옥산교(1본) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-08 17:27:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),내산2천교,생태수로1,2 옥산교(1본) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-06-08 07:41:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-08 16:13:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J16203,"2019-06-08 07:43:00",19-제조-03,a.품질검사,"신축동 옹벽공사준비,
|
|
산외교, 옥산교 데크 생산 및 품질관리, ","2019-06-08 16:04:00",19-제조-03,a.품질검사,"신축동 옹벽공사준비,
|
|
산외교, 옥산교 데크 생산 및 품질관리, ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
J14308,"2019-06-08 13:07:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-08 18:38:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M05510,"2019-06-09 07:53:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",203.226.207.179,NULL,NULL,004C8,,,
|
|
J07202,"2019-06-10 06:57:00",19-제조-04,b.기계,"삼남1교 주두부 블럭 생산과 사무동 서고 정리","2019-06-11 06:23:00",19-제조-04,b.기계,"삼남1교 주두부 블럭 생산과 사무동 서고 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-06-10 07:20:00",18-시공-15,g.기타,"원흥2교 측량준비
|
|
및 중량물취급계획서 작성","2019-06-10 18:04:00",18-시공-15,g.기타,"원흥2교 측량준비
|
|
및 중량물취급계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J14308,"2019-06-10 07:22:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-10 22:24:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-10 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-06-10 07:25:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),내산2천교,생태수로1,2 옥산교(1본) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-06-10 07:27:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-10 18:03:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18202,"2019-06-10 07:32:00",07-교영-01,b.시공사,"현황 파악","2019-06-10 18:08:00",07-교영-01,b.시공사,"현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M05510,"2019-06-10 07:39:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-06-11 08:08:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",203.226.207.123,NULL,223.62.178.164,004C8,,,
|
|
M02302,"2019-06-10 07:41:00",19-제조-02,a.생산관리,"내산천2교 공정 협의","2019-06-10 18:02:00",19-제조-02,a.생산관리,"내산천2교 공정 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-06-10 07:45:00",19-계약-01,d.기타,"검단산업단지~검단IC, 연산~두마관련 남양건설, 코오롱글로벌 방문 예정 등 : 남일~보은 수리티교 외 5개교 계약 추진 중","2019-06-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-06-10 07:47:00",17-시공-10,b.시공,"거더시공가설관련시공사공문 검토","2019-06-10 09:58:00",17-시공-10,b.시공,"거더시공가설관련시공사공문 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-06-10 07:48:00",19-제조-03,a.품질검사,"새천2교, 산외교, 옥산교 데크, 가로보 생산 및 품질관리, ","2019-06-10 22:28:00",19-제조-03,a.품질검사,"새천2교, 산외교, 옥산교 데크, 가로보 생산 및 품질관리, ","2019-06-10 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J13308,"2019-06-10 07:54:00",19-시공-08,b.시공,"1. 주천2교 시공상세변경 및 철근신청서 작성
|
|
2. 주천2교 시공계획서 작성","2019-06-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
J18206,"2019-06-10 08:07:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-06-10 18:22:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-06-10 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-06-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-06-10 08:16:00",19-설계-05,"a.계획 및 협의",계획협의,"2019-06-10 19:03:00",19-설계-05,"a.계획 및 협의",계획협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-06-10 08:23:00",19-교영-06,d.기타,"양근대교 거더 설계가 공사비 검토 및 시행가, Pre-Deck (난지섬 연도교 건설사업) 설계가 및 시행가(특정공법심의), 거더 설계가 및 시행가 (송산그린시티~시화멀티테크노밸리), 제3연륙교 가설공사비 검토","2019-06-10 18:17:00",19-교영-06,d.기타,"양근대교 거더 설계가 공사비 검토 및 시행가, Pre-Deck (난지섬 연도교 건설사업) 설계가 및 시행가(특정공법심의), 거더 설계가 및 시행가 (송산그린시티~시화멀티테크노밸리), 제3연륙교 가설공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15201,"2019-06-10 08:23:00",19-교영-14,c.설계사,"과업진행현황 파악","2019-06-10 18:03:00",19-교영-14,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14306,"2019-06-10 08:25:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-10 18:15:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J13201,"2019-06-10 08:26:00",19-설계-03,c.도면,"송산~시화 배근도 작성","2019-06-10 21:22:00",19-설계-03,c.도면,"송산~시화 배근도 작성","2019-06-10 18:41:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J18205,"2019-06-10 08:27:00",19-설계-03,c.도면,"거더 일반도 및 배근도 작성","2019-06-10 21:22:00",19-설계-03,c.도면,"거더 일반도 및 배근도 작성","2019-06-10 18:37:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J10301,"2019-06-10 08:27:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-10 18:20:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16202,"2019-06-10 08:29:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-10 18:16:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07103,"2019-06-10 08:33:00",19-교영-01,d.기타,사업관리,"2019-06-10 18:22:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15307,"2019-06-10 08:33:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-10 18:01:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J11202,"2019-06-10 08:33:00",19-시공-02,b.시공,공사관리,"2019-06-10 18:13:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J11203,"2019-06-10 08:34:00",19-설계-03,e.검토,"라멘교(시종점 강결) 교각 계산서 작성","2019-06-10 18:03:00",19-설계-03,e.검토,"라멘교(시종점 강결) 교각 계산서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-설계-03<|>e.검토<|>2@40 IAB교량(PTC1차작업)검토<|>01:30<|><br>",,
|
|
J17205,"2019-06-10 08:34:00",18-교영-01,c.설계사,.,"2019-06-10 19:00:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11305,"2019-06-10 08:35:00",19-설계-03,e.검토,계획검토,"2019-06-10 18:15:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07210,"2019-06-10 08:37:00",16-시공-20,g.기타,"당초 변경","2019-06-10 18:20:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15301,"2019-06-10 08:40:00",16-시공-20,b.시공,공무,"2019-06-10 18:14:00",16-시공-20,b.시공,공무,"0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15202,"2019-06-10 08:49:00",19-설계-03,b.구조계산,"계산서 작성","2019-06-10 21:19:00",19-설계-03,b.구조계산,"계산서 작성","2019-06-10 18:42:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10313,"2019-06-10 08:50:00",19-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","2019-06-10 09:13:00",19-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14101,"2019-06-10 08:50:00",16-시공-20,출장,한양,"2019-06-10 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-10 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-10 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-06-10 08:50:00",16-시공-41,출장,"옥산교 현장","2019-06-10 18:00:00",16-시공-41,출장,"옥산교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-06-11 06:24:00",19-제조-04,b.기계,"산외교 출장","2019-06-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
T04204,"2019-06-11 07:31:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),내산2천교,생태수로1,2 옥산교(1본) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-11 19:16:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),내산2천교,생태수로1,2 옥산교(1본) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-06-11 07:34:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-11 22:36:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-11 19:35:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-06-11 07:35:00",19-계약-01,d.기타,"대림산업 계약관련 동반성장외주실 방문 등 : 남일~보은 수리티교 외 5개교 계약 추진 중","2019-06-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J14308,"2019-06-11 07:40:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-11 21:55:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-11 18:40:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J13308,"2019-06-11 07:41:00",19-시공-08,b.시공,"1. 주천2교 시공상세변경 및 철근신청서 작성
|
|
2. 주천2교 시공계획서 작성","2019-06-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
J16203,"2019-06-11 07:43:00",19-제조-03,a.품질검사,"새천2교, 산외교, 옥산교 데크, 가로보 생산 및 품질관리, ","2019-06-11 22:36:00",19-제조-03,a.품질검사,"새천2교, 산외교, 옥산교 데크, 가로보 생산 및 품질관리, ","2019-06-11 19:35:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18202,"2019-06-11 07:48:00",07-교영-01,b.시공사,"현황 파악","2019-06-11 18:10:00",07-교영-01,b.시공사,"현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J11305,"2019-06-11 08:06:00",19-설계-03,e.검토,계획검토,"2019-06-11 18:04:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
M05510,"2019-06-11 08:09:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-06-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.178.164,NULL,NULL,004C8,,,
|
|
B15306,"2019-06-11 08:09:00",18-관리-02,e.기타,"비서업무 외","2019-06-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-06-11 08:15:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-06-11 18:08:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-06-11 08:17:00",19-설계-05,"a.계획 및 협의",계획협의,"2019-06-11 18:06:00",19-설계-05,"a.계획 및 협의",계획협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J14306,"2019-06-11 08:18:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-11 18:01:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10314,"2019-06-11 08:19:00",14-교영-12,d.기타,"Pre-Deck (난지섬 연도교 건설사업) 설계가 및 시행가(특정공법심의), 양근대교 거더 설계가 공사비 검토 및 시행가, 거더 설계가 및 시행가 (송산그린시티~시화멀티테크노밸리), 제3연륙교 가설공사비 검토","2019-06-11 18:06:00",14-교영-12,d.기타,"Pre-Deck (난지섬 연도교 건설사업) 설계가 및 시행가(특정공법심의), 양근대교 거더 설계가 공사비 검토 및 시행가, 거더 설계가 및 시행가 (송산그린시티~시화멀티테크노밸리), 제3연륙교 가설공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15307,"2019-06-11 08:21:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-11 21:36:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-11 18:35:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J07103,"2019-06-11 08:21:00",19-교영-01,d.기타,사업관리,"2019-06-11 18:11:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-06-11 08:23:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-11 18:19:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16202,"2019-06-11 08:24:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-11 18:07:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-06-11 08:27:00",19-교영-12,c.설계사,"과업진행현황 파악","2019-06-11 18:03:00",19-교영-12,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11202,"2019-06-11 08:28:00",19-시공-02,b.시공,공사관리,"2019-06-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J15301,"2019-06-11 08:31:00",16-시공-20,b.시공,"계산서 처리
|
|
현장정산서 작성
|
|
수원외곽 노무비닷컴 기성 청구","2019-06-11 18:17:00",16-시공-20,b.시공,"계산서 처리
|
|
현장정산서 작성
|
|
수원외곽 노무비닷컴 기성 청구","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J07210,"2019-06-11 08:31:00",16-시공-20,g.기타,"당초 변경","2019-06-11 18:06:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11203,"2019-06-11 08:31:00",19-설계-05,h.기타,"심의의견반형 야노2교 슬래브 배근도 수정","2019-06-11 18:03:00",19-설계-05,h.기타,"심의의견반형 야노2교 슬래브 배근도 수정","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-설계-03<|>g.업무지원<|>업무회의(김ES 박BJ, 류BJ, 정CJ, 문CJ)<|>01:00<|><br>19-설계-02<|>f.보고서 및 시방서<|>DR, Pre-Deck 시방서작성 후 발송<|>02:00<|><br>",,
|
|
J17205,"2019-06-11 08:33:00",18-교영-01,c.설계사,.,"2019-06-11 18:11:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-06-11 08:36:00",19-설계-03,b.구조계산,"계산서 작성","2019-06-11 21:55:00",19-설계-03,b.구조계산,"계산서 작성","2019-06-11 18:35:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J18205,"2019-06-11 08:38:00",19-설계-03,c.도면,"합성 라멘 구조도 작성","2019-06-11 21:29:00",19-설계-03,c.도면,"합성 라멘 구조도 작성","2019-06-11 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-06-11 08:38:00",12-설계-24,b.구조계산,"가설벤트 변경검토","2019-06-11 21:27:00",12-설계-24,b.구조계산,"가설벤트 변경검토","2019-06-11 18:39:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J09101,"2019-06-11 08:50:00",19-교영-01,c.설계사,과업조사,"2019-06-11 18:02:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10313,"2019-06-11 08:51:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-06-11 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14101,"2019-06-11 08:50:00",16-시공-20,출장,한양,"2019-06-11 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-11 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-11 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11302,"2019-06-11 08:50:00",18-시공-15,출장,"[경기도 고양시 덕양구 화정동]원흥2교 밴트기초 거푸집 해체 및 되메우기","2019-06-11 18:00:00",18-시공-15,출장,"[경기도 고양시 덕양구 화정동]원흥2교 밴트기초 거푸집 해체 및 되메우기","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J18207,"2019-06-11 08:50:00",17-시공-10,출장,"[대구달성군]성주대교현장 거더가설관련 시공사협의","2019-06-11 18:00:00",17-시공-10,출장,"[대구달성군]성주대교현장 거더가설관련 시공사협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11302,"2019-06-12 07:07:00",18-시공-15,g.기타,"원흥2교 밴트PCM작성","2019-06-12 18:08:00",18-시공-15,g.기타,"원흥2교 밴트PCM작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18202,"2019-06-12 07:13:00",07-교영-01,b.시공사,"현황 파악","2019-06-12 18:10:00",07-교영-01,b.시공사,"현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J14308,"2019-06-12 07:20:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-12 22:10:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-12 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18208,"2019-06-12 07:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-12 21:51:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-12 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-06-12 07:30:00",19-제조-03,a.품질검사,"새천2교, 산외교, 옥산교 데크, 가로보 생산 및 품질관리, ","2019-06-12 20:36:00",19-제조-03,a.품질검사,"새천2교, 산외교, 옥산교 데크, 가로보 생산 및 품질관리, ","2019-06-12 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18207,"2019-06-12 07:36:00",17-시공-10,b.시공,"성주대교현장 거더가설관련 시공사(금광기업)협의","2019-06-12 18:44:00",17-시공-10,b.시공,"성주대교현장 거더가설관련 시공사(금광기업)협의","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
T04204,"2019-06-12 07:40:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),함평교,생태수로1,2 옥산교(1본) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J11305,"2019-06-12 08:13:00",19-설계-03,e.검토,계획검토,"2019-06-12 18:08:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10315,"2019-06-12 08:13:00",17-설계-09,"a.계획 및 협의","제작장 협의","2019-06-12 18:07:00",17-설계-09,"a.계획 및 협의","제작장 협의","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
B15306,"2019-06-12 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-06-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11202,"2019-06-12 08:16:00",19-시공-02,b.시공,공사관리,"2019-06-12 18:57:00",19-시공-02,b.시공,공사관리,"2019-06-12 18:31:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,,
|
|
J10314,"2019-06-12 08:20:00",14-교영-12,d.기타,"DR거더 제작 연장 및 공종별 구분 일위대가 검토자료, 양근대교 거더 설계가 공사비 검토 및 시행가, Pre-Deck (난지섬 연도교 건설사업) 설계가 및 시행가(특정공법심의), 거더 설계가 및 시행가 (송산그린시티~시화멀티테크노밸리)","2019-06-12 18:09:00",14-교영-12,d.기타,"DR거더 제작 연장 및 공종별 구분 일위대가 검토자료, 양근대교 거더 설계가 공사비 검토 및 시행가, Pre-Deck (난지섬 연도교 건설사업) 설계가 및 시행가(특정공법심의), 거더 설계가 및 시행가 (송산그린시티~시화멀티테크노밸리)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14306,"2019-06-12 08:20:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-12 18:10:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18206,"2019-06-12 08:20:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-06-12 18:39:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10301,"2019-06-12 08:22:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-12 21:10:00",17-시공-09,d.자재,"삼남1교 가설벤트 품의 관련 검토","2019-06-12 18:30:00",172.16.9.158,NULL,172.16.9.158,004E1,,1,
|
|
J15202,"2019-06-12 08:28:00",19-설계-03,b.구조계산,"계산서 작성","2019-06-12 18:05:00",19-설계-03,b.구조계산,"계산서 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J15307,"2019-06-12 08:28:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-12 21:31:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-12 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J16202,"2019-06-12 08:28:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-12 18:13:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07103,"2019-06-12 08:29:00",19-교영-01,d.기타,사업관리,"2019-06-12 18:23:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18205,"2019-06-12 08:32:00",19-설계-03,c.도면,"합성 라멘 구조도 작성","2019-06-12 17:05:00",19-설계-03,c.도면,"합성 라멘 구조도 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J13201,"2019-06-12 08:32:00",12-설계-24,b.구조계산,"가설벤트 변경검토","2019-06-12 18:04:00",12-설계-24,b.구조계산,"가설벤트 변경검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11203,"2019-06-12 08:34:00",19-설계-05,h.기타,"심의의견반형 야노1, 2교 슬래브 계산서 배근도 수정","2019-06-12 18:03:00",19-설계-05,h.기타,"심의의견반형 야노1, 2교 슬래브 계산서 배근도 수정","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-시공-15<|>g.기타<|>가설밴트 상단EL검토<|>03:30<|><br>18-설계-19<|>h.기타<|>설계도서심의 의견 답변작성 4공구 오송지선 전동교<|>00:30<|><br>",,
|
|
J09101,"2019-06-12 08:35:00",19-교영-01,c.설계사,과업조사,"2019-06-12 18:02:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J07210,"2019-06-12 08:36:00",16-시공-20,g.기타,"당초 변경","2019-06-12 20:50:00",16-시공-20,g.기타,"당초 변경","2019-06-12 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15201,"2019-06-12 08:38:00",19-교영-12,c.설계사,"과업진행현황 파악","2019-06-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J17205,"2019-06-12 08:38:00",18-교영-01,c.설계사,.,"2019-06-12 12:18:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-06-12 08:38:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-06-12 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
M05510,"2019-06-12 08:59:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-06-13 10:39:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",223.62.178.101,NULL,223.39.138.30,004C8,,,
|
|
J15301,"2019-06-12 12:58:00",16-시공-20,b.시공,"단장천2교 투입내역서 작성
|
|
현장정산서 작성
|
|
산외교 하도급지킴이 기성 청구","2019-06-12 18:11:00",16-시공-20,b.시공,"단장천2교 투입내역서 작성
|
|
현장정산서 작성
|
|
산외교 하도급지킴이 기성 청구","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15202,"2019-06-14 08:31:00",19-설계-03,b.구조계산,"성과품 정리","2019-06-14 18:03:00",19-설계-03,b.구조계산,"성과품 정리","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J18205,"2019-06-14 08:31:00",19-설계-03,c.도면,"합성 라멘 수량산출서 작성","2019-06-14 21:39:00",19-설계-03,c.도면,"합성 라멘 수량산출서 작성","2019-06-14 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J14101,"2019-06-12 08:50:00",16-시공-20,출장,한양,"2019-06-12 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-12 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-12 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J09102,"2019-06-12 08:50:00",19-계약-01,출장,"남일-보은 도로건설","2019-06-12 18:00:00",19-계약-01,출장,"남일-보은 도로건설","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J13308,"2019-06-12 08:50:00",19-시공-08,출장,"[천안시]계약변경관련 업무협의","2019-06-12 18:00:00",19-시공-08,출장,"[천안시]계약변경관련 업무협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E3,,,
|
|
J07202,"2019-06-13 06:55:00",19-제조-04,b.기계,"삼남1교 주두부 받침 블럭 생산과 거더 거푸집 도색","2019-06-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J11302,"2019-06-13 07:24:00",18-시공-15,g.기타,"원흥2교 밴트PCM작성","2019-06-13 18:07:00",18-시공-15,g.기타,"원흥2교 밴트PCM작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18208,"2019-06-13 07:26:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-13 20:42:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-13 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-06-13 07:27:00",19-계약-01,d.기타,"국지도 84호선 중리교 예상 시행가 등 : 남일-보은 외 4개교 계약 추진 중","2019-06-13 18:00:00",19-계약-01,d.기타,"국지도 84호선 중리교 예상 시행가 등 : 남일-보은 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
M02302,"2019-06-13 07:28:00",19-제조-02,a.생산관리,"산외교 현장 검토 자료 작성","2019-06-13 18:11:00",19-제조-02,a.생산관리,"내산천2교 공정 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>산외교 자료 취합<|>01:30<|><br>19-제조-02<|>a.생산관리<|>현장 보고서 작성 및 검토<|>03:00<|><br>",,
|
|
J14308,"2019-06-13 07:28:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-13 20:47:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-13 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-06-13 07:33:00",17-시공-09,b.시공," 거더가설관련 가벤트시공검토","2019-06-13 21:13:00",17-시공-09,b.시공," 거더가설관련 가벤트시공검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18202,"2019-06-13 07:37:00",07-교영-01,b.시공사,"현황 파악","2019-06-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J16203,"2019-06-13 07:42:00",19-제조-03,a.품질검사,"새천2교, 산외교, 옥산교 데크, 가로보 생산 및 품질관리, ","2019-06-13 22:52:00",19-제조-03,a.품질검사,"새천2교, 산외교, 옥산교 데크, 가로보 생산 및 품질관리, ","2019-06-13 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J13308,"2019-06-13 07:44:00",19-시공-08,b.시공,"1. 하도급 계약 (변경) 통보서 발송
|
|
2. 내역서 작성
|
|
3. 자재구입비 정산","2019-06-13 14:30:00",19-시공-08,b.시공,"1. 하도급 계약 (변경) 통보서 발송
|
|
2. 내역서 작성
|
|
3. 자재구입비 정산","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J11305,"2019-06-13 08:11:00",19-설계-03,e.검토,계획검토,"2019-06-13 18:21:00",19-설계-03,e.검토,계획검토,"0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-06-13 08:13:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-06-13 21:10:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-06-13 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-06-13 18:18:18",NULL,NULL,"비서업무 외","0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-06-13 08:19:00",19-설계-05,"a.계획 및 협의",계획협의,"2019-06-13 19:09:00",19-설계-05,"a.계획 및 협의",계획협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
T04204,"2019-06-13 08:21:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),함평교,생태수로1,2 옥산교(1본) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J10314,"2019-06-13 08:22:00",19-설계-03,h.기타,"연결교 거더 시행견적서 (송산그린시티~시화멀티테크노밸리), 문경3교(이천~문경 9공구) 시행견적서, DR거더 제작 연장 및 공종별 구분 일위대가 검토자료, 양근대교 거더 공사비 검토","2019-06-13 18:17:00",19-설계-03,h.기타,"연결교 거더 시행견적서 (송산그린시티~시화멀티테크노밸리), 문경3교(이천~문경 9공구) 시행견적서, DR거더 제작 연장 및 공종별 구분 일위대가 검토자료, 양근대교 거더 공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J10315,"2019-06-13 08:23:00",17-시공-09,b.시공,"가설계획서 작성","2019-06-13 18:11:00",17-시공-09,b.시공,"가설계획서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J11202,"2019-06-13 08:24:00",19-시공-02,b.시공,공사관리,"2019-06-13 21:14:00",19-시공-02,b.시공,공사관리,"2019-06-13 18:58:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J15201,"2019-06-13 08:26:00",19-교영-12,c.설계사,"과업진행현황 파악","2019-06-13 18:03:00",19-교영-12,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15202,"2019-06-13 08:27:00",19-설계-03,b.구조계산,"성과품 정리","2019-06-13 21:05:00",19-설계-03,b.구조계산,"성과품 정리","2019-06-13 18:37:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J14306,"2019-06-13 08:27:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-13 18:13:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15307,"2019-06-13 08:27:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-13 21:38:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-13 18:38:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10301,"2019-06-13 08:29:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-13 21:14:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07103,"2019-06-13 08:31:00",19-교영-01,d.기타,사업관리,"2019-06-13 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J07210,"2019-06-13 08:31:00",16-시공-20,g.기타,"당초 변경","2019-06-13 20:54:00",16-시공-20,g.기타,"당초 변경","2019-06-13 18:37:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15301,"2019-06-13 08:32:00",16-시공-20,b.시공,"현장정산서 작성
|
|
중앙거리(대흥로) 가로환경정비공사 하도급 계약 서류 제출","2019-06-13 18:23:00",16-시공-20,b.시공,"현장정산서 작성
|
|
중앙거리(대흥로) 가로환경정비공사 하도급 계약 서류 제출","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11203,"2019-06-13 08:32:00",18-설계-19,h.기타,"설계도서 심의 4공구 오송지선 전동교 답변자료작성, 발송","2019-06-13 18:05:00",18-설계-19,h.기타,"설계도서 심의 4공구 오송지선 전동교 답변자료작성, 발송","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-시공-15<|>g.기타<|>밴트상단EL.(솟음보정치 포함) 검토, 수정<|>02:00<|><br>19-설계-03<|>b.구조계산<|>P16 단일현장타설말뚝 철근직경수정(설계사요청), 계산서 수정<|>04:00<|><br>18-설계-19<|>h.기타<|>5공구 대콘 설계도서심의의견 답변작성<|>01:00<|><br>",,
|
|
J16202,"2019-06-13 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-13 18:24:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J18205,"2019-06-13 08:40:00",19-설계-03,c.도면,"합성 라멘 구조도 작성","2019-06-13 21:06:00",19-설계-03,c.도면,"합성 라멘 구조도 작성","2019-06-13 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-06-13 08:40:00",12-설계-24,b.구조계산,"가설벤트 변경검토","2019-06-13 21:06:00",12-설계-24,b.구조계산,"가설벤트 변경검토","2019-06-13 18:38:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10313,"2019-06-13 08:49:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-06-13 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-06-13 08:54:00",19-교영-01,c.설계사,과업조사,"2019-06-13 18:12:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
M05510,"2019-06-13 10:41:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-06-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.138.30,NULL,NULL,004C8,,,
|
|
J14101,"2019-06-13 08:50:00",16-시공-20,출장,한양,"2019-06-13 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-13 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-13 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11302,"2019-06-14 07:12:00",18-시공-15,g.기타,"한포제1,2교 중량물취급계획서 작성
|
|
옥산교,옥산4교 인장계획서 작성","2019-06-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E2,,,
|
|
J09102,"2019-06-14 07:31:00",19-계약-01,d.기타,"포스코건설 본사 방문 예정, 이천~문경9 문경3교 예상 시행가 등 : 남일-보은 외 4개교 계약 추진 중","2019-06-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
T04204,"2019-06-14 07:32:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),함평교,생태수로1,2 옥산교(1본) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-06-14 07:33:00",19-제조-04,b.기계,"도하4교 (파주P2) 런처앵커 해체 출장","2019-06-14 18:00:00",19-제조-04,b.기계,"도하4교 (파주P2) 런처앵커 해체 출장","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-06-14 07:34:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-14 18:02:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18207,"2019-06-14 07:34:00",16-시공-41,b.시공," 거더가설사고 향후처리 대책일정검토 ","2019-06-14 18:06:00",16-시공-41,b.시공," 거더가설사고 향후처리 대책일정검토 ","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-06-14 07:36:00",19-제조-03,a.품질검사,"새천2교, 산외교, 옥산교 데크, 가로보 생산 및 품질관리, ","2019-06-14 21:50:00",19-제조-03,a.품질검사,"새천2교, 산외교, 옥산교 데크, 가로보 생산 및 품질관리, ","2019-06-14 18:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,,
|
|
J18208,"2019-06-14 07:36:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-14 18:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-06-14 07:38:00",19-제조-02,a.생산관리,"도하4교 앵커작업 지원","2019-06-14 18:01:00",19-제조-02,a.생산관리,"도하4교 앵커작업 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-06-14 07:39:00",07-교영-01,b.시공사,"현황 파악","2019-06-14 18:17:00",07-교영-01,b.시공사,"현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
B15306,"2019-06-14 08:02:00",18-관리-02,e.기타,"비서업무 외","2019-06-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-06-14 08:09:00",17-시공-09,g.기타,"스트롱백 구조검토","2019-06-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J18206,"2019-06-14 08:12:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-06-14 18:21:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-06-14 08:13:00",19-설계-05,"a.계획 및 협의",계획협의,"2019-06-14 18:04:00",19-설계-05,"a.계획 및 협의",계획협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-06-14 08:23:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-14 18:00:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J07103,"2019-06-14 08:23:00",19-교영-01,d.기타,사업관리,"2019-06-14 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14306,"2019-06-14 08:24:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J11202,"2019-06-14 08:25:00",19-시공-02,b.시공,공사관리,"2019-06-14 18:19:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J16202,"2019-06-14 08:25:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-14 18:15:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10314,"2019-06-14 08:26:00",17-설계-07,h.기타,"문경3교(이천~문경 9공구) 시행견적서, DR거더 제작 연장 및 공종별 구분 일위대가 검토자료, 양근대교 거더 공사비 검토, 중리교(국지도84호선) 시행견적서(입찰)","2019-06-14 18:11:00",17-설계-07,h.기타,"문경3교(이천~문경 9공구) 시행견적서, DR거더 제작 연장 및 공종별 구분 일위대가 검토자료, 양근대교 거더 공사비 검토, 중리교(국지도84호선) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11203,"2019-06-14 08:31:00",19-설계-03,b.구조계산,"종점부 라멘의 시점 교각(P16) 계산서 수정(설계사 요청, 내진해석하중, 말뚝변위, 철근통일 등)","2019-06-14 18:02:00",19-설계-03,b.구조계산,"종점부 라멘의 시점 교각(P16) 계산서 수정(설계사 요청, 내진해석하중, 말뚝변위, 철근통일 등)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J13201,"2019-06-14 08:32:00",12-설계-24,b.구조계산,"삼남1교 솟음도 작성","2019-06-14 18:02:00",12-설계-24,b.구조계산,"삼남1교 솟음도 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15201,"2019-06-14 08:34:00",19-교영-14,c.설계사,"과업진행현황 파악","2019-06-14 18:02:00",19-교영-14,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15301,"2019-06-14 08:34:00",16-시공-20,b.시공,"현장정산서 작성
|
|
중앙거리(대흥로) 가로환경정비공사 하도급 계약 서류 제출","2019-06-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.172,NULL,NULL,004E4,,,
|
|
J07210,"2019-06-14 08:40:00",16-시공-20,g.기타,"당초 변경","2019-06-14 18:01:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J09101,"2019-06-14 08:51:00",19-교영-01,c.설계사,과업조사,"2019-06-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-06-14 08:50:00",16-시공-20,출장,한양,"2019-06-14 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-14 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-14 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-06-14 08:50:00",16-시공-41,출장,"옥산교 현장","2019-06-14 18:00:00",16-시공-41,출장,"옥산교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M05510,"2019-06-15 09:10:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.190.217,NULL,NULL,004C8,,,
|
|
M05510,"2019-06-16 07:57:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.149.54,NULL,NULL,004C8,,,
|
|
J07202,"2019-06-17 06:16:00",19-제조-04,b.기계,"거더 거푸집 보수와 삼남1교 주두부 받침블럭 생산","2019-06-18 07:33:00",19-제조-04,b.기계,"거더 거푸집 보수와 삼남1교 주두부 받침블럭 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-06-17 07:16:00",18-시공-15,g.기타,"삼간교 인장계획서 작성
|
|
삼간교 가설계획서 작성
|
|
옥산교,옥산4교 인장계획서 작성","2019-06-17 18:04:00",18-시공-15,g.기타,"삼간교 인장계획서 작성
|
|
삼간교 가설계획서 작성
|
|
옥산교,옥산4교 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-06-17 07:25:00",16-제조-02,a.생산관리,"삼남1교(측,중앙경간),함평교,생태수로1,2 옥산교(1본) 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-06-17 07:25:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-17 20:43:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-17 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-06-17 07:26:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-17 18:06:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M05510,"2019-06-17 07:32:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-06-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.150.133,NULL,NULL,004C8,,,
|
|
J09102,"2019-06-17 07:37:00",19-계약-01,d.기타,"이천~문경9 문경3교 예상 시행가 등 : 남일-보은 외 4개교 계약 추진 중","2019-06-17 19:41:00",19-계약-01,d.기타,"이천~문경9 문경3교 예상 시행가 등 : 남일-보은 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
M02302,"2019-06-17 07:40:00",19-제조-02,a.생산관리,"내산2천2교 출하관련 협의","2019-06-17 18:00:00",19-제조-02,a.생산관리,"도하4교 앵커작업 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>관리자 면담<|>01:30<|><br>19-제조-02<|>a.생산관리<|>Pre-Beam 생산준비 검토<|>02:00<|><br>19-제조-02<|>a.생산관리<|>삼남1교 현장 지원 검토<|>00:30<|><br>",,
|
|
J18207,"2019-06-17 07:44:00",17-시공-08,b.시공," 거더가설 관련 런쳐제작검토 ","2019-06-17 19:38:00",17-시공-08,b.시공," 거더가설 관련 런쳐제작검토 ","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18202,"2019-06-17 07:56:00",07-교영-01,b.시공사,"발주 현황 파악","2019-06-17 18:11:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J10301,"2019-06-17 08:08:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-17 19:33:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-17 19:01:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,,
|
|
J18206,"2019-06-17 08:09:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-06-17 18:10:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-06-17 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-06-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-06-17 08:14:00",19-설계-05,"a.계획 및 협의",계획협의,"2019-06-17 18:11:00",19-설계-05,"a.계획 및 협의",계획협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15201,"2019-06-17 08:24:00",19-교영-14,c.설계사,"과업진행현황 파악","2019-06-17 18:08:00",19-교영-14,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15307,"2019-06-17 08:24:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-17 18:00:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J07103,"2019-06-17 08:25:00",19-교영-01,d.기타,사업관리,"2019-06-17 18:21:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10314,"2019-06-17 08:25:00",18-설계-05,h.기타,"중리교(국지도84호선) 시행견적서(입찰), DR거더 제작 연장 및 공종별 구분 일위대가 검토자료, 양근대교 거더 공사비 검토","2019-06-17 18:17:00",18-설계-05,h.기타,"중리교(국지도84호선) 시행견적서(입찰), DR거더 제작 연장 및 공종별 구분 일위대가 검토자료, 양근대교 거더 공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11202,"2019-06-17 08:26:00",19-시공-02,b.시공,공사관리,"2019-06-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J07210,"2019-06-17 08:26:00",16-시공-20,g.기타,"당초 변경","2019-06-17 18:10:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11203,"2019-06-17 08:31:00",19-설계-03,b.구조계산,"종점부 라멘 계산서 정리","2019-06-17 18:09:00",19-설계-03,b.구조계산,"종점부 라멘 계산서 정리","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>c.도면<|>9공구 한맥 청룡천교 런처가설도 작성<|>02:00<|><br>19-설계-05<|>c.도면<|>야노1,2교 가설도 정리<|>01:00<|><br>",,
|
|
J17205,"2019-06-17 08:33:00",18-교영-01,c.설계사,.,"2019-06-17 18:11:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J09101,"2019-06-17 08:33:00",19-교영-01,c.설계사,과업조사,"2019-06-17 18:02:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J11305,"2019-06-17 08:34:00",17-시공-09,g.기타,"스트롱백 구조검토","2019-06-17 18:07:00",17-시공-09,g.기타,"스트롱백 구조검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18205,"2019-06-17 08:37:00",19-설계-03,c.도면,"합성 라멘 수량산출서 작성","2019-06-17 18:07:00",19-설계-03,c.도면,"합성 라멘 수량산출서 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J15202,"2019-06-17 08:37:00",19-설계-03,b.구조계산,"성과품 정리","2019-06-17 18:41:00",19-설계-03,b.구조계산,"성과품 정리","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J13201,"2019-06-17 08:38:00",12-설계-24,b.구조계산,"삼남1교 솟음도 작성","2019-06-17 18:10:00",12-설계-24,b.구조계산,"삼남1교 솟음도 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J16202,"2019-06-17 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-17 18:15:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10313,"2019-06-17 08:43:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-06-17 18:02:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16203,"2019-06-17 08:53:00",19-제조-03,a.품질검사,"광교1.3 교 코아시공, 배합시험 준비","2019-06-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J14101,"2019-06-17 08:50:00",16-시공-20,출장,한양,"2019-06-17 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-17 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-17 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-06-17 08:50:00",16-시공-33,출장,"KCC 건설","2019-06-17 18:00:00",16-시공-33,출장,"KCC 건설","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J14308,"2019-06-18 06:54:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-18 21:03:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- 공장 홍보 동영상 제작","2019-06-18 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J11302,"2019-06-18 07:09:00",18-시공-15,g.기타,"삼간교 가설계획서 작성
|
|
옥산교,옥산4교 인장계획서 작성","2019-06-18 18:09:00",18-시공-15,g.기타,"삼간교 가설계획서 작성
|
|
옥산교,옥산4교 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18208,"2019-06-18 07:20:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-18 19:17:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-06-18 07:23:00",19-제조-02,a.생산관리,"노듈러 거더 개선사항 검토","2019-06-18 18:05:00",19-제조-02,a.생산관리,"노듈러 거더 개선사항 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>J-web 철근망 개선안 검토<|>02:30<|><br>19-제조-02<|>a.생산관리<|>거더 조립 공정 검토<|>03:00<|><br>19-제조-02<|>a.생산관리<|>산외교 현장 협의<|>01:00<|><br>",,
|
|
T04204,"2019-06-18 07:25:00",16-제조-02,a.생산관리,"삼남1교(주두부,함양),생태수로1,2 가공,점접 철근 생산, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-06-18 07:34:00",19-제조-04,b.기계,"내산2천2교 거더 상차와 삼남1교 주두부 받침블럭 생산 및 사무동 서고 이적","2019-06-18 18:01:00",19-제조-04,b.기계,"내산2천2교 거더 상차와 삼남1교 주두부 받침블럭 생산 및 사무동 서고 이적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-06-18 07:38:00",19-계약-01,d.기타,"두산건설, 포스코건설 방문예정, 중리교 3개교 예상 시행가 등 : 남일-보은 외 4개교 계약 추진 중","2019-06-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J07103,"2019-06-18 08:06:00",19-교영-01,d.기타,사업관리,"2019-06-18 18:12:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18206,"2019-06-18 08:07:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-06-18 18:02:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-06-18 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-06-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-06-18 08:17:00",19-설계-05,"a.계획 및 협의",계획협의,"2019-06-18 18:06:00",19-설계-05,"a.계획 및 협의",계획협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10301,"2019-06-18 08:18:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-18 18:07:00",17-시공-21,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J18205,"2019-06-18 08:19:00",19-설계-03,c.도면,"성과품 수정","2019-06-18 21:35:00",19-설계-03,c.도면,"성과품 수정","2019-06-18 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-06-18 08:20:00",12-설계-24,b.구조계산,"삼남1교 솟음도 작성","2019-06-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E2,,,
|
|
J10314,"2019-06-18 08:20:00",18-설계-05,h.기타,"양근대교 거더 공사비 검토, 중리교(국지도84호선) 시행견적서(입찰), DR거더 제작 연장 및 공종별 구분 일위대가 검토자료","2019-06-18 18:05:00",18-설계-05,h.기타,"양근대교 거더 공사비 검토, 중리교(국지도84호선) 시행견적서(입찰), DR거더 제작 연장 및 공종별 구분 일위대가 검토자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15307,"2019-06-18 08:24:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-18 21:31:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-18 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J11203,"2019-06-18 08:31:00",19-설계-03,b.구조계산,"종점부 라멘 거더 분절부 검토","2019-06-18 18:12:00",19-설계-03,b.구조계산,"종점부 라멘 거더 분절부 검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>b.구조계산<|>심의의견반영 긴장력 하향(75%->72%) 모델링수정, 전동교<|>05:00<|><br>",,
|
|
J15301,"2019-06-18 08:31:00",16-시공-20,b.시공,"동용교 하도급지킴이 기성 청구서 작성
|
|
성주대교 하도급지킴이 기성 청구서 작성
|
|
동화교 기성 세금계산서 발행
|
|
현장정산서 작성","2019-06-18 18:06:00",16-시공-20,b.시공,"동용교 하도급지킴이 기성 청구서 작성
|
|
성주대교 하도급지킴이 기성 청구서 작성
|
|
동화교 기성 세금계산서 발행
|
|
현장정산서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J10313,"2019-06-18 08:32:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-06-18 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11305,"2019-06-18 08:33:00",17-시공-09,g.기타,"스트롱백 구조검토","2019-06-18 18:09:00",17-시공-09,g.기타,"스트롱백 구조검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15201,"2019-06-18 08:36:00",19-교영-14,c.설계사,"과업진행현황 파악","2019-06-18 18:03:00",19-교영-14,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-06-18 08:36:00",16-시공-20,g.기타,"당초 변경","2019-06-18 20:58:00",16-시공-20,g.기타,"당초 변경","2019-06-18 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J17205,"2019-06-18 08:36:00",18-교영-01,c.설계사,.,"2019-06-18 18:04:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J16202,"2019-06-18 08:42:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-18 18:10:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-06-18 08:51:00",19-설계-03,b.구조계산,"성과품 정리","2019-06-18 20:54:00",19-설계-03,b.구조계산,"성과품 정리","2019-06-18 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J09101,"2019-06-18 08:53:00",19-교영-01,c.설계사,과업조사,"2019-06-18 18:57:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-06-18 08:50:00",16-시공-20,출장,한양,"2019-06-18 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-18 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-18 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-06-18 08:50:00",16-시공-33,출장,"KCC 건설","2019-06-18 18:00:00",16-시공-33,출장,"KCC 건설","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18207,"2019-06-18 08:50:00",17-시공-08,출장,"[대구 울산]세천2교 삼남1교 가설관련 시공사협의","2019-06-18 18:00:00",17-시공-08,출장,"[대구 울산]세천2교 삼남1교 가설관련 시공사협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18202,"2019-06-18 08:50:00",07-교영-01,출장,"[합천군 대병면, 구미시 해평면]함양~합천고속도로 5공구(계룡건설-합천호교), 구미국가산업단지 2공구(롯데건설-괴평교)","2019-06-18 18:00:00",07-교영-01,출장,"[합천군 대병면, 구미시 해평면]함양~합천고속도로 5공구(계룡건설-합천호교), 구미국가산업단지 2공구(롯데건설-괴평교)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11202,"2019-06-18 08:50:00",17-시공-08,출장,"[대구 달성군]빔런처 일정에 따른 세천2교 공정계획 협의 ","2019-06-18 18:00:00",17-시공-08,출장,"[대구 달성군]빔런처 일정에 따른 세천2교 공정계획 협의 ","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J14308,"2019-06-19 07:24:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작","2019-06-19 18:18:18",19-제조-02,a.생산관리,NULL,"2019-06-19 18:55:00",175.203.206.128,175.203.206.128,NULL,006E2,,,
|
|
T04204,"2019-06-19 07:25:00",16-제조-02,a.생산관리,"삼남1교(주두부,측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-06-19 07:33:00",19-제조-02,a.생산관리,"노듈러 거더 개선사항 검토","2019-06-19 18:09:00",19-제조-02,a.생산관리,"노듈러 거더 개선사항 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-06-19 07:36:00",19-계약-01,d.기타,"계룡건설, 강산건설, 한신공영 현장 방문예정, 조령천교 예상 시행가 등 : 남일-보은 외 4개교 계약 추진 중","2019-06-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-06-19 07:45:00",19-제조-03,a.품질검사,"산외교 ,새천2교 데크,가로보 생산품질관리","2019-06-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J10315,"2019-06-19 07:53:00",17-시공-09,b.시공,가설검토,"2019-06-19 18:04:00",17-시공-09,b.시공,가설검토,"0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J07103,"2019-06-19 08:12:00",19-교영-01,d.기타,사업관리,"2019-06-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
B15306,"2019-06-19 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-06-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-06-19 08:12:00",19-설계-05,"a.계획 및 협의",계획협의,"2019-06-19 18:29:00",19-설계-05,"a.계획 및 협의",계획협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-06-19 08:16:00",17-시공-09,g.기타,"스트롱백 구조검토","2019-06-19 18:06:00",17-시공-09,g.기타,"스트롱백 구조검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-06-19 08:20:00",19-시공-13,b.시공,"PJT별 시행계획 검토","2019-06-19 18:10:00",19-시공-13,b.시공,"PJT별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-06-19 08:21:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-19 21:37:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-19 18:35:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10314,"2019-06-19 08:23:00",17-설계-09,h.기타,"곡천교(안성~성남 2공구) 협의자료, 양근대교 거더 공사비 검토, 중리교(국지도84호선) 시행견적서(입찰)","2019-06-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J18205,"2019-06-19 08:23:00",19-설계-03,c.도면,"성과품 수정","2019-06-19 21:32:00",19-설계-03,c.도면,"성과품 수정","2019-06-19 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07210,"2019-06-19 08:31:00",16-시공-20,g.기타,"당초 변경","2019-06-19 21:06:00",16-시공-20,g.기타,"당초 변경","2019-06-19 18:36:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J16202,"2019-06-19 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-19 18:06:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-06-19 08:31:00",19-설계-03,b.구조계산,"성과품 정리","2019-06-19 21:19:00",19-설계-03,b.구조계산,"성과품 정리","2019-06-19 18:36:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J15301,"2019-06-19 08:33:00",16-시공-20,b.시공,"현장정산서 작성
|
|
성주대교 기성 세금계산서 발행
|
|
디비닥 강봉 자재 발주
|
|
원흥2교, 옥산교 작업일보 작성","2019-06-19 18:06:00",16-시공-20,b.시공,"현장정산서 작성
|
|
성주대교 기성 세금계산서 발행
|
|
디비닥 강봉 자재 발주
|
|
원흥2교, 옥산교 작업일보 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11203,"2019-06-19 08:33:00",19-설계-03,b.구조계산,"종점부 라멘 거더 분절부 검토","2019-06-19 18:04:00",19-설계-03,b.구조계산,"종점부 라멘 거더 분절부 검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>b.구조계산<|>심의의견반영 긴장력 하향(75%->72%) 모델링수정 10개 <|>06:00<|><br>",,
|
|
J13201,"2019-06-19 08:33:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 수정","2019-06-19 21:06:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 수정","2019-06-19 18:35:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J11202,"2019-06-19 08:34:00",19-시공-02,b.시공,"공사관리 ","2019-06-19 18:30:00",19-시공-02,b.시공,"공사관리 ","0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10313,"2019-06-19 08:35:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-06-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J17205,"2019-06-19 08:38:00",18-교영-01,c.설계사,.,"2019-06-19 18:01:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-06-19 08:38:00",19-교영-16,c.설계사,"과업진행현황 파악","2019-06-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J09101,"2019-06-19 08:53:00",19-교영-01,c.설계사,과업조사,"2019-06-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J07202,"2019-06-19 13:14:00",19-제조-04,b.기계,"내산2천2교 거더 상차와 삼남1교 주두부 받침블럭 생산 및 사무동 서고 이적","2019-06-20 07:34:00",19-제조-04,b.기계,"내산2천2교 거더 상차와 삼남1교 주두부 받침블럭 생산 및 사무동 서고 이적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14101,"2019-06-19 08:50:00",16-시공-20,출장,한양,"2019-06-19 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-19 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-19 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18207,"2019-06-19 08:50:00",17-시공-08,출장,"[대구 울산]세천2교 삼남1교 가설관련 시공사협의","2019-06-19 18:00:00",17-시공-08,출장,"[대구 울산]세천2교 삼남1교 가설관련 시공사협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18202,"2019-06-19 08:50:00",07-교영-01,출장,"[합천군 대병면, 구미시 해평면]함양~합천고속도로 5공구(계룡건설-합천호교), 구미국가산업단지 2공구(롯데건설-괴평교)","2019-06-19 18:00:00",07-교영-01,출장,"[합천군 대병면, 구미시 해평면]함양~합천고속도로 5공구(계룡건설-합천호교), 구미국가산업단지 2공구(롯데건설-괴평교)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10301,"2019-06-19 08:50:00",17-시공-21,출장,"[경기도 수원시]북수원1교 거더 제작 및 광교1교 2차인장 작업 현장관리","2019-06-19 18:00:00",17-시공-21,출장,"[경기도 수원시]북수원1교 거더 제작 및 광교1교 2차인장 작업 현장관리","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
T04204,"2019-06-20 07:32:00",16-제조-02,a.생산관리,"삼남1교(주두부,측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-06-20 07:32:00",07-교영-01,b.시공사,"발주 현황 파악","2019-06-20 18:10:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-06-20 07:34:00",19-계약-01,d.기타,"학일1교 계룡건설 현장 방문예정, 조령천교 예상 시행가 등 : 남일-보은 외 4개교 계약 추진 중","2019-06-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J07202,"2019-06-20 07:35:00",19-제조-04,b.기계,"주천2교 거푸집 보수와 함평교 분절거더 콘크리트 지원과 삼남1교 주두부 받침블럭 생산","2019-06-21 07:30:00",19-제조-04,b.기계,"주천2교 거푸집 보수와 함평교 분절거더 콘크리트 지원과 삼남1교 주두부 받침블럭 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-06-20 07:41:00",19-제조-02,a.생산관리,"콘크리트 양생실험 계획 검토","2019-06-20 18:09:00",19-제조-02,a.생산관리,"콘크리트 양생실험 계획 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J10315,"2019-06-20 07:54:00",17-시공-09,b.시공,"인장계획서 작성","2019-06-20 18:16:00",17-시공-09,b.시공,"인장계획서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J10301,"2019-06-20 07:56:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-20 18:19:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
B15306,"2019-06-20 08:03:00",18-관리-02,e.기타,"비서업무 외","2019-06-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-06-20 08:12:00",17-시공-09,g.기타,"스트롱백 구조검토","2019-06-20 18:05:00",17-시공-09,g.기타,"스트롱백 구조검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J11202,"2019-06-20 08:19:00",19-시공-02,b.시공,"공사관리 ","2019-06-20 18:22:00",19-시공-02,b.시공,"공사관리 ","0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J11203,"2019-06-20 08:20:00",18-설계-19,b.구조계산,"심의견반영 긴장력 조정 10BR 응럭부분 계산서작성","2019-06-20 18:03:00",18-설계-19,b.구조계산,"심의견반영 긴장력 조정 10BR 응럭부분 계산서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J08201,"2019-06-20 08:21:00",18-설계-16,g.업무지원,설계VE지원,"2019-06-20 19:25:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J07103,"2019-06-20 08:21:00",19-교영-01,d.기타,사업관리,"2019-06-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
J15201,"2019-06-20 08:24:00",19-교영-16,c.설계사,"과업진행현황 파악","2019-06-20 18:02:00",19-교영-16,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J18205,"2019-06-20 08:24:00",19-설계-03,c.도면,"성과품 수정","2019-06-20 21:43:00",19-설계-03,c.도면,"성과품 수정","2019-06-20 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-06-20 08:24:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 수정","2019-06-20 21:17:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 수정","2019-06-20 18:41:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10314,"2019-06-20 08:25:00",17-설계-09,h.기타,"중리교(국지도84호선) 시행견적서(입찰), 곡천교(안성~성남 2공구) 검토자료, 양근대교 거더 공사비 검토","2019-06-20 18:16:00",17-설계-09,h.기타,"곡천교(안성~성남 2공구) 검토자료, 중리교(국지도84호선) 시행견적서(입찰), 양근대교 거더 공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J16203,"2019-06-20 08:25:00",19-제조-03,a.품질검사,"산외교 ,새천2교 데크,가로보 생산품질관리","2019-06-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J14308,"2019-06-20 08:25:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작","2019-06-20 18:09:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16202,"2019-06-20 08:29:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J15307,"2019-06-20 08:35:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-20 18:00:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J07210,"2019-06-20 08:36:00",16-시공-20,g.기타,"당초 변경","2019-06-20 21:06:00",16-시공-20,g.기타,"당초 변경","2019-06-20 18:41:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15202,"2019-06-20 08:36:00",19-설계-03,b.구조계산,수량산출,"2019-06-20 21:16:00",19-설계-03,b.구조계산,수량산출,"2019-06-20 18:41:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10313,"2019-06-20 08:38:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-06-20 18:03:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
M05510,"2019-06-20 09:08:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-06-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.130.114,NULL,NULL,004C8,,,
|
|
J09101,"2019-06-20 08:49:00",19-교영-01,c.설계사,과업조사,"2019-06-20 18:18:18",NULL,NULL,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-06-20 08:50:00",16-시공-20,출장,한양,"2019-06-20 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-20 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-20 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18206,"2019-06-20 08:50:00",19-시공-01,출장,"군도4호선,선진정공","2019-06-20 18:00:00",19-시공-01,출장,"군도4호선,선진정공","0000-00-00 00:00:00",NULL,NULL,NULL,001C5,,,
|
|
J18207,"2019-06-20 08:50:00",16-시공-20,출장,"[경남 밀양시]산외교 현장점검","2019-06-20 18:00:00",16-시공-20,출장,"[경남 밀양시]산외교 현장점검","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J15301,"2019-06-20 08:50:00",15-시공-14,출장,"[전북 익산]동용교 기성 서류 제출","2019-06-20 18:00:00",15-시공-14,출장,"[전북 익산]동용교 기성 서류 제출","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
T04204,"2019-06-21 07:20:00",16-제조-02,a.생산관리,"삼남1교(주두부,측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M05510,"2019-06-21 07:23:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-06-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.131.175,NULL,NULL,004C8,,,
|
|
J18208,"2019-06-21 07:25:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-21 13:07:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-06-21 07:27:00",19-제조-03,a.품질검사,"산외교 ,새천2교 데크,가로보 생산품질관리","2019-06-21 21:23:00",19-제조-03,a.품질검사,"산외교 ,새천2교 데크,가로보 생산품질관리","2019-06-21 18:48:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18202,"2019-06-21 07:28:00",07-교영-01,b.시공사,"발주 현황 파악","2019-06-21 18:04:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-06-21 07:30:00",19-제조-02,a.생산관리,"STRONGBACK 시험체 제작","2019-06-21 18:08:00",19-제조-02,a.생산관리,"STRONGBACK 시험체 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
J07202,"2019-06-21 07:31:00",19-제조-04,b.기계,"스트롱백 실험 블럭제작과 주천2교 거푸집 보수와 함평교 분절거더 콘크리트 지원","2019-06-21 18:05:00",19-제조-04,b.기계,"스트롱백 실험 블럭제작과 주천2교 거푸집 보수와 함평교 분절거더 콘크리트 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-06-21 07:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작","2019-06-21 21:04:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작","2019-06-21 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-06-21 07:37:00",17-시공-09,b.시공,"가밴트가설 시공관련 자재제작및직원투입검토","2019-06-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.10.246,NULL,NULL,004C7,,,
|
|
J09102,"2019-06-21 07:41:00",19-계약-01,d.기타,"조령천교 한신공영 현장 방문예정, 곡천교, 조령천교 예상 시행가 등 : 남일-보은 외 4개교 계약 추진 중","2019-06-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-06-21 08:05:00",18-시공-04,b.시공,"인장계획서 작성","2019-06-21 18:04:00",18-시공-04,b.시공,"인장계획서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
B15306,"2019-06-21 08:05:00",18-관리-02,e.기타,"비서업무 외","2019-06-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10301,"2019-06-21 08:13:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-21 18:17:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10314,"2019-06-21 08:17:00",17-설계-09,h.기타,"곡천교(안성~성남 2공구) 시행가 검토자료, 중리교(국지도84호선) 시행견적서(입찰), 양근대교 거더 공사비 검토","2019-06-21 18:10:00",17-설계-09,h.기타,"곡천교(안성~성남 2공구) 시행가 검토자료, 중리교(국지도84호선) 시행견적서(입찰), 양근대교 거더 공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-06-21 08:18:00",18-설계-16,g.업무지원,설계VE지원,"2019-06-21 18:06:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-06-21 08:18:00",19-설계-03,c.도면,"성과품 수정","2019-06-21 18:08:00",19-설계-03,c.도면,"성과품 수정","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J13201,"2019-06-21 08:19:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 수정","2019-06-21 18:10:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11305,"2019-06-21 08:20:00",17-시공-09,g.기타,"스트롱백 구조검토","2019-06-21 18:06:00",17-시공-09,g.기타,"스트롱백 구조검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-06-21 08:24:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","2019-06-21 18:04:00",19-설계-03,c.도면,"1. 접속교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J18206,"2019-06-21 08:28:00",16-시공-20,b.시공,"설계 및 시공개선 사항 ","2019-06-21 18:04:00",16-시공-20,b.시공,"설계 및 시공개선 사항 ","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11202,"2019-06-21 08:28:00",19-시공-02,b.시공,"공사관리 ","2019-06-21 18:20:00",19-시공-02,b.시공,"공사관리 ","0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-06-21 08:29:00",19-설계-03,b.구조계산,수량산출,"2019-06-21 18:04:00",19-설계-03,b.구조계산,수량산출,"0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J16202,"2019-06-21 08:30:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-21 18:11:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-06-21 08:32:00",18-교영-01,c.설계사,.,"2019-06-21 18:08:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11203,"2019-06-21 08:34:00",18-설계-19,b.구조계산,"심의견반영 긴장력 조정 10BR 응럭부분 계산서작성","2019-06-21 18:06:00",18-설계-19,b.구조계산,"심의견반영 긴장력 조정 10BR 응럭부분 계산서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15201,"2019-06-21 08:34:00",19-교영-12,c.설계사,"과업진행현황 파악","2019-06-21 18:02:00",19-교영-12,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-06-21 08:37:00",16-시공-20,g.기타,"당초 변경","2019-06-21 18:06:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15301,"2019-06-21 08:39:00",16-시공-20,b.시공,"현장정산서 작성
|
|
옥산교 작업일보 작성 및 발송
|
|
원흥2교 출력일보 작성","2019-06-21 18:12:00",16-시공-20,b.시공,"현장정산서 작성
|
|
옥산교 작업일보 작성 및 발송
|
|
원흥2교 출력일보 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J10313,"2019-06-21 08:42:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-06-21 18:02:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-06-21 08:50:00",19-교영-01,c.설계사,과업조사,"2019-06-21 18:03:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-06-21 08:50:00",16-시공-20,출장,한양,"2019-06-21 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-21 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-21 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J16203,"2019-06-22 07:31:00",19-제조-03,a.품질검사,"산외교 ,새천2교 데크,가로보 생산품질관리","2019-06-22 16:39:00",19-제조-03,a.품질검사,"산외교 ,새천2교 데크,가로보 생산품질관리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
T04204,"2019-06-22 07:31:00",16-제조-02,a.생산관리,"삼남1교(주두부,측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-22 16:46:00",16-제조-02,a.생산관리,"삼남1교(주두부,측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-06-22 07:31:00",19-제조-02,a.생산관리,"공장관리 및 업무 보고","2019-06-22 16:46:00",19-제조-02,a.생산관리,"STRONGBACK 시험체 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-06-22 07:34:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-22 16:42:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M05510,"2019-06-22 07:37:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.179.142,NULL,NULL,004C8,,,
|
|
J10315,"2019-06-22 10:08:00",18-시공-03,b.시공,"가설계획서 작성
|
|
","2019-06-22 15:59:00",18-시공-03,b.시공,"가설계획서 작성
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,1,
|
|
J18208,"2019-06-24 07:18:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-24 21:03:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-24 18:57:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-06-24 07:27:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작","2019-06-24 21:16:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작","2019-06-24 18:58:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-06-24 07:29:00",19-제조-03,a.품질검사,"산외교 ,평촌교 데크 생산품질관리","2019-06-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
T04204,"2019-06-24 07:30:00",16-제조-02,a.생산관리,"삼남1교(주두부,측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-06-24 07:35:00",19-제조-04,b.기계,"1층 사무동 서고 이적과 주천2교 거푸집 보수와 함평교 분절거더 콘크리트 지원","2019-06-25 06:02:00",19-제조-04,b.기계,"1층 사무동 서고 이적과 주천2교 거푸집 보수와 함평교 분절거더 콘크리트 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-06-24 07:37:00",19-계약-01,d.기타,"검단천교 남양건설 현장 방문예정, 곡천교, 조령천교 예상 시행가 등 : 남일-보은 외 4개교 계약 추진 중","2019-06-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M02302,"2019-06-24 07:39:00",19-제조-02,a.생산관리,"산외교 철근 개선 검토 및 일정 검토","2019-06-24 18:00:00",19-제조-02,a.생산관리,"산외교 철근 개선 검토 및 일정 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-06-24 07:40:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 공사 내역 및 공사 검토
|
|
2. 업무현황 파악 및 보고","2019-06-24 18:27:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 공사 내역 및 공사 검토
|
|
2. 업무현황 파악 및 보고","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18202,"2019-06-24 07:40:00",07-교영-01,b.시공사,"발주 현황 파악","2019-06-24 18:34:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18207,"2019-06-24 07:44:00",17-시공-09,b.시공,"가밴트가설 시공관련 자재제작및직원투입검토","2019-06-24 18:35:00",17-시공-09,b.시공,"가밴트가설 시공관련 자재제작및직원투입검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18206,"2019-06-24 08:09:00",16-시공-20,b.시공,"설계 및 시공개선 사항 ","2019-06-24 18:17:00",16-시공-20,b.시공,"설계 및 시공개선 사항 ","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-06-24 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-06-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-06-24 08:14:00",18-설계-16,g.업무지원,설계VE지원,"2019-06-24 19:14:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-06-24 08:16:00",19-설계-03,h.기타,"접속교 GC라멘 거더 설계가(송산그린시티~시화멀티테크노밸리), 곡천교(안성~성남 2공구) 시행가 검토자료, 중리교(국지도84호선) 시행견적서(입찰), 양근대교 거더 공사비 검토","2019-06-24 18:23:00",19-설계-03,h.기타,"접속교 GC라멘 거더 설계가(송산그린시티~시화멀티테크노밸리), 곡천교(안성~성남 2공구) 시행가 검토자료, 중리교(국지도84호선) 시행견적서(입찰), 양근대교 거더 공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-06-24 08:19:00",19-교영-01,d.기타,사업관리,"2019-06-24 18:23:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11202,"2019-06-24 08:20:00",19-시공-02,b.시공,"공사관리 ","2019-06-24 21:01:00",19-시공-02,b.시공,"공사관리 ","2019-06-24 18:36:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J10313,"2019-06-24 08:23:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-06-24 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14306,"2019-06-24 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-24 18:14:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J09101,"2019-06-24 08:25:00",19-교영-01,c.설계사,과업조사,"2019-06-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J10301,"2019-06-24 08:26:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-24 18:50:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-06-24 08:29:00",12-설계-24,e.검토,"신장량 검토 및 도면표기","2019-06-24 20:33:00",12-설계-24,e.검토,"신장량 검토 및 도면표기","2019-06-24 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-06-24 08:29:00",16-시공-20,g.기타,"당초 변경","2019-06-24 18:06:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11203,"2019-06-24 08:32:00",18-설계-19,b.구조계산,"심의견반영 긴장력 조정 10BR 응럭부분 계산서작성","2019-06-24 20:33:00",18-설계-19,b.구조계산,"심의견반영 긴장력 조정 10BR 응럭부분 계산서작성","2019-06-24 18:31:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"18-설계-19<|>b.구조계산<|>심의견반영 긴장력 조정 10BR 솟음 연속부 계산서작성<|>02:00<|><br>16-설계-18<|>g.업무지원<|>안전보고서 관련자료작성<|>02:00<|><br>",1,
|
|
J18205,"2019-06-24 08:32:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","2019-06-24 21:44:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","2019-06-24 18:32:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-06-24 08:33:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 수정","2019-06-24 18:19:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J16202,"2019-06-24 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-24 18:11:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-06-24 08:36:00",19-교영-12,c.설계사,"과업진행현황 파악","2019-06-24 18:04:00",19-교영-12,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-06-24 08:37:00",17-시공-09,g.기타,"스트롱백 구조검토","2019-06-24 18:04:00",17-시공-09,g.기타,"스트롱백 구조검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J17205,"2019-06-24 08:50:00",18-교영-01,c.설계사,.,"2019-06-24 18:13:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
M05510,"2019-06-24 09:22:00",17-시공-09,b.시공,"spliced girder 제작 (형고=2.5M)
|
|
측경간 A L=21m~32.13M 10본 ,측경간 B L=40M 10본,중안경간 L=40M 30본
|
|
주두부 40본 L=25M
|
|
시공,안전,품질 관리
|
|
안전,품질 공사관리","2019-06-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.155.112,NULL,NULL,004C8,,,
|
|
J07202,"2019-06-12 08:50:00",19-제조-03,출장,"산외교 현장 점검","2019-06-12 18:00:00",19-제조-03,출장,"산외교 현장 점검","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J14101,"2019-06-24 08:50:00",16-시공-20,출장,한양,"2019-06-24 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-24 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-24 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-06-24 08:50:00",17-시공-10,출장,"성주대교 현장","2019-06-24 18:00:00",17-시공-10,출장,"성주대교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-06-25 06:03:00",19-제조-04,b.기계,"당진상공회의소에서 주관하는 경제조찬세미나 참석","2019-06-25 18:03:00",19-제조-04,b.기계,"당진상공회의소에서 주관하는 경제조찬세미나 참석","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-04<|>b.기계<|>스트롱백 콘크리트 블럭 해체<|>00:30<|><br>",,
|
|
J17205,"2019-06-25 07:06:00",18-교영-01,c.설계사,.,"2019-06-25 18:01:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
M02302,"2019-06-25 07:29:00",19-제조-02,a.생산관리,"산외교 철근 개선 검토 및 일정 검토","2019-06-25 18:00:00",19-제조-02,a.생산관리,"산외교 철근 개선 검토 및 일정 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-06-25 07:29:00",16-제조-02,a.생산관리,"삼남1교(주두부,측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-06-25 07:30:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J09102,"2019-06-25 07:31:00",19-계약-01,d.기타,"계룡시 국대(연산~두마) 코오롱건설 방문 예정, 상반기 결산 검토 등 : 남일-보은 외 4개교 계약 추진 중","2019-06-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J14308,"2019-06-25 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작","2019-06-25 18:01:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-06-25 07:35:00",19-제조-03,a.품질검사,"산외교 ,평촌교 가로보, 데크 생산품질관리","2019-06-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18207,"2019-06-25 07:36:00",17-시공-10,b.시공,"거더가설 시공관리 ","2019-06-25 18:21:00",17-시공-10,b.시공,"거더가설 시공관리 ","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-06-25 07:38:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 공사 내역 및 공사 검토
|
|
2. 업무현황 파악 및 보고","2019-06-25 18:06:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 공사 내역 및 공사 검토
|
|
2. 업무현황 파악 및 보고","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J11305,"2019-06-25 08:07:00",17-시공-09,g.기타,"스트롱백 구조검토","2019-06-25 18:09:00",17-시공-09,g.기타,"스트롱백 구조검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07103,"2019-06-25 08:10:00",19-교영-01,d.기타,사업관리,"2019-06-25 18:22:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J08201,"2019-06-25 08:11:00",18-설계-16,g.업무지원,설계VE지원,"2019-06-25 19:50:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-06-25 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-06-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-06-25 08:17:00",17-시공-09,g.기타,"1. 삼남1교 강가로보 횡단면도 작성","2019-06-25 21:31:00",17-시공-09,g.기타,"1. 삼남1교 강가로보 횡단면도 작성","2019-06-25 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J13201,"2019-06-25 08:21:00",14-설계-08,c.도면,"교량1교 빔배치","2019-06-25 18:03:00",12-설계-24,b.구조계산,"삼남1교 가설벤트 수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,"12-설계-24<|>c.도면<|>삼남1교 가설벤트 도면정리<|>04:00<|><br>",,
|
|
J18205,"2019-06-25 08:22:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","2019-06-25 21:40:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","2019-06-25 18:31:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J14306,"2019-06-25 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-25 18:03:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07210,"2019-06-25 08:26:00",16-시공-20,g.기타,"당초 변경","2019-06-25 18:07:00",16-시공-20,g.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10314,"2019-06-25 08:27:00",19-설계-03,h.기타,"양근대교 거더 공사비 검토, 접속교 GC라멘 거더 설계가(송산그린시티~시화멀티테크노밸리), 곡천교(안성~성남 2공구) 시행가 검토자료, 중리교(국지도84호선) 시행견적서(입찰), ","2019-06-25 18:12:00",19-설계-03,h.기타,"양근대교 거더 공사비 검토, 접속교 GC라멘 거더 설계가(송산그린시티~시화멀티테크노밸리), 곡천교(안성~성남 2공구) 시행가 검토자료, 중리교(국지도84호선) 시행견적서(입찰), ","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15202,"2019-06-25 08:29:00",12-설계-24,e.검토,"신장량 검토 및 도면표기","2019-06-25 18:30:00",12-설계-24,e.검토,"신장량 검토 및 도면표기","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J09101,"2019-06-25 08:33:00",19-교영-01,c.설계사,과업조사,"2019-06-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J11203,"2019-06-25 08:33:00",19-관리-04,g.기타,"인트라넷 정리","2019-06-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J15201,"2019-06-25 08:35:00",19-교영-16,c.설계사,"과업진행현황 파악","2019-06-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J16202,"2019-06-25 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-25 18:30:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11202,"2019-06-25 08:36:00",19-시공-02,b.시공,"공사관리 ","2019-06-25 18:31:00",19-시공-02,b.시공,"공사관리 ","0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10313,"2019-06-25 08:36:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-06-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J10301,"2019-06-25 08:30:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-25 18:18:18",NULL,NULL,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J14101,"2019-06-25 08:50:00",16-시공-20,출장,한양,"2019-06-25 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-25 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-25 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-06-25 08:50:00",17-시공-10,출장,"성주대교 현장","2019-06-25 18:00:00",17-시공-10,출장,"성주대교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18206,"2019-06-25 08:50:00",16-시공-20,출장,산외교외,"2019-06-25 18:00:00",16-시공-20,출장,산외교외,"0000-00-00 00:00:00",NULL,NULL,NULL,001C5,,,
|
|
J18202,"2019-06-25 08:50:00",07-교영-01,출장,"[전북-전주, 전남-장흥]남포~장재 (해상교량-FCM), 새남금 ~전주 고속도로 6공구(삼천교-FCM)","2019-06-25 18:00:00",07-교영-01,출장,"[전북-전주, 전남-장흥]남포~장재 (해상교량-FCM), 새남금 ~전주 고속도로 6공구(삼천교-FCM)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
T04204,"2019-06-26 07:22:00",16-제조-02,a.생산관리,"삼남1교(주두부,측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-06-26 07:27:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 공사 내역 및 공사 검토
|
|
2. 업무현황 파악 및 보고","2019-06-26 18:02:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 공사 내역 및 공사 검토
|
|
2. 업무현황 파악 및 보고","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J14308,"2019-06-26 07:31:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작","2019-06-26 18:01:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-06-26 07:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-26 18:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-06-26 07:34:00",19-제조-03,a.품질검사,"산외교 ,평촌교 가로보, 데크 생산품질관리","2019-06-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
M02302,"2019-06-26 07:34:00",19-제조-02,a.생산관리,"산외교 철근 개선 검토 및 일정 검토","2019-06-26 18:09:00",19-제조-02,a.생산관리,"산외교 철근 개선 검토 및 일정 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-06-26 07:40:00",19-계약-01,d.기타,"서부내륙민자 포스코건설 방문 예정, 상반기 결산 검토 등 : 남일-보은 외 4개교 계약 추진 중","2019-06-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-06-26 07:48:00",17-시공-09,b.시공,"가밴트설치 자재투입 및거더가설 시공관리 ,직원추가투입검토","2019-06-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.10.246,NULL,NULL,004C7,,,
|
|
J08201,"2019-06-26 08:10:00",18-설계-16,g.업무지원,설계VE지원,"2019-06-26 19:17:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-06-26 08:18:00",18-설계-05,h.기타,"곡천교(안성~성남 2공구) 시행가 검토자료, 양근대교 거더 공사비 검토, 중리교(국지도84호선) 시행견적서(입찰), 접속교 GC라멘 거더 설계가(송산그린시티~시화멀티테크노밸리)","2019-06-26 18:11:00",18-설계-05,h.기타,"곡천교(안성~성남 2공구) 시행가 검토자료, 양근대교 거더 공사비 검토, 중리교(국지도84호선) 시행견적서(입찰), 접속교 GC라멘 거더 설계가(송산그린시티~시화멀티테크노밸리)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-06-26 08:19:00",18-관리-02,e.기타,"비서업무 외","2019-06-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-06-26 08:21:00",17-시공-09,g.기타,"스트롱백 구조검토","2019-06-26 18:05:00",17-시공-09,g.기타,"스트롱백 구조검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J16202,"2019-06-26 08:22:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-26 18:08:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-06-26 08:22:00",19-교영-16,c.설계사,"과업진행현황 파악","2019-06-26 18:02:00",19-교영-16,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14306,"2019-06-26 08:25:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-26 18:09:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15307,"2019-06-26 08:26:00",17-시공-09,g.기타,"1. 삼남1교 강가로보 횡단면도 작성","2019-06-26 18:00:00",17-시공-09,g.기타,"1. 삼남1교 강가로보 횡단면도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J07103,"2019-06-26 08:27:00",19-교영-01,d.기타,사업관리,"2019-06-26 18:19:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11202,"2019-06-26 08:28:00",19-시공-02,b.시공,"공사관리 ","2019-06-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J11203,"2019-06-26 08:31:00",18-설계-19,b.구조계산,"심의의견반영 긴장력 조정 10BR 휨강도부분 계산서작성","2019-06-26 18:07:00",18-설계-19,b.구조계산,"심의견반영 긴장력 조정 10BR 휨강도부분 계산서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J13201,"2019-06-26 08:31:00",18-설계-16,c.도면,"상방림교 빔배치 변경 검토","2019-06-26 18:10:00",18-설계-16,c.도면,"상방림교 빔배치 변경 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J18205,"2019-06-26 08:32:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","2019-06-26 22:04:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","2019-06-26 19:03:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J17205,"2019-06-26 08:34:00",18-교영-01,c.설계사,.,"2019-06-26 18:02:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-06-26 08:36:00",12-설계-24,e.검토,"신장량 검토 및 도면표기","2019-06-26 20:57:00",12-설계-24,e.검토,"신장량 검토 및 도면표기","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J10313,"2019-06-26 08:44:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-06-26 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-06-26 08:57:00",19-교영-01,c.설계사,과업조사,"2019-06-26 18:04:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10301,"2019-06-26 08:50:00",17-시공-09,출장,"[경기도 과천시, 용인시]서울지방국토관리청 기성서류제출(금곡교), 삼남1교 가설벤트 납품계약서 체결","2019-06-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J14101,"2019-06-26 08:50:00",16-시공-20,출장,한양,"2019-06-26 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-26 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-26 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-06-26 08:50:00",17-시공-10,출장,"성주대교 현장","2019-06-26 18:00:00",17-시공-10,출장,"성주대교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18206,"2019-06-26 08:50:00",16-시공-20,출장,산외교외,"2019-06-26 18:00:00",16-시공-20,출장,산외교외,"0000-00-00 00:00:00",NULL,NULL,NULL,001C5,,,
|
|
J18202,"2019-06-26 08:50:00",07-교영-01,출장,"[전북-전주, 전남-장흥]남포~장재 (해상교량-FCM), 새남금 ~전주 고속도로 6공구(삼천교-FCM)","2019-06-26 18:00:00",07-교영-01,출장,"[전북-전주, 전남-장흥]남포~장재 (해상교량-FCM), 새남금 ~전주 고속도로 6공구(삼천교-FCM)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07210,"2019-06-26 08:50:00",16-시공-20,출장,"[산외교 현장]산외교 솟음관련 현장 회의","2019-06-26 18:00:00",16-시공-20,출장,"[산외교 현장]산외교 솟음관련 현장 회의","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J07202,"2019-06-27 07:08:00",19-제조-04,b.기계,"풍림천교(PTC) 거더 거푸집 보수와 주두부 블록 받침 생산","2019-06-28 07:27:00",19-제조-04,b.기계,"풍림천교(PTC) 거더 거푸집 보수와 주두부 블록 받침 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-06-27 07:23:00",07-교영-01,b.시공사,"발주현황 파악","2019-06-27 18:11:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
T04204,"2019-06-27 07:27:00",16-제조-02,a.생산관리,"삼남1교(주두부,측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-06-27 07:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작 관리","2019-06-27 21:42:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작 관리","2019-06-27 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J13308,"2019-06-27 07:37:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 공사 내역 및 공사 검토
|
|
2. 업무현황 파악 및 보고","2019-06-27 18:11:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 공사 내역 및 공사 검토
|
|
2. 업무현황 파악 및 보고","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
M02302,"2019-06-27 07:38:00",19-제조-02,a.생산관리,"STRONGBACK 시험체 제작 및 일정 검토","2019-06-27 18:03:00",19-제조-02,a.생산관리,"STRONGBACK 시험체 제작 및 일정 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-06-27 07:42:00",19-계약-01,d.기타,"코오롱건설 본사, 청라지구 유성산업 방문 예정, 상반기 결산 검토 등 : 남일-보은 외 4개교 계약 추진 중","2019-06-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-06-27 07:42:00",17-시공-09,b.시공,"가밴트설치 자재투입 및거더가설 시공관리 ,직원추가투입검토","2019-06-27 18:11:00",17-시공-09,b.시공,"가밴트설치 자재투입 및거더가설 시공관리 ,직원추가투입검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
B15306,"2019-06-27 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-06-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-06-27 08:16:00",17-시공-09,g.기타,"1. 삼남1교 강가로보 횡단면도 작성","2019-06-27 18:02:00",17-시공-09,g.기타,"1. 삼남1교 강가로보 횡단면도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J11305,"2019-06-27 08:18:00",17-시공-09,g.기타,"스트롱백 구조검토","2019-06-27 18:08:00",17-시공-09,g.기타,"스트롱백 구조검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-06-27 08:18:00",18-설계-16,g.업무지원,설계VE지원,"2019-06-27 18:12:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-06-27 08:20:00",18-설계-05,h.기타,"양근대교 거더 공사비 검토, 중리교(국지도84호선) 시행견적서(입찰), 곡천교(안성~성남 2공구) 시행가 검토자료, 접속교 GC라멘 거더 설계가(송산그린시티~시화멀티테크노밸리)","2019-06-27 18:13:00",18-설계-05,h.기타,"양근대교 거더 공사비 검토, 중리교(국지도84호선) 시행견적서(입찰), 곡천교(안성~성남 2공구) 시행가 검토자료, 접속교 GC라멘 거더 설계가(송산그린시티~시화멀티테크노밸리)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11202,"2019-06-27 08:22:00",19-시공-02,b.시공,"공사관리 ","2019-06-27 18:30:00",19-시공-02,b.시공,"공사관리 ","0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15201,"2019-06-27 08:23:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-06-27 18:06:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J16202,"2019-06-27 08:24:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-27 18:08:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-06-27 08:26:00",19-교휴-01,d.기타,"ERP data 입력","2019-06-27 18:12:00",19-교휴-01,d.기타,"ERP data 입력","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,1,
|
|
J14306,"2019-06-27 08:26:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-27 18:08:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18205,"2019-06-27 08:28:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","2019-06-27 21:53:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","2019-06-27 18:42:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-06-27 08:29:00",18-설계-16,c.도면,"상방림교 빔배치 변경 검토","2019-06-27 18:08:00",18-설계-16,c.도면,"상방림교 빔배치 변경 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J10301,"2019-06-27 08:29:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-06-27 18:35:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11203,"2019-06-27 08:32:00",18-설계-19,b.구조계산,"심의의견반영 긴장력 조정 10BR 전단강도부분 계산서작성","2019-06-27 18:06:00",18-설계-19,b.구조계산,"심의견반영 긴장력 조정 10BR 전단강도부분 계산서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J07103,"2019-06-27 08:33:00",19-교영-01,d.기타,사업관리,"2019-06-27 18:12:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J17205,"2019-06-27 08:35:00",18-교영-01,c.설계사,.,"2019-06-27 18:58:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18208,"2019-06-27 08:37:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-27 21:54:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-27 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J07210,"2019-06-27 08:37:00",14-설계-32,h.기타,"당초 변경","2019-06-27 18:07:00",14-설계-32,h.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-06-27 08:48:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-06-27 18:02:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-06-27 08:58:00",19-교영-01,c.설계사,과업조사,"2019-06-27 18:06:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J18206,"2019-06-27 08:50:00",16-시공-20,출장,산외교외,"2019-06-27 18:11:00",16-시공-20,b.시공,"산외교외 현장별 시행계획 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J16203,"2019-06-27 07:20:00",19-제조-03,a.품질검사,"산외교, 평촌교, 단장천교 데크 제작 생산관리 ,레미콘 관리","2019-06-27 22:44:00",19-제조-03,a.품질검사,"산외교 ,평촌교 가로보, 데크 생산품질관리","2019-06-27 18:35:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14101,"2019-06-27 08:50:00",16-시공-20,출장,한양,"2019-06-27 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-27 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-27 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-06-27 08:50:00",17-시공-10,출장,"성주대교 현장","2019-06-27 18:00:00",17-시공-10,출장,"성주대교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18202,"2019-06-28 07:09:00",07-교영-01,b.시공사,"발주현황 파악","2019-06-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J16203,"2019-06-28 07:21:00",19-제조-03,a.품질검사,"산외교, 새천2교, 데크 생산품질관리","2019-06-28 21:51:00",19-제조-03,a.품질검사,"산외교, 새천2교, 데크 생산품질관리","2019-06-28 18:43:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18207,"2019-06-28 07:25:00",17-시공-09,b.시공,"가밴트설치 자재투입 및거더가설 시공관리 ,직원추가투입검토","2019-06-28 18:01:00",17-시공-09,b.시공,"가밴트설치 자재투입 및거더가설 시공관리 ,직원추가투입검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18208,"2019-06-28 07:26:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-28 20:43:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-06-28 18:42:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,,
|
|
J07202,"2019-06-28 07:28:00",19-제조-04,b.기계,"풍림천교(PTC) 거더 거푸집 보수와 스트롱백 실험체 조립","2019-06-29 06:31:00",19-제조-04,b.기계,"풍림천교(PTC) 거더 거푸집 보수와 스트롱백 실험체 조립","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-06-28 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작 관리","2019-06-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J09102,"2019-06-28 07:33:00",19-계약-01,d.기타,"청라지구~북항 Pre-Deck(강교) 예상 시행가, 상반기 결산 검토 등 : 남일-보은 외 4개교 계약 추진 중","2019-06-28 18:00:00",19-계약-01,d.기타,"청라지구~북항 Pre-Deck(강교) 예상 시행가, 상반기 결산 검토 등 : 남일-보은 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
T04204,"2019-06-28 07:35:00",16-제조-02,a.생산관리,"삼남1교(주두부,측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-06-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-06-28 07:42:00",19-시공-08,b.시공,"1. 일반공사 3개소 주간업무현황보고
|
|
2. 심사분석회의자료
|
|
3. 발릭파판 노듈러 거더 검토","2019-06-28 18:07:00",19-시공-08,b.시공,"1. 일반공사 3개소 주간업무현황보고
|
|
2. 심사분석회의자료
|
|
3. 발릭파판 노듈러 거더 검토","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J07103,"2019-06-28 08:16:00",19-교영-01,d.기타,사업관리,"2019-06-28 18:10:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11305,"2019-06-28 08:22:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-06-28 18:05:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-06-28 08:23:00",18-설계-16,g.업무지원,설계VE지원,"2019-06-28 18:17:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-06-28 08:25:00",17-설계-09,h.기타,"곡천교(안성~성남 2공구) 시행가 검토자료, 양근대교 거더 공사비 검토, 중리교(국지도84호선) 시행견적서(입찰), 접속교 GC라멘 거더 설계가(송산그린시티~시화멀티테크노밸리)","2019-06-28 18:23:00",17-설계-09,h.기타,"곡천교(안성~성남 2공구) 시행가 검토자료, 양근대교 거더 공사비 검토, 중리교(국지도84호선) 시행견적서(입찰), 접속교 GC라멘 거더 설계가(송산그린시티~시화멀티테크노밸리)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15202,"2019-06-28 08:26:00",19-교휴-01,d.기타,"ERP data 입력","2019-06-28 18:05:00",19-교휴-01,d.기타,"ERP data 입력","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J14306,"2019-06-28 08:26:00",19-관리-04,a.계약,"계약, 인사 외","2019-06-28 18:04:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18205,"2019-06-28 08:27:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","2019-06-28 18:04:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J13201,"2019-06-28 08:28:00",16-시공-20,g.기타,"산외교 연속지점부가로보 거푸집 검토","2019-06-28 18:05:00",16-시공-20,g.기타,"산외교 연속지점부가로보 거푸집 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11202,"2019-06-28 08:29:00",19-시공-02,b.시공,"공사관리 ","2019-06-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J07210,"2019-06-28 08:31:00",14-설계-32,h.기타,"당초 변경","2019-06-28 18:04:00",14-설계-32,h.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J16202,"2019-06-28 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-06-28 18:19:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J18206,"2019-06-28 08:31:00",16-시공-20,b.시공,"산외교외 공사시행 방안 검토","2019-06-28 18:15:00",16-시공-20,b.시공,"산외교외 공사시행 방안 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11203,"2019-06-28 08:33:00",18-설계-19,b.구조계산,"심의의견반영 긴장력 조정 10BR 비틀림, 연속부부분 계산서작성","2019-06-28 18:04:00",18-설계-19,b.구조계산,"심의견반영 긴장력 조정 10BR 비틀림, 연속부부분 계산서작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15201,"2019-06-28 08:34:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-06-28 18:12:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15307,"2019-06-28 08:40:00",17-시공-09,g.기타,"1. 설계성과품 정리","2019-06-28 18:03:00",17-시공-09,g.기타,"1. 설계성과품 정리","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J17205,"2019-06-28 08:41:00",18-교영-01,c.설계사,.,"2019-06-28 18:16:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J09101,"2019-06-28 08:46:00",19-교영-01,c.설계사,과업조사,"2019-06-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
M05510,"2019-06-28 17:19:00",17-시공-09,b.시공,"제작 및 가설공사","2019-06-29 09:33:00",17-시공-09,b.시공,"제작 및 가설공사","0000-00-00 00:00:00",223.39.162.28,NULL,223.39.161.156,004C8,,,
|
|
J14101,"2019-06-28 08:50:00",16-시공-20,출장,한양,"2019-06-28 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-28 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-28 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-06-28 08:50:00",17-시공-10,출장,"성주대교 현장","2019-06-28 18:00:00",17-시공-10,출장,"성주대교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M02302,"2019-06-28 08:50:00",19-제조-02,출장,"[서울 한맥빌딩]기술개발센터 회의 참석 및 업무보고","2019-06-28 18:00:00",19-제조-02,출장,"[서울 한맥빌딩]기술개발센터 회의 참석 및 업무보고","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J10301,"2019-06-28 08:50:00",17-시공-09,출장,"[충남 천안시 피일레븐 제작공장]삼남1교 가설벤트 제작관련 자재검수 확인","2019-06-28 18:00:00",17-시공-09,출장,"[충남 천안시 피일레븐 제작공장]삼남1교 가설벤트 제작관련 자재검수 확인","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J07202,"2019-06-29 06:32:00",19-제조-04,b.기계,"B/P 컨베이어 안전검사 보완(풀코트, 비상정지S/W, 경고등) 설치- PLUS 전선","2019-06-29 17:54:00",19-제조-04,b.기계,"B/P 컨베이어 안전검사 보완(풀코트, 비상정지S/W, 경고등) 설치- PLUS 전선","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
M05510,"2019-06-29 09:33:00",17-시공-09,b.시공,"제작 및 가설공사","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.161.156,NULL,NULL,004C8,,,
|
|
M05510,"2019-06-30 10:38:00",17-시공-09,b.시공,"제작 및 가설공사","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.184.47,NULL,NULL,004C8,,,
|
|
J14308,"2019-07-01 07:23:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작 관리","2019-07-01 21:48:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작 관리","2019-07-01 18:45:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J13308,"2019-07-01 07:28:00",19-시공-08,b.시공,"1. 일반공사 3개소 주간업무현황보고
|
|
2. 심사분석회의자료
|
|
3. 발릭파판 노듈러 거더 검토","2019-07-01 18:06:00",19-시공-08,b.시공,"1. 일반공사 3개소 주간업무현황보고
|
|
2. 심사분석회의자료
|
|
3. 발릭파판 노듈러 거더 검토","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J07202,"2019-07-01 07:28:00",19-제조-04,b.기계,"풍림천교(PTC) 거더 거푸집 그라인더와 상하반도 홀가공","2019-07-02 07:56:00",19-제조-04,b.기계,"풍림천교(PTC) 거더 거푸집 그라인더와 상하반도 홀가공","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-04<|>b.기계<|>사무동 2층 서고 이적<|>04:00<|><br>",,
|
|
J16203,"2019-07-01 07:33:00",19-제조-03,a.품질검사,"옥산교 출하,
|
|
산외교, 새천2교, 데크 생산품질관리","2019-07-01 22:55:00",19-제조-03,a.품질검사,"성주대교 출하,
|
|
산외교, 새천2교, 데크 생산품질관리","2019-07-01 18:46:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
T04204,"2019-07-01 07:34:00",16-제조-02,a.생산관리,"삼남1교(측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-07-01 07:36:00",07-교영-01,b.시공사,"발주현황 파악","2019-07-01 18:14:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-07-01 07:36:00",19-계약-01,d.기타,"유성산업, 강산건설 방문 예정, 청라지구~북항 Pre-Deck(강교) 예상 시행가 등 : 남일-보은 외 4개교 계약 추진 중","2019-07-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-07-01 07:41:00",18-시공-15,b.시공,"가밴트설치 및거더가설 시공관리 ,일시적직원투입검토","2019-07-01 18:36:00",18-시공-15,b.시공,"가밴트설치 및거더가설 시공관리 ,일시적직원투입검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18206,"2019-07-01 08:11:00",16-시공-20,b.시공,"산외교외 공사시행 방안 검토","2019-07-01 18:31:00",16-시공-20,b.시공,"산외교외 공사시행 방안 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-07-01 08:11:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-01 18:25:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-07-01 08:17:00",18-관리-02,e.기타,"비서업무 외","2019-07-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-07-01 08:17:00",16-시공-25,g.기타,"1. 쉬스관, 철근 간섭 확인","2019-07-01 18:05:00",16-시공-25,g.기타,"1. 쉬스관, 철근 간섭 확인","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J10314,"2019-07-01 08:19:00",17-설계-09,h.기타,"무릉교(황강 남상지구) 설계견적서(특정공법심의), 중리교(국지도84호선) 시행견적서(입찰), 곡천교(안성~성남 2공구) 시행가 검토자료, 양근대교 거더 공사비 검토","2019-07-01 18:20:00",17-설계-09,h.기타,"무릉교(황강 남상지구) 설계견적서(특정공법심의), 중리교(국지도84호선) 시행견적서(입찰), 곡천교(안성~성남 2공구) 시행가 검토자료, 양근대교 거더 공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J10301,"2019-07-01 08:26:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-01 18:19:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-07-01 08:28:00",19-교휴-01,d.기타,"ERP data 입력","2019-07-01 18:03:00",19-교휴-01,d.기타,"ERP data 입력","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J10313,"2019-07-01 08:29:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-07-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J11305,"2019-07-01 08:30:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-01 18:22:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07210,"2019-07-01 08:31:00",14-설계-32,h.기타,"당초 변경","2019-07-01 18:07:00",14-설계-32,h.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11202,"2019-07-01 08:31:00",19-시공-02,b.시공,"공사관리 ","2019-07-01 18:28:00",19-시공-02,b.시공,"공사관리 ","0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15301,"2019-07-01 08:33:00",16-시공-20,b.시공,"주요자재 거래명세표 검토
|
|
원흥2교 노무비닷컴 재청구
|
|
산외교 하도급지킴이 기성 청구","2019-07-01 18:18:00",16-시공-20,b.시공,"주요자재 거래명세표 검토
|
|
원흥2교 노무비닷컴 재청구
|
|
산외교 하도급지킴이 기성 청구","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11203,"2019-07-01 08:34:00",18-설계-19,b.구조계산,"심의의견반영 긴장력 조정 10BR 거더도면 수정","2019-07-01 18:05:00",18-설계-19,b.구조계산,"심의견반영 긴장력 조정 10BR 거더도면 수정","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J16202,"2019-07-01 08:36:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-01 18:26:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-07-01 08:37:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-07-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J17205,"2019-07-01 08:37:00",18-교영-01,c.설계사,.,"2019-07-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J10309,"2019-07-01 08:38:00",17-시공-07,g.기타,"현장투입 준비
|
|
전현장 정산","2019-07-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E1,,,
|
|
J18205,"2019-07-01 08:39:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","2019-07-01 19:37:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J13201,"2019-07-01 08:40:00",16-시공-20,g.기타,"산외교 연속지점부가로보 거푸집 검토","2019-07-01 18:06:00",16-시공-20,g.기타,"산외교 연속지점부가로보 거푸집 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
M05510,"2019-07-01 09:53:00",17-시공-09,b.시공,"제작 및 가설공사","2019-07-02 14:45:00",17-시공-09,b.시공,"제작 및 가설공사","0000-00-00 00:00:00",223.62.178.63,NULL,223.39.145.42,004C8,,,
|
|
J09101,"2019-07-01 15:01:00",19-교영-01,c.설계사,과업조사,"2019-07-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14306,"2019-07-01 08:18:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-01 18:10:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J14101,"2019-07-01 08:50:00",16-시공-20,출장,한양,"2019-07-01 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-07-01 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-07-01 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-07-01 08:50:00",17-시공-10,출장,"성주대교 현장","2019-07-01 18:00:00",17-시공-10,출장,"성주대교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M02302,"2019-07-01 08:50:00",16-시공-20,출장,"[경남 밀양]Nodular Girder 생산 개선 검토","2019-07-01 18:00:00",16-시공-20,출장,"[경남 밀양]Nodular Girder 생산 개선 검토","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J18208,"2019-07-01 08:50:00",19-제조-02,출장,"[산외교(밀양)]산외교 R & D","2019-07-01 18:00:00",19-제조-02,출장,"[산외교(밀양)]산외교 R & D","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J16203,"2019-07-02 07:12:00",19-제조-03,a.품질검사,"옥산교. 평촌교 출하,
|
|
산외교, 새천2교, 데크 생산품질관리","2019-07-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18202,"2019-07-02 07:22:00",07-교영-01,b.시공사,"발주현황 파악","2019-07-02 18:14:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J14308,"2019-07-02 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
- PTC 분절거더 제작 관리","2019-07-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J09102,"2019-07-02 07:32:00",19-계약-01,d.기타,"유창ENC 방문 예정, 검암2교, 수직교 등 예상 계약가 등 : 남일-보은 외 4개교 계약 추진 중","2019-07-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-07-02 07:41:00",17-시공-09,b.시공,"가밴트설치 및거더가설 시공관리 ,일시적직원투입검토","2019-07-02 18:24:00",17-시공-09,b.시공,"가밴트설치 및거더가설 시공관리 ,일시적직원투입검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J15307,"2019-07-02 07:54:00",16-시공-25,g.기타,"1. 쉬스관, 철근 간섭 확인","2019-07-02 21:17:00",16-시공-25,g.기타,"1. 쉬스관, 철근 간섭 확인","2019-07-02 18:53:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J07202,"2019-07-02 07:57:00",19-제조-04,b.기계,"신포2천1교(PTC) 거더 거푸집 그라인더와 사무동 서고 이적","2019-07-02 18:40:00",19-제조-04,b.기계,"신포2천1교(PTC) 거더 거푸집 그라인더와 사무동 서고 이적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18206,"2019-07-02 07:59:00",16-시공-20,b.시공,"산외교외 공사시행 방안 검토","2019-07-02 18:47:00",16-시공-20,b.시공,"산외교외 공사시행 방안 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J07103,"2019-07-02 08:08:00",19-교영-01,d.기타,사업관리,"2019-07-02 18:23:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J09101,"2019-07-02 08:11:00",19-교영-01,c.설계사,과업조사,"2019-07-02 18:07:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15301,"2019-07-02 08:12:00",16-시공-20,b.시공,"주요자재 거래명세표 검토
|
|
원흥2교 노무비닷컴 재청구
|
|
산외교 하도급지킴이 기성 청구","2019-07-02 18:04:00",16-시공-20,b.시공,"주요자재 거래명세표 검토
|
|
원흥2교 노무비닷컴 재청구
|
|
산외교 하도급지킴이 기성 청구","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J08201,"2019-07-02 08:13:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J11305,"2019-07-02 08:13:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-02 18:08:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15201,"2019-07-02 08:15:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-07-02 18:07:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10314,"2019-07-02 08:15:00",18-설계-08,h.기타,"오산교(함양~창녕9공구) 시행견적서, 무릉교(황강 남상지구) 설계견적서(특정공법심의), 중리교(국지도84호선) 시행견적서(입찰), 곡천교(안성~성남 2공구) 시행가 검토자료","2019-07-02 18:21:00",18-설계-08,h.기타,"오산교(함양~창녕9공구) 시행견적서, 무릉교(황강 남상지구) 설계견적서(특정공법심의), 중리교(국지도84호선) 시행견적서(입찰), 곡천교(안성~성남 2공구) 시행가 검토자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14306,"2019-07-02 08:18:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J13201,"2019-07-02 08:19:00",16-시공-20,g.기타,"산외교 연속지점부가로보 거푸집 검토","2019-07-02 18:10:00",16-시공-20,g.기타,"산외교 연속지점부가로보 거푸집 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J18205,"2019-07-02 08:21:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","2019-07-02 21:57:00",18-설계-01,e.검토,"DR Girder 단면 개선 자료정리","2019-07-02 18:53:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J10301,"2019-07-02 08:22:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J16202,"2019-07-02 08:22:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-02 18:11:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-07-02 08:25:00",18-설계-19,d.산출서,"심의의견반영 긴장력 조정 10BR 수량산출서 수정","2019-07-02 18:05:00",18-설계-19,d.산출서,"심의의견반영 긴장력 조정 10BR 수량산출서 수정","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-09<|>g.기타<|>전도방지시설 설치 구조검토서 작성<|>05:00<|><br>",,
|
|
J15202,"2019-07-02 08:26:00",19-교휴-01,d.기타,"ERP data 입력","2019-07-02 18:45:00",19-교휴-01,d.기타,"ERP data 입력","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J10313,"2019-07-02 08:26:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-07-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J07210,"2019-07-02 08:26:00",14-설계-32,h.기타,"당초 변경","2019-07-02 20:40:00",14-설계-32,h.기타,"당초 변경","2019-07-02 18:37:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J17205,"2019-07-02 08:29:00",18-교영-01,c.설계사,.,"2019-07-02 18:09:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
B15306,"2019-07-02 08:25:00",18-관리-02,e.기타,"비서업무 외","2019-07-02 18:18:18",NULL,NULL,"비서업무 외","0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
T04204,"2019-07-02 13:58:00",16-제조-02,a.생산관리,"삼남1교(측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-07-02 14:01:00",19-시공-08,b.시공,"1. 일반공사 3개소 주간업무현황보고
|
|
2. 심사분석회의자료
|
|
3. 발릭파판 노듈러 거더 검토","2019-07-02 18:11:00",19-시공-08,b.시공,"1. 일반공사 3개소 주간업무현황보고
|
|
2. 심사분석회의자료
|
|
3. 발릭파판 노듈러 거더 검토","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
M05510,"2019-07-02 14:45:00",17-시공-09,b.시공,"제작 및 가설공사","2019-07-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.145.42,NULL,NULL,004C8,,,
|
|
J14101,"2019-07-02 08:50:00",16-시공-20,출장,한양,"2019-07-02 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-07-02 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-07-02 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-07-02 08:50:00",17-시공-10,출장,"성주대교 현장","2019-07-02 18:00:00",17-시공-10,출장,"성주대교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M02302,"2019-07-02 08:50:00",16-시공-20,출장,"[경남 밀양]Nodular Girder 생산 개선 검토","2019-07-02 18:00:00",16-시공-20,출장,"[경남 밀양]Nodular Girder 생산 개선 검토","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J18208,"2019-07-02 08:50:00",19-제조-02,출장,"[산외교(밀양)]산외교 R & D","2019-07-02 18:00:00",19-제조-02,출장,"[산외교(밀양)]산외교 R & D","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J11202,"2019-07-02 08:50:00",17-시공-09,출장,"[충남 당진시]삼남1교 스트롱백 시험시공","2019-07-02 18:00:00",17-시공-09,출장,"[충남 당진시]삼남1교 스트롱백 시험시공","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J14101,"2019-06-06 08:50:00",16-시공-20,출장,한양,"2019-06-06 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-06-06 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-06-06 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11302,"2019-06-06 08:50:00",18-시공-15,출장,"[고양시 덕양구 화정동]원흥2교 밴트기초 거푸집 해체","2019-06-06 18:00:00",18-시공-15,출장,"[고양시 덕양구 화정동]원흥2교 밴트기초 거푸집 해체","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J10315,"2019-06-06 08:50:00",16-시공-41,출장,"옥산교 현장","2019-06-06 18:00:00",16-시공-41,출장,"옥산교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10315,"2019-06-07 08:50:00",16-시공-41,출장,"옥산교 현장","2019-06-07 18:00:00",16-시공-41,출장,"옥산교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M02302,"2019-06-11 08:50:00",19-제조-03,출장,"[경남 밀양]산외교 현장 점검","2019-06-11 18:00:00",19-제조-03,출장,"[경남 밀양]산외교 현장 점검","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
M02302,"2019-06-12 08:50:00",19-제조-03,출장,"[경남 밀양]산외교 현장 점검","2019-06-12 18:00:00",19-제조-03,출장,"[경남 밀양]산외교 현장 점검","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J16203,"2019-06-18 08:50:00",19-제조-03,출장,"[아산(실크로즈 연구소)]고강도 및 준조강 시멘트 배합설계","2019-06-18 18:00:00",19-제조-03,출장,"[아산(실크로즈 연구소)]고강도 및 준조강 시멘트 배합설계","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J18208,"2019-06-19 08:50:00",19-제조-02,출장,"[성주대교(대구시 달성군 하빈면)]성주대교 가설벤트 측량","2019-06-19 18:00:00",19-제조-02,출장,"[성주대교(대구시 달성군 하빈면)]성주대교 가설벤트 측량","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J18208,"2019-06-20 08:50:00",19-제조-02,출장,"[성주대교(대구시 달성군 하빈면)]성주대교 가설벤트 측량","2019-06-20 18:00:00",19-제조-02,출장,"[성주대교(대구시 달성군 하빈면)]성주대교 가설벤트 측량","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J17205,"2019-06-20 08:50:00",19-교영-01,출장,"[평택시 박람회장]경기도 신기술 박람회 참석","2019-06-20 18:00:00",19-교영-01,출장,"[평택시 박람회장]경기도 신기술 박람회 참석","0000-00-00 00:00:00",NULL,NULL,NULL,008E2,,,
|
|
J18207,"2019-07-03 07:31:00",17-시공-09,b.시공,"가밴트설치 및거더가설 시공관리 ,일시적직원투입검토 당진공장시험시공예정","2019-07-03 09:28:00",17-시공-09,b.시공,"가밴트설치 및거더가설 시공관리 ,일시적직원투입검토 당진공장시험시공예정","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-07-03 07:31:00",19-시공-08,b.시공,"1. 일반공사 3개소 주간업무현황보고
|
|
2. 심사분석회의자료
|
|
3. 발릭파판 노듈러 거더 검토","2019-07-03 20:51:00",19-시공-08,b.시공,"1. 일반공사 3개소 주간업무현황보고
|
|
2. 심사분석회의자료
|
|
3. 발릭파판 노듈러 거더 검토","2019-07-03 18:47:00",172.16.8.170,172.16.8.170,172.16.8.170,004E3,,1,
|
|
J14308,"2019-07-03 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-03 22:14:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-03 18:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-07-03 07:33:00",16-제조-02,a.생산관리,"삼남1교(측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-03 21:27:00",16-제조-02,a.생산관리,"삼남1교(측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-07-03 07:35:00",19-제조-03,a.품질검사,"삼간교,옥산교출하,
|
|
산외교, 새천2교, 데크 생산품질관리","2019-07-03 21:45:00",19-제조-03,a.품질검사,"삼간교,옥산교출하,
|
|
산외교, 새천2교, 데크 생산품질관리","2019-07-03 18:38:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18202,"2019-07-03 07:38:00",07-교영-01,b.시공사,"발주현황 파악","2019-07-03 18:04:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-07-03 07:51:00",19-계약-01,d.기타,"화웅지구 한신공영 방문 예정, 검암2교, 수직교 등 예상 계약가 등 : 남일-보은 외 4개교 계약 추진 중","2019-07-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
B15306,"2019-07-03 07:56:00",18-관리-02,e.기타,"비서업무 외","2019-07-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-07-03 08:11:00",18-설계-19,c.도면,"승천천교 슬래브 도면 수정","2019-07-03 18:00:00",18-설계-19,c.도면,"승천천교 슬래브 도면 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J08201,"2019-07-03 08:14:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-03 18:17:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-07-03 08:16:00",19-교영-04,c.설계사,"도림1육교 모델링","2019-07-03 21:32:00",19-교영-04,c.설계사,"도림1육교 모델링","2019-07-03 18:52:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J11305,"2019-07-03 08:17:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J10314,"2019-07-03 08:18:00",18-설계-08,h.기타,"곡천교(안성~성남 2공구) 시행가 검토자료, DR거더(국도34호선 안동상리지구) 설계견적서(특정공법심의), 오산교(함양~창녕9공구) 시행견적서, 무릉교(황강 남상지구) 설계견적서(특정공법심의)","2019-07-03 18:05:00",18-설계-08,h.기타,"DR거더(국도34호선 안동상리지구) 설계견적서(특정공법심의), 오산교(함양~창녕9공구) 시행견적서, 무릉교(황강 남상지구) 설계견적서(특정공법심의), 곡천교(안성~성남 2공구) 시행가 검토자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J16202,"2019-07-03 08:29:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-03 18:12:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-07-03 08:29:00",14-설계-08,b.구조계산,"#1교 구조계산","2019-07-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.155,NULL,NULL,008E1,"19-설계-03<|>a.계획 및 협의<|>합사방문. 수정사항 및 가설방법 협의<|>04:00<|><br>",,
|
|
J13201,"2019-07-03 08:32:00",16-시공-20,g.기타,"산외교 연속지점부가로보 거푸집 검토","2019-07-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E2,,,
|
|
J11203,"2019-07-03 08:33:00",18-설계-19,d.산출서,"심의의견반영 승천천교 세종방향 방음벽측 슬래브높이 변경요구로 철근량 수정","2019-07-03 18:05:00",18-설계-19,d.산출서,"심의의견반영 승천천교 세종방향 방음벽측 슬래브높이 변경요구로 철근량 수정","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"16-설계-18<|>h.기타<|>동부eng 안전보고서 관련서류처리<|>02:00<|><br>17-시공-09<|>g.기타<|> 전도방지시설 설치 구조검토서 작성 <|>04:00<|><br>",,
|
|
J17205,"2019-07-03 08:35:00",18-교영-01,c.설계사,.,"2019-07-03 18:06:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-07-03 08:37:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-07-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15201,"2019-07-03 08:37:00",19-교영-14,c.설계사,"과업진행현황 파악","2019-07-03 18:03:00",19-교영-14,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14306,"2019-07-03 08:41:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-03 18:45:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07210,"2019-07-03 08:42:00",14-설계-32,h.기타,"당초 변경","2019-07-03 18:14:00",14-설계-32,h.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15301,"2019-07-03 08:43:00",16-시공-20,b.시공,"주요자재 거래명세표 검토
|
|
원흥2교 노무비닷컴 재청구","2019-07-03 18:03:00",16-시공-20,b.시공,"주요자재 거래명세표 검토
|
|
원흥2교 노무비닷컴 재청구","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-07-03 09:02:00",19-교영-01,c.설계사,과업조사,"2019-07-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J18206,"2019-07-03 08:50:00",19-제조-04,출장,당진공장,"2019-07-03 18:16:00",16-시공-20,b.시공,"산외교외 공사시행 방안 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J14101,"2019-07-03 08:50:00",16-시공-20,출장,한양,"2019-07-03 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-07-03 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-07-03 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-07-03 08:50:00",17-시공-10,출장,"성주대교 현장","2019-07-03 18:00:00",17-시공-10,출장,"성주대교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M02302,"2019-07-03 08:50:00",16-시공-20,출장,"[경남 밀양]Nodular Girder 생산 개선 검토","2019-07-03 18:00:00",16-시공-20,출장,"[경남 밀양]Nodular Girder 생산 개선 검토","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J18208,"2019-07-03 08:50:00",19-제조-02,출장,"[산외교(밀양)]산외교 R & D","2019-07-03 18:00:00",19-제조-02,출장,"[산외교(밀양)]산외교 R & D","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J11202,"2019-07-03 08:50:00",17-시공-09,출장,"[충남 당진시]삼남1교 스트롱백 시험시공","2019-07-03 18:00:00",17-시공-09,출장,"[충남 당진시]삼남1교 스트롱백 시험시공","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J07103,"2019-07-03 08:50:00",13-시공-13,출장,당진본사,"2019-07-03 18:00:00",13-시공-13,출장,당진본사,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J18202,"2019-07-04 07:21:00",07-교영-01,b.시공사,"발주현황 파악","2019-07-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J13308,"2019-07-04 07:30:00",19-시공-08,b.시공,"1. 일반공사 3개소 주간업무현황보고
|
|
2. 심사분석회의자료
|
|
3. 발릭파판 노듈러 거더 검토","2019-07-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
J09102,"2019-07-04 07:30:00",19-계약-01,d.기타,"조령천교 한신공영 방문 예정, 조령천교 등 예상 계약가 등 : 남일-보은 외 4개교 계약 추진 중","2019-07-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
T04204,"2019-07-04 07:32:00",16-제조-02,a.생산관리,"삼남1교(측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-07-04 07:32:00",18-시공-15,b.시공,"거더가설 시공관리 ,일시적직원투입검토 당진공장시험시공예정","2019-07-04 18:03:00",18-시공-15,b.시공,"거더가설 시공관리 ,일시적직원투입검토 당진공장시험시공예정","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-07-04 07:40:00",19-제조-03,a.품질검사,"삼간교,옥산교출하,
|
|
산외교, 새천2교, 데크 생산품질관리","2019-07-04 20:36:00",19-제조-03,a.품질검사,"삼간교,옥산교출하,
|
|
산외교, 새천2교, 데크 생산품질관리","2019-07-04 18:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14308,"2019-07-04 07:41:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-04 22:26:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-04 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18206,"2019-07-04 08:08:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-04 18:19:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-07-04 08:11:00",18-설계-19,c.도면,"승천천교 슬래브 도면 수정","2019-07-04 18:01:00",18-설계-19,c.도면,"승천천교 슬래브 도면 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J08201,"2019-07-04 08:12:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-04 18:07:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-07-04 08:14:00",17-설계-09,h.기타,"DR거더(국도34호선 안동상리지구) 설계견적서(특정공법심의), 오산교(함양~창녕9공구) 시행견적서, 무릉교(황강 남상지구) 설계견적서(특정공법심의), 곡천교(안성~성남 2공구) 시행가 검토자료","2019-07-04 19:52:00",17-설계-09,h.기타,"DR거더(국도34호선 안동상리지구) 설계견적서(특정공법심의), 오산교(함양~창녕9공구) 시행견적서, 무릉교(황강 남상지구) 설계견적서(특정공법심의), 곡천교(안성~성남 2공구) 시행가 검토자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-07-04 08:15:00",18-관리-02,e.기타,"비서업무 외","2019-07-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-07-04 08:19:00",19-교영-01,d.기타,사업관리,"2019-07-04 18:01:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18205,"2019-07-04 08:22:00",19-교영-04,c.설계사,"도림1육교 모델링","2019-07-04 18:05:00",19-교영-04,c.설계사,"도림1육교 모델링","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J13201,"2019-07-04 08:22:00",16-시공-20,g.기타,"산외교 연속지점부가로보 거푸집 검토","2019-07-04 18:05:00",16-시공-20,g.기타,"산외교 연속지점부가로보 거푸집 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J10315,"2019-07-04 08:27:00",17-설계-09,"a.계획 및 협의","제작 및 가설협의자료 작성","2019-07-04 18:18:00",17-설계-09,"a.계획 및 협의","제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J11202,"2019-07-04 08:29:00",19-시공-02,b.시공,공사관리,"2019-07-04 18:30:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14306,"2019-07-04 08:30:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-04 18:04:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07210,"2019-07-04 08:34:00",14-설계-32,h.기타,"당초 변경","2019-07-04 20:43:00",14-설계-32,h.기타,"당초 변경","2019-07-04 18:41:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15301,"2019-07-04 08:36:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
원흥2교 가로보 철근 수량 산출","2019-07-04 18:15:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
원흥2교 가로보 철근 수량 산출","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11203,"2019-07-04 08:38:00",17-시공-09,g.기타,"전도방지공 검토의견서 작성","2019-07-04 18:07:00",17-시공-09,g.기타,"전동방지공 검토의견서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-설계-02<|>h.기타<|>단경간 강선긴장력 조절(75-70 -> 73-66) 구조계산서 재작성<|>04:00<|><br>",,
|
|
J09101,"2019-07-04 08:40:00",19-교영-01,c.설계사,과업조사,"2019-07-04 18:01:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10313,"2019-07-04 08:40:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-07-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J17205,"2019-07-04 08:41:00",18-교영-01,c.설계사,.,"2019-07-04 19:08:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-07-04 08:41:00",19-교영-14,c.설계사,"과업진행현황 파악","2019-07-04 18:01:00",19-교영-14,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-07-04 08:41:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-04 18:06:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J16202,"2019-07-04 08:46:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-04 18:13:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-07-04 08:47:00",14-설계-08,b.구조계산,"#1교 구조계산","2019-07-04 18:04:00",14-설계-08,b.구조계산,"#1교 구조계산","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"12-설계-24<|>e.검토<|>삼남1교 신장량 검토<|>03:00<|><br>",,
|
|
J14101,"2019-07-04 08:50:00",16-시공-20,출장,한양,"2019-07-04 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-07-04 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-07-04 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M02302,"2019-07-04 08:50:00",16-시공-20,출장,"[경남 밀양]Nodular Girder 생산 개선 검토","2019-07-04 18:00:00",16-시공-20,출장,"[경남 밀양]Nodular Girder 생산 개선 검토","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J14308,"2019-07-05 07:15:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J13308,"2019-07-05 07:20:00",19-시공-08,b.시공,"1. 일반공사 3개소 주간업무현황보고
|
|
2. 심사분석회의자료
|
|
3. 발릭파판 노듈러 거더 검토","2019-07-05 18:02:00",19-시공-08,b.시공,"1. 일반공사 3개소 주간업무현황보고
|
|
2. 심사분석회의자료
|
|
3. 발릭파판 노듈러 거더 검토","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18207,"2019-07-05 07:27:00",16-시공-20,b.시공,"시공사 실정보고예산검토 및 개선사항정리","2019-07-05 18:04:00",16-시공-20,b.시공,"시공사 실정보고예산검토 및 개선사항정리","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
T04204,"2019-07-05 07:31:00",16-제조-02,a.생산관리,"삼남1교(측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09102,"2019-07-05 07:43:00",19-계약-01,d.기타,"포스코 본사, 유성산업 현장 방문 예정, 곡천교, 조령천교 등 예상 계약가 등 : 남일-보은 외 4개교 계약 추진 중","2019-07-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-07-05 07:53:00",19-제조-03,a.품질검사,"단장천 출하
|
|
산외교, 새천2교, 데크 생산품질관리","2019-07-05 22:27:00",19-제조-03,a.품질검사,"단장천 출하
|
|
산외교, 새천2교, 데크 생산품질관리","2019-07-05 19:04:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
B15306,"2019-07-05 07:53:00",18-관리-02,e.기타,"비서업무 외","2019-07-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-07-05 07:54:00",19-교영-01,d.기타,사업관리,"2019-07-05 17:37:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11305,"2019-07-05 08:08:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-05 18:05:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10314,"2019-07-05 08:11:00",15-설계-12,h.기타,"지경천교 (포항~영덕 3공구) 가설검토, DR거더(국도34호선 안동상리지구) 설계견적서(특정공법심의), 오산교(함양~창녕9공구) 시행견적서, 무릉교(황강 남상지구) 설계견적서(특정공법심의), 곡천교(안성~성남 2공구) 시행가 검토자료","2019-07-05 18:10:00",15-설계-12,h.기타,"지경천교 (포항~영덕 3공구) 가설검토, DR거더(국도34호선 안동상리지구) 설계견적서(특정공법심의), 오산교(함양~창녕9공구) 시행견적서, 무릉교(황강 남상지구) 설계견적서(특정공법심의), 곡천교(안성~성남 2공구) 시행가 검토자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15307,"2019-07-05 08:13:00",18-설계-19,c.도면,"승천천교 슬래브 도면 수정","2019-07-05 18:02:00",18-설계-19,c.도면,"승천천교 슬래브 도면 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J08201,"2019-07-05 08:13:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-05 18:07:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-07-05 08:22:00",19-교영-04,c.설계사,"도림1육교 모델링","2019-07-05 18:04:00",19-교영-04,c.설계사,"도림1육교 모델링","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J13201,"2019-07-05 08:22:00",14-설계-08,c.도면,"슬래브 일반도 수정","2019-07-05 18:04:00",16-시공-20,g.기타,"산외교 연속지점부가로보 거푸집 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15202,"2019-07-05 08:25:00",14-설계-08,b.구조계산,"#1교 구조계산","2019-07-05 18:02:00",14-설계-08,b.구조계산,"#1교 구조계산","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"12-설계-24<|>e.검토<|>삼남1교 유효프리스트레스 검토<|>02:30<|><br>",,
|
|
J16202,"2019-07-05 08:25:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-05 18:03:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14306,"2019-07-05 08:25:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J11202,"2019-07-05 08:28:00",19-시공-02,b.시공,공사관리,"2019-07-05 18:10:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15201,"2019-07-05 08:29:00",19-교영-12,c.설계사,"과업진행현황 파악","2019-07-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J17205,"2019-07-05 08:29:00",18-교영-01,c.설계사,.,"2019-07-05 18:09:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11203,"2019-07-05 08:30:00",17-시공-09,g.기타,"전도방지공 검토의견서 작성","2019-07-05 18:03:00",17-시공-09,g.기타,"전도방지공 검토의견서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"16-설계-18<|>h.기타<|>8/9공구 동부ENG 안전보고서 공문 발송<|>00:30<|><br>17-설계-16<|>h.기타<|>도화육교 성과품수정 후 KCI 송부<|>02:00<|><br>",,
|
|
J07210,"2019-07-05 08:31:00",14-설계-32,h.기타,"당초 변경","2019-07-05 18:04:00",14-설계-32,h.기타,"당초 변경","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-07-05 08:42:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-07-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15301,"2019-07-05 08:45:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
원흥2교 가로보 철근 수량 산출","2019-07-05 18:01:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
원흥2교 가로보 철근 수량 산출","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-07-05 08:50:00",19-교영-01,c.설계사,과업조사,"2019-07-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-07-05 08:50:00",16-시공-20,출장,한양,"2019-07-05 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-07-05 08:50:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","2019-07-05 18:00:00",17-시공-08,출장,"[충남 당진]런처제작, 조립, 재하시험준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M02302,"2019-07-05 08:50:00",16-시공-20,출장,"[경남 밀양]Nodular Girder 생산 개선 검토","2019-07-05 18:00:00",16-시공-20,출장,"[경남 밀양]Nodular Girder 생산 개선 검토","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J10315,"2019-07-05 08:50:00",18-시공-03,출장,"왕림교 가설협의","2019-07-05 18:00:00",18-시공-03,출장,"왕림교 가설협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10315,"2019-07-06 09:09:00",18-시공-04,b.시공,"가설계획서 및 관련기관 의자료 자료작성","2019-07-06 16:21:00",18-시공-04,b.시공,"가설계획서 및 관련기관 의자료 자료작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,1,
|
|
J10315,"2019-07-07 14:04:00",17-시공-21,b.시공,"북수원2교 가설계획서 및 인장계획서 작성","2019-07-07 16:17:00",17-시공-21,b.시공,"북수원2교 가설계획서 및 인장계획서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,1,
|
|
J07202,"2019-07-08 07:05:00",19-제조-04,b.기계,"신포2천1교(PTC) INVERTED-T 거푸집 상차와 사무실 서고 이적","2019-07-09 06:15:00",19-제조-04,b.기계,"신포2천1교(PTC) INVERTED-T 거푸집 상차와 사무실 서고 이적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-04<|>b.기계<|>단장천2교 런처 자재 입고 하역<|>01:30<|><br>",,
|
|
T04204,"2019-07-08 07:23:00",16-제조-02,a.생산관리,"풍림천교,성주대교(측,중앙경간),삼남1교(측중앙경간,함양),점접 철근 생산, 평촌교,삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-07-08 07:31:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-08 21:17:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-08 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18208,"2019-07-08 07:31:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-08 22:03:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-08 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-07-08 07:43:00",19-계약-01,d.기타,"코오롱글로벌 본사, 방문 예정, 곡천교, 조령천교 등 예상 계약가 등 : 남일-보은 외 4개교 계약 추진 중","2019-07-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18202,"2019-07-08 07:49:00",07-교영-01,b.시공사,"발주현황 파악","2019-07-08 18:09:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J11202,"2019-07-08 07:58:00",19-시공-02,b.시공,공사관리,"2019-07-08 18:35:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18206,"2019-07-08 08:09:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-08 18:30:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-07-08 08:11:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-08 18:06:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-07-08 08:11:00",18-설계-19,c.도면,"승천천교 슬래브 도면 수정","2019-07-08 21:31:00",18-설계-19,c.도면,"승천천교 슬래브 도면 수정","2019-07-08 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
B15306,"2019-07-08 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-07-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-07-08 08:14:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-08 18:03:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10314,"2019-07-08 08:26:00",15-설계-12,h.기타,"보덕교(세종~안성, 오송3교) 빔런처가설 설계가, R-A1교(회덕IC 연결도로) 설계견적서(특정공법심의), 지경천교 (포항~영덕 3공구) 가설검토, 곡천교(안성~성남 2공구)시행견적서","2019-07-08 18:39:00",15-설계-12,h.기타,"R-A1교(회덕IC 연결도로) 설계견적서(특정공법심의), 보덕교(세종~안성, 오송3교) 빔런처가설 설계가, 지경천교 (포항~영덕 3공구) 가설검토, 곡천교(안성~성남 2공구)시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15202,"2019-07-08 08:28:00",14-설계-08,b.구조계산,"#1교 구조계산","2019-07-08 20:34:00",14-설계-08,b.구조계산,"#1교 구조계산","2019-07-08 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"12-설계-24<|>e.검토<|>삼남1교 유효프리스트레스 검토<|>02:00<|><br>",1,
|
|
J18205,"2019-07-08 08:30:00",17-설계-09,e.검토,"Spliced Girder 성과품 비교 검토
|
|
","2019-07-08 21:30:00",17-설계-09,e.검토,"Spliced Girder 성과품 비교 검토
|
|
","2019-07-08 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-07-08 08:30:00",14-설계-08,c.도면,"슬래브 배근도 수정","2019-07-08 18:06:00",16-시공-20,g.기타,"산외교 연속지점부가로보 거푸집 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11203,"2019-07-08 08:32:00",19-설계-03,b.구조계산,"종점부 라멘 계산서수정(설계사요청)","2019-07-08 20:33:00",19-설계-03,b.구조계산,"종점부 라멘 계산서수정(설계사요청)","2019-07-08 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"18-설계-16<|>f.보고서 및 시방서<|>시방서 수정(Pre-Deck부분 삭제)<|>01:00<|><br>",1,
|
|
J15201,"2019-07-08 08:38:00",19-교영-12,c.설계사,"과업진행현황 파악","2019-07-08 18:03:00",19-교영-12,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-07-08 08:38:00",18-교영-01,c.설계사,.,"2019-07-08 18:33:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J16202,"2019-07-08 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-08 18:30:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10313,"2019-07-08 08:39:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-08 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-07-08 08:42:00",19-교영-01,c.설계사,과업조사,"2019-07-08 18:24:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14306,"2019-07-08 08:30:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-08 18:14:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
M05510,"2019-07-08 18:37:00",17-시공-09,b.시공,"Spliced PSC Girder 제작 및 가설공사
|
|
경간부 50본
|
|
주두부 40본
|
|
가설벤트 1번~8번 /2회 설치
|
|
공무,공사,안전,품질 관리","2019-07-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.150.197,NULL,NULL,004C8,,,
|
|
J14101,"2019-07-08 08:50:00",16-시공-20,출장,한양,"2019-07-08 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-07-08 08:50:00",18-시공-15,출장,"원흥2교 현장","2019-07-08 18:00:00",18-시공-15,출장,"원흥2교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07103,"2019-07-08 08:50:00",16-시공-20,출장,"산외교 출장","2019-07-08 18:00:00",16-시공-20,출장,"산외교 출장","0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J13308,"2019-07-08 08:50:00",19-교휴-06,경유,"경유(원흥2교 가설 장비서류 제출)","2019-07-08 18:00:00",19-교휴-06,경유,"경유(원흥2교 가설 장비서류 제출)","0000-00-00 00:00:00",NULL,NULL,NULL,004E3,,,
|
|
J18207,"2019-07-08 08:50:00",16-시공-20,출장,"[경남 밀양시]산외교 점검","2019-07-08 18:00:00",16-시공-20,출장,"[경남 밀양시]산외교 점검","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07210,"2019-07-08 08:50:00",14-설계-32,출장,"[산외교 현장]대책회의","2019-07-08 18:00:00",14-설계-32,출장,"[산외교 현장]대책회의","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J16203,"2019-07-08 08:50:00",19-제조-03,출장,"[산외교(밀양)]콘크리트배헙 확인, 강도 레미콘 원재료 확인","2019-07-08 18:00:00",19-제조-03,출장,"[산외교(밀양)]콘크리트배헙 확인, 강도 레미콘 원재료 확인","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J07202,"2019-07-09 06:17:00",19-제조-04,b.기계,"가산2교 거푸집(H2.0) 보수와 배수로 및 L동 사면 토사정리","2019-07-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-07-09 07:30:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-09 20:37:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-09 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-07-09 07:32:00",16-제조-02,a.생산관리,"풍림천교,성주대교(측,중앙경간),점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-07-09 07:34:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-09 20:38:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-09 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18202,"2019-07-09 07:36:00",07-교영-01,b.시공사,"발주현황 파악","2019-07-09 18:15:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-07-09 07:39:00",19-계약-01,d.기타,"계룡건설 방문(시화분기점, 문산~도라산1 관련),조령천교, Ramp-B~E교 예상 계약가 등 : 남일-보은 외 4개교 계약 추진 중","2019-07-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
B15306,"2019-07-09 08:06:00",18-관리-02,e.기타,"비서업무 외","2019-07-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-07-09 08:12:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-09 18:31:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-07-09 08:13:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-09 18:40:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-07-09 08:13:00",17-설계-09,e.검토,"Spliced Girder 성과품 비교 검토
|
|
","2019-07-09 19:45:00",17-설계-09,e.검토,"Spliced Girder 성과품 비교 검토
|
|
","2019-07-09 18:36:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15307,"2019-07-09 08:14:00",17-설계-15,c.도면,"#1교 도면 수정","2019-07-10 08:10:00",17-설계-15,c.도면,"#1교 도면 수정","2019-07-09 18:36:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10314,"2019-07-09 08:17:00",15-설계-12,h.기타,"지경천교 (포항~영덕 3공구) 가설검토, R-A1교(회덕IC 연결도로) 설계견적서(특정공법심의), 보덕교(세종~안성, 오송3교) 빔런처가설 설계가, 곡천교(안성~성남 2공구)시행견적서","2019-07-09 18:19:00",15-설계-12,h.기타,"지경천교 (포항~영덕 3공구) 가설검토, R-A1교(회덕IC 연결도로) 설계견적서(특정공법심의), 보덕교(세종~안성, 오송3교) 빔런처가설 설계가, 곡천교(안성~성남 2공구)시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11305,"2019-07-09 08:17:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-09 18:22:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J11202,"2019-07-09 08:21:00",19-시공-02,b.시공,공사관리,"2019-07-09 21:00:00",19-시공-02,b.시공,공사관리,"2019-07-09 18:30:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J14306,"2019-07-09 08:21:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-09 18:09:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J13201,"2019-07-09 08:25:00",14-설계-08,c.도면,"슬래브 배근도 수정","2019-07-09 18:18:18",16-시공-20,g.기타,NULL,"2019-07-09 18:36:00",172.16.9.165,172.16.9.165,NULL,008E2,,,
|
|
J15202,"2019-07-09 08:28:00",14-설계-08,b.구조계산,"#1교 구조계산","2019-07-09 21:42:00",14-설계-08,b.구조계산,"#1교 구조계산","2019-07-09 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"16-설계-19<|>e.검토<|>교량받침 배치 검토<|>02:00<|><br>17-설계-06<|>e.검토<|>솔플레이트 변경 모델링<|>01:30<|><br>",1,
|
|
J10301,"2019-07-09 08:33:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-09 18:57:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15301,"2019-07-09 08:35:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
북수원1교 잔여물량 전체 발주
|
|
성주대교 가로보 출하요청서 작성 (BR1)
|
|
산외교 기성분 결제
|
|
한포1,2교 장비,자재 투입내역서 작성
|
|
삼남1교 건설기계임대차계약서 작성","2019-07-09 18:24:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
북수원1교 잔여물량 전체 발주
|
|
성주대교 가로보 출하요청서 작성 (BR1)
|
|
산외교 기성분 결제
|
|
한포1,2교 장비,자재 투입내역서 작성
|
|
삼남1교 건설기계임대차계약서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J16202,"2019-07-09 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-09 18:28:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10313,"2019-07-09 08:36:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-09 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15201,"2019-07-09 08:38:00",19-교영-12,c.설계사,"과업진행현황 파악","2019-07-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J17205,"2019-07-09 08:38:00",18-교영-01,c.설계사,.,"2019-07-09 18:09:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-07-09 08:38:00",14-설계-32,h.기타,"기타 검토","2019-07-09 18:11:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11203,"2019-07-09 08:39:00",19-설계-03,b.구조계산,"종점부 라멘 계산서수정(설계사요청)","2019-07-09 19:41:00",19-설계-03,b.구조계산,"종점부 라멘 계산서수정(설계사요청)","2019-07-09 18:35:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J09101,"2019-07-09 08:47:00",19-교영-01,c.설계사,과업조사,"2019-07-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
M05510,"2019-07-09 18:05:00",17-시공-09,b.시공,"Spliced PSC Girder 제작 및 가설공사
|
|
경간부 50본
|
|
주두부 40본
|
|
가설벤트 1번~8번 /2회 설치
|
|
공무,공사,안전,품질 관리","2019-07-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.150.173,NULL,NULL,004C8,,,
|
|
J14101,"2019-07-09 08:50:00",16-시공-20,출장,한양,"2019-07-09 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-07-09 08:50:00",18-시공-15,출장,"원흥2교 현장","2019-07-09 18:00:00",18-시공-15,출장,"원흥2교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07103,"2019-07-09 08:50:00",16-시공-20,출장,"산외교 출장","2019-07-09 18:00:00",16-시공-20,출장,"산외교 출장","0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J16203,"2019-07-09 08:50:00",19-제조-03,출장,"[산외교(밀양)]콘크리트배헙 확인, 강도 레미콘 원재료 확인","2019-07-09 18:00:00",19-제조-03,출장,"[산외교(밀양)]콘크리트배헙 확인, 강도 레미콘 원재료 확인","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J13308,"2019-07-09 08:50:00",18-시공-15,출장,"[원흥2교 현장]가설 및 1차 인장","2019-07-09 18:00:00",18-시공-15,출장,"[원흥2교 현장]가설 및 1차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E3,,,
|
|
J18207,"2019-07-09 08:50:00",17-시공-10,출장,"[대구 달성군]성주대교 현장점검","2019-07-09 18:00:00",17-시공-10,출장,"[대구 달성군]성주대교 현장점검","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J15202,"2019-07-10 08:31:00",14-설계-08,b.구조계산,"#1교 구조계산","2019-07-10 20:45:00",14-설계-08,b.구조계산,"#1교 구조계산","2019-07-10 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"19-설계-03<|>e.검토<|>런처가설검토 협의<|>01:30<|><br>19-설계-03<|>f.보고서 및 시방서<|>보고서 작성<|>01:00<|><br>",1,
|
|
J18207,"2019-07-10 07:22:00",16-시공-20,b.시공,"거파단에의한 조치방안 검토","2019-07-10 18:48:00",16-시공-20,b.시공,"거파단에의한 조치방안 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18202,"2019-07-10 07:23:00",07-교영-01,b.시공사,"발주현황 파악","2019-07-10 18:05:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J13308,"2019-07-10 07:27:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","2019-07-10 18:04:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J07202,"2019-07-10 07:31:00",19-제조-04,b.기계,"가산2교 거푸집(H2.0) 보수와 수평 컨베이어 텐션 주변 막음장치","2019-07-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
T04204,"2019-07-10 07:31:00",16-제조-02,a.생산관리,"풍림천교,성주대교(측,중앙경간),점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-07-10 07:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J18208,"2019-07-10 07:36:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-10 18:07:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J15307,"2019-07-10 08:10:00",17-설계-15,c.도면,"#1교 도면 수정","2019-07-10 18:03:00",17-설계-15,c.도면,"#1교 도면 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J18206,"2019-07-10 08:14:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-10 18:45:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-07-10 08:14:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-10 18:05:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-07-10 08:16:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-10 18:06:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-07-10 08:17:00",19-교영-15,d.기타,"DR거더 (문산~도라산T/K) 설계가, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 지경천교 (포항~영덕 3공구) 가설검토, 보덕교(세종~안성, 오송3교) 빔런처가설 설계가, 곡천교(안성~성남 2공구)시행견적서","2019-07-10 18:03:00",19-교영-15,d.기타,"DR거더 (문산~도라산T/K) 설계가, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 지경천교 (포항~영덕 3공구) 가설검토, 보덕교(세종~안성, 오송3교) 빔런처가설 설계가, 곡천교(안성~성남 2공구)시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-07-10 08:20:00",18-관리-02,e.기타,"비서업무 외","2019-07-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J14306,"2019-07-10 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-10 18:53:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15201,"2019-07-10 08:24:00",19-교영-12,c.설계사,"과업진행현황 파악","2019-07-10 18:01:00",19-교영-12,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10301,"2019-07-10 08:27:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-10 18:14:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-07-10 08:29:00",14-설계-08,c.도면,"슬래브 배근도 수정","2019-07-10 20:46:00",14-설계-08,c.도면,"슬래브 배근도 수정","2019-07-10 18:32:00",172.16.9.165,172.16.9.155,172.16.9.165,008E2,,1,
|
|
J18205,"2019-07-10 08:31:00",17-설계-09,e.검토,"Spliced Girder 성과품 비교 검토
|
|
","2019-07-10 22:03:00",17-설계-09,e.검토,"Spliced Girder 성과품 비교 검토
|
|
","2019-07-10 19:08:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J16202,"2019-07-10 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-10 18:19:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-07-10 08:34:00",19-설계-03,b.구조계산,"종점부 라멘 계산서수정(설계사요청)","2019-07-10 20:33:00",19-설계-03,b.구조계산,"종점부 라멘 계산서수정(설계사요청)","2019-07-10 18:31:00",172.16.9.160,172.16.9.155,172.16.9.160,008E1,"18-설계-19<|>d.산출서<|>4공구(경동), 9공구(한맥) 수량산출서수정<|>01:30<|><br>",1,
|
|
J17205,"2019-07-10 08:34:00",18-교영-01,c.설계사,.,"2019-07-10 18:11:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11202,"2019-07-10 08:34:00",19-시공-02,b.시공,공사관리,"2019-07-10 18:50:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-07-10 08:39:00",14-설계-32,h.기타,"기타 검토","2019-07-10 18:11:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15301,"2019-07-10 08:39:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
산외교 기성분 결제
|
|
삼간교 2차 강선 자재 발주
|
|
삼남1교 투입내역서 작성 및 하도급지킴이 기성 청구
|
|
원흥2교 노무비닷컴 기성 수정","2019-07-10 18:08:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
산외교 기성분 결제
|
|
삼간교 2차 강선 자재 발주
|
|
삼남1교 투입내역서 작성 및 하도급지킴이 기성 청구
|
|
원흥2교 노무비닷컴 기성 수정","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J07103,"2019-07-10 08:41:00",19-교영-01,d.기타,사업관리,"2019-07-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
J09101,"2019-07-10 08:47:00",19-교영-01,c.설계사,과업조사,"2019-07-10 18:03:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10313,"2019-07-10 08:53:00",19-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","2019-07-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
M05510,"2019-07-10 11:27:00",17-시공-09,b.시공,"Spliced PSC Girder 제작 및 가설공사
|
|
경간부 50본
|
|
주두부 40본
|
|
가설벤트 1번~8번 /2회 설치
|
|
공무,공사,안전,품질 관리","2019-07-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.180.75,NULL,NULL,004C8,,,
|
|
J14101,"2019-07-10 08:50:00",16-시공-20,출장,한양,"2019-07-10 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-07-10 08:50:00",18-시공-15,출장,"원흥2교 현장","2019-07-10 18:00:00",18-시공-15,출장,"원흥2교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J09102,"2019-07-10 08:50:00",19-계약-01,출장,대일건설,"2019-07-10 18:00:00",19-계약-01,출장,대일건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18202,"2019-07-11 07:20:00",07-교영-01,b.시공사,"발주현황 파악","2019-07-11 18:18:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J07202,"2019-07-11 07:27:00",19-제조-04,b.기계,"가산2교 거푸집(H2.0) 보수와 장마 지붕 청소","2019-07-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-07-11 07:27:00",16-시공-20,b.시공,"거파단에의한 조치방안 검토","2019-07-11 18:30:00",16-시공-20,b.시공,"거파단에의한 조치방안 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
T04204,"2019-07-11 07:29:00",16-제조-02,a.생산관리,"풍림천교,성주대교(측,중앙경간),점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-07-11 07:31:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-11 21:56:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-11 18:54:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J13308,"2019-07-11 07:33:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","2019-07-11 18:53:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J09102,"2019-07-11 07:33:00",19-계약-01,b.시공사,"유성산업(인천 북항) 방문 예정, 곡천교, 조령천교 예상 계약가 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","2019-07-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J14308,"2019-07-11 07:35:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-11 21:54:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-11 18:41:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-07-11 07:35:00",19-제조-03,a.품질검사,"태안배수문교, 산외교 데크 생산 및 품질관리, 산외교 출하","2019-07-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J10315,"2019-07-11 07:55:00",17-시공-09,b.시공,"가설계획서 보완
|
|
","2019-07-11 08:59:00",17-시공-09,b.시공,"가설계획서 보완
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J10314,"2019-07-11 08:12:00",19-교영-15,d.기타,"접속교(송산그린시티~시화멀티테크노밸리) 검토자료, DR거더 (문산~도라산T/K) 연장별 설계가, 지경천교 (포항~영덕 3공구) 가설검토, 곡천교(안성~성남 2공구)시행견적서","2019-07-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J15307,"2019-07-11 08:14:00",17-설계-15,c.도면,"#1교 도면 및 수량","2019-07-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.171,NULL,NULL,008E4,,,
|
|
J15302,"2019-07-11 08:17:00",19-설계-06,b.구조계산,"계산서 확인","2019-07-11 18:07:00",19-설계-06,b.구조계산,"계산서 확인","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J08201,"2019-07-11 08:18:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-11 18:13:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-07-11 08:19:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-11 18:05:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-07-11 08:20:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-11 18:19:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J13201,"2019-07-11 08:25:00",14-설계-08,c.도면,"슬래브 배근도 수정","2019-07-11 18:05:00",14-설계-08,c.도면,"슬래브 배근도 수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J18205,"2019-07-11 08:26:00",17-설계-09,e.검토,"Spliced Girder 성과품 비교 검토
|
|
","2019-07-11 18:06:00",17-설계-09,e.검토,"Spliced Girder 성과품 비교 검토
|
|
","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,"19-설계-03<|>c.도면<|>BR4 합성라멘 배근도 수정<|>03:00<|><br>",,
|
|
J14306,"2019-07-11 08:27:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-11 18:05:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-07-11 08:30:00",19-교영-01,d.기타,사업관리,"2019-07-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
J10301,"2019-07-11 08:31:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J10313,"2019-07-11 08:33:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15301,"2019-07-11 08:33:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
삼남1교 투입내역서 작성
|
|
옥산교 1본 추가 제작 강선 발주
|
|
수원북부 노무비닷컴 기성내역서 작성","2019-07-11 18:28:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
삼남1교 투입내역서 작성
|
|
옥산교 1본 추가 제작 강선 발주
|
|
수원북부 노무비닷컴 기성내역서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J16202,"2019-07-11 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J11203,"2019-07-11 08:36:00",19-설계-03,b.구조계산,"종점부 라멘 계산서수정(설계사요청)","2019-07-11 18:06:00",19-설계-03,b.구조계산,"종점부 라멘 계산서수정(설계사요청)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J11202,"2019-07-11 08:36:00",19-시공-02,b.시공,공사관리,"2019-07-11 18:53:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-07-11 08:39:00",14-설계-32,h.기타,"기타 검토","2019-07-11 18:07:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15201,"2019-07-11 08:39:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-07-11 18:14:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15202,"2019-07-11 08:39:00",19-설계-03,"f.보고서 및 시방서","보고서 작성","2019-07-11 18:00:00",19-설계-03,"f.보고서 및 시방서","보고서 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"17-설계-12<|>b.구조계산<|>상부변경 구조계산<|>07:00<|><br>",,
|
|
J09101,"2019-07-11 08:42:00",19-교영-01,c.설계사,과업조사,"2019-07-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J17205,"2019-07-11 08:39:00",18-교영-01,c.설계사,.,"2019-07-11 17:59:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
M05510,"2019-07-11 12:08:00",17-시공-09,b.시공,"Spliced PSC Girder 제작 및 가설공사
|
|
경간부 50본
|
|
주두부 40본
|
|
가설벤트 1번~8번 /2회 설치
|
|
공무,공사,안전,품질 관리","2019-07-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.180.180,NULL,NULL,004C8,,,
|
|
J14101,"2019-07-11 08:50:00",16-시공-20,출장,한양,"2019-07-11 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-07-12 07:14:00",07-교영-01,b.시공사,"발주현황 파악","2019-07-12 18:04:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18207,"2019-07-12 07:23:00",16-시공-20,b.시공,"거파단에의한 조치방안 검토","2019-07-12 18:08:00",16-시공-20,b.시공,"거파단에의한 조치방안 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
T04204,"2019-07-12 07:30:00",16-제조-02,a.생산관리,"풍림천교,성주대교(측,중앙경간),점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-07-12 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-12 20:48:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-12 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-07-12 07:34:00",19-제조-03,a.품질검사,"새천2교, 산외교 데크 생산 및 품질관리, 산외교 출하","2019-07-12 23:03:00",19-제조-03,a.품질검사,"새천2교, 산외교 데크 생산 및 품질관리, 산외교 출하","2019-07-12 18:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J13308,"2019-07-12 07:34:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","2019-07-12 18:01:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J14308,"2019-07-12 07:35:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-12 21:53:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-12 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J07202,"2019-07-12 07:37:00",19-제조-04,b.기계,"가산2교 거푸집(H2.0) 폐인트 도색과 주두부 받침 블럭 강재 거푸집 제작","2019-07-13 07:32:00",19-제조-04,b.기계,"가산2교 거푸집(H2.0) 폐인트 도색과 주두부 받침 블럭 강재 거푸집 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-07-12 07:40:00",19-계약-01,b.시공사,"한신공영, SK건설 방문 예정, 곡천교, 조령천교 예상 계약가 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","2019-07-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-07-12 08:01:00",17-시공-09,b.시공,"가설계획서 보완
|
|
","2019-07-12 18:39:00",17-시공-09,b.시공,"가설계획서 보완
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J10313,"2019-07-12 08:03:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J18206,"2019-07-12 08:08:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-12 18:18:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-07-12 08:14:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-12 18:09:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-07-12 08:15:00",19-설계-03,c.도면,"BR4 합성라멘 도면 수정","2019-07-12 18:01:00",17-설계-09,e.검토,"Spliced Girder 성과품 비교 검토
|
|
","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J15307,"2019-07-12 08:16:00",19-설계-06,c.도면,"도림1육교 빔배치","2019-07-12 18:00:00",19-설계-06,c.도면,"도림1육교 빔배치","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J10314,"2019-07-12 08:17:00",19-교영-15,d.기타,"DR거더 (문산~도라산T/K) 연장별 설계가, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 지경천교 (포항~영덕 3공구) 가설검토, 곡천교(안성~성남 2공구)시행견적서","2019-07-12 18:06:00",19-교영-15,d.기타,"DR거더 (문산~도라산T/K) 연장별 설계가, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 지경천교 (포항~영덕 3공구) 가설검토, 곡천교(안성~성남 2공구)시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15302,"2019-07-12 08:27:00",17-설계-12,b.구조계산,"계산서 및 도면작성","2019-07-12 18:02:00",17-설계-12,b.구조계산,"계산서 및 도면작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J11305,"2019-07-12 08:28:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J14306,"2019-07-12 08:30:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-12 18:01:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-07-12 08:32:00",19-시공-02,b.시공,공사관리,"2019-07-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J13201,"2019-07-12 08:32:00",12-설계-24,c.도면,"가설벤트 제작도 작성","2019-07-12 14:09:00",12-설계-24,c.도면,"가설벤트 제작도 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,"14-설계-32<|>b.구조계산<|>연속지점부 거푸집 검토<|>04:00<|><br>",,
|
|
J15301,"2019-07-12 08:33:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
수원북부 노무비닷컴 기성내역서 작성
|
|
부가세 신고 전표 복사","2019-07-12 18:04:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
수원북부 노무비닷컴 기성내역서 작성
|
|
부가세 신고 전표 복사","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J16202,"2019-07-12 08:33:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-12 18:14:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-07-12 08:35:00",19-설계-03,b.구조계산,"종점부 라멘 계산서수정(설계사요청)","2019-07-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J10301,"2019-07-12 08:36:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-12 18:39:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-07-12 08:37:00",14-설계-32,h.기타,"기타 검토","2019-07-12 18:04:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15202,"2019-07-12 08:37:00",19-설계-03,"f.보고서 및 시방서","보고서 작성","2019-07-12 18:02:00",19-설계-03,"f.보고서 및 시방서","보고서 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,17-설계-12<|>b.구조계산<|>구조계산<|>04:00<|><br>,,
|
|
J15201,"2019-07-12 08:37:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-07-12 18:03:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07103,"2019-07-12 08:46:00",19-교영-01,d.기타,사업관리,"2019-07-12 18:06:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J09101,"2019-07-12 08:57:00",19-교영-01,c.설계사,과업조사,"2019-07-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-07-12 08:50:00",16-시공-20,출장,한양,"2019-07-12 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J16203,"2019-07-13 07:18:00",19-제조-03,a.품질검사,"새천2교, 산외교 데크 생산 및 품질관리, 산외교 출하","2019-07-13 15:30:00",19-제조-03,a.품질검사,"새천2교, 산외교 데크 생산 및 품질관리, 산외교 출하","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
T04204,"2019-07-13 07:25:00",16-제조-02,a.생산관리,"성주대교(측,중앙경간),점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-13 15:54:00",16-제조-02,a.생산관리,"성주대교(측,중앙경간),점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-07-13 07:32:00",19-제조-04,b.기계,"야적장 정리와 주두부 받침 블럭 강재 거푸집 제작","2019-07-13 15:41:00",19-제조-04,b.기계,"야적장 정리와 주두부 받침 블럭 강재 거푸집 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-07-13 07:37:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-13 15:53:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J14308,"2019-07-13 07:38:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-13 18:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M05510,"2019-07-13 17:10:00",17-시공-09,b.시공,"Spliced PSC Girder 제작 및 가설공사
|
|
경간부 50본
|
|
주두부 40본
|
|
가설벤트 1번~8번 /2회 설치
|
|
공무,공사,안전,품질 관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.215.46,NULL,NULL,004C8,,,
|
|
J10315,"2019-07-14 10:25:00",17-시공-21,b.시공,"북수원2교 가설계획서 작성
|
|
","2019-07-14 16:42:00",17-시공-21,b.시공,"북수원2교 가설계획서 작성
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,1,
|
|
J09102,"2019-07-15 07:24:00",19-계약-01,b.시공사,"양평~이천 2공구 예상 입찰가, 조령천교 한신공영 요청자료 작성 등 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","2019-07-15 19:43:00",19-계약-01,b.시공사,"양평~이천 2공구 예상 입찰가, 조령천교 한신공영 요청자료 작성 등 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
T04204,"2019-07-15 07:26:00",16-제조-02,a.생산관리,"성주대교(측,중앙경간),점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-07-15 07:27:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-15 21:33:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-15 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J13308,"2019-07-15 07:31:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","2019-07-15 18:22:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18208,"2019-07-15 07:34:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-15 22:24:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-15 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-07-15 07:37:00",19-제조-02,a.생산관리,"산외교 현장 자료 정리","2019-07-15 18:12:00",19-제조-02,a.생산관리,"산외교 현장 자료 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-07-15 07:40:00",19-제조-03,a.품질검사,"새천2교, 산외교 데크 생산 및 품질관리, 산외교 출하","2019-07-15 22:24:00",19-제조-03,a.품질검사,"새천2교, 산외교 데크 생산 및 품질관리, 산외교 출하","2019-07-15 18:57:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J07202,"2019-07-15 07:41:00",19-제조-04,b.기계,"원흥2교 주두부 받침과 제작용 조립대 하역과 가산2교 거푸집 상차 및 성주대교 가공철근 상차","2019-07-16 07:29:00",19-제조-04,b.기계,"원흥2교 주두부 받침과 제작용 조립대 하역과 가산2교 거푸집 상차 및 성주대교 가공철근 상차","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-07-15 07:49:00",07-교영-01,b.시공사,"발주현황 파악","2019-07-15 18:08:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M05510,"2019-07-15 07:54:00",17-시공-09,b.시공,"Spliced PSC Girder 제작 및 가설공사
|
|
경간부 50본
|
|
주두부 40본
|
|
가설벤트 1번~8번 /2회 설치
|
|
공무,공사,안전,품질 관리","2019-07-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.222.9,NULL,NULL,004C8,,,
|
|
J18207,"2019-07-15 07:55:00",18-시공-15,b.시공,"주두부솔프레이트 보수방법 조치방안 검토","2019-07-15 18:23:00",18-시공-15,b.시공,"주두부솔프레이트 보수방법 조치방안 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18206,"2019-07-15 08:07:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-15 18:19:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-07-15 08:08:00",19-설계-06,c.도면,"도림1육교 슬래브도 작성","2019-07-15 22:25:00",19-설계-06,c.도면,"도림1육교 슬래브도 작성","2019-07-15 19:18:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J08201,"2019-07-15 08:13:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-15 18:34:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-07-15 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-07-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10315,"2019-07-15 08:16:00",18-시공-03,b.시공,"철탑관련 협의자료 작성
|
|
","2019-07-15 18:03:00",18-시공-03,b.시공,"철탑관련 협의자료 작성
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J10314,"2019-07-15 08:22:00",19-설계-03,h.기타,"접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 교량#1교(부산에코델타시티 4구간) 설계내역서, DR거더 (문산~도라산T/K) 연장별 설계가, 지경천교 (포항~영덕 3공구) 가설검토","2019-07-15 18:07:00",14-설계-08,h.기타,"접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 교량#1교(부산에코델타시티 4구간) 설계내역서, DR거더 (문산~도라산T/K) 연장별 설계가, 지경천교 (포항~영덕 3공구) 가설검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15202,"2019-07-15 08:36:00",19-설계-03,"f.보고서 및 시방서","보고서 작성","2019-07-15 21:30:00",19-설계-03,"f.보고서 및 시방서","보고서 작성","2019-07-15 19:00:00",172.16.9.155,172.16.9.155,NULL,008E1,"17-설계-12<|>e.검토<|>지적사항 내용 검토 및 수정<|>05:00<|><br>",1,
|
|
J14306,"2019-07-15 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-15 18:03:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-07-15 08:25:00",19-교영-01,d.기타,사업관리,"2019-07-15 18:15:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J17205,"2019-07-15 08:26:00",18-교영-01,c.설계사,.,"2019-07-15 18:16:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15302,"2019-07-15 08:26:00",17-설계-12,b.구조계산,"계산서 작성 및 별첨자료 작성","2019-07-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.173,NULL,NULL,008E4,,1,
|
|
J10301,"2019-07-15 08:29:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-15 19:44:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-15 19:07:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,,
|
|
J13201,"2019-07-15 08:31:00",12-설계-24,c.도면,"가설벤트 제작도 작성","2019-07-15 18:18:18",12-설계-24,c.도면,NULL,"2019-07-15 19:20:00",172.16.9.165,172.16.9.165,NULL,008E2,,,
|
|
J18205,"2019-07-15 08:31:00",19-설계-06,b.구조계산,"도림1육교 모델링(설계사 의견반영)
|
|
","2019-07-15 22:12:00",19-설계-06,b.구조계산,"도림1육교 모델링(설계사 의견반영)
|
|
","2019-07-15 19:08:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J09101,"2019-07-15 08:32:00",19-교영-01,c.설계사,과업조사,"2019-07-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J11203,"2019-07-15 08:32:00",19-설계-03,b.구조계산,"종점부 라멘 계산서수정(설계사요청)","2019-07-15 20:44:00",19-설계-03,b.구조계산,"종점부 라멘 계산서수정(설계사요청)","2019-07-15 19:19:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J15201,"2019-07-15 08:36:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-07-15 18:04:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-07-15 08:39:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-15 18:02:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16202,"2019-07-15 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J15301,"2019-07-15 08:41:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
산외교 정산서 작성
|
|
운곡교 시공계획서 작성
|
|
삼남1교 투입내역서 수정
|
|
단장천2교 강연선 발주
|
|
","2019-07-15 18:44:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
산외교 정산서 작성
|
|
운곡교 시공계획서 작성
|
|
삼남1교 투입내역서 수정
|
|
단장천2교 강연선 발주
|
|
","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J07210,"2019-07-15 08:46:00",14-설계-32,h.기타,"기타 검토","2019-07-15 18:08:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J14101,"2019-07-15 08:50:00",16-시공-20,출장,한양,"2019-07-15 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11305,"2019-07-15 08:50:00",17-시공-08,출장,현장사무실,"2019-07-15 18:00:00",17-시공-08,출장,현장사무실,"0000-00-00 00:00:00",NULL,NULL,NULL,008C7,,,
|
|
J13308,"2019-07-16 07:19:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","2019-07-16 20:09:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J16203,"2019-07-16 07:27:00",19-제조-03,a.품질검사,"새천2교, 산외교 데크 생산 및 품질관리, 산외교 출하","2019-07-16 20:40:00",19-제조-03,a.품질검사,"새천2교, 산외교 데크 생산 및 품질관리, 산외교 출하","2019-07-16 18:40:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18208,"2019-07-16 07:27:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-16 22:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-16 18:42:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-07-16 07:29:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-16 21:33:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-16 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-07-16 07:30:00",19-제조-02,a.생산관리,"Pre-Deck 상부 음영 검토 및 전단철근 삭제 검토","2019-07-16 18:01:00",19-제조-02,a.생산관리,"Pre-Deck 상부 음영 검토 및 전단철근 삭제 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>J-web 하부 전단철근 가공 관련 자료 수집 및 shop 검토<|>03:00<|><br>",,
|
|
J07202,"2019-07-16 07:30:00",19-제조-04,b.기계,"평촌교 거푸집 보수와 팔레트 대용 고일목 테스트","2019-07-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-07-16 07:32:00",18-시공-12,b.시공,"스플라이스거더 주두부 및 경간부 제작장검토","2019-07-16 18:20:00",18-시공-12,b.시공,"스플라이스거더 주두부 및 경간부 제작장검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-07-16 07:34:00",19-계약-01,b.시공사,"문산~도라산 계룡 합사 방문예정, 조령천교 한신공영 요청자료 작성 등 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","2019-07-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18202,"2019-07-16 07:34:00",07-교영-01,b.시공사,"발주현황 파악","2019-07-16 18:07:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J08201,"2019-07-16 07:48:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-16 19:00:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-07-16 07:59:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J10314,"2019-07-16 07:59:00",14-설계-08,h.기타,"교량#1교(부산에코델타시티 4구간) 설계내역서, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, DR거더 (문산~도라산T/K) 연장별 설계가, 지경천교 (포항~영덕 3공구) 가설검토","2019-07-16 18:12:00",14-설계-08,h.기타,"교량#1교(부산에코델타시티 4구간) 설계내역서, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, DR거더 (문산~도라산T/K) 연장별 설계가, 지경천교 (포항~영덕 3공구) 가설검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15307,"2019-07-16 08:00:00",19-설계-06,c.도면,"도림1육교 슬래브도 작성","2019-07-16 21:44:00",19-설계-06,c.도면,"도림1육교 슬래브도 작성","2019-07-16 18:31:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J13201,"2019-07-16 08:05:00",14-설계-32,c.도면,"연속지점부거푸집 검토","2019-07-16 18:04:00",12-설계-24,c.도면,"가설벤트 제작도 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J18206,"2019-07-16 08:06:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-16 18:14:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J18205,"2019-07-16 08:10:00",19-설계-06,b.구조계산,"도림1육교 모델링(설계사 의견반영)
|
|
","2019-07-16 21:44:00",19-설계-06,b.구조계산,"도림1육교 모델링(설계사 의견반영)
|
|
","2019-07-16 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15301,"2019-07-16 08:14:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
산외교 정산서 작성
|
|
단장천2교 강연선 발주
|
|
단장천2교 투입내역서 작성","2019-07-16 18:11:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
산외교 정산서 작성
|
|
단장천2교 강연선 발주
|
|
단장천2교 투입내역서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15302,"2019-07-16 08:17:00",17-설계-12,b.구조계산,"계산서 작성 및 별첨자료 작성","2019-07-16 18:03:00",17-설계-12,b.구조계산,"계산서 작성 및 별첨자료 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J11203,"2019-07-16 08:17:00",18-설계-19,h.기타,"4공구(경동, 웹하드발송), 9공구(한맥, 카카오톡발송 곽태신부장) 성과품 수정 후 발송","2019-07-16 18:02:00",18-설계-19,h.기타,"4공구(경동), 9공구(한맥) 성과품 수정 후 발송","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J16202,"2019-07-16 08:18:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-16 18:21:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07103,"2019-07-16 08:21:00",19-교영-01,d.기타,사업관리,"2019-07-16 18:04:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J09101,"2019-07-16 08:22:00",19-교영-01,c.설계사,과업조사,"2019-07-16 18:05:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14306,"2019-07-16 08:24:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-16 18:43:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-07-16 08:26:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-16 18:30:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-07-16 08:28:00",19-설계-03,"f.보고서 및 시방서","보고서 작성","2019-07-16 21:07:00",19-설계-03,"f.보고서 및 시방서","보고서 작성","2019-07-16 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"19-교휴-06<|>a.기타<|>격월제 발표 및 업무회의<|>03:30<|><br>",1,
|
|
J17205,"2019-07-16 08:30:00",18-교영-01,c.설계사,.,"2019-07-16 18:10:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-07-16 08:31:00",14-설계-32,h.기타,"기타 검토","2019-07-16 20:34:00",14-설계-32,h.기타,"기타 검토","2019-07-16 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15201,"2019-07-16 08:36:00",19-교영-01,c.설계사,"철도과업 현황 조사","2019-07-16 18:02:00",19-교영-01,c.설계사,"철도과업 현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
B15306,"2019-07-16 08:01:00",18-관리-02,e.기타,"비서업무 외","2019-07-16 18:18:18",NULL,NULL,"비서업무 외","0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10315,"2019-07-16 08:50:00",18-시공-03,출장,"왕림교 현장","2019-07-16 18:03:00",18-시공-03,b.시공,"철탑관련 협의자료 작성
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J14101,"2019-07-16 08:50:00",16-시공-20,출장,한양,"2019-07-16 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18207,"2019-07-17 07:25:00",18-시공-15,b.시공,"스플라이스거더 주두부 솔프레이트 보수 검토","2019-07-17 18:15:00",18-시공-15,b.시공,"스플라이스거더 주두부 솔프레이트 보수 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
T04204,"2019-07-17 07:28:00",16-제조-02,a.생산관리,"성주대교(측,중앙경간),점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-07-17 07:30:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-17 18:37:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-07-17 07:31:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-17 22:34:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-17 18:37:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J07202,"2019-07-17 07:31:00",19-제조-04,b.기계,"팔레트 대용 고일목 테스트와 평촌교 거푸집 보수, 각재정리","2019-07-18 06:19:00",19-제조-04,b.기계,"팔레트 대용 고일목 테스트와 평촌교 거푸집 보수, 각재정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-07-17 07:32:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","2019-07-17 19:52:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
M02302,"2019-07-17 07:33:00",19-제조-02,a.생산관리,"노듈러 거더 개선사항 검토 ","2019-07-17 20:47:00",19-제조-02,a.생산관리,"노듈러 거더 개선사항 검토 ","2019-07-17 18:41:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공장 검수 협의 <|>04:00<|><br>",1,
|
|
J09102,"2019-07-17 07:35:00",19-계약-01,b.시공사,"코오롱글로벌 본사 방문예정, 조령천교 한신공영 요청자료 작성 등 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","2019-07-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18206,"2019-07-17 08:11:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-17 17:54:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-07-17 08:13:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-17 18:10:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-07-17 08:13:00",19-설계-06,c.도면,"도림1육교 슬래브, 거더 도면 작성","2019-07-17 20:32:00",19-설계-06,c.도면,"도림1육교 슬래브, 거더 도면 작성","2019-07-17 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10314,"2019-07-17 08:17:00",18-설계-12,h.기타,"청룡2교외4개소(평택동부민자) 시행견적서, 교량#1교(부산에코델타시티 4구간) 설계내역서, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, DR거더 (문산~도라산T/K) 연장별 설계가","2019-07-17 18:06:00",18-설계-12,h.기타,"청룡2교외4개소(평택동부민자) 시행견적서, 교량#1교(부산에코델타시티 4구간) 설계내역서, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, DR거더 (문산~도라산T/K) 연장별 설계가","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J16202,"2019-07-17 08:23:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-17 18:09:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J18205,"2019-07-17 08:24:00",19-설계-06,b.구조계산,"도림1육교 구조계산서 작성","2019-07-17 21:36:00",19-설계-06,b.구조계산,"도림1육교 구조계산서 작성","2019-07-17 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15202,"2019-07-17 08:29:00",18-설계-12,"f.보고서 및 시방서","보고서 작성","2019-07-17 18:03:00",18-설계-12,"f.보고서 및 시방서","보고서 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J07103,"2019-07-17 08:29:00",19-교영-01,d.기타,사업관리,"2019-07-17 18:21:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14306,"2019-07-17 08:29:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-17 18:06:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16203,"2019-07-17 08:29:00",19-제조-03,a.품질검사,"새천2교, 산외교 데크 생산 및 품질관리, 산외교 출하","2019-07-17 22:34:00",19-제조-03,a.품질검사,"새천2교, 산외교 데크 생산 및 품질관리, 산외교 출하","2019-07-17 18:46:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
B15306,"2019-07-17 08:17:00",18-관리-02,e.기타,"비서업무 외","2019-07-17 18:18:18",NULL,NULL,"비서업무 외","0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J17205,"2019-07-17 08:34:00",18-교영-01,c.설계사,.,"2019-07-17 18:04:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11203,"2019-07-17 08:34:00",19-설계-03,h.기타,"종점부 라멘 교각16 계산서 수정(설계사요청)","2019-07-17 18:06:00",19-설계-03,h.기타,"종점부 라멘 교각16 계산서 수정(설계사요청)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>h.기타<|>4공구 전동교 도면수정(한번정리된 도면, 도면번호)<|>01:00<|><br>19-설계-02<|>h.기타<|>치악교 별첨자료 수정(설계사 요구)<|>00:30<|><br>",,
|
|
J07210,"2019-07-17 08:39:00",14-설계-32,h.기타,"기타 검토","2019-07-17 18:08:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J13201,"2019-07-17 08:41:00",12-설계-24,c.도면,"스트롱백 도면수정","2019-07-17 18:04:00",12-설계-24,c.도면,"가설벤트 제작도 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15201,"2019-07-17 08:43:00",19-교영-01,c.설계사,"양평~이천 4공구 합사 방문 과업진행현황 조사","2019-07-17 18:03:00",19-교영-01,c.설계사,"양평~이천 4공구 합사 방문 과업진행현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15301,"2019-07-17 08:44:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
산외교 정산서 작성
|
|
성남-안성 공급원승인서 발송
|
|
7월 지출내역서 작성","2019-07-17 18:04:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
산외교 정산서 작성
|
|
성남-안성 공급원승인서 발송
|
|
7월 지출내역서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11305,"2019-07-17 08:44:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-17 18:08:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10313,"2019-07-17 08:48:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J09101,"2019-07-17 08:51:00",19-교영-01,c.설계사,과업조사,"2019-07-17 18:04:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15302,"2019-07-17 08:30:00",17-설계-12,b.구조계산,"계산서 작성 및 별첨자료 작성","2019-07-17 18:05:00",17-설계-12,b.구조계산,"계산서 작성 및 별첨자료 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J10301,"2019-07-17 08:50:00",18-시공-15,출장,"[GS건설 현장사무소(고양시)]원흥2교 주두부 1본 솔플레이트 보수 관련 협의","2019-07-17 21:03:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-17 18:36:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J14101,"2019-07-17 08:50:00",16-시공-20,출장,한양,"2019-07-17 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-07-17 08:50:00",16-시공-41,출장,"옥산교 현장","2019-07-17 18:00:00",16-시공-41,출장,"옥산교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18202,"2019-07-17 08:50:00",07-교영-01,출장,"[전주일원]새만금~전주 고속도로 6공구(고려개발-FCM ED교) 상부공 영업관련","2019-07-17 18:00:00",07-교영-01,출장,"[전주일원]새만금~전주 고속도로 6공구(고려개발-FCM ED교) 상부공 영업관련","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-07-18 06:19:00",19-제조-04,b.기계,"캔틸레버 인양지그 제작과 수리티교 거푸집 보수 및 야적장 정리","2019-07-19 07:30:00",19-제조-04,b.기계,"캔틸레버 인양지그 제작과 수리티교 거푸집 보수 및 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-07-18 07:22:00",16-제조-02,a.생산관리,"성주대교(측,중앙경간),수리티교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-07-18 07:31:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-18 18:21:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18202,"2019-07-18 07:31:00",07-교영-01,b.시공사,"발주 현황 파악","2019-07-18 18:08:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J14308,"2019-07-18 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-18 18:22:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J09102,"2019-07-18 07:35:00",19-계약-01,b.시공사,"평택동부 민자고속도로 56개교 시행 견적가 등 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","2019-07-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-07-18 07:35:00",19-제조-03,a.품질검사,"ISO 갱신 점검(한국 품질인증원)7월 18일 ~ 19일","2019-07-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
M02302,"2019-07-18 07:37:00",19-제조-02,a.생산관리,"J-web 하부 노출철근 가공설비 검토","2019-07-18 18:43:00",19-제조-02,a.생산관리,"노듈러 거더 개선사항 검토 ","2019-07-18 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>ISO 심사 관련 회의<|>01:00<|><br>19-제조-02<|>a.생산관리<|>법인인감 관련서류 협의<|>02:00<|><br>",,
|
|
J13308,"2019-07-18 07:42:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","2019-07-18 20:15:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18207,"2019-07-18 07:46:00",16-시공-20,b.시공,"거더제작과정 품질관리 및 파손부분 제작일정점검","2019-07-18 18:13:00",16-시공-20,b.시공,"거더제작과정 품질관리 및 파손부분 제작일정점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10313,"2019-07-18 08:07:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-18 18:03:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18206,"2019-07-18 08:09:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-18 18:19:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-07-18 08:09:00",18-관리-02,e.기타,"비서업무 외","2019-07-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-07-18 08:11:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-18 18:05:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-07-18 08:13:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-18 18:09:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-07-18 08:24:00",19-설계-06,b.구조계산,"도림1육교 구조계산서 작성","2019-07-18 21:30:00",19-설계-06,b.구조계산,"도림1육교 구조계산서 작성","2019-07-18 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,"17-설계-09<|>c.도면<|>정착구 구조계산서 검토<|>02:00<|><br>",1,
|
|
J14306,"2019-07-18 08:26:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-18 18:36:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15202,"2019-07-18 08:26:00",18-설계-12,"f.보고서 및 시방서","보고서 작성","2019-07-18 20:54:00",18-설계-12,"f.보고서 및 시방서","보고서 작성","2019-07-18 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"15-설계-31<|>e.검토<|>경안천교 시공전 검토<|>07:00<|><br>",1,
|
|
J10314,"2019-07-18 08:27:00",18-설계-03,h.기타,"장동교(순천 벌교~주암 3-2공구) 시행견적서, 청룡2교외4개소(평택동부민자) 시행견적서, 교량#1교(부산에코델타시티 4구간) 설계견적서 및 내역서, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, DR거더 (문산~도라산T/K) 연장별 설계가","2019-07-18 18:09:00",18-설계-03,h.기타,"장동교(순천 벌교~주암 3-2공구) 시행견적서, 청룡2교외4개소(평택동부민자) 시행견적서, 교량#1교(부산에코델타시티 4구간) 설계견적서 및 내역서, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, DR거더 (문산~도라산T/K) 연장별 설계가","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15302,"2019-07-18 08:27:00",17-설계-12,b.구조계산,"계산서 작성 및 별첨자료 작성","2019-07-18 18:07:00",17-설계-12,b.구조계산,"계산서 작성 및 별첨자료 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J10301,"2019-07-18 08:28:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-18 18:13:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11203,"2019-07-18 08:30:00",17-시공-08,g.기타,"런처운용, 교각검토","2019-07-18 18:07:00",17-시공-08,g.기타,"런처운용, 교각검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J13201,"2019-07-18 08:31:00",17-설계-09,c.도면,"조령천교 가설벤트 검토","2019-07-18 18:14:00",17-설계-09,c.도면,"조령천교 가설벤트 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J16202,"2019-07-18 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-18 18:21:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15307,"2019-07-18 08:32:00",19-설계-06,c.도면,"도림1육교 슬래브, 거더 도면 작성","2019-07-18 18:03:00",19-설계-06,c.도면,"도림1육교 슬래브, 거더 도면 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J07103,"2019-07-18 08:33:00",19-교영-01,d.기타,사업관리,"2019-07-18 18:33:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J17205,"2019-07-18 08:39:00",18-교영-01,c.설계사,.,"2019-07-18 19:01:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-07-18 08:39:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-07-18 18:08:00",19-교영-01,c.설계사,"신규과업 현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-07-18 08:39:00",14-설계-32,h.기타,"기타 검토","2019-07-18 18:05:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J09101,"2019-07-18 08:41:00",19-교영-01,c.설계사,과업조사,"2019-07-18 18:09:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
M05510,"2019-07-18 08:46:00",17-시공-09,b.시공,"Spliced PSC Girder 제작 및 가설공사
|
|
경간부 50본
|
|
주두부 40본
|
|
가설벤트 1번~8번 /2회 설치
|
|
공무,공사,안전,품질 관리","2019-07-19 07:05:00",17-시공-09,b.시공,"Spliced PSC Girder 제작 및 가설공사
|
|
경간부 50본
|
|
주두부 40본
|
|
가설벤트 1번~8번 /2회 설치
|
|
공무,공사,안전,품질 관리","0000-00-00 00:00:00",223.33.181.133,NULL,223.33.180.162,004C8,,,
|
|
J15301,"2019-07-18 08:50:00",18-시공-15,출장,"[고양시]Sole Plate 보수 작업","2019-07-18 18:14:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
산외교 정산서 작성
|
|
성남-안성 공급원승인서 발송
|
|
7월 지출내역서 작성
|
|
부가세신고 누락분 확인","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14101,"2019-07-18 08:50:00",16-시공-20,출장,한양,"2019-07-18 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-07-18 08:50:00",17-시공-09,출장,대림산업,"2019-07-18 18:00:00",17-시공-09,출장,대림산업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M05510,"2019-07-19 07:05:00",17-시공-09,b.시공,"Spliced PSC Girder 제작 및 가설공사
|
|
경간부 50본
|
|
주두부 40본
|
|
가설벤트 1번~8번 /2회 설치
|
|
공무,공사,안전,품질 관리","2019-07-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.180.162,NULL,NULL,004C8,,,
|
|
T04204,"2019-07-19 07:27:00",16-제조-02,a.생산관리,"성주대교(측,중앙경간),수리티교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-07-19 07:29:00",07-교영-01,b.시공사,"발주 현황 파악","2019-07-19 18:04:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J14308,"2019-07-19 07:30:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-19 18:18:18",19-제조-02,a.생산관리,NULL,"2019-07-19 18:31:00",175.203.206.128,175.203.206.128,NULL,006E2,,,
|
|
J16203,"2019-07-19 07:31:00",19-제조-03,a.품질검사,"ISO 갱신 점검(한국 품질인증원)7월 18일 ~ 19일","2019-07-19 21:39:00",19-제조-03,a.품질검사,"ISO 갱신 점검(한국 품질인증원)7월 18일 ~ 19일","2019-07-19 18:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J07202,"2019-07-19 07:31:00",19-제조-04,b.기계,"로더와 굴삭기 유압과 엔진오일 교체 및 수리티교 거푸집 보수","2019-07-20 08:49:00",19-제조-04,b.기계,"로더와 굴삭기 유압과 엔진오일 교체 및 수리티교 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-07-19 07:35:00",19-계약-01,b.시공사,"평택동부 민자고속도로 6개교 시행 견적가 등 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","2019-07-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18208,"2019-07-19 07:37:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-19 18:03:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-07-19 07:42:00",19-제조-02,a.생산관리,"Pre-Deck 야적 검토","2019-07-19 18:03:00",19-제조-02,a.생산관리,"Pre-Deck 야적 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>ISO 심사 관련 회의<|>01:00<|><br>19-제조-02<|>a.생산관리<|>Pre-Deck 야적 관련 구조 검토 및 계산서 작성<|>05:00<|><br>",,
|
|
J18207,"2019-07-19 07:43:00",16-시공-20,b.시공,"거더제작과정 품질관리 및 파손부분 제작일정점검","2019-07-19 17:23:00",16-시공-20,b.시공,"거더제작과정 품질관리 및 파손부분 제작일정점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-07-19 07:58:00",17-시공-09,b.시공,"가설계획서 보완","2019-07-19 18:03:00",17-시공-09,b.시공,"가설계획서 보완","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
B15306,"2019-07-19 08:01:00",18-관리-02,e.기타,"비서업무 외","2019-07-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-07-19 08:09:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-19 18:15:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-07-19 08:14:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-19 17:21:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-07-19 08:14:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-19 18:04:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-07-19 08:24:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-19 18:00:00",17-설계-09,c.도면,"조령천교 도면 검토","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J15202,"2019-07-19 08:24:00",15-설계-31,e.검토,"시공전 성과품 검토","2019-07-19 18:33:00",15-설계-31,e.검토,"시공전 성과품 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J18205,"2019-07-19 08:26:00",19-설계-06,b.구조계산,"도림1육교 구조계산서 작성","2019-07-19 18:05:00",19-설계-06,b.구조계산,"도림1육교 구조계산서 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J07103,"2019-07-19 08:26:00",19-교영-01,d.기타,사업관리,"2019-07-19 18:19:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14306,"2019-07-19 08:26:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-19 18:12:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15302,"2019-07-19 08:28:00",18-설계-19,b.구조계산,"지적사항 일식 수정","2019-07-19 18:10:00",18-설계-19,b.구조계산,"지적사항 일식 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J16202,"2019-07-19 08:28:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J10301,"2019-07-19 08:28:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-19 18:00:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-07-19 08:31:00",14-설계-32,h.기타,"기타 검토","2019-07-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.162,NULL,NULL,008E1,,,
|
|
J13201,"2019-07-19 08:31:00",17-설계-09,c.도면,"조령천교 가설벤트 검토","2019-07-19 18:04:00",17-설계-09,c.도면,"조령천교 가설벤트 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11203,"2019-07-19 08:33:00",17-시공-08,g.기타,"런처운용, 교각검토","2019-07-19 18:09:00",17-시공-08,g.기타,"런처운용, 교각검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>h.기타<|>대콘 5공구 크레인제원중 700ton 자료작성<|>00:30<|><br>",,
|
|
J09101,"2019-07-19 08:37:00",19-교영-01,c.설계사,과업조사,"2019-07-19 18:04:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15201,"2019-07-19 08:38:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-07-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J17205,"2019-07-19 08:38:00",18-교영-01,c.설계사,.,"2019-07-19 18:09:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10313,"2019-07-19 08:43:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-19 18:03:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J10314,"2019-07-19 13:44:00",14-설계-08,h.기타,"교량#1교(부산에코델타시티 4구간) 설계견적서 및 내역서, 장동교(순천 벌교~주암 3-2공구) 시행견적서, 청룡2교외4개소(평택동부민자) 시행견적서, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료","2019-07-19 18:03:00",14-설계-08,h.기타,"교량#1교(부산에코델타시티 4구간) 설계견적서 및 내역서, 장동교(순천 벌교~주암 3-2공구) 시행견적서, 청룡2교외4개소(평택동부민자) 시행견적서, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14101,"2019-07-19 08:50:00",16-시공-20,출장,한양,"2019-07-19 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J15301,"2019-07-19 08:50:00",18-시공-15,출장,"[고양시]Sole Plate 보수 작업","2019-07-19 18:00:00",18-시공-15,출장,"[고양시]Sole Plate 보수 작업","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J10315,"2019-07-20 08:24:00",17-시공-09,b.시공,"가설계획서 보완","2019-07-20 16:09:00",17-시공-09,b.시공,"가설계획서 보완","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,1,
|
|
J07202,"2019-07-20 08:49:00",19-제조-04,b.기계,"천정 크레인 청소","2019-07-20 14:00:00",19-제조-04,b.기계,"천정 크레인 청소","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07210,"2019-07-20 13:30:00",14-설계-32,h.기타,"기타 검토","2019-07-20 17:04:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,1,
|
|
J09102,"2019-07-22 07:29:00",19-계약-01,b.시공사,"평택동부 민자고속도로 6개교 실행 예산서 등 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","2019-07-22 19:21:00",19-계약-01,b.시공사,"평택동부 민자고속도로 6개교 실행 예산서 등 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J14308,"2019-07-22 07:30:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-22 18:04:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-07-22 07:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-22 18:04:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J07202,"2019-07-22 07:32:00",19-제조-04,b.기계,"수리티교 거더 거푸집(H2.2m) 보수와 모바일배치플랜트 크레인 테스트","2019-07-23 06:13:00",19-제조-04,b.기계,"수리티교 거더 거푸집(H2.2m) 보수와 모바일배치플랜트 크레인 테스트","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-07-22 07:34:00",16-제조-02,a.생산관리,"성주대교(측,중앙경간),수리티교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-07-22 07:38:00",19-제조-02,a.생산관리,"Pre-Deck 야적 검토","2019-07-22 18:01:00",19-제조-02,a.생산관리,"Pre-Deck 야적 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>확대회의 자료 준비<|>02:00<|><br>19-제조-02<|>a.생산관리<|>확대회의<|>01:00<|><br>",,
|
|
J18202,"2019-07-22 07:42:00",07-교영-01,b.시공사,"발주 현황 파악","2019-07-22 18:08:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J13308,"2019-07-22 07:43:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","2019-07-22 18:12:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류 검토
|
|
2. 중앙거리(대흥로) 실정보고 및 설계변경 현황파악
|
|
3. 일일작업 보고서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18207,"2019-07-22 07:44:00",16-시공-20,b.시공,"거더제작과정 품질관리 및 제작 인장점검","2019-07-22 18:15:00",16-시공-20,b.시공,"거더제작과정 품질관리 및 제작 인장점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-07-22 07:56:00",19-제조-03,a.품질검사,"ISO 서류 작성, 히팅레일 시험","2019-07-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J10315,"2019-07-22 08:02:00",17-시공-09,b.시공,"가설계획서 보완","2019-07-22 18:01:00",17-시공-09,b.시공,"가설계획서 보완","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18206,"2019-07-22 08:09:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-22 18:14:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-07-22 08:09:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-22 18:12:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-07-22 08:10:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-22 21:47:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-22 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
M05510,"2019-07-22 08:14:00",17-시공-09,b.시공,"Spliced PSC Girder 제작 및 가설공사
|
|
경간부 50본
|
|
주두부 40본
|
|
가설벤트 1번~8번 /2회 설치
|
|
공무,공사,안전,품질 관리","2019-07-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.130.99,NULL,NULL,004C8,,,
|
|
J18205,"2019-07-22 08:15:00",17-설계-09,c.도면,"구조계산서 검토","2019-07-22 21:42:00",17-설계-09,c.도면,"구조계산서 검토","2019-07-22 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
B15306,"2019-07-22 08:21:00",18-관리-02,e.기타,"비서업무 외","2019-07-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15202,"2019-07-22 08:22:00",15-설계-31,e.검토,"시공전 성과품 검토","2019-07-22 21:15:00",15-설계-31,e.검토,"시공전 성과품 검토","2019-07-22 18:32:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"12-설계-24<|>e.검토<|>삼남1교 시공순서 변경 검토<|>05:00<|><br>",1,
|
|
J10301,"2019-07-22 08:24:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-22 21:04:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-22 18:33:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J10314,"2019-07-22 08:24:00",18-설계-06,h.기타,"신촌교(양평~이천 2공구) 시행견적서(입찰), 교량#1교(부산에코델타시티 4구간) 설계견적서 및 내역서, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료","2019-07-22 18:07:00",18-설계-06,h.기타,"신촌교(양평~이천 2공구) 시행견적서(입찰), 교량#1교(부산에코델타시티 4구간) 설계견적서 및 내역서, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15201,"2019-07-22 08:26:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-07-22 18:02:00",19-교영-01,c.설계사,"신규과업 현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15302,"2019-07-22 08:28:00",18-설계-19,b.구조계산,"지적사항 일식 수정","2019-07-22 18:08:00",18-설계-19,b.구조계산,"지적사항 일식 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J07103,"2019-07-22 08:29:00",19-교영-01,d.기타,사업관리,"2019-07-22 18:15:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J16202,"2019-07-22 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-22 18:17:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J13201,"2019-07-22 08:32:00",14-설계-32,c.도면,"연속지점부거푸집 검토","2019-07-22 18:15:00",14-설계-32,c.도면,"연속지점부거푸집 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11203,"2019-07-22 08:34:00",17-시공-08,g.기타,"런처운용, 교각검토","2019-07-22 18:07:00",17-시공-08,g.기타,"런처운용, 교각검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J11202,"2019-07-22 08:34:00",19-시공-02,b.시공,공사관리,"2019-07-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J11305,"2019-07-22 08:35:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-22 18:05:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J17205,"2019-07-22 08:35:00",18-교영-01,c.설계사,.,"2019-07-22 18:09:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-07-22 08:40:00",14-설계-32,h.기타,"기타 검토","2019-07-22 18:09:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-07-22 08:41:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-22 18:05:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-07-22 08:45:00",19-교영-01,c.설계사,과업조사,"2019-07-22 18:01:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-07-22 08:50:00",16-시공-20,출장,한양,"2019-07-22 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-07-23 06:15:00",19-제조-04,b.기계,"강연선 인입실험 자재준비와 수리티교 거더 거푸집(H2.2m) 보수와 삼남1교 자재구입 및 발송","2019-07-24 07:10:00",19-제조-04,b.기계,"강연선 인입실험 자재준비와 수리티교 거더 거푸집(H2.2m) 보수와 삼남1교 자재구입 및 발송","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-07-23 07:26:00",19-제조-02,a.생산관리,"전기 양생실험 ","2019-07-23 18:05:00",19-제조-02,a.생산관리,"전기 양생실험 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>주52시간 관련 회의 및 자료 수집<|>02:30<|><br>19-제조-02<|>a.생산관리<|>노듈러 거더 개선 검토<|>02:30<|><br>",,
|
|
J18208,"2019-07-23 07:27:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-23 20:41:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-23 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18202,"2019-07-23 07:28:00",07-교영-01,b.시공사,"발주 현황 파악","2019-07-23 18:11:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
T04204,"2019-07-23 07:29:00",16-제조-02,a.생산관리,"수리티교,성주대교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-07-23 07:33:00",16-시공-20,b.시공,"거더제작과정 품질관리 및 제작 인장점검","2019-07-23 18:11:00",16-시공-20,b.시공,"거더제작과정 품질관리 및 제작 인장점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-07-23 07:35:00",19-계약-01,b.시공사,"코오롱글로벌 본사 방문예정, 평택동부 민자고속도로 6개교 실행 예산서 등 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","2019-07-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J14308,"2019-07-23 07:39:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-23 20:42:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-23 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-07-23 07:44:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 히팅레일 시험","2019-07-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18206,"2019-07-23 08:07:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-23 18:10:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-07-23 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-07-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10315,"2019-07-23 08:15:00",17-시공-07,b.시공,"제작 및 가설검토
|
|
","2019-07-23 18:07:00",17-시공-07,b.시공,"제작 및 가설검토
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J17205,"2019-07-23 08:17:00",18-교영-01,c.설계사,.,"2019-07-23 18:24:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10314,"2019-07-23 08:18:00",19-설계-03,h.기타,"신촌교(양평~이천 2공구) 시행견적서(입찰), 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 공법별 공통단가(2019년 상반기기준)","2019-07-23 18:08:00",19-설계-03,h.기타,"접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 신촌교(양평~이천 2공구) 시행견적서(입찰), 공법별 공통단가(2019년 상반기기준)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15307,"2019-07-23 08:21:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.171,NULL,NULL,008E4,,,
|
|
J14306,"2019-07-23 08:21:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-23 18:01:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11305,"2019-07-23 08:22:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-23 18:04:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J09101,"2019-07-23 08:22:00",19-교영-01,c.설계사,과업조사,"2019-07-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J18205,"2019-07-23 08:25:00",17-설계-09,c.도면,"구조물도 수정","2019-07-23 21:35:00",17-설계-09,c.도면,"구조물도 수정","2019-07-23 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-07-23 08:25:00",14-설계-32,c.도면,"연속지점부거푸집 검토","2019-07-23 18:00:00",14-설계-32,c.도면,"연속지점부거푸집 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J16202,"2019-07-23 08:28:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-23 19:19:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10301,"2019-07-23 08:28:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-23 18:11:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-07-23 08:31:00",19-시공-02,b.시공,공사관리,"2019-07-23 18:23:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-07-23 08:32:00",14-설계-32,h.기타,"기타 검토","2019-07-23 18:05:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15202,"2019-07-23 08:34:00",15-설계-31,e.검토,"시공전 성과품 검토","2019-07-23 21:04:00",15-설계-31,e.검토,"시공전 성과품 검토","2019-07-23 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"19-설계-06<|>e.검토<|>도림1육교 빔배치<|>02:00<|><br>",1,
|
|
J11203,"2019-07-23 08:34:00",17-시공-08,g.기타,"런처운용, 교각검토","2019-07-23 18:05:00",17-시공-08,g.기타,"런처운용, 교각검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-설계-02<|>h.기타<|>치악교 설계도서수정 후 송부(심의의견반영, 설계사 통일부분 요청)<|>03:00<|><br>",,
|
|
J15201,"2019-07-23 08:37:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-07-23 18:19:00",19-교영-01,c.설계사,"신규과업 현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07103,"2019-07-23 08:38:00",19-교영-01,d.기타,사업관리,"2019-07-23 12:57:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10313,"2019-07-23 08:45:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-23 18:03:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15301,"2019-07-23 08:55:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
부가세신고 누락분 확인
|
|
금곡교 투입내역 작성 및 이체증 발송","2019-07-23 18:37:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
부가세신고 누락분 확인
|
|
금곡교 투입내역 작성 및 이체증 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14101,"2019-07-23 08:50:00",16-시공-20,출장,한양,"2019-07-23 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J13308,"2019-07-23 08:50:00",19-시공-08,출장,"[천안시청]중앙거리(대흥로) 가로환경 정비공사 준공계제출","2019-07-23 18:00:00",19-시공-08,출장,"[천안시청]중앙거리(대흥로) 가로환경 정비공사 준공계제출","0000-00-00 00:00:00",NULL,NULL,NULL,004E3,,,
|
|
J07202,"2019-07-24 07:11:00",19-제조-04,b.기계,"왕림교 전도방지 출장과 수리티교 거더 거푸집(H2.2m) 보수와 옥산교 프리덱 상차","2019-07-25 07:29:00",19-제조-04,b.기계,"왕림교 전도방지 출장과 수리티교 거더 거푸집(H2.2m) 보수와 옥산교 프리덱 상차","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-07-24 07:16:00",07-교영-01,b.시공사,"발주 현황 파악","2019-07-25 07:36:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
T04204,"2019-07-24 07:18:00",16-제조-02,a.생산관리,"수리티교,성주대교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-07-24 07:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-24 22:24:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-24 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,,
|
|
M02302,"2019-07-24 07:30:00",19-제조-02,a.생산관리,"오토클레이브 부지 활용 계획 검토","2019-07-24 18:05:00",19-제조-02,a.생산관리,"오토클레이브 부지 활용 계획 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-07-24 07:31:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 출장보고
|
|
2. 중앙거리(대흥로) 가로환경정비공사 정산서류 작성
|
|
3. 조령천교 철근신청서 작성 및 협의
|
|
4. 7월 기성내역 작성","2019-07-24 18:03:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 출장보고
|
|
2. 중앙거리(대흥로) 가로환경정비공사 정산서류 작성
|
|
3. 조령천교 철근신청서 작성 및 협의
|
|
4. 7월 기성내역 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J09102,"2019-07-24 07:35:00",19-계약-01,b.시공사,"송산~시화MTV 접속교 실행 예산서 등 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","2019-07-24 19:42:00",19-계약-01,b.시공사,"송산~시화MTV 접속교 실행 예산서 등 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J14308,"2019-07-24 07:39:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-24 21:50:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-24 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-07-24 07:44:00",16-시공-20,b.시공,"거더제작과정 품질관리 및 제작 인장점검","2019-07-24 18:06:00",16-시공-20,b.시공,"거더제작과정 품질관리 및 제작 인장점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-07-24 07:44:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 히팅레일 시험","2019-07-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
B15306,"2019-07-24 08:02:00",18-관리-02,e.기타,"비서업무 외","2019-07-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-07-24 08:10:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-24 20:47:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10315,"2019-07-24 08:11:00",17-시공-09,b.시공,"가설계획서 보완
|
|
","2019-07-24 18:11:00",17-시공-09,b.시공,"가설계획서 보완
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18206,"2019-07-24 08:15:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-24 18:13:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J17205,"2019-07-24 08:19:00",18-교영-01,c.설계사,.,"2019-07-24 18:28:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J16202,"2019-07-24 08:21:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J14306,"2019-07-24 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-24 18:02:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-07-24 08:25:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-24 18:13:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J18205,"2019-07-24 08:26:00",17-설계-09,c.도면,"구조물도 수정","2019-07-24 21:40:00",17-설계-09,c.도면,"구조물도 수정","2019-07-24 18:31:00",61.98.205.243,172.16.9.155,61.98.205.243,008E2,,1,
|
|
J11202,"2019-07-24 08:26:00",19-시공-02,b.시공,공사관리,"2019-07-24 18:33:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10314,"2019-07-24 08:27:00",19-설계-03,h.기타,"접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 신촌교(양평~이천 2공구) 시행견적서(입찰), 공법별 공통단가(2019년 상반기기준)","2019-07-24 18:31:00",19-설계-03,h.기타,"접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 신촌교(양평~이천 2공구) 시행견적서(입찰), 공법별 공통단가(2019년 상반기기준)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15302,"2019-07-24 08:27:00",18-설계-19,b.구조계산,"지적사항 일식 수정","2019-07-24 18:10:00",18-설계-19,b.구조계산,"지적사항 일식 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15202,"2019-07-24 08:31:00",15-설계-31,e.검토,"시공전 성과품 검토","2019-07-24 21:12:00",15-설계-31,e.검토,"시공전 성과품 검토","2019-07-24 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"19-설계-03<|>e.검토<|>가설방안 회의<|>04:00<|><br>19-설계-06<|>e.검토<|>도림1육교 교량계획<|>01:00<|><br>",1,
|
|
J11305,"2019-07-24 08:36:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-24 18:12:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07210,"2019-07-24 08:39:00",14-설계-32,h.기타,"기타 검토","2019-07-24 18:09:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11203,"2019-07-24 08:41:00",17-시공-08,g.기타,"런처운용, Rear Support하중, 가설된거더에 재하시 거더응력검토서 수정","2019-07-24 18:11:00",17-시공-08,g.기타,"런처운용, 교각검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-10<|>g.기타<|>가설벤트 지지 구조검토 공문작성 첨부자료 확인<|>03:00<|><br>",,
|
|
J10313,"2019-07-24 08:44:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-24 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15301,"2019-07-24 08:55:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
단장천2교 입금증 발송
|
|
외주시행 정산 업데이트","2019-07-24 18:08:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
단장천2교 입금증 발송
|
|
외주시행 정산 업데이트","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-07-24 08:56:00",19-교영-01,c.설계사,과업조사,"2019-07-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15201,"2019-07-24 09:01:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-07-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J13201,"2019-07-24 13:05:00",14-설계-32,c.도면,"연속지점부거푸집 검토","2019-07-24 18:09:00",14-설계-32,c.도면,"연속지점부거푸집 검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,"19-설계-01<|>c.도면<|>신평교 중간가로보 수정<|>04:00<|><br>",,
|
|
J14101,"2019-07-24 08:50:00",16-시공-20,출장,한양,"2019-07-24 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07103,"2019-07-24 08:50:00",16-시공-20,출장,산외교현장,"2019-07-24 18:00:00",16-시공-20,출장,산외교현장,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J10315,"2019-07-25 06:10:00",17-시공-09,b.시공,"가설계획서 보완
|
|
","2019-07-25 18:01:00",17-시공-09,b.시공,"가설계획서 보완
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J07202,"2019-07-25 07:29:00",19-제조-04,b.기계,"수리티교 거더 거푸집(H2.2m) 보수와 강연선 인입실험체 목재 거푸집 제작","2019-07-26 07:32:00",19-제조-04,b.기계,"수리티교 거더 거푸집(H2.2m) 보수와 강연선 인입실험체 목재 거푸집 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-07-25 07:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-25 21:15:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-25 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-07-25 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-25 18:07:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-07-25 07:33:00",19-제조-02,a.생산관리,"Pre-Deck 야적 검토","2019-07-25 18:04:00",19-제조-02,a.생산관리,"Pre-Deck 야적 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-07-25 07:36:00",07-교영-01,b.시공사,"발주 현황 파악","2019-07-25 18:04:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J13308,"2019-07-25 07:37:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 출장보고
|
|
2. 중앙거리(대흥로) 가로환경정비공사 정산서류 작성
|
|
3. 조령천교 철근신청서 작성 및 협의
|
|
4. 7월 기성내역 작성","2019-07-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
T04204,"2019-07-25 07:38:00",16-제조-02,a.생산관리,"수리티교,성주대교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09102,"2019-07-25 07:40:00",19-계약-01,b.시공사,"대림산업 합사 방문예정, 송산~시화MTV 접속교 실행 예산서 등 : 안성~구리 1공구 조령천교 외 5개교 계약 추진 중","2019-07-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-07-25 07:43:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, ","2019-07-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J07103,"2019-07-25 08:11:00",18-교영-01,d.기타,사업관리,"2019-07-25 18:17:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J08201,"2019-07-25 08:15:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-25 20:12:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-07-25 08:17:00",18-관리-02,e.기타,"비서업무 외","2019-07-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-07-25 08:19:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-25 18:31:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J14306,"2019-07-25 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-25 18:07:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10314,"2019-07-25 08:24:00",19-설계-03,h.기타,"접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 운흥천교(고부~영원) 설계내역서(특정공법심의), 신촌교(양평~이천 2공구) 시행견적서(입찰)","2019-07-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J10301,"2019-07-25 08:25:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-25 18:09:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15201,"2019-07-25 08:25:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-07-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J18205,"2019-07-25 08:26:00",17-설계-09,c.도면,"구조물도 수정","2019-07-25 21:36:00",17-설계-09,c.도면,"구조물도 수정","2019-07-25 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15302,"2019-07-25 08:26:00",18-설계-19,b.구조계산,"지적사항 일식 수정","2019-07-25 18:08:00",18-설계-19,b.구조계산,"지적사항 일식 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J13201,"2019-07-25 08:29:00",17-설계-09,c.도면,"조령천교 가설벤트 EL산정","2019-07-25 18:03:00",17-설계-09,c.도면,"조령천교 가설벤트 EL산정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15202,"2019-07-25 08:30:00",15-설계-31,e.검토,"시공전 성과품 검토","2019-07-25 21:13:00",15-설계-31,e.검토,"시공전 성과품 검토","2019-07-25 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J11305,"2019-07-25 08:33:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-25 18:05:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J17205,"2019-07-25 08:33:00",18-교영-01,c.설계사,.,"2019-07-25 18:07:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-07-25 08:34:00",14-설계-32,h.기타,"기타 검토","2019-07-25 18:07:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11203,"2019-07-25 08:41:00",17-시공-08,g.기타,"런처운용, 거더검토","2019-07-25 18:07:00",17-시공-08,g.기타,"런처운용, 교각검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15307,"2019-07-25 08:42:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-25 21:31:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-25 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J09101,"2019-07-25 08:42:00",19-교영-01,c.설계사,과업조사,"2019-07-25 18:16:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10313,"2019-07-25 08:44:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-25 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16202,"2019-07-25 08:50:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-25 18:21:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15301,"2019-07-25 08:56:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
단장천2교 입금증 발송
|
|
외주시행 정산 업데이트","2019-07-25 18:39:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
단장천2교 입금증 발송
|
|
외주시행 정산 업데이트","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14101,"2019-07-25 08:50:00",16-시공-20,출장,한양,"2019-07-25 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18206,"2019-07-26 08:21:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-26 18:08:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J14308,"2019-07-26 07:21:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-26 20:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-26 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-07-26 07:27:00",16-제조-02,a.생산관리,"수리티교,성주대교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-07-26 07:28:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-26 18:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-07-26 07:31:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-07-26 18:18:18",19-제조-03,a.품질검사,NULL,"2019-07-26 18:38:00",175.203.206.128,175.203.206.128,NULL,006E1,,1,
|
|
J07202,"2019-07-26 07:33:00",19-제조-04,b.기계,"강연선 인입실험체 목재 거푸집 제작과 배수로 정비","2019-07-27 07:31:00",19-제조-04,b.기계,"강연선 인입실험체 목재 거푸집 제작과 배수로 정비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-07-26 07:33:00",19-제조-02,a.생산관리,"노듈러 거더 하부바닥판 생산 및 시공 검토","2019-07-26 18:04:00",19-제조-02,a.생산관리,"노듈러 거더 하부바닥판 생산 및 시공 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>평택~동부 프리텐션 거더 설비 관련 협의<|>02:00<|><br>",,
|
|
J18202,"2019-07-26 07:33:00",07-교영-01,b.시공사,"발주 현황 파악","2019-07-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J08201,"2019-07-26 08:12:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-26 18:20:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-07-26 08:20:00",19-설계-03,h.기타,"접속교 가설 검토자료(송산그린시티~시화멀티테크노밸리), 운흥천교(고부~영원) 설계내역서(특정공법심의), 신촌교(양평~이천 2공구) 시행견적서(입찰), 공법별 공통단가(2019년 상반기기준)","2019-07-26 18:05:00",19-설계-03,h.기타,"운흥천교(고부~영원) 설계내역서(특정공법심의), 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 신촌교(양평~이천 2공구) 시행견적서(입찰), 공법별 공통단가(2019년 상반기기준)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11202,"2019-07-26 08:22:00",19-시공-02,b.시공,공사관리,"2019-07-26 18:22:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14306,"2019-07-26 08:24:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
B15306,"2019-07-26 08:24:00",18-관리-02,e.기타,"비서업무 외","2019-07-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15302,"2019-07-26 08:26:00",18-설계-19,b.구조계산,"지적사항 일식 수정","2019-07-26 18:02:00",18-설계-19,b.구조계산,"지적사항 일식 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J11305,"2019-07-26 08:26:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-26 18:06:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J16202,"2019-07-26 08:29:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-26 18:18:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10315,"2019-07-26 08:30:00",17-시공-09,b.시공,"가설계획서 보완
|
|
","2019-07-26 18:29:00",17-시공-09,b.시공,"가설계획서 보완
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J15307,"2019-07-26 08:30:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-26 18:03:00",17-설계-09,c.도면,"조령천교 도면 검토","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J10301,"2019-07-26 08:31:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-26 18:05:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-07-26 08:33:00",15-설계-31,e.검토,"시공전 성과품 검토","2019-07-26 18:00:00",15-설계-31,e.검토,"시공전 성과품 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J11203,"2019-07-26 08:34:00",17-시공-08,g.기타,"클램프계산서제외 교각코핑, 기둥, 기존거더, 트롤리 인양강선계산서 정리 후 발송","2019-07-26 18:31:00",17-시공-08,g.기타,"런처운용, 트롤리 검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-08<|>g.기타<|>회의(남BSJ, 정SM, 차ES, 이종승BJ, 박BJ)<|>01:30<|><br>",,
|
|
J07210,"2019-07-26 08:37:00",14-설계-32,h.기타,"기타 검토","2019-07-26 18:02:00",14-설계-32,h.기타,"기타 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15201,"2019-07-26 08:37:00",19-교영-01,c.설계사,"신규과업 현황 조사","2019-07-26 18:03:00",19-교영-01,c.설계사,"신규과업 현황 조사","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J13201,"2019-07-26 08:38:00",17-설계-09,c.도면,"조령천교 가설벤트 EL산정","2019-07-26 18:03:00",17-설계-09,c.도면,"조령천교 가설벤트 EL산정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J17205,"2019-07-26 08:38:00",18-교영-01,c.설계사,.,"2019-07-26 18:05:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18205,"2019-07-26 08:41:00",17-설계-09,c.도면,"구조물도 수정","2019-07-26 21:38:00",17-설계-09,c.도면,"구조물도 수정","2019-07-26 18:36:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J10313,"2019-07-26 08:45:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15301,"2019-07-26 08:50:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
단장천2교 입금증 발송
|
|
외주시행 정산 업데이트","2019-07-26 18:06:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
단장천2교 입금증 발송
|
|
외주시행 정산 업데이트","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-07-26 08:57:00",19-교영-01,c.설계사,과업조사,"2019-07-26 18:10:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-07-26 08:50:00",16-시공-20,출장,한양,"2019-07-26 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J09102,"2019-07-26 08:50:00",19-계약-01,출장,"한신공영(안성구리1), SK건설(안성구리2)","2019-07-26 18:00:00",19-계약-01,출장,"한신공영(안성구리1), SK건설(안성구리2)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-07-27 07:31:00",19-제조-04,b.기계,"업무회의 및 강연선 인입실험체 목재 거푸집 제작과 배수로 정비","2019-07-27 14:26:00",19-제조-04,b.기계,"업무회의 및 강연선 인입실험체 목재 거푸집 제작과 배수로 정비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-07-27 07:35:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-27 17:09:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J16203,"2019-07-27 07:39:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-07-27 16:14:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
M02302,"2019-07-27 07:41:00",19-제조-02,a.생산관리,"공장관리 및 업무 보고","2019-07-27 16:07:00",19-제조-02,a.생산관리,"공장관리 및 업무 보고","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
T04204,"2019-07-27 07:49:00",16-제조-02,a.생산관리,"수리티교,성주대교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-27 16:07:00",16-제조-02,a.생산관리,"수리티교,성주대교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-07-28 16:24:00",17-시공-09,b.시공,"경간부 45본,주두부 40본 제작 및 가설공사
|
|
벤트조립 및 해체
|
|
안전,품질,시공관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.153.176,NULL,NULL,004C8,,,
|
|
J14308,"2019-07-29 07:22:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-29 18:06:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-07-29 07:28:00",16-제조-02,a.생산관리,"수리티교,주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-07-29 07:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-29 18:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18202,"2019-07-29 07:29:00",07-교영-01,b.시공사,"발주 현황 파악","2019-07-29 18:21:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J13308,"2019-07-29 07:31:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 출장보고
|
|
2. 중앙거리(대흥로) 가로환경정비공사 정산서류 작성
|
|
3. 조령천교 철근신청서 작성 및 협의
|
|
4. 7월 기성내역 작성","2019-07-29 18:11:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 출장보고
|
|
2. 중앙거리(대흥로) 가로환경정비공사 정산서류 작성
|
|
3. 조령천교 철근신청서 작성 및 협의
|
|
4. 7월 기성내역 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J07202,"2019-07-29 07:31:00",19-제조-04,b.기계,"수리티교 거더 거푸집(H2.2) 보수와 성주대교 프리덱 상차","2019-07-30 07:30:00",19-제조-04,b.기계,"수리티교 거더 거푸집(H2.2) 보수와 성주대교 프리덱 상차","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-07-29 07:36:00",19-계약-01,b.시공사,"남양건설 방문예정, 벌교~주암(3-2공구), 용진~우아2 예상 시행가 : 조령천교 외 5개교 계약 추진 중","2019-07-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M02302,"2019-07-29 07:40:00",19-제조-02,a.생산관리,"철근 재고관리 및 절단계획 검토","2019-07-29 18:05:00",19-제조-02,a.생산관리,"철근 재고관리 및 절단계획 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-07-29 07:40:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-07-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18207,"2019-07-29 07:43:00",16-시공-20,b.시공,"거더제작과정 품질관리 및 제작 인장점검","2019-07-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.10.246,NULL,NULL,004C7,,,
|
|
M05510,"2019-07-29 07:58:00",17-시공-09,b.시공,"경간부 45본,주두부 40본 제작 및 가설공사
|
|
벤트조립 및 해체
|
|
안전,품질,시공관리","2019-07-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.153.195,NULL,NULL,004C8,,,
|
|
J08201,"2019-07-29 08:11:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J10315,"2019-07-29 08:13:00",17-시공-21,b.시공,"북수원1교 가설협의
|
|
","2019-07-29 13:00:00",17-시공-21,b.시공,"북수원1교 가설협의
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
B15306,"2019-07-29 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-07-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-07-29 08:16:00",18-교영-01,d.기타,사업관리,"2019-07-29 19:06:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18206,"2019-07-29 08:20:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-29 19:03:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-07-29 08:20:00",18-설계-06,h.기타,"운흥천교(고부~영원) 설계견적서 및 내역서(특정공법심의), 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 신촌교(양평~이천 2공구) 시행견적서(입찰), 공법별 공통단가(2019년 상반기기준)","2019-07-29 18:16:00",18-설계-06,h.기타,"운흥천교(고부~영원) 설계견적서 및 내역서(특정공법심의), 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 신촌교(양평~이천 2공구) 시행견적서(입찰), 공법별 공통단가(2019년 상반기기준)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11305,"2019-07-29 08:25:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-29 19:06:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-07-29 08:26:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-29 21:33:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-29 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J15302,"2019-07-29 08:26:00",18-설계-19,b.구조계산,"지적사항 일식 수정","2019-07-29 18:12:00",18-설계-19,b.구조계산,"지적사항 일식 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J16202,"2019-07-29 08:27:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-29 18:22:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14306,"2019-07-29 08:27:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-29 18:02:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-07-29 08:30:00",19-시공-02,b.시공,공사관리,"2019-07-29 21:19:00",19-시공-02,b.시공,공사관리,"2019-07-29 18:30:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J18205,"2019-07-29 08:29:00",17-설계-09,c.도면,"구조물도 수정","2019-07-29 21:50:00",17-설계-09,c.도면,"구조물도 수정","2019-07-29 18:32:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,"19-설계-06<|>b.구조계산<|>Slab Extension 구조계산서 작성<|>03:00<|><br>",1,
|
|
J15202,"2019-07-29 08:30:00",15-설계-31,e.검토,"시공전 성과품 검토","2019-07-29 21:35:00",15-설계-31,e.검토,"시공전 성과품 검토","2019-07-29 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"17-설계-09<|>e.검토<|>조령천교 시공전 성과품 검토<|>07:00<|><br>",1,
|
|
J11203,"2019-07-29 08:32:00",17-시공-08,g.기타,"런처운용, 트롤리 검토","2019-07-29 18:11:00",17-시공-08,g.기타,"런처운용, 트롤리 검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-10<|>g.기타<|>육상부 가설밴트 공사팀 발송<|>00:30<|><br>17-시공-08<|>g.기타<|>시공사요구사항 발주처보고자료 작성후송부<|>01:00<|><br>",,
|
|
J17205,"2019-07-29 08:35:00",18-교영-01,c.설계사,.,"2019-07-29 18:12:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15301,"2019-07-29 08:47:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
단장천2교 입금증 발송
|
|
외주시행 정산 업데이트","2019-07-29 18:15:00",16-시공-20,b.시공,"산외교 정산서 작성
|
|
단장천2교 입금증 발송
|
|
외주시행 정산 업데이트","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-07-29 09:06:00",19-교영-01,c.설계사,과업조사,"2019-07-29 18:03:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J18301,"2019-07-29 16:43:00",19-제조-02,a.생산관리,"런처 정비보수","2019-07-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
J14101,"2019-07-29 08:50:00",16-시공-20,출장,한양,"2019-07-29 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10301,"2019-07-29 08:50:00",18-시공-15,출장,"[GS건설 현장사무소(고양시)]원흥2교 주두부 1본 솔플레이트 보수 관련 잭업작업 ","2019-07-29 18:00:00",18-시공-15,출장,"[GS건설 현장사무소(고양시)]원흥2교 주두부 1본 솔플레이트 보수 관련 잭업작업 ","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
T04204,"2019-07-30 07:24:00",16-제조-02,a.생산관리,"수리티교,주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-07-30 07:29:00",07-교영-01,b.시공사,"발주 현황 파악","2019-07-30 18:15:00",07-교영-01,b.시공사,"발주 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J07202,"2019-07-30 07:31:00",19-제조-04,b.기계,"수리티교 거더 거푸집(H2.2) 보수와 컨베이어 골재낙석 개선","2019-07-31 07:26:00",19-제조-04,b.기계,"수리티교 거더 거푸집(H2.2) 보수와 컨베이어 골재낙석 개선","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-07-30 07:34:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-30 21:43:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-30 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18208,"2019-07-30 07:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-30 21:23:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-30 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18301,"2019-07-30 07:37:00",19-제조-02,a.생산관리,"런처 정비보수","2019-07-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
J13308,"2019-07-30 07:41:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 출장보고
|
|
2. 중앙거리(대흥로) 가로환경정비공사 정산서류 작성
|
|
3. 조령천교 철근신청서 작성 및 협의
|
|
4. 7월 기성내역 작성","2019-07-30 18:04:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 출장보고
|
|
2. 중앙거리(대흥로) 가로환경정비공사 정산서류 작성
|
|
3. 조령천교 철근신청서 작성 및 협의
|
|
4. 7월 기성내역 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10315,"2019-07-30 08:03:00",17-시공-09,b.시공,"밴트레벨 적정성 검토","2019-07-30 18:02:00",17-시공-09,b.시공,"밴트레벨 적정성 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J10314,"2019-07-30 08:09:00",18-설계-06,h.기타,"공법별 공통단가(2019년 상반기기준), 운흥천교(고부~영원) 설계견적서 및 내역서(특정공법심의), 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 신촌교(양평~이천 2공구) 시행견적서(입찰)","2019-07-30 14:00:00",18-설계-06,h.기타,"공법별 공통단가(2019년 상반기기준), 운흥천교(고부~영원) 설계견적서 및 내역서(특정공법심의), 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 신촌교(양평~이천 2공구) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-07-30 08:11:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J18206,"2019-07-30 08:14:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-30 18:22:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J14306,"2019-07-30 08:18:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-30 18:02:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
B15306,"2019-07-30 08:22:00",18-관리-02,e.기타,"비서업무 외","2019-07-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10301,"2019-07-30 08:26:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-30 18:11:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15302,"2019-07-30 08:27:00",19-설계-06,c.도면,"도화1육교 배근도 작성","2019-07-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.173,NULL,NULL,008E4,,,
|
|
J15202,"2019-07-30 08:29:00",17-설계-09,e.검토,"시공전 성과품 검토","2019-07-30 21:08:00",17-설계-09,e.검토,"시공전 성과품 검토","2019-07-30 18:37:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"12-설계-24<|>e.검토<|>처짐도 검토<|>02:00<|><br>17-설계-09<|>e.검토<|>곡천교 가설계획도 검토<|>02:00<|><br>",1,
|
|
J10313,"2019-07-30 08:30:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-07-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15307,"2019-07-30 08:31:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-30 21:34:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-30 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J18205,"2019-07-30 08:33:00",17-설계-09,c.도면,"구조물도 수정","2019-07-30 21:38:00",17-설계-09,c.도면,"구조물도 수정","2019-07-30 18:36:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,,
|
|
J17205,"2019-07-30 08:35:00",18-교영-01,c.설계사,.,"2019-07-30 18:36:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11203,"2019-07-30 08:35:00",17-시공-08,g.기타,"런처가설검토(외측거더 크레인 가설 도면작업)","2019-07-30 18:01:00",17-시공-08,g.기타,"런처가설검토(외측거더 크레인 가설 도면작업)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"18-설계-19<|>h.기타<|>5공구 대콘 3개교량 성과품 검토 후 발송<|>01:00<|><br>19-교영-01<|>d.기타<|>유신 고부영원 빔배치 R=450, 2@50 폭원유지 선배수 설계사요구<|>01:00<|><br>",,
|
|
J16202,"2019-07-30 08:42:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-30 18:27:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J09101,"2019-07-30 08:47:00",19-교영-01,c.설계사,과업조사,"2019-07-30 18:14:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15301,"2019-07-30 08:49:00",16-시공-20,b.시공,"주요자재 거래명세표 검토
|
|
옥산교 작업일보 작성
|
|
자안2교 프리덱, 가로보 공급원승인서 발송","2019-07-30 18:06:00",16-시공-20,b.시공,"주요자재 거래명세표 검토
|
|
옥산교 작업일보 작성
|
|
자안2교 프리덱, 가로보 공급원승인서 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14101,"2019-07-30 08:50:00",16-시공-20,출장,한양,"2019-07-30 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J09102,"2019-07-30 08:50:00",19-영업-01,출장,진성이앤씨,"2019-07-30 18:00:00",19-영업-01,출장,진성이앤씨,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M02302,"2019-07-30 08:50:00",19-제조-02,출장,"[한맥빌딩]노듈러 거더 부자재 관련 업체 협의","2019-07-30 18:00:00",19-제조-02,출장,"[한맥빌딩]노듈러 거더 부자재 관련 업체 협의","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J11305,"2019-07-30 08:50:00",17-시공-10,출장,현장사무실,"2019-07-30 18:00:00",17-시공-10,출장,현장사무실,"0000-00-00 00:00:00",NULL,NULL,NULL,008C7,,,
|
|
J18207,"2019-07-30 08:50:00",17-시공-10,출장,"성주대교현장 가밴트가설관련 시공사협의","2019-07-30 18:00:00",17-시공-10,출장,"성주대교현장 가밴트가설관련 시공사협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
T04204,"2019-07-31 07:17:00",16-제조-02,a.생산관리,"수리티교,주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-07-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-07-31 07:27:00",19-제조-04,b.기계,"수리티교 거더 거푸집(H2.2) 보수와 컨베이어 골재낙석 개선","2019-07-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-07-31 07:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-31 20:36:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-07-31 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18301,"2019-07-31 07:30:00",19-제조-02,a.생산관리,"런처 정비보수","2019-07-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
M02302,"2019-07-31 07:30:00",19-제조-02,a.생산관리,"Nodular Girder 원가분석 검토","2019-07-31 18:12:00",19-제조-02,a.생산관리,"Nodular Girder 원가분석 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-07-31 07:37:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-31 20:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-07-31 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-07-31 07:41:00",16-시공-20,b.시공,"산외교현장 공사관리점검","2019-07-31 18:04:00",16-시공-20,b.시공,"산외교현장 공사관리점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-07-31 07:50:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 출장보고
|
|
2. 중앙거리(대흥로) 가로환경정비공사 정산서류 작성
|
|
3. 조령천교 철근신청서 작성 및 협의
|
|
4. 7월 기성내역 작성","2019-07-31 18:04:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 가로환경정비공사 출장보고
|
|
2. 중앙거리(대흥로) 가로환경정비공사 정산서류 작성
|
|
3. 조령천교 철근신청서 작성 및 협의
|
|
4. 7월 기성내역 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10315,"2019-07-31 08:06:00",17-시공-09,b.시공,"밴트레벨 적정성 검토","2019-07-31 18:00:00",17-시공-09,b.시공,"밴트레벨 적정성 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J10309,"2019-07-31 08:07:00",18-시공-06,b.시공,제작준비,"2019-07-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",61.98.205.243,NULL,NULL,004E1,,,
|
|
J08201,"2019-07-31 08:09:00",18-설계-16,g.업무지원,설계VE지원,"2019-07-31 20:48:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-07-31 08:10:00",17-설계-09,c.도면,"구조물도 수정","2019-07-31 21:38:00",17-설계-09,c.도면,"구조물도 수정","2019-07-31 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J18206,"2019-07-31 08:11:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-07-31 18:03:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J07103,"2019-07-31 08:17:00",18-교영-01,d.기타,사업관리,"2019-07-31 18:04:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15302,"2019-07-31 08:25:00",19-설계-06,c.도면,"도화1육교 배근도 작성","2019-07-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.173,NULL,NULL,008E4,,,
|
|
J14306,"2019-07-31 08:27:00",19-관리-04,a.계약,"계약, 인사 외","2019-07-31 18:05:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15202,"2019-07-31 08:27:00",17-설계-09,e.검토,"시공전 성과품 검토","2019-07-31 21:40:00",17-설계-09,e.검토,"시공전 성과품 검토","2019-07-31 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"17-설계-09<|>e.검토<|>가설계획도 검토<|>02:00<|><br>",1,
|
|
J11305,"2019-07-31 08:28:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-07-31 18:03:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10301,"2019-07-31 08:30:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-07-31 18:23:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15307,"2019-07-31 08:31:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-31 21:31:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-07-31 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J11203,"2019-07-31 08:32:00",18-설계-19,h.기타,"설계사 검토사항 용암1교 설계도서검토","2019-07-31 18:03:00",18-설계-19,h.기타,"설계사 검토사항 용암1교 설계도서검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J16202,"2019-07-31 08:34:00",19-교영-01,c.설계사,신규사업현황조사,"2019-07-31 18:19:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-07-31 08:38:00",18-교영-01,c.설계사,.,"2019-07-31 18:08:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15301,"2019-07-31 08:50:00",16-시공-20,b.시공,"주요자재 거래명세표 검토
|
|
옥산교 작업일보 작성
|
|
자안2교 프리덱, 가로보 공급원승인서 발송","2019-07-31 18:08:00",16-시공-20,b.시공,"주요자재 거래명세표 검토
|
|
옥산교 작업일보 작성
|
|
자안2교 프리덱, 가로보 공급원승인서 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J16203,"2019-07-31 08:56:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-07-31 20:36:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-07-31 18:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09101,"2019-07-31 13:07:00",19-교영-01,c.설계사,과업조사,"2019-07-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J14101,"2019-07-31 08:50:00",16-시공-20,출장,한양,"2019-07-31 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14308,"2019-08-01 07:06:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-01 21:34:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-01 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18301,"2019-08-01 07:10:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
J18208,"2019-08-01 07:37:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-01 21:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-01 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-08-01 08:02:00",16-시공-20,b.시공,"산외교현장 j-web 상연 인장력 제어안 공사관리점검","2019-08-01 18:12:00",16-시공-20,b.시공,"산외교현장 j-web 상연 인장력 제어안 공사관리점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
B15306,"2019-08-01 08:03:00",18-관리-02,e.기타,"비서업무 외","2019-08-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-08-01 08:10:00",18-설계-16,g.업무지원,설계VE지원,"2019-08-01 18:46:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-08-01 08:15:00",18-설계-06,h.기타,"우산1교 및 구룡교(화순 동면~송광 봉산) 설계견적서, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 신촌교(양평~이천 2공구) 시행견적서(입찰)","2019-08-01 18:19:00",18-설계-06,h.기타,"우산1교 및 구룡교(화순 동면~송광 봉산) 설계견적서, 접속교(송산그린시티~시화멀티테크노밸리) 검토자료, 신촌교(양평~이천 2공구) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J10315,"2019-08-01 08:19:00",17-시공-09,b.시공,"스트롱백 설치 및 가설방안 적정성 검토","2019-08-01 18:12:00",17-시공-09,b.시공,"스트롱백 설치 및 가설방안 적정성 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18206,"2019-08-01 08:20:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-08-01 18:09:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11202,"2019-08-01 08:23:00",19-시공-02,b.시공,공사관리,"2019-08-01 18:52:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J13201,"2019-08-01 08:25:00",17-설계-09,c.도면,"조령천교 가설벤트상세도 작성","2019-08-01 20:45:00",17-설계-09,c.도면,"조령천교 가설벤트상세도 작성","2019-08-01 18:31:00",172.16.9.165,172.16.9.155,172.16.9.165,008E2,,1,
|
|
J16202,"2019-08-01 08:25:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J14306,"2019-08-01 08:26:00",19-관리-04,a.계약,"계약, 인사 외","2019-08-01 18:05:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-08-01 08:27:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-01 18:49:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15302,"2019-08-01 08:27:00",19-설계-06,c.도면,"도화1육교 배근도 작성","2019-08-01 18:04:00",19-설계-06,c.도면,"도화1육교 배근도 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15202,"2019-08-01 08:27:00",17-설계-09,e.검토,"시공전 성과품 검토","2019-08-01 20:45:00",17-설계-09,e.검토,"시공전 성과품 검토","2019-08-01 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J11203,"2019-08-01 08:32:00",19-설계-07,"a.계획 및 협의","설계사와 협의 후 빔배치","2019-08-01 18:03:00",18-설계-19,h.기타,"설계사 검토사항 용암1교 설계도서검토","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-10<|>g.기타<|>동성에 2015년 2017년 밴트기초 자료 발송분 발송<|>01:00<|><br>",,
|
|
J15307,"2019-08-01 08:33:00",17-설계-09,c.도면,"조령천교 도면 검토","2019-08-01 18:04:00",17-설계-09,c.도면,"조령천교 도면 검토","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,"15-설계-31<|>c.도면<|>경안천교 도면 검토<|>02:30<|><br>",,
|
|
J11305,"2019-08-01 08:33:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-08-01 18:18:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07210,"2019-08-01 08:34:00",14-설계-32,h.기타,"거더 검토","2019-08-01 20:47:00",14-설계-32,h.기타,"거더 검토","2019-08-01 18:31:00",172.16.9.162,172.16.9.155,172.16.9.162,008E1,,1,
|
|
J17205,"2019-08-01 08:36:00",18-교영-01,c.설계사,.,"2019-08-01 18:13:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07103,"2019-08-01 08:41:00",18-교영-01,d.기타,사업관리,"2019-08-01 18:24:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15301,"2019-08-01 08:49:00",16-시공-20,b.시공,"자안2교 프리덱, 가로보 공급원승인서 발송
|
|
현장 정산서 작성
|
|
옥산교 작업일보 작성
|
|
운곡교 위험성평가 작성","2019-08-01 18:20:00",16-시공-20,b.시공,"자안2교 프리덱, 가로보 공급원승인서 발송
|
|
현장 정산서 작성
|
|
옥산교 작업일보 작성
|
|
운곡교 위험성평가 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-08-01 09:16:00",19-교영-01,c.설계사,과업조사,"2019-08-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
M05510,"2019-08-01 09:48:00",17-시공-09,b.시공,"경간부 45본,주두부 40본 제작 및 가설공사
|
|
벤트조립 및 해체
|
|
안전,품질,시공관리","2019-08-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.151.169,NULL,NULL,004C8,,,
|
|
J16203,"2019-08-01 12:51:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-08-01 20:36:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-08-01 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,,
|
|
M02302,"2019-08-01 07:20:00",19-제조-02,a.생산관리,"운송회사 소송관련 협의 및 보고","2019-08-01 18:08:00",19-제조-02,a.생산관리,"운송회사 소송관련 협의 및 보고","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14101,"2019-08-01 08:50:00",16-시공-20,출장,한양,"2019-08-01 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J13308,"2019-08-01 08:50:00",19-시공-08,출장,"[천안시청, 천안시 현장]천안시청 준공계 제출 및 협의","2019-08-01 18:00:00",19-시공-08,출장,"[천안시청, 천안시 현장]천안시청 준공계 제출 및 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E3,,,
|
|
J18207,"2019-08-02 07:22:00",16-시공-20,b.시공,"산외교현장 j-web 상연 인장력 제어안 공사관리점검","2019-08-02 18:15:00",16-시공-20,b.시공,"산외교현장 j-web 상연 인장력 제어안 공사관리점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18301,"2019-08-02 07:29:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-02 12:00:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J18208,"2019-08-02 07:30:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-02 12:00:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J13308,"2019-08-02 07:34:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류작성
|
|
2. 북수원1교 솔플레이트 보수계획서 작성","2019-08-02 18:16:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류작성
|
|
2. 북수원1교 솔플레이트 보수계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J14308,"2019-08-02 07:34:00",19-제조-02,a.생산관리,"- 1팀 생산관리
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-02 18:56:00",19-제조-02,a.생산관리,"- 1팀 생산관리
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-08-02 07:34:00",19-제조-02,a.생산관리,"탕비실/회의실 이사","2019-08-02 18:02:00",19-제조-02,a.생산관리,"탕비실/회의실 이사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-08-02 07:39:00",19-제조-04,b.기계,"사무동 휴게실 물품 이동과 컨베이어 골재낙석 개선","2019-08-02 18:00:00",19-제조-04,b.기계,"사무동 휴게실 물품 이동과 컨베이어 골재낙석 개선","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-08-02 07:42:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-08-02 22:30:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-08-02 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J10315,"2019-08-02 08:00:00",17-시공-09,b.시공,"스트롱백 설치 및 가설방안 적정성 검토","2019-08-02 18:06:00",17-시공-09,b.시공,"스트롱백 설치 및 가설방안 적정성 검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J08201,"2019-08-02 08:10:00",18-설계-16,g.업무지원,설계VE지원,"2019-08-02 18:27:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-08-02 08:13:00",16-시공-20,b.시공,"산외교 현안사항 검토","2019-08-02 18:15:00",16-시공-20,b.시공,"산외교 현안사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-08-02 08:15:00",18-관리-02,e.기타,"비서업무 외","2019-08-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-08-02 08:16:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-08-02 18:08:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J14306,"2019-08-02 08:20:00",19-관리-04,a.계약,"계약, 인사 외","2019-08-02 18:10:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15202,"2019-08-02 08:24:00",17-설계-09,e.검토,"시공전 성과품 검토","2019-08-02 18:17:00",17-설계-09,e.검토,"시공전 성과품 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J10301,"2019-08-02 08:25:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-02 18:34:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16202,"2019-08-02 08:26:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-02 18:15:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15302,"2019-08-02 08:26:00",19-설계-06,c.도면,"도화1육교 배근도 및 세종~안성 일식 수정","2019-08-02 18:09:00",19-설계-06,c.도면,"도화1육교 배근도 및 세종~안성 일식 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J11202,"2019-08-02 08:26:00",19-시공-02,b.시공,공사관리,"2019-08-02 18:42:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-08-02 08:29:00",14-설계-32,h.기타,"거더 검토","2019-08-02 18:11:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J07103,"2019-08-02 08:30:00",18-교영-01,d.기타,사업관리,"2019-08-02 18:20:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10314,"2019-08-02 08:32:00",19-설계-03,h.기타,"접속교 설계견적서(송산그린시티~시화멀티테크노밸리), 도림1육교(영동고속도로 확장) 설계견적서 및 내역서, 우산1교 및 구룡교(화순 동면~송광 봉산) 설계견적서, 신촌교(양평~이천 2공구) 시행견적서(입찰)","2019-08-02 18:16:00",19-설계-03,h.기타,"접속교 설계견적서(송산그린시티~시화멀티테크노밸리), 도림1육교(영동고속도로 확장) 설계견적서 및 내역서, 우산1교 및 구룡교(화순 동면~송광 봉산) 설계견적서, 신촌교(양평~이천 2공구) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J17205,"2019-08-02 08:34:00",18-교영-01,c.설계사,.,"2019-08-02 18:07:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15307,"2019-08-02 08:37:00",15-설계-31,c.도면,"경안천교 도면 검토","2019-08-02 18:12:00",15-설계-31,c.도면,"경안천교 도면 검토","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J13201,"2019-08-02 08:40:00",17-설계-09,c.도면,"조령천교 가설벤트상세도 작성","2019-08-02 18:15:00",17-설계-09,c.도면,"조령천교 가설벤트상세도 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11203,"2019-08-02 08:41:00",19-설계-07,b.구조계산,"하중산정, 모델링 1차","2019-08-02 18:06:00",19-설계-07,b.구조계산,"하중산정, 모델링 1차","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15301,"2019-08-02 08:49:00",16-시공-20,b.시공,"자안2교 프리덱, 가로보 공급원승인서 발송
|
|
현장 정산서 작성
|
|
옥산교 작업일보 작성
|
|
운곡교 위험성평가 작성","2019-08-02 18:20:00",16-시공-20,b.시공,"자안2교 프리덱, 가로보 공급원승인서 발송
|
|
현장 정산서 작성
|
|
옥산교 작업일보 작성
|
|
운곡교 위험성평가 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-08-02 08:51:00",19-교영-01,c.설계사,과업조사,"2019-08-02 18:08:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-08-02 08:50:00",16-시공-20,출장,한양,"2019-08-02 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J16203,"2019-07-10 08:50:00",19-제조-03,출장,"[산외교(밀양)]산외교 콘크리트 품질관리 ","2019-07-10 18:00:00",19-제조-03,출장,"[산외교(밀양)]산외교 콘크리트 품질관리 ","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J15301,"2019-07-22 08:50:00",18-시공-15,출장,"[고양시]원흥2교 솔플레이트 보수작업 현장관리 및 협의","2019-07-22 18:00:00",18-시공-15,출장,"[고양시]원흥2교 솔플레이트 보수작업 현장관리 및 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J07103,"2019-07-30 08:50:00",17-시공-09,출장,"삼남1교 출장","2019-07-30 18:00:00",17-시공-09,출장,"삼남1교 출장","0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J10309,"2019-07-30 08:50:00",18-시공-06,출장,"[전남 나주시]업무협의","2019-07-30 18:00:00",18-시공-06,출장,"[전남 나주시]업무협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10313,"2019-08-04 09:14:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-08-04 14:56:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,1,
|
|
J14308,"2019-08-05 07:30:00",19-제조-02,a.생산관리,"- 1팀 생산관리
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-05 18:01:00",19-제조-02,a.생산관리,"- 1팀 생산관리
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J13308,"2019-08-05 07:30:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류작성
|
|
2. 북수원1교 솔플레이트 보수계획서 작성","2019-08-05 18:14:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류작성
|
|
2. 북수원1교 솔플레이트 보수계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J07202,"2019-08-05 07:32:00",19-제조-04,b.기계,"사무동 휴게실 물품 이동과 컨베이어 골재낙석 개선","2019-08-06 07:31:00",19-제조-04,b.기계,"사무동 휴게실 물품 이동과 컨베이어 골재낙석 개선","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-08-05 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J18202,"2019-08-05 07:33:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","2019-08-05 18:14:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-08-05 07:36:00",19-계약-01,b.시공사,"(주)흥화 본사 방문, 광주광역시 영업지원관련 자료 작성 등 : 조령천교 외 5개교 계약 추진 중","2019-08-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-08-05 07:39:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-08-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
M02302,"2019-08-05 07:39:00",19-제조-02,a.생산관리,"조직 개편 검토 및 협의","2019-08-05 18:00:00",19-제조-02,a.생산관리,"조직 개편 검토 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>임원회의 자료작성<|>03:00<|><br>19-제조-02<|>a.생산관리<|>운수회사 소장 관련 협의<|>01:30<|><br>",,
|
|
J18207,"2019-08-05 07:58:00",16-시공-20,b.시공,"산외교현장 j-web 상연 인장력 제어안 공사관리점검","2019-08-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.10.246,NULL,NULL,004C7,,,
|
|
B15306,"2019-08-05 08:08:00",18-관리-02,e.기타,"비서업무 외","2019-08-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-08-05 08:09:00",18-설계-16,g.업무지원,설계VE지원,"2019-08-05 20:06:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10301,"2019-08-05 08:14:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-05 18:06:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10314,"2019-08-05 08:19:00",19-설계-03,h.기타,"도림1육교(영동고속도로 확장) 설계견적서 및 내역서, 우산1교 및 구룡교(화순 동면~송광 봉산) 설계견적서, 신촌교(양평~이천 2공구) 시행견적서(입찰)","2019-08-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J16202,"2019-08-05 08:24:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-05 18:10:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10310,"2019-08-05 08:24:00",18-시공-04,b.시공,"자안2교 1차인장 결과서 작성 및 송부","2019-08-05 18:06:00",18-시공-04,b.시공,"자안2교 1차인장 결과서 작성 및 송부","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,004C8,,,
|
|
J15302,"2019-08-05 08:25:00",19-설계-06,c.도면,"도화1육교 배근도 및 세종~안성 일식 수정","2019-08-05 18:07:00",19-설계-06,c.도면,"도화1육교 배근도 및 세종~안성 일식 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15201,"2019-08-05 08:25:00",19-교영-17,c.설계사,"과업진행현황 파악","2019-08-05 18:03:00",19-교영-17,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J09101,"2019-08-05 08:25:00",19-교영-01,c.설계사,과업조사,"2019-08-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J07103,"2019-08-05 08:27:00",18-교영-01,d.기타,사업관리,"2019-08-05 18:07:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15307,"2019-08-05 08:27:00",15-설계-31,c.도면,"경안천교 도면 검토","2019-08-05 21:31:00",15-설계-31,c.도면,"경안천교 도면 검토","2019-08-05 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J17205,"2019-08-05 08:37:00",18-교영-01,c.설계사,.,"2019-08-05 18:09:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11305,"2019-08-05 08:38:00",17-시공-09,g.기타,"시공전 검토사항 체크","2019-08-05 18:05:00",17-시공-09,g.기타,"시공전 검토사항 체크","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J13201,"2019-08-05 08:39:00",19-설계-07,b.구조계산,"무릉교 반력산출","2019-08-05 18:36:00",19-설계-07,b.구조계산,"무릉교 반력산출","2019-08-05 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,,
|
|
J07210,"2019-08-05 08:39:00",14-설계-32,h.기타,"거더 검토","2019-08-05 18:32:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-08-05 08:48:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-08-05 18:00:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15301,"2019-08-05 08:48:00",16-시공-20,b.시공,"동림교 프리덱, 가로보 공급원승인서 발송
|
|
조령천교 자재 공급원승인서 준비
|
|
현장 정산서 작성","2019-08-05 18:07:00",16-시공-20,b.시공,"동림교 프리덱, 가로보 공급원승인서 발송
|
|
조령천교 자재 공급원승인서 준비
|
|
현장 정산서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J18301,"2019-08-05 12:38:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
J14101,"2019-08-05 08:50:00",16-시공-20,출장,한양,"2019-08-05 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-08-05 08:50:00",17-시공-09,출장,"삼남1교 현장","2019-08-05 18:00:00",17-시공-09,출장,"삼남1교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18207,"2019-08-06 07:22:00",17-시공-09,b.시공,"스플라이스거더 가설 및 스트롱백시공 점검","2019-08-06 18:10:00",17-시공-09,b.시공,"스플라이스거더 가설 및 스트롱백시공 점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-08-06 07:30:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류작성
|
|
2. 북수원1교 솔플레이트 보수계획서 작성","2019-08-06 18:07:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류작성
|
|
2. 북수원1교 솔플레이트 보수계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J07202,"2019-08-06 07:32:00",19-제조-04,b.기계,"주천1교 거더 거푸집(H2.6) 보수와 자재 하차","2019-08-07 07:29:00",19-제조-04,b.기계,"주천1교 거더 거푸집(H2.6) 보수와 자재 하차","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-08-06 07:32:00",19-제조-02,a.생산관리,"- 1팀 생산관리
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-06 21:36:00",19-제조-02,a.생산관리,"- 1팀 생산관리
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-06 18:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-08-06 07:35:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-08-06 18:18:18",19-제조-03,a.품질검사,NULL,"2019-08-06 18:34:00",175.203.206.128,175.203.206.128,NULL,006E1,,1,
|
|
J18202,"2019-08-06 07:37:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","2019-08-06 18:06:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-08-06 07:37:00",19-계약-01,b.시공사,"유성건설, 계룡건설 방문 예정, 강진~광주 3공구 Pre-Deck 시행가 등 : 조령천교 외 5개교 계약 추진 중","2019-08-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
T04204,"2019-08-06 07:37:00",19-제조-02,a.생산관리,"주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18301,"2019-08-06 07:39:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
J18208,"2019-08-06 07:42:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-06 20:59:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-06 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
B15306,"2019-08-06 08:06:00",18-관리-02,e.기타,"비서업무 외","2019-08-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-08-06 08:09:00",19-설계-03,e.검토,"성과품 검토","2019-08-06 18:13:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10314,"2019-08-06 08:12:00",18-설계-06,h.기타,"신촌교(양평~이천 2공구) 시행견적서(입찰), 노송1교외 4개소(강진~광주3공구) 검토자료","2019-08-06 18:10:00",16-설계-09,h.기타,"노송1교외 4개소(강진~광주3공구) 검토자료, 신촌교(양평~이천 2공구) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J09101,"2019-08-06 08:15:00",19-교영-01,c.설계사,과업조사,"2019-08-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J18205,"2019-08-06 08:16:00",17-설계-09,c.도면,"시공상세 변경 요청서 작성(조령천교)","2019-08-06 21:34:00",17-설계-09,c.도면,"보고자료 작성","2019-08-06 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J14306,"2019-08-06 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-08-06 18:00:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-08-06 08:24:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-06 18:20:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-08-06 08:24:00",19-교영-17,c.설계사,"과업진행현황 파악","2019-08-06 18:12:00",19-교영-17,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10301,"2019-08-06 08:25:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-06 18:18:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15302,"2019-08-06 08:27:00",19-설계-06,c.도면,"도화1육교 배근도 및 세종~안성 일식 수정","2019-08-06 18:05:00",19-설계-06,c.도면,"도화1육교 배근도 및 세종~안성 일식 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15307,"2019-08-06 08:27:00",15-설계-31,c.도면,"경안천교 도면 검토","2019-08-06 21:31:00",15-설계-31,c.도면,"경안천교 도면 검토","2019-08-06 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J13201,"2019-08-06 08:28:00",19-설계-07,b.구조계산,"무릉교 반력산출","2019-08-06 21:14:00",19-설계-07,b.구조계산,"무릉교 반력산출","2019-08-06 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J07103,"2019-08-06 08:32:00",18-교영-01,d.기타,사업관리,"2019-08-06 21:03:00",18-교영-01,d.기타,사업관리,"2019-08-06 18:52:00",172.16.9.142,172.16.9.142,172.16.9.142,008C6,,1,
|
|
J07210,"2019-08-06 08:33:00",14-설계-32,h.기타,"거더 검토","2019-08-06 21:00:00",14-설계-32,h.기타,"거더 검토","2019-08-06 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J17205,"2019-08-06 08:37:00",18-교영-01,c.설계사,.,"2019-08-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J10313,"2019-08-06 08:46:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-08-06 18:06:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15301,"2019-08-06 08:50:00",16-시공-20,b.시공,"동림교 프리덱, 가로보 공급원승인서 발송
|
|
조령천교 자재 공급원승인서 준비
|
|
현장 정산서 작성","2019-08-06 18:10:00",16-시공-20,b.시공,"동림교 프리덱, 가로보 공급원승인서 발송
|
|
조령천교 자재 공급원승인서 준비
|
|
현장 정산서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J08201,"2019-08-06 08:30:00",18-설계-16,g.업무지원,설계VE지원,"2019-08-06 20:03:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
M02302,"2019-08-06 08:50:00",19-제조-02,출장,"[한맥빌딩]서울 임원회의","2019-08-06 18:09:00",19-제조-02,a.생산관리,"조직 개편 검토 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14101,"2019-08-06 08:50:00",16-시공-20,출장,한양,"2019-08-06 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-08-06 08:50:00",17-시공-09,출장,"삼남1교 현장","2019-08-06 18:00:00",17-시공-09,출장,"삼남1교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18202,"2019-08-07 06:54:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","2019-08-07 18:13:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
T04204,"2019-08-07 07:19:00",19-제조-02,a.생산관리,"주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-08-07 07:20:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류작성
|
|
2. 북수원1교 솔플레이트 보수계획서 작성","2019-08-07 18:21:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산서류작성
|
|
2. 북수원1교 솔플레이트 보수계획서 작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J16203,"2019-08-07 07:21:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-08-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18208,"2019-08-07 07:25:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-07 19:36:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18301,"2019-08-07 07:26:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-07 18:05:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
M02302,"2019-08-07 07:28:00",19-제조-02,a.생산관리,"조직개편 및 업무분장 검토","2019-08-07 18:04:00",19-제조-02,a.생산관리,"조직개편 및 업무분장 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>산외교 Pre-Deck Shop Dwg.<|>05:00<|><br>19-제조-02<|>a.생산관리<|>함평교(분절거더)출하 관리 <|>00:30<|><br>",,
|
|
J07202,"2019-08-07 07:29:00",19-제조-04,b.기계,"공장내 배수 맨홀 청소와 주천1교 거더 거푸집(H2.6) 보수","2019-08-08 07:30:00",19-제조-04,b.기계,"공장내 배수 맨홀 청소와 주천1교 거더 거푸집(H2.6) 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-08-07 07:31:00",19-계약-01,b.시공사,"코오롱글로벌 본사 방문 예정, 검단천교 및 강진~광주 3공구 Pre-Deck 시행가 등 : 조령천교 외 5개교 계약 추진 중","2019-08-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J14308,"2019-08-07 07:33:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-07 20:36:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-07 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-08-07 07:37:00",17-시공-09,b.시공,"스플라이스거더 가설 및 스트롱백시공 점검","2019-08-07 18:17:00",17-시공-09,b.시공,"스플라이스거더 가설 및 스트롱백시공 점검","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J08201,"2019-08-07 08:12:00",18-설계-16,g.업무지원,설계VE지원,"2019-08-07 21:05:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J07103,"2019-08-07 08:12:00",18-교영-01,d.기타,사업관리,"2019-08-07 21:06:00",18-교영-01,d.기타,사업관리,"2019-08-07 18:51:00",172.16.9.142,172.16.9.142,172.16.9.142,008C6,,1,
|
|
B15306,"2019-08-07 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-08-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-08-07 08:14:00",16-설계-09,h.기타,"노송1교외 4개소(강진~광주3공구) 시행견적서, 신촌교(양평~이천 2공구) 시행견적서(입찰)","2019-08-07 18:12:00",16-설계-09,h.기타,"노송1교외 4개소(강진~광주3공구) 시행견적서, 신촌교(양평~이천 2공구) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11202,"2019-08-07 08:20:00",19-시공-02,b.시공,공사관리,"2019-08-07 18:46:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14306,"2019-08-07 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-08-07 18:47:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18205,"2019-08-07 08:25:00",17-설계-09,c.도면,"시공상세 변경 요청서 작성(조령천교)","2019-08-07 22:09:00",17-설계-09,c.도면,"보고자료 작성","2019-08-07 19:09:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J10301,"2019-08-07 08:26:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-07 18:52:00",18-시공-12,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J17205,"2019-08-07 08:27:00",18-교영-01,c.설계사,.,"2019-08-07 18:07:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15302,"2019-08-07 08:27:00",19-설계-06,c.도면,"도화1육교 일식수정 및 세종~안성 일식 수정","2019-08-07 18:29:00",19-설계-06,c.도면,"도화1육교 일식수정 및 세종~안성 일식 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J13201,"2019-08-07 08:31:00",19-설계-07,b.구조계산,"무릉교 구조계산서 작성","2019-08-07 18:03:00",19-설계-07,b.구조계산,"무릉교 구조계산서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J07210,"2019-08-07 08:33:00",14-설계-32,h.기타,"거더 검토","2019-08-07 21:01:00",14-설계-32,h.기타,"거더 검토","2019-08-07 18:51:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J16202,"2019-08-07 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-07 18:17:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15307,"2019-08-07 08:37:00",19-설계-07,b.구조계산,"무릉교 슬래브 일반도 작성","2019-08-07 18:02:00",19-설계-07,b.구조계산,"무릉교 슬래브 일반도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J11305,"2019-08-07 08:39:00",19-설계-03,e.검토,"성과품 검토","2019-08-07 18:09:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J09101,"2019-08-07 08:41:00",19-교영-01,c.설계사,과업조사,"2019-08-07 18:01:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15201,"2019-08-07 08:44:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","2019-08-07 18:06:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-08-07 08:48:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-08-07 18:00:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15301,"2019-08-07 08:49:00",16-시공-20,b.시공,"동림교 프리덱, 가로보 공급원승인서 발송
|
|
조령천교 자재 공급원승인서 준비
|
|
현장 정산서 작성","2019-08-07 18:07:00",16-시공-20,b.시공,"동림교 프리덱, 가로보 공급원승인서 발송
|
|
조령천교 자재 공급원승인서 준비
|
|
현장 정산서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14101,"2019-08-07 08:50:00",16-시공-20,출장,한양,"2019-08-07 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-08-07 08:50:00",17-시공-09,출장,"삼남1교 현장","2019-08-07 18:00:00",17-시공-09,출장,"삼남1교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18202,"2019-08-08 07:28:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","2019-08-08 18:12:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
T04204,"2019-08-08 07:29:00",19-제조-02,a.생산관리,"주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-08-08 07:31:00",19-제조-04,b.기계,"함평교 분절거더 상차","2019-08-09 07:32:00",19-제조-04,b.기계,"함평교 분절거더 상차","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-08-08 07:31:00",19-제조-02,a.생산관리,"산외교 Pre-Deck Shop Dwg.","2019-08-08 18:06:00",19-제조-02,a.생산관리,"산외교 Pre-Deck Shop Dwg.","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-08-08 07:32:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-08 18:05:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-08-08 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-08 21:56:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-08 18:42:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18301,"2019-08-08 07:37:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-08 18:08:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J09102,"2019-08-08 07:40:00",19-계약-01,b.시공사,"중리~천리 예상 계약가, 광주광역시 영업관련 예상 시행가 등 : 조령천교 외 5개교 계약 추진 중","2019-08-08 21:25:00",19-계약-01,b.시공사,"중리~천리 예상 계약가, 광주광역시 영업관련 예상 시행가 등 : 조령천교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J18207,"2019-08-08 07:44:00",17-설계-09,g.업무지원,"공사착공준비를 위한 시공상세도면검토 및 제작장협의","2019-08-08 18:17:00",17-설계-09,g.업무지원,"공사착공준비를 위한 시공상세도면검토 및 제작장협의","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J08201,"2019-08-08 08:09:00",18-설계-16,g.업무지원,설계VE지원,"2019-08-08 19:26:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-08-08 08:17:00",18-관리-02,e.기타,"비서업무 외","2019-08-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10313,"2019-08-08 08:20:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-08-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J16202,"2019-08-08 08:21:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-08 18:39:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11305,"2019-08-08 08:23:00",19-설계-03,e.검토,"성과품 검토","2019-08-08 18:09:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07103,"2019-08-08 08:25:00",18-교영-01,d.기타,사업관리,"2019-08-08 14:15:00",18-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J13201,"2019-08-08 08:27:00",19-설계-07,b.구조계산,"무릉교 구조계산서 작성","2019-08-08 18:07:00",19-설계-07,b.구조계산,"무릉교 구조계산서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J17205,"2019-08-08 08:28:00",18-교영-01,c.설계사,.,"2019-08-08 18:04:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18205,"2019-08-08 08:31:00",17-설계-09,c.도면,"시공상세 변경 요청서 작성(조령천교)","2019-08-08 18:04:00",17-설계-09,c.도면,"보고자료 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J15202,"2019-08-08 08:31:00",17-설계-09,e.검토,"시공전 성과품 검토","2019-08-08 18:18:18",17-설계-09,e.검토,NULL,"2019-08-08 18:34:00",172.16.9.155,172.16.9.155,NULL,008E1,,1,
|
|
J07210,"2019-08-08 08:33:00",14-설계-32,h.기타,"거더 검토","2019-08-08 18:06:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15307,"2019-08-08 08:35:00",19-설계-07,b.구조계산,"무릉교 슬래브 일반도, 바닥판 계산서 작성","2019-08-08 18:04:00",19-설계-07,b.구조계산,"무릉교 슬래브 일반도, 바닥판 계산서 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J14306,"2019-08-08 08:41:00",19-관리-04,a.계약,"계약, 인사 외","2019-08-08 18:10:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15301,"2019-08-08 08:49:00",16-시공-20,b.시공,"동림교 프리덱, 가로보 공급원승인서 발송
|
|
경안천교 쏠플레이트 검토서 작성
|
|
수리티교 자재 수량 산출
|
|
수리티교 쏠플레이트 검토 및 흥우건설 발송
|
|
운곡교 자재 발주 수량 변경
|
|
삼남1교 이체증 발송 (6월분)
|
|
노무비 내역서 작성
|
|
가산2교, 추천2교 강연선 수량 산출","2019-08-08 18:14:00",16-시공-20,b.시공,"동림교 프리덱, 가로보 공급원승인서 발송
|
|
경안천교 쏠플레이트 검토서 작성
|
|
수리티교 자재 수량 산출
|
|
수리티교 쏠플레이트 검토 및 흥우건설 발송
|
|
운곡교 자재 발주 수량 변경
|
|
삼남1교 이체증 발송 (6월분)
|
|
노무비 내역서 작성
|
|
가산2교, 추천2교 강연선 수량 산출","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15201,"2019-08-08 12:07:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","2019-08-08 18:07:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11202,"2019-08-08 08:50:00",17-설계-09,출장,"[경기도 안성]조령천교 현장투입 및 시공관련 협의","2019-08-08 21:07:00",19-시공-02,b.시공,공사관리,"2019-08-08 18:30:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J14101,"2019-08-08 08:50:00",16-시공-20,출장,한양,"2019-08-08 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-08-08 08:50:00",17-시공-09,출장,"삼남1교 현장","2019-08-08 18:00:00",17-시공-09,출장,"삼남1교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J13308,"2019-08-08 08:50:00",19-시공-08,출장,"[천안시청, 천안시 동남구 일원]준공서류 제출","2019-08-08 18:00:00",19-시공-08,출장,"[천안시청, 천안시 동남구 일원]준공서류 제출","0000-00-00 00:00:00",NULL,NULL,NULL,004E3,,,
|
|
T04204,"2019-08-09 07:25:00",19-제조-02,a.생산관리,"주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-08-09 07:26:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-09 18:02:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-08-09 07:30:00",19-제조-02,a.생산관리,"직원 교육 준비 및 보고자료 작성","2019-08-09 18:05:00",19-제조-02,a.생산관리,"직원 교육 준비 및 보고자료 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>직원교육<|>01:00<|><br>19-제조-02<|>a.생산관리<|>철근 관리 프로그램 협의 및 회의<|>02:30<|><br>19-제조-02<|>a.생산관리<|>노듈러 거더 관련 업무협조전 작성 및 발송<|>03:00<|><br>",,
|
|
J09102,"2019-08-09 07:30:00",19-계약-01,b.시공사,"한신공영, 강산건설 계약관련 방문 등 : 조령천교 외 5개교 계약 추진 중","2019-08-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-08-09 07:32:00",17-설계-09,g.업무지원,"공사착공준비를 위한 시공상세도면검토 및 제작장협의","2019-08-09 18:23:00",17-설계-09,g.업무지원,"공사착공준비를 위한 시공상세도면검토 및 제작장협의","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-08-09 07:32:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 변경 실행품의 및 내역작성
|
|
2. 중앙거리(대흥로) 정산 및 출금전표작성","2019-08-09 18:09:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 변경 실행품의 및 내역작성
|
|
2. 중앙거리(대흥로) 정산 및 출금전표작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J07202,"2019-08-09 07:33:00",19-제조-04,b.기계,"함평교 분절거더 상차 후 정리 및 PC강연선 인입시험 거푸집 준비","2019-08-10 07:34:00",19-제조-04,b.기계,"함평교 분절거더 상차 후 정리 및 PC강연선 인입시험 거푸집 준비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-08-09 07:39:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","2019-08-09 18:20:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18301,"2019-08-09 07:42:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-09 18:01:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J08201,"2019-08-09 08:09:00",18-설계-16,g.업무지원,설계VE지원,"2019-08-09 18:26:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-08-09 08:24:00",18-관리-02,e.기타,"비서업무 외","2019-08-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18205,"2019-08-09 08:24:00",17-설계-09,c.도면,"보고자료 작성","2019-08-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",61.98.205.243,NULL,NULL,008E2,,,
|
|
J13201,"2019-08-09 08:25:00",19-설계-07,b.구조계산,"무릉교 거더도면작성","2019-08-09 14:03:00",19-설계-07,b.구조계산,"무릉교 거더도면작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J14306,"2019-08-09 08:27:00",19-관리-04,a.계약,"계약, 인사 외","2019-08-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J16202,"2019-08-09 08:27:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-09 18:19:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15307,"2019-08-09 08:29:00",19-설계-07,b.구조계산,"무릉교 바닥판 계산서, 슬래브 배근도 작성","2019-08-09 18:05:00",19-설계-07,b.구조계산,"무릉교 바닥판 계산서, 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J11202,"2019-08-09 08:30:00",19-시공-02,b.시공,공사관리,"2019-08-09 18:25:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15201,"2019-08-09 08:35:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","2019-08-09 18:07:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-08-09 08:35:00",18-교영-01,c.설계사,.,"2019-08-09 18:06:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-08-09 08:35:00",17-설계-09,e.검토,"시공전 성과품 검토","2019-08-09 18:01:00",17-설계-09,e.검토,"시공전 성과품 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J11305,"2019-08-09 08:35:00",19-설계-03,e.검토,"성과품 검토","2019-08-09 18:08:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07210,"2019-08-09 08:37:00",14-설계-32,h.기타,"거더 검토","2019-08-09 18:03:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15301,"2019-08-09 08:46:00",16-시공-20,b.시공,"노무비 내역서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
조령천교 자재 공급원승인서 발송 (케이티에이 고강도)
|
|
경안천교 강봉 공급원승인서 발송
|
|
원흥2교, 북수원1교, 가산2교, 삼남1교 기성 청구","2019-08-09 18:07:00",16-시공-20,b.시공,"노무비 내역서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
조령천교 자재 공급원승인서 발송 (케이티에이 고강도)
|
|
경안천교 강봉 공급원승인서 발송
|
|
원흥2교, 북수원1교, 가산2교, 삼남1교 기성 청구","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J10313,"2019-08-09 08:52:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-08-09 18:06:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-08-09 08:55:00",19-교영-01,c.설계사,과업조사,"2019-08-09 18:04:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
M05510,"2019-08-09 11:27:00",17-시공-09,b.시공,"SP거더 제작 및 가설공사
|
|
안전,품질,공사관리","2019-08-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.158.132,NULL,NULL,004C8,,,
|
|
J14308,"2019-08-09 13:55:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-09 20:43:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-09 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14101,"2019-08-09 08:50:00",16-시공-20,출장,한양,"2019-08-09 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-08-09 08:50:00",17-시공-09,출장,"삼남1교 현장","2019-08-09 18:00:00",17-시공-09,출장,"삼남1교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07103,"2019-08-09 08:50:00",16-시공-20,출장,산외교현장,"2019-08-09 18:00:00",16-시공-20,출장,산외교현장,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J18208,"2019-08-10 06:19:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-10 16:04:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
T04204,"2019-08-10 07:08:00",19-제조-02,a.생산관리,"주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-10 16:03:00",19-제조-02,a.생산관리,"주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-08-10 07:27:00",19-제조-02,a.생산관리,"공장관리 및 업무 보고","2019-08-10 16:02:00",19-제조-02,a.생산관리,"공장관리 및 업무 보고","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
J14308,"2019-08-10 07:27:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-10 16:06:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J07202,"2019-08-10 07:34:00",19-제조-04,b.기계,"야적장 청소와 PC강연선 인입시험 거푸집 제작","2019-08-10 15:35:00",19-제조-04,b.기계,"야적장 청소와 PC강연선 인입시험 거푸집 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-08-12 07:28:00",19-제조-02,a.생산관리,"주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-08-12 07:28:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-12 18:02:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-08-12 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-12 18:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18202,"2019-08-12 07:34:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","2019-08-12 18:10:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M05510,"2019-08-12 07:37:00",17-시공-09,b.시공,"SP거더 제작 및 가설공사
|
|
안전,품질,공사관리","2019-08-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.140.194,NULL,NULL,004C8,,,
|
|
J07202,"2019-08-12 07:38:00",19-제조-04,b.기계,"공장내 물 고임 확인과 조치 및 PC강연선 인입시험 거푸집 제작","2019-08-13 07:43:00",19-제조-04,b.기계,"공장내 물 고임 확인과 조치 및 PC강연선 인입시험 거푸집 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-08-12 07:38:00",19-제조-02,a.생산관리," 산외교 Pre-Deck Shop Dwg.","2019-08-12 18:00:00",19-제조-02,a.생산관리," 산외교 Pre-Deck Shop Dwg.","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-08-12 07:47:00",19-계약-01,b.시공사,"남양건설 방문 예정, 검단천교, 조령천교 예상 계약가 등 : 조령천교 외 5개교 계약 추진 중","2019-08-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-08-12 07:51:00",19-제조-03,a.품질검사,"산외, 동림 가로보 및 데크 생산관리, 콘크리트 시험","2019-08-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J10310,"2019-08-12 08:07:00",19-시공-15,b.시공,"1.수리티교 예상실행 작성
|
|
2.자재요청서 작성
|
|
3.관련도면 검토
|
|
","2019-08-12 18:02:00",19-시공-15,b.시공,"1.수리티교 예상실행 작성
|
|
2.자재요청서 작성
|
|
3.관련도면 검토
|
|
","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,004C8,,,
|
|
J13308,"2019-08-12 08:07:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 변경 실행품의 및 내역작성
|
|
2. 중앙거리(대흥로) 정산 및 출금전표작성","2019-08-12 20:41:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 변경 실행품의 및 내역작성
|
|
2. 중앙거리(대흥로) 정산 및 출금전표작성","2019-08-12 18:39:00",172.16.8.170,172.16.8.170,172.16.8.170,004E3,,1,
|
|
J08201,"2019-08-12 08:12:00",18-설계-16,g.업무지원,설계VE지원,"2019-08-12 18:14:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-08-12 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-08-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-08-12 08:17:00",16-시공-20,b.시공,"산외교 설계 및 시공개선사항 ","2019-08-12 18:09:00",16-시공-20,b.시공,"산외교 설계 및 시공개선사항 ","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-08-12 08:23:00",18-설계-06,h.기타,"신촌교(양평~이천 2공구) 시행견적서(입찰), 2019년 하반기 단가 기준 표준내역 작업","2019-08-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J10313,"2019-08-12 08:26:00",19-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인
|
|
","2019-08-12 18:00:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-08-12 08:29:00",19-교영-01,c.설계사,과업조사,"2019-08-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J16202,"2019-08-12 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-12 21:02:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-12 18:59:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J17205,"2019-08-12 08:34:00",18-교영-01,c.설계사,.,"2019-08-12 21:01:00",18-교영-01,c.설계사,.,"2019-08-12 18:58:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J18205,"2019-08-12 08:34:00",17-설계-09,c.도면,"보고자료 작성","2019-08-12 18:08:00",17-설계-09,c.도면,"보고자료 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J11203,"2019-08-12 08:35:00",18-시공-06,g.기타,"운곡교 검토(포스코공문 내요)","2019-08-12 18:06:00",18-시공-06,g.기타,"운곡교 검토(포스코공문 내요)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J13201,"2019-08-12 08:35:00",19-설계-07,b.구조계산,"무릉교 수량산출","2019-08-12 18:05:00",19-설계-07,b.구조계산,"무릉교 수량산출","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11305,"2019-08-12 08:36:00",19-설계-03,e.검토,"성과품 검토","2019-08-12 18:07:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-08-12 08:38:00",19-설계-07,b.구조계산,"무릉교 슬래브 배근도 작성","2019-08-12 18:06:00",19-설계-07,b.구조계산,"무릉교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J15202,"2019-08-12 08:38:00",19-설계-06,c.도면,"성과품 작성","2019-08-12 21:00:00",19-설계-06,c.도면,"성과품 작성","2019-08-12 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J15301,"2019-08-12 08:40:00",16-시공-20,b.시공,"노무비 내역서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
조령천교 자재 공급원승인서 발송 (케이티에이 고강도)
|
|
경안천교 강봉 공급원승인서 발송
|
|
현장소장 경력서 영문 번역","2019-08-12 18:06:00",16-시공-20,b.시공,"노무비 내역서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
조령천교 자재 공급원승인서 발송 (케이티에이 고강도)
|
|
경안천교 강봉 공급원승인서 발송
|
|
현장소장 경력서 영문 번역","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14306,"2019-08-12 08:40:00",19-관리-04,a.계약,"계약, 인사 외","2019-08-12 18:13:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-08-12 08:41:00",19-시공-02,b.시공,공사관리,"2019-08-12 20:37:00",19-시공-02,b.시공,공사관리,"2019-08-12 18:31:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J07210,"2019-08-12 08:42:00",14-설계-32,h.기타,"거더 검토","2019-08-12 18:04:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15201,"2019-08-12 08:43:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","2019-08-12 21:01:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","2019-08-12 18:58:00",172.16.9.150,172.16.9.150,172.16.9.150,008C8,,,
|
|
J14101,"2019-08-12 08:50:00",16-시공-20,출장,한양,"2019-08-12 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-08-12 08:50:00",17-시공-09,출장,"삼남1교 현장","2019-08-12 18:00:00",17-시공-09,출장,"삼남1교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
T04204,"2019-08-13 07:12:00",19-제조-02,a.생산관리,"주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-08-13 07:17:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","2019-08-13 18:10:00",07-교영-01,b.시공사,"새만금남북도로2단계1공구 주상천교 관련 견적","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18208,"2019-08-13 07:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-13 20:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-13 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-08-13 07:30:00",19-제조-02,a.생산관리," 산외교 Pre-Deck Shop Dwg.","2019-08-13 18:07:00",19-제조-02,a.생산관리," 산외교 Pre-Deck Shop Dwg.","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18301,"2019-08-13 07:30:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-13 18:01:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J09102,"2019-08-13 07:32:00",19-계약-01,b.시공사,"한신공영 본사 및 화웅지구 방문예정, 검단천교, 조령천교 예상 계약가 등 : 조령천교 외 5개교 계약 추진 중","2019-08-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J14308,"2019-08-13 07:35:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-13 20:37:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-13 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-08-13 07:37:00",19-제조-03,a.품질검사,"북수원1가로보, 산외교 데크, 생태수로 프리빔 생산관리, 콘크리트 시험","2019-08-13 20:44:00",19-제조-03,a.품질검사,"북수원1가로보, 산외교 데크, 생태수로 프리빔 생산관리, 콘크리트 시험","2019-08-13 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J13308,"2019-08-13 07:43:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 변경 실행품의 및 내역작성
|
|
2. 중앙거리(대흥로) 정산 및 출금전표작성","2019-08-13 20:47:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 변경 실행품의 및 내역작성
|
|
2. 중앙거리(대흥로) 정산 및 출금전표작성","2019-08-13 18:46:00",172.16.8.170,172.16.8.170,172.16.8.170,004E3,,1,
|
|
J07202,"2019-08-13 07:43:00",19-제조-04,b.기계,"PC강연선 인입시험 거푸집 제작 및 주천1교 거푸집 보수","2019-08-14 07:31:00",19-제조-04,b.기계,"PC강연선 인입시험 거푸집 제작 및 주천1교 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18206,"2019-08-13 08:16:00",16-시공-20,b.시공,"산외교 설계 및 시공개선사항 ","2019-08-13 18:30:00",16-시공-20,b.시공,"산외교 설계 및 시공개선사항 ","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-08-13 08:16:00",18-관리-02,e.기타,"비서업무 외","2019-08-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J13201,"2019-08-13 08:24:00",19-설계-07,b.구조계산,"무릉교 수량산출","2019-08-13 18:08:00",19-설계-07,b.구조계산,"무릉교 수량산출","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J09101,"2019-08-13 08:25:00",19-교영-01,c.설계사,과업조사,"2019-08-13 18:01:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15201,"2019-08-13 08:25:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","2019-08-13 18:03:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10315,"2019-08-13 08:28:00",18-설계-18,"a.계획 및 협의","제작협의자료 작성","2019-08-13 18:03:00",18-설계-18,"a.계획 및 협의","제작협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J11203,"2019-08-13 08:32:00",18-시공-06,g.기타,"운곡교 검토(포스코공문 내요)","2019-08-13 18:32:00",18-시공-06,g.기타,"운곡교 검토(포스코공문 내요)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J18205,"2019-08-13 08:33:00",17-설계-09,c.도면,"성주대교 현장도면 검토","2019-08-13 21:08:00",17-설계-09,c.도면,"성주대교 현장도면 검토","2019-08-13 19:00:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J11305,"2019-08-13 08:35:00",19-설계-03,e.검토,"성과품 검토","2019-08-13 18:03:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07210,"2019-08-13 08:36:00",14-설계-32,h.기타,"거더 검토","2019-08-13 21:36:00",14-설계-32,h.기타,"거더 검토","2019-08-13 19:33:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J17205,"2019-08-13 08:37:00",18-교영-01,c.설계사,.,"2019-08-13 19:01:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15307,"2019-08-13 08:37:00",19-설계-07,b.구조계산,"무릉교 슬래브 배근도 작성","2019-08-13 21:49:00",19-설계-07,b.구조계산,"무릉교 슬래브 배근도 작성","2019-08-13 18:48:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J15202,"2019-08-13 08:39:00",19-설계-06,c.도면,"성과품 작성","2019-08-13 18:37:00",19-설계-06,c.도면,"성과품 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J16202,"2019-08-13 08:40:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-13 18:07:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14306,"2019-08-13 08:42:00",19-관리-04,a.계약,"계약, 인사 외","2019-08-13 18:01:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-08-13 08:43:00",19-교영-01,d.기타,사업관리,"2019-08-13 18:12:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15301,"2019-08-13 09:02:00",16-시공-20,b.시공,"노무비 내역서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
조령천교 자재 공급원승인서 발송 (케이티에이 고강도)
|
|
경안천교 강봉 공급원승인서 발송
|
|
현장소장 경력서 영문 번역
|
|
수리티교 자재 발주
|
|
옥산교 BR1 2차인장결과서 작성","2019-08-13 18:15:00",16-시공-20,b.시공,"노무비 내역서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
조령천교 자재 공급원승인서 발송 (케이티에이 고강도)
|
|
경안천교 강봉 공급원승인서 발송
|
|
현장소장 경력서 영문 번역
|
|
수리티교 자재 발주
|
|
옥산교 BR1 2차인장결과서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J10314,"2019-08-13 13:39:00",18-설계-06,h.기타,"신촌교(양평~이천 2공구) 시행견적서(입찰), 2019년 하반기 단가 기준 표준내역 작업","2019-08-13 18:53:00",18-설계-06,h.기타,"신촌교(양평~이천 2공구) 시행견적서(입찰), 2019년 하반기 단가 기준 표준내역 작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-08-13 08:50:00",17-설계-09,경유,"조령천교 시공샵변경","2019-08-13 18:16:00",18-설계-16,g.업무지원,설계VE지원,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11202,"2019-08-13 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 쏠플레이트 보수작업확인 및 추후 일정 협의","2019-08-13 18:27:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14101,"2019-08-13 08:50:00",16-시공-20,출장,한양,"2019-08-13 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10310,"2019-08-13 08:50:00",19-시공-15,출장,"[보은군]수리티교,교암교 사전 일정조율 및 제작협의 및 북수원1교 경유","2019-08-13 18:00:00",19-시공-15,출장,"[보은군]수리티교,교암교 사전 일정조율 및 제작협의 및 북수원1교 경유","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
T04204,"2019-08-14 07:10:00",19-제조-02,a.생산관리,"주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-08-14 07:26:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-14 20:23:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-08-14 07:30:00",19-제조-02,a.생산관리," 산외교 Pre-Deck Shop Dwg.","2019-08-14 18:01:00",19-제조-02,a.생산관리," 산외교 Pre-Deck Shop Dwg.","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-08-14 07:31:00",19-제조-04,b.기계,"주천1교 거푸집 보수와 PC강연선 인입시험 거푸집 제작","2019-08-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18301,"2019-08-14 07:33:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-14 18:00:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J14308,"2019-08-14 07:33:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-14 20:37:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-14 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-08-14 07:39:00",19-제조-03,a.품질검사,"북수원1가로보, 산외교 데크, 생태수로 프리빔 생산관리, 콘크리트 시험","2019-08-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J10315,"2019-08-14 07:53:00",18-설계-18,"a.계획 및 협의","제작협의자료 작성","2019-08-14 14:16:00",18-설계-18,"a.계획 및 협의","제작협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J13308,"2019-08-14 07:56:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 변경 실행품의 및 내역작성
|
|
2. 중앙거리(대흥로) 정산 및 출금전표작성","2019-08-14 18:03:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 변경 실행품의 및 내역작성
|
|
2. 중앙거리(대흥로) 정산 및 출금전표작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
B15306,"2019-08-14 08:00:00",18-관리-02,e.기타,"비서업무 외","2019-08-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-08-14 08:07:00",16-시공-20,b.시공,"산외교 설계 및 시공개선사항 ","2019-08-14 18:09:00",16-시공-20,b.시공,"산외교 설계 및 시공개선사항 ","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-08-14 08:08:00",19-설계-07,h.기타,"신촌교(양평~이천 2공구) 시행견적서(입찰), 무릉교(황강남상지구) 설계내역서, 2019년 하반기 단가 기준 표준내역 작업","2019-08-14 18:16:00",19-설계-07,h.기타,"신촌교(양평~이천 2공구) 시행견적서(입찰), 무릉교(황강남상지구) 설계내역서, 2019년 하반기 단가 기준 표준내역 작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-08-14 08:25:00",19-교영-01,d.기타,사업관리,"2019-08-14 18:16:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14306,"2019-08-14 08:25:00",19-관리-04,a.계약,"계약, 인사 외","2019-08-14 12:54:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07210,"2019-08-14 08:27:00",14-설계-32,h.기타,"거더 검토","2019-08-14 18:09:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15201,"2019-08-14 08:28:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","2019-08-14 18:00:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11202,"2019-08-14 08:29:00",19-시공-02,b.시공,공사관리,"2019-08-14 18:08:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15307,"2019-08-14 08:29:00",19-설계-07,b.구조계산,"무릉교 슬래브 배근도 작성","2019-08-14 18:01:00",19-설계-07,b.구조계산,"무릉교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J16202,"2019-08-14 08:30:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-14 21:52:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-14 18:33:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J10313,"2019-08-14 08:38:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","2019-08-14 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18205,"2019-08-14 08:42:00",17-설계-09,c.도면,"성주대교 현장도면 검토","2019-08-14 20:33:00",17-설계-09,c.도면,"성주대교 현장도면 검토","2019-08-14 18:31:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J09101,"2019-08-14 08:42:00",19-교영-01,c.설계사,과업조사,"2019-08-14 22:25:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,"19-교영-01<|>c.설계사<|>화순동면-송광봉산 경제성분석<|>03:00<|><br>",,
|
|
J13201,"2019-08-14 08:43:00",19-설계-07,b.구조계산,"무릉교 부대공도면작성","2019-08-14 18:05:00",19-설계-07,b.구조계산,"무릉교 부대공도면작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15301,"2019-08-14 08:57:00",16-시공-20,b.시공,"노무비 내역서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
경안천교 강봉 공급원승인서 발송
|
|
현장 정산서 작성
|
|
수리티교 자재요청서 작성","2019-08-14 18:12:00",16-시공-20,b.시공,"노무비 내역서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
경안천교 강봉 공급원승인서 발송
|
|
현장 정산서 작성
|
|
수리티교 자재요청서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-08-14 17:48:00",17-시공-09,b.시공,"SP거더 제작 및 가설공사
|
|
안전,품질,공사관리","2019-08-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",203.226.207.232,NULL,NULL,004C8,,,
|
|
J14101,"2019-08-14 08:50:00",16-시공-20,출장,한양,"2019-08-14 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-08-14 08:50:00",07-교영-01,b.시공사,"[전북 부안군 하서면 일원]새만금 남북도로 2단계 1공구 롯데건설(견적 제출 및 현장소장 미팅), ","2019-08-14 18:00:00",07-교영-01,출장,"[전뷱뷰안군 하서면 일원]새만금 남북도로 2단계 1공구 롯데건설(견적 제출 및 현장소장 미팅), ","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11203,"2019-08-14 08:50:00",18-시공-06,출장,"[전라남도 나주]광주-강진 고속도로건설공사 5공구, 운곡교 한계상태설계 관련 업무협의","2019-08-14 18:00:00",18-시공-06,출장,"[전라남도 나주]광주-강진 고속도로건설공사 5공구, 운곡교 한계상태설계 관련 업무협의","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J16202,"2019-08-15 09:01:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-15 12:51:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14308,"2019-08-15 09:20:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-15 16:57:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J09101,"2019-08-15 09:56:00",19-교영-01,c.설계사,과업조사,"2019-08-15 15:43:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,"19-교영-01<|>c.설계사<|>화순동면-송광봉산 경제성분석<|>05:00<|><br>",1,
|
|
M05510,"2019-08-16 06:38:00",17-시공-09,b.시공,"SP거더 제작 및 가설공사
|
|
안전,품질,공사관리","2019-08-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.160.253,NULL,NULL,004C8,,,
|
|
J14308,"2019-08-16 07:16:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","2019-08-16 18:26:00",19-제조-02,a.생산관리,"- SHOP 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 표준화 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-08-16 07:20:00",19-제조-02,a.생산관리,"주천2교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-08-16 07:25:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-16 21:54:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-16 18:55:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-08-16 07:26:00",17-시공-08,b.시공,"거더 런쳐가설방법 검토","2019-08-16 18:22:00",17-시공-08,b.시공,"거더 런쳐가설방법 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M02302,"2019-08-16 07:40:00",19-제조-02,a.생산관리,"인사고과 자료 수정 ","2019-08-16 18:02:00",19-제조-02,a.생산관리,"인사고과 자료 수정 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>인사고과 자료 수정<|>01:30<|><br>19-제조-02<|>a.생산관리<|>임원회의 자료 수정<|>01:00<|><br>19-제조-02<|>a.생산관리<|>워크샵 숙소 관련 외근<|>02:30<|><br>",,
|
|
J07202,"2019-08-16 07:48:00",19-제조-04,b.기계,"천정크레인 트로리바 연결대 교체와 폐콘크리트 처리용 작업대 제작","2019-08-16 18:18:00",19-제조-04,b.기계,"천정크레인 트로리바 연결대 교체와 폐콘크리트 처리용 작업대 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-04<|>b.기계<|>더블캡 4289호 정기검사<|>01:30<|><br>19-제조-01<|>d.관재<|>화학물질 통계조사표 작성 교육(천안축구센터 대세미나실A)14~17시<|>03:00<|><br>",,
|
|
J18206,"2019-08-16 08:13:00",16-시공-20,b.시공,"산외교 설계 및 시공개선사항 ","2019-08-16 18:20:00",16-시공-20,b.시공,"산외교 설계 및 시공개선사항 ","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-08-16 08:17:00",18-관리-02,e.기타,"비서업무 외","2019-08-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-08-16 08:21:00",19-설계-07,"a.계획 및 협의","조령천교 시공샵변경","2019-08-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J10315,"2019-08-16 08:21:00",18-설계-18,"a.계획 및 협의","제작협의자료 작성","2019-08-16 18:16:00",18-설계-18,"a.계획 및 협의","제작협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J09101,"2019-08-16 08:24:00",19-교영-01,c.설계사,과업조사,"2019-08-16 18:07:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15302,"2019-08-16 08:25:00",18-설계-19,e.검토,"지적사항 검토 및 수정","2019-08-16 18:00:00",18-설계-19,e.검토,"지적사항 검토 및 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J07210,"2019-08-16 08:26:00",14-설계-32,h.기타,"거더 검토","2019-08-16 18:16:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J16202,"2019-08-16 08:28:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J14306,"2019-08-16 08:34:00",19-관리-04,a.계약,"계약, 인사 외","2019-08-16 18:02:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-08-16 08:37:00",19-교영-01,d.기타,사업관리,"2019-08-16 18:22:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-08-16 08:38:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-16 18:25:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15307,"2019-08-16 08:41:00",19-설계-03,c.도면,"접속교 슬래브 도면 수정","2019-08-16 18:00:00",19-설계-03,c.도면,"접속교 슬래브 도면 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J10313,"2019-08-16 08:52:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","2019-08-16 18:04:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J13201,"2019-08-16 08:52:00",19-설계-07,b.구조계산,"무릉교 성과품취합","2019-08-16 18:00:00",19-설계-07,b.구조계산,"무릉교 부대공도면작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11202,"2019-08-16 08:30:00",19-시공-02,b.시공,공사관리,"2019-08-16 18:17:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14101,"2019-08-16 08:50:00",16-시공-20,출장,한양,"2019-08-16 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18208,"2019-08-17 07:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-17 16:38:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
T04204,"2019-08-19 07:18:00",19-제조-02,a.생산관리,"주천2교,조령천교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J16203,"2019-08-19 07:21:00",19-제조-03,a.품질검사,"북수원1가로보, 산외교 데크, 생태수로 프리빔 생산관리, 콘크리트 시험","2019-08-19 18:18:18",19-제조-03,a.품질검사,NULL,"2019-08-19 18:34:00",175.203.206.128,175.203.206.128,NULL,006E1,,,
|
|
J18202,"2019-08-19 07:31:00",07-교영-01,b.시공사,"새만금~전주 고속도로6공구 삼천교 현황 파악","2019-08-19 18:20:00",07-교영-01,b.시공사,"새만금~전주 고속도로6공구 삼천교 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18208,"2019-08-19 07:37:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-19 18:24:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18301,"2019-08-19 07:37:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-19 18:01:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
M02302,"2019-08-19 07:38:00",19-제조-02,a.생산관리,"인사고과 자료 수정 ","2019-08-19 18:08:00",19-제조-02,a.생산관리,"인사고과 자료 수정 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>사무동 인테리어공사 협의<|>01:30<|><br>19-제조-02<|>a.생산관리<|>생산본부 제작 공정표 샘플 작성<|>02:00<|><br>19-제조-02<|>a.생산관리<|>사무동 가구배치 검토<|>03:00<|><br>",,
|
|
J18207,"2019-08-19 07:42:00",17-시공-08,b.시공,"거더 런쳐가설방법 검토","2019-08-19 18:06:00",17-시공-08,b.시공,"거더 런쳐가설방법 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M05510,"2019-08-19 07:50:00",17-시공-09,b.시공,"SP거더 제작 및 가설공사
|
|
안전,품질,공사관리","2019-08-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.33.153.198,NULL,NULL,004C8,,,
|
|
J13308,"2019-08-19 07:57:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 변경 실행품의 및 내역작성
|
|
2. 중앙거리(대흥로) 정산 및 출금전표작성","2019-08-19 20:14:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 변경 실행품의 및 내역작성
|
|
2. 중앙거리(대흥로) 정산 및 출금전표작성","2019-08-19 19:08:00",172.16.8.170,172.16.8.170,172.16.8.170,004E3,,1,
|
|
B15306,"2019-08-19 08:06:00",18-관리-02,e.기타,"비서업무 외","2019-08-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-08-19 08:08:00",19-설계-07,h.기타,"무릉교(황강남상지구) 설계내역서 및 견적서, 2019년 하반기 단가 기준 표준내역 작업, 화순 동면~송광봉산 검토, 신촌교(양평~이천 2공구) 시행견적서(입찰)","2019-08-19 18:09:00",19-설계-07,h.기타,"무릉교(황강남상지구) 설계내역서 및 견적서, 2019년 하반기 단가 기준 표준내역 작업, 화순 동면~송광봉산 검토, 신촌교(양평~이천 2공구) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-08-19 08:09:00",19-설계-07,"a.계획 및 협의","조령천교 시공샵변경","2019-08-19 20:25:00",19-설계-07,"a.계획 및 협의","조령천교 시공샵변경","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-08-19 08:10:00",16-시공-20,b.시공,"산외교 설계 및 시공개선사항 ","2019-08-19 18:14:00",16-시공-20,b.시공,"산외교 설계 및 시공개선사항 ","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J09101,"2019-08-19 08:18:00",19-교영-01,c.설계사,과업조사,"2019-08-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J07103,"2019-08-19 08:18:00",19-교영-01,d.기타,사업관리,"2019-08-19 18:05:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14306,"2019-08-19 08:25:00",19-관리-04,a.계약,"계약, 인사 외","2019-08-19 18:05:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15201,"2019-08-19 08:26:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","2019-08-19 18:01:00",19-교영-06,c.설계사,"특정공법심의 자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10301,"2019-08-19 08:27:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-19 18:41:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15307,"2019-08-19 08:27:00",19-설계-03,c.도면,"접속교 슬래브 도면 수정","2019-08-19 21:31:00",19-설계-03,c.도면,"접속교 슬래브 도면 수정","2019-08-19 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J13201,"2019-08-19 08:30:00",19-설계-05,b.구조계산,"야노1,2교 계산서수정","2019-08-19 18:07:00",19-설계-05,b.구조계산,"야노1,2교 계산서수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15302,"2019-08-19 08:31:00",18-설계-19,e.검토,"지적사항 검토 및 수정","2019-08-19 18:05:00",18-설계-19,e.검토,"지적사항 검토 및 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J17205,"2019-08-19 08:34:00",18-교영-01,c.설계사,.,"2019-08-19 18:06:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18205,"2019-08-19 08:34:00",17-설계-09,c.도면,"성주대교 현장도면 검토","2019-08-19 20:55:00",17-설계-09,c.도면,"성주대교 현장도면 검토","2019-08-19 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J11202,"2019-08-19 08:35:00",19-시공-02,b.시공,공사관리,"2019-08-19 20:37:00",19-시공-02,b.시공,공사관리,"2019-08-19 18:33:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J11203,"2019-08-19 08:42:00",18-시공-06,g.기타,"운곡교관련자료 작성","2019-08-19 20:34:00",18-시공-06,g.기타,"운곡교관련자료 작성","2019-08-19 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"18-설계-19<|>e.검토<|>승천천교 세종방향 방음벽(h=7.5m) 슬래브철근검토<|>01:30<|><br>17-설계-02<|>h.기타<|>1공구 왕숙천, 마야위천 감리검토사항 답변작성<|>01:30<|><br>",1,
|
|
J10313,"2019-08-19 08:43:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","2019-08-19 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15301,"2019-08-19 08:48:00",16-시공-20,b.시공,"8월 지출내역표 작성
|
|
현장 정산서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
곡천교 공급원승인서 재발송 (고강도, 메일)
|
|
곡천교 거래정보동의서 작성 (고려제강)","2019-08-19 18:07:00",16-시공-20,b.시공,"8월 지출내역표 작성
|
|
현장 정산서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
곡천교 공급원승인서 재발송 (고강도, 메일)
|
|
곡천교 거래정보동의서 작성 (고려제강)","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15202,"2019-08-19 08:52:00",19-설계-06,c.도면,"성과품 작성","2019-08-19 20:39:00",19-설계-06,c.도면,"성과품 작성","2019-08-19 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07202,"2019-08-19 08:50:00",19-교휴-01,교육,경영간부교육(한국표준협회),"2019-08-19 18:00:00",19-교휴-01,교육,경영간부교육(한국표준협회),"0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J07202,"2019-08-20 08:50:00",19-교휴-01,교육,경영간부교육(한국표준협회),"2019-08-20 18:00:00",19-교휴-01,교육,경영간부교육(한국표준협회),"0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J09102,"2019-08-19 08:50:00",19-계약-01,경유,안성구리1공구(한신공영),"2019-08-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J14101,"2019-08-19 08:50:00",16-시공-20,출장,한양,"2019-08-19 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
T04204,"2019-08-20 07:20:00",19-제조-02,a.생산관리,"주천2교,조령천교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-08-20 07:20:00",07-교영-01,b.시공사,"새만금~전주 고속도로6공구 삼천교 현황 파악","2019-08-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J18208,"2019-08-20 07:27:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-20 21:50:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-20 18:42:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M05510,"2019-08-20 07:33:00",17-시공-09,b.시공,"SP거더 제작 및 가설공사
|
|
안전,품질,공사관리","2019-08-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.39.155.4,NULL,NULL,004C8,,,
|
|
J18301,"2019-08-20 07:33:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-20 18:03:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J09102,"2019-08-20 07:33:00",19-계약-01,b.시공사,"문산~도라산 1공구 계룡합사 방문 예정, 조령천교 계약가 등 : 조령천교 외 5개교 계약 추진 중","2019-08-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M02302,"2019-08-20 07:34:00",19-제조-02,a.생산관리,"철근 SHOP Dwg. 변수작업 검토","2019-08-20 18:06:00",19-제조-02,a.생산관리,"철근 SHOP Dwg. 변수작업 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-08-20 07:36:00",19-제조-03,a.품질검사,"북수원1가로보, 산외교 데크, 생태수로 프리빔 생산관리, 콘크리트 시험","2019-08-20 21:13:00",19-제조-03,a.품질검사,"북수원1가로보, 산외교 데크, 생태수로 프리빔 생산관리, 콘크리트 시험","2019-08-20 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J13308,"2019-08-20 07:50:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 변경 실행품의 및 내역작성
|
|
2. 중앙거리(대흥로) 정산 및 출금전표작성","2019-08-20 18:10:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 변경 실행품의 및 내역작성
|
|
2. 중앙거리(대흥로) 정산 및 출금전표작성","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J08201,"2019-08-20 08:07:00",19-설계-07,"a.계획 및 협의","조령천교 시공샵변경","2019-08-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J10314,"2019-08-20 08:14:00",19-설계-07,h.기타,"화순 동면~송광봉산 설계견적서 및 내역서, 무릉교(황강남상지구) 설계내역서 및 견적서, 교암교외2개소(남일-보은 2공구) 시행견적서","2019-08-20 18:13:00",19-설계-07,h.기타,"화순 동면~송광봉산 설계견적서 및 내역서, 무릉교(황강남상지구) 설계내역서 및 견적서, 교암교외2개소(남일-보은 2공구) 시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-08-20 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-08-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J14306,"2019-08-20 08:23:00",19-관리-04,a.계약,"계약, 인사 외","2019-08-20 18:03:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15201,"2019-08-20 08:25:00",19-교영-15,c.설계사,과업진행현황파악,"2019-08-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J10301,"2019-08-20 08:26:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-20 18:10:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15302,"2019-08-20 08:26:00",18-설계-19,e.검토,"지적사항 검토 및 수정","2019-08-20 18:02:00",18-설계-19,e.검토,"지적사항 검토 및 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J13201,"2019-08-20 08:31:00",19-설계-05,b.구조계산,"야노1,2교 도면수정","2019-08-20 18:00:00",19-설계-05,b.구조계산,"야노1,2교 계산서수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J18205,"2019-08-20 08:33:00",18-설계-01,e.검토,"DR Girder 제품 개선 관련 조사","2019-08-20 18:06:00",17-설계-09,c.도면,"성주대교 현장도면 검토","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J09101,"2019-08-20 08:35:00",19-교영-01,c.설계사,과업조사,"2019-08-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15307,"2019-08-20 08:36:00",19-설계-01,c.도면,"신평교 도면 및 계산서 수정","2019-08-20 18:09:00",19-설계-01,c.도면,"신평교 도면 및 계산서 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J17205,"2019-08-20 08:37:00",18-교영-01,c.설계사,.,"2019-08-20 18:25:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-08-20 08:37:00",14-설계-32,h.기타,"거더 검토","2019-08-20 18:02:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15202,"2019-08-20 08:42:00",19-교휴-06,a.기타,"SP GIRDER 스트롱백 전도검토","2019-08-20 18:35:00",19-교휴-06,a.기타,"SP GIRDER 스트롱백 전도검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J11203,"2019-08-20 08:43:00",18-시공-06,g.기타,"운곡교관련자료 작성","2019-08-20 18:15:00",18-시공-06,g.기타,"운곡교관련자료 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-설계-02<|>h.기타<|>3공구 수동IC R-A 감리검토사항 답변작성<|>01:00<|><br>",,
|
|
J15301,"2019-08-20 08:48:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
곡천교 공급원승인서 재발송 (고강도, 메일)
|
|
곡천교 거래정보동의서 작성 (고려제강)
|
|
산외교 하도급지킴이 기성 청구","2019-08-20 18:55:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
곡천교 공급원승인서 재발송 (고강도, 메일)
|
|
곡천교 거래정보동의서 작성 (고려제강)
|
|
산외교 하도급지킴이 기성 청구","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J10313,"2019-08-20 08:52:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","2019-08-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J14101,"2019-08-20 08:50:00",16-시공-20,출장,한양,"2019-08-20 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07103,"2019-08-20 08:50:00",16-시공-20,출장,산외교현장,"2019-08-20 18:00:00",16-시공-20,출장,산외교현장,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J18206,"2019-08-20 08:50:00",16-시공-20,출장,산외교현장/성주대교/당진공장,"2019-08-20 18:00:00",16-시공-20,출장,산외교현장/성주대교/당진공장,"0000-00-00 00:00:00",NULL,NULL,NULL,001C5,,,
|
|
J11305,"2019-08-20 08:50:00",17-시공-08,출장,"세천2교 런쳐거더가설 방법 시공사협의","2019-08-20 18:00:00",17-시공-08,출장,"세천2교 런쳐거더가설 방법 시공사협의","0000-00-00 00:00:00",NULL,NULL,NULL,008C7,,,
|
|
J18207,"2019-08-20 08:50:00",17-시공-08,출장,"세천2교 런쳐거더가설 방법 시공사협의","2019-08-20 18:00:00",17-시공-08,출장,"세천2교 런쳐거더가설 방법 시공사협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11202,"2019-08-20 08:50:00",17-시공-08,출장,"[대구 달성군]빔런처 가설관련 협의","2019-08-20 18:00:00",17-시공-08,출장,"[대구 달성군]빔런처 가설관련 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18301,"2019-08-21 07:18:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-21 18:02:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J18208,"2019-08-21 07:18:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-21 18:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-08-21 07:22:00",19-제조-02,a.생산관리,"주천2교,조령천교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-08-21 07:25:00",19-제조-02,a.생산관리,"철근 SHOP Dwg. 변수작업 검토","2019-08-21 18:01:00",19-제조-02,a.생산관리,"철근 SHOP Dwg. 변수작업 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>사무동 인테리어 관련 협의 및 회의<|>02:00<|><br>19-제조-02<|>a.생산관리<|>부사장 보고 및 회의<|>03:00<|><br>",,
|
|
J18202,"2019-08-21 07:27:00",07-교영-01,b.시공사,"새만금~전주 고속도로6공구 삼천교 현황 파악","2019-08-21 18:10:00",07-교영-01,b.시공사,"새만금~전주 고속도로6공구 삼천교 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J13308,"2019-08-21 07:31:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산 및 출금전표작성
|
|
2. 조령천교 및 경안천교 시공상세변경관련 철근수량 정리","2019-08-21 18:09:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산 및 출금전표작성
|
|
2. 조령천교 및 경안천교 시공상세변경관련 철근수량 정리","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J16203,"2019-08-21 07:36:00",19-제조-03,a.품질검사,"북수원1가로보, 산외교 데크, 생태수로 프리빔 생산관리, 콘크리트 시험","2019-08-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J07202,"2019-08-21 07:37:00",19-제조-04,b.기계,"주천1교 거푸집 보수와 강연선 인입실험체 제작","2019-08-22 07:29:00",19-제조-04,b.기계,"주천1교 거푸집 보수와 강연선 인입실험체 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-08-21 07:48:00",17-시공-08,b.시공,"세천2교 런쳐거더가설 방법 가교사용성 구조검토","2019-08-21 18:17:00",17-시공-08,b.시공,"세천2교 런쳐거더가설 방법 가교사용성 구조검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-08-21 07:51:00",17-시공-09,b.시공,"2차 가설계획서 작성 ","2019-08-21 18:00:00",17-시공-09,b.시공,"2차 가설계획서 작성 ","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
B15306,"2019-08-21 08:02:00",18-관리-02,e.기타,"비서업무 외","2019-08-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-08-21 08:10:00",19-설계-07,"a.계획 및 협의","조령천교 시공샵변경","2019-08-21 19:15:00",19-설계-07,"a.계획 및 협의","조령천교 시공샵변경","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-08-21 08:10:00",17-설계-09,h.기타,"교암교외2개소(남일-보은 2공구) 시행견적서, 조령천교(안성-성남1공구) 시행견적서, 화순 동면~송광봉산 설계견적서 및 내역서, 무릉교(황강남상지구) 설계내역서 및 견적서","2019-08-21 18:32:00",17-설계-09,h.기타,"교암교외2개소(남일-보은 2공구) 시행견적서, 조령천교(안성-성남1공구) 시행견적서, 화순 동면~송광봉산 설계견적서 및 내역서, 무릉교(황강남상지구) 설계내역서 및 견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11305,"2019-08-21 08:11:00",19-설계-03,e.검토,"성과품 검토","2019-08-21 18:07:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10301,"2019-08-21 08:22:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-21 18:00:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15302,"2019-08-21 08:25:00",18-설계-19,e.검토,"지적사항 검토 및 수정","2019-08-21 20:47:00",18-설계-19,e.검토,"지적사항 검토 및 수정","2019-08-21 18:46:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J11203,"2019-08-21 08:27:00",18-시공-06,g.기타,"운곡교관련자료 작성","2019-08-21 20:46:00",18-시공-06,g.기타,"운곡교관련자료 작성","2019-08-21 18:45:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"18-설계-19<|>h.기타<|>대콘 3개교 가설관련 가도폭보완도면발송(허상무, 대콘)<|>01:00<|><br>",1,
|
|
J15201,"2019-08-21 08:27:00",19-교영-15,c.설계사,과업진행현황파악,"2019-08-21 18:10:00",19-교영-15,c.설계사,과업진행현황파악,"0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11202,"2019-08-21 08:31:00",19-시공-02,b.시공,공사관리,"2019-08-21 18:18:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-08-21 08:33:00",19-교휴-06,a.기타,"SP GIRDER 스트롱백 전도검토","2019-08-21 21:11:00",19-교휴-06,a.기타,"SP GIRDER 스트롱백 전도검토","2019-08-21 18:44:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-08-21 08:33:00",14-설계-32,h.기타,"거더 검토","2019-08-21 20:53:00",14-설계-32,h.기타,"거더 검토","2019-08-21 18:46:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J09101,"2019-08-21 08:33:00",19-교영-01,c.설계사,과업조사,"2019-08-21 18:11:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J18205,"2019-08-21 08:34:00",18-설계-01,e.검토,"DR Girder 제품 개선 관련 조사","2019-08-21 22:05:00",18-설계-01,e.검토,"DR Girder 제품 개선 관련 조사","2019-08-21 19:01:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J17205,"2019-08-21 08:34:00",18-교영-01,c.설계사,.,"2019-08-21 18:12:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15307,"2019-08-21 08:40:00",19-설계-01,c.도면,"신평교 도면 및 계산서 수정","2019-08-21 21:31:00",19-설계-01,c.도면,"신평교 도면 및 계산서 수정","2019-08-21 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10309,"2019-08-21 08:41:00",18-시공-06,g.기타,"안전관리계획서 및 제작장배치계획 수립","2019-08-21 18:04:00",18-시공-06,g.기타,"안전관리계획서 및 제작장배치계획 수립","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,004E1,,,
|
|
J13201,"2019-08-21 08:42:00",17-설계-09,b.구조계산,"조령천교 가설벤트 계산","2019-08-21 18:08:00",17-설계-09,b.구조계산,"조령천교 가설벤트 계산","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J10313,"2019-08-21 08:44:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","2019-08-21 18:02:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14306,"2019-08-21 08:50:00",19-교휴-06,경유,"경유(등기소(법인인감증명서 발급))","2019-08-21 18:21:00",19-관리-04,a.계약,"계약, 인사 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15301,"2019-08-21 08:50:00",17-시공-21,출장,"[수원시]북수원1교 현장 정리","2019-08-21 18:11:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
경안천교 쏠플레이트 검토서 작성
|
|
곡천교 공급원승인서 재발송 (고강도, 메일)
|
|
곡천교 거래정보동의서 작성 (고려제강)
|
|
산외교 하도급지킴이 기성 청구","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09102,"2019-08-21 08:50:00",19-시공-20,출장,"안성성남1(한신공영), 동읍한림(두산중공업) 서울사무소 출장","2019-08-21 18:00:00",19-시공-20,출장,"안성성남1(한신공영), 동읍한림(두산중공업) 서울사무소 출장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J14101,"2019-08-21 08:50:00",16-시공-20,출장,한양,"2019-08-21 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18206,"2019-08-21 08:50:00",16-시공-20,출장,산외교현장/성주대교/당진공장,"2019-08-21 18:00:00",16-시공-20,출장,산외교현장/성주대교/당진공장,"0000-00-00 00:00:00",NULL,NULL,NULL,001C5,,,
|
|
T04204,"2019-08-22 07:16:00",19-제조-02,a.생산관리,"주천2교,조령천교 점접 철근 생산, 동림교, 삼간교, 세천2교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-08-22 07:30:00",19-제조-04,b.기계,"주천1교 거푸집 보수와 강연선 인입실험체 제작","2019-08-22 19:00:00",19-제조-04,b.기계,"주천1교 거푸집 보수와 강연선 인입실험체 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-08-22 07:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-22 22:09:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-22 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-08-22 07:33:00",17-시공-08,b.시공,"세천2교 런쳐거더가설 방법 가교사용성 구조검토","2019-08-22 18:13:00",17-시공-08,b.시공,"세천2교 런쳐거더가설 방법 가교사용성 구조검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18202,"2019-08-22 07:33:00",07-교영-01,b.시공사,"새만금~전주 고속도로6공구 삼천교 현황 파악","2019-08-22 18:11:00",07-교영-01,b.시공사,"새만금~전주 고속도로6공구 삼천교 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-08-22 07:34:00",19-계약-01,b.시공사,"두산건설 현장 방문 예정, 남일~보은 예상 계약가 등 : 조령천교 외 6개교 계약 추진 중","2019-08-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18301,"2019-08-22 07:37:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-22 18:01:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J13308,"2019-08-22 07:40:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산 및 출금전표작성
|
|
2. 조령천교 및 경안천교 시공상세변경관련 철근수량 정리","2019-08-22 18:19:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산 및 출금전표작성
|
|
2. 조령천교 및 경안천교 시공상세변경관련 철근수량 정리","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J16203,"2019-08-22 07:40:00",19-제조-03,a.품질검사,"북수원1가로보, 산외교 데크, 생태수로 프리빔 생산관리, 콘크리트 시험","2019-08-22 20:54:00",19-제조-03,a.품질검사,"북수원1가로보, 산외교 데크, 생태수로 프리빔 생산관리, 콘크리트 시험","2019-08-22 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
M02302,"2019-08-22 07:41:00",19-제조-02,a.생산관리,"철근 가공 절단계획 Story Board 계획","2019-08-22 18:07:00",19-제조-02,a.생산관리,"철근 SHOP Dwg. 변수작업 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>사무실 인테리어 관련 검토<|>02:00<|><br>19-제조-02<|>a.생산관리<|>인도네시아 손님 방문관련 공장정비 계획 및 조사<|>03:00<|><br>",,
|
|
J10315,"2019-08-22 08:05:00",17-시공-10,b.시공,"3차 가설계획서 작성 ","2019-08-22 18:02:00",17-시공-10,b.시공,"3차 가설계획서 작성 ","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J08201,"2019-08-22 08:10:00",19-설계-07,"a.계획 및 협의","조령천교 시공샵변경","2019-08-22 18:10:00",19-설계-07,"a.계획 및 협의","조령천교 시공샵변경","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-08-22 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-08-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10309,"2019-08-22 08:16:00",18-시공-06,g.기타,"안전관리계획서 및 제작장배치계획 수립","2019-08-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",61.98.205.243,NULL,NULL,004E1,,,
|
|
J11305,"2019-08-22 08:17:00",19-설계-03,e.검토,"성과품 검토","2019-08-22 18:03:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15302,"2019-08-22 08:27:00",18-설계-19,e.검토,"지적사항 검토 및 수정","2019-08-22 18:04:00",18-설계-19,e.검토,"지적사항 검토 및 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J07103,"2019-08-22 08:28:00",19-교영-01,d.기타,사업관리,"2019-08-22 18:13:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14306,"2019-08-22 08:31:00",19-관리-04,a.계약,"계약업무 외","2019-08-22 18:05:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-08-22 08:31:00",19-시공-02,b.시공,공사관리,"2019-08-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J13201,"2019-08-22 08:31:00",17-설계-09,b.구조계산,"조령천교 가설벤트 계산","2019-08-22 18:02:00",17-설계-09,b.구조계산,"조령천교 가설벤트 계산","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15202,"2019-08-22 08:31:00",15-설계-31,g.업무지원,"시공shop변경 현장설명","2019-08-22 18:08:00",15-설계-31,g.업무지원,"시공shop변경 현장설명","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J09101,"2019-08-22 08:33:00",19-교영-01,c.설계사,과업조사,"2019-08-22 20:26:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J18205,"2019-08-22 08:34:00",18-설계-01,e.검토,"DR Girder 제품 개선 관련 조사","2019-08-22 18:01:00",18-설계-01,e.검토,"DR Girder 제품 개선 관련 조사","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J15307,"2019-08-22 08:34:00",19-설계-03,c.도면,"접속교 도면 및 계산서 수정","2019-08-22 18:00:00",19-설계-03,c.도면,"접속교 도면 및 계산서 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J15201,"2019-08-22 08:35:00",19-교영-15,c.설계사,과업진행현황파악,"2019-08-22 21:04:00",19-교영-15,c.설계사,과업진행현황파악,"2019-08-22 18:34:00",172.16.9.150,172.16.9.150,172.16.9.150,008C8,,,
|
|
J17205,"2019-08-22 08:35:00",18-교영-01,c.설계사,.,"2019-08-22 21:05:00",18-교영-01,c.설계사,.,"2019-08-22 18:33:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J11203,"2019-08-22 08:36:00",18-시공-06,g.기타,"운곡교관련자료 작성","2019-08-22 18:03:00",18-시공-06,g.기타,"운곡교관련자료 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"17-시공-08<|>g.기타<|>세천2교 런처관련 시공사요구사항 정리<|>03:30<|><br>",,
|
|
J07210,"2019-08-22 08:39:00",14-설계-32,h.기타,"거더 검토","2019-08-22 18:06:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10301,"2019-08-22 08:41:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-22 18:00:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J18206,"2019-08-22 08:47:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-08-22 18:10:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10313,"2019-08-22 08:47:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","2019-08-22 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15301,"2019-08-22 08:51:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
경안천교 쏠플레이트 검토서 작성","2019-08-22 18:06:00",16-시공-20,b.시공,"현장 정산서 작성
|
|
경안천교 쏠플레이트 검토서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14306,"2019-08-23 08:50:00",19-교휴-01,교육,"외주협력업체교육(쌍용건설)_건산법 실무 외","2019-08-23 18:00:00",19-교휴-01,교육,"외주협력업체교육(쌍용건설)_건산법 실무 외","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J14101,"2019-08-22 08:50:00",16-시공-20,출장,한양,"2019-08-22 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
T04204,"2019-08-23 07:26:00",19-제조-02,a.생산관리,"주천2교,조령천교 점접 철근 생산, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-08-23 07:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-23 20:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-23 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-08-23 07:30:00",19-제조-02,a.생산관리,"공장 환경개선사항 검토 및 보고자료 준비","2019-08-23 18:07:00",19-제조-02,a.생산관리,"공장 환경개선사항 검토 및 보고자료 준비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18301,"2019-08-23 07:31:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
J18207,"2019-08-23 07:31:00",17-시공-08,b.시공,"세천2교 런쳐거더가설 방법 가교사용성 구조검토","2019-08-23 18:16:00",17-시공-08,b.시공,"세천2교 런쳐거더가설 방법 가교사용성 구조검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18202,"2019-08-23 07:32:00",07-교영-01,b.시공사,"새만금~전주 고속도로6공구 삼천교 현황 파악","2019-08-23 18:07:00",07-교영-01,b.시공사,"새만금~전주 고속도로6공구 삼천교 현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J10315,"2019-08-23 07:33:00",17-시공-10,b.시공,"3차 가설계획서 작성 ","2019-08-23 18:04:00",17-시공-10,b.시공,"3차 가설계획서 작성 ","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J16203,"2019-08-23 07:34:00",19-제조-03,a.품질검사,"준조강 배합시험 준비,
|
|
산외교 데크, 생태수로 프리빔,자안1교, 생산관리, ","2019-08-23 21:38:00",19-제조-03,a.품질검사,"준조강 배합시험 준비,
|
|
산외교 데크, 생태수로 프리빔,자안1교, 생산관리, ","2019-08-23 18:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-08-23 07:43:00",19-계약-01,b.시공사,"계룡건설 합사, 한화건설 현장 방문 예정, 남일~보은 예상 계약가 등 : 조령천교 외 6개교 계약 추진 중","2019-08-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-08-23 07:47:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산 및 출금전표작성
|
|
2. 조령천교 및 경안천교 시공상세변경관련 철근수량 정리","2019-08-23 18:21:00",19-시공-08,b.시공,"1. 중앙거리(대흥로) 정산 및 출금전표작성
|
|
2. 조령천교 및 경안천교 시공상세변경관련 철근수량 정리","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J13201,"2019-08-23 08:05:00",19-교영-06,c.설계사,"제3연육교 바닥판수량 및 거더배치","2019-08-23 18:02:00",17-설계-09,b.구조계산,"조령천교 가설벤트 계산","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
B15306,"2019-08-23 08:06:00",18-관리-02,e.기타,"비서업무 외","2019-08-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-08-23 08:18:00",19-교영-01,d.기타,사업관리,"2019-08-23 18:19:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11305,"2019-08-23 08:24:00",19-설계-03,e.검토,"성과품 검토","2019-08-23 18:10:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10313,"2019-08-23 08:29:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","2019-08-23 18:11:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18205,"2019-08-23 08:30:00",18-설계-01,e.검토,"검토요청서 관련 자료 작성","2019-08-23 18:05:00",18-설계-01,e.검토,"DR Girder 제품 개선 관련 조사","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J09101,"2019-08-23 08:32:00",19-교영-01,c.설계사,과업조사,"2019-08-23 20:10:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J11202,"2019-08-23 08:32:00",19-시공-02,b.시공,공사관리,"2019-08-23 18:24:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15302,"2019-08-23 08:37:00",18-설계-19,e.검토,"지적사항 검토 및 수정","2019-08-23 18:04:00",18-설계-19,e.검토,"지적사항 검토 및 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J17205,"2019-08-23 08:37:00",18-교영-01,c.설계사,.,"2019-08-23 20:15:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15307,"2019-08-23 08:41:00",19-설계-03,c.도면,"접속교 도면 및 계산서 수정","2019-08-23 18:01:00",19-설계-03,c.도면,"접속교 도면 및 계산서 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J18206,"2019-08-23 08:42:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-08-23 12:16:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15201,"2019-08-23 08:42:00",19-교영-15,c.설계사,과업진행현황파악,"2019-08-23 20:14:00",19-교영-15,c.설계사,과업진행현황파악,"2019-08-23 19:01:00",172.16.9.150,172.16.9.150,172.16.9.150,008C8,,,
|
|
J15301,"2019-08-23 08:50:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","2019-08-23 18:11:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J07202,"2019-08-23 12:23:00",19-제조-04,b.기계,"주천1교 거푸집 보수와 조령천교 거푸집 보수","2019-08-24 07:33:00",19-제조-04,b.기계,"주천1교 거푸집 보수와 조령천교 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11203,"2019-08-23 13:13:00",18-시공-06,g.기타,"3공구 Pre-Deck 설치에 대한 감독지시사항 정리","2019-08-23 18:05:00",18-시공-06,g.기타,"3공구 Pre-Deck 설치에 대한 감독지시사항 정리","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J14101,"2019-08-23 08:50:00",16-시공-20,출장,한양,"2019-08-23 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J08201,"2019-08-23 08:50:00",10-설계-29,출장,"주천2교 현장사무실","2019-08-23 18:00:00",10-설계-29,출장,"주천2교 현장사무실","0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J10314,"2019-08-23 08:50:00",14-교영-00,출장,"[광주광역시청] 광주광역시 가시설 입찰관련 (피티씨)","2019-08-23 18:00:00",14-교영-00,출장,"[광주광역시청] 광주광역시 가시설 입찰관련 (피티씨)","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-08-24 06:25:00",18-시공-15,b.시공,"밴트레벨조정 검토
|
|
","2019-08-24 15:48:00",18-시공-15,b.시공,"밴트레벨조정 검토
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,1,
|
|
J18208,"2019-08-24 07:25:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-24 16:45:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M02302,"2019-08-24 07:28:00",19-제조-02,a.생산관리,"공장 환경개선사항 검토 및 보고자료 준비","2019-08-24 16:11:00",19-제조-02,a.생산관리,"공장 환경개선사항 검토 및 보고자료 준비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
J07202,"2019-08-24 07:34:00",19-제조-04,b.기계,"각재와 야적장 정리","2019-08-24 15:53:00",19-제조-04,b.기계,"각재와 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-08-24 07:35:00",19-제조-02,a.생산관리,"주천2교,조령천교 점접 철근 생산, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-24 16:12:00",19-제조-02,a.생산관리,"주천2교,조령천교 점접 철근 생산, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18206,"2019-08-24 12:18:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-08-24 15:47:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,1,
|
|
J07202,"2019-08-26 07:11:00",19-제조-04,b.기계,"주두부 거푸집 보수와 야적장 정리","2019-08-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M05510,"2019-08-26 07:24:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","2019-08-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.41.61,NULL,NULL,004C8,,,
|
|
T04204,"2019-08-26 07:24:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 주천2교 점접 철근 생산, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-08-26 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-08-26 18:05:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-08-26 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-26 18:05:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18202,"2019-08-26 07:34:00",07-교영-01,b.시공사,"발주현황 파악","2019-08-26 18:18:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-08-26 07:36:00",19-제조-02,a.생산관리,"사무실 이사 및 교육실 집기 이사","2019-08-26 18:05:00",19-제조-02,a.생산관리,"공장 환경개선사항 검토 및 보고자료 준비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-08-26 07:39:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-08-26 18:04:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18207,"2019-08-26 07:44:00",19-시공-02,b.시공,"공동도급시공예산검관련 시공예산검토","2019-08-26 18:21:00",19-시공-02,b.시공,"공동도급시공예산검관련 시공예산검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-08-26 07:47:00",19-계약-01,b.시공사,"용상~교리1, 남일~보은 예상 계약가 등 : 조령천교 외 6개교 계약 추진 중","2019-08-26 18:10:00",19-계약-01,b.시공사,"용상~교리1, 남일~보은 예상 계약가 등 : 조령천교 외 6개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J10315,"2019-08-26 07:51:00",19-교영-06,a.발주처,"제안서 검토
|
|
","2019-08-26 18:10:00",19-교영-06,a.발주처,"제안서 검토
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18206,"2019-08-26 08:09:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-08-26 18:17:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-08-26 08:11:00",19-설계-07,"a.계획 및 협의","주천2교 현장사무실","2019-08-26 15:40:00",19-설계-07,"a.계획 및 협의","주천2교 현장사무실","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-08-26 08:19:00",19-교영-06,d.기타,"제3연륙교 Pre-Deck 설계내역서 및 견적서, 교암교외 2개소(남일~보은2) 시행견적서","2019-08-26 19:34:00",19-교영-06,d.기타,"제3연륙교 Pre-Deck 설계내역서 및 견적서, 교암교외 2개소(남일~보은2) 시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-08-26 08:24:00",19-교영-01,d.기타,사업관리,"2019-08-26 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J09101,"2019-08-26 08:24:00",19-교영-01,c.설계사,과업조사,"2019-08-26 20:00:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15302,"2019-08-26 08:26:00",18-설계-19,c.도면,"거더도면 확인","2019-08-26 20:42:00",18-설계-19,c.도면,"거더도면 확인","2019-08-26 18:42:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"19-교영-06<|>d.기타<|>제3연육교 수량산출<|>02:00<|><br>",1,
|
|
J14306,"2019-08-26 08:29:00",19-관리-04,a.계약,"계약업무 외","2019-08-26 18:09:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18205,"2019-08-26 08:30:00",19-시공-20,g.기타,"검토요청서 관련 자료 작성","2019-08-26 21:38:00",18-설계-01,e.검토,"DR Girder 제품 개선 관련 조사","2019-08-26 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15307,"2019-08-26 08:32:00",19-설계-03,c.도면,"접속교 도면 및 계산서 수정","2019-08-26 18:04:00",19-설계-03,c.도면,"접속교 도면 및 계산서 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J10301,"2019-08-26 08:32:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-26 21:02:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-26 18:30:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J11203,"2019-08-26 08:32:00",18-시공-06,g.기타,"3공구 Pre-Deck 설치에 대한 감독지시사항 정리","2019-08-26 20:43:00",18-시공-06,g.기타,"3공구 Pre-Deck 설치에 대한 감독지시사항 정리","2019-08-26 18:42:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"19-교영-06<|>d.기타<|>거더 수량산출<|>01:30<|><br>",1,
|
|
J16203,"2019-08-26 08:50:00",19-교휴-01,교육,"품질경영자 교육","2019-08-26 18:00:00",19-교휴-01,교육,"품질경영자 교육","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J16203,"2019-08-27 08:50:00",19-교휴-01,교육,"품질경영자 교육","2019-08-27 18:00:00",19-교휴-01,교육,"품질경영자 교육","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J17205,"2019-08-26 08:39:00",18-교영-01,c.설계사,.,"2019-08-26 20:02:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-08-26 08:39:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-08-26 20:02:00",19-교영-06,c.설계사,"특정공법심의자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-08-26 08:39:00",19-설계-03,e.검토,"성과품 검토","2019-08-26 18:15:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J16202,"2019-08-26 08:40:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-26 20:03:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-26 19:12:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J13201,"2019-08-26 08:40:00",17-설계-09,b.구조계산,"조령천교 가설벤트 계산","2019-08-26 20:52:00",17-설계-09,b.구조계산,"조령천교 가설벤트 계산","2019-08-26 18:42:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10313,"2019-08-26 08:41:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","2019-08-26 18:04:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15202,"2019-08-26 08:47:00",19-교휴-06,a.기타,"SP GIRDER 검토","2019-08-26 21:00:00",19-교휴-06,a.기타,"SP GIRDER 검토","2019-08-26 18:36:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"10-설계-29<|>e.검토<|>솟음량 도면 변경<|>07:00<|><br>",1,
|
|
J07210,"2019-08-26 08:47:00",14-설계-32,h.기타,"거더 검토","2019-08-26 18:02:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15301,"2019-08-26 08:49:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","2019-08-26 18:16:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11202,"2019-08-26 09:01:00",19-시공-02,b.시공,공사관리,"2019-08-26 20:55:00",19-시공-02,b.시공,공사관리,"2019-08-26 18:30:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J18301,"2019-08-26 12:37:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-26 18:04:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J14101,"2019-08-26 08:50:00",16-시공-20,출장,한양,"2019-08-26 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-08-27 07:02:00",19-제조-04,b.기계,"주두부 거푸집 보수와 야적장 정리","2019-08-28 07:15:00",19-제조-04,b.기계,"주두부 거푸집 보수와 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-08-27 07:27:00",19-제조-02,a.생산관리,"사무실 이사 및 교육실 집기 이사","2019-08-27 18:04:00",19-제조-02,a.생산관리,"사무실 이사 및 교육실 집기 이사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-08-27 07:27:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 주천2교 점접 철근 생산, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-27 20:17:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 주천2교 점접 철근 생산, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-27 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,,,
|
|
J18202,"2019-08-27 07:33:00",07-교영-01,b.시공사,"발주현황 파악","2019-08-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J09102,"2019-08-27 07:37:00",19-계약-01,b.시공사,"송산~봉담 한화건설 방문예정, 용상~교리1, 남일~보은 예상 계약가 등 : 조령천교 외 6개교 계약 추진 중","2019-08-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J14308,"2019-08-27 07:37:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-08-27 22:14:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-08-27 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18301,"2019-08-27 07:37:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-27 18:00:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
J18208,"2019-08-27 07:44:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-27 21:48:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-27 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-08-27 07:52:00",19-시공-02,b.시공,"공동도급시공예산검관련 시공예산검토","2019-08-27 18:15:00",19-시공-02,b.시공,"공동도급시공예산검관련 시공예산검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-08-27 07:56:00",18-시공-04,b.시공,"가설계획서 작성
|
|
|
|
","2019-08-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J13308,"2019-08-27 08:02:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-08-27 19:34:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10314,"2019-08-27 08:12:00",19-교영-06,d.기타,"제3연륙교 설계내역서 및 견적서, 2019년 하반기 단가기준 표준내역 작업","2019-08-27 19:30:00",19-교영-06,d.기타,"제3연륙교 설계내역서 및 견적서, 2019년 하반기 단가기준 표준내역 작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-08-27 08:14:00",19-설계-07,"a.계획 및 협의","주천2교 현장사무실","2019-08-27 21:36:00",19-설계-07,"a.계획 및 협의","주천2교 현장사무실","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-08-27 08:17:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-08-27 18:31:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-08-27 08:23:00",18-관리-02,e.기타,"비서업무 외","2019-08-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J09101,"2019-08-27 08:23:00",19-교영-01,c.설계사,과업조사,"2019-08-27 19:44:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15302,"2019-08-27 08:25:00",18-설계-19,c.도면,"한계상태설계법 교량 허용응력 검토","2019-08-27 20:56:00",18-설계-19,c.도면,"한계상태설계법 교량 허용응력 검토","2019-08-27 18:56:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,19-설계-06<|>c.도면<|>도곽교체<|>01:00<|><br>,1,
|
|
J11202,"2019-08-27 08:29:00",19-시공-02,b.시공,공사관리,"2019-08-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J15307,"2019-08-27 08:29:00",19-설계-03,c.도면,"접속교 도면 및 계산서 수정","2019-08-27 20:59:00",19-설계-03,c.도면,"접속교 도면 및 계산서 수정","2019-08-27 18:56:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J11203,"2019-08-27 08:30:00",18-시공-06,g.기타,"3공구 Pre-Deck 설치에 대한 감독지시사항 정리","2019-08-27 20:57:00",18-시공-06,g.기타,"3공구 Pre-Deck 설치에 대한 감독지시사항 정리","2019-08-27 18:55:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J14306,"2019-08-27 08:30:00",19-관리-04,a.계약,"계약업무 외","2019-08-27 18:10:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-08-27 08:31:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-27 20:38:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-27 18:38:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J15202,"2019-08-27 08:31:00",19-교휴-06,a.기타,"SP GIRDER 검토","2019-08-27 18:04:00",19-교휴-06,a.기타,"SP GIRDER 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J11305,"2019-08-27 08:31:00",19-설계-03,e.검토,"성과품 검토","2019-08-27 19:02:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J13201,"2019-08-27 08:31:00",17-설계-09,b.구조계산,"조령천교 가설벤트 수량산출","2019-08-27 20:58:00",17-설계-09,b.구조계산,"조령천교 가설벤트 수량산출","2019-08-27 18:55:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,"19-교영-06<|>c.설계사<|>제3연육교 수량변경<|>03:00<|><br>19-설계-07<|>b.구조계산<|>기초 강연선량 검토<|>03:00<|><br>",1,
|
|
J07210,"2019-08-27 08:35:00",14-설계-32,h.기타,"거더 검토","2019-08-27 21:00:00",14-설계-32,h.기타,"거더 검토","2019-08-27 18:56:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J17205,"2019-08-27 08:36:00",18-교영-01,c.설계사,.,"2019-08-27 21:00:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07103,"2019-08-27 08:40:00",19-교영-01,d.기타,사업관리,"2019-08-27 18:20:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15201,"2019-08-27 08:43:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-08-27 21:08:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-08-27 19:07:00",172.16.9.150,172.16.9.150,172.16.9.150,008C8,,,
|
|
J10313,"2019-08-27 08:48:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","2019-08-27 18:03:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16202,"2019-08-27 08:49:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-27 21:09:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-27 19:08:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J15301,"2019-08-27 08:51:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","2019-08-27 18:10:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J18205,"2019-08-27 08:51:00",19-시공-20,g.기타,"검토요청서 관련 자료 작성","2019-08-27 22:06:00",19-시공-20,g.기타,"검토요청서 관련 자료 작성","2019-08-27 19:05:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J14101,"2019-08-27 08:50:00",16-시공-20,출장,한양,"2019-08-27 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-08-28 07:16:00",19-제조-04,b.기계,"공장 내 제초작업과 사무동 사무가구 이적","2019-08-29 07:00:00",19-제조-04,b.기계,"공장 내 제초작업과 사무동 사무가구 이적","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-08-28 07:19:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 주천2교 점접 철근 생산, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18301,"2019-08-28 07:23:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-28 18:00:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
M02302,"2019-08-28 07:27:00",19-제조-02,a.생산관리,"일용직 계약서 준비 및 계약","2019-08-28 18:05:00",19-제조-02,a.생산관리,"사무실 이사 및 교육실 집기 이사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>생산직 직원 채용 품의<|>01:00<|><br>19-제조-02<|>a.생산관리<|>교육실 샘플 자재 진열 검토<|>03:00<|><br>19-제조-02<|>a.생산관리<|>공장홍보 동영상 제작 관련 자료 및 시나리오 검토<|>04:00<|><br>",,
|
|
J16203,"2019-08-28 07:29:00",19-제조-03,a.품질검사,"산외교 데크 켄칠레버, 북수원 가로보, 생태수로2 생산 및 품질관리","2019-08-28 22:57:00",19-제조-03,a.품질검사,"산외겨 데,크 켄칠레버, 북수원 가로보, 생태수로2 생산 및 품질관리","2019-08-28 19:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14308,"2019-08-28 07:29:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-08-28 21:54:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-08-28 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M05510,"2019-08-28 07:34:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","2019-08-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.41.104,NULL,NULL,004C8,,,
|
|
J13308,"2019-08-28 07:38:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-08-28 18:15:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10315,"2019-08-28 07:56:00",14-시공-18,b.시공,"가설계획서 작성
|
|
|
|
","2019-08-28 13:12:00",14-시공-18,b.시공,"가설계획서 작성
|
|
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J08201,"2019-08-28 08:09:00",19-설계-07,"a.계획 및 협의","주천2교 현장사무실","2019-08-28 20:43:00",19-설계-07,"a.계획 및 협의","주천2교 현장사무실","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-08-28 08:13:00",19-설계-03,e.검토,"성과품 검토","2019-08-28 18:29:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-08-28 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-08-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-08-28 08:16:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-08-28 18:15:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-08-28 08:16:00",19-교영-15,d.기타,"DR거더 연장별 설계견적서(문산~도라산T/K), 제3연륙교 설계내역서 및 견적서, 제3도하교(성환~입장) 설계견적서 및 내역서(특공)","2019-08-28 18:57:00",19-교영-15,d.기타,"DR거더 연장별 설계견적서(문산~도라산T/K), 제3연륙교 설계내역서 및 견적서, 제3도하교(성환~입장) 설계견적서 및 내역서(특공)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J13201,"2019-08-28 08:25:00",17-설계-09,b.구조계산,"조령천교 솟음도작성","2019-08-28 20:43:00",17-설계-09,b.구조계산,"조령천교 솟음도작성","2019-08-28 18:36:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J11202,"2019-08-28 08:27:00",19-시공-02,b.시공,공사관리,"2019-08-28 18:18:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07103,"2019-08-28 08:28:00",19-교영-01,d.기타,사업관리,"2019-08-28 18:20:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15302,"2019-08-28 08:29:00",18-설계-19,c.도면,"한계상태설계법 교량 허용응력 검토","2019-08-28 20:36:00",18-설계-19,c.도면,"한계상태설계법 교량 허용응력 검토","2019-08-28 18:35:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J15307,"2019-08-28 08:30:00",19-설계-03,c.도면,"접속교 도면 및 계산서 수정","2019-08-28 20:34:00",19-설계-03,c.도면,"접속교 도면 및 계산서 수정","2019-08-28 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J17205,"2019-08-28 08:30:00",18-교영-01,c.설계사,.,"2019-08-28 20:50:00",18-교영-01,c.설계사,.,"2019-08-28 18:44:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J11203,"2019-08-28 08:30:00",18-시공-06,g.기타,"3공구 Pre-Deck 설치에 대한 감독지시사항 정리","2019-08-28 20:32:00",18-시공-06,g.기타,"3공구 Pre-Deck 설치에 대한 감독지시사항 정리","2019-08-28 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"18-시공-06<|>g.기타<|>5공구감독 지시사항 설계도서 보완 정리<|>04:00<|><br>",1,
|
|
J14306,"2019-08-28 08:35:00",19-관리-04,a.계약,"계약업무 외","2019-08-28 18:14:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-08-28 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-28 20:50:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-28 18:40:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J15201,"2019-08-28 08:35:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-08-28 20:49:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-08-28 18:37:00",172.16.9.150,172.16.9.150,172.16.9.150,008C8,,,
|
|
J10301,"2019-08-28 08:36:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-28 18:25:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-08-28 08:37:00",14-설계-32,h.기타,"거더 검토","2019-08-28 20:44:00",14-설계-32,h.기타,"거더 검토","2019-08-28 18:35:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J10313,"2019-08-28 08:37:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","2019-08-28 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-08-28 08:37:00",19-교영-01,c.설계사,과업조사,"2019-08-28 18:21:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15202,"2019-08-28 08:39:00",19-교휴-06,a.기타,"SP GIRDER 검토","2019-08-28 21:02:00",19-교휴-06,a.기타,"SP GIRDER 검토","2019-08-28 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J15301,"2019-08-28 13:53:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","2019-08-28 18:03:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14101,"2019-08-28 08:50:00",16-시공-20,출장,한양,"2019-08-28 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-08-28 08:50:00",07-교영-01,출장,"[구미, 함양]구미국가산업단지 진입도로(롯데건설-괴평교), 함양~창녕 고속도로 5공구(계룡건설-합천호교)","2019-08-28 18:00:00",07-교영-01,출장,"[구미, 함양]구미국가산업단지 진입도로(롯데건설-괴평교), 함양~창녕 고속도로 5공구(계룡건설-합천호교)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J09102,"2019-08-28 08:50:00",19-계약-01,출장,"남양건설(검단산업단지~검단IC) 출장","2019-08-28 18:00:00",19-계약-01,출장,"남양건설(검단산업단지~검단IC) 출장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18208,"2019-08-28 08:50:00",19-제조-02,출장,"[성주대교(대구광역시 하빈면)]성주대교 가설밴트 측량","2019-08-28 18:00:00",19-제조-02,출장,"[성주대교(대구광역시 하빈면)]성주대교 가설밴트 측량","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J18207,"2019-08-28 08:50:00",19-시공-02,출장,"[전북김제 남광토건] 공동도급사 공동운영회의참석","2019-08-28 18:00:00",19-시공-02,출장,"[전북김제 남광토건] 공동도급사 공동운영회의참석","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-08-29 07:01:00",19-제조-04,b.기계,"공장 내 제초작업과 주두부 거푸집 보수","2019-08-30 07:11:00",19-제조-04,b.기계,"공장 내 제초작업과 주두부 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J17205,"2019-08-29 07:09:00",18-교영-01,c.설계사,.,"2019-08-29 21:33:00",18-교영-01,c.설계사,.,"2019-08-29 18:50:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J18301,"2019-08-29 07:26:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-29 18:02:00",19-제조-02,a.생산관리,"런처 정비보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E3,,,
|
|
M02302,"2019-08-29 07:28:00",19-제조-02,a.생산관리,"고강도 콘크리트 배치 적용실험","2019-08-29 18:07:00",19-제조-02,a.생산관리,"고강도 콘크리트 배치 적용실험","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-08-29 07:29:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-08-29 19:07:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J13308,"2019-08-29 07:30:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-08-29 18:06:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18207,"2019-08-29 07:35:00",16-시공-20,b.시공,"상부슬라브타설 시공 하도급계약검토","2019-08-29 18:16:00",16-시공-20,b.시공,"상부슬라브타설 시공 하도급계약검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-08-29 07:37:00",19-제조-03,a.품질검사,"준조강 시멘트 배합시험,","2019-08-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J10315,"2019-08-29 07:42:00",14-시공-18,b.시공,"인장 및 가설계획서 작성
|
|
|
|
","2019-08-29 18:03:00",14-시공-18,b.시공,"인장 및 가설계획서 작성
|
|
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J08201,"2019-08-29 08:12:00",19-설계-07,"a.계획 및 협의","주천2교 현장사무실","2019-08-29 20:19:00",19-설계-07,"a.계획 및 협의","주천2교 현장사무실","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-08-29 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-08-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-08-29 08:25:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-08-29 18:15:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-08-29 08:26:00",18-교영-28,d.기타,"포항~안동1-1 (1~3공구) 설계내역서(특공), DR거더 연장별 설계견적서(문산~도라산T/K), 제3연륙교 설계내역서","2019-08-29 20:16:00",19-교영-06,d.기타,"포항~안동1-1 (1~3공구) 설계견적서 및 내역서(특공), DR거더 연장별 설계견적서(문산~도라산T/K), 제3연륙교 설계내역서 및 견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15302,"2019-08-29 08:27:00",18-설계-19,c.도면,"한계상태설계법 교량 허용응력 검토 및 포항~안동 수량산출","2019-08-29 20:36:00",18-설계-19,c.도면,"한계상태설계법 교량 허용응력 검토 및 포항~안동 수량산출","2019-08-29 18:32:00",172.16.9.173,172.16.9.171,172.16.9.173,008E4,"19-설계-07<|>c.도면<|>표준도 도면오류수정<|>01:00<|><br>",1,
|
|
J07103,"2019-08-29 08:27:00",19-교영-01,d.기타,사업관리,"2019-08-29 18:19:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J13201,"2019-08-29 08:29:00",17-설계-09,b.구조계산,"조령천교 솟음도작성","2019-08-29 18:06:00",17-설계-09,b.구조계산,"조령천교 솟음도작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11203,"2019-08-29 08:34:00",18-시공-06,g.기타,"3공구(Pre-Deck) 5공구(운곡교) 감독지시사항 정리","2019-08-29 20:54:00",18-시공-06,g.기타,"3공구(Pre-Deck) 5공구(운곡교) 감독지시사항 정리","2019-08-29 18:32:00",172.16.9.160,172.16.9.155,172.16.9.160,008E1,,1,
|
|
J15202,"2019-08-29 08:34:00",17-설계-09,e.검토,"시공샵 변경 요청서 작성","2019-08-29 21:01:00",17-설계-09,e.검토,"시공샵 변경 요청서 작성","2019-08-29 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J11305,"2019-08-29 08:35:00",19-설계-03,e.검토,"성과품 검토","2019-08-29 18:23:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J11202,"2019-08-29 08:35:00",19-시공-02,b.시공,공사관리,"2019-08-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J09101,"2019-08-29 08:35:00",19-교영-01,c.설계사,과업조사,"2019-08-29 21:19:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14306,"2019-08-29 08:37:00",19-관리-04,a.계약,"계약업무 외","2019-08-29 18:45:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-08-29 08:38:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-29 18:08:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-08-29 08:39:00",14-설계-32,h.기타,"거더 검토","2019-08-29 20:43:00",14-설계-32,h.기타,"거더 검토","2019-08-29 18:31:00",172.16.9.162,172.16.9.155,172.16.9.162,008E1,,1,
|
|
J16202,"2019-08-29 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-29 22:03:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-29 18:50:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J10313,"2019-08-29 08:40:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","2019-08-29 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15307,"2019-08-29 08:48:00",10-설계-48,c.도면,"지산교 도면 검토 및 수정","2019-08-29 21:34:00",10-설계-48,c.도면,"지산교 도면 검토 및 수정","2019-08-29 18:31:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,"18-교영-28<|>d.기타<|>빔배치 작성<|>02:00<|><br>",1,
|
|
J15201,"2019-08-29 08:48:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-08-29 21:12:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-08-29 18:50:00",172.16.9.150,172.16.9.150,172.16.9.150,008C8,,,
|
|
J15301,"2019-08-29 08:49:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","2019-08-29 18:08:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
T04204,"2019-08-29 07:20:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-29 21:54:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14101,"2019-08-29 08:50:00",16-시공-20,출장,한양,"2019-08-29 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J09102,"2019-08-29 08:50:00",19-계약-01,출장,재성건설,"2019-08-29 18:00:00",19-계약-01,출장,재성건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18202,"2019-08-29 08:50:00",07-교영-01,출장,"[구미, 함양]구미국가산업단지 진입도로(롯데건설-괴평교), 함양~창녕 고속도로 5공구(계룡건설-합천호교)","2019-08-29 18:00:00",07-교영-01,출장,"[구미, 함양]구미국가산업단지 진입도로(롯데건설-괴평교), 함양~창녕 고속도로 5공구(계룡건설-합천호교)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18208,"2019-08-29 08:50:00",19-제조-02,출장,"[성주대교(대구광역시 하빈면)]성주대교 가설밴트 측량","2019-08-29 18:00:00",19-제조-02,출장,"[성주대교(대구광역시 하빈면)]성주대교 가설밴트 측량","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J10315,"2019-08-30 07:01:00",14-시공-18,b.시공,"인장 및 가설계획서 작성
|
|
|
|
","2019-08-30 18:00:00",14-시공-18,b.시공,"인장 및 가설계획서 작성
|
|
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J07202,"2019-08-30 07:11:00",19-제조-04,b.기계,"공장 주변 제초작업과 주두부 거푸집 보수","2019-08-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J16203,"2019-08-30 07:17:00",19-제조-03,a.품질검사,"산외, 북수원, 생태수로 데크, 켄틸, 프리빔 제작 및 생산 관리, 콘크리트 물성 확인","2019-08-30 22:39:00",19-제조-03,a.품질검사,"산외, 북수원, 생태수로 데크, 켄틸, 프리빔 제작 및 생산 관리, 콘크리트 물성 확인","2019-08-30 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18208,"2019-08-30 07:17:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-08-30 18:09:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-08-30 07:20:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-08-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-08-30 07:22:00",07-교영-01,b.시공사,"발주현황 파악","2019-08-30 18:06:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-08-30 07:32:00",19-제조-02,a.생산관리,"사무동내 사무실 정리","2019-08-30 18:06:00",19-제조-02,a.생산관리,"사무동내 사무실 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-08-30 07:37:00",16-시공-20,b.시공,"상부슬라브타설 시공 하도급계약검토","2019-08-30 18:03:00",16-시공-20,b.시공,"상부슬라브타설 시공 하도급계약검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J14308,"2019-08-30 07:39:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-08-30 18:02:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18301,"2019-08-30 07:39:00",19-제조-02,a.생산관리,"런처 정비보수","2019-08-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E3,,,
|
|
J09102,"2019-08-30 07:45:00",19-계약-01,b.시공사,"남양건설 현장, 코오롱글로벌 본사 방문 예정, 검단천교 예상 계약가 등 : 조령천교 외 6개교 계약 추진 중","2019-08-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-08-30 07:49:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-08-30 18:05:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J17205,"2019-08-30 07:51:00",18-교영-01,c.설계사,.,"2019-08-30 19:34:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10314,"2019-08-30 07:54:00",19-교영-06,d.기타,"제3연륙교 설계내역서, 포항~안동1-1 (1~3공구) 설계견적서 및 내역서(특공)","2019-08-30 18:03:00",19-교영-06,d.기타,"포항~안동1-1 (1~3공구) 설계견적서 및 내역서(특공),제3연륙교 설계내역서 및 견적서, DR거더 연장별 설계견적서(문산~도라산T/K)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-08-30 08:14:00",19-설계-07,"a.계획 및 협의","주천2교 현장사무실","2019-08-30 18:21:00",19-설계-07,"a.계획 및 협의","주천2교 현장사무실","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-08-30 08:16:00",18-관리-02,e.기타,"비서업무 외","2019-08-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-08-30 08:19:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-08-30 17:33:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-08-30 08:22:00",19-설계-03,e.검토,"성과품 검토","2019-08-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J11203,"2019-08-30 08:27:00",18-시공-06,g.기타,"3공구(Pre-Deck) 5공구(운곡교) 감독지시사항 정리","2019-08-30 18:11:00",18-시공-06,g.기타,"3공구(Pre-Deck) 5공구(운곡교) 감독지시사항 정리","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J14306,"2019-08-30 08:28:00",19-관리-04,a.계약,"계약업무 외","2019-08-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J10301,"2019-08-30 08:29:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-08-30 18:08:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15302,"2019-08-30 08:31:00",18-설계-19,c.도면,"한계상태설계법 교량 허용응력 검토 및 포항~안동 수량산출","2019-08-30 18:05:00",18-설계-19,c.도면,"한계상태설계법 교량 허용응력 검토 및 포항~안동 수량산출","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,"19-교영-19<|>d.기타<|>우산1교,구룡교 빔배치<|>05:00<|><br>",,
|
|
J15307,"2019-08-30 08:35:00",10-설계-48,c.도면,"지산교 도면 검토 및 수정","2019-08-30 18:03:00",10-설계-48,c.도면,"지산교 도면 검토 및 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J09101,"2019-08-30 08:36:00",19-교영-01,c.설계사,과업조사,"2019-08-30 08:38:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15201,"2019-08-30 08:38:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-08-30 18:46:00",19-교영-06,c.설계사,"특정공법심의자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-08-30 08:38:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","2019-08-30 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15202,"2019-08-30 08:38:00",17-설계-09,e.검토,"시공샵 변경 요청서 작성","2019-08-30 19:03:00",17-설계-09,e.검토,"시공샵 변경 요청서 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J07210,"2019-08-30 08:39:00",14-설계-32,h.기타,"거더 검토","2019-08-30 18:03:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J16202,"2019-08-30 08:41:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-30 21:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-30 18:30:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J11202,"2019-08-30 08:43:00",19-시공-02,b.시공,공사관리,"2019-08-30 18:05:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15301,"2019-08-30 08:50:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","2019-08-30 18:12:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J07103,"2019-08-30 08:52:00",19-교영-01,d.기타,사업관리,"2019-08-30 18:20:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14101,"2019-08-30 08:50:00",16-시공-20,출장,한양,"2019-08-30 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-08-31 07:32:00",19-교영-06,a.발주처,"가설검토 및 제안서 작성
|
|
|
|
","2019-08-31 18:50:00",19-교영-06,a.발주처,"가설검토 및 제안서 작성
|
|
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,1,
|
|
J16203,"2019-08-31 07:44:00",19-제조-03,a.품질검사,"산외교 데크, 켄틸, 생산 관리, 콘크리트 물성 확인","2019-08-31 16:59:00",19-제조-03,a.품질검사,"산외교 데크, 켄틸, 생산 관리, 콘크리트 물성 확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
J10313,"2019-08-31 08:20:00",19-제조-02,a.생산관리,월마감,"2019-08-31 12:01:00",19-제조-01,b.총무,월마감,"0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,1,
|
|
J14308,"2019-08-31 08:51:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-08-31 15:31:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J10314,"2019-08-31 08:57:00",17-교영-26,d.기타,"포항~안동1-1 (1~3공구) 설계견적서 및 내역서(특공),제3연륙교 설계내역서","2019-08-31 13:39:00",17-교영-26,d.기타,"포항~안동1-1 (1~3공구) 설계견적서 및 내역서(특공),제3연륙교 설계내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,1,
|
|
J07103,"2019-08-31 09:10:00",19-교영-01,d.기타,사업관리,"2019-08-31 18:20:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,1,
|
|
J16202,"2019-08-31 09:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-08-31 20:43:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-08-31 09:37:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-08-31 20:43:00",19-교영-06,c.설계사,"특정공법심의자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J18206,"2019-08-31 09:58:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-08-31 17:53:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,1,
|
|
J09101,"2019-08-31 10:04:00",19-교영-01,c.설계사,과업조사,"2019-08-31 20:42:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,1,
|
|
M05510,"2019-08-31 15:52:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.42.166,NULL,NULL,004C8,,,
|
|
J18207,"2019-08-31 18:10:00",16-시공-20,b.시공,"상부슬라브타설 시공 하도급계약검토","2019-08-31 18:10:00",16-시공-20,b.시공,"상부슬라브타설 시공 하도급계약검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,1,
|
|
J09101,"2019-09-01 08:59:00",19-교영-01,c.설계사,과업조사,"2019-09-01 20:30:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,1,
|
|
J15201,"2019-09-01 09:25:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-09-01 20:27:00",19-교영-06,c.설계사,"특정공법심의자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J16202,"2019-09-01 09:29:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-01 20:33:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07103,"2019-09-01 09:48:00",19-교영-01,d.기타,사업관리,"2019-09-01 17:58:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,1,
|
|
J10315,"2019-09-01 10:54:00",19-교영-06,a.발주처,"가설검토 및 제안서 작성
|
|
|
|
","2019-09-01 16:37:00",19-교영-06,a.발주처,"가설검토 및 제안서 작성
|
|
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,1,
|
|
M05510,"2019-09-01 17:27:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.41.39,NULL,NULL,004C8,,,
|
|
J11302,"2019-09-02 07:08:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성","2019-09-02 18:07:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J07202,"2019-09-02 07:08:00",19-제조-04,b.기계,"조령천교 주두부 거푸집 보수와 공장 내 정리정돈","2019-09-03 07:25:00",19-제조-04,b.기계,"조령천교 주두부 거푸집 보수와 공장 내 정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-09-02 07:14:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","2019-09-03 13:35:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","0000-00-00 00:00:00",223.38.42.88,NULL,223.38.42.248,004C8,,,
|
|
J14308,"2019-09-02 07:16:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-02 21:38:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-02 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-09-02 07:29:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-02 20:38:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-09-02 07:31:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-02 18:07:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18202,"2019-09-02 07:33:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-02 18:08:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J16203,"2019-09-02 07:34:00",19-제조-03,a.품질검사,"산외교,자안2교,새천1교, 데크, 켄틸, 생산 관리, 콘크리트 물성 확인","2019-09-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18207,"2019-09-02 07:43:00",17-시공-08,b.시공,"런쳐 거더 기설방법 검토","2019-09-02 18:03:00",17-시공-08,b.시공,"런쳐 거더 기설방법 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M02302,"2019-09-02 07:43:00",19-제조-02,a.생산관리,"사무동내 사무실 정리","2019-09-02 18:05:00",19-제조-02,a.생산관리,"사무동내 사무실 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-09-02 07:46:00",19-계약-01,b.시공사,"문산~도라산 예상 시행가, 검단천교 예상 계약가 등 : 조령천교 외 6개교 계약 추진 중","2019-09-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-09-02 08:04:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-09-02 18:07:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10315,"2019-09-02 08:04:00",19-교영-06,a.발주처,"가설검토 및 제안서 작성
|
|
|
|
","2019-09-02 18:11:00",19-교영-06,a.발주처,"가설검토 및 제안서 작성
|
|
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18206,"2019-09-02 08:11:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-02 18:26:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-09-02 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-09-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-09-02 08:16:00",19-설계-07,"a.계획 및 협의","주천2교 현장사무실","2019-09-02 18:09:00",19-설계-07,"a.계획 및 협의","주천2교 현장사무실","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-09-02 08:18:00",17-교영-26,d.기타,"포항~안동1-1 (1~3공구) 설계견적서 및 내역서(특공),제3연륙교 설계내역서","2019-09-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J18205,"2019-09-02 08:27:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-02 21:36:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-02 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J09101,"2019-09-02 08:27:00",19-교영-01,c.설계사,과업조사,"2019-09-03 04:33:00",19-교영-01,c.설계사,과업조사,"2019-09-02 18:32:00",172.16.8.144,172.16.8.144,172.16.8.144,008C7,,1,
|
|
J15302,"2019-09-02 08:29:00",18-설계-19,c.도면,"우산1교 구룡교 빔배치 및 일반도 작성","2019-09-02 21:28:00",18-설계-19,c.도면,"우산1교 구룡교 빔배치 및 일반도 작성","2019-09-02 18:55:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J15307,"2019-09-02 08:30:00",10-설계-48,c.도면,"Spliced Girder 현황 조사","2019-09-02 21:30:00",10-설계-48,c.도면,"지산교 도면 검토 및 수정","2019-09-02 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J11202,"2019-09-02 08:31:00",19-시공-02,b.시공,공사관리,"2019-09-02 18:08:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07103,"2019-09-02 08:32:00",19-교영-01,d.기타,사업관리,"2019-09-02 18:10:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11203,"2019-09-02 08:32:00",18-시공-06,g.기타,"3공구(Pre-Deck) 5공구(운곡교) 감독지시사항 정리","2019-09-02 20:21:00",18-시공-06,g.기타,"3공구(Pre-Deck) 5공구(운곡교) 감독지시사항 정리","2019-09-02 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"17-시공-08<|>g.기타<|>시공사요구사항발송(부재력전산결과자료)<|>00:30<|><br>17-설계-02<|>h.기타<|>감리검토사항 답변 별첨자료 작성<|>03:00<|><br>",1,
|
|
J14306,"2019-09-02 08:32:00",19-관리-04,a.계약,"계약업무 외","2019-09-02 18:04:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J13201,"2019-09-02 08:34:00",19-교영-19,c.설계사,"우산1교 모델링","2019-09-02 20:46:00",19-교영-19,c.설계사,"우산1교 모델링","2019-09-02 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J07210,"2019-09-02 08:34:00",14-설계-32,h.기타,"거더 검토","2019-09-02 19:05:00",14-설계-32,h.기타,"거더 검토","2019-09-02 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,,
|
|
J10301,"2019-09-02 08:35:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-02 18:14:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J17205,"2019-09-02 08:35:00",18-교영-01,c.설계사,.,"2019-09-03 04:33:00",18-교영-01,c.설계사,.,"2019-09-02 18:31:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J11305,"2019-09-02 08:37:00",19-설계-03,e.검토,"성과품 검토","2019-09-02 18:13:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J16202,"2019-09-02 08:44:00",19-교영-06,c.설계사,제안서,"2019-09-03 04:32:00",19-교영-06,c.설계사,제안서,"2019-09-02 18:31:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J10313,"2019-09-02 08:44:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-09-02 18:00:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15201,"2019-09-02 08:46:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-09-03 04:32:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-09-02 18:31:00",172.16.9.150,172.16.9.150,172.16.9.150,008C8,,,
|
|
J15301,"2019-09-02 08:50:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","2019-09-02 18:07:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14101,"2019-09-02 08:50:00",16-시공-20,출장,한양,"2019-09-02 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07103,"2019-08-12 08:50:00",16-시공-20,출장,"산외교 출장","2019-08-12 18:00:00",16-시공-20,출장,"산외교 출장","0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J14101,"2019-08-15 08:50:00",16-시공-20,출장,한양,"2019-08-15 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07103,"2019-08-21 08:50:00",16-시공-20,출장,산외교현장,"2019-08-21 18:00:00",16-시공-20,출장,산외교현장,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J09101,"2019-09-03 06:40:00",19-교영-01,c.설계사,과업조사,"2019-09-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J11302,"2019-09-03 07:15:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성","2019-09-03 18:09:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-09-03 07:21:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-03 20:20:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-09-03 07:26:00",19-제조-04,b.기계,"조령천교 주두부 거푸집 보수와 PC강봉 적치대 제작","2019-09-04 07:33:00",19-제조-04,b.기계,"조령천교 주두부 거푸집 보수와 PC강봉 적치대 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-09-03 07:27:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-03 21:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-03 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18208,"2019-09-03 07:27:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-03 18:03:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18202,"2019-09-03 07:28:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-03 18:10:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-09-03 07:29:00",19-제조-02,a.생산관리,"1층 교육실 가구 정리 및 청소","2019-09-03 18:01:00",19-제조-02,a.생산관리,"1층 교육실 가구 정리 및 청소","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-09-03 07:35:00",19-계약-01,b.시공사,"대림산업, 계룡건설 방문 예정, 시화분기점, 검단천교 예상 계약가 등 : 조령천교 외 6개교 계약 추진 중","2019-09-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J15201,"2019-09-03 07:42:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-09-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J16203,"2019-09-03 07:44:00",19-제조-03,a.품질검사,"산외교,자안2교,새천1교, 데크, 켄틸, 생산 관리, 콘크리트 물성 확인","2019-09-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J16202,"2019-09-03 07:45:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J17205,"2019-09-03 07:45:00",18-교영-01,c.설계사,.,"2019-09-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J13308,"2019-09-03 07:46:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-09-03 18:11:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18207,"2019-09-03 07:48:00",17-시공-08,b.시공,"런쳐 거더 기설방법 검토","2019-09-03 18:11:00",17-시공-08,b.시공,"런쳐 거더 기설방법 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
B15306,"2019-09-03 08:09:00",18-관리-02,e.기타,"비서업무 외","2019-09-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-09-03 08:18:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-03 18:22:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10313,"2019-09-03 08:19:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-09-03 18:02:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J08201,"2019-09-03 08:19:00",19-설계-07,"a.계획 및 협의","계획 및 협의","2019-09-03 20:42:00",19-설계-07,"a.계획 및 협의","계획 및 협의","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-09-03 08:19:00",18-교영-28,d.기타,"포항~안동1-1 (1~3공구) 설계견적서 및 내역서(특공), 제3연륙교 설계내역서, 교암교외 2개소(남일~보은2공구) 시행견적서","2019-09-03 18:05:00",18-교영-28,d.기타,"포항~안동1-1 (1~3공구) 설계견적서 및 내역서(특공), 제3연륙교 설계내역서, 교암교외 2개소(남일~보은2공구) 시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-09-03 08:27:00",19-교영-01,d.기타,사업관리,"2019-09-03 09:45:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J13201,"2019-09-03 08:27:00",19-교영-19,c.설계사,"우산1교 모델링","2019-09-03 20:33:00",19-교영-19,c.설계사,"우산1교 모델링","2019-09-03 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J14306,"2019-09-03 08:28:00",19-관리-04,a.계약,"계약업무 외","2019-09-03 18:03:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15302,"2019-09-03 08:28:00",18-설계-19,c.도면,"우산1교 구룡교 빔배치 및 일반도 작성","2019-09-03 20:32:00",18-설계-19,c.도면,"우산1교 구룡교 빔배치 및 일반도 작성","2019-09-03 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"17-설계-11<|>e.검토<|>정착구 및 강선갯수확인<|>01:30<|><br>",1,
|
|
J18205,"2019-09-03 08:29:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-03 22:18:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-03 19:11:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J11305,"2019-09-03 08:30:00",19-설계-03,e.검토,"성과품 검토","2019-09-03 18:14:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10301,"2019-09-03 08:33:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-03 18:16:00",17-시공-09,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-09-03 08:37:00",14-설계-32,h.기타,"거더 검토","2019-09-03 20:33:00",14-설계-32,h.기타,"거더 검토","2019-09-03 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15202,"2019-09-03 08:38:00",17-설계-09,e.검토,"시공샵 변경 요청서 작성","2019-09-03 21:34:00",17-설계-09,e.검토,"시공샵 변경 요청서 작성","2019-09-03 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J15307,"2019-09-03 08:40:00",10-설계-48,c.도면,"지산교 도면 검토 및 수정","2019-09-03 21:31:00",10-설계-48,c.도면,"지산교 도면 검토 및 수정","2019-09-03 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J15301,"2019-09-03 08:49:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","2019-09-03 18:12:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11202,"2019-09-03 08:51:00",19-시공-02,b.시공,공사관리,"2019-09-03 18:16:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
M05510,"2019-09-03 14:35:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","2019-09-04 10:01:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","0000-00-00 00:00:00",223.38.42.243,NULL,223.38.41.89,004C8,,,
|
|
J10315,"2019-09-03 08:50:00",18-시공-12,출장,"포스코 건설","2019-09-03 18:11:00",19-교영-06,a.발주처,"가설검토 및 제안서 작성
|
|
|
|
","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J11203,"2019-09-03 08:50:00",18-시공-06,g.기타,"공구(Pre-Deck) 5공구(운곡교) 감독지시사항 정리","2019-09-03 20:40:00",18-시공-06,g.기타,"3공구(Pre-Deck) 5공구(운곡교) 감독지시사항 정리","2019-09-03 18:38:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J14101,"2019-09-03 08:50:00",16-시공-20,출장,한양,"2019-09-03 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-09-04 07:18:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성","2019-09-04 18:10:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-09-04 07:23:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-09-04 07:25:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-04 18:05:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J16203,"2019-09-04 07:31:00",19-제조-03,a.품질검사,"산외교,자안2교,새천1교, 데크, 켄틸, 생산 관리, 콘크리트 물성 확인","2019-09-04 20:40:00",19-제조-03,a.품질검사,"산외교,자안2교,새천1교, 데크, 켄틸, 생산 관리, 콘크리트 물성 확인","2019-09-04 18:35:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
M02302,"2019-09-04 07:32:00",19-제조-02,a.생산관리,"계약직 전환자 계약 및 면담","2019-09-04 18:02:00",19-제조-02,a.생산관리,"계약직 전환자 계약 및 면담","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>철근 창고동 정리<|>02:00<|><br>19-제조-02<|>a.생산관리<|>성주대교 Shop Dwg. 지원<|>04:00<|><br>",,
|
|
J07202,"2019-09-04 07:33:00",19-제조-04,b.기계,"조령천교 주두부 거푸집 보수와 PC강봉 적치대 도색","2019-09-05 07:00:00",19-제조-04,b.기계,"조령천교 주두부 거푸집 보수와 PC강봉 적치대 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-09-04 07:34:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-04 21:36:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-04 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-09-04 07:38:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-04 21:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-04 18:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-09-04 07:45:00",17-시공-08,b.시공,"런쳐 거더 기설방법 검토","2019-09-04 18:02:00",17-시공-08,b.시공,"런쳐 거더 기설방법 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-09-04 07:46:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-09-04 18:29:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10315,"2019-09-04 08:12:00",14-시공-18,b.시공,"가설계획서 작성","2019-09-04 18:01:00",14-시공-18,b.시공,"가설계획서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J10314,"2019-09-04 08:13:00",17-설계-11,h.기타,"양포교(함안천 가야지구) 시행견적서, 제3연륙교 설계내역서, 신양교(안동~영덕) 시행가 견적서 및 검토자료","2019-09-04 18:11:00",17-설계-11,h.기타,"양포교(함안천 가야지구) 시행견적서, 제3연륙교 설계내역서, 신양교(안동~영덕) 시행가 견적서 및 검토자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-09-04 08:15:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-04 18:08:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-09-04 08:23:00",18-관리-02,e.기타,"비서업무 외","2019-09-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18205,"2019-09-04 08:26:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-04 21:38:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-04 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J11305,"2019-09-04 08:26:00",19-설계-03,e.검토,"성과품 검토","2019-09-04 18:19:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15302,"2019-09-04 08:27:00",18-설계-19,c.도면,"우산1교 구룡교 거더도 작성","2019-09-04 20:35:00",18-설계-19,c.도면,"우산1교 구룡교 거더도 작성","2019-09-04 18:31:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J15307,"2019-09-04 08:29:00",19-교영-14,d.기타,"내포2교 슬래브 일반도 작성","2019-09-04 18:00:00",19-교영-14,d.기타,"내포2교 슬래브 일반도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J11203,"2019-09-04 08:32:00",17-설계-02,h.기타,"감리검토 의견에 대한 자료 정리(별첨자료)","2019-09-04 20:37:00",17-설계-02,h.기타,"감리검토 의견에 대한 자료 정리(별첨자료)","2019-09-04 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J15201,"2019-09-04 08:37:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-09-04 18:10:00",19-교영-06,c.설계사,"특정공법심의자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-09-04 08:37:00",14-설계-32,h.기타,"거더 검토","2019-09-04 20:49:00",14-설계-32,h.기타,"거더 검토","2019-09-04 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J13201,"2019-09-04 08:44:00",19-교영-19,c.설계사,"구룡교 모델링","2019-09-04 20:44:00",19-교영-19,c.설계사,"구룡교 모델링","2019-09-04 18:31:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J11202,"2019-09-04 08:46:00",19-시공-02,b.시공,공사관리,"2019-09-04 18:11:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10313,"2019-09-04 08:47:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-09-04 18:02:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-09-04 08:48:00",19-교영-01,c.설계사,과업조사,"2019-09-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J16202,"2019-09-04 08:50:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-04 21:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-04 18:34:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J15202,"2019-09-04 08:51:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-04 21:31:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-04 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J14306,"2019-09-04 08:52:00",19-관리-04,a.계약,"계약업무 외","2019-09-04 18:53:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15301,"2019-09-04 08:54:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","2019-09-04 18:13:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-09-04 10:01:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","2019-09-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.41.89,NULL,NULL,004C8,,,
|
|
J08201,"2019-09-04 08:50:00",19-시공-20,경유,"시공상세변경 주감독 설명요청","2019-09-04 18:24:00",19-설계-07,"a.계획 및 협의","계획 및 협의","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J17205,"2019-09-04 08:36:00",18-교영-01,c.설계사,.,"2019-09-04 18:26:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J14101,"2019-09-04 08:50:00",16-시공-20,출장,한양,"2019-09-04 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10301,"2019-09-04 08:50:00",19-관리-06,출장,"[한일건설]부산항[북항] 재개발사업 1-1단계 부지조성공사 입찰","2019-09-04 18:00:00",19-관리-06,출장,"[한일건설]부산항[북항] 재개발사업 1-1단계 부지조성공사 입찰","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J09102,"2019-09-04 08:50:00",19-계약-01,출장,"남양건설 본사","2019-09-04 18:00:00",19-계약-01,출장,"남양건설 본사","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07103,"2019-09-04 08:50:00",19-교휴-01,교육,"기술사 교육(9/3~9/6)","2019-09-04 18:00:00",19-교휴-01,교육,"기술사 교육(9/3~9/6)","0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J07202,"2019-09-05 07:01:00",19-제조-04,b.기계,"생산2팀 PC강봉 적치대 도색과 조령천교 주두부 거푸집 보수","2019-09-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J11302,"2019-09-05 07:21:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성
|
|
왕림교 인장계획서 작성
|
|
세천2교 가설샵작업","2019-09-05 18:11:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성
|
|
왕림교 인장계획서 작성
|
|
세천2교 가설샵작업","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18202,"2019-09-05 07:24:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-05 18:07:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
T04204,"2019-09-05 07:28:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-05 21:19:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-09-05 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-05 22:20:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-05 19:08:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18208,"2019-09-05 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-05 22:19:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-05 19:12:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-09-05 07:34:00",19-제조-02,a.생산관리,"야근수당 기준 정리","2019-09-05 18:07:00",19-제조-02,a.생산관리,"야근수당 기준 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>마을 추석선물 전달 및 인사<|>02:00<|><br>19-제조-02<|>a.생산관리<|>생태수로 공장검수 및 협의<|>03:00<|><br>",,
|
|
M05510,"2019-09-05 07:34:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","2019-09-06 18:22:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","0000-00-00 00:00:00",223.38.41.101,NULL,223.38.41.79,004C8,,,
|
|
J13308,"2019-09-05 07:41:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-09-05 18:03:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J16203,"2019-09-05 07:43:00",19-제조-03,a.품질검사,"산외교,자안2교,새천1교, 데크, 켄틸, 생산 관리, 콘크리트 물성 확인","2019-09-05 20:58:00",19-제조-03,a.품질검사,"산외교,자안2교,새천1교, 데크, 켄틸, 생산 관리, 콘크리트 물성 확인","2019-09-05 19:08:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18207,"2019-09-05 07:43:00",17-시공-08,b.시공,"런쳐 거더 기설방법 검토","2019-09-05 17:54:00",17-시공-08,b.시공,"런쳐 거더 기설방법 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-09-05 07:45:00",19-계약-01,b.시공사,"삼환기업 현장방문 예정, 안동~영덕 신양교 예상 게약가 등 : 조령천교 외 5개교 계약 추진 중","2019-09-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-09-05 07:59:00",14-시공-18,b.시공,"가설계획서 작성","2019-09-05 18:01:00",14-시공-18,b.시공,"가설계획서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18206,"2019-09-05 08:09:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-05 17:39:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-09-05 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-09-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-09-05 08:14:00",19-교영-15,c.설계사,"교량계획 ","2019-09-05 20:15:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-09-05 08:15:00",14-설계-33,h.기타,"신양교(안동~영덕) 시행가 견적서 및 첨부자료, 양포교(함안천 가야지구) 시행견적서, 제3연륙교 설계내역서","2019-09-05 18:10:00",14-설계-33,h.기타,"신양교(안동~영덕) 시행가 견적서 및 첨부자료, 양포교(함안천 가야지구) 시행견적서, 제3연륙교 설계내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11305,"2019-09-05 08:20:00",19-설계-03,e.검토,"성과품 검토","2019-09-05 18:03:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-09-05 08:28:00",19-교영-14,d.기타,"내포2교 슬래브 일반도 작성","2019-09-05 21:42:00",19-교영-14,d.기타,"내포2교 슬래브 일반도 작성","2019-09-05 19:38:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J15302,"2019-09-05 08:28:00",17-설계-02,e.검토,"당초 변경 작성","2019-09-05 20:05:00",17-설계-02,e.검토,"당초 변경 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,1,
|
|
J11203,"2019-09-05 08:29:00",17-설계-02,h.기타,"감리검토 의견에 대한 자료 정리(별첨자료)","2019-09-05 20:33:00",17-설계-02,h.기타,"감리검토 의견에 대한 자료 정리(별첨자료)","2019-09-05 18:32:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"17-시공-08<|>g.기타<|>수정된 런처가설시 기둥검토<|>05:00<|><br>",1,
|
|
J14306,"2019-09-05 08:31:00",19-관리-04,a.계약,"계약업무 외","2019-09-05 18:07:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-09-05 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-05 18:08:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J18205,"2019-09-05 08:33:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-05 21:37:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-05 18:33:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J10301,"2019-09-05 08:35:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-05 18:51:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-09-05 08:37:00",19-교영-19,c.설계사,"우산1교 응력검토","2019-09-05 20:35:00",19-교영-19,c.설계사,"우산1교 응력검토","2019-09-05 18:33:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J15201,"2019-09-05 08:38:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-09-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J11202,"2019-09-05 08:40:00",19-시공-02,b.시공,공사관리,"2019-09-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J07210,"2019-09-05 08:42:00",14-설계-32,h.기타,"거더 검토","2019-09-05 21:11:00",14-설계-32,h.기타,"거더 검토","2019-09-05 18:33:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J10313,"2019-09-05 08:43:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-09-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15202,"2019-09-05 08:46:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-05 18:18:18",19-교영-14,c.설계사,NULL,"2019-09-05 18:32:00",172.16.9.155,172.16.9.155,NULL,008E1,,1,
|
|
J09101,"2019-09-05 08:47:00",19-교영-01,c.설계사,과업조사,"2019-09-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15301,"2019-09-05 08:52:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","2019-09-06 08:49:00",16-시공-20,b.시공,"경안천교 쏠플레이트 검토서 작성
|
|
교암교 쏠플레이트 검토서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J17205,"2019-09-05 08:38:00",18-교영-01,c.설계사,.,"2019-09-05 18:05:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J14101,"2019-09-05 08:50:00",16-시공-20,출장,한양,"2019-09-05 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07103,"2019-09-05 08:50:00",19-교휴-01,교육,"기술사 교육(9/3~9/6)","2019-09-05 18:00:00",19-교휴-01,교육,"기술사 교육(9/3~9/6)","0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J07202,"2019-09-06 07:01:00",19-제조-04,b.기계,"조령천교 주두부 받침대 홀 가공과 청소 및 도색","2019-09-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
T04204,"2019-09-06 07:15:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-06 19:20:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-09-06 07:24:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성
|
|
왕림교 인장계획서 작성
|
|
세천2교 가설샵작업","2019-09-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E2,,,
|
|
J14308,"2019-09-06 07:26:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-06 21:57:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-06 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18202,"2019-09-06 07:29:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J18208,"2019-09-06 07:31:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-06 18:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-09-06 07:36:00",19-제조-02,a.생산관리,"태풍 대비 공장 점검 및 한맥기술 실사","2019-09-06 18:05:00",19-제조-02,a.생산관리,"공장 점검 및 한맥기술 실사","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>산외교 Cantilever부 Pre-Deck Shop Dwg.<|>04:30<|><br>",,
|
|
J16203,"2019-09-06 07:38:00",19-제조-03,a.품질검사,"산외교,자안2교,새천1교, 데크, 켄틸, 생산 관리, 콘크리트 물성 확인","2019-09-06 22:23:00",19-제조-03,a.품질검사,"산외교,자안2교,새천1교, 데크, 켄틸, 생산 관리, 콘크리트 물성 확인","2019-09-06 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,,
|
|
J18207,"2019-09-06 07:42:00",17-시공-08,b.시공,"런쳐 거더 기설방법 검토","2019-09-06 17:57:00",17-시공-08,b.시공,"런쳐 거더 기설방법 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-09-06 07:49:00",17-설계-05,"a.계획 및 협의","협의자료 작성(제작 및 가설)","2019-09-06 14:13:00",17-설계-05,"a.계획 및 협의","협의자료 작성(제작 및 가설)","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
B15306,"2019-09-06 08:07:00",18-관리-02,e.기타,"비서업무 외","2019-09-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10301,"2019-09-06 08:10:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-06 18:12:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J08201,"2019-09-06 08:14:00",19-교영-15,c.설계사,"교량계획 ","2019-09-06 18:06:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-09-06 08:18:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-06 18:04:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J13201,"2019-09-06 08:24:00",19-교영-19,c.설계사,"우산1교 응력검토","2019-09-06 18:04:00",19-교영-19,c.설계사,"우산1교 응력검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J10314,"2019-09-06 08:24:00",18-설계-19,h.기타,"신기술(특허)협약관련 첨부서류, 양포교(함안천 가야지구) 시행견적서, 제3연륙교 설계내역서","2019-09-06 18:32:00",18-설계-19,h.기타,"신기술(특허)협약관련 첨부서류, 양포교(함안천 가야지구) 시행견적서, 제3연륙교 설계내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11305,"2019-09-06 08:24:00",19-설계-03,e.검토,"성과품 검토","2019-09-06 18:06:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15302,"2019-09-06 08:26:00",17-설계-02,e.검토,"당초 변경 및 별첨자료 작성","2019-09-06 18:05:00",17-설계-02,e.검토,"당초 변경 및 별첨자료 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J11202,"2019-09-06 08:29:00",19-시공-02,b.시공,공사관리,"2019-09-06 18:02:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18205,"2019-09-06 08:30:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-06 18:10:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J16202,"2019-09-06 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-06 18:29:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-09-06 08:32:00",18-교영-01,c.설계사,.,"2019-09-06 18:20:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11203,"2019-09-06 08:35:00",17-설계-02,h.기타,"감리검토 의견에 대한 자료 정리(별첨자료)","2019-09-06 18:05:00",17-설계-02,h.기타,"감리검토 의견에 대한 자료 정리(별첨자료)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J15201,"2019-09-06 08:36:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-09-06 18:19:00",19-교영-06,c.설계사,"특정공법심의자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-09-06 08:37:00",14-설계-32,h.기타,"거더 검토","2019-09-06 18:02:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15307,"2019-09-06 08:38:00",19-교영-14,d.기타,"내포2교 바닥판, 거더 수량 작성","2019-09-06 15:08:00",19-교영-14,d.기타,"내포2교 바닥판, 거더 수량 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J15202,"2019-09-06 08:39:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-06 18:17:00",19-교영-14,c.설계사,"내포2교 구조계산","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J10313,"2019-09-06 08:40:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-09-06 18:03:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-09-06 08:48:00",19-교영-01,c.설계사,과업조사,"2019-09-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15301,"2019-09-06 08:49:00",16-시공-20,b.시공,"산외교 17차 기성 청구 (하도급지킴이 작성)
|
|
작업반 정산서 작성
|
|
교리교 자재공급원승인서 준비 (디비닥 외)
|
|
동림교 공급원승인서 재발송 준비
|
|
삼남1교 투입내역서 작성","2019-09-06 18:04:00",16-시공-20,b.시공,"산외교 17차 기성 청구 (하도급지킴이 작성)
|
|
작업반 정산서 작성
|
|
교리교 자재공급원승인서 준비 (디비닥 외)
|
|
동림교 공급원승인서 재발송 준비
|
|
삼남1교 투입내역서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-09-06 18:22:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","2019-09-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.41.79,NULL,NULL,004C8,,,
|
|
J14101,"2019-09-06 08:50:00",16-시공-20,출장,한양,"2019-09-06 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07103,"2019-09-06 08:50:00",19-교휴-01,교육,"기술사 교육(9/3~9/6)","2019-09-06 18:00:00",19-교휴-01,교육,"기술사 교육(9/3~9/6)","0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J09102,"2019-09-06 08:50:00",19-계약-01,출장,"동광건설, 한신공영","2019-09-06 18:00:00",19-계약-01,출장,"동광건설, 한신공영","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J14306,"2019-09-06 08:50:00",19-관리-04,출장,"[천안,홍성]건설업면허수첩 19년도 시평액 기재(전문,종합면허)","2019-09-06 18:00:00",19-관리-04,출장,"[천안,홍성]건설업면허수첩 19년도 시평액 기재(전문,종합면허)","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
T04204,"2019-09-07 07:31:00",19-제조-02,a.생산관리,"태풍 링링 북상 관련 대비 근무 ","2019-09-07 18:00:00",19-제조-02,a.생산관리,"태풍 링링 북상 관련 대비 근무 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-09-07 07:47:00",19-제조-02,a.생산관리,"공장 시설물 관리 ","2019-09-07 18:00:00",19-제조-02,a.생산관리,"공장 시설물 관리 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
J18207,"2019-09-07 08:08:00",17-시공-08,b.시공,"런쳐 거더 기설방법 검토","2019-09-07 17:00:00",17-시공-08,b.시공,"런쳐 거더 기설방법 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,1,
|
|
J10313,"2019-09-07 09:04:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-09-07 12:00:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,1,
|
|
M05510,"2019-09-08 18:29:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.10.188,NULL,NULL,004C8,,,
|
|
J11302,"2019-09-09 07:11:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성
|
|
왕림교 인장계획서 작성
|
|
세천2교 가설샵작업","2019-09-09 18:41:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성
|
|
왕림교 인장계획서 작성
|
|
세천2교 가설샵작업","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J12202,"2019-09-09 07:14:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-09-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-09-09 07:21:00",19-제조-04,b.기계,"태풍피해 복구와 조령천교 주두부 받침대 홀 가공과 청소 및 도색","2019-09-10 06:59:00",19-제조-04,b.기계,"태풍피해 복구와 조령천교 주두부 받침대 홀 가공과 청소 및 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-09-09 07:27:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
T04204,"2019-09-09 07:28:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-09 20:17:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-09-09 07:41:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-09 18:25:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18207,"2019-09-09 07:49:00",17-시공-09,b.시공,"스플라이스거더 3차인장 문제점검토","2019-09-09 19:06:00",17-시공-09,b.시공,"스플라이스거더 3차인장 문제점검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-09-09 07:55:00",19-계약-01,b.시공사,"남양건설 현장, 신양교, 교리교외 1개교, 검단천교 예상 계약가 등 : 조령천교 외 5개교 계약 추진 중","2019-09-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18202,"2019-09-09 08:06:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-09 18:04:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18206,"2019-09-09 08:13:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-09 19:40:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J13308,"2019-09-09 08:15:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-09-09 18:06:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10315,"2019-09-09 08:16:00",17-설계-05,"a.계획 및 협의","구안천교 협의","2019-09-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J10314,"2019-09-09 08:19:00",14-설계-33,h.기타,"내포2교(문산~도라산 T/K 1공구) 설계내역서, 신양교(안동~영덕) 시행가","2019-09-09 18:06:00",14-설계-33,h.기타,"신양교(안동~영덕) 시행견적서, 내포2교(문산~도라산 T/K 1공구) 설계견적서 및 내역서, 제3연륙교 설계내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-09-09 08:21:00",19-교영-01,d.기타,사업관리,"2019-09-09 18:24:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J08201,"2019-09-09 08:22:00",19-교영-15,c.설계사,"교량계획 ","2019-09-09 20:32:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-09-09 08:23:00",18-관리-02,e.기타,"비서업무 외","2019-09-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15201,"2019-09-09 08:30:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-09-09 21:11:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-09-09 18:46:00",172.16.9.150,172.16.9.150,172.16.9.150,008C8,,,
|
|
J18205,"2019-09-09 08:34:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-09 21:52:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-09 19:12:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-09-09 08:34:00",19-교영-19,c.설계사,"규룡교 반력산정","2019-09-09 18:03:00",19-교영-19,c.설계사,"규룡교 반력산정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J16202,"2019-09-09 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-09 21:13:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-09 18:46:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J17205,"2019-09-09 08:35:00",18-교영-01,c.설계사,.,"2019-09-09 21:11:00",18-교영-01,c.설계사,.,"2019-09-09 18:45:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J11203,"2019-09-09 08:35:00",17-시공-08,g.기타,"런처가설시 교각 코핑의 응력, 휨강도, 전단강도 검토","2019-09-09 20:32:00",17-시공-08,g.기타,"런처가설시 교각 코핑의 응력, 휨강도, 전단강도 검토","2019-09-09 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J14306,"2019-09-09 08:35:00",19-관리-04,a.계약,"계약업무 외","2019-09-09 18:04:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J09101,"2019-09-09 08:36:00",19-교영-01,c.설계사,과업조사,"2019-09-09 18:21:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J11305,"2019-09-09 08:37:00",19-설계-03,e.검토,"성과품 검토","2019-09-09 18:14:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J16203,"2019-09-09 08:39:00",19-제조-03,a.품질검사,"준 조강 시멘트 배합시험,
|
|
산외교,북수원1교,새천1교, 데크, 켄틸, 생산 관리","2019-09-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J10301,"2019-09-09 08:39:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-09 18:19:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-09-09 08:40:00",14-설계-32,h.기타,"거더 검토","2019-09-09 18:02:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-09-09 08:43:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-09 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11202,"2019-09-09 08:46:00",19-시공-02,b.시공,공사관리,"2019-09-09 18:15:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15301,"2019-09-09 08:51:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
교리교 자재공급원승인서 준비 (디비닥 외)
|
|
자안2교 투입내역서 작성
|
|
단장천2교 투입내역서 작성","2019-09-09 18:10:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
교리교 자재공급원승인서 준비 (디비닥 외)
|
|
자안2교 투입내역서 작성
|
|
단장천2교 투입내역서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J08201,"2019-09-16 08:22:00",19-교영-15,c.설계사,"교량계획 ","2019-09-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J14101,"2019-09-09 08:50:00",16-시공-20,출장,한양,"2019-09-09 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
M02302,"2019-09-09 08:50:00",19-제조-02,출장,"[한맥빌딩]기술개발센터 협의","2019-09-09 18:00:00",19-제조-02,출장,"[한맥빌딩]기술개발센터 협의","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J07202,"2019-09-10 06:59:00",19-제조-04,b.기계,"조령천교 주두부 받침대 홀 가공과 청소 및 도색","2019-09-11 06:57:00",19-제조-04,b.기계,"조령천교 주두부 받침대 홀 가공과 청소 및 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-09-10 07:22:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-10 21:42:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-10 18:41:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-09-10 07:25:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-10 21:11:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-09-10 07:27:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성
|
|
왕림교 인장계획서 작성
|
|
세천2교 가설샵작업","2019-09-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E2,,,
|
|
J18202,"2019-09-10 07:30:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-10 18:05:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-09-10 07:35:00",19-제조-02,a.생산관리,"인도네시아 기술이전 관련 설비 및 레미콘 자료 검토","2019-09-10 18:05:00",19-제조-02,a.생산관리,"인도네시아 기술이전 관련 설비 및 레미콘 자료 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-09-10 07:37:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-10 21:43:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-10 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-09-10 07:41:00",19-제조-03,a.품질검사,"동림교,산외교,북수원1교, 데크 켄틸, 생산 관리","2019-09-10 22:49:00",19-제조-03,a.품질검사,"동림교,산외교,북수원1교, 데크 켄틸, 생산 관리","2019-09-10 18:41:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-09-10 07:45:00",19-계약-01,b.시공사,"대림산업 현장 계룡건설 합사, 신양교, 교리교외 1개교, 검단천교 예상 계약가 등 : 조령천교 외 5개교 계약 추진 중","2019-09-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10309,"2019-09-10 07:56:00",18-시공-06,g.기타,"시공샵도작성 및 제작장배치계획 작성","2019-09-10 20:51:00",18-시공-06,g.기타,"시공샵도작성 및 제작장배치계획 작성","0000-00-00 00:00:00",61.98.205.243,NULL,211.176.125.70,004E1,,,
|
|
J07103,"2019-09-10 08:10:00",19-교영-01,d.기타,사업관리,"2019-09-10 18:07:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J13308,"2019-09-10 08:15:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-09-10 18:09:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J08201,"2019-09-10 08:19:00",19-교영-15,c.설계사,"교량계획 ","2019-09-10 18:17:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J09101,"2019-09-10 08:19:00",19-교영-01,c.설계사,과업조사,"2019-09-10 18:06:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J18206,"2019-09-10 08:21:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-10 18:06:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-09-10 08:22:00",19-설계-03,e.검토,"성과품 검토","2019-09-10 18:11:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15201,"2019-09-10 08:27:00",19-교영-06,c.설계사,"특정공법심의자료 작성","2019-09-10 18:04:00",19-교영-06,c.설계사,"특정공법심의자료 작성","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10314,"2019-09-10 08:28:00",19-교영-14,d.기타,"내포2교(문산~도라산 T/K 1공구) 설계견적서 및 내역서, 신양교(안동~영덕) 시행견적서, 제3연륙교 설계내역서","2019-09-10 18:03:00",19-교영-14,d.기타,"내포2교(문산~도라산 T/K 1공구) 설계견적서 및 내역서, 신양교(안동~영덕) 시행견적서, 제3연륙교 설계내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J17205,"2019-09-10 08:30:00",18-교영-01,c.설계사,.,"2019-09-10 18:06:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11203,"2019-09-10 08:31:00",17-설계-02,h.기타,"감리검토사항 별첨자료재작성(표현 모양등 통일)","2019-09-10 18:01:00",17-설계-02,h.기타,"감리검토사항 별첨자료재작성(표현 모양등 통일)","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J13201,"2019-09-10 08:32:00",19-교영-19,c.설계사,"우산1교 반력산정","2019-09-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E2,,,
|
|
J07210,"2019-09-10 08:32:00",14-설계-32,h.기타,"거더 검토","2019-09-10 20:34:00",14-설계-32,h.기타,"거더 검토","2019-09-10 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J18205,"2019-09-10 08:33:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-10 22:24:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-10 19:15:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
B15306,"2019-09-10 08:34:00",18-관리-02,e.기타,"비서업무 외","2019-09-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J16202,"2019-09-10 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-10 18:05:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14306,"2019-09-10 08:39:00",19-관리-04,a.계약,"계약업무 외","2019-09-10 18:01:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-09-10 08:41:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-10 18:53:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-09-10 08:47:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-10 18:06:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15301,"2019-09-10 08:57:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
교리교 자재공급원승인서 준비 (디비닥 외)
|
|
동림교 공급원승인서 재발송
|
|
자안2교 투입내역서 작성
|
|
단장천2교 투입내역서 작성
|
|
동읍한림 노무비닷컴 기성 청구
|
|
","2019-09-10 18:43:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
교리교 자재공급원승인서 준비 (디비닥 외)
|
|
동림교 공급원승인서 재발송
|
|
자안2교 투입내역서 작성
|
|
단장천2교 투입내역서 작성
|
|
동읍한림 노무비닷컴 기성 청구
|
|
","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15202,"2019-09-10 08:57:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-10 18:38:00",19-교영-14,c.설계사,"내포2교 구조계산","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
M05510,"2019-09-10 14:34:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","2019-09-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.11.224,NULL,NULL,004C8,,,
|
|
J11202,"2019-09-10 08:50:00",19-시공-20,출장,"[경기도 안성]조령천교 시공전 킥오프 미팅(주감독 면담)","2019-09-10 18:14:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14101,"2019-09-10 08:50:00",16-시공-20,출장,한양,"2019-09-10 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-09-10 08:50:00",16-설계-17,출장,계룡건설,"2019-09-10 18:00:00",16-설계-17,출장,계룡건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18207,"2019-09-10 08:50:00",17-시공-09,출장,"[울산시 울주군 대림산업현장]공사관련협의(시공사 발주처)","2019-09-10 18:00:00",17-시공-09,출장,"[울산시 울주군 대림산업현장]공사관련협의(시공사 발주처)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-09-11 06:58:00",19-제조-04,b.기계,"명절맞이 대 청소와 조령천교 주두부 받침대 홀 가공과 청소 및 도색","2019-09-11 17:56:00",19-제조-04,b.기계,"명절맞이 대 청소와 조령천교 주두부 받침대 홀 가공과 청소 및 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-09-11 07:07:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.10.211,NULL,NULL,004C8,,,
|
|
J16203,"2019-09-11 07:18:00",19-제조-03,a.품질검사,"동림교,산외교,북수원1교, 데크 켄틸, 생산 관리","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J11302,"2019-09-11 07:21:00",19-시공-20,g.기타,"왕림교 인장계획서 작성
|
|
세천2교 가설샵작업","2019-09-11 15:05:00",19-시공-20,g.기타,"옥산4교,옥산교 가설계획서 작성
|
|
왕림교 인장계획서 작성
|
|
세천2교 가설샵작업","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-09-11 07:21:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-09-11 07:22:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","2019-09-11 18:02:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-09-11 07:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J13308,"2019-09-11 07:34:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
J18202,"2019-09-11 07:37:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
M02302,"2019-09-11 07:37:00",19-제조-02,a.생산관리,"산외교 Shop Dwg. 지원","2019-09-11 17:52:00",19-제조-02,a.생산관리,"산외교 Shop Dwg. 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>사무동내 청소 <|>04:00<|><br>",,
|
|
J09102,"2019-09-11 07:45:00",19-계약-01,b.시공사,"신양교, 교리교외 1개교, 검단천교 예상 계약가 등 : 조령천교 외 5개교 계약 추진 중","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-09-11 07:50:00",19-시공-22,b.시공,"산외교 울산방향 캠버조정안검토","2019-09-11 16:02:00",19-시공-22,b.시공,"산외교 울산방향 캠버조정안검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10313,"2019-09-11 08:15:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J08201,"2019-09-11 08:18:00",19-교영-15,c.설계사,"교량계획 ","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
B15306,"2019-09-11 08:22:00",18-관리-02,e.기타,"비서업무 외","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18205,"2019-09-11 08:24:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",61.98.205.243,NULL,NULL,008E2,,,
|
|
J18206,"2019-09-11 08:26:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-11 16:17:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J17205,"2019-09-11 08:26:00",18-교영-01,c.설계사,.,"2019-09-11 16:16:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-09-11 08:32:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.155,NULL,NULL,008E1,,,
|
|
J14306,"2019-09-11 08:32:00",19-관리-04,a.계약,"계약업무 외","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J15201,"2019-09-11 08:34:00",19-교영-06,c.설계사,특정공법심의자료,"2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J11203,"2019-09-11 08:35:00",18-설계-19,h.기타,"9공구(한맥) 받침이력표 작성","2019-09-11 14:49:00",18-설계-19,h.기타,"9공구(한맥) 받침이력표 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J10301,"2019-09-11 08:35:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J13201,"2019-09-11 08:36:00",19-설계-08,b.구조계산,"우산1교 계산서 작성","2019-09-11 15:04:00",19-교영-19,c.설계사,"우산1교 계산서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J07210,"2019-09-11 08:41:00",14-설계-32,h.기타,"거더 검토","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.162,NULL,NULL,008E1,,,
|
|
J16202,"2019-09-11 08:41:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J07103,"2019-09-11 08:41:00",19-교영-01,d.기타,사업관리,"2019-09-11 16:22:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11202,"2019-09-11 08:41:00",19-시공-02,b.시공,공사관리,"2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J15301,"2019-09-11 08:55:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
교리교 자재공급원승인서 준비 (디비닥 외)
|
|
동림교 공급원승인서 재발송
|
|
자안2교 투입내역서 작성
|
|
단장천2교 투입내역서 작성
|
|
동읍한림 노무비닷컴 기성 청구
|
|
","2019-09-11 15:03:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
교리교 자재공급원승인서 준비 (디비닥 외)
|
|
동림교 공급원승인서 재발송
|
|
자안2교 투입내역서 작성
|
|
단장천2교 투입내역서 작성
|
|
동읍한림 노무비닷컴 기성 청구
|
|
","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11305,"2019-09-11 08:55:00",19-설계-03,e.검토,"성과품 검토","2019-09-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J09101,"2019-09-11 08:59:00",19-교영-01,c.설계사,과업조사,"2019-09-11 16:00:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-09-11 08:50:00",16-시공-20,출장,한양,"2019-09-11 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-09-16 07:40:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-16 18:09:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J12202,"2019-09-16 06:53:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-09-16 18:06:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J11302,"2019-09-16 07:11:00",19-시공-20,g.기타,"시화jct 가교가설검토
|
|
세천2교 가설샵작업","2019-09-16 18:05:00",19-시공-20,g.기타,"시화jct 가교가설검토
|
|
세천2교 가설샵작업","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18208,"2019-09-16 07:25:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-16 22:02:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-16 18:37:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-09-16 07:25:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-16 21:09:00",19-제조-02,a.생산관리,"조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-09-16 07:27:00",19-시공-22,b.시공,"산외교 울산방향 캠버조정안검토","2019-09-16 18:38:00",19-시공-22,b.시공,"산외교 울산방향 캠버조정안검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-09-16 07:31:00",19-제조-03,a.품질검사,"동림교,산외교,북수원1교, 데크 켄틸, 생산 관리","2019-09-16 22:53:00",19-제조-03,a.품질검사,"동림교,산외교,북수원1교, 데크 켄틸, 생산 관리","2019-09-16 19:12:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-09-16 07:39:00",19-계약-01,b.시공사,"문산~도라산 2공구 3개교 시행가, 신양교, 교리교외 1개교, 검단천교 예상 계약가 등 : 조령천교 외 5개교 계약 추진 중","2019-09-16 18:02:00",19-계약-01,b.시공사,"문산~도라산1 계룡건설 방문예정, 신양교, 교리교외 1개교, 검단천교 예상 계약가 등 : 조령천교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
M05510,"2019-09-16 07:43:00",17-시공-09,b.시공,"거더제작 주주두 40본
|
|
경간부 50본
|
|
안전,품징 ,시공관리","2019-09-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.10.213,NULL,NULL,004C8,,,
|
|
J07202,"2019-09-16 07:45:00",19-제조-04,b.기계,"조령천교 주두부 받침대 홀 가공과 청소 및 도색","2019-09-17 06:52:00",19-제조-04,b.기계,"조령천교 주두부 받침대 홀 가공과 청소 및 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-09-16 07:50:00",19-제조-02,a.생산관리,"산외교 Shop Dwg. 지원","2019-09-16 18:04:00",19-제조-02,a.생산관리,"산외교 Shop Dwg. 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>임원회의 자료준비<|>02:30<|><br>19-제조-02<|>a.생산관리<|>홍보동영상 대본수정<|>03:00<|><br>",,
|
|
J13308,"2019-09-16 07:57:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","2019-09-16 18:03:00",19-시공-20,b.시공,"1. 조령천교 시공 투입 준비
|
|
2. 용상교리 교리교 시공계획서 작성
|
|
3. 새말고 A/S 투입 준비","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.8.170,004E3,,,
|
|
B15306,"2019-09-16 08:09:00",18-관리-02,e.기타,"비서업무 외","2019-09-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J09101,"2019-09-16 08:16:00",19-교영-01,c.설계사,과업조사,"2019-09-16 18:22:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10314,"2019-09-16 08:18:00",14-설계-33,h.기타,"신양교(안동~영덕) 시행견적서, 문산~도라산 T/K 2공구 설계 및 시행견적서, 제3연륙교 설계가","2019-09-16 18:14:00",14-설계-33,h.기타,"신양교(안동~영덕) 시행견적서, 문산~도라산 T/K 2공구 설계 및 시행견적서, 제3연륙교 설계가","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-09-16 08:19:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-16 18:55:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J18205,"2019-09-16 08:24:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-16 22:10:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-16 19:04:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-09-16 08:26:00",19-교영-15,c.설계사,"생태육교 반력산출","2019-09-16 21:23:00",19-교영-15,c.설계사,"생태육교 반력산출","2019-09-16 18:39:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10315,"2019-09-16 08:26:00",17-설계-05,"a.계획 및 협의","제작 및 가설검토","2019-09-16 18:03:00",17-설계-05,"a.계획 및 협의","제작 및 가설검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J15302,"2019-09-16 08:28:00",19-설계-08,c.도면,도면작성,"2019-09-16 20:37:00",19-설계-08,c.도면,도면작성,"2019-09-16 18:36:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"19-교영-15<|>d.기타<|>거더 수량산출<|>02:00<|><br>18-설계-19<|>h.기타<|>피복변경에 따른 도서변경<|>04:00<|><br>",1,
|
|
J15307,"2019-09-16 08:30:00",10-설계-48,c.도면,"도면 검토 및 수정","2019-09-16 18:00:00",10-설계-48,c.도면,"도면 검토 및 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J11202,"2019-09-16 08:31:00",19-시공-02,b.시공,공사관리,"2019-09-16 18:36:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J11203,"2019-09-16 08:35:00",19-교영-15,d.기타,"4교 모델링","2019-09-16 21:26:00",19-교영-15,d.기타,"4교 모델링","2019-09-16 18:39:00",172.16.9.171,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J15202,"2019-09-16 08:38:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-16 21:33:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-16 18:33:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10313,"2019-09-16 08:39:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-16 12:35:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J17205,"2019-09-16 08:39:00",18-교영-01,c.설계사,.,"2019-09-16 19:01:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-09-16 08:40:00",19-교영-15,c.설계사,설계관련협의,"2019-09-16 18:26:00",19-교영-15,c.설계사,설계관련협의,"0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-09-16 08:41:00",14-설계-32,h.기타,"거더 검토","2019-09-16 20:46:00",14-설계-32,h.기타,"거더 검토","2019-09-16 18:39:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J11305,"2019-09-16 08:41:00",19-설계-03,e.검토,"성과품 검토","2019-09-16 18:07:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15301,"2019-09-16 08:51:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
수리티교 프리덱 공급원승인서 발송
|
|
교리교 자재공급원승인서 발송
|
|
북수원1교 한성스틸 철근 커플러 발주 (25mm-50, 16mm-100)
|
|
노무비 계산식 작성
|
|
성남 판교대로 자재요청서 발송 (PTC)","2019-09-16 18:11:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
수리티교 프리덱 공급원승인서 발송
|
|
교리교 자재공급원승인서 발송
|
|
북수원1교 한성스틸 철근 커플러 발주 (25mm-50, 16mm-100)
|
|
노무비 계산식 작성
|
|
성남 판교대로 자재요청서 발송 (PTC)","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14306,"2019-09-16 08:52:00",19-관리-04,a.계약,"계약업무 외","2019-09-16 18:10:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-09-16 08:30:00",19-교영-01,d.기타,사업관리,"2019-09-16 13:32:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J16202,"2019-09-16 08:28:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-16 19:02:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-16 18:30:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J14101,"2019-09-16 08:50:00",16-시공-20,출장,한양,"2019-09-16 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-09-17 06:52:00",19-제조-04,b.기계,"신리고가교 콤프레샤 상차와 조령천교 주두부 받침대 홀 가공과 청소 및 도색","2019-09-18 06:53:00",19-제조-04,b.기계,"신리고가교 콤프레샤 상차와 조령천교 주두부 받침대 홀 가공과 청소 및 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-09-17 06:54:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-09-17 18:07:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
T04204,"2019-09-17 07:21:00",19-제조-02,a.생산관리,"교암교,조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-17 21:06:00",19-제조-02,a.생산관리,"교암교,조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-09-17 07:27:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-17 22:03:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-17 18:42:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-09-17 07:28:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산본부 홍보 동영상 제작","2019-09-17 22:07:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산본부 홍보 동영상 제작","2019-09-17 18:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-09-17 07:31:00",19-제조-03,a.품질검사,"동림교,산외교,북수원1교, 데크 켄틸버j, 생산 및 품질관리","2019-09-17 22:49:00",19-제조-03,a.품질검사,"동림교,산외교,북수원1교, 데크 켄틸버j, 생산 및 품질관리","2019-09-17 18:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J11302,"2019-09-17 07:34:00",19-시공-20,g.기타,"시화JCT 가교 가설 수정
|
|
내포2교 가설검토","2019-09-17 18:08:00",19-시공-20,g.기타,"옥산교,옥산4교 가설계획서 작성
|
|
내포2교 가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18207,"2019-09-17 07:44:00",19-시공-22,b.시공,"산외교 울산방향 캠버조정안검토","2019-09-17 20:34:00",19-시공-22,b.시공,"산외교 울산방향 캠버조정안검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-09-17 07:47:00",19-계약-01,b.시공사,"계룡건설합사 방문예정, 신양교, 교리교외 1개교, 검단천교 예상 계약가 등 : 검단천교 외 5개교 계약 추진 중","2019-09-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-09-17 07:51:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-09-17 18:06:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18205,"2019-09-17 07:51:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","2019-09-17 18:00:00",19-시공-20,g.기타,"시공사 요청사항 자료 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J18202,"2019-09-17 07:53:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-17 18:12:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J15302,"2019-09-17 07:53:00",19-설계-08,c.도면,도면작성,"2019-09-17 18:18:18",19-설계-08,c.도면,NULL,"2019-09-17 18:30:00",172.16.9.173,172.16.9.173,NULL,008E4,,1,
|
|
B15306,"2019-09-17 08:00:00",18-관리-02,e.기타,"비서업무 외","2019-09-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-09-17 08:10:00",19-교영-15,c.설계사,"교량계획 ","2019-09-17 18:42:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-09-17 08:11:00",19-교영-15,d.기타,"문산~도라산 T/K 1, 2공구 설계 및 시행견적서, 제3연륙교 설계가","2019-09-17 18:03:00",19-교영-15,d.기타,"문산~도라산 T/K 1, 2공구 설계 및 시행견적서, 제3연륙교 설계가","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15301,"2019-09-17 08:13:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
수리티교 프리덱 공급원승인서 발송
|
|
교리교 자재공급원승인서 발송
|
|
북수원1교 한성스틸 철근 커플러 발주 (25mm-50, 16mm-100)
|
|
삼남1교 건설기계관리대장 작성 (8월 기성분)","2019-09-17 18:36:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
수리티교 프리덱 공급원승인서 발송
|
|
교리교 자재공급원승인서 발송
|
|
북수원1교 한성스틸 철근 커플러 발주 (25mm-50, 16mm-100)
|
|
삼남1교 건설기계관리대장 작성 (8월 기성분)","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15201,"2019-09-17 08:15:00",19-교영-15,c.설계사,설계관련협의,"2019-09-17 21:05:00",19-교영-15,c.설계사,설계관련협의,"2019-09-17 18:57:00",172.16.9.150,172.16.9.150,172.16.9.150,008C8,,,
|
|
J18206,"2019-09-17 08:15:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-17 21:13:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-09-17 08:17:00",19-교영-15,d.기타,"거더 도면 작성","2019-09-17 21:20:00",19-교영-15,d.기타,"거더 도면 작성","2019-09-17 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J09101,"2019-09-17 08:17:00",19-교영-01,c.설계사,과업조사,"2019-09-17 20:33:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J13201,"2019-09-17 08:23:00",19-교영-15,c.설계사,"생태육교 반력산출","2019-09-17 18:15:00",19-교영-15,c.설계사,"생태육교 반력산출","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J11305,"2019-09-17 08:26:00",19-설계-03,e.검토,"성과품 검토","2019-09-17 18:11:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J14306,"2019-09-17 08:26:00",19-관리-04,a.계약,"계약업무 외","2019-09-17 18:16:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J17205,"2019-09-17 08:28:00",18-교영-01,c.설계사,.,"2019-09-17 21:13:00",18-교영-01,c.설계사,.,"2019-09-17 18:56:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J11202,"2019-09-17 08:28:00",19-시공-02,b.시공,공사관리,"2019-09-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J10301,"2019-09-17 08:29:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-17 18:31:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-09-17 08:30:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-17 21:01:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-17 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-09-17 08:32:00",14-설계-32,h.기타,"거더 검토","2019-09-17 18:00:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11203,"2019-09-17 08:32:00",19-교영-15,d.기타,"4교 모델링","2019-09-17 19:55:00",19-교영-15,d.기타,"4교 모델링","2019-09-17 18:31:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,,
|
|
J10313,"2019-09-17 08:35:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-17 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16202,"2019-09-17 08:42:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-17 21:13:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-17 18:57:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J10315,"2019-09-17 08:50:00",17-시공-23,출장,현장,"2019-09-17 18:08:00",17-설계-05,"a.계획 및 협의","제작 및 가설검토","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
M02302,"2019-09-17 08:50:00",19-제조-02,출장,[한맥빌딩]임원회의,"2019-09-17 18:09:00",19-제조-02,a.생산관리,"산외교 Shop Dwg. 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공정 및 업무회의(생산1팀)<|>01:00<|><br>19-제조-02<|>a.생산관리<|>공정 및 업무회의(생산2팀)<|>01:30<|><br>",,
|
|
J07103,"2019-09-17 08:50:00",13-시공-13,출장,현장,"2019-09-17 21:17:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14101,"2019-09-17 08:50:00",16-시공-20,출장,한양,"2019-09-17 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J08201,"2019-09-18 08:10:00",19-교영-15,c.설계사,"교량계획 ","2019-09-18 20:06:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J07202,"2019-09-18 06:54:00",19-제조-04,b.기계,"모바일배치플랜트 골재 투입 장치 수리와 조령천교 주두부 받침대 홀 가공과 청소 및 도색","2019-09-19 07:14:00",19-제조-04,b.기계,"모바일배치플랜트 골재 투입 장치 수리와 조령천교 주두부 받침대 홀 가공과 청소 및 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-09-18 07:16:00",19-제조-03,a.품질검사,"KS서류작성,
|
|
동림교,산외교,북수원1교, 데크 켄틸버j, 생산 및 품질관리","2019-09-18 21:16:00",19-제조-03,a.품질검사,"KS서류작성,
|
|
동림교,산외교,북수원1교, 데크 켄틸버j, 생산 및 품질관리","2019-09-18 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14308,"2019-09-18 07:20:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산본부 홍보 동영상 제작","2019-09-18 21:14:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산본부 홍보 동영상 제작","2019-09-18 18:37:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-09-18 07:23:00",19-제조-02,a.생산관리,"교암교,조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-18 21:02:00",19-제조-02,a.생산관리,"교암교,조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-09-18 07:24:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-18 20:46:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-18 18:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J11302,"2019-09-18 07:24:00",19-시공-20,g.기타,"옥산교,옥산4교 가설계획서 작성
|
|
","2019-09-18 18:12:00",19-시공-20,g.기타,"옥산교,옥산4교 가설계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
M02302,"2019-09-18 07:26:00",19-제조-02,a.생산관리," 산외교 Shop Dwg. 지원","2019-09-18 18:14:00",19-제조-02,a.생산관리," 산외교 Shop Dwg. 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>화분분갈이<|>03:00<|><br>16-제조-02<|>a.생산관리<|>Pre-deck 표준화작업(RC)<|>04:30<|><br>",,
|
|
J18202,"2019-09-18 07:31:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-18 18:25:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J12202,"2019-09-18 07:38:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-09-18 18:01:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J18207,"2019-09-18 07:48:00",19-시공-19,b.시공,"광역철도 승강장 공동도급사 운영회의 참석","2019-09-18 18:14:00",19-시공-19,b.시공,"광역철도 승강장 공동도급사 운영회의 참석","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-09-18 07:56:00",19-계약-01,b.시공사,"제3연육교 예상 시행가, 신양교, 교리교외 1개교, 검단천교 예상 계약가 등 : 검단천교 외 5개교 계약 추진 중","2019-09-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-09-18 08:10:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-09-18 18:25:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J10315,"2019-09-18 08:12:00",17-시공-09,b.시공,"함양방향 가설계획서 보완","2019-09-18 18:01:00",17-시공-09,b.시공,"함양방향 가설계획서 보완","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J11305,"2019-09-18 08:14:00",19-설계-03,e.검토,"성과품 검토","2019-09-18 18:09:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-09-18 08:18:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-18 17:53:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-09-18 08:23:00",19-설계-06,h.기타,"도림1육교(영동고속도로확장) 설계내역서, 제3연륙교 설계내역서, 문산~도라산 T/K 1, 2공구 설계 및 시행견적서","2019-09-18 18:03:00",19-설계-06,h.기타,"도림1육교(영동고속도로확장) 설계내역서, 제3연륙교 설계내역서, 문산~도라산 T/K 1, 2공구 설계 및 시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-09-18 08:25:00",18-관리-02,e.기타,"비서업무 외","2019-09-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15302,"2019-09-18 08:27:00",19-설계-08,c.도면,도면작성,"2019-09-18 20:38:00",19-설계-08,c.도면,도면작성,"2019-09-18 18:37:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J15307,"2019-09-18 08:30:00",19-교영-15,d.기타,"거더 도면 작성","2019-09-18 21:32:00",19-교영-15,d.기타,"거더 도면 작성","2019-09-18 18:32:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J11203,"2019-09-18 08:34:00",19-교영-15,d.기타,"4교 상부계산서 작성","2019-09-18 20:41:00",19-교영-15,d.기타,"4교 모델링","2019-09-18 18:38:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J13201,"2019-09-18 08:34:00",19-교영-15,c.설계사,"생태육교 반력산출","2019-09-18 20:44:00",19-교영-15,c.설계사,"생태육교 반력산출","2019-09-18 18:36:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J17205,"2019-09-18 08:35:00",18-교영-01,c.설계사,.,"2019-09-18 18:10:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11202,"2019-09-18 08:37:00",19-시공-02,b.시공,공사관리,"2019-09-18 18:08:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-09-18 08:38:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-18 20:47:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-18 18:32:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-09-18 08:40:00",14-설계-32,h.기타,"거더 검토","2019-09-18 20:46:00",14-설계-32,h.기타,"거더 검토","2019-09-18 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J10313,"2019-09-18 08:40:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-18 18:02:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J10301,"2019-09-18 08:41:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-18 18:17:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16202,"2019-09-18 08:41:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-18 18:13:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-09-18 08:47:00",19-교영-06,a.발주처,"공법심의 자료 제출 및 협의","2019-09-18 18:07:00",19-교영-06,a.발주처,"공법심의 자료 제출 및 협의","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15301,"2019-09-18 08:48:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
교리교 자재공급원승인서 발송
|
|
북수원1교 한성스틸 철근 커플러 발주 (25mm-50, 16mm-100)
|
|
삼남1교 건설기계관리대장 작성 (8월 기성분)
|
|
조령천교 종평면도 쏠플레이트 기재","2019-09-18 18:11:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
교리교 자재공급원승인서 발송
|
|
북수원1교 한성스틸 철근 커플러 발주 (25mm-50, 16mm-100)
|
|
삼남1교 건설기계관리대장 작성 (8월 기성분)
|
|
조령천교 종평면도 쏠플레이트 기재","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14306,"2019-09-18 08:50:00",19-교휴-06,경유,"경유(등기소(법인인감증명서 발급))","2019-09-18 18:16:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-09-18 08:36:00",19-교영-01,d.기타,사업관리,"2019-09-18 18:15:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J09101,"2019-09-18 08:50:00",19-교영-06,경유,공법설명,"2019-09-18 18:03:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-09-18 08:50:00",16-시공-20,출장,한양,"2019-09-18 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J13308,"2019-09-19 08:05:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-09-19 18:02:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J12202,"2019-09-19 07:08:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-09-19 18:16:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-09-19 07:15:00",19-제조-04,b.기계,"모바일배치플랜트 골재 투입 장치 수리와 조령천교 주두부 받침대 홀 가공과 청소 및 도색과 PC강봉 절단 칼날 교체","2019-09-20 06:57:00",19-제조-04,b.기계,"모바일배치플랜트 골재 투입 장치 수리와 조령천교 주두부 받침대 홀 가공과 청소 및 도색과 PC강봉 절단 칼날 교체","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-04<|>b.기계<|>정화조 미생물 모터 교체<|>01:00<|><br>",,
|
|
T04204,"2019-09-19 07:22:00",19-제조-02,a.생산관리,"경안천교,교암교,조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-19 21:12:00",19-제조-02,a.생산관리,"경안천교,교암교,조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J10315,"2019-09-19 07:28:00",17-시공-24,b.시공,"가설계획서 작성","2019-09-19 18:06:00",17-시공-24,b.시공,"가설계획서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18202,"2019-09-19 07:28:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J14308,"2019-09-19 07:30:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산본부 홍보 동영상 제작","2019-09-19 18:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산본부 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-09-19 07:30:00",19-제조-02,a.생산관리,"Pre-deck 표준화작업(RC)","2019-09-19 18:08:00",19-제조-02,a.생산관리," 산외교 Shop Dwg. 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>모바일배치 플랜트 설비 개선 관련 협의<|>02:00<|><br>19-제조-02<|>a.생산관리<|>PTC 거더 철근 검토<|>02:00<|><br>19-제조-02<|>a.생산관리<|>직산교 철근 처리 관련 자료 검토<|>03:00<|><br>",,
|
|
J16203,"2019-09-19 07:33:00",19-제조-03,a.품질검사,"KS 인증서류 작성
|
|
산외교,북수원1교,동림교 데크 및 켄틸버 생산 및 품질관리","2019-09-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18207,"2019-09-19 07:49:00",19-시공-19,b.시공,"광역철도 승강장 공동도급사 운영회의 참석","2019-09-19 19:55:00",19-시공-19,b.시공,"광역철도 승강장 공동도급사 운영회의 참석","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-09-19 07:53:00",19-계약-01,b.시공사,"제3연육교 예상 시행가, 신촌교, 중리교 예상 계약가 등 : 검단천교 외 5개교 계약 추진 중","2019-09-19 20:27:00",19-계약-01,b.시공사,"제3연육교 예상 시행가, 신촌교, 중리교 예상 계약가 등 : 검단천교 외 5개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J11305,"2019-09-19 08:07:00",19-설계-03,e.검토,"성과품 검토","2019-09-19 19:49:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-09-19 08:11:00",18-관리-02,e.기타,"비서업무 외","2019-09-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-09-19 08:15:00",19-교영-15,c.설계사,"교량계획 ","2019-09-19 18:16:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-09-19 08:20:00",19-교영-06,d.기타,"제3도하교(성환~입장) 설계견적서 및 내역서(특공), 도림1육교(영동고속도로확장) 설계내역서, 제3연륙교 설계내역서, 문산~도라산 T/K 1, 2공구 설계 및 시행견적서","2019-09-19 20:50:00",19-교영-06,d.기타,"제3도하교(성환~입장) 설계견적서 및 내역서(특공), 도림1육교(영동고속도로확장) 설계내역서, 제3연륙교 설계내역서, 문산~도라산 T/K 1, 2공구 설계 및 시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-09-19 08:23:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-19 20:27:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J13201,"2019-09-19 08:26:00",19-교영-15,c.설계사,"생태육교 계산서작성","2019-09-19 20:34:00",19-교영-15,c.설계사,"생태육교 계산서작성","2019-09-19 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J15307,"2019-09-19 08:30:00",19-교영-15,d.기타,"거더 도면 작성","2019-09-19 21:00:00",19-교영-15,d.기타,"거더 도면 작성","2019-09-19 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J15302,"2019-09-19 08:30:00",19-교영-15,d.기타,수량산출,"2019-09-19 20:32:00",19-교영-15,d.기타,수량산출,"2019-09-19 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J16202,"2019-09-19 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-19 21:22:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-19 18:31:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J11202,"2019-09-19 08:34:00",19-시공-02,b.시공,공사관리,"2019-09-19 18:44:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J11203,"2019-09-19 08:34:00",19-교영-15,d.기타,"3개교(1교, 4교, 생태육교) 성과품 작성, 정리, 발송","2019-09-19 20:33:00",19-교영-15,d.기타,"3개교(1교, 4교, 생태육교) 성과품 작성, 정리, 발송","2019-09-19 18:31:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J10313,"2019-09-19 08:35:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-19 18:07:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15202,"2019-09-19 08:35:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-19 20:32:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-19 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J09101,"2019-09-19 08:35:00",19-교영-01,c.설계사,과업조사,"2019-09-19 20:29:00",19-교영-01,c.설계사,과업조사,"2019-09-19 18:32:00",172.16.8.144,172.16.8.144,172.16.8.144,008C7,,1,
|
|
J07210,"2019-09-19 08:38:00",14-설계-32,h.기타,"거더 검토","2019-09-19 18:04:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15201,"2019-09-19 08:38:00",19-교영-06,a.발주처,"공법심의 자료 제출 및 협의","2019-09-19 20:29:00",19-교영-06,a.발주처,"공법심의 자료 제출 및 협의","2019-09-19 18:32:00",172.16.9.150,172.16.9.150,172.16.9.150,008C8,,,
|
|
J17205,"2019-09-19 08:39:00",18-교영-01,c.설계사,.,"2019-09-19 21:21:00",18-교영-01,c.설계사,.,"2019-09-19 18:31:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J14306,"2019-09-19 08:41:00",19-관리-04,a.계약,"계약업무 외","2019-09-19 18:20:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-09-19 08:42:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-19 18:00:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15301,"2019-09-19 08:49:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
교리교 자재공급원승인서 발송
|
|
주천2교 도면 제본
|
|
배수용 작업일보, 출력일보 발송 (용포천교)
|
|
신리고가교 중량물 취급계획서 작성","2019-09-19 18:14:00",16-시공-20,b.시공,"작업반 정산서 작성
|
|
교리교 자재공급원승인서 발송
|
|
주천2교 도면 제본
|
|
배수용 작업일보, 출력일보 발송 (용포천교)
|
|
신리고가교 중량물 취급계획서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J07103,"2019-09-19 08:53:00",19-교영-01,d.기타,사업관리,"2019-09-19 17:44:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14101,"2019-09-19 08:50:00",16-시공-20,출장,한양,"2019-09-19 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18208,"2019-09-19 08:50:00",19-제조-02,출장,"[성주대교(대구광역시 달성군 하빈면)]성주대교 가설밴트 측량","2019-09-19 18:00:00",19-제조-02,출장,"[성주대교(대구광역시 달성군 하빈면)]성주대교 가설밴트 측량","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J07202,"2019-09-20 06:58:00",19-제조-04,b.기계,"조령천교 주두부 받침대 홀 가공과 청소 및 도색 그리고 교암교 거푸집(H1.7) 보수","2019-09-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J12202,"2019-09-20 07:03:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-09-20 18:11:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J11302,"2019-09-20 07:09:00",19-시공-20,g.기타,"옥산교,옥산4교 가설계획서 작성
|
|
","2019-09-20 12:59:00",19-시공-20,g.기타,"옥산교,옥산4교 가설계획서 작성
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-09-20 07:24:00",19-제조-02,a.생산관리,"경안천교,교암교,조령천교(BR2 주두부), 철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-09-20 07:27:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산본부 홍보 동영상 제작","2019-09-20 21:10:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산본부 홍보 동영상 제작","2019-09-20 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-09-20 07:30:00",19-제조-03,a.품질검사,"KS 인증서류 작성
|
|
산외교,북수원1교,동림교 데크 및 켄틸버 생산 및 품질관리","2019-09-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18202,"2019-09-20 07:34:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-20 18:11:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-09-20 07:39:00",19-제조-02,a.생산관리," 산외교 Shop Dwg. 지원","2019-09-20 18:04:00",19-제조-02,a.생산관리," 산외교 Shop Dwg. 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>천막동 보수 공사<|>01:30<|><br>16-제조-02<|>a.생산관리<|>업무 분장관련 협의<|>03:00<|><br>",,
|
|
J09102,"2019-09-20 07:47:00",19-계약-01,b.시공사,"고려개발 본사, 문산~도라산 2공구 5개교 예상 시행가, 신촌교, 중리교 예상 계약가 등 : 검단천교 외 5개교 계약 추진 중","2019-09-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-09-20 07:48:00",17-시공-09,b.시공,"3차인장 및 그라우팅검토","2019-09-20 19:59:00",17-시공-09,b.시공,"3차인장 및 그라우팅검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-09-20 08:00:00",17-시공-27,b.시공,"제작장 부지 적정성 검토","2019-09-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J10314,"2019-09-20 08:11:00",19-교영-15,d.기타,"문산~도라산 T/K 2공구 설계 및 시행견적서, 도림1육교(영동고속도로확장) 설계내역서","2019-09-20 19:57:00",19-교영-15,d.기타,"문산~도라산 T/K 2공구 설계 및 시행견적서, 도림1육교(영동고속도로확장) 설계내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-09-20 08:12:00",19-교영-15,c.설계사,"교량계획 ","2019-09-20 19:02:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-09-20 08:15:00",18-관리-02,e.기타,"비서업무 외","2019-09-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-09-20 08:16:00",19-교영-01,d.기타,사업관리,"2019-09-20 19:58:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11305,"2019-09-20 08:18:00",19-설계-03,e.검토,"성과품 검토","2019-09-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J18206,"2019-09-20 08:22:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-20 19:59:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-09-20 08:25:00",19-교영-15,d.기타,"거더 도면 작성","2019-09-20 18:04:00",19-교영-15,d.기타,"거더 도면 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J18205,"2019-09-20 08:26:00",19-교영-15,c.설계사,"상부 도면 작성","2019-09-20 21:00:00",19-교영-15,c.설계사,"상부 도면 작성","2019-09-20 18:42:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J17205,"2019-09-20 08:28:00",18-교영-01,c.설계사,.,"2019-09-20 18:12:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15302,"2019-09-20 08:29:00",19-설계-08,c.도면,도면작성,"2019-09-20 18:03:00",19-설계-08,c.도면,도면작성,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,"19-교영-15<|>d.기타<|>2교 5교 수량산출<|>02:00<|><br>",,
|
|
J13201,"2019-09-20 08:29:00",19-설계-08,b.구조계산,"우산1교 계산서작성","2019-09-20 21:17:00",19-설계-08,b.구조계산,"우산1교 계산서작성","2019-09-20 18:42:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J11202,"2019-09-20 08:30:00",19-시공-02,b.시공,공사관리,"2019-09-20 18:10:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-09-20 08:35:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-20 22:35:00",19-교영-14,c.설계사,"내포2교 구조계산","2019-09-20 18:42:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J14306,"2019-09-20 08:35:00",19-관리-04,a.계약,"계약업무 외","2019-09-20 18:05:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07210,"2019-09-20 08:35:00",14-설계-32,h.기타,"거더 검토","2019-09-20 18:02:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-09-20 08:37:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J10301,"2019-09-20 08:37:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-20 18:05:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J16202,"2019-09-20 08:48:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-20 18:16:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11203,"2019-09-20 11:25:00",17-시공-08,g.기타,"런처가설관련 검토서 감리검토사항 반영","2019-09-20 21:08:00",17-시공-08,g.기타,"런처가설관련 검토서 감리검토사항 반영","2019-09-20 18:42:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J09101,"2019-09-20 08:50:00",19-교영-06,출장,경제자유구역청,"2019-09-20 19:58:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-09-20 08:50:00",16-시공-20,출장,한양,"2019-09-20 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18208,"2019-09-20 08:50:00",19-제조-02,출장,"[성주대교(대구광역시 달성군 하빈면)]성주대교 가설밴트 측량","2019-09-20 18:00:00",19-제조-02,출장,"[성주대교(대구광역시 달성군 하빈면)]성주대교 가설밴트 측량","0000-00-00 00:00:00",NULL,NULL,NULL,006E2,,,
|
|
J15201,"2019-09-20 08:50:00",19-교영-06,출장,인천경제자유구역청,"2019-09-20 18:00:00",19-교영-06,출장,인천경제자유구역청,"0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J15301,"2019-09-20 08:50:00",17-시공-21,출장,"[수원시]북수원1교 가로보 용접","2019-09-20 18:00:00",17-시공-21,출장,"[수원시]북수원1교 가로보 용접","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J18208,"2019-09-21 07:41:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-21 16:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J07202,"2019-09-21 07:44:00",19-제조-04,b.기계,"공장 B동 북측 철근 출입문 바닥 콘크리트 타설","2019-09-21 15:31:00",19-제조-04,b.기계,"공장 B동 북측 철근 출입문 바닥 콘크리트 타설","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J15307,"2019-09-21 08:31:00",19-교영-15,d.기타,"슬래브, 거더 도면 작성","2019-09-21 14:06:00",19-교영-15,d.기타,"슬래브, 거더 도면 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,1,
|
|
J11203,"2019-09-21 08:51:00",19-교영-15,d.기타,"추가교량 도면 작성 후 발송","2019-09-21 14:12:00",17-시공-08,g.기타,"런처가설관련 검토서 감리검토사항 반영","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,1,
|
|
J08201,"2019-09-21 09:46:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J17205,"2019-09-21 10:08:00",18-교영-01,c.설계사,.,"2019-09-21 14:15:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11203,"2019-09-22 08:48:00",19-교영-15,d.기타,"추가교량 수량 작성 후 발송","2019-09-22 12:02:00",19-교영-15,d.기타,"추가교량 수량 작성 후 발송","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,1,
|
|
J15302,"2019-09-22 08:51:00",19-교영-15,d.기타,"추가교량 수량산출","2019-09-22 12:02:00",19-설계-08,c.도면,도면작성,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,1,
|
|
J07202,"2019-09-23 06:36:00",19-제조-04,b.기계,"교암교 거푸집(H1.7) 보수와 조령천교 주두부 받침대 홀가공","2019-09-24 06:37:00",19-제조-04,b.기계,"교암교 거푸집(H1.7) 보수와 조령천교 주두부 받침대 홀가공","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-09-23 07:10:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-09-23 18:11:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J11302,"2019-09-23 07:10:00",19-시공-20,g.기타,"가산2교 가설계획서 수정
|
|
북수원1교 가로보 철근 수량 정리 및 중량물취급계획서 작성
|
|
북수원2교 가설계획서 수정","2019-09-23 18:12:00",19-시공-20,g.기타,"가산2교 가설계획서 수정
|
|
북수원1교 가로보 철근 수량 정리 및 중량물취급계획서 작성
|
|
북수원2교 가설계획서 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J15201,"2019-09-23 07:19:00",19-교영-19,c.설계사,"특정공법심의 관련 협의","2019-09-23 18:05:00",19-교영-19,c.설계사,"특정공법심의 관련 협의","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J18208,"2019-09-23 07:22:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-23 18:03:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J13308,"2019-09-23 07:24:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-09-23 18:11:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J16203,"2019-09-23 07:25:00",19-제조-03,a.품질검사,"수원1교,동림교산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-09-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
T04204,"2019-09-23 07:27:00",19-제조-02,a.생산관리,"경안천교,교암교철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-09-23 07:33:00",19-제조-02,a.생산관리,"열선 양생 시스템 검토 및 협의","2019-09-23 18:00:00",19-제조-02,a.생산관리,"열선 양생 시스템 검토 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-09-23 07:33:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-23 18:11:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18207,"2019-09-23 07:36:00",17-시공-09,b.시공,"3차인장 및 그라우팅검토","2019-09-23 18:48:00",17-시공-09,b.시공,"3차인장 및 그라우팅검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-09-23 07:55:00",19-계약-01,b.시공사,"유성산업 방문예정, 문산~도라산 2공구 5개교 예상 시행가, 신촌교, 중리교 예상 계약가 등 : 검단천교 외 5개교 계약 추진 중","2019-09-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
B15306,"2019-09-23 08:04:00",18-관리-02,e.기타,"비서업무 외","2019-09-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-09-23 08:15:00",19-교영-15,c.설계사,"교량계획 ","2019-09-23 18:32:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-09-23 08:23:00",19-교영-14,d.기타,"강구대교 및 운정천교 특정공법심의 검토, 문산~도라산 T/K 시행견적서, 2019년 하반기 표준내역작업","2019-09-23 18:14:00",19-교영-15,d.기타,"강구대교 및 운정천교 특정공법심의 검토, 문산~도라산 T/K 시행견적서, 2019년 하반기 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-09-23 08:25:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-23 18:09:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15302,"2019-09-23 08:26:00",19-설계-08,c.도면,도면작성,"2019-09-23 20:38:00",19-설계-08,c.도면,도면작성,"2019-09-23 18:31:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J11202,"2019-09-23 08:28:00",19-시공-02,b.시공,공사관리,"2019-09-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J07210,"2019-09-23 08:29:00",14-설계-32,h.기타,"거더 검토","2019-09-23 18:01:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J18205,"2019-09-23 08:30:00",19-교영-15,c.설계사,"2, 5교 상부계산서 작성","2019-09-23 21:33:00",19-교영-15,c.설계사,"2, 5교 상부계산서 작성","2019-09-23 18:31:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07103,"2019-09-23 08:35:00",19-교영-01,d.기타,사업관리,"2019-09-23 18:09:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J17205,"2019-09-23 08:35:00",18-교영-01,c.설계사,.,"2019-09-23 18:07:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J14306,"2019-09-23 08:35:00",19-관리-04,a.계약,"계약업무 외","2019-09-23 18:12:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11305,"2019-09-23 08:35:00",19-설계-03,e.검토,"성과품 검토","2019-09-23 18:29:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10313,"2019-09-23 08:37:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15202,"2019-09-23 08:38:00",18-설계-12,g.업무지원,설계VE검토,"2019-09-23 21:32:00",18-설계-12,g.업무지원,설계VE검토,"2019-09-23 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10301,"2019-09-23 08:38:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-23 18:28:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11203,"2019-09-23 08:40:00",17-시공-08,g.기타,"런처가설시 계산서 수정(감리검토사항 반영분)","2019-09-23 20:39:00",17-시공-08,g.기타,"런처가설시 계산서 수정(감리검토사항 반영분)","2019-09-23 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,"19-설계-08<|>g.업무지원<|>업무회의(김재호es 이하 6명)<|>01:30<|><br>19-교영-15<|>d.기타<|>추가교량, 2교 5교 계산서작성(정충렬차장) 관리<|>01:30<|><br>",1,
|
|
J13201,"2019-09-23 08:42:00",19-설계-08,b.구조계산,"구룡교 계산서작성","2019-09-23 20:40:00",19-설계-08,b.구조계산,"구룡교 계산서작성","2019-09-23 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,"19-설계-07<|>c.도면<|>설계VE사항 수정<|>05:00<|><br>",1,
|
|
J09101,"2019-09-23 08:43:00",19-교영-01,c.설계사,과업조사,"2019-09-23 18:05:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J16202,"2019-09-23 08:44:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-23 18:09:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15307,"2019-09-23 08:52:00",18-설계-12,e.검토,"슬래브 철근 변경으로 인한 철근량 증감 검토","2019-09-23 21:31:00",18-설계-12,e.검토,"슬래브 철근 변경으로 인한 철근량 증감 검토","2019-09-23 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J14308,"2019-09-23 07:25:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-09-23 18:01:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M05510,"2019-09-23 10:11:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-09-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.11.136,NULL,NULL,004C8,,,
|
|
J14101,"2019-09-23 08:50:00",16-시공-20,출장,한양,"2019-09-23 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-09-23 08:50:00",17-시공-10,출장,현장,"2019-09-23 18:00:00",17-시공-10,출장,현장,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-09-24 06:16:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-09-24 18:16:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-09-24 06:37:00",19-제조-04,b.기계,"교암교 거푸집(H1.7) 보수와 조령천교 주두부 받침대 홀가공","2019-09-25 07:05:00",19-제조-04,b.기계,"교암교 거푸집(H1.7) 보수와 조령천교 주두부 받침대 홀가공","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-09-24 07:21:00",19-제조-02,a.생산관리,"경안천교,교암교철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-24 21:44:00",19-제조-02,a.생산관리,"경안천교,교암교철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-09-24 07:24:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-24 22:42:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-24 19:26:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-09-24 07:26:00",19-제조-02,a.생산관리,"열선 양생 시스템 검토 및 협의","2019-09-24 18:11:00",19-제조-02,a.생산관리,"열선 양생 시스템 검토 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-09-24 07:30:00",19-시공-20,g.기타,"가산2교 가설계획서 수정
|
|
북수원1교 가로보 철근 수량 정리 및 중량물취급계획서 작성
|
|
북수원2교 가설계획서 수정","2019-09-24 18:28:00",19-시공-20,g.기타,"가산2교 가설계획서 수정
|
|
북수원1교 가로보 철근 수량 정리 및 중량물취급계획서 작성
|
|
북수원2교 가설계획서 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J14308,"2019-09-24 07:30:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-09-24 22:25:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-09-24 19:22:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-09-24 07:33:00",19-제조-03,a.품질검사,"동림교 공장검수
|
|
북수원1교,동림교산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-09-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18202,"2019-09-24 07:35:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-24 18:11:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18207,"2019-09-24 07:43:00",17-시공-08,b.시공,"런처가설시 구조안전성 검토보안","2019-09-24 18:23:00",17-시공-08,b.시공,"런처가설시 구조안전성 검토보안","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J09102,"2019-09-24 07:43:00",19-계약-01,b.시공사,"포스코건설 본사 방문예정, 문산~도라산 2공구 5개교 예상 시행가, 신촌교, 중리교 예상 계약가 등 : 검단천교 외 5개교 계약 추진 중","2019-09-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-09-24 07:44:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-09-24 18:14:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
B15306,"2019-09-24 08:16:00",18-관리-02,e.기타,"비서업무 외","2019-09-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-09-24 08:17:00",19-교영-15,d.기타,"운정천교(밀양 아노 국가산단) 설계견적서 및 내역서, 강구대교 특정공법심의 검토, 문산~도라산 T/K 시행견적서, 2019년 하반기 표준내역작업","2019-09-24 18:20:00",19-교영-15,d.기타,"운정천교(밀양 아노 국가산단) 설계견적서 및 내역서, 강구대교 특정공법심의 검토, 문산~도라산 T/K 시행견적서, 2019년 하반기 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-09-24 08:21:00",19-교영-15,c.설계사,"교량계획 ","2019-09-24 19:37:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-09-24 08:22:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-24 18:00:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15302,"2019-09-24 08:27:00",19-설계-08,c.도면,도면작성,"2019-09-24 18:03:00",19-설계-08,c.도면,도면작성,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J07103,"2019-09-24 08:28:00",19-교영-01,d.기타,사업관리,"2019-09-24 18:21:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15307,"2019-09-24 08:28:00",19-설계-08,d.산출서,"거더, 슬래브 수량 산출","2019-09-24 21:30:00",19-설계-08,d.산출서,"거더, 슬래브 수량 산출","2019-09-24 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J18205,"2019-09-24 08:32:00",19-교영-15,c.설계사,"2, 5교 상부계산서 작성","2019-09-24 21:53:00",19-교영-15,c.설계사,"2, 5교 상부계산서 작성","2019-09-24 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15202,"2019-09-24 08:32:00",18-설계-12,g.업무지원,설계VE검토,"2019-09-24 18:18:18",18-설계-12,g.업무지원,NULL,"2019-09-24 18:30:00",172.16.9.155,172.16.9.155,NULL,008E1,,1,
|
|
J13201,"2019-09-24 08:33:00",19-교영-06,c.설계사,"3@55 9본 교량 구조검토","2019-09-24 20:36:00",19-교영-06,c.설계사,"3@55 9본 교량 구조검토","2019-09-24 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J17205,"2019-09-24 08:36:00",18-교영-01,c.설계사,.,"2019-09-24 18:13:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-09-24 08:37:00",14-설계-32,h.기타,"거더 검토","2019-09-24 18:04:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J14306,"2019-09-24 08:39:00",19-관리-04,a.계약,"계약업무 외","2019-09-24 18:01:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-09-24 08:40:00",19-시공-02,b.시공,공사관리,"2019-09-24 20:36:00",19-시공-02,b.시공,공사관리,"2019-09-24 18:30:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J11203,"2019-09-24 08:41:00",17-시공-08,g.기타,"런처가설시 계산서 수정(감리검토사항 반영분)","2019-09-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J10301,"2019-09-24 08:42:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-24 18:36:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-09-24 08:42:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J09101,"2019-09-24 08:46:00",19-교영-01,c.설계사,과업조사,"2019-09-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J11305,"2019-09-24 08:50:00",19-교영-06,출장,합사,"2019-09-24 18:15:00",19-설계-03,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15201,"2019-09-24 08:50:00",19-교영-06,출장,합사,"2019-09-24 18:12:00",19-교영-19,c.설계사,"특정공법심의 관련 협의","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J16202,"2019-09-24 08:50:00",19-교휴-06,경유,"경유(제3연륙교 송도합사)","2019-09-24 18:22:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14101,"2019-09-24 08:50:00",16-시공-20,출장,한양,"2019-09-24 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-09-24 08:50:00",17-시공-10,출장,현장,"2019-09-24 18:00:00",17-시공-10,출장,현장,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-09-25 06:34:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-09-25 18:07:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-09-25 07:05:00",19-제조-04,b.기계,"교암교 거푸집(H1.7) 보수와 조령천교 주두부 받침대 홀가공","2019-09-26 06:23:00",19-제조-04,b.기계,"교암교 거푸집(H1.7) 보수와 조령천교 주두부 받침대 홀가공","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-09-25 07:23:00",19-시공-20,g.기타,"가산2교 가설계획서 수정
|
|
북수원1교 가로보 철근 수량 정리 및 중량물취급계획서 작성
|
|
북수원2교 가설계획서 수정","2019-09-25 18:08:00",19-시공-20,g.기타,"가산2교 가설계획서 수정
|
|
북수원1교 가로보 철근 수량 정리 및 중량물취급계획서 작성
|
|
북수원2교 가설계획서 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-09-25 07:27:00",19-제조-02,a.생산관리,"경안천교,교암교철근 가공, 자안2교,옥산교,산외교 등 프리덱 가로보 철근가공 생산","2019-09-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-09-25 07:27:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-25 18:02:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J14308,"2019-09-25 07:30:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-09-25 18:01:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-09-25 07:30:00",19-제조-02,a.생산관리,"열선 양생 시스템 검토 및 협의","2019-09-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-09-25 07:38:00",17-시공-08,b.시공,"런처가설시 구조안전성 검토보안","2019-09-25 18:15:00",17-시공-08,b.시공,"런처가설시 구조안전성 검토보안","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M05510,"2019-09-25 07:41:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-09-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.11.230,NULL,NULL,004C8,,,
|
|
J16203,"2019-09-25 07:41:00",19-제조-03,a.품질검사,"동림교 공장검수, KSL 업무협의
|
|
북수원1교,동림교산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-09-25 22:44:00",19-제조-03,a.품질검사,"동림교 공장검수, KSL 업무협의
|
|
북수원1교,동림교산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-09-25 19:53:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J13308,"2019-09-25 08:10:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-09-25 18:04:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J08201,"2019-09-25 08:17:00",19-교영-15,c.설계사,"교량계획 ","2019-09-25 18:01:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-09-25 08:17:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-25 08:52:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-09-25 08:19:00",19-설계-08,e.검토,"성과품 검토","2019-09-25 18:04:00",19-설계-08,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J17205,"2019-09-25 08:26:00",18-교영-01,c.설계사,.,"2019-09-25 18:03:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15302,"2019-09-25 08:26:00",19-설계-08,c.도면,도면작성,"2019-09-25 20:33:00",19-설계-08,c.도면,도면작성,"2019-09-25 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J11202,"2019-09-25 08:26:00",19-시공-02,b.시공,공사관리,"2019-09-25 18:24:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10313,"2019-09-25 08:28:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-25 18:05:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15307,"2019-09-25 08:29:00",19-설계-08,d.산출서,"거더, 슬래브 수량 산출","2019-09-25 20:32:00",19-설계-08,d.산출서,"거더, 슬래브 수량 산출","2019-09-25 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J14306,"2019-09-25 08:30:00",19-관리-04,a.계약,"계약업무 외","2019-09-25 18:05:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18205,"2019-09-25 08:30:00",17-설계-05,e.검토,"시공전 성과품 검토","2019-09-25 21:35:00",17-설계-05,e.검토,"시공전 성과품 검토","2019-09-25 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-09-25 08:33:00",19-교영-06,c.설계사,"3@55 9본 교량 구조검토","2019-09-25 20:42:00",19-교영-06,c.설계사,"3@55 9본 교량 구조검토","2019-09-25 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10301,"2019-09-25 08:35:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-25 18:15:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11203,"2019-09-25 08:35:00",17-시공-08,g.기타,"런처가설시 계산서 수정(감리검토사항 반영분)","2019-09-25 20:34:00",17-시공-08,g.기타,"런처가설시 계산서 수정(감리검토사항 반영분)","2019-09-25 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J07210,"2019-09-25 08:35:00",14-설계-32,h.기타,"거더 검토","2019-09-25 20:53:00",14-설계-32,h.기타,"거더 검토","2019-09-25 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J09101,"2019-09-25 08:35:00",19-교영-01,c.설계사,과업조사,"2019-09-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15201,"2019-09-25 08:36:00",19-교영-17,c.설계사,"과업진행현황 파악","2019-09-25 18:01:00",19-교영-17,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J16202,"2019-09-25 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-25 18:28:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-09-25 08:40:00",19-설계-08,b.구조계산,구조계산,"2019-09-25 21:31:00",19-설계-08,b.구조계산,구조계산,"2019-09-25 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07103,"2019-09-25 08:44:00",19-교영-01,d.기타,사업관리,"2019-09-25 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18208,"2019-09-25 07:40:00",19-제조-02,a.생산관리,"생산, 배차 관리 및 Shop DWG","2019-09-25 22:43:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-25 19:50:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14101,"2019-09-25 08:50:00",16-시공-20,출장,한양,"2019-09-25 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10314,"2019-09-25 08:50:00",14-설계-38,출장,"[흥우건설 현장사무실]교암교외 2개소(남일-보은 2공구) 계약","2019-09-25 18:00:00",14-설계-38,출장,"[흥우건설 현장사무실]교암교외 2개소(남일-보은 2공구) 계약","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-09-25 08:50:00",17-시공-10,출장,현장,"2019-09-25 18:00:00",17-시공-10,출장,현장,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J09102,"2019-09-25 08:50:00",19-계약-01,출장,대우건설,"2019-09-25 18:00:00",19-계약-01,출장,대우건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-09-26 06:24:00",19-제조-04,b.기계,"주천 2교 거푸집(H2.4) 보수와 조령천교 주두부 받침대 홀메우기 및 가공","2019-09-27 06:51:00",19-제조-04,b.기계,"주천 2교 거푸집(H2.4) 보수와 조령천교 주두부 받침대 홀메우기 및 가공","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-09-26 07:00:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-09-26 18:13:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J11302,"2019-09-26 07:13:00",19-시공-20,g.기타,"구안천교 거치관련 PPT작성
|
|
수리티교 가설계획서 작성","2019-09-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E2,,,
|
|
T04204,"2019-09-26 07:21:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간)철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-09-26 20:28:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간)철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-09-26 07:26:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-09-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J18208,"2019-09-26 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-26 19:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-26 18:51:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,,
|
|
J16203,"2019-09-26 07:35:00",19-제조-03,a.품질검사,"경안천교 원재료 시험의뢰(협의)
|
|
북수원1교,동림교산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-09-26 18:18:18",19-제조-03,a.품질검사,NULL,"2019-09-26 18:54:00",175.203.206.128,175.203.206.128,NULL,006E1,,,
|
|
M02302,"2019-09-26 07:38:00",19-제조-02,a.생산관리,"열선 양생 시스템 검토 및 협의","2019-09-26 18:01:00",19-제조-02,a.생산관리,"열선 양생 시스템 검토 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-09-26 07:40:00",17-시공-10,b.시공,"스플라이스거더 가설 안정시공검토","2019-09-26 18:05:00",17-시공-10,b.시공,"스플라이스거더 가설 안정시공검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-09-26 07:52:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-09-26 18:05:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J08201,"2019-09-26 08:12:00",19-교영-15,c.설계사,"교량계획 ","2019-09-26 19:20:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J09101,"2019-09-26 08:12:00",19-교영-01,c.설계사,과업조사,"2019-09-26 18:03:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
B15306,"2019-09-26 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-09-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-09-26 08:23:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-26 18:20:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J13201,"2019-09-26 08:25:00",19-교영-06,c.설계사,"3@55 9본 교량 구조검토","2019-09-26 20:41:00",19-교영-06,c.설계사,"3@55 9본 교량 구조검토","2019-09-26 18:33:00",172.16.9.165,172.16.9.173,172.16.9.165,008E2,,1,
|
|
J18205,"2019-09-26 08:27:00",17-설계-05,e.검토,"시공전 성과품 검토","2019-09-26 22:20:00",17-설계-05,e.검토,"시공전 성과품 검토","2019-09-26 19:17:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15302,"2019-09-26 08:27:00",19-설계-08,c.도면,도면작성,"2019-09-26 20:33:00",19-설계-08,c.도면,도면작성,"2019-09-26 18:32:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"18-설계-19<|>e.검토<|>계산서 검토 및 재발송<|>02:00<|><br>",1,
|
|
J16202,"2019-09-26 08:28:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-26 18:17:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-09-26 08:31:00",19-설계-08,b.구조계산,구조계산,"2019-09-26 21:02:00",19-설계-08,b.구조계산,구조계산,"2019-09-26 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10314,"2019-09-26 08:32:00",19-교영-15,d.기타,"DR거더(문산~도라산 2공구) 설계가 및 시행가, 2019년도 하반기 단가기준 표준내역작업","2019-09-26 18:20:00",19-교영-15,d.기타,"DR거더(문산~도라산 2공구) 설계가 및 시행가, 2019년도 하반기 단가기준 표준내역작업, 강구대교 설계가 특정공법심의 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-09-26 08:32:00",19-교영-01,d.기타,사업관리,"2019-09-26 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J07210,"2019-09-26 08:36:00",14-설계-32,h.기타,"거더 검토","2019-09-26 18:03:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J14306,"2019-09-26 08:38:00",19-관리-04,a.계약,"계약업무 외","2019-09-26 18:07:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15201,"2019-09-26 08:38:00",19-교영-17,c.설계사,"과업진행현황 파악","2019-09-26 18:01:00",19-교영-17,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-09-26 08:38:00",19-설계-08,e.검토,"성과품 검토","2019-09-26 18:13:00",19-설계-08,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10301,"2019-09-26 08:39:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-26 20:32:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-26 18:30:00",172.16.9.158,172.16.9.158,172.16.9.158,004E1,,1,
|
|
J11203,"2019-09-26 08:39:00",17-시공-08,g.기타,"런처가설시 계산서 수정(감리검토사항 반영분)","2019-09-26 20:34:00",17-시공-08,g.기타,"런처가설시 계산서 수정(감리검토사항 반영분)","2019-09-26 18:32:00",172.16.9.160,172.16.9.155,172.16.9.160,008E1,,1,
|
|
J10313,"2019-09-26 08:43:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-26 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J17205,"2019-09-26 08:45:00",18-교영-01,c.설계사,.,"2019-09-26 18:07:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15307,"2019-09-26 08:45:00",19-설계-08,d.산출서,"도면 검토 및 수정","2019-09-26 18:00:00",19-설계-08,d.산출서,"도면 검토 및 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J15301,"2019-09-26 08:56:00",16-시공-20,b.시공,공무,"2019-09-26 18:08:00",16-시공-20,b.시공,공무,"0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.175,004E4,,,
|
|
J14101,"2019-09-26 08:50:00",16-시공-20,출장,한양,"2019-09-26 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-09-26 08:50:00",17-시공-10,출장,현장,"2019-09-26 18:00:00",17-시공-10,출장,현장,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18202,"2019-09-26 08:50:00",18-시공-06,출장,"[나주]운곡교 안전 협의체 회의 참석","2019-09-26 18:00:00",18-시공-06,출장,"[나주]운곡교 안전 협의체 회의 참석","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-09-27 06:41:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-09-27 18:02:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-09-27 06:52:00",19-제조-04,b.기계,"조령천교 주두부 받침대 홀메우기 및 가공과 주천 2교 거푸집(H2.4) 보수","2019-09-28 07:30:00",19-제조-04,b.기계,"조령천교 주두부 받침대 홀메우기 및 가공과 주천 2교 거푸집(H2.4) 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-09-27 07:06:00",19-제조-03,a.품질검사,"북수원1교,동림교산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-09-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18208,"2019-09-27 07:07:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-27 18:09:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-09-27 07:29:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간)철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-09-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-09-27 07:31:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-09-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
M02302,"2019-09-27 07:35:00",19-제조-02,a.생산관리,"열선 양생 시스템 검토 및 협의","2019-09-27 18:16:00",19-제조-02,a.생산관리,"열선 양생 시스템 검토 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-09-27 07:51:00",19-계약-01,b.시공사,"한신공영, 강산건설 방문예정, 문산~도라산 2공구 예상 시행가 등 : 검단천교 외 4개교 계약 추진 중","2019-09-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J10301,"2019-09-27 08:08:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-27 18:09:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-09-27 08:08:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-27 18:17:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J13308,"2019-09-27 08:10:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-09-27 18:01:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18206,"2019-09-27 08:13:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-27 18:03:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-09-27 08:21:00",19-교영-15,c.설계사,"교량계획 ","2019-09-27 18:22:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-09-27 08:22:00",18-관리-02,e.기타,"비서업무 외","2019-09-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15302,"2019-09-27 08:28:00",19-설계-08,c.도면,도면작성,"2019-09-27 18:00:00",19-설계-08,c.도면,도면작성,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J10314,"2019-09-27 08:30:00",18-설계-19,h.기타,"2019년도 하반기 단가기준 표준내역작업, 신기술협약자료(세종~안성(세종~안성))","2019-09-27 18:07:00",18-설계-19,h.기타,"신기술협약자료(세종~안성(세종~안성)), 2019년도 하반기 단가기준 표준내역작업, 강구대교 설계가 특정공법심의 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-09-27 08:30:00",19-교영-01,d.기타,사업관리,"2019-09-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
J13201,"2019-09-27 08:30:00",19-교영-06,c.설계사,빔배치,"2019-09-27 18:00:00",19-교영-06,c.설계사,빔배치,"0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15307,"2019-09-27 08:31:00",19-설계-08,d.산출서,"도면 검토 및 수정","2019-09-27 16:19:00",19-설계-08,d.산출서,"도면 검토 및 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.171,008E4,,,
|
|
J11203,"2019-09-27 08:33:00",19-교영-15,d.기타,"계산서 설계사 요구사항 작성","2019-09-27 18:00:00",19-교영-15,d.기타,"계산서 설계사 요구사항 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J17205,"2019-09-27 08:33:00",18-교영-01,c.설계사,.,"2019-09-27 18:07:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-09-27 08:35:00",19-설계-08,b.구조계산,구조계산,"2019-09-27 18:00:00",19-설계-08,b.구조계산,구조계산,"0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J07210,"2019-09-27 08:35:00",14-설계-32,h.기타,"거더 검토","2019-09-27 18:02:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15201,"2019-09-27 08:36:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-09-27 18:05:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J16202,"2019-09-27 08:41:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-27 18:13:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J09101,"2019-09-27 08:47:00",19-교영-01,c.설계사,과업조사,"2019-09-27 18:03:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15301,"2019-09-27 08:48:00",16-시공-20,b.시공,공무,"2019-09-27 18:10:00",16-시공-20,b.시공,공무,"0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J18202,"2019-09-27 08:30:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-27 18:18:18",NULL,NULL,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J14101,"2019-09-27 08:50:00",16-시공-20,출장,한양,"2019-09-27 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-09-27 08:50:00",17-시공-10,출장,현장,"2019-09-27 18:00:00",17-시공-10,출장,현장,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11202,"2019-09-27 08:50:00",17-시공-08,출장,"[대구 달성군]빔런처 구조검토서 최종본 제출 및 현장 일정 협의","2019-09-27 18:00:00",17-시공-08,출장,"[대구 달성군]빔런처 구조검토서 최종본 제출 및 현장 일정 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11305,"2019-09-27 08:50:00",17-시공-08,출장,"[대구 달성군]빔런처 구조검토서 최종본 제출 및 현장 일정 협의","2019-09-27 18:00:00",17-시공-08,출장,"[대구 달성군]빔런처 구조검토서 최종본 제출 및 현장 일정 협의","0000-00-00 00:00:00",NULL,NULL,NULL,008C7,,,
|
|
J11302,"2019-09-27 08:50:00",14-시공-18,출장,"[경기도 용인시 처인구 포공읍]동림교 인장협의, 북수원2교 1차인장","2019-09-27 18:00:00",14-시공-18,출장,"[경기도 용인시 처인구 포공읍]동림교 인장협의, 북수원2교 1차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J18207,"2019-09-27 08:50:00",17-시공-08,출장,"[대구 달성군]새천2교 런처가설시 구조안정성검토서 보안서류제출 및 설명","2019-09-27 18:00:00",17-시공-08,출장,"[대구 달성군]새천2교 런처가설시 구조안정성검토서 보안서류제출 및 설명","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
T04204,"2019-09-28 07:27:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-09-28 17:00:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-09-28 07:31:00",19-제조-04,b.기계,"교암교 거푸집 상차와 주천 2교 거푸집(H2.4) 보수","2019-09-28 15:55:00",19-제조-04,b.기계,"교암교 거푸집 상차와 주천 2교 거푸집(H2.4) 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-09-28 07:38:00",19-제조-03,a.품질검사,"북수원1교,동림교산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-09-28 17:00:00",19-제조-03,a.품질검사,"북수원1교,동림교산외교
|
|
데크 및 켄틸버 생산 및 품질관리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
M02302,"2019-09-28 07:46:00",19-제조-02,a.생산관리,"열선 양생 시스템 검토 및 협의","2019-09-28 16:54:00",19-제조-02,a.생산관리,"열선 양생 시스템 검토 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
J11203,"2019-09-28 08:54:00",19-교영-15,d.기타,"계산서 설계사 요구사항 작성","2019-09-28 14:01:00",19-교영-15,d.기타,"계산서 설계사 요구사항 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,1,
|
|
J14308,"2019-09-28 09:39:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-09-28 17:55:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J12202,"2019-09-30 06:42:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-09-30 18:11:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J11302,"2019-09-30 07:10:00",17-시공-21,g.기타,"북수원2교 교통통제계획서 작성 및 수리티교 가설계획서 작성","2019-09-30 18:11:00",17-시공-21,g.기타,"북수원2교 교통통제계획서 작성 및 수리티교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J15201,"2019-09-30 07:17:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-09-30 18:01:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
T04204,"2019-09-30 07:26:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-09-30 21:09:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-09-30 07:29:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-09-30 21:08:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-09-30 18:58:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18202,"2019-09-30 07:33:00",07-교영-01,b.시공사,"발주현황 파악","2019-09-30 18:09:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J07202,"2019-09-30 07:36:00",19-제조-04,b.기계,"주천 2교 거푸집(H2.4) 보수","2019-09-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-09-30 07:41:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-09-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
M05510,"2019-09-30 07:46:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-09-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.10.199,NULL,NULL,004C8,,,
|
|
J16203,"2019-09-30 07:47:00",19-제조-03,a.품질검사,"경안천 원재료 시험,
|
|
북수원1교,동림교, 산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-09-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
M02302,"2019-09-30 07:48:00",19-제조-02,a.생산관리,"임원회의 자료 작성 및 보고자료 작성","2019-09-30 18:02:00",19-제조-02,a.생산관리,"열선 양생 시스템 검토 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>임원회의 자료 및 보고자료 작성<|>03:00<|><br>19-제조-02<|>a.생산관리<|>교육실 및 분임토의장 청소 관리<|>02:00<|><br>",,
|
|
J09102,"2019-09-30 07:53:00",19-계약-01,b.시공사,"남양건설, 포스코건설 계약관련 방문예정, 문산~도라산 1,2공구 예상 시행가 등 : 검단천교 외 4개교 계약 추진 중","2019-09-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-09-30 07:54:00",17-시공-08,b.시공,"새천2교 런처가설시 구조안정성검토서 보안서류제출 및 설명 ","2019-09-30 18:27:00",17-시공-08,b.시공,"새천2교 런처가설시 구조안정성검토서 보안서류제출 및 설명 ","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-09-30 08:08:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-09-30 18:11:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J08201,"2019-09-30 08:09:00",19-교영-15,c.설계사,"교량계획 ","2019-09-30 19:04:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-09-30 08:10:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-09-30 18:15:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-09-30 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-09-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10315,"2019-09-30 08:16:00",17-시공-27,b.시공,"제작 및 가설 협의자료 작성","2019-09-30 13:27:00",17-시공-27,b.시공,"제작 및 가설 협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J07103,"2019-09-30 08:25:00",19-교영-01,d.기타,사업관리,"2019-09-30 18:13:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-09-30 08:26:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-09-30 18:36:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15302,"2019-09-30 08:27:00",19-설계-08,c.도면,"성과품 검토","2019-09-30 20:33:00",19-설계-08,c.도면,"성과품 검토","2019-09-30 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J16202,"2019-09-30 08:27:00",19-교영-01,c.설계사,신규사업현황조사,"2019-09-30 18:09:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10314,"2019-09-30 08:28:00",18-설계-19,h.기타,"신기술협약자료(세종~안성(세종~안성)), 2019년도 하반기 단가기준 표준내역작업","2019-09-30 18:10:00",18-설계-19,h.기타,"신기술협약자료(세종~안성(세종~안성)), 2019년도 하반기 단가기준 표준내역작업, 강구대교 설계가 특정공법심의 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J09101,"2019-09-30 08:29:00",19-교영-01,c.설계사,과업조사,"2019-09-30 18:03:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J11202,"2019-09-30 08:32:00",19-시공-02,b.시공,공사관리,"2019-09-30 20:41:00",19-시공-02,b.시공,공사관리,"2019-09-30 18:30:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J18205,"2019-09-30 08:33:00",17-설계-05,e.검토,"시공전 성과품 검토","2019-09-30 21:35:00",17-설계-05,e.검토,"시공전 성과품 검토","2019-09-30 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J17205,"2019-09-30 08:36:00",18-교영-01,c.설계사,.,"2019-09-30 18:13:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11305,"2019-09-30 08:38:00",19-설계-08,e.검토,"성과품 검토","2019-09-30 18:05:00",19-설계-08,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07210,"2019-09-30 08:40:00",14-설계-32,h.기타,"거더 검토","2019-09-30 18:02:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15307,"2019-09-30 08:41:00",19-설계-08,d.산출서,"도면 검토 및 수정","2019-09-30 21:30:00",19-설계-08,d.산출서,"도면 검토 및 수정","2019-09-30 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10313,"2019-09-30 08:42:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-09-30 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J13201,"2019-09-30 08:44:00",19-교영-06,c.설계사,"제3연륙교 빔배치","2019-09-30 18:03:00",19-교영-06,c.설계사,"제3연륙교 빔배치","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15301,"2019-09-30 08:50:00",16-시공-20,b.시공,공무,"2019-09-30 18:13:00",16-시공-20,b.시공,공무,"0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15202,"2019-09-30 08:56:00",19-설계-08,b.구조계산,구조계산,"2019-09-30 18:02:00",19-설계-08,b.구조계산,구조계산,"0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J11202,"2019-10-02 08:44:00",19-시공-02,b.시공,공사관리,"2019-10-02 18:21:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14101,"2019-09-30 08:50:00",16-시공-20,출장,한양,"2019-09-30 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-10-01 06:31:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-01 18:09:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-10-01 06:56:00",19-제조-04,b.기계,"주천 2교 거푸집(H2.0) 청소와 페인트 도색","2019-10-02 06:53:00",19-제조-04,b.기계,"주천 2교 거푸집(H2.0) 청소와 페인트 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-10-01 07:22:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
T04204,"2019-10-01 07:26:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-01 21:47:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-10-01 07:27:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-01 21:01:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-01 18:43:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J11302,"2019-10-01 07:32:00",17-시공-21,g.기타,"제3연륙교 런쳐 해체도 작성 및 수리티교 인장계획서 작성","2019-10-01 18:12:00",17-시공-21,g.기타,"제3연륙교 런쳐 해체도 작성 및 수리티교 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J09102,"2019-10-01 07:35:00",19-계약-01,b.시공사,"양평~이천 2공구 신촌교, 국지도 84호선 중리교 예상 시행가 등 : 검단천교 외 4개교 계약 추진 중","2019-10-01 18:04:00",19-계약-01,b.시공사,"양평~이천 2공구 신촌교, 국지도 84호선 중리교 예상 시행가 등 : 검단천교 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J18207,"2019-10-01 07:36:00",19-시공-22,b.시공,"산외교 상부스라브 공정계획및 업체선정검토","2019-10-01 18:05:00",19-시공-22,b.시공,"산외교 상부스라브 공정계획및 업체선정검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10315,"2019-10-01 07:39:00",17-시공-27,b.시공,"제작 및 가설 협의자료 작성","2019-10-01 18:14:00",17-시공-27,b.시공,"제작 및 가설 협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18208,"2019-10-01 07:42:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-01 22:16:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-01 18:42:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-10-01 07:43:00",19-제조-03,a.품질검사,"북수원1교,동림교, 산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-10-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J13308,"2019-10-01 07:55:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-10-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.170,NULL,NULL,004E3,,,
|
|
B15306,"2019-10-01 08:04:00",18-관리-02,e.기타,"비서업무 외","2019-10-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-10-01 08:14:00",19-교영-15,c.설계사,"교량계획 ","2019-10-01 18:17:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-10-01 08:14:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-01 18:08:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-10-01 08:14:00",19-설계-08,e.검토,"성과품 검토","2019-10-01 18:16:00",19-설계-08,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J09101,"2019-10-01 08:18:00",19-교영-01,c.설계사,과업조사,"2019-10-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15201,"2019-10-01 08:22:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-10-01 18:04:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15302,"2019-10-01 08:27:00",17-설계-05,e.검토,"성과품 검토","2019-10-01 20:33:00",17-설계-05,e.검토,"성과품 검토","2019-10-01 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J07103,"2019-10-01 08:27:00",19-교영-01,d.기타,사업관리,"2019-10-01 18:09:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11202,"2019-10-01 08:27:00",19-시공-02,b.시공,공사관리,"2019-10-01 18:11:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18205,"2019-10-01 08:28:00",17-설계-05,e.검토,"구조계산서 검토","2019-10-01 21:34:00",17-설계-05,e.검토,"구조계산서 검토","2019-10-01 18:31:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J14306,"2019-10-01 08:28:00",19-관리-04,a.계약,"계약업무 외","2019-10-01 18:02:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-10-01 08:30:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-01 18:09:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-10-01 08:30:00",19-교영-06,c.설계사,"제3연륙교 빔배치","2019-10-01 20:40:00",19-교영-06,c.설계사,"제3연륙교 빔배치","2019-10-01 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J11203,"2019-10-01 08:33:00",17-시공-08,g.기타,"감리추가요구사항 정리","2019-10-01 20:31:00",19-시공-21,g.기타,"3공구 프리덱 감독검토사항 정리 후 발송","2019-10-01 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,1,
|
|
J15202,"2019-10-01 08:36:00",19-교영-14,c.설계사,"구조계산서 작성","2019-10-01 20:39:00",19-교영-14,c.설계사,"구조계산서 작성","2019-10-01 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-10-01 08:36:00",14-설계-32,h.기타,"거더 검토","2019-10-01 20:37:00",14-설계-32,h.기타,"거더 검토","2019-10-01 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15307,"2019-10-01 08:41:00",19-설계-08,d.산출서,"2018~2019년도 설계도서 마무리(체크리스트) 작성","2019-10-01 18:00:00",19-설계-08,d.산출서,"2018~2019년도 설계도서 마무리(체크리스트) 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J16202,"2019-10-01 08:41:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-01 18:12:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10313,"2019-10-01 08:41:00",19-제조-01,b.총무,"월 마감, 생산직 직원 급여","2019-10-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15301,"2019-10-01 09:37:00",16-시공-20,b.시공,공무,"2019-10-01 18:10:00",16-시공-20,b.시공,공무,"0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-10-01 10:05:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",180.69.61.130,NULL,NULL,004C8,,,
|
|
J14101,"2019-10-01 08:50:00",16-시공-20,출장,한양,"2019-10-01 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
M02302,"2019-10-01 08:50:00",19-제조-02,출장,[한맥빌딩]임원회의,"2019-10-01 18:00:00",19-제조-02,출장,[한맥빌딩]임원회의,"0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J12202,"2019-10-02 06:35:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-02 18:03:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-10-02 06:57:00",19-제조-04,b.기계,"태풍대비 천막동 단속과 주천2교 거푸집 청소 및 페인트 도색과 생산2팀 생산 및 품질관리","2019-10-03 07:40:00",19-제조-04,b.기계,"태풍대비 천막동 단속과 주천2교 거푸집 청소 및 페인트 도색과 생산2팀 생산 및 품질관리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-10-02 07:05:00",19-제조-03,a.품질검사,"북수원1교,동림교, 산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-10-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J14308,"2019-10-02 07:15:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-02 20:51:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-02 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J11302,"2019-10-02 07:27:00",17-시공-21,g.기타,"제3연륙교 런쳐 해체도 작성 및 수리티교 인장계획서 작성","2019-10-02 18:06:00",17-시공-21,g.기타,"제3연륙교 런쳐 해체도 작성 및 수리티교 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18202,"2019-10-02 07:27:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-02 18:09:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18207,"2019-10-02 07:32:00",19-시공-22,b.시공,"산외교 상부스라브 공정계획및 업체선정검토","2019-10-02 18:20:00",19-시공-22,b.시공,"산외교 상부스라브 공정계획및 업체선정검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18208,"2019-10-02 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-02 20:51:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-02 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,,
|
|
T04204,"2019-10-02 07:40:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
B15306,"2019-10-02 08:05:00",18-관리-02,e.기타,"비서업무 외","2019-10-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10315,"2019-10-02 08:09:00",17-시공-27,b.시공,"제작 및 가설 협의자료 작성","2019-10-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J10314,"2019-10-02 08:11:00",17-설계-16,h.기타,"도화육교(도화~송학) 시행견적서, 신기술협약자료(세종~안성(세종~안성)), 2019년도 하반기 단가기준 표준내역작업","2019-10-02 19:44:00",17-설계-16,h.기타,"도화육교(도화~송학) 시행견적서, 신기술협약자료(세종~안성(세종~안성)), 2019년도 하반기 단가기준 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11305,"2019-10-02 08:13:00",19-설계-08,e.검토,"성과품 검토","2019-10-02 19:08:00",19-설계-08,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-10-02 08:18:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-02 18:17:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-10-02 08:21:00",19-교영-15,c.설계사,"교량계획 ","2019-10-02 19:08:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J13201,"2019-10-02 08:26:00",19-교영-06,c.설계사,"캔틸레버 Pre-Deck 검토","2019-10-02 18:18:18",19-교영-06,c.설계사,NULL,"2019-10-02 18:30:00",172.16.9.165,172.16.9.165,NULL,008E2,,,
|
|
J07103,"2019-10-02 08:27:00",19-교영-01,d.기타,사업관리,"2019-10-02 18:16:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15307,"2019-10-02 08:28:00",19-설계-08,d.산출서,"2010~2019년도 Pre-Deck 전수조사
|
|
2018~2019년도 설계도서 마무리(체크리스트) 작성","2019-10-02 19:08:00",19-설계-08,d.산출서,"2010~2019년도 Pre-Deck 전수조사
|
|
2018~2019년도 설계도서 마무리(체크리스트) 작성","2019-10-02 19:07:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,,
|
|
J15302,"2019-10-02 08:30:00",17-설계-05,e.검토,"성과품 검토","2019-10-02 18:15:00",17-설계-05,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J14306,"2019-10-02 08:30:00",19-관리-04,a.계약,"계약업무 외","2019-10-02 18:09:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-10-02 08:30:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-02 22:00:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-02 18:30:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J11203,"2019-10-02 08:30:00",17-시공-08,g.기타,"감리추가요구사항 정리","2019-10-02 19:07:00",17-시공-08,g.기타,"감리추가요구사항 정리","2019-10-02 18:30:00",172.16.9.160,172.16.9.160,172.16.9.160,008E1,,,
|
|
J15202,"2019-10-02 08:31:00",19-교영-14,c.설계사,"구조계산서 작성","2019-10-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.155,NULL,NULL,008E1,,,
|
|
J07210,"2019-10-02 08:32:00",14-설계-32,h.기타,"거더 검토","2019-10-02 19:02:00",14-설계-32,h.기타,"거더 검토","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10301,"2019-10-02 08:33:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-02 18:19:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J09101,"2019-10-02 08:35:00",19-교영-01,c.설계사,과업조사,"2019-10-02 19:24:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10313,"2019-10-02 08:35:00",19-제조-01,b.총무,"월 마감, 생산직 직원 급여","2019-10-02 18:02:00",19-제조-01,b.총무,"월 마감, 생산직 직원 급여","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J17205,"2019-10-02 08:46:00",18-교영-01,c.설계사,.,"2019-10-02 22:00:00",18-교영-01,c.설계사,.,"2019-10-02 18:31:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J15201,"2019-10-02 08:46:00",18-교영-26,c.설계사,"과업진행현황 파악","2019-10-02 19:23:00",18-교영-26,c.설계사,"과업진행현황 파악","2019-10-02 18:31:00",172.16.9.150,172.16.9.150,172.16.9.150,008C8,,,
|
|
J15301,"2019-10-02 09:02:00",16-시공-20,b.시공,공무,"2019-10-02 18:07:00",16-시공-20,b.시공,공무,"0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-10-02 16:35:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",180.69.61.130,NULL,NULL,004C8,,,
|
|
J14101,"2019-10-02 08:50:00",16-시공-20,출장,한양,"2019-10-02 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J09102,"2019-10-02 08:50:00",19-계약-01,출장,동광건설,"2019-10-02 18:00:00",19-계약-01,출장,동광건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M02302,"2019-10-02 08:50:00",19-제조-02,출장,"[충북 음성 중장비 중고시장]02 백호우 구매관련 출장","2019-10-02 18:00:00",19-제조-02,출장,"[충북 음성 중장비 중고시장]02 백호우 구매관련 출장","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J14101,"2019-09-12 08:50:00",16-시공-20,출장,한양,"2019-09-12 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14101,"2019-09-13 08:50:00",16-시공-20,출장,한양,"2019-09-13 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18205,"2019-09-27 08:50:00",19-시공-20,출장,"[경기도 안성시 금광면] 현장업무 협의","2019-09-27 18:00:00",19-시공-20,출장,"[경기도 안성시 금광면] 현장업무 협의","0000-00-00 00:00:00",NULL,NULL,NULL,008E2,,,
|
|
J11203,"2019-09-30 08:50:00",16-설계-09,출장,"[나주부근]3공구감독이 검토한사항(PRE-DECK 검토사항) 반영 보고","2019-09-30 18:00:00",16-설계-09,출장,"[나주부근]3공구감독이 검토한사항(PRE-DECK 검토사항) 반영 보고","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J12202,"2019-10-03 06:28:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-03 12:53:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-10-03 07:40:00",19-제조-04,b.기계,"콘크리트 제품 생산과 품질경영 총괄업무","2019-10-03 15:36:00",19-제조-04,b.기계,"콘크리트 제품 생산과 품질경영 총괄업무","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-10-03 07:44:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-03 21:10:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J16203,"2019-10-03 07:45:00",19-제조-03,a.품질검사,"북수원1교,동림교, 산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-10-03 19:37:00",19-제조-03,a.품질검사,"북수원1교,동림교, 산외교
|
|
데크 및 켄틸버 생산 및 품질관리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
M05510,"2019-10-03 11:52:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",180.69.61.130,NULL,NULL,004C8,,,
|
|
J12202,"2019-10-04 06:46:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-04 18:04:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-10-04 06:59:00",19-제조-04,b.기계,"콘크리트 제품 생산과 품질경영 총괄업무","2019-10-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
T04204,"2019-10-04 07:23:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-04 18:07:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-10-04 07:33:00",17-시공-21,g.기타,"제3연륙교 런쳐 해체도 작성 및 수리티교 인장계획서 작성","2019-10-04 20:36:00",17-시공-21,g.기타,"제3연륙교 런쳐 해체도 작성 및 수리티교 인장계획서 작성","2019-10-04 18:33:00",172.16.9.166,172.16.9.166,172.16.9.166,004E2,,1,
|
|
J18208,"2019-10-04 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-04 18:04:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18207,"2019-10-04 07:41:00",19-시공-22,b.시공,"산외교 상부스라브 캠버조정에따른 그라우트댐설치, 공정계획및 업체선정검토","2019-10-04 18:15:00",19-시공-22,b.시공,"산외교 상부스라브 캠버조정에따른 그라우트댐설치, 공정계획및 업체선정검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M02302,"2019-10-04 07:47:00",19-제조-02,a.생산관리,"Pre-Deck 표준도 작성 및 기획서 작성","2019-10-04 18:03:00",19-제조-02,a.생산관리,"Pre-Deck 표준도 작성 및 기획서 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-10-04 07:50:00",19-계약-01,b.시공사,"용상~교리 2공구 2개교 예상 계약가 등 : 검단천교 외 4개교 계약 추진 중","2019-10-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-10-04 07:54:00",19-제조-03,a.품질검사,"북수원1교,동림교, 산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-10-04 22:46:00",19-제조-03,a.품질검사,"북수원1교,동림교, 산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-10-04 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J10315,"2019-10-04 08:03:00",17-시공-27,b.시공,"제작 및 가설 협의자료 작성","2019-10-04 18:01:00",17-시공-27,b.시공,"제작 및 가설 협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J18206,"2019-10-04 08:08:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-04 15:33:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-10-04 08:14:00",18-관리-02,e.기타,"비서업무 외","2019-10-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-10-04 08:20:00",18-설계-02,h.기타,"금호강교외1개소(금호강수변공간) 설계내역서, 옥성교(봉청~방문) 설계견적서(특공), 신기술협약자료(세종~안성(세종~안성)), 2019년도 하반기 단가기준 표준내역작업","2019-10-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J15307,"2019-10-04 08:24:00",19-설계-08,d.산출서,"2010~2019년도 Pre-Deck 전수조사
|
|
2018~2019년도 설계도서 마무리(체크리스트) 작성","2019-10-04 18:02:00",19-설계-08,d.산출서,"2010~2019년도 Pre-Deck 전수조사
|
|
2018~2019년도 설계도서 마무리(체크리스트) 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J09101,"2019-10-04 08:27:00",19-교영-01,c.설계사,과업조사,"2019-10-04 18:01:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J17205,"2019-10-04 08:28:00",18-교영-01,c.설계사,.,"2019-10-04 18:11:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07103,"2019-10-04 08:33:00",19-교영-01,d.기타,사업관리,"2019-10-04 18:11:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10313,"2019-10-04 08:35:00",19-제조-01,b.총무,"월 마감, 생산직 직원 급여","2019-10-04 18:03:00",19-제조-01,b.총무,"월 마감, 생산직 직원 급여","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16202,"2019-10-04 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-04 18:06:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14306,"2019-10-04 08:45:00",19-관리-04,a.계약,"계약업무 외","2019-10-04 18:03:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-10-04 08:48:00",19-시공-02,b.시공,공사관리,"2019-10-04 18:05:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15301,"2019-10-04 08:56:00",16-시공-20,b.시공,공무,"2019-10-04 18:10:00",16-시공-20,b.시공,공무,"0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14308,"2019-10-04 08:30:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-04 18:37:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J14101,"2019-10-04 08:50:00",16-시공-20,출장,한양,"2019-10-04 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07210,"2019-10-04 08:50:00",16-시공-20,출장,"[산외교 현장 (밀양)]산외교 솟음관련 회의","2019-10-04 18:00:00",16-시공-20,출장,"[산외교 현장 (밀양)]산외교 솟음관련 회의","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
M05510,"2019-10-05 11:21:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.11.222,NULL,NULL,004C8,,,
|
|
M05510,"2019-10-06 07:12:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.10.171,NULL,NULL,004C8,,,
|
|
J18202,"2019-10-07 07:20:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-07 18:12:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
T04204,"2019-10-07 07:28:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-10-07 07:28:00",19-제조-04,b.기계,"주천 2교 거푸집(H2.4) 보수와 우천으로 인한 공장 주변 점검","2019-10-08 07:00:00",19-제조-04,b.기계,"주천 2교 거푸집(H2.4) 보수와 우천으로 인한 공장 주변 점검","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-10-07 07:30:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-07 18:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J11302,"2019-10-07 07:31:00",17-시공-21,g.기타,"수리티교 인장계획서 작성 및 검단천2교 가설검토","2019-10-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E2,,,
|
|
J16203,"2019-10-07 07:47:00",19-제조-03,a.품질검사,"북수원1교,동림교, 산외교
|
|
데크 및 켄틸버 생산 및 품질관리","2019-10-07 18:18:18",19-제조-03,a.품질검사,NULL,"2019-10-07 18:41:00",175.203.206.128,175.203.206.128,NULL,006E1,,1,
|
|
M02302,"2019-10-07 07:49:00",19-제조-02,a.생산관리,"Pre-Deck 표준도 작성 및 기획서 작성","2019-10-07 18:06:00",19-제조-02,a.생산관리,"Pre-Deck 표준도 작성 및 기획서 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-10-07 07:50:00",19-계약-01,b.시공사,"남양건설, 코오롱글로벌 방문예정, 용상~교리 2공구 2개교 예상 계약가 등 : 검단천교 외 4개교 계약 추진 중","2019-10-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M05510,"2019-10-07 07:53:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.11.89,NULL,NULL,004C8,,,
|
|
B15306,"2019-10-07 08:04:00",18-관리-02,e.기타,"비서업무 외","2019-10-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J13308,"2019-10-07 08:11:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-10-07 18:12:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J18207,"2019-10-07 08:17:00",17-시공-08,b.시공,"런처가설 및크레인가설 방법 구조안정성검토 발주처 보안사항승인확인","2019-10-07 18:20:00",17-시공-08,b.시공,"런처가설 및크레인가설 방법 구조안정성검토 발주처 보안사항승인확인","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J18206,"2019-10-07 08:21:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-07 18:20:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-10-07 08:22:00",19-교영-15,c.설계사,"교량계획 ","2019-10-07 19:30:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-10-07 08:25:00",17-설계-05,e.검토,"구조계산서 검토","2019-10-07 21:41:00",17-설계-05,e.검토,"구조계산서 검토","2019-10-07 18:33:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J10315,"2019-10-07 08:25:00",19-시공-23,b.시공,"교리교 제작 및 가설협의자료 작성","2019-10-07 18:11:00",19-시공-23,b.시공,"교리교 제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J15307,"2019-10-07 08:26:00",19-설계-08,d.산출서,"2010~2019년도 Pre-Deck 전수조사
|
|
2018~2019년도 설계도서 마무리(체크리스트) 작성","2019-10-07 21:34:00",19-설계-08,d.산출서,"2010~2019년도 Pre-Deck 전수조사
|
|
2018~2019년도 설계도서 마무리(체크리스트) 작성","2019-10-07 18:34:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J15201,"2019-10-07 08:27:00",18-교영-26,c.설계사,"과업진행현황 파악","2019-10-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J14306,"2019-10-07 08:33:00",19-관리-04,a.계약,"계약업무 외","2019-10-07 18:02:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11305,"2019-10-07 08:35:00",19-설계-08,e.검토,"성과품 검토","2019-10-07 18:24:00",19-설계-08,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10301,"2019-10-07 08:35:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-07 18:39:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-10-07 08:37:00",19-교영-06,c.설계사,"제3연륙교 횡단작성","2019-10-07 18:13:00",19-교영-06,c.설계사,"제3연륙교 횡단작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J07210,"2019-10-07 08:39:00",14-설계-32,h.기타,"산외교 솟음","2019-10-07 18:04:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J09101,"2019-10-07 08:41:00",19-교영-01,c.설계사,과업조사,"2019-10-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J16202,"2019-10-07 08:43:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-07 18:22:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-10-07 08:44:00",18-교영-01,c.설계사,.,"2019-10-07 18:04:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11202,"2019-10-07 08:46:00",19-시공-02,b.시공,공사관리,"2019-10-07 20:35:00",19-시공-02,b.시공,공사관리,"2019-10-07 18:30:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J15301,"2019-10-07 08:49:00",16-시공-20,b.시공,"용강IC, 석현천교 자재요청서 발송
|
|
현장정산서 작성
|
|
주요자재 거래명세표 작성
|
|
용강IC, 석현천교 도면 제본 발송 (김정기 이사님)","2019-10-07 19:20:00",16-시공-20,b.시공,"용강IC, 석현천교 자재요청서 발송
|
|
현장정산서 작성
|
|
주요자재 거래명세표 작성
|
|
용강IC, 석현천교 도면 제본 발송 (김정기 이사님)","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15202,"2019-10-07 08:58:00",19-교영-14,c.설계사,"구조계산서 작성","2019-10-07 21:00:00",19-교영-14,c.설계사,"구조계산서 작성","2019-10-07 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J11203,"2019-10-07 13:27:00",18-시공-06,g.기타,"정착구 검토서, 가로보검토서 작성","2019-10-07 18:07:00",17-시공-08,g.기타,"감리추가요구사항 정리","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J14101,"2019-10-07 08:50:00",16-시공-20,출장,한양,"2019-10-07 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10314,"2019-10-07 08:50:00",18-설계-19,출장,"[한국도로공사 인력개발원]신기술(특허) 사용협약 체결","2019-10-07 18:00:00",18-설계-19,출장,"[한국도로공사 인력개발원]신기술(특허) 사용협약 체결","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J12202,"2019-10-08 06:23:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-08 18:09:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-10-08 07:00:00",19-제조-04,b.기계,"주천 2교 거푸집(H2.6) 보수와 야적장 각재 정리","2019-10-09 07:44:00",19-제조-04,b.기계,"주천 2교 거푸집(H2.6) 보수와 야적장 각재 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-10-08 07:26:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-10-08 07:28:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-08 18:06:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18208,"2019-10-08 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-08 23:17:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-08 18:50:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-10-08 07:37:00",19-제조-02,a.생산관리,"Pre-Deck 표준도 작성 및 기획서 작성","2019-10-08 18:01:00",19-제조-02,a.생산관리,"Pre-Deck 표준도 작성 및 기획서 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-10-08 07:40:00",19-제조-03,a.품질검사,"히팅레일 시험, 북수원1교,동림교, 산외교
|
|
데크 및 켄틸레버 생산 및 품질관리","2019-10-08 21:33:00",19-제조-03,a.품질검사,"히팅레일 시험, 북수원1교,동림교, 산외교
|
|
데크 및 켄틸레버 생산 및 품질관리","2019-10-08 18:46:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-10-08 07:44:00",19-계약-01,b.시공사,"안성구리2 SK건설 방문예정, 중리교 신촌교 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","2019-10-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-10-08 07:44:00",18-시공-06,b.시공,"거더제작관련 정착구 도면 검토 및 가로보위치이동 검토","2019-10-08 18:06:00",18-시공-06,b.시공,"거더제작관련 정착구 도면 검토 및 가로보위치이동 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J13308,"2019-10-08 07:54:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-10-08 18:15:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
B15306,"2019-10-08 08:03:00",18-관리-02,e.기타,"비서업무 외","2019-10-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10315,"2019-10-08 08:06:00",19-시공-23,b.시공,"교리교 제작 및 가설협의자료 작성","2019-10-08 18:03:00",19-시공-23,b.시공,"교리교 제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J11305,"2019-10-08 08:13:00",19-설계-08,e.검토,"성과품 검토","2019-10-08 18:07:00",19-설계-08,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10314,"2019-10-08 08:13:00",19-설계-08,h.기타,"구룔교외 1개소(화순동면~송광부산) 설계견적서 및 내역서,
|
|
신기술(협약) 추가첨부자료(세종~안성)","2019-10-08 18:08:00",19-설계-08,h.기타,"구룔교외 1개소(화순동면~송광부산) 설계견적서 및 내역서,
|
|
신기술(협약) 추가첨부자료(세종~안성)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-10-08 08:15:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-08 18:02:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-10-08 08:19:00",19-교영-15,c.설계사,"교량계획 ","2019-10-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J11203,"2019-10-08 08:26:00",18-시공-06,g.기타,"정착구 검토서, 가로보검토서 작성","2019-10-08 18:04:00",18-시공-06,g.기타,"정착구 검토서, 가로보검토서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,"19-교영-18<|>d.기타<|>30m, 35m 거더 수량산출<|>00:30<|><br>19-시공-21<|>g.기타<|>프리덱 배근관련 설계기준 자료정리후 시공사발송<|>02:00<|><br>",,
|
|
J15307,"2019-10-08 08:27:00",19-설계-08,d.산출서,"2010~2019년도 Pre-Deck 전수조사
|
|
2018~2019년도 설계도서 마무리(체크리스트) 작성","2019-10-08 18:02:00",19-설계-08,d.산출서,"2010~2019년도 Pre-Deck 전수조사
|
|
2018~2019년도 설계도서 마무리(체크리스트) 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J16202,"2019-10-08 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J13201,"2019-10-08 08:31:00",17-설계-05,c.도면,"구안천교 좌표확인","2019-10-08 18:04:00",17-설계-05,c.도면,"구안천교 좌표확인","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J18205,"2019-10-08 08:32:00",17-설계-05,e.검토,"구조계산서 검토","2019-10-08 21:40:00",17-설계-05,e.검토,"구조계산서 검토","2019-10-08 19:02:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07210,"2019-10-08 08:35:00",14-설계-32,h.기타,"산외교 솟음","2019-10-08 18:05:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11202,"2019-10-08 08:35:00",19-시공-02,b.시공,공사관리,"2019-10-08 18:25:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14306,"2019-10-08 08:37:00",19-관리-04,a.계약,"계약업무 외","2019-10-08 18:00:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J17205,"2019-10-08 08:37:00",18-교영-01,c.설계사,.,"2019-10-08 18:19:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-10-08 08:38:00",19-교영-14,c.설계사,업무지원,"2019-10-08 18:34:00",19-교영-14,c.설계사,업무지원,"0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J10301,"2019-10-08 08:39:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-08 18:35:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-10-08 08:43:00",19-제조-01,b.총무,"월 마감, 생산직 직원 급여","2019-10-08 18:02:00",19-제조-01,b.총무,"월 마감, 생산직 직원 급여","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-10-08 08:47:00",19-교영-01,c.설계사,과업조사,"2019-10-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15201,"2019-10-08 08:48:00",18-교영-26,c.설계사,"과업진행현황 파악","2019-10-08 18:01:00",18-교영-26,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15301,"2019-10-08 08:50:00",16-시공-20,b.시공,"현장정산서 작성
|
|
신양교 공급원승인서 3부 준비 (일반)
|
|
도화육교 공급원승인서 3부 준비 (고강도)
|
|
조령천교 임대차계약서 작성
|
|
삼남1교 하도급지킴이 기성 청구","2019-10-08 18:30:00",16-시공-20,b.시공,"현장정산서 작성
|
|
신양교 공급원승인서 3부 준비 (일반)
|
|
도화육교 공급원승인서 3부 준비 (고강도)
|
|
조령천교 임대차계약서 작성
|
|
삼남1교 하도급지킴이 기성 청구","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-10-08 14:26:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.10.122,NULL,NULL,004C8,,,
|
|
J14101,"2019-10-08 08:50:00",16-시공-20,출장,한양,"2019-10-08 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-10-08 08:50:00",14-시공-18,출장,"[경기도 용인시 처인구 포공읍]동림교 1차인장 작업","2019-10-08 18:00:00",14-시공-18,출장,"[경기도 용인시 처인구 포공읍]동림교 1차인장 작업","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J07202,"2019-10-09 07:46:00",19-제조-04,b.기계,"콘크리트 제품 생산 및 품질경영 업무 지원","2019-10-09 15:28:00",19-제조-04,b.기계,"콘크리트 제품 생산 및 품질경영 업무 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-10-10 06:41:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-10 18:07:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-10-10 07:03:00",19-제조-04,b.기계,"주천 2교 거푸집(H2.6)과 석현천교 거푸집(H2.0) 보수와 조령천교 주두부 바닥판 홀 가공","2019-10-11 06:55:00",19-제조-04,b.기계,"주천 2교 거푸집(H2.6)과 석현천교 거푸집(H2.0) 보수와 조령천교 주두부 바닥판 홀 가공","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-10-10 07:24:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-10-10 07:31:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-10 18:10:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18207,"2019-10-10 07:40:00",18-시공-06,b.시공,"거더제작관련 정착구 도면 검토 및 가로보위치이동 검토","2019-10-10 18:17:00",18-시공-06,b.시공,"거더제작관련 정착구 도면 검토 및 가로보위치이동 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-10-10 07:41:00",19-제조-03,a.품질검사,"히팅레일 시험, 북수원1교,동림교, 산외교
|
|
데크 및 켄틸레버 생산 및 품질관리","2019-10-10 20:39:00",19-제조-03,a.품질검사,"히팅레일 시험, 북수원1교,동림교, 산외교
|
|
데크 및 켄틸레버 생산 및 품질관리","2019-10-10 18:35:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
M02302,"2019-10-10 07:43:00",19-제조-02,a.생산관리,"Pre-Deck 표준도 작성 및 기획서 작성","2019-10-10 18:02:00",19-제조-02,a.생산관리,"Pre-Deck 표준도 작성 및 기획서 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>홍보 동영상 자료용 드론 촬영<|>02:00<|><br>19-제조-02<|>a.생산관리<|>공장내 시설물 점검 및 협의<|>01:00<|><br>19-제조-02<|>a.생산관리<|>반장 확대 회의<|>01:00<|><br>",,
|
|
J09102,"2019-10-10 07:45:00",19-계약-01,b.시공사,"학일3교 TOP거더 --> SPLICED거더 변경 검토, 중리교 신촌교 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","2019-10-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-10-10 07:55:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-10-10 18:12:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J08201,"2019-10-10 08:08:00",19-교영-15,c.설계사,"교량계획 ","2019-10-10 18:03:00",19-교영-15,c.설계사,"교량계획 ","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-10-10 08:13:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-10 18:12:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-10-10 08:19:00",19-설계-08,e.검토,"성과품 검토","2019-10-10 18:14:00",19-설계-08,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-10-10 08:23:00",18-관리-02,e.기타,"비서업무 외","2019-10-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-10-10 08:27:00",18-설계-15,e.검토,"5개 교량의 도면, 계산서 등 검토 및 수정","2019-10-10 21:34:00",18-설계-15,e.검토,"5개 교량의 도면, 계산서 등 검토 및 수정","2019-10-10 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J14308,"2019-10-10 12:59:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-10 21:01:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-10 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J15302,"2019-10-10 08:27:00",18-설계-15,e.검토,"체크리스트 검토","2019-10-10 20:34:00",18-설계-15,e.검토,"체크리스트 검토","2019-10-10 18:31:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"17-설계-02<|>e.검토<|>별첨자료 수정<|>06:00<|><br>",1,
|
|
J11202,"2019-10-10 08:29:00",19-시공-02,b.시공,공사관리,"2019-10-10 20:33:00",19-시공-02,b.시공,공사관리,"2019-10-10 18:30:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J13201,"2019-10-10 08:30:00",19-교영-06,c.설계사,"캔틸레버 Pre-Deck 검토","2019-10-10 20:46:00",17-설계-05,c.도면,"구안천교 좌표확인","2019-10-10 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J07210,"2019-10-10 08:32:00",14-설계-32,h.기타,"산외교 솟음","2019-10-10 20:49:00",14-설계-32,h.기타,"산외교 솟음","2019-10-10 18:31:00",172.16.9.162,172.16.9.155,172.16.9.162,008E1,,1,
|
|
J15201,"2019-10-10 08:37:00",18-교영-26,c.설계사,"과업진행현황 파악","2019-10-10 18:00:00",18-교영-26,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-10-10 08:37:00",18-교영-01,c.설계사,.,"2019-10-10 18:24:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-10-10 08:37:00",10-설계-29,e.검토,"받침 변위량 검토","2019-10-10 21:37:00",10-설계-29,e.검토,"받침 변위량 검토","2019-10-10 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J14306,"2019-10-10 08:38:00",19-관리-04,a.계약,"계약업무 외","2019-10-10 18:11:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J09101,"2019-10-10 08:39:00",19-교영-01,c.설계사,과업조사,"2019-10-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J16202,"2019-10-10 08:42:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-10 18:13:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10313,"2019-10-10 08:42:00",19-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","2019-10-10 18:00:00",19-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J10301,"2019-10-10 08:42:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-10 18:24:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J18205,"2019-10-10 08:44:00",17-설계-05,e.검토,"모델링 수정(BR3_상행)","2019-10-10 21:41:00",17-설계-05,e.검토,"모델링 수정(BR3_상행)","2019-10-10 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15301,"2019-10-10 08:48:00",16-시공-20,b.시공,"현장정산서 작성
|
|
노무비계산서 작성
|
|
외주시행정산 업데이트
|
|
신양교 특허등록원부 발송","2019-10-10 19:25:00",16-시공-20,b.시공,"현장정산서 작성
|
|
노무비계산서 작성
|
|
외주시행정산 업데이트
|
|
신양교 특허등록원부 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11203,"2019-10-10 08:32:00",18-시공-06,g.기타,"정착구 검토서, 가로보검토서 작성","2019-10-10 17:59:00",18-시공-06,g.기타,"정착구 검토서, 가로보검토서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
M05510,"2019-10-10 10:51:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.10.169,NULL,NULL,004C8,,,
|
|
J14101,"2019-10-10 08:50:00",16-시공-20,출장,한양,"2019-10-10 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-10-10 08:50:00",14-시공-18,출장,"[경기도 용인시 처인구 포공읍]동림교 1차인장 작업","2019-10-10 18:00:00",14-시공-18,출장,"[경기도 용인시 처인구 포공읍]동림교 1차인장 작업","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J10314,"2019-10-10 08:50:00",18-설계-19,출장,"[한국도로공사(김천)] 신기술(특허) 협약 추가자료제출","2019-10-10 18:00:00",18-설계-19,출장,"[한국도로공사(김천)] 신기술(특허) 협약 추가자료제출","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-10-10 08:50:00",17-시공-21,출장,"북수원 2교 현장","2019-10-10 18:00:00",17-시공-21,출장,"북수원 2교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M05510,"2019-10-11 06:35:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.10.150,NULL,NULL,004C8,,,
|
|
J07202,"2019-10-11 06:56:00",19-제조-04,b.기계,"석현천교와 용강IC교 거푸집(H2.0) 보수 및 조령천교 주두부 바닥판 홀 가공","2019-10-12 07:38:00",19-제조-04,b.기계,"석현천교와 용강IC교 거푸집(H2.0) 보수 및 조령천교 주두부 바닥판 홀 가공","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-10-11 07:05:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J14308,"2019-10-11 07:14:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-11 21:19:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-11 18:41:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-10-11 07:17:00",19-제조-03,a.품질검사,"히팅레일 시험, 북수원1교,동림교, 산외교
|
|
데크 및 켄틸레버 생산 및 품질관리","2019-10-11 23:17:00",19-제조-03,a.품질검사,"히팅레일 시험, 북수원1교,동림교, 산외교
|
|
데크 및 켄틸레버 생산 및 품질관리","2019-10-11 18:46:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
T04204,"2019-10-11 07:28:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-10-11 07:28:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-10-11 18:05:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
M02302,"2019-10-11 07:35:00",19-제조-02,a.생산관리,"홍보동영상 프로그램 콘티 작업","2019-10-11 18:09:00",19-제조-02,a.생산관리,"홍보동영상 프로그램 콘티 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>홍보 동영상용 드론 <|>02:00<|><br>19-제조-02<|>a.생산관리<|>Pre-Deck 프로그램 기획 관련 협의<|>01:30<|><br>",,
|
|
J09102,"2019-10-11 07:39:00",19-계약-01,b.시공사,"한백기술공사, 유성산업 방문 예정, 중리교 신촌교 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","2019-10-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18206,"2019-10-11 08:12:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-11 18:06:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-10-11 08:20:00",19-설계-08,e.검토,"성과품 검토","2019-10-11 18:07:00",19-설계-08,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10314,"2019-10-11 08:26:00",16-설계-08,h.기타,"교리교외 1개소(용상~교리1) 시행견적서, 우산1교외1개소(화순동면~송광봉산)설계견적서 및 내역서(초안), 아중교(용진~우아2)시행견적서","2019-10-11 18:10:00",16-설계-08,h.기타,"교리교외 1개소(용상~교리1) 시행견적서, 우산1교외1개소(화순동면~송광봉산)설계견적서 및 내역서(초안), 아중교(용진~우아2)시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-10-11 08:26:00",18-관리-02,e.기타,"비서업무 외","2019-10-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-10-11 08:28:00",18-설계-15,e.검토,"5개 교량의 도면, 계산서 등 검토 및 수정","2019-10-11 18:05:00",18-설계-15,e.검토,"5개 교량의 도면, 계산서 등 검토 및 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J13201,"2019-10-11 08:30:00",19-교영-06,c.설계사,"캔틸레버 Pre-Deck 검토","2019-10-11 18:04:00",17-설계-05,c.도면,"구안천교 좌표확인","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15302,"2019-10-11 08:31:00",17-설계-13,e.검토,"오류 수정","2019-10-11 18:03:00",17-설계-13,e.검토,"오류 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J18205,"2019-10-11 08:31:00",17-설계-05,e.검토,"모델링 수정(BR3_상행)","2019-10-11 21:58:00",17-설계-05,e.검토,"모델링 수정(BR3_상행)","2019-10-11 18:58:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15202,"2019-10-11 08:35:00",10-설계-29,e.검토,"받침 변위량 검토","2019-10-11 18:06:00",10-설계-29,e.검토,"받침 변위량 검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J07210,"2019-10-11 08:35:00",14-설계-32,h.기타,"산외교 솟음","2019-10-11 18:05:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11202,"2019-10-11 08:37:00",19-시공-02,b.시공,공사관리,"2019-10-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J15201,"2019-10-11 08:39:00",18-교영-26,c.설계사,"과업진행현황 파악","2019-10-11 18:04:00",18-교영-26,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-10-11 08:40:00",18-교영-01,c.설계사,.,"2019-10-11 18:03:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J14306,"2019-10-11 08:40:00",19-관리-04,a.계약,"계약업무 외","2019-10-11 18:09:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-10-11 08:41:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-11 18:09:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10313,"2019-10-11 08:43:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-11 18:00:00",19-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J10301,"2019-10-11 08:43:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-11 18:33:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15301,"2019-10-11 08:50:00",16-시공-20,b.시공,"현장정산서 작성
|
|
산외교 투입내역서 작성
|
|
신양교 공급원승인서 3부 발송 (일반)
|
|
도화육교 공급원승인서 3부 발송 (고강도)
|
|
옥산4교 투입내역서 작성
|
|
옥산교, 옥산4교 가설 장비서류 작성","2019-10-11 19:06:00",16-시공-20,b.시공,"현장정산서 작성
|
|
산외교 투입내역서 작성
|
|
신양교 공급원승인서 3부 발송 (일반)
|
|
도화육교 공급원승인서 3부 발송 (고강도)
|
|
옥산4교 투입내역서 작성
|
|
옥산교, 옥산4교 가설 장비서류 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-10-11 09:05:00",19-교영-01,c.설계사,과업조사,"2019-10-11 18:07:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J14101,"2019-10-11 08:50:00",16-시공-20,출장,한양,"2019-10-11 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18202,"2019-10-11 08:50:00",07-교영-01,출장,"[구미시 해평면]구미산업단지 조성공사 진입도로 상부공 (괴평교-FCM)","2019-10-11 18:00:00",07-교영-01,출장,"[구미시 해평면]구미산업단지 조성공사 진입도로 상부공 (괴평교-FCM)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11302,"2019-10-11 08:50:00",14-시공-18,출장,"[경기도 용인시 처인구 포공읍]동림교 1차인장 작업","2019-10-11 18:00:00",14-시공-18,출장,"[경기도 용인시 처인구 포공읍]동림교 1차인장 작업","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J10315,"2019-10-11 08:50:00",17-시공-21,출장,"북수원 2교 현장","2019-10-11 18:00:00",17-시공-21,출장,"북수원 2교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J08201,"2019-10-11 08:50:00",17-시공-10,출장,"성주대교 현장사무실","2019-10-11 18:00:00",17-시공-10,출장,"성주대교 현장사무실","0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J11203,"2019-10-11 08:50:00",16-설계-09,출장,"[광주완도 사업단(나주)]현장 업무협의(운곡교)","2019-10-11 18:00:00",16-설계-09,출장,"[광주완도 사업단(나주)]현장 업무협의(운곡교)","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
J18207,"2019-10-11 08:50:00",18-시공-06,출장,"[전남 나주시]운곡교 현장협의 (정착구 관련)","2019-10-11 18:00:00",18-시공-06,출장,"[전남 나주시]운곡교 현장협의 (정착구 관련)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J16203,"2019-10-12 07:00:00",19-제조-03,a.품질검사,"히팅레일 시험, 북수원1교,동림교, 산외교
|
|
데크 및 켄틸레버 생산 및 품질관리","2019-10-12 17:16:00",19-제조-03,a.품질검사,"히팅레일 시험, 북수원1교,동림교, 산외교
|
|
데크 및 켄틸레버 생산 및 품질관리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
J14308,"2019-10-12 07:28:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-12 16:31:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J07202,"2019-10-12 07:38:00",19-제조-04,b.기계,"석현천교와 용강IC교 거푸집(H2.0) 보수 및 조령천교 주두부 바닥판 홀 가공 출장","2019-10-12 15:51:00",19-제조-04,b.기계,"석현천교와 용강IC교 거푸집(H2.0) 보수 및 조령천교 주두부 바닥판 홀 가공 출장","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-10-12 07:43:00",19-제조-02,a.생산관리,"공장관리 및 업무 보고","2019-10-12 16:40:00",19-제조-02,a.생산관리,"홍보동영상 프로그램 콘티 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
M05510,"2019-10-13 09:59:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.11.217,NULL,NULL,004C8,,,
|
|
J11302,"2019-10-14 06:47:00",17-시공-07,g.기타,"가산2교 프리데크 시공계획서 작성
|
|
신리고가교 중량물취급계획서 작성","2019-10-14 18:09:00",17-시공-07,g.기타,"가산2교 프리데크 시공계획서 작성
|
|
신리고가교 중량물취급계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J12202,"2019-10-14 07:01:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-14 18:06:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J14308,"2019-10-14 07:24:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-14 22:31:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-14 18:46:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-10-14 07:26:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-14 21:07:00",19-제조-02,a.생산관리,"경안천교(주두부,측중앙경간),용강IC교, 셕현천교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-10-14 07:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-14 21:56:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-14 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18202,"2019-10-14 07:37:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-14 18:07:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J07202,"2019-10-14 07:40:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공과 석현천교와 용강IC교 거푸집(H2.0) 보수 ","2019-10-15 06:54:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공과 석현천교와 용강IC교 거푸집(H2.0) 보수 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-10-14 07:41:00",19-계약-01,b.시공사,"서울~광명 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","2019-10-14 18:10:00",19-계약-01,b.시공사,"포스코 방문 예정, 서울~광명 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
J16203,"2019-10-14 07:43:00",19-제조-03,a.품질검사,"수리티교, 성주대교,동림교, 산외교
|
|
데크 및가로보 생산 및 품질관리","2019-10-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18207,"2019-10-14 07:46:00",17-시공-09,b.시공,"가설공정검토 및 안전행사 협의체회의예정","2019-10-14 15:03:00",17-시공-09,b.시공,"가설공정검토 및 안전행사 협의체회의예정","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
M02302,"2019-10-14 07:49:00",19-제조-02,a.생산관리,"관리자 업무 분장 및 협의","2019-10-14 18:03:00",19-제조-02,a.생산관리,"홍보동영상 프로그램 콘티 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>Pre-Deck 프로그램 제작 업무 협의 <|>02:00<|><br>19-제조-02<|>a.생산관리<|>Gantry Crane 구매검토 및 협의<|>02:00<|><br>19-제조-02<|>a.생산관리<|>관리자 업무 분장 및 협의<|>01:30<|><br>",,
|
|
J13308,"2019-10-14 07:51:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","2019-10-14 18:07:00",19-시공-20,b.시공,"1. 안동JCT 하자보수 투입준비
|
|
2. 경안천교 균열 A/S 투입준비
|
|
3. 작업일보 작성
|
|
4. 9월 기성내역서 작성 외","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
M05510,"2019-10-14 08:07:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.11.183,NULL,NULL,004C8,,,
|
|
J10314,"2019-10-14 08:10:00",15-설계-26,h.기타,"아중교(용진~우아2)시행견적서, 우산1교외1개소(화순동면~송광봉산)설계견적서 및 내역서","2019-10-14 18:10:00",15-설계-26,h.기타,"우산1교외1개소(화순동면~송광봉산)설계견적서 및 내역서, 아중교(용진~우아2)시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-10-14 08:10:00",19-설계-08,"a.계획 및 협의","업무 조정 및 교량계획","2019-10-14 18:07:00",19-설계-08,"a.계획 및 협의","업무 조정 및 교량계획","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-10-14 08:22:00",18-관리-02,e.기타,"비서업무 외","2019-10-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-10-14 08:24:00",19-교영-01,d.기타,사업관리,"2019-10-14 18:15:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18205,"2019-10-14 08:29:00",17-설계-05,e.검토,"모델링 수정(BR3_하행)","2019-10-14 21:31:00",17-설계-05,e.검토,"모델링 수정(BR3_하행)","2019-10-14 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-10-14 08:29:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","2019-10-14 20:45:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","2019-10-14 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J15307,"2019-10-14 08:31:00",19-설계-10,c.도면,"입암교 빔배치","2019-10-14 21:31:00",19-설계-10,c.도면,"입암교 빔배치","2019-10-14 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J15201,"2019-10-14 08:33:00",18-교영-26,c.설계사,"과업진행현황 파악","2019-10-14 18:04:00",18-교영-26,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-10-14 08:33:00",18-교영-01,c.설계사,.,"2019-10-14 18:11:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-10-14 08:33:00",14-설계-32,h.기타,"산외교 솟음","2019-10-14 18:02:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J11202,"2019-10-14 08:33:00",19-시공-02,b.시공,공사관리,"2019-10-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J11305,"2019-10-14 08:34:00",19-설계-08,e.검토,"성과품 검토","2019-10-14 18:04:00",19-설계-08,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15302,"2019-10-14 08:35:00",17-설계-13,e.검토,"오류 수정","2019-10-14 20:34:00",17-설계-13,e.검토,"오류 수정","2019-10-14 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J15202,"2019-10-14 08:35:00",10-설계-29,e.검토,"받침 변위량 검토","2019-10-14 20:49:00",10-설계-29,e.검토,"받침 변위량 검토","2019-10-14 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J16202,"2019-10-14 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-14 18:18:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14306,"2019-10-14 08:37:00",19-관리-04,a.계약,"계약업무 외","2019-10-14 18:09:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10313,"2019-10-14 08:40:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-14 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J10301,"2019-10-14 08:44:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-14 18:00:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15301,"2019-10-14 08:51:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
신양교 공급원승인서 3부 발송 (일반)
|
|
도화육교 공급원승인서 3부 발송 (고강도)
|
|
옥산4교 투입내역서 작성
|
|
수리티교 인장 자재 발주","2019-10-14 18:02:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
신양교 공급원승인서 3부 발송 (일반)
|
|
도화육교 공급원승인서 3부 발송 (고강도)
|
|
옥산4교 투입내역서 작성
|
|
수리티교 인장 자재 발주","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-10-14 08:51:00",19-교영-01,c.설계사,과업조사,"2019-10-14 18:05:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J18206,"2019-10-14 08:30:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-14 18:17:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11203,"2019-10-14 08:38:00",18-시공-06,g.기타,"[광주완도 사업단(나주)]현장 업무협의(운곡교)","2019-10-14 18:18:18",NULL,NULL,"[광주완도 사업단(나주)]현장 업무협의(운곡교)","0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J14101,"2019-10-14 08:50:00",16-시공-20,출장,한양,"2019-10-14 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-10-14 08:50:00",17-시공-24,출장,"옥산교,옥산4교 거더가설","2019-10-14 18:00:00",17-시공-24,출장,"옥산교,옥산4교 거더가설","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-10-15 06:41:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-15 18:03:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-10-15 06:54:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공과 석현천교와 용강IC교 거푸집(H2.0) 보수 ","2019-10-16 07:01:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공과 석현천교와 용강IC교 거푸집(H2.0) 보수 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-10-15 07:21:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-15 20:36:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-15 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-10-15 07:30:00",19-제조-02,a.생산관리,"홍보동영상 프로그램 콘티 작업","2019-10-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-10-15 07:30:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-15 20:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-15 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-10-15 07:32:00",19-제조-02,a.생산관리,"용강IC교, 셕현천교,경안천교(중앙부),주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-10-15 07:38:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-15 18:04:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-10-15 07:45:00",19-계약-01,b.시공사,"계룡건설, 고려개발 방문예정, 서울~광명 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","2019-10-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J11302,"2019-10-15 07:49:00",17-시공-07,g.기타,"가산2교 프리데크 시공계획서 작성
|
|
가산2교 중량물취급계획서 작성
|
|
수리티교 가설계획서 수정 및 용접이음가로보 수량 산출
|
|
동림교 가설계획서 수정","2019-10-15 18:04:00",17-시공-07,g.기타,"가산2교 프리데크 시공계획서 작성
|
|
가산2교 중량물취급계획서 작성
|
|
수리티교 가설계획서 수정 및 용접이음가로보 수량 산출
|
|
동림교 가설계획서 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18206,"2019-10-15 08:04:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-15 18:07:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-10-15 08:13:00",18-관리-02,e.기타,"비서업무 외","2019-10-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-10-15 08:17:00",19-설계-08,"a.계획 및 협의","업무 조정 및 교량계획","2019-10-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J10314,"2019-10-15 08:18:00",19-설계-08,h.기타,"우산1교외1개소(화순동면~송광봉산)설계견적서 및 내역서, 송령교 개략공사비","2019-10-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J18205,"2019-10-15 08:20:00",17-설계-05,e.검토,"모델링 수정(BR3_하행)","2019-10-15 18:01:00",17-설계-05,e.검토,"모델링 수정(BR3_하행)","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J14306,"2019-10-15 08:27:00",19-관리-04,a.계약,"계약업무 외","2019-10-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J15302,"2019-10-15 08:29:00",17-설계-13,e.검토,"오류 수정","2019-10-15 18:01:00",17-설계-13,e.검토,"오류 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J13201,"2019-10-15 08:30:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","2019-10-15 18:01:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J07103,"2019-10-15 08:31:00",19-교영-01,d.기타,사업관리,"2019-10-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
J15307,"2019-10-15 08:31:00",19-설계-10,c.도면,"입암교 바닥판 계산 및 도면 작성","2019-10-15 18:01:00",19-설계-10,c.도면,"입암교 바닥판 계산 및 도면 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J10301,"2019-10-15 08:32:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-15 18:05:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-10-15 08:35:00",19-시공-02,b.시공,공사관리,"2019-10-15 18:06:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J11203,"2019-10-15 08:35:00",19-설계-10,b.구조계산,"입암교 모델링","2019-10-15 18:00:00",19-설계-10,b.구조계산,"입암교 모델링","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.160,008E1,,,
|
|
J15201,"2019-10-15 08:36:00",18-교영-26,c.설계사,"과업진행현황 파악","2019-10-15 18:01:00",18-교영-26,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J09101,"2019-10-15 08:38:00",19-교영-01,c.설계사,과업조사,"2019-10-15 18:01:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J11305,"2019-10-15 08:39:00",19-설계-08,e.검토,"성과품 검토","2019-10-15 18:09:00",19-설계-08,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10313,"2019-10-15 08:40:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J07210,"2019-10-15 08:43:00",14-설계-32,h.기타,"산외교 솟음","2019-10-15 18:02:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J17205,"2019-10-15 08:43:00",18-교영-01,c.설계사,.,"2019-10-15 18:26:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15202,"2019-10-15 08:50:00",19-설계-10,"a.계획 및 협의","입암교 업무협의","2019-10-15 18:01:00",19-설계-10,"a.계획 및 협의","입암교 업무협의","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J15301,"2019-10-15 08:51:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
신양교 공급원승인서 3부 발송 (일반)
|
|
도화육교 공급원승인서 3부 발송 (고강도)
|
|
부가세 신고 관련 세금계산서 복사
|
|
경안천교 SP거더 자재발주 (정착구, 쉬스관, 쏠플레이트)","2019-10-15 18:05:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
신양교 공급원승인서 3부 발송 (일반)
|
|
도화육교 공급원승인서 3부 발송 (고강도)
|
|
부가세 신고 관련 세금계산서 복사
|
|
경안천교 SP거더 자재발주 (정착구, 쉬스관, 쏠플레이트)","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J18207,"2019-10-15 08:50:00",17-시공-09,출장,"[울산시 울주군 대림산업현장]삼남1교현장 안전의날행사및 협의체회의참석","2019-10-15 18:05:00",17-시공-09,b.시공,"가설공정검토 및 안전행사 협의체회의예정","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J16203,"2019-10-15 07:00:00",19-제조-03,a.품질검사,"북수원, 산외, 동림 ,성주 데크(가로보)제작 및 품질관리","2019-10-15 20:36:00",19-제조-03,a.품질검사,"수리티교, 성주대교,동림교, 산외교
|
|
데크 및가로보 생산 및 품질관리","2019-10-15 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14101,"2019-10-15 08:50:00",16-시공-20,출장,한양,"2019-10-15 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-10-15 08:50:00",17-시공-23,출장,"신리고가교 가설","2019-10-15 18:00:00",17-시공-23,출장,"신리고가교 가설","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-10-16 06:54:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-16 18:05:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-10-16 07:02:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공과 석현천교와 용강IC교 거푸집(H2.0) 보수와 주천 2교 거푸집(H2.6) 상차","2019-10-17 07:07:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공과 석현천교와 용강IC교 거푸집(H2.0) 보수와 주천 2교 거푸집(H2.6) 상차","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-10-16 07:23:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-16 22:15:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-16 18:35:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-10-16 07:23:00",19-제조-02,a.생산관리,"공장 홍보동영상 자료 수집 및 검토","2019-10-16 18:05:00",19-제조-02,a.생산관리,"공장 홍보동영상 자료 수집 및 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>피난경로 작성 및 동영상 구현 협의<|>03:00<|><br>19-제조-02<|>a.생산관리<|>동양대학교 방문 일정 협의 및 답례품 협의<|>01:00<|><br>",,
|
|
T04204,"2019-10-16 07:30:00",19-제조-02,a.생산관리,"주천2교,용강IC교, 석현천교,경안천교(중앙부),주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-16 19:22:00",19-제조-02,a.생산관리,"주천2교,용강IC교, 석현천교,경안천교(중앙부),주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-10-16 07:31:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
J14308,"2019-10-16 07:34:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-16 18:11:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-10-16 07:34:00",19-제조-03,a.품질검사,"성신기술연구소, 수리티교, 성주대교,동림교, 산외교
|
|
데크 및가로보 생산관리","2019-10-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J11302,"2019-10-16 07:39:00",17-시공-07,g.기타,"왕림교 가로보,프리데크 시공계획서 작성
|
|
가산2교 중량물취급계획서 작성
|
|
신리고가교 중량물취급계획서 수정","2019-10-16 18:12:00",17-시공-07,g.기타,"왕림교 가로보,프리데크 시공계획서 작성
|
|
가산2교 중량물취급계획서 작성
|
|
신리고가교 중량물취급계획서 수정","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J16202,"2019-10-16 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-16 18:34:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J18207,"2019-10-16 07:41:00",17-시공-08,b.시공,"거더가설방법 구조안정성검토서 보안검토","2019-10-16 18:23:00",17-시공-08,b.시공,"거더가설방법 구조안정성검토서 보안검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J11305,"2019-10-16 08:06:00",19-설계-08,e.검토,"성과품 검토","2019-10-16 18:07:00",19-설계-08,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J11203,"2019-10-16 08:09:00",17-시공-08,g.기타,"감리요구사항 반영후 검토서 발송","2019-10-16 18:45:00",19-설계-10,b.구조계산,"입암교 모델링","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J08201,"2019-10-16 08:11:00",19-설계-08,"a.계획 및 협의","업무 조정 및 교량계획","2019-10-16 18:11:00",19-설계-08,"a.계획 및 협의","업무 조정 및 교량계획","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-10-16 08:12:00",18-관리-02,e.기타,"비서업무 외","2019-10-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-10-16 08:23:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-16 18:17:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J07103,"2019-10-16 08:24:00",19-교영-01,d.기타,사업관리,"2019-10-16 18:21:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15202,"2019-10-16 08:26:00",19-설계-10,b.구조계산,"입암교 모델링","2019-10-16 21:32:00",19-설계-10,b.구조계산,"입암교 모델링","2019-10-16 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J15302,"2019-10-16 08:30:00",17-설계-13,e.검토,"DR구간 오류수정","2019-10-16 20:32:00",17-설계-13,e.검토,"DR구간 오류수정","2019-10-16 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J13201,"2019-10-16 08:33:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","2019-10-16 18:01:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J14306,"2019-10-16 08:35:00",19-관리-04,a.계약,"계약업무 외","2019-10-16 18:13:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J18205,"2019-10-16 08:35:00",17-설계-05,e.검토,"모델링 수정(BR3_하행)","2019-10-16 18:16:00",17-설계-05,e.검토,"모델링 수정(BR3_하행)","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J15201,"2019-10-16 08:37:00",19-교영-18,c.설계사,"과업진행현황 파악","2019-10-16 18:01:00",19-교영-18,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-10-16 08:37:00",18-교영-01,c.설계사,.,"2019-10-16 18:05:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15307,"2019-10-16 08:38:00",19-설계-10,c.도면,"입암교 바닥판 계산 및 도면 작성","2019-10-16 21:33:00",19-설계-10,c.도면,"입암교 바닥판 계산 및 도면 작성","2019-10-16 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10301,"2019-10-16 08:38:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-16 18:38:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-10-16 08:38:00",14-설계-32,h.기타,"산외교 솟음","2019-10-16 20:32:00",14-설계-32,h.기타,"산외교 솟음","2019-10-16 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J11202,"2019-10-16 08:38:00",19-시공-02,b.시공,공사관리,"2019-10-16 18:21:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10313,"2019-10-16 08:41:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-16 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15301,"2019-10-16 08:47:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
신양교 공급원승인서 3부 발송 (일반)
|
|
도화육교 공급원승인서 3부 발송 (고강도)
|
|
부가세 신고 관련 세금계산서 복사
|
|
경안천교 SP거더 자재발주 (정착구, 쉬스관, 쏠플레이트)","2019-10-16 18:57:00",16-시공-20,b.시공,"안종기팀 정산서 작성
|
|
신양교 공급원승인서 3부 발송 (일반)
|
|
도화육교 공급원승인서 3부 발송 (고강도)
|
|
부가세 신고 관련 세금계산서 복사
|
|
경안천교 SP거더 자재발주 (정착구, 쉬스관, 쏠플레이트)","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-10-16 08:55:00",19-교영-01,c.설계사,과업조사,"2019-10-16 18:04:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J10314,"2019-10-16 08:50:00",19-교휴-06,경유,"경유(포스코건설(광명~서울) 현장사무실, 시행가협의)","2019-10-16 18:22:00",18-교영-26,d.기타,"Pre-Deck(봉정~방문) 설계견적서, 송령교 DR거더 개략공사비","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14101,"2019-10-16 08:50:00",16-시공-20,출장,한양,"2019-10-16 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J09102,"2019-10-16 08:50:00",19-계약-01,출장,포스코건설(서울-광명),"2019-10-16 18:00:00",19-계약-01,출장,포스코건설(서울-광명),"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10315,"2019-10-16 08:50:00",17-시공-07,출장,"[창원시 의창구 대산면]가산2교 가설협의 및 가설","2019-10-16 18:00:00",17-시공-07,출장,"[창원시 의창구 대산면]가산2교 가설협의 및 가설","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-10-17 07:06:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-17 18:05:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-10-17 07:07:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공과 석현천교와 용강IC교 거푸집(H2.0) 보수와 주천 2교 거푸집(H2.6) 상차","2019-10-18 06:51:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공과 석현천교와 용강IC교 거푸집(H2.0) 보수와 주천 2교 거푸집(H2.6) 상차","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-10-17 07:12:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-17 21:10:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-17 19:05:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-10-17 07:25:00",19-제조-02,a.생산관리,"주천2교,용강IC교, 석현천교,경안천교(중앙부),주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-17 21:12:00",19-제조-02,a.생산관리,"주천2교,용강IC교, 석현천교,경안천교(중앙부),주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-10-17 07:26:00",19-제조-03,a.품질검사,"북수원2교, 1교, 성주대교,동림교, 산외교
|
|
데크 및가로보 생산관리","2019-10-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18208,"2019-10-17 07:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-17 18:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18202,"2019-10-17 07:31:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-17 18:17:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-10-17 07:33:00",19-제조-02,a.생산관리,"피난대피 관련 동영상 자료 수집 및 검토","2019-10-17 18:10:00",19-제조-02,a.생산관리,"공장 홍보동영상 자료 수집 및 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공장견학 동선 안내 동영상 작업 및 자료 수집<|>03:00<|><br>19-제조-02<|>a.생산관리<|>강교 Pre-Deck 적용성 검토<|>02:00<|><br>19-제조-02<|>a.생산관리<|>RCP 프로그램 검토 및 협의<|>03:00<|><br>",,
|
|
M05510,"2019-10-17 07:36:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.11.226,NULL,NULL,004C8,,,
|
|
J09102,"2019-10-17 07:39:00",19-계약-01,b.시공사,"두산건설 방문 예정, 광명~서울 1공구 4개교 예성 시행가 등 : 교리교 외 4개교 계약 추진 중","2019-10-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J08201,"2019-10-17 08:08:00",19-설계-08,"a.계획 및 협의","업무 조정 및 교량계획","2019-10-17 18:36:00",19-설계-08,"a.계획 및 협의","업무 조정 및 교량계획","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-10-17 08:13:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-17 18:10:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-10-17 08:14:00",18-교영-26,d.기타,"Pre-Deck(봉정~방문) 설계견적서(특공), Dr.Wide Flange Girder(월곶-판교1공구) 설계 및 시행견적서","2019-10-17 19:06:00",18-교영-26,d.기타,"Pre-Deck(봉정~방문) 설계견적서(특공), Dr.Wide Flange Girder(월곶-판교1공구) 설계 및 시행견적서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11305,"2019-10-17 08:27:00",19-설계-08,e.검토,"성과품 검토","2019-10-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J13201,"2019-10-17 08:27:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","2019-10-17 20:57:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","2019-10-17 18:32:00",172.16.9.165,172.16.9.173,172.16.9.165,008E2,,1,
|
|
J11202,"2019-10-17 08:27:00",19-시공-02,b.시공,공사관리,"2019-10-17 18:43:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07103,"2019-10-17 08:28:00",19-교영-01,d.기타,사업관리,"2019-10-17 18:15:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18205,"2019-10-17 08:28:00",17-설계-05,e.검토,"구조계산서 작성(BR3_상행)","2019-10-17 21:32:00",17-설계-05,e.검토,"구조계산서 작성(BR3_상행)","2019-10-17 18:38:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15302,"2019-10-17 08:30:00",17-설계-13,e.검토,"DR구간 오류수정","2019-10-17 20:33:00",17-설계-13,e.검토,"DR구간 오류수정","2019-10-17 18:31:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J14306,"2019-10-17 08:30:00",19-관리-04,a.계약,"계약업무 외","2019-10-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J15202,"2019-10-17 08:32:00",19-설계-10,b.구조계산,"입암교 모델링","2019-10-17 21:31:00",19-설계-10,b.구조계산,"입암교 모델링","2019-10-17 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10301,"2019-10-17 08:33:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-17 18:10:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11203,"2019-10-17 08:36:00",18-시공-06,g.기타,"교량받침관련 검토서 작성","2019-10-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J15307,"2019-10-17 08:38:00",19-설계-10,c.도면,"입장교 슬래브 배근도 작성","2019-10-17 21:00:00",19-설계-10,c.도면,"입장교 슬래브 배근도 작성","2019-10-17 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J17205,"2019-10-17 08:38:00",18-교영-01,c.설계사,.,"2019-10-17 18:10:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-10-17 08:38:00",19-교영-18,c.설계사,"과업진행현황 파악","2019-10-17 18:04:00",19-교영-18,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-10-17 08:39:00",14-설계-32,h.기타,"산외교 솟음","2019-10-17 18:04:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-10-17 08:39:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-17 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16202,"2019-10-17 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-17 18:07:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J09101,"2019-10-17 08:45:00",19-교영-01,c.설계사,과업조사,"2019-10-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15301,"2019-10-17 08:47:00",16-시공-20,b.시공,"당진화력, 군도4호선 변경계약서 송부
|
|
석현천교, 용강IC교 공급원승인서 발송 (가로보, 프리덱)
|
|
조령천교, 경안천교 출하요청서 작성
|
|
삼남1교 건설기계임대차계약서 보증서 발행","2019-10-17 18:08:00",16-시공-20,b.시공,"당진화력, 군도4호선 변경계약서 송부
|
|
석현천교, 용강IC교 공급원승인서 발송 (가로보, 프리덱)
|
|
조령천교, 경안천교 출하요청서 작성
|
|
삼남1교 건설기계임대차계약서 보증서 발행","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14101,"2019-10-17 08:50:00",16-시공-20,출장,한양,"2019-10-17 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-10-17 08:50:00",17-시공-07,출장,"[창원시 의창구 대산면]가산2교 가설협의 및 가설","2019-10-17 18:00:00",17-시공-07,출장,"[창원시 의창구 대산면]가산2교 가설협의 및 가설","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11302,"2019-10-17 08:50:00",19-시공-15,출장,"[충북 보은군 수한면 후평리]수리티교 가설시공 설명","2019-10-17 18:00:00",19-시공-15,출장,"[충북 보은군 수한면 후평리]수리티교 가설시공 설명","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J18207,"2019-10-17 08:50:00",18-시공-06,출장,"[ 전남나주(포스코) 대구달성군(대우)]운곡교현장 세천2교현장 시공사 발주처협의","2019-10-17 18:00:00",18-시공-06,출장,"[ 전남나주(포스코) 대구달성군(대우)]운곡교현장 세천2교현장 시공사 발주처협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-10-18 06:52:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공과 경안천교 측경간과 중앙경간 거푸집(H2.5) 보수","2019-10-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-10-18 07:24:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-18 18:02:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18208,"2019-10-18 07:24:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-18 19:16:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-10-18 07:24:00",19-제조-03,a.품질검사,"북수원2교, 1교, 성주대교,동림교, 산외교
|
|
데크 및가로보 생산관리","2019-10-18 22:22:00",19-제조-03,a.품질검사,"북수원2교, 1교, 성주대교,동림교, 산외교
|
|
데크 및가로보 생산관리","2019-10-18 19:05:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14308,"2019-10-18 07:25:00",19-제조-02,a.생산관리," - SHOP Drawing - SHOP 프로그램 변수 작업- 생산본부 홍보 동영상 제작","2019-10-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
T04204,"2019-10-18 07:27:00",19-제조-02,a.생산관리,"주천2교,용강IC교, 석현천교,경안천교(중앙부),주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-18 19:29:00",19-제조-02,a.생산관리,"주천2교,용강IC교, 석현천교,경안천교(중앙부),주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-10-18 07:31:00",19-계약-01,b.시공사,"코오롱 글로벌, 포스코건설 방문, 광명~서울 1공구 4개교 예성 시행가 등 : 교리교 외 4개교 계약 추진 중","2019-10-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M02302,"2019-10-18 07:34:00",19-제조-02,a.생산관리,"공장 견학 안내 동영상 콘티 작업","2019-10-18 18:02:00",19-제조-02,a.생산관리,"공장 견학 안내 동영상 콘티 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>사내 기준 검토 및 공고 준비(일용직 신청)<|>04:00<|><br>19-제조-02<|>a.생산관리<|>노듈러 거더 제작도(J-web) 검토<|>02:00<|><br>",,
|
|
J10315,"2019-10-18 08:00:00",17-시공-07,b.시공,"받침변위 적정성 검토","2019-10-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J15302,"2019-10-18 08:09:00",17-설계-13,e.검토,"DR구간 오류수정","2019-10-18 18:01:00",17-설계-13,e.검토,"DR구간 오류수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J18206,"2019-10-18 08:12:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-18 12:46:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-10-18 08:16:00",19-설계-10,c.도면,"입장교 슬래브 배근도 작성","2019-10-18 14:41:00",19-설계-10,c.도면,"입장교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J15202,"2019-10-18 08:32:00",19-설계-10,b.구조계산,"입암교 모델링","2019-10-18 18:00:00",19-설계-10,b.구조계산,"입암교 모델링","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J10313,"2019-10-18 08:32:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-18 18:29:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11202,"2019-10-18 08:33:00",19-시공-02,b.시공,공사관리,"2019-10-18 18:08:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J09101,"2019-10-18 08:33:00",19-교영-01,c.설계사,과업조사,"2019-10-18 18:03:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J18205,"2019-10-18 08:34:00",17-설계-05,e.검토,"구조계산서 작성(BR3_상행)","2019-10-18 18:05:00",17-설계-05,e.검토,"구조계산서 작성(BR3_상행)","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J13201,"2019-10-18 08:34:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","2019-10-18 18:02:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J14306,"2019-10-18 08:35:00",19-관리-04,a.계약,"계약업무 외","2019-10-18 18:00:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-10-18 08:36:00",19-교영-01,d.기타,사업관리,"2019-10-18 18:09:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15201,"2019-10-18 08:37:00",19-교영-18,c.설계사,"과업진행현황 파악","2019-10-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J17205,"2019-10-18 08:38:00",18-교영-01,c.설계사,.,"2019-10-18 18:10:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10301,"2019-10-18 08:38:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J07210,"2019-10-18 08:40:00",14-설계-32,h.기타,"산외교 솟음","2019-10-18 19:00:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J16202,"2019-10-18 08:41:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-18 18:15:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J14101,"2019-10-18 08:50:00",16-시공-20,출장,한양,"2019-10-18 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18207,"2019-10-18 08:50:00",18-시공-06,출장,"[ 전남나주(포스코) 대구달성군(대우)]운곡교현장 세천2교현장 시공사 발주처협의","2019-10-18 18:00:00",18-시공-06,출장,"[ 전남나주(포스코) 대구달성군(대우)]운곡교현장 세천2교현장 시공사 발주처협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-10-18 08:50:00",17-시공-08,출장,"[충남 서산시 (선진정공)]런처, 트롤리 제작공정 및 전기작업 확인 ","2019-10-18 18:00:00",17-시공-08,출장,"[충남 서산시 (선진정공)]런처, 트롤리 제작공정 및 전기작업 확인 ","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M05510,"2019-10-19 10:08:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.10.138,NULL,NULL,004C8,,,
|
|
M05510,"2019-10-20 14:11:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.10.83,NULL,NULL,004C8,,,
|
|
J11302,"2019-10-21 07:10:00",14-시공-18,g.기타,"동림교 장비작업계획서 작성 및 수리티교 인장준비","2019-10-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E2,,,
|
|
J12202,"2019-10-21 07:15:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-21 18:03:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J14308,"2019-10-21 07:20:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-21 18:02:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-10-21 07:26:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-21 23:46:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-21 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-10-21 07:26:00",19-제조-02,a.생산관리,"주천2교,용강IC교, 석현천교,경안천교(중앙부),주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-21 21:36:00",19-제조-02,a.생산관리,"주천2교,용강IC교, 석현천교,경안천교(중앙부),주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-10-21 07:26:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-21 18:05:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J18207,"2019-10-21 07:36:00",18-시공-06,b.시공,"[ 전남나주(포스코) 대구달성군(대우)]운곡교현장 세천2교현장 시공사 발주처협의","2019-10-21 18:12:00",18-시공-06,b.시공,"[ 전남나주(포스코) 대구달성군(대우)]운곡교현장 세천2교현장 시공사 발주처협의","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J07202,"2019-10-21 07:36:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공 출장과 경안천교 측경간과 중앙경간 거푸집(H2.5) 보수","2019-10-22 06:51:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공 출장과 경안천교 측경간과 중앙경간 거푸집(H2.5) 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-10-21 07:40:00",19-계약-01,b.시공사,"시화분기점 계룡건설 방문, 화도~포천 예상 시행가 등 : 교리교 외 4개교 계약 추진 중","2019-10-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
M02302,"2019-10-21 07:44:00",19-제조-02,a.생산관리,"공장 견학 안내 동영상 콘티 작업","2019-10-21 18:01:00",19-제조-02,a.생산관리,"공장 견학 안내 동영상 콘티 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>굴삭기 매물 검토 및 협의<|>01:00<|><br>19-제조-02<|>a.생산관리<|>안내동영상 취합 및 수정<|>03:30<|><br>19-제조-02<|>a.생산관리<|>홍보동영상 취합 및 수정<|>01:30<|><br>",,
|
|
J16203,"2019-10-21 07:45:00",19-제조-03,a.품질검사,"북수원2교, 1교, 성주대교,동림교, 산외교
|
|
데크 및가로보 생산관리","2019-10-21 23:42:00",19-제조-03,a.품질검사,"북수원2교, 1교, 성주대교,동림교, 산외교
|
|
데크 및가로보 생산관리","2019-10-21 18:47:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J10314,"2019-10-21 08:11:00",19-교영-18,d.기타,"Dr.Wide Flange Girder(월곶-판교1공구) 설계 및 시행견적서, 세방교(상리동~새방골간) 신기술(특허)협약관련자료","2019-10-21 19:17:00",19-교영-18,d.기타,"Dr.Wide Flange Girder(월곶-판교1공구) 설계 및 시행견적서, 세방교(상리동~새방골간) 신기술(특허)협약관련자료, 세종~포천(세종~안성) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J10315,"2019-10-21 08:13:00",17-시공-07,b.시공,"받침변위 적정성 검토","2019-10-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J08201,"2019-10-21 08:18:00",19-설계-08,"a.계획 및 협의","업무 조정 및 교량계획","2019-10-21 19:48:00",19-설계-08,"a.계획 및 협의","업무 조정 및 교량계획","0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-10-21 08:19:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-21 18:29:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J07103,"2019-10-21 08:25:00",19-교영-01,d.기타,사업관리,"2019-10-21 18:08:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15302,"2019-10-21 08:27:00",17-설계-13,e.검토,"DR구간 오류수정","2019-10-21 20:35:00",17-설계-13,e.검토,"DR구간 오류수정","2019-10-21 18:33:00",172.16.9.173,172.16.9.171,172.16.9.173,008E4,19-교영-18<|>d.기타<|>빔배치<|>06:00<|><br>,1,
|
|
J11202,"2019-10-21 08:30:00",19-시공-02,b.시공,공사관리,"2019-10-21 20:37:00",19-시공-02,b.시공,공사관리,"2019-10-21 18:30:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J18205,"2019-10-21 08:31:00",17-설계-05,e.검토,"구조계산서 작성(BR3_상행)","2019-10-21 22:00:00",17-설계-05,e.검토,"구조계산서 작성(BR3_상행)","2019-10-21 18:49:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J14306,"2019-10-21 08:32:00",19-관리-04,a.계약,"계약업무 외","2019-10-21 18:08:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15307,"2019-10-21 08:32:00",19-설계-10,c.도면,"입장교 슬래브 배근도 작성","2019-10-21 21:33:00",19-설계-10,c.도면,"입장교 슬래브 배근도 작성","2019-10-21 18:32:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10301,"2019-10-21 08:34:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-21 18:09:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-10-21 08:37:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","2019-10-21 18:04:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J07210,"2019-10-21 08:38:00",14-설계-32,h.기타,"산외교 솟음","2019-10-21 20:51:00",14-설계-32,h.기타,"산외교 솟음","2019-10-21 18:39:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15202,"2019-10-21 08:38:00",19-설계-10,b.구조계산,"입암교 모델링","2019-10-21 21:07:00",19-설계-10,b.구조계산,"입암교 모델링","2019-10-21 18:32:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J15201,"2019-10-21 08:38:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-10-21 18:01:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-10-21 08:39:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-21 19:11:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-10-21 08:40:00",19-교영-01,c.설계사,과업조사,"2019-10-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J16202,"2019-10-21 08:41:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-21 18:30:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15301,"2019-10-21 08:50:00",16-시공-20,b.시공,"도화육교 쏠플레이트 검토
|
|
부가세 신고 누락계산서 확인
|
|
북수원1교 프리덱, 북수원2교, 자안2교 가로보 출하요청서 작성","2019-10-21 18:11:00",16-시공-20,b.시공,"도화육교 쏠플레이트 검토
|
|
부가세 신고 누락계산서 확인
|
|
북수원1교 프리덱, 북수원2교, 자안2교 가로보 출하요청서 작성","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J17205,"2019-10-21 08:30:00",18-교영-01,c.설계사,.,"2019-10-21 18:14:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
M05510,"2019-10-21 09:26:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.11.86,NULL,NULL,004C8,,,
|
|
J14101,"2019-10-21 08:50:00",16-시공-20,출장,한양,"2019-10-21 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J16203,"2019-10-22 07:49:00",19-제조-03,a.품질검사,"북수원2교, 1교, 성주대교,동림교, 산외교
|
|
데크 및가로보 생산관리","2019-10-22 23:15:00",19-제조-03,a.품질검사,"북수원2교, 1교, 성주대교,동림교, 산외교
|
|
데크 및가로보 생산관리","2019-10-22 18:57:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J12202,"2019-10-22 06:29:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-22 18:00:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-10-22 06:52:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공 출장과 경안천교 측경간과 중앙경간 거푸집(H2.5) 보수","2019-10-23 07:05:00",19-제조-04,b.기계,"조령천교 주두부 바닥판 홀 가공 출장과 경안천교 측경간과 중앙경간 거푸집(H2.5) 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-10-22 07:13:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-22 21:13:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-22 18:56:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-10-22 07:27:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-22 22:00:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-22 18:56:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,,,
|
|
J18208,"2019-10-22 07:27:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-22 23:07:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-22 19:10:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-10-22 07:30:00",19-제조-02,a.생산관리,"산외교 데크Shop 지원","2019-10-22 18:05:00",19-제조-02,a.생산관리,"공장 견학 안내 동영상 콘티 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-10-22 07:34:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-22 18:05:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
J09102,"2019-10-22 07:43:00",19-계약-01,b.시공사,"새만금~전주5 고려개발 방문 예정, 화도~포천 예상 시행가 등 : 교리교 외 4개교 계약 추진 중","2019-10-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J08201,"2019-10-22 08:08:00",19-설계-08,"a.계획 및 협의","업무 조정 및 교량계획","2019-10-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J18206,"2019-10-22 08:10:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-22 18:01:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-10-22 08:21:00",19-설계-04,h.기타,"새방교(상리동~새방골간) 신기술(특허)협약관련자료, Dr.Wide Flange Girder(동두천~연천2공구) 설계견적서 및 내역서","2019-10-22 18:05:00",19-설계-04,h.기타,"새방교(상리동~새방골간) 신기술(특허)협약관련자료, Dr.Wide Flange Girder(동두천~연천2공구) 설계견적서 및 내역서, 세종~포천(세종~안성) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11203,"2019-10-22 08:21:00",18-시공-06,g.기타,"교량받침관련 검토서 작성","2019-10-22 18:55:00",18-시공-06,g.기타,"교량받침관련 검토서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J10315,"2019-10-22 08:25:00",17-시공-07,b.시공,"받침변위 적정성 검토","2019-10-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.147,NULL,NULL,004C7,,,
|
|
J17205,"2019-10-22 08:28:00",18-교영-01,c.설계사,.,"2019-10-22 18:05:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07103,"2019-10-22 08:29:00",19-교영-01,d.기타,사업관리,"2019-10-22 18:20:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15302,"2019-10-22 08:29:00",19-교영-18,d.기타,빔배치,"2019-10-22 18:01:00",19-교영-18,d.기타,빔배치,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.160,008E4,,,
|
|
J15202,"2019-10-22 08:31:00",19-교영-14,c.설계사,"지적사항 업무지원","2019-10-22 21:31:00",19-교영-14,c.설계사,"지적사항 업무지원","2019-10-22 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J14306,"2019-10-22 08:33:00",19-관리-04,a.계약,"계약업무 외","2019-10-22 18:02:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-10-22 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-22 18:09:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11202,"2019-10-22 08:35:00",19-시공-02,b.시공,공사관리,"2019-10-22 20:36:00",19-시공-02,b.시공,공사관리,"2019-10-22 18:30:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J10301,"2019-10-22 08:35:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-22 18:00:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J18205,"2019-10-22 08:35:00",19-시공-20,g.기타,"보완요청사항 검토 및 자료 작성","2019-10-22 21:34:00",17-설계-05,e.검토,"구조계산서 작성(BR3_상행)","2019-10-22 18:31:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-10-22 08:37:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","2019-10-22 20:34:00",19-설계-09,"a.계획 및 협의","제3연륙교 빔배치수정","2019-10-22 18:31:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10313,"2019-10-22 08:37:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-22 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15201,"2019-10-22 08:39:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-10-22 18:01:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J08201,"2019-10-23 08:50:00",19-교휴-01,교육,"기술자 승급교육","2019-10-23 18:00:00",19-교휴-01,교육,"기술자 승급교육","0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J08201,"2019-10-24 08:50:00",19-교휴-01,교육,"기술자 승급교육","2019-10-24 18:00:00",19-교휴-01,교육,"기술자 승급교육","0000-00-00 00:00:00",NULL,NULL,NULL,008C8,,,
|
|
J08201,"2019-10-25 08:50:00",19-교휴-01,교육,"기술자 승급교육","2019-10-25 08:13:00",19-교휴-01,교육,"기술자 승급교육","0000-00-00 00:00:00",NULL,NULL,172.16.9.151,008C8,,,
|
|
J13201,"2019-10-23 08:50:00",19-교휴-01,교육,"기술자 전문교육","2019-10-23 18:00:00",19-교휴-01,교육,"기술자 전문교육","0000-00-00 00:00:00",NULL,NULL,NULL,008E2,,,
|
|
J13201,"2019-10-24 08:50:00",19-교휴-01,교육,"기술자 전문교육","2019-10-24 18:00:00",19-교휴-01,교육,"기술자 전문교육","0000-00-00 00:00:00",NULL,NULL,NULL,008E2,,,
|
|
J13201,"2019-10-25 08:50:00",19-교휴-01,교육,"기술자 전문교육","2019-10-25 18:00:00",19-교휴-01,교육,"기술자 전문교육","0000-00-00 00:00:00",NULL,NULL,NULL,008E2,,,
|
|
J07210,"2019-10-22 08:43:00",14-설계-32,h.기타,"산외교 솟음","2019-10-22 18:02:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J09101,"2019-10-22 08:50:00",19-교영-01,c.설계사,과업조사,"2019-10-22 18:01:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J15307,"2019-10-22 08:56:00",19-설계-10,c.도면,"입장교 슬래브 배근도 작성","2019-10-22 18:01:00",19-설계-10,c.도면,"입장교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
M05510,"2019-10-22 14:23:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.10.94,NULL,NULL,004C8,,,
|
|
J18206,"2019-10-24 08:23:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-24 18:19:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J14101,"2019-10-22 08:50:00",16-시공-20,출장,한양,"2019-10-22 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-10-22 08:50:00",19-시공-15,출장,"[충북 보은군 수한면 후평리]수리티교 1차인장","2019-10-22 18:00:00",19-시공-15,출장,"[충북 보은군 수한면 후평리]수리티교 1차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J18207,"2019-10-22 08:50:00",17-시공-08,출장,"[대구 달성군 (대우건설 사업단)]세천2교 런쳐반입 시공사협의 및 기술검토반 방문","2019-10-22 18:00:00",17-시공-08,출장,"[대구 달성군 (대우건설 사업단)]세천2교 런쳐반입 시공사협의 및 기술검토반 방문","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-10-23 06:57:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-23 18:16:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-10-23 07:06:00",19-제조-04,b.기계,"북수원 1교 런처 앵커 홀 막음 출장과 경안천교 측경간과 중앙경간 거푸집(H2.5) 보수","2019-10-24 06:52:00",19-제조-04,b.기계,"북수원 1교 런처 앵커 홀 막음 출장과 경안천교 측경간과 중앙경간 거푸집(H2.5) 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-10-23 07:10:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-23 21:14:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-23 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18208,"2019-10-23 07:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-23 23:49:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-23 19:22:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-10-23 07:37:00",19-계약-01,b.시공사,"제천시 국대 도화육교 예상 계역가, 세종~안성 1,5,9공구,오송지선 예상 입찰가 등 : 교리교 외 4개교 계약 추진 중","2019-10-23 18:05:00",19-계약-01,b.시공사,"제천시 국대 도화육교 예상 계역가, 세종~안성 1,5,9공구,오송지선 예상 입찰가 등 : 교리교 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.8.145,004C7,,,
|
|
T04204,"2019-10-23 07:38:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M05510,"2019-10-23 07:46:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.11.51,NULL,NULL,004C8,,,
|
|
J18207,"2019-10-23 07:49:00",17-시공-08,b.시공,"[대구 달성군 (대우건설 사업단)]세천2교 런쳐반입 준비","2019-10-23 18:04:00",17-시공-08,b.시공,"[대구 달성군 (대우건설 사업단)]세천2교 런쳐반입 준비","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10314,"2019-10-23 08:10:00",18-설계-19,h.기타,"Dr.Wide Flange Girder(동두천~연천2공구) 설계견적서 및 내역서, 새방교(상리동~새방골간) 신기술(특허)협약관련자료, 세종~포천(세종~안성) 시행견적서(입찰) 관련자료 검토","2019-10-23 18:11:00",18-설계-19,h.기타,"Dr.Wide Flange Girder(동두천~연천2공구) 설계견적서 및 내역서, 새방교(상리동~새방골간) 신기술(특허)협약관련자료, 세종~포천(세종~안성) 시행견적서(입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-10-23 08:14:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-23 18:10:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15307,"2019-10-23 08:26:00",19-설계-10,c.도면,"입장교 슬래브 배근도 작성","2019-10-23 21:03:00",19-설계-10,c.도면,"입장교 슬래브 배근도 작성","2019-10-23 18:51:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J17205,"2019-10-23 08:29:00",18-교영-01,c.설계사,.,"2019-10-23 18:15:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J16202,"2019-10-23 08:30:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-23 18:18:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15302,"2019-10-23 08:31:00",19-교영-18,d.기타,빔배치,"2019-10-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.173,NULL,NULL,008E4,,1,
|
|
B15306,"2019-10-23 08:00:00",19-관리-02,e.기타,"비서업무 외 ","2019-10-23 18:18:18",NULL,NULL,"비서업무 외 ","0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18205,"2019-10-23 08:32:00",19-시공-20,g.기타,"보완요청사항 검토 및 자료 작성","2019-10-23 22:00:00",19-시공-20,g.기타,"보완요청서 답변 자료 작성","2019-10-23 19:00:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07210,"2019-10-23 08:32:00",14-설계-32,h.기타,"산외교 솟음","2019-10-23 21:04:00",14-설계-32,h.기타,"산외교 솟음","2019-10-23 18:49:00",172.16.9.162,172.16.9.155,172.16.9.162,008E1,,1,
|
|
J11202,"2019-10-23 08:34:00",19-시공-02,b.시공,공사관리,"2019-10-23 20:37:00",19-시공-02,b.시공,공사관리,"2019-10-23 18:31:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J11203,"2019-10-23 08:34:00",18-시공-06,g.기타,"교량받침관련 검토서 작성","2019-10-23 18:00:00",18-시공-06,g.기타,"교량받침관련 검토서 작성","0000-00-00 00:00:00",172.16.9.160,NULL,172.16.9.160,008E1,,,
|
|
J14306,"2019-10-23 08:35:00",19-관리-04,a.계약,"계약업무 외","2019-10-23 18:12:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15202,"2019-10-23 08:36:00",19-설계-10,b.구조계산,"죽장교 모델링","2019-10-23 21:35:00",19-설계-10,b.구조계산,"죽장교 모델링","2019-10-23 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10301,"2019-10-23 08:37:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-23 18:10:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15201,"2019-10-23 08:38:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-10-23 18:01:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07103,"2019-10-23 08:42:00",19-교영-01,d.기타,사업관리,"2019-10-23 18:09:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15301,"2019-10-22 08:50:00",19-교휴-01,교육,"건설시공기술자 중급 승급교육","2019-10-22 18:00:00",19-교휴-01,교육,"건설시공기술자 중급 승급교육","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J15301,"2019-10-23 08:50:00",19-교휴-01,교육,"건설시공기술자 중급 승급교육","2019-10-23 18:00:00",19-교휴-01,교육,"건설시공기술자 중급 승급교육","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J15301,"2019-10-24 08:50:00",19-교휴-01,교육,"건설시공기술자 중급 승급교육","2019-10-24 18:00:00",19-교휴-01,교육,"건설시공기술자 중급 승급교육","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J15301,"2019-10-25 08:50:00",19-교휴-01,교육,"건설시공기술자 중급 승급교육","2019-10-25 18:00:00",19-교휴-01,교육,"건설시공기술자 중급 승급교육","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J10313,"2019-10-23 08:46:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-23 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-10-23 08:55:00",19-교영-01,c.설계사,과업조사,"2019-10-23 18:11:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
J16203,"2019-10-23 07:35:00",19-제조-03,a.품질검사,"고강도 배합시험(성신연구소)","2019-10-23 23:47:00",19-제조-03,a.품질검사,"고강도 배합시험(성신연구소)","2019-10-23 18:35:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18202,"2019-10-23 07:35:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-23 18:02:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-10-23 07:20:00",19-제조-02,a.생산관리,"공장관리 및 동양대학교 공장소개 PPT 작성","2019-10-23 18:16:00",19-제조-02,a.생산관리,"공장 소개 PPT 작업(동양대학교 방문)","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>생산1팀 업무 스케줄 검토 및 협의<|>03:00<|><br>19-제조-02<|>a.생산관리<|>노듈러 거더 제작도 검토 및 업무 지시<|>01:30<|><br>19-제조-02<|>a.생산관리<|>사무동 인테리어<|>03:00<|><br>",,
|
|
J14101,"2019-10-23 08:50:00",16-시공-20,출장,한양,"2019-10-23 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-10-23 08:50:00",19-시공-15,출장,"[충북 보은군 수한면 후평리]수리티교 1차인장","2019-10-23 18:00:00",19-시공-15,출장,"[충북 보은군 수한면 후평리]수리티교 1차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J10315,"2019-10-23 08:50:00",14-시공-18,출장,SK건설,"2019-10-23 18:00:00",14-시공-18,출장,SK건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-10-24 06:52:00",19-제조-04,b.기계,"북수원 1교 런처 앵커 홀 막음 출장과 경안천교 측경간과 중앙경간 거푸집(H2.5) 보수","2019-10-25 06:55:00",19-제조-04,b.기계,"북수원 1교 런처 앵커 홀 막음 출장과 경안천교 측경간과 중앙경간 거푸집(H2.5) 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-10-24 07:05:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J14308,"2019-10-24 07:32:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-24 21:38:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-24 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-10-24 07:35:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18202,"2019-10-24 07:35:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-25 07:25:00",07-교영-01,b.시공사,"발주현황 파악","0000-00-00 00:00:00",172.16.9.182,NULL,172.16.9.182,004C7,,,
|
|
M02302,"2019-10-24 07:36:00",19-제조-02,a.생산관리,"산외교 Shop Dwg 지원","2019-10-24 18:06:00",19-제조-02,a.생산관리,"산외교 Shop Dwg 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>사장님 면담<|>02:00<|><br>19-제조-02<|>a.생산관리<|>삼안 사장님 공장 방문 수행<|>04:00<|><br>19-제조-02<|>a.생산관리<|>동양대학교 방문자 공장소개PPT작성<|>01:30<|><br>",,
|
|
J16203,"2019-10-24 07:37:00",19-제조-03,a.품질검사,"산외교,북수원1교, 2교, 가산2교,생탸수로1 데크 프리빔 생산관리","2019-10-24 21:42:00",19-제조-03,a.품질검사,"산외교,북수원1교, 2교, 가산2교,생탸수로1 데크 프리빔 샌산관리","2019-10-24 18:48:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18208,"2019-10-24 07:37:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-24 21:40:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-24 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-10-24 07:39:00",19-계약-01,b.시공사,"계룡건설, 강산건설 방문예정, 세종~안성 1,5,9공구,오송지선 예상 입찰가 등 : 교리교 외 4개교 계약 추진 중","2019-10-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-10-24 08:03:00",19-시공-20,b.시공,"스플라이스거더 제작에따른 공정 및 거푸집제작검토","2019-10-24 18:47:00",19-시공-20,b.시공,"스플라이스거더 제작에따른 공정 및 거푸집제작검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J10301,"2019-10-24 08:07:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-24 18:44:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11305,"2019-10-24 08:12:00",19-설계-10,e.검토,"성과품 검토","2019-10-24 18:30:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-10-24 08:14:00",19-관리-02,e.기타,"비서업무 외 ","2019-10-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-10-24 08:22:00",16-설계-09,h.기타,"물가변동비 검토(강진~광주 5공구), 새방교(상리동~새방골간) 신기술(특허)협약관련자료","2019-10-24 18:04:00",16-설계-09,h.기타,"물가변동비 검토(강진~광주 5공구), 새방교(상리동~새방골간) 신기술(특허)협약관련자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15307,"2019-10-24 08:26:00",19-설계-10,c.도면,"입암교 상부 수량산출","2019-10-24 21:31:00",19-설계-10,c.도면,"입암교 상부 수량산출","2019-10-24 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J15302,"2019-10-24 08:28:00",19-교영-18,d.기타,반력산정,"2019-10-24 20:34:00",19-교영-18,d.기타,반력산정,"2019-10-24 18:31:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J15202,"2019-10-24 08:29:00",19-설계-10,b.구조계산,"죽장교 모델링","2019-10-24 20:47:00",19-설계-10,b.구조계산,"죽장교 모델링","2019-10-24 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10313,"2019-10-24 08:32:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-24 18:05:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11202,"2019-10-24 08:32:00",19-시공-02,b.시공,공사관리,"2019-10-24 18:54:00",19-시공-02,b.시공,공사관리,"2019-10-24 18:39:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,,
|
|
J18205,"2019-10-24 08:30:00",19-시공-20,g.기타,"보완요청사항 검토 및 자료 작성","2019-10-24 21:55:00",19-시공-20,g.기타,"보완요청사항 검토 및 자료 작성","2019-10-24 18:39:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07210,"2019-10-24 08:34:00",14-설계-32,h.기타,"산외교 솟음","2019-10-24 20:43:00",14-설계-32,h.기타,"산외교 솟음","2019-10-24 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J11203,"2019-10-24 08:34:00",18-시공-06,g.기타,"교량받침관련 검토서 작성","2019-10-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.160,NULL,NULL,008E1,,,
|
|
J17205,"2019-10-24 08:36:00",18-교영-01,c.설계사,.,"2019-10-24 18:27:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J16202,"2019-10-24 08:37:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-24 18:28:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-10-24 08:37:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-10-24 18:25:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07103,"2019-10-24 08:42:00",19-교영-01,d.기타,사업관리,"2019-10-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
J09101,"2019-10-24 08:55:00",19-교영-01,c.설계사,과업조사,"2019-10-24 18:25:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.8.144,008C7,,,
|
|
M05510,"2019-10-24 12:10:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-24 19:24:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","0000-00-00 00:00:00",223.62.11.76,NULL,223.62.10.6,004C8,,,
|
|
J14306,"2019-10-24 08:50:00",19-교휴-06,경유,"경유(한일건설(광역철도 승강장_오산역 현장사무실)_하도급계약서류 날인)","2019-10-24 18:43:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J14101,"2019-10-24 08:50:00",16-시공-20,출장,한양,"2019-10-24 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-10-24 08:50:00",19-시공-15,출장,"[충북 보은군 수한면 후평리]수리티교 1차인장","2019-10-24 18:00:00",19-시공-15,출장,"[충북 보은군 수한면 후평리]수리티교 1차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J10315,"2019-10-24 08:50:00",14-시공-18,출장,SK건설,"2019-10-24 18:00:00",14-시공-18,출장,SK건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-10-25 06:43:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J07202,"2019-10-25 06:57:00",19-제조-04,b.기계,"도화육교 거푸집(H2.4) 보수와 북수원 1교 런처 앵커 홀 막음 출장","2019-10-26 07:26:00",19-제조-04,b.기계,"도화육교 거푸집(H2.4) 보수와 북수원 1교 런처 앵커 홀 막음 출장","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18202,"2019-10-25 07:25:00",07-교영-01,b.시공사,"발주현황 파악","2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.182,NULL,NULL,004C7,,,
|
|
M02302,"2019-10-25 07:35:00",19-제조-02,a.생산관리,"RCP 프로그램 기획 및 협의","2019-10-25 18:52:00",19-제조-02,a.생산관리,"RCP 프로그램 기획 및 협의","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>동양대학교 방문 준비<|>03:00<|><br>19-제조-02<|>a.생산관리<|>RCP 프로그램 회의<|>02:30<|><br>",1,
|
|
J18208,"2019-10-25 07:36:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-25 18:27:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-10-25 07:37:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-25 18:53:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-10-25 07:42:00",19-제조-03,a.품질검사,"산외교,북수원1교, 2교, 가산2교,생탸수로1 데크 프리빔 생산관리","2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J14308,"2019-10-25 07:45:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-25 18:53:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18207,"2019-10-25 08:08:00",17-시공-08,b.시공,"런처장비 현장반입 검토","2019-10-25 15:27:00",17-시공-08,b.시공,"런처장비 현장반입 검토","0000-00-00 00:00:00",172.16.10.246,NULL,172.16.10.246,004C7,,,
|
|
J11302,"2019-10-25 08:10:00",18-시공-03,g.기타,"왕림교 1차인장
|
|
","2019-10-25 15:23:00",18-시공-03,g.기타,"왕림교 1차인장
|
|
","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18206,"2019-10-25 08:15:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-25 15:22:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10315,"2019-10-25 08:16:00",18-시공-05,b.시공,"인장계획서 작성","2019-10-25 18:36:00",18-시공-05,b.시공,"인장계획서 작성","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,,
|
|
J10314,"2019-10-25 08:20:00",18-교영-33,d.기타,"Spliced 거더 개략공사비(검단~경명로), 물가변동비 검토(강진~광주 5공구), 새방교(상리동~새방골간) 신기술(특허)협약관련자료","2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J10301,"2019-10-25 08:20:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
B15306,"2019-10-25 08:20:00",19-관리-02,e.기타,"비서업무 외 ","2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-10-25 08:28:00",19-설계-10,c.도면,"죽장교 슬래브 도면 작성","2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.171,NULL,NULL,008E4,,,
|
|
J11305,"2019-10-25 08:28:00",19-설계-10,e.검토,"성과품 검토","2019-10-25 15:17:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15302,"2019-10-25 08:29:00",19-교영-18,d.기타,반력산정,"2019-10-25 15:21:00",19-교영-18,d.기타,반력산정,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J16202,"2019-10-25 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-25 15:20:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-10-25 08:31:00",19-설계-10,b.구조계산,"죽장교 모델링","2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.155,NULL,NULL,008E1,,,
|
|
J18205,"2019-10-25 08:32:00",19-시공-20,g.기타,"보완요청사항 검토 및 자료 작성","2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",61.98.205.243,NULL,NULL,008E2,,,
|
|
J07103,"2019-10-25 08:33:00",19-교영-01,d.기타,사업관리,"2019-10-25 15:19:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J17205,"2019-10-25 08:35:00",18-교영-01,c.설계사,.,"2019-10-25 11:56:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-10-25 08:36:00",14-설계-32,h.기타,"산외교 솟음","2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.162,NULL,NULL,008E1,,,
|
|
M05510,"2019-10-25 08:43:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.62.10.220,NULL,NULL,004C8,,,
|
|
J10313,"2019-10-25 08:43:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-25 18:04:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-10-25 08:45:00",19-교영-01,c.설계사,과업조사,"2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.8.144,NULL,NULL,008C7,,,
|
|
J15201,"2019-10-25 08:46:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-10-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J14306,"2019-10-25 08:50:00",19-관리-04,a.계약,"계약업무 외","2019-10-25 15:20:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J14101,"2019-10-25 08:50:00",16-시공-20,출장,한양,"2019-10-25 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-10-25 08:50:00",18-시공-15,출장,"[경기도 일산]원흥2교 2차 강연선 자재 검수 및 후속 공정 업무 협의","2019-10-25 18:00:00",18-시공-15,출장,"[경기도 일산]원흥2교 2차 강연선 자재 검수 및 후속 공정 업무 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
T04204,"2019-10-26 07:19:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) , 도화육교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-26 16:40:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) , 도화육교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-10-26 07:26:00",19-제조-04,b.기계,"도화육교 거푸집(H2.4) 보수와 야적장 정리","2019-10-26 16:23:00",19-제조-04,b.기계,"도화육교 거푸집(H2.4) 보수와 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-10-26 07:34:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-26 16:30:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M02302,"2019-10-26 07:35:00",19-제조-02,a.생산관리,"동양대학교 공장소개 및 공장 안내","2019-10-26 16:32:00",19-제조-02,a.생산관리,"동양대학교 공장소개 및 공장 안내","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-10-26 07:45:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-26 18:15:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J10315,"2019-10-26 08:06:00",19-시공-15,b.시공,"가설계획서 보완 및 협의(크레인 규격변경)","2019-10-26 13:26:00",19-시공-15,b.시공,"가설계획서 보완 및 협의(크레인 규격변경)","0000-00-00 00:00:00",172.16.8.147,NULL,172.16.8.147,004C7,,1,
|
|
J12202,"2019-10-28 07:13:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
T04204,"2019-10-28 07:25:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) , 도화육교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-10-28 07:38:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-28 18:02:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-10-28 07:38:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-28 18:03:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J07202,"2019-10-28 07:39:00",19-제조-04,b.기계,"도화육교 거푸집(H2.4) 보수와 야적장 각재정리","2019-10-29 06:52:00",19-제조-04,b.기계,"도화육교 거푸집(H2.4) 보수와 야적장 각재정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-10-28 07:47:00",19-계약-01,b.시공사," 세종~안성 1,5,9공구,오송지선 예상 입찰가 등 : 교리교 외 4개교 계약 추진 중","2019-10-28 18:04:00",19-계약-01,b.시공사," 세종~안성 1,5,9공구,오송지선 예상 입찰가 등 : 교리교 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.8.145,NULL,172.16.9.145,004C7,,,
|
|
M02302,"2019-10-28 07:50:00",19-제조-02,a.생산관리,"프리캐스트 가로보 표준도 검토 및 작성","2019-10-28 18:02:00",19-제조-02,a.생산관리,"프리캐스트 가로보 표준도 검토 및 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>생산직 지원자 면접<|>01:00<|><br>19-제조-02<|>a.생산관리<|>소화기 파악및 구매<|>00:30<|><br>19-제조-02<|>a.생산관리<|>관리자 업무 분장 협의 및 지시<|>04:00<|><br>",,
|
|
J18207,"2019-10-28 07:51:00",17-시공-21,b.시공,"현장관리감독자 투입 및 안전관리 미흡사항 조치계획검토","2019-10-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.10.246,NULL,NULL,004C7,,,
|
|
B15306,"2019-10-28 08:04:00",19-관리-02,e.기타,"비서업무 외 ","2019-10-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-10-28 08:16:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-10-28 18:20:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-10-28 08:19:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","2019-10-28 18:00:00",16-시공-20,b.시공,"산외교현장관리, 개선사항 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15302,"2019-10-28 08:19:00",19-교영-18,d.기타,"턴키 성과품일식작성","2019-10-28 18:05:00",17-설계-05,b.구조계산,계산서작성,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15307,"2019-10-28 08:25:00",19-설계-10,c.도면,"죽장교 바닥판 계산서 작성","2019-10-28 18:03:00",19-설계-10,c.도면,"죽장교 바닥판 계산서 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J09101,"2019-10-28 08:27:00",19-교영-01,c.설계사,과업조사,"2019-10-28 18:32:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.8.144,NULL,172.16.9.144,008C7,,,
|
|
J18205,"2019-10-28 08:30:00",17-설계-05,h.기타,"구조계산서 작성","2019-10-28 22:18:00",17-설계-05,h.기타,"구조계산서 작성","2019-10-28 19:14:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07103,"2019-10-28 08:33:00",19-교영-01,d.기타,사업관리,"2019-10-28 18:17:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14306,"2019-10-28 08:36:00",19-관리-04,a.계약,"계약업무 외","2019-10-28 18:15:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07210,"2019-10-28 08:38:00",14-설계-32,h.기타,"산외교 솟음","2019-10-28 18:03:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J17205,"2019-10-28 08:38:00",18-교영-01,c.설계사,.,"2019-10-28 18:07:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-10-28 08:39:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-10-28 18:02:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-10-28 08:39:00",19-설계-10,e.검토,"성과품 검토","2019-10-28 18:04:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J16202,"2019-10-28 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-28 18:07:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10301,"2019-10-28 08:40:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-28 18:20:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-10-28 08:45:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-28 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15301,"2019-10-28 08:51:00",16-시공-20,b.시공,공무,"2019-10-28 18:55:00",16-시공-20,b.시공,공무,"0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-10-28 09:22:00",17-시공-09,b.시공,"거더제작 및 벤트설치
|
|
안전,품질 시공관리","2019-10-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.10.1,NULL,NULL,004C8,,,
|
|
J16203,"2019-10-28 08:20:00",19-제조-03,a.품질검사,"산외교 데크재하시험","2019-10-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J10315,"2019-10-28 08:07:00",19-시공-15,b.시공,"가설계획서 보완 및 협의(크레인 규격변경)","2019-10-28 19:31:00",19-시공-15,b.시공,"가설계획서 보완 및 협의(크레인 규격변경)","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J14101,"2019-10-28 08:50:00",16-시공-20,출장,한양,"2019-10-28 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10314,"2019-10-28 08:50:00",19-설계-04,출장,"[ 대구광역시 종합건설본부] 신기술(특허) 사용협약 체결","2019-10-28 18:00:00",19-설계-04,출장,"[ 대구광역시 종합건설본부] 신기술(특허) 사용협약 체결","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11202,"2019-10-28 08:50:00",18-시공-15,출장,"[경기도 일산]원흥2교 강연선 삽입 및 전도방지 해체","2019-10-28 18:00:00",18-시공-15,출장,"[경기도 일산]원흥2교 강연선 삽입 및 전도방지 해체","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11302,"2019-10-28 08:50:00",18-시공-03,출장,"[화성시 비봉면 삼화리]왕림교 1차인장 및 그라우팅","2019-10-28 18:00:00",18-시공-03,출장,"[화성시 비봉면 삼화리]왕림교 1차인장 및 그라우팅","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J09101,"2019-10-29 08:49:00",19-교영-01,c.설계사,과업조사,"2019-10-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.144,NULL,NULL,008C7,,,
|
|
J07202,"2019-10-29 06:53:00",19-제조-04,b.기계,"현장 각재정리와 도화육교 거푸집(H2.4) 청소와 페인트 도색","2019-10-30 06:50:00",19-제조-04,b.기계,"현장 각재정리와 도화육교 거푸집(H2.4) 청소와 페인트 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-10-29 07:10:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-30 06:28:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J18208,"2019-10-29 07:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-29 18:18:18",19-제조-02,a.생산관리,NULL,"2019-10-29 19:03:00",175.203.206.128,175.203.206.128,NULL,006E2,,1,
|
|
T04204,"2019-10-29 07:35:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) , 도화육교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-29 22:04:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) , 도화육교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-10-29 07:36:00",19-제조-02,a.생산관리,"산외교 Shop Dwg 지원","2019-10-29 21:42:00",19-제조-02,a.생산관리,"산외교 Shop Dwg 지원","2019-10-29 19:01:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>J-web 상단 시험체 도면 작성<|>05:00<|><br>19-제조-02<|>a.생산관리<|>절곡기 개선 검토 및 협의<|>01:00<|><br>19-제조-02<|>a.생산관리<|>RCP 파악 <|>01:00<|><br>",1,
|
|
J14308,"2019-10-29 07:38:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-29 22:17:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-29 19:01:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-10-29 07:40:00",19-제조-03,a.품질검사,"산외교,북수원1교, 2교, 가산2교,생태수로1 데크 프리빔 생산관리","2019-10-29 22:52:00",19-제조-03,a.품질검사,"산외교,북수원1교, 2교, 가산2교,생탸수로1 데크 프리빔 샌산관리","2019-10-29 19:41:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J10315,"2019-10-29 08:08:00",19-시공-15,b.시공,"가설계획서 보완 및 협의(크레인 규격변경)","2019-10-29 18:01:00",19-시공-15,b.시공,"가설계획서 보완 및 협의(크레인 규격변경)","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J08201,"2019-10-29 08:15:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-10-29 18:17:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-10-29 08:16:00",19-설계-10,e.검토,"성과품 검토","2019-10-29 18:04:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-10-29 08:20:00",19-관리-02,e.기타,"비서업무 외 ","2019-10-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J13201,"2019-10-29 08:27:00",19-설계-09,b.구조계산,"BR3 반력수정","2019-10-29 21:01:00",19-설계-09,b.구조계산,"BR1 모델링","2019-10-29 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10314,"2019-10-29 08:30:00",16-설계-09,h.기타,"강진~광주 5공구 물가변동비 검토, 조령천교 거더 개략공사비(안성~성남1공구), 세종~포천(세종~안성) 시행견적서 (입찰)","2019-10-29 18:04:00",16-설계-09,h.기타,"강진~광주 5공구 물가변동비 검토, 조령천교 거더 개략공사비(안성~성남1공구), 세종~포천(세종~안성) 시행견적서 (입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15302,"2019-10-29 08:30:00",19-교영-18,d.기타,"턴키 성과품일식작성","2019-10-29 20:32:00",17-설계-05,b.구조계산,계산서작성,"2019-10-29 18:31:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J07103,"2019-10-29 08:30:00",19-교영-01,d.기타,사업관리,"2019-10-29 18:05:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11202,"2019-10-29 08:32:00",19-시공-02,b.시공,공사관리,"2019-10-29 18:04:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J16202,"2019-10-29 08:33:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-29 18:06:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-10-29 08:33:00",19-설계-10,b.구조계산,"죽장교 모델링","2019-10-29 18:34:00",19-설계-10,b.구조계산,"죽장교 모델링","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J14306,"2019-10-29 08:35:00",19-관리-04,a.계약,"계약업무 외","2019-10-29 18:02:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07210,"2019-10-29 08:37:00",14-설계-32,h.기타,"산외교 솟음","2019-10-29 18:10:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10301,"2019-10-29 08:39:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-29 18:05:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15201,"2019-10-29 08:39:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-10-29 18:03:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-10-29 08:39:00",18-교영-01,c.설계사,.,"2019-10-29 18:03:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J18205,"2019-10-29 08:41:00",17-설계-05,h.기타,"구조계산서 작성","2019-10-29 21:36:00",17-설계-05,h.기타,"구조계산서 작성","2019-10-29 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15307,"2019-10-29 08:41:00",19-설계-10,c.도면,"죽장교 슬래브 배근도 작성","2019-10-29 20:55:00",19-설계-10,c.도면,"죽장교 슬래브 배근도 작성","2019-10-29 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10313,"2019-10-29 08:41:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-29 18:02:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11302,"2019-10-29 08:50:00",18-시공-03,출장,"[화성시 비봉면 삼화리]왕림교 1차인장 및 그라우팅","2019-10-29 18:00:00",18-시공-03,출장,"[화성시 비봉면 삼화리]왕림교 1차인장 및 그라우팅","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J18207,"2019-10-29 08:50:00",18-시공-06,출장,"[전남 나주시]운곡교현장 공정관리 협의 및 협의체회의 참석","2019-10-29 18:00:00",18-시공-06,출장,"[전남 나주시]운곡교현장 공정관리 협의 및 협의체회의 참석","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J09102,"2019-10-29 08:50:00",19-계약-01,경유,"대림산업 본사 : 북수원1교 안전관리 및 용두교 계약관련","2019-10-29 18:00:00",19-계약-01,경유,"대림산업 본사 : 북수원1교 안전관리 및 용두교 계약관련","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J18206,"2019-10-29 08:50:00",19-관리-06,출장,고성하이현장,"2019-10-29 18:00:00",19-관리-06,출장,고성하이현장,"0000-00-00 00:00:00",NULL,NULL,NULL,001C5,,,
|
|
J12202,"2019-10-30 06:28:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-30 18:02:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J16203,"2019-10-30 06:39:00",19-제조-03,a.품질검사,"산외교,북수원1교, 2교, 가산2교, 데크 생산관리","2019-10-30 22:52:00",19-제조-03,a.품질검사,"산외교,북수원1교, 2교, 가산2교, 데크 생산관리","2019-10-30 18:55:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J07202,"2019-10-30 06:51:00",19-제조-04,b.기계,"사무동 1층 서고정리와 운곡교 거푸집(H2.6) 그라인더 작업","2019-10-31 06:59:00",19-제조-04,b.기계,"사무동 1층 서고정리와 운곡교 거푸집(H2.6) 그라인더 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-10-30 07:34:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-30 22:52:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-30 18:44:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-10-30 07:35:00",19-계약-01,b.시공사,"상리동~새방골간 새방교 얘상 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-10-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-10-30 07:37:00",17-시공-08,b.시공,"세천2교 런처장비 현장반입 및 준비작업검토","2019-10-30 18:13:00",17-시공-08,b.시공,"세천2교 런처장비 현장반입 및 준비작업검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
T04204,"2019-10-30 07:37:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) , 도화육교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-10-30 07:39:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
M02302,"2019-10-30 07:40:00",19-제조-02,a.생산관리,"산외교 Shop Dwg 지원","2019-10-30 21:04:00",19-제조-02,a.생산관리,"산외교 Shop Dwg 지원","2019-10-30 18:55:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>서고정리 진행 확인 및 협의<|>02:00<|><br>19-제조-02<|>a.생산관리<|>절곡기 구매 및 철근형상 정리 <|>02:30<|><br>19-제조-02<|>b.출하<|>Gantry Crane 적용성 검토<|>01:30<|><br>",1,
|
|
J11305,"2019-10-30 08:03:00",19-설계-10,e.검토,"성과품 검토","2019-10-30 18:07:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-10-30 08:11:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-10-30 18:03:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-10-30 08:17:00",19-설계-10,c.도면,"죽장교 슬래브 배근도 작성","2019-10-30 20:56:00",19-설계-10,c.도면,"죽장교 슬래브 배근도 작성","2019-10-30 18:33:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
B15306,"2019-10-30 08:24:00",19-관리-02,e.기타,"비서업무 외 ","2019-10-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J13201,"2019-10-30 08:27:00",19-설계-09,b.구조계산,"BR1 모델링","2019-10-30 20:43:00",19-설계-09,b.구조계산,"BR1 모델링","2019-10-30 18:41:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J18206,"2019-10-30 08:28:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-10-30 18:32:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J16202,"2019-10-30 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-30 18:09:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-10-30 08:33:00",19-설계-08,b.구조계산,"우산1교 모델링","2019-10-30 21:05:00",19-설계-08,b.구조계산,"우산1교 모델링","2019-10-30 18:39:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J15302,"2019-10-30 08:33:00",17-설계-05,b.구조계산,계산서작성,"2019-10-30 20:37:00",17-설계-05,b.구조계산,계산서작성,"2019-10-30 18:33:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"19-설계-06<|>e.검토<|>ve지적사항 수정<|>02:00<|><br>",1,
|
|
J11202,"2019-10-30 08:34:00",19-시공-02,b.시공,공사관리,"2019-10-30 18:10:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J14306,"2019-10-30 08:34:00",19-관리-04,a.계약,"계약업무 외","2019-10-30 18:08:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07210,"2019-10-30 08:35:00",14-설계-32,h.기타,"산외교 솟음","2019-10-30 20:56:00",14-설계-32,h.기타,"산외교 솟음","2019-10-30 18:41:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J10301,"2019-10-30 08:36:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-30 18:12:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J17205,"2019-10-30 08:38:00",18-교영-01,c.설계사,.,"2019-10-30 18:09:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-10-30 08:38:00",19-교영-06,c.설계사,"과업진행현황 파악","2019-10-30 18:08:00",19-교영-06,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-10-30 08:40:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-30 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J07103,"2019-10-30 08:46:00",19-교영-01,d.기타,사업관리,"2019-10-30 18:10:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J09101,"2019-10-30 08:50:00",19-교영-01,c.설계사,과업조사,"2019-10-30 18:06:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J11302,"2019-10-30 08:50:00",18-시공-03,출장,"[화성시 비봉면 삼화리]왕림교 1차인장 및 그라우팅","2019-10-30 18:00:00",18-시공-03,출장,"[화성시 비봉면 삼화리]왕림교 1차인장 및 그라우팅","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J10315,"2019-10-30 08:50:00",19-시공-15,출장,"수리티교 현장","2019-10-30 18:00:00",19-시공-15,출장,"수리티교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-10-31 06:44:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-10-31 18:03:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-10-31 06:59:00",19-제조-04,b.기계,"사무동 1층 서고정리와 운곡교 거푸집(H2.6) 그라인더 작업","2019-11-01 06:47:00",19-제조-04,b.기계,"사무동 1층 서고정리와 운곡교 거푸집(H2.6) 그라인더 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-10-31 07:25:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) , 도화육교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","2019-10-31 21:01:00",19-제조-02,a.생산관리,"주천2교(H2.4 ,H2.0) , 도화육교 철근 가공, 산외교,성주대교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-10-31 07:32:00",19-제조-03,a.품질검사,"PTC 프리빔(생태1)출하(10.30~10.31)
|
|
산외교,북수원1교, 2교, 가산2교, 데크 생산관리","2019-10-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J14308,"2019-10-31 07:33:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-10-31 19:12:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-10-31 07:34:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-31 22:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-10-31 18:51:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-10-31 07:43:00",19-시공-22,b.시공,"산외교 상부슬라브공사 실행 및 시공참여자선정 검토","2019-10-31 17:59:00",19-시공-22,b.시공,"산외교 상부슬라브공사 실행 및 시공참여자선정 검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
M02302,"2019-10-31 07:47:00",19-제조-02,a.생산관리,"굴삭기 매입 검토 및 확인","2019-10-31 20:28:00",19-제조-02,a.생산관리,"굴삭기 매입 검토 및 확인","2019-10-31 19:23:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>캔틸레버 브라켓 시험체 제작 협의 및 도면 작성<|>02:00<|><br>19-제조-02<|>a.생산관리<|>임원회의 자료 검토<|>01:00<|><br>19-제조-02<|>a.생산관리<|>업무 조정 및 협의<|>01:30<|><br>",1,
|
|
J11202,"2019-10-31 08:00:00",19-시공-02,b.시공,공사관리,"2019-10-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J11305,"2019-10-31 08:06:00",19-설계-10,e.검토,"성과품 검토","2019-10-31 18:06:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10314,"2019-10-31 08:13:00",18-설계-19,h.기타,"강진~광주 5공구 물가변동비 검토, 지경천교(포항~영덕 3공구) 답변자료작성, 세종~포천(세종~안성) 시행견적서 (입찰), ","2019-10-31 18:16:00",18-설계-19,h.기타,"강진~광주 5공구 물가변동비 검토, 지경천교(포항~영덕 3공구) 답변자료작성, 세종~포천(세종~안성) 시행견적서 (입찰), ","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-10-31 08:13:00",19-관리-02,e.기타,"비서업무 외 ","2019-10-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-10-31 08:15:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-10-31 18:02:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-10-31 08:20:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-10-31 19:04:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-10-31 08:25:00",19-설계-10,c.도면,"죽장교 슬래브 배근도 작성","2019-10-31 18:01:00",19-설계-10,c.도면,"죽장교 슬래브 배근도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J18205,"2019-10-31 08:28:00",18-시공-12,g.기타,"Strongback 설치시 철근 간섭 검토","2019-10-31 21:35:00",18-시공-12,g.기타,"Strongback 설치시 철근 간섭 검토","2019-10-31 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-10-31 08:29:00",19-설계-09,b.구조계산,"슬래브 단면검토, 신축이음부 Blockout 검토","2019-10-31 20:56:00",19-설계-09,b.구조계산,빔배치수정,"2019-10-31 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J15302,"2019-10-31 08:32:00",17-설계-05,b.구조계산,계산서작성,"2019-10-31 18:04:00",17-설계-05,b.구조계산,계산서작성,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J07103,"2019-10-31 08:33:00",19-교영-01,d.기타,사업관리,"2019-10-31 18:02:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J16202,"2019-10-31 08:34:00",19-교영-01,c.설계사,신규사업현황조사,"2019-10-31 18:16:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07210,"2019-10-31 08:35:00",14-설계-32,h.기타,"산외교 솟음","2019-10-31 20:38:00",14-설계-32,h.기타,"산외교 솟음","2019-10-31 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15201,"2019-10-31 08:37:00",19-교영-21,c.설계사,"과업진행현황 파악","2019-10-31 18:04:00",19-교영-21,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14306,"2019-10-31 08:37:00",19-관리-04,a.계약,"계약업무 외","2019-10-31 18:06:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15202,"2019-10-31 08:38:00",12-설계-24,e.검토,"삼남1교 스트롱백 변위검토","2019-10-31 20:56:00",12-설계-24,e.검토,"삼남1교 스트롱백 변위검토","2019-10-31 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10301,"2019-10-31 08:39:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-10-31 18:18:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-10-31 08:40:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","2019-10-31 18:02:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-10-31 08:48:00",19-교영-01,c.설계사,과업조사,"2019-10-31 18:05:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J11302,"2019-10-31 08:50:00",18-시공-03,출장,"[화성시 비봉면 삼화리]왕림교 1차인장 및 그라우팅","2019-10-31 18:00:00",18-시공-03,출장,"[화성시 비봉면 삼화리]왕림교 1차인장 및 그라우팅","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J10315,"2019-10-31 08:50:00",19-시공-15,출장,"수리티교 현장","2019-10-31 18:00:00",19-시공-15,출장,"수리티교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J09102,"2019-10-31 08:50:00",19-계약-01,경유,"광명~서울 1공구 : 노오사교 외 3개교 포스코건설 수의시담","2019-10-31 18:00:00",19-계약-01,경유,"광명~서울 1공구 : 노오사교 외 3개교 포스코건설 수의시담","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-11-01 06:48:00",19-제조-04,b.기계,"운곡교 거푸집(H2.6) 그라인더 작업과 사무동 1층 자재창고정리","2019-11-01 18:02:00",19-제조-04,b.기계,"운곡교 거푸집(H2.6) 그라인더 작업과 사무동 1층 자재창고정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J12202,"2019-11-01 06:53:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-11-01 18:05:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
T04204,"2019-11-01 07:37:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-11-01 07:39:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-01 12:57:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-11-01 07:42:00",19-제조-02,a.생산관리,"프리캐스트 가로보 검토","2019-11-01 18:01:00",19-제조-02,a.생산관리,"프리캐스트 가로보 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-11-01 07:44:00",19-계약-01,b.시공사,"이천~문경 문경3교 및 안막교 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J14308,"2019-11-01 07:45:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-11-01 18:01:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-11-01 07:52:00",19-제조-03,a.품질검사,"KS 준비
|
|
산외교,북수원1교, 2교, 가산2교, 데크 생산관리","2019-11-01 21:55:00",19-제조-03,a.품질검사,"KS 준비
|
|
산외교,북수원1교, 2교, 가산2교, 데크 생산관리","2019-11-01 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18207,"2019-11-01 08:06:00",19-시공-22,b.시공,"산외교 상부슬라브공사 실행 및 시공참여자선정 검토","2019-11-01 18:12:00",19-시공-22,b.시공,"산외교 상부슬라브공사 실행 및 시공참여자선정 검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
B15306,"2019-11-01 08:13:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-11-01 08:14:00",19-설계-10,e.검토,"성과품 검토","2019-11-01 18:01:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10314,"2019-11-01 08:18:00",18-설계-19,h.기타,"세종~포천(세종~안성) 시행견적서 (입찰), 신촌교(양평~이천 2공구) 시행견적서, 지경천교(포항~영덕 3공구) 답변자료작성","2019-11-01 18:03:00",18-설계-19,h.기타,"세종~포천(세종~안성) 시행견적서 (입찰), 신촌교(양평~이천 2공구) 시행견적서, 지경천교(포항~영덕 3공구) 답변자료작성","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-11-01 08:21:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-01 19:05:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J13201,"2019-11-01 08:25:00",19-설계-09,b.구조계산,"BR1모델링, 코핑폭검토","2019-11-01 18:02:00",19-설계-09,b.구조계산,빔배치수정,"0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15302,"2019-11-01 08:26:00",17-설계-05,b.구조계산,계산서작성,"2019-11-01 18:02:00",17-설계-05,b.구조계산,계산서작성,"0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J18206,"2019-11-01 08:26:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-01 18:14:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J07103,"2019-11-01 08:28:00",19-교영-01,d.기타,사업관리,"2019-11-01 18:11:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J07210,"2019-11-01 08:29:00",14-설계-32,h.기타,"산외교 솟음","2019-11-01 18:03:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J14306,"2019-11-01 08:30:00",19-관리-04,a.계약,"계약업무 외","2019-11-01 18:00:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15202,"2019-11-01 08:31:00",12-설계-24,e.검토,"삼남1교 스트롱백 변위검토","2019-11-01 18:01:00",12-설계-24,e.검토,"삼남1교 스트롱백 변위검토","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J18205,"2019-11-01 08:32:00",18-시공-12,g.기타,"Strongback 설치시 철근 간섭 검토","2019-11-01 18:00:00",18-시공-12,g.기타,"Strongback 설치시 철근 간섭 검토","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J16202,"2019-11-01 08:33:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-01 18:17:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10301,"2019-11-01 08:34:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-01 18:18:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-11-01 08:34:00",19-시공-02,b.시공,공사관리,"2019-11-01 18:19:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10313,"2019-11-01 08:34:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-11-01 18:00:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15201,"2019-11-01 08:38:00",19-교영-21,c.설계사,"과업진행현황 파악","2019-11-01 18:07:00",19-교영-21,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15307,"2019-11-01 08:45:00",19-설계-08,c.도면,"우산1교 빔배치","2019-11-01 18:01:00",19-설계-08,c.도면,"우산1교 빔배치","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J17205,"2019-11-01 08:49:00",18-교영-01,c.설계사,.,"2019-11-01 18:08:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
M05510,"2019-11-01 09:18:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-01 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.10.214,NULL,NULL,004C8,,,
|
|
J10315,"2019-11-01 08:50:00",19-시공-15,출장,"수리티교 현장","2019-11-01 18:00:00",19-시공-15,출장,"수리티교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M05510,"2019-11-02 06:25:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.11.231,NULL,NULL,004C8,,,
|
|
J16203,"2019-11-02 07:50:00",19-제조-03,a.품질검사,"KS 서류준비, 북수원 ,산외교 데크 강봉 절단 가동","2019-11-02 17:29:00",19-제조-03,a.품질검사,"KS 서류준비, 북수원 ,산외교 데크 강봉 절단 가동","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,,
|
|
J07202,"2019-11-02 07:52:00",19-제조-04,b.기계,"제작팀과 품질팀 동영상 콘티 체크","2019-11-02 13:54:00",19-제조-04,b.기계,"제작팀과 품질팀 동영상 콘티 체크","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-10-09 08:50:00",14-시공-18,출장,"[경기도 용인시 처인구 포공읍]동림교 1차인장 작업","2019-10-09 18:00:00",14-시공-18,출장,"[경기도 용인시 처인구 포공읍]동림교 1차인장 작업","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J10315,"2019-10-09 08:50:00",17-시공-21,출장,"북수원 2교 현장","2019-10-09 18:00:00",17-시공-21,출장,"북수원 2교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J15301,"2019-10-18 08:50:00",19-관리-06,출장,"[당진시]당진공장 서류 정리","2019-10-18 18:00:00",19-관리-06,출장,"[당진시]당진공장 서류 정리","0000-00-00 00:00:00",NULL,NULL,NULL,004E4,,,
|
|
J11302,"2019-10-18 08:50:00",19-시공-15,출장,"[충북 보은군 수한면 후평리]수리티교 가설시공 설명","2019-10-18 18:00:00",19-시공-15,출장,"[충북 보은군 수한면 후평리]수리티교 가설시공 설명","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J11203,"2019-10-21 08:50:00",16-설계-09,출장,"[광주완도 사업단(나주)]현장 업무협의(운곡교)","2019-10-21 18:00:00",16-설계-09,출장,"[광주완도 사업단(나주)]현장 업무협의(운곡교)","0000-00-00 00:00:00",NULL,NULL,NULL,008E1,,,
|
|
M05510,"2019-11-04 06:37:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.10.126,NULL,NULL,004C8,,,
|
|
J12202,"2019-11-04 06:48:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-11-04 18:03:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J18208,"2019-11-04 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-04 20:56:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-04 18:44:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-11-04 07:34:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-04 21:01:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-11-04 07:37:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-11-04 21:43:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-11-04 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-11-04 07:42:00",19-제조-02,a.생산관리,"신입직원 지원규정 검토","2019-11-04 18:04:00",19-제조-02,a.생산관리,"신입직원 지원규정 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>생산본부 관리자 근태확립기준안 작성<|>02:30<|><br>19-제조-02<|>a.생산관리<|>물품신청서 문서 양식 검토<|>01:00<|><br>19-제조-02<|>a.생산관리<|>공장동 청소 관리<|>01:00<|><br>",,
|
|
J18207,"2019-11-04 07:50:00",19-시공-22,b.시공," 상부슬라브공사 실행d예산 및 시공참여자선정 검토","2019-11-04 18:18:00",19-시공-22,b.시공," 상부슬라브공사 실행d예산 및 시공참여자선정 검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J09102,"2019-11-04 07:51:00",19-계약-01,b.시공사,"벌교~주암 잔동교, 이천~문경 문경3교 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
B15306,"2019-11-04 08:08:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-11-04 08:10:00",18-시공-03,g.기타,"왕림교 가설공사비 검토(국도43호선횡단 야간가설), 세종~포천(세종~안성) 시행견적서 (입찰)","2019-11-04 18:09:00",18-시공-03,g.기타,"왕림교 가설공사비 검토(국도43호선횡단 야간가설), 세종~포천(세종~안성) 시행견적서 (입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-11-04 08:17:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-04 19:06:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-11-04 08:18:00",19-설계-10,e.검토,"성과품 검토","2019-11-04 18:17:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10313,"2019-11-04 08:19:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-11-04 18:10:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18206,"2019-11-04 08:25:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-04 18:17:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15302,"2019-11-04 08:29:00",17-설계-05,b.구조계산,"도면 및 수량 계산서 작성","2019-11-04 20:34:00",17-설계-05,b.구조계산,"도면 및 수량 계산서 작성","2019-11-04 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J18205,"2019-11-04 08:30:00",18-시공-12,g.기타,"임시 가로보 설치 검토","2019-11-04 21:37:00",18-시공-12,g.기타,"임시 가로보 설치 검토","2019-11-04 18:32:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07103,"2019-11-04 08:33:00",19-교영-01,d.기타,사업관리,"2019-11-04 18:10:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15307,"2019-11-04 08:33:00",19-설계-10,c.도면,"도곽 변경","2019-11-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.171,NULL,NULL,008E4,,,
|
|
J13201,"2019-11-04 08:34:00",19-설계-09,b.구조계산,BR1모델링,"2019-11-04 20:50:00",19-설계-09,b.구조계산,BR1모델링,"2019-11-04 18:30:00",172.16.9.165,172.16.9.173,172.16.9.165,008E2,,1,
|
|
J07210,"2019-11-04 08:35:00",14-설계-32,h.기타,"산외교 솟음","2019-11-04 18:04:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J14306,"2019-11-04 08:36:00",19-관리-04,a.계약,"계약업무 외","2019-11-04 18:05:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15201,"2019-11-04 08:37:00",19-교영-21,c.설계사,"과업진행현황 파악","2019-11-04 18:02:00",19-교영-21,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-11-04 08:37:00",18-교영-01,c.설계사,.,"2019-11-04 18:03:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11202,"2019-11-04 08:38:00",19-시공-02,b.시공,공사관리,"2019-11-04 20:39:00",19-시공-02,b.시공,공사관리,"2019-11-04 18:31:00",172.16.9.159,172.16.9.159,172.16.9.159,004E1,,1,
|
|
J10301,"2019-11-04 08:39:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-04 18:58:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J09101,"2019-11-04 08:45:00",19-교영-01,c.설계사,과업조사,"2019-11-04 18:01:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J16202,"2019-11-04 08:46:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-04 18:05:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-11-04 08:46:00",19-설계-10,b.구조계산,"입암교 구조계산서 작성","2019-11-04 20:51:00",19-설계-10,b.구조계산,"입암교 구조계산서 작성","2019-11-04 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"19-설계-06<|>g.업무지원<|>도림1육교 설계VE 지적사항 검토<|>02:30<|><br>",1,
|
|
J10315,"2019-11-04 08:50:00",17-시공-09,출장,"삼남1교 현장","2019-11-04 18:00:00",17-시공-09,출장,"삼남1교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11302,"2019-11-04 08:50:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 2차인장","2019-11-04 18:00:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 2차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J07202,"2019-11-04 08:50:00",19-제조-02,출장,"[경남 밀양시]산외교의 당진공장 제품 확인 및 점검과 입고설비 점검","2019-11-04 18:00:00",19-제조-02,출장,"[경남 밀양시]산외교의 당진공장 제품 확인 및 점검과 입고설비 점검","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J16203,"2019-11-04 08:50:00",19-제조-02,출장,"[경남 밀양시]산외교의 당진공장 제품 확인 및 점검과 입고설비 점검","2019-11-04 18:00:00",19-제조-02,출장,"[경남 밀양시]산외교의 당진공장 제품 확인 및 점검과 입고설비 점검","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J14101,"2019-11-04 08:50:00",16-시공-20,출장,한양,"2019-11-04 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-11-05 06:41:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-11-05 18:05:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J18208,"2019-11-05 07:30:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-05 20:49:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-05 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-11-05 07:36:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-11-05 20:49:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-11-05 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-11-05 07:38:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-05 19:34:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-11-05 07:40:00",19-계약-01,b.시공사,"벌교~주암 잔동교, 이천~문경 문경3교 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-05 18:01:00",19-계약-01,b.시공사,"벌교~주암 잔동교, 이천~문경 문경3교 시행가 등 : 교리교 외 3개교 계약 추진 중","0000-00-00 00:00:00",172.16.9.145,NULL,172.16.9.145,004C7,,,
|
|
J18207,"2019-11-05 07:42:00",19-시공-22,b.시공," 상부슬라브공사 실행d예산 및 시공참여자선정 검토","2019-11-05 18:15:00",19-시공-22,b.시공," 상부슬라브공사 실행d예산 및 시공참여자선정 검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J08201,"2019-11-05 07:45:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-05 19:08:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-11-05 08:02:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-11-05 08:06:00",19-설계-10,h.기타,"입암교외1개소(포항~안동 1-1) 설계견적서 및 내역서, 왕림교 가설공사비 검토(국도43호선횡단 야간가설), 세종~포천(세종~안성) 시행견적서 (입찰)","2019-11-05 18:03:00",19-설계-10,h.기타,"입암교외1개소(포항~안동 1-1) 설계견적서 및 내역서, 왕림교 가설공사비 검토(국도43호선횡단 야간가설), 세종~포천(세종~안성) 시행견적서 (입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-11-05 08:08:00",19-교영-01,d.기타,사업관리,"2019-11-05 18:15:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
M05510,"2019-11-05 08:09:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.11.248,NULL,NULL,004C8,,,
|
|
J09101,"2019-11-05 08:11:00",19-교영-01,c.설계사,과업조사,"2019-11-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.144,NULL,NULL,008C7,,,
|
|
J13201,"2019-11-05 08:12:00",19-설계-09,b.구조계산,"런처가설에 따른 코핑길이 검토","2019-11-05 20:52:00",19-설계-09,b.구조계산,"런처가설에 따른 코핑길이 검토","2019-11-05 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J11305,"2019-11-05 08:16:00",19-설계-10,e.검토,"성과품 검토","2019-11-05 18:06:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-11-05 08:17:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-05 18:24:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15201,"2019-11-05 08:21:00",19-교영-21,c.설계사,"과업진행현황 파악","2019-11-05 18:04:00",19-교영-21,c.설계사,"과업진행현황 파악","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10301,"2019-11-05 08:24:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-05 18:25:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-11-05 08:27:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-11-05 18:00:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J17205,"2019-11-05 08:27:00",18-교영-01,c.설계사,.,"2019-11-05 18:02:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15302,"2019-11-05 08:27:00",17-설계-05,b.구조계산,"도면 및 수량 계산서 작성","2019-11-05 18:03:00",17-설계-05,b.구조계산,"도면 및 수량 계산서 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15307,"2019-11-05 08:29:00",19-설계-10,c.도면,"입암교 도면, 수량, 계산서 검토","2019-11-05 21:30:00",19-설계-10,c.도면,"입암교 도면, 수량, 계산서 검토","2019-11-05 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J11202,"2019-11-05 08:33:00",19-시공-02,b.시공,공사관리,"2019-11-06 08:26:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.8.170,004E1,,,
|
|
J15202,"2019-11-05 08:34:00",19-설계-10,b.구조계산,"죽장교 구조계산서 작성","2019-11-05 21:00:00",19-설계-10,b.구조계산,"죽장교 구조계산서 작성","2019-11-05 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"19-설계-10<|>b.구조계산<|>입암교 구조계산서 작성<|>02:30<|><br>",1,
|
|
J18205,"2019-11-05 08:35:00",18-시공-12,g.기타,"임시 가로보 설치 검토","2019-11-05 21:34:00",18-시공-12,g.기타,"임시 가로보 설치 검토","2019-11-05 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07210,"2019-11-05 08:37:00",14-설계-32,h.기타,"산외교 솟음","2019-11-05 18:02:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J16202,"2019-11-05 08:40:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J14306,"2019-11-05 08:50:00",19-교휴-06,경유,"경유(기술인협회(청담천-김원삼부장 입사 및 경력신고))","2019-11-05 18:03:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10315,"2019-11-05 08:50:00",17-시공-09,출장,"삼남1교 현장","2019-11-05 18:00:00",17-시공-09,출장,"삼남1교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11302,"2019-11-05 08:50:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 2차인장","2019-11-05 18:00:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 2차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J07202,"2019-11-05 08:50:00",19-제조-02,출장,"[경남 밀양시]산외교의 당진공장 제품 확인 및 점검과 입고설비 점검","2019-11-05 18:00:00",19-제조-02,출장,"[경남 밀양시]산외교의 당진공장 제품 확인 및 점검과 입고설비 점검","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J16203,"2019-11-05 08:50:00",19-제조-02,출장,"[경남 밀양시]산외교의 당진공장 제품 확인 및 점검과 입고설비 점검","2019-11-05 18:00:00",19-제조-02,출장,"[경남 밀양시]산외교의 당진공장 제품 확인 및 점검과 입고설비 점검","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J14101,"2019-11-05 08:50:00",16-시공-20,출장,한양,"2019-11-05 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
M02302,"2019-11-05 08:50:00",19-제조-02,출장,"[서울사무소]임원회의 및 업무 보고","2019-11-05 18:00:00",19-제조-02,출장,"[서울사무소]임원회의 및 업무 보고","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J07202,"2019-11-06 07:23:00",19-제조-04,b.기계,"PSC강연선 인입실험 준비와 캔틸레버 브라켓 실험 및 Pre-Deck 실험 준비","2019-11-07 07:09:00",19-제조-04,b.기계,"PSC강연선 인입실험 준비와 캔틸레버 브라켓 실험 및 Pre-Deck 실험 준비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-11-06 07:25:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-06 21:59:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-06 18:57:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-11-06 07:33:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-06 21:55:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-11-06 07:37:00",19-시공-20,b.시공,"스프라이스거더 제작 공정관련 투입작업팀 및 공정검토","2019-11-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.139,NULL,NULL,004C7,,,
|
|
J14308,"2019-11-06 07:41:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-11-06 22:18:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 철근 절단 프로그램 변수 작업 ","2019-11-06 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-11-06 07:55:00",19-계약-01,b.시공사,"중리~천리 중리교, 양평~이천 신촌교 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
B15306,"2019-11-06 08:04:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-11-06 08:15:00",19-설계-10,e.검토,"성과품 검토","2019-11-06 18:06:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-11-06 08:18:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J10314,"2019-11-06 08:20:00",18-설계-19,h.기타,"Dr.Wide Flange Girder(동두천-연천 2공구) 설계 견적서 및 내역서, 왕림교 가설공사비 검토(국도43호선횡단 야간가설), 세종~포천(세종~안성) 시행견적서 (입찰)","2019-11-06 18:21:00",19-교영-22,d.기타,"Dr.Wide Flange Girder(동두천-연천 2공구) 설계 견적서 및 내역서, 왕림교 가설공사비 검토(국도43호선횡단 야간가설), 세종~포천(세종~안성) 시행견적서 (입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11202,"2019-11-06 08:26:00",19-시공-02,b.시공,공사관리,"2019-11-06 18:15:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.8.170,NULL,172.16.9.159,004E1,,,
|
|
J18206,"2019-11-06 08:26:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-06 10:05:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J17205,"2019-11-06 08:28:00",18-교영-01,c.설계사,.,"2019-11-06 18:04:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15302,"2019-11-06 08:29:00",17-설계-05,b.구조계산,"도면 및 수량 계산서 작성","2019-11-06 20:34:00",17-설계-05,b.구조계산,"도면 및 수량 계산서 작성","2019-11-06 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"17-설계-09<|>c.도면<|>조령천교당초변경 검토<|>03:00<|><br>19-교영-18<|>d.기타<|>월곶~판교 설계현황작성<|>04:00<|><br>",1,
|
|
J13201,"2019-11-06 08:32:00",19-설계-09,b.구조계산,"런처가설에 따른 코핑길이 검토","2019-11-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E2,,,
|
|
J16202,"2019-11-06 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-06 18:08:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-11-06 08:33:00",19-설계-10,b.구조계산,"죽장교 구조계산서 작성","2019-11-06 20:33:00",19-설계-10,b.구조계산,"죽장교 구조계산서 작성","2019-11-06 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"19-설계-06<|>e.검토<|>도림1육교 VE 지적사항 검토<|>04:00<|><br>",1,
|
|
J18205,"2019-11-06 08:33:00",18-시공-12,g.기타,"임시 가로보 설치 검토","2019-11-06 21:35:00",18-시공-12,g.기타,"임시 가로보 설치 검토","2019-11-06 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07103,"2019-11-06 08:34:00",19-교영-01,d.기타,사업관리,"2019-11-06 18:17:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15201,"2019-11-06 08:36:00",19-교영-06,c.설계사,"과업진행현황 파악 및 회의 참석","2019-11-06 18:03:00",19-교영-06,c.설계사,"과업진행현황 파악 및 회의 참석","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15307,"2019-11-06 08:36:00",19-설계-10,c.도면,"죽장교 도면, 수량, 계산서 검토","2019-11-06 21:00:00",19-설계-10,c.도면,"죽장교 도면, 수량, 계산서 검토","2019-11-06 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10313,"2019-11-06 08:37:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-11-06 18:02:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J14306,"2019-11-06 08:44:00",19-관리-04,a.계약,"계약업무 외","2019-11-06 18:01:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J09101,"2019-11-06 08:52:00",19-교영-01,c.설계사,과업조사,"2019-11-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.144,NULL,NULL,008C7,,,
|
|
J16203,"2019-11-06 08:54:00",19-제조-03,a.품질검사,"산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 관리 (7시35분 출근)","2019-11-06 23:11:00",19-제조-03,a.품질검사,"산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 관리 (7시35분 출근)","2019-11-06 18:57:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J10315,"2019-11-06 08:50:00",17-시공-09,출장,"삼남1교 현장","2019-11-06 18:00:00",17-시공-09,출장,"삼남1교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11302,"2019-11-06 08:50:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 2차인장","2019-11-06 18:00:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 2차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J14101,"2019-11-06 08:50:00",16-시공-20,출장,한양,"2019-11-06 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-11-06 08:50:00",17-시공-08,출장,"[대구 광역시]런처 현장투입 검수","2019-11-06 18:00:00",17-시공-08,출장,"[대구 광역시]런처 현장투입 검수","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M02302,"2019-11-06 08:50:00",19-시공-20,출장,"조령천교, 경안천교 현장 출장","2019-11-06 18:00:00",19-시공-20,출장,"조령천교, 경안천교 현장 출장","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,1,
|
|
J10301,"2019-11-06 08:50:00",17-시공-21,출장,"[대림현장사무소, 당진공장]북수원1교 프리덱설치 관련 공정협의, 당진공장(운반업체협의)","2019-11-06 18:00:00",17-시공-21,출장,"[대림현장사무소, 당진공장]북수원1교 프리덱설치 관련 공정협의, 당진공장(운반업체협의)","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J07202,"2019-11-07 07:10:00",19-제조-04,b.기계,"콤프레샤 교체 출장(경북 상주)과 PSC강연선 인입실험 준비","2019-11-08 06:54:00",19-제조-04,b.기계,"콤프레샤 교체 출장(경북 상주)과 PSC강연선 인입실험 준비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-11-07 07:27:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-07 20:32:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-11-07 07:30:00",19-시공-20,b.시공,"스프라이스거더 제작 공정관련 투입작업팀 및 공정검토","2019-11-07 18:14:00",19-시공-20,b.시공,"스프라이스거더 제작 공정관련 투입작업팀 및 공정검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J18208,"2019-11-07 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-07 18:06:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J14308,"2019-11-07 07:36:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-07 23:23:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-07 19:18:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-11-07 07:41:00",19-제조-02,a.생산관리,"프리캐스트 가로보 제작도 셈플 검토","2019-11-07 19:14:00",19-제조-02,a.생산관리,"프리캐스트 가로보 제작도 셈플 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>Pre-Deck 프로그램 검토 및 협의<|>01:00<|><br>19-제조-02<|>a.생산관리<|>운수회사 방문 및 면담<|>02:00<|><br>19-제조-02<|>a.생산관리<|>홍보동영상 자료 정리 및 전달<|>01:30<|><br>",1,
|
|
J16203,"2019-11-07 07:44:00",19-제조-03,a.품질검사,"산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 관리 (7시35분 출근)","2019-11-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-11-07 07:48:00",19-계약-01,b.시공사,"중리~천리 중리교, 양평~이천 신촌교 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-07 18:02:00",19-계약-01,b.시공사,"중리~천리 중리교, 양평~이천 신촌교 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","0000-00-00 00:00:00",172.16.9.145,NULL,172.16.9.145,004C7,,,
|
|
J18206,"2019-11-07 08:13:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-07 18:05:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-11-07 08:14:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-07 18:05:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J16202,"2019-11-07 08:17:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J10314,"2019-11-07 08:20:00",18-설계-19,h.기타,"청도3교외 1개소(청도천외 1개소 하천재해예방사업) 설계견적서 및 내역서(특공), Dr.Wide Flange Girder(동두천-연천 2공구) 설계 견적서 및 내역서, 세종~포천(세종~안성) 시행견적서 (입찰)","2019-11-07 18:02:00",19-교영-22,d.기타,"청도3교외 1개소(청도천외 1개소 하천재해예방사업) 설계견적서 및 내역서(특공), Dr.Wide Flange Girder(동두천-연천 2공구) 설계 견적서 및 내역서, 세종~포천(세종~안성) 시행견적서 (입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11305,"2019-11-07 08:21:00",19-설계-10,e.검토,"성과품 검토","2019-11-07 18:06:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-11-07 08:22:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J13201,"2019-11-07 08:24:00",19-설계-09,b.구조계산,"빔배치 수정","2019-11-07 20:42:00",19-설계-09,b.구조계산,"런처가설에 따른 코핑길이 검토","2019-11-07 18:33:00",172.16.9.165,172.16.9.155,172.16.9.165,008E2,,1,
|
|
J18205,"2019-11-07 08:27:00",17-설계-05,c.도면,"구조물도 작성","2019-11-07 21:34:00",17-설계-05,c.도면,"구조물도 작성","2019-11-07 18:33:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J17205,"2019-11-07 08:27:00",18-교영-01,c.설계사,.,"2019-11-07 18:08:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15302,"2019-11-07 08:30:00",19-설계-06,e.검토,"설계VE 지적사항 수정","2019-11-07 20:33:00",19-설계-06,e.검토,"설계VE 지적사항 수정","2019-11-07 18:33:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"19-교영-18<|>d.기타<|>부반력검토 <|>03:00<|><br>",1,
|
|
J10313,"2019-11-07 08:31:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-11-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15202,"2019-11-07 08:32:00",19-설계-08,b.구조계산,"경간장 변경 우산1교 반력산정","2019-11-07 20:32:00",19-설계-08,b.구조계산,"경간장 변경 우산1교 반력산정","2019-11-07 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-11-07 08:32:00",14-설계-32,h.기타,"산외교 솟음","2019-11-07 18:07:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J14306,"2019-11-07 08:36:00",19-관리-04,a.계약,"계약업무 외","2019-11-07 18:18:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15201,"2019-11-07 08:37:00",19-교영-06,c.설계사,"과업진행현황 파악 및 회의 참석","2019-11-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J15307,"2019-11-07 08:37:00",19-설계-08,c.도면,"우산1교 슬래브 일반도 작성
|
|
우산1교 바닥판 계산서 작성","2019-11-07 18:01:00",19-설계-08,c.도면,"우산1교 슬래브 일반도 작성
|
|
우산1교 바닥판 계산서 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J07103,"2019-11-07 08:38:00",19-교영-01,d.기타,사업관리,"2019-11-07 18:20:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-11-07 08:39:00",19-시공-22,d.자재,"[대림현장사무소, 당진공장]북수원1교 프리덱설치 관련 공정협의, 당진공장(운반업체협의)","2019-11-07 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J09101,"2019-11-07 08:55:00",19-교영-01,c.설계사,과업조사,"2019-11-08 09:13:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J10315,"2019-11-07 08:50:00",17-시공-09,출장,"삼남1교 현장","2019-11-07 18:00:00",17-시공-09,출장,"삼남1교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11302,"2019-11-07 08:50:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 2차인장","2019-11-07 18:00:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 2차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J14101,"2019-11-07 08:50:00",16-시공-20,출장,한양,"2019-11-07 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-11-07 08:50:00",17-시공-08,출장,"[대구 광역시]런처 현장투입 검수","2019-11-07 18:00:00",17-시공-08,출장,"[대구 광역시]런처 현장투입 검수","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11202,"2019-11-07 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-07 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J07202,"2019-11-08 06:55:00",19-제조-04,b.기계,"경비실 후면 뚜껑 제작과 캔틸레버 실험용 거더 제작 및 PSC강연선 인입실험 준비","2019-11-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
T04204,"2019-11-08 07:26:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-08 20:23:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-11-08 07:39:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-08 20:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-08 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,,
|
|
J14308,"2019-11-08 07:40:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-08 20:35:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-08 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-11-08 07:40:00",19-제조-03,a.품질검사,"산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 관리 ","2019-11-08 20:34:00",19-제조-03,a.품질검사,"산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 관리 ","2019-11-08 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
M02302,"2019-11-08 07:40:00",19-제조-02,a.생산관리,"굴삭기 장비 등록 및 매매서류 작성","2019-11-08 17:56:00",19-제조-02,a.생산관리,"굴삭기 장비 등록 및 매매서류 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>반장확대회의 회의자료 작성<|>02:00<|><br>19-제조-02<|>a.생산관리<|>평가사 손님 안내 및 접견<|>01:00<|><br>19-제조-02<|>a.생산관리<|>반장회의<|>00:30<|><br>",1,
|
|
J18207,"2019-11-08 07:41:00",18-시공-12,b.시공,"스프라이스거더 제작 공정관련 시공사 포스코협의 ","2019-11-08 17:53:00",18-시공-12,b.시공,"스프라이스거더 제작 공정관련 시공사 포스코협의 ","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J09102,"2019-11-08 07:56:00",19-계약-01,b.시공사,"용진~우아 아중교, 양평~이천 신촌교 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J10314,"2019-11-08 08:06:00",19-교영-22,d.기타,"Dr.Wide Flange Girder(동두천-연천 2공구) 설계 견적서 및 내역서, 세종~포천(세종~안성) 시행견적서 (입찰)","2019-11-08 18:06:00",19-교영-22,d.기타,"Dr.Wide Flange Girder(동두천-연천 2공구) 설계 견적서 및 내역서, 세종~포천(세종~안성) 시행견적서 (입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-11-08 08:13:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-11-08 08:17:00",19-설계-10,e.검토,"성과품 검토","2019-11-08 18:07:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-11-08 08:19:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-08 18:16:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18205,"2019-11-08 08:25:00",17-설계-05,c.도면,"구조물도 작성","2019-11-08 18:04:00",17-설계-05,c.도면,"구조물도 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J15307,"2019-11-08 08:27:00",19-설계-08,c.도면,"우산1교 바닥판 계산서 작성","2019-11-08 18:01:00",19-설계-08,c.도면,"우산1교 바닥판 계산서 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J18206,"2019-11-08 08:27:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-08 18:04:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J16202,"2019-11-08 08:28:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-08 18:05:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15302,"2019-11-08 08:29:00",17-설계-13,h.기타,"DR구간 수량 산출 취합","2019-11-08 18:04:00",17-설계-13,h.기타,"DR구간 수량 산출 취합","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,"18-설계-19<|>e.검토<|>제출성과품 #으로 표시된거 수정후 재제출<|>02:00<|><br>",,
|
|
J13201,"2019-11-08 08:31:00",19-설계-09,b.구조계산,"빔배치 수정","2019-11-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E2,,,
|
|
J07103,"2019-11-08 08:33:00",19-교영-01,d.기타,사업관리,"2019-11-08 18:09:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15202,"2019-11-08 08:34:00",19-설계-08,b.구조계산,"경간장 변경 우산1교 반력산정","2019-11-08 18:34:00",19-설계-08,b.구조계산,"경간장 변경 우산1교 반력산정","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"19-설계-06<|>g.업무지원<|>설계VE 업무지원<|>03:00<|><br>",,
|
|
J17205,"2019-11-08 08:36:00",18-교영-01,c.설계사,.,"2019-11-08 18:07:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-11-08 08:37:00",14-설계-32,h.기타,"산외교 솟음","2019-11-08 18:04:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15201,"2019-11-08 08:43:00",19-교영-06,c.설계사,"과업진행현황 파악 및 회의 참석","2019-11-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
M05510,"2019-11-08 08:47:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.36.59,NULL,NULL,004C8,,,
|
|
J14306,"2019-11-08 08:49:00",19-관리-04,a.계약,"계약업무 외","2019-11-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J09101,"2019-11-08 09:13:00",19-교영-01,c.설계사,과업조사,"2019-11-08 18:07:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J10313,"2019-11-08 08:21:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-11-08 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J10315,"2019-11-08 08:50:00",17-시공-09,출장,"삼남1교 현장","2019-11-08 18:00:00",17-시공-09,출장,"삼남1교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11302,"2019-11-08 08:50:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 2차인장","2019-11-08 18:00:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 2차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J14101,"2019-11-08 08:50:00",16-시공-20,출장,한양,"2019-11-08 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-11-08 08:50:00",17-시공-08,출장,"[대구 광역시]런처 현장투입 검수","2019-11-08 18:00:00",17-시공-08,출장,"[대구 광역시]런처 현장투입 검수","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11202,"2019-11-08 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-08 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10301,"2019-11-08 08:50:00",17-시공-09,출장,"[울산시, 밀양시]산외교 및 삼남1교 현장 ","2019-11-08 18:00:00",17-시공-09,출장,"[울산시, 밀양시]산외교 및 삼남1교 현장 ","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M05510,"2019-11-09 07:21:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.35.222,NULL,NULL,004C8,,,
|
|
M02302,"2019-11-09 07:36:00",19-제조-02,a.생산관리,"공장관리 및 주말보고","2019-11-09 16:02:00",19-제조-02,a.생산관리,"공장관리 및 주말보고","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-11-09 07:37:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-09 16:44:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J14308,"2019-11-09 07:42:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-09 16:17:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
T04204,"2019-11-09 07:43:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-09 16:16:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-11-09 07:44:00",19-제조-03,a.품질검사,"산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 관리 ","2019-11-09 15:36:00",19-제조-03,a.품질검사,"산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 관리 ","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
J12202,"2019-11-11 07:05:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 검수","2019-11-11 18:08:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 검수","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
M05510,"2019-11-11 07:16:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.36.91,NULL,NULL,004C8,,,
|
|
J18208,"2019-11-11 07:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-11 20:58:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-11 18:48:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J07202,"2019-11-11 07:37:00",19-제조-04,b.기계,"도화육교 거푸집(H2.4) 보수 및 야적장 정리정돈","2019-11-12 06:55:00",19-제조-04,b.기계,"도화육교 거푸집(H2.4) 보수 및 야적장 정리정돈","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,,,,
|
|
T04204,"2019-11-11 07:40:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-11 19:28:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-11-11 07:40:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-11 21:15:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-11 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-11-11 07:43:00",19-계약-01,b.시공사,"롯데건설 본사, 용진~우아 아중교, 양평~이천 신촌교 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-11-11 07:47:00",18-시공-12,b.시공,"스프라이스거더 제작 공정관련 시공사 포스코협의 ","2019-11-11 18:19:00",18-시공-12,b.시공,"스프라이스거더 제작 공정관련 시공사 포스코협의 ","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J16203,"2019-11-11 08:01:00",19-제조-03,a.품질검사,"산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 관리 ","2019-11-11 22:45:00",19-제조-03,a.품질검사,"산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 관리 ","2019-11-11 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J18205,"2019-11-11 08:13:00",17-설계-05,c.도면,"구조물도 작성","2019-11-11 18:02:00",17-설계-05,c.도면,"구조물도 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
B15306,"2019-11-11 08:14:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-11-11 08:17:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-11 18:16:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-11-11 08:18:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-11 18:50:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-11-11 08:19:00",19-설계-08,c.도면,"우산1교 슬래브 배근도 작성","2019-11-11 20:45:00",19-설계-08,c.도면,"우산1교 슬래브 배근도 작성","2019-11-11 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J09101,"2019-11-11 08:25:00",19-교영-01,c.설계사,과업조사,"2019-11-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.144,NULL,NULL,008C7,,,
|
|
J10314,"2019-11-11 08:25:00",19-설계-09,h.기타,"제3연륙교(영종~청라) 설계내역서(9열배치), 대천교(청도천외 1개소 하천재해예방사업) 설계견적서 및 내역서(특공), 세종~포천(세종~안성) 시행견적서 (입찰), 신양교(안동~영덕) 계약협의","2019-11-11 18:02:00",19-설계-09,h.기타,"제3연륙교(영종~청라) 설계내역서(9열배치), 대천교(청도천외 1개소 하천재해예방사업) 설계견적서 및 내역서(특공), 세종~포천(세종~안성) 시행견적서 (입찰), 신양교(안동~영덕) 계약협의","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15302,"2019-11-11 08:29:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-11 20:34:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-11 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J07103,"2019-11-11 08:32:00",19-교영-01,d.기타,사업관리,"2019-11-11 18:13:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15201,"2019-11-11 08:35:00",19-교영-06,c.설계사,"과업진행현황 파악 및 회의 참석","2019-11-11 18:04:00",19-교영-06,c.설계사,"과업진행현황 파악 및 회의 참석","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J07210,"2019-11-11 08:36:00",14-설계-32,h.기타,"산외교 솟음","2019-11-11 20:40:00",14-설계-32,h.기타,"산외교 솟음","2019-11-11 18:33:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J16202,"2019-11-11 08:37:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-11 18:17:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-11-11 08:37:00",18-교영-01,c.설계사,.,"2019-11-11 18:15:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J13201,"2019-11-11 08:42:00",19-설계-09,b.구조계산,"빔배치 수정","2019-11-11 20:46:00",19-설계-09,b.구조계산,"빔배치 수정","2019-11-11 18:33:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10313,"2019-11-11 08:42:00",19-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","2019-11-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J11305,"2019-11-11 08:42:00",19-설계-10,e.검토,"성과품 검토","2019-11-11 18:07:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15202,"2019-11-11 08:52:00",19-설계-08,b.구조계산,"경간장 변경 우산1교 반력산정","2019-11-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.155,NULL,NULL,008E1,18-설계-12<|>g.업무지원<|>합사업무협의<|>03:00<|><br>,,
|
|
J10301,"2019-11-11 08:30:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-11 18:26:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J14306,"2019-11-11 08:50:00",19-교휴-06,경유,"경유(등기소(법인인감증명서 발급))","2019-11-11 18:02:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10315,"2019-11-11 08:50:00",17-시공-09,출장,"삼남1교 현장","2019-11-11 18:00:00",17-시공-09,출장,"삼남1교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J14101,"2019-11-11 08:50:00",16-시공-20,출장,한양,"2019-11-11 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-11 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-11 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M02302,"2019-11-11 08:50:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","2019-11-11 18:00:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J18301,"2019-11-11 08:50:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","2019-11-11 18:00:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","0000-00-00 00:00:00",NULL,NULL,NULL,006E3,,,
|
|
M05510,"2019-11-12 06:50:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.36.248,NULL,NULL,004C8,,,
|
|
J07202,"2019-11-12 06:55:00",19-제조-04,b.기계,"도화육교 거푸집(H2.4) 보수 및 경비실 후면 뚜껑 제작","2019-11-13 06:53:00",19-제조-04,b.기계,"도화육교 거푸집(H2.4) 보수 및 경비실 후면 뚜껑 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-11-12 07:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-12 22:00:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-12 18:49:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-11-12 07:37:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-12 20:26:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-11-12 07:37:00",19-시공-20,b.시공,"거더 제작 공정관련 작업팀투입 시공사 협의 ","2019-11-12 18:13:00",19-시공-20,b.시공,"거더 제작 공정관련 작업팀투입 시공사 협의 ","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J09102,"2019-11-12 07:39:00",19-계약-01,b.시공사,"포스코건설 현장, 강진~광주 7공구 용두교 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-11-12 07:42:00",19-시공-23,b.시공,"제작 및 가설협의 자료작성","2019-11-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.147,NULL,NULL,004C7,,,
|
|
J16203,"2019-11-12 07:42:00",19-제조-03,a.품질검사,"ks점검준비,산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 ","2019-11-12 20:35:00",19-제조-03,a.품질검사,"ks점검준비,산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 ","2019-11-12 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J11305,"2019-11-12 08:18:00",19-설계-10,e.검토,"성과품 검토","2019-11-12 18:08:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-11-12 08:18:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-12 18:26:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-11-12 08:24:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-11-12 08:25:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-12 18:20:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J16202,"2019-11-12 08:28:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-12 18:22:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15302,"2019-11-12 08:28:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-12 18:06:00",17-설계-13,h.기타,"DR거더 표준도 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J07103,"2019-11-12 08:29:00",19-교영-01,d.기타,사업관리,"2019-11-12 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15307,"2019-11-12 08:31:00",19-설계-08,c.도면,"우산1교 슬래브 배근도 작성","2019-11-12 21:31:00",19-설계-08,c.도면,"우산1교 슬래브 배근도 작성","2019-11-12 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10313,"2019-11-12 08:32:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-12 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18205,"2019-11-12 08:35:00",17-설계-05,c.도면,"구조물도 작성","2019-11-12 21:37:00",17-설계-05,c.도면,"구조물도 작성","2019-11-12 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07210,"2019-11-12 08:35:00",14-설계-32,h.기타,"산외교 솟음","2019-11-12 20:39:00",14-설계-32,h.기타,"산외교 솟음","2019-11-12 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J13201,"2019-11-12 08:35:00",19-설계-09,b.구조계산,반력검토,"2019-11-12 20:36:00",19-설계-09,b.구조계산,반력검토,"2019-11-12 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J17205,"2019-11-12 08:36:00",18-교영-01,c.설계사,.,"2019-11-12 18:10:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15201,"2019-11-12 08:37:00",19-교영-22,c.설계사,"과업진행현황 파악 ","2019-11-12 18:05:00",19-교영-22,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15202,"2019-11-12 08:37:00",19-설계-08,b.구조계산,"구조계산서 작성","2019-11-12 18:30:00",19-설계-08,b.구조계산,"구조계산서 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"18-설계-12<|>g.업무지원<|>설계안전보고서 작성<|>05:00<|><br>",,
|
|
J14306,"2019-11-12 08:40:00",19-관리-04,a.계약,"계약업무 외","2019-11-12 18:02:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-11-12 08:42:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-12 18:15:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J09101,"2019-11-12 08:46:00",19-교영-01,c.설계사,과업조사,"2019-11-12 18:09:00",19-교영-01,c.설계사,과업조사,"0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J14308,"2019-11-12 16:57:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-12 22:00:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-12 18:50:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14101,"2019-11-12 08:50:00",16-시공-20,출장,한양,"2019-11-12 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-12 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-12 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M02302,"2019-11-12 08:50:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","2019-11-12 18:00:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J18301,"2019-11-12 08:50:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","2019-11-12 18:00:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","0000-00-00 00:00:00",NULL,NULL,NULL,006E3,,,
|
|
J11302,"2019-11-12 08:50:00",17-시공-10,출장,"[대구 달성구 하빈면]성주대교 균열조사 및 세천2교 현장 근무","2019-11-12 18:00:00",17-시공-10,출장,"[대구 달성구 하빈면]성주대교 균열조사 및 세천2교 현장 근무","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
M05510,"2019-11-13 06:43:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-14 07:13:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.36.200,NULL,223.38.36.243,004C8,,,
|
|
J07202,"2019-11-13 06:54:00",19-제조-04,b.기계,"운곡교 거더 거푸집(H2.6) 상차와 생태수로 INVETED-T 거푸집 청소와 그라인더 작업","2019-11-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J12202,"2019-11-13 07:04:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 검수","2019-11-13 18:05:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 검수","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J18208,"2019-11-13 07:25:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-13 18:13:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J14308,"2019-11-13 07:27:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-13 18:11:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18207,"2019-11-13 07:32:00",16-시공-20,b.시공,"상부스라브 콘크리트타설 방법 및 시공계획서 검토","2019-11-13 18:43:00",16-시공-20,b.시공,"상부스라브 콘크리트타설 방법 및 시공계획서 검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
T04204,"2019-11-13 07:39:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J16203,"2019-11-13 07:44:00",19-제조-03,a.품질검사,"ks점검준비,산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 ","2019-11-13 22:40:00",19-제조-03,a.품질검사,"ks점검준비,산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 ","2019-11-13 19:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-11-13 07:47:00",19-계약-01,b.시공사,"코오롱글로벌 본사, 새만금~전주 1공구 심포2교 외 3개교 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-11-13 08:07:00",19-시공-23,b.시공,"제작 및 가설협의 자료작성","2019-11-13 18:01:00",19-시공-23,b.시공,"제작 및 가설협의 자료작성","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J10314,"2019-11-13 08:13:00",19-시공-25,g.기타,"신양교(안동~영덕) 계약견적서 및 첨부서류, 세종~포천(세종~안성) 시행견적서 (입찰), 지경천교(포항~영덕 3공구) 가설검토자료","2019-11-13 18:05:00",19-시공-25,g.기타,"신양교(안동~영덕) 계약견적서 및 첨부서류, 세종~포천(세종~안성) 시행견적서 (입찰), 지경천교(포항~영덕 3공구) 가설검토자료","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-11-13 08:14:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-13 19:12:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-11-13 08:17:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-13 18:35:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-11-13 08:21:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J13201,"2019-11-13 08:21:00",19-설계-09,b.구조계산,반력검토,"2019-11-13 18:02:00",19-설계-09,b.구조계산,반력검토,"0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J16202,"2019-11-13 08:28:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-13 18:36:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15302,"2019-11-13 08:29:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-13 20:34:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-13 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J15202,"2019-11-13 08:30:00",18-설계-12,e.검토,"설계안전보고서 작성","2019-11-13 20:40:00",18-설계-12,e.검토,"설계안전보고서 작성","2019-11-13 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"16-교영-39<|>c.설계사<|>거더수량 산출<|>02:00<|><br>",1,
|
|
J18205,"2019-11-13 08:30:00",17-설계-05,c.도면,"구조물도 작성","2019-11-13 20:47:00",17-설계-05,c.도면,"구조물도 작성","2019-11-13 18:32:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15307,"2019-11-13 08:31:00",19-설계-08,c.도면,"우산1교 슬래브 배근도 작성","2019-11-13 21:16:00",19-설계-08,c.도면,"우산1교 슬래브 배근도 작성","2019-11-13 18:30:00",172.16.9.173,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J07210,"2019-11-13 08:33:00",14-설계-32,h.기타,"산외교 솟음","2019-11-13 20:35:00",14-설계-32,h.기타,"산외교 솟음","2019-11-13 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J10313,"2019-11-13 08:33:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15201,"2019-11-13 08:37:00",19-교영-21,c.설계사,"과업진행현황 파악 ","2019-11-13 18:05:00",19-교영-21,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14306,"2019-11-13 08:39:00",19-관리-04,a.계약,"계약업무 외","2019-11-13 18:07:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-11-13 08:42:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-13 18:33:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J17205,"2019-11-13 08:43:00",18-교영-01,c.설계사,.,"2019-11-13 18:14:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11305,"2019-11-13 08:36:00",19-설계-10,e.검토,"성과품 검토","2019-11-13 18:03:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J14101,"2019-11-13 08:50:00",16-시공-20,출장,한양,"2019-11-13 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-13 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-13 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M02302,"2019-11-13 08:50:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","2019-11-13 18:00:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J18301,"2019-11-13 08:50:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","2019-11-13 18:00:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","0000-00-00 00:00:00",NULL,NULL,NULL,006E3,,,
|
|
J11302,"2019-11-13 08:50:00",17-시공-10,출장,"[대구 달성구 하빈면]성주대교 균열조사 및 세천2교 현장 근무","2019-11-13 18:00:00",17-시공-10,출장,"[대구 달성구 하빈면]성주대교 균열조사 및 세천2교 현장 근무","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J07103,"2019-11-13 08:50:00",17-시공-08,출장,현장사무소,"2019-11-13 18:00:00",17-시공-08,출장,현장사무소,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J07202,"2019-11-14 06:53:00",19-제조-04,b.기계,"공장 내 보온작업과 동절기 기 제작된 거더 물빼기 출장","2019-11-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M05510,"2019-11-14 07:13:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.36.243,NULL,NULL,004C8,,,
|
|
J18208,"2019-11-14 07:18:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J18207,"2019-11-14 07:29:00",16-시공-20,b.시공,"상부스라브 콘크리트타설 방법 및 시공계획서 검토","2019-11-14 18:39:00",16-시공-20,b.시공,"상부스라브 콘크리트타설 방법 및 시공계획서 검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J14308,"2019-11-14 07:40:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-14 20:36:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-14 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-11-14 07:46:00",19-계약-01,b.시공사,"청도군 영업관련 효원건설 미팅, 새만금~전주 1공구 심포2교 외 3개교 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-11-14 07:59:00",19-제조-03,a.품질검사,"ks점검준비,산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 ","2019-11-14 20:36:00",19-제조-03,a.품질검사,"ks점검준비,산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 ","2019-11-14 18:35:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J10315,"2019-11-14 08:05:00",19-시공-23,b.시공,"제작 및 가설협의 자료작성","2019-11-14 18:07:00",19-시공-23,b.시공,"제작 및 가설협의 자료작성","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J10313,"2019-11-14 08:09:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J18206,"2019-11-14 08:18:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-14 18:38:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15302,"2019-11-14 08:20:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-14 20:36:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-14 18:36:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"18-설계-15<|>e.검토<|>시공사 지적사항 체크<|>03:00<|><br>",1,
|
|
J10314,"2019-11-14 08:21:00",15-설계-12,h.기타,"노성천교외 2개소(두마~노성) 설계견적서 및 내역서(특공), 지경천교 크레인가설 검토자료, 삼남1교 설계가 단가갱신, 세종~포천(세종~안성) 시행견적서 (입찰)","2019-11-14 18:25:00",17-시공-09,g.기타,"노성천교외 2개소(두마~노성) 설계견적서 및 내역서(특공), 삼남1교 설계가 단가갱신, 세종~포천(세종~안성) 시행견적서 (입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-11-14 08:26:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-14 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-11-14 08:29:00",19-설계-10,e.검토,"성과품 검토","2019-11-14 18:05:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18205,"2019-11-14 08:30:00",17-설계-05,c.도면,"구조물도 작성","2019-11-14 18:19:00",17-설계-05,c.도면,"구조물도 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J14306,"2019-11-14 08:32:00",19-관리-04,a.계약,"계약업무 외","2019-11-14 18:04:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J13201,"2019-11-14 08:32:00",19-설계-09,b.구조계산,"3@55 검토","2019-11-14 20:38:00",19-설계-09,b.구조계산,"3@55 검토","2019-11-14 18:36:00",172.16.9.165,172.16.9.173,172.16.9.165,008E2,,1,
|
|
J10301,"2019-11-14 08:34:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-14 18:44:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J17205,"2019-11-14 08:34:00",18-교영-01,c.설계사,.,"2019-11-14 18:07:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J07210,"2019-11-14 08:34:00",14-설계-32,h.기타,"산외교 솟음","2019-11-14 18:13:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15307,"2019-11-14 08:35:00",19-설계-08,c.도면,"우산1교 거더 상세도 작성","2019-11-14 21:23:00",19-설계-08,c.도면,"우산1교 거더 상세도 작성","2019-11-14 18:36:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J16202,"2019-11-14 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-14 18:29:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-11-14 08:39:00",17-설계-09,g.업무지원,"조령천교 기술검토반 검토사항 정리","2019-11-14 20:37:00",17-설계-09,g.업무지원,"조령천교 기술검토반 검토사항 정리","2019-11-14 18:36:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"18-설계-15<|>g.업무지원<|>시공사 지적사항 답변정리<|>04:00<|><br>",1,
|
|
J07103,"2019-11-14 09:08:00",19-교영-01,d.기타,사업관리,"2019-11-14 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J14101,"2019-11-14 08:50:00",16-시공-20,출장,한양,"2019-11-14 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-14 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-14 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M02302,"2019-11-14 08:50:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","2019-11-14 18:00:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J18301,"2019-11-14 08:50:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","2019-11-14 18:00:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","0000-00-00 00:00:00",NULL,NULL,NULL,006E3,,,
|
|
J11302,"2019-11-14 08:50:00",17-시공-10,출장,"[대구 달성구 하빈면]성주대교 균열조사 및 세천2교 현장 근무","2019-11-14 18:00:00",17-시공-10,출장,"[대구 달성구 하빈면]성주대교 균열조사 및 세천2교 현장 근무","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J12202,"2019-11-15 06:57:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 검수","2019-11-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J18208,"2019-11-15 07:19:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-15 18:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-11-15 07:35:00",19-제조-02,a.생산관리,"조령천교SPG(단경,측경,중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-11-15 07:43:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-15 20:34:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-15 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-11-15 07:46:00",19-계약-01,b.시공사,"새만금~전주 1공구 심포2교 외 3개교 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-15 19:04:00",19-계약-01,b.시공사,"새만금~전주 1공구 심포2교 외 3개교 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","0000-00-00 00:00:00",172.16.9.145,NULL,172.16.9.145,004C7,,,
|
|
J16203,"2019-11-15 07:46:00",19-제조-03,a.품질검사,"ks점검준비,산외교, 북수원1, 북수원2, 생태수로5 데크 및 프리빔 생산관리, 레미콘 ","2019-11-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J10313,"2019-11-15 07:54:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J08201,"2019-11-15 08:08:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-15 18:03:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-11-15 08:13:00",19-설계-10,e.검토,"성과품 검토","2019-11-15 18:05:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-11-15 08:18:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-15 18:12:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10315,"2019-11-15 08:19:00",17-시공-27,b.시공,"제작 및 가설협의자료 작성","2019-11-15 18:00:00",17-시공-27,b.시공,"제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J10314,"2019-11-15 08:23:00",17-시공-09,g.기타,"삼남1교 설계가 단가갱신, 공종단가비교표(동두천~연천2공구), ERP (인트라넷) 입력 및 정리, DR개략공사비(만강~검단), 세종~포천(세종~안성) 시행견적서 (입찰)","2019-11-15 18:03:00",17-시공-09,g.기타,"삼남1교 설계가 단가갱신, 공종단가비교표(동두천~연천2공구), ERP (인트라넷) 입력 및 정리, DR개략공사비(만강~검단), 세종~포천(세종~안성) 시행견적서 (입찰)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15302,"2019-11-15 08:28:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-15 18:01:00",17-설계-13,h.기타,"DR거더 표준도 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,17-설계-13<|>e.검토<|>성과품정리<|>03:00<|><br>,,
|
|
J16202,"2019-11-15 08:29:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-15 19:04:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15307,"2019-11-15 08:30:00",19-설계-08,c.도면,"우산1교 거더 상세도 작성","2019-11-15 18:01:00",19-설계-08,c.도면,"우산1교 거더 상세도 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.171,008E4,,,
|
|
J18205,"2019-11-15 08:34:00",17-설계-05,c.도면,"구조물도 작성","2019-11-15 18:03:00",17-설계-05,c.도면,"구조물도 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J15201,"2019-11-15 08:35:00",19-교영-21,c.설계사,"과업진행현황 파악 ","2019-11-15 18:01:00",19-교영-21,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15202,"2019-11-15 08:37:00",17-설계-09,g.업무지원,"조령천교 기술검토반 검토사항 정리","2019-11-15 18:06:00",17-설계-09,g.업무지원,"조령천교 기술검토반 검토사항 정리","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"18-교영-33<|>c.설계사<|>거더 수량 산출<|>02:00<|><br>",,
|
|
J14306,"2019-11-15 08:40:00",19-관리-04,a.계약,"계약업무 외","2019-11-15 18:02:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-11-15 08:44:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J07103,"2019-11-15 08:45:00",19-교영-01,d.기타,사업관리,"2019-11-15 18:08:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J17205,"2019-11-15 08:46:00",18-교영-01,c.설계사,.,"2019-11-15 18:05:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
M05510,"2019-11-15 17:47:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-15 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.35.10,NULL,NULL,004C8,,,
|
|
J14101,"2019-11-15 08:50:00",16-시공-20,출장,한양,"2019-11-15 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-15 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-15 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M02302,"2019-11-15 08:50:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","2019-11-15 18:00:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J18301,"2019-11-15 08:50:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","2019-11-15 18:00:00",19-제조-02,출장,"[이탈리아 베니스]STRADDLE CARRIER 구입관련 현장실사","0000-00-00 00:00:00",NULL,NULL,NULL,006E3,,,
|
|
J11302,"2019-11-15 08:50:00",17-시공-10,출장,"[대구 달성구 하빈면]성주대교 균열조사 및 세천2교 현장 근무","2019-11-15 18:00:00",17-시공-10,출장,"[대구 달성구 하빈면]성주대교 균열조사 및 세천2교 현장 근무","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J18207,"2019-11-15 08:50:00",19-시공-15,출장,"[충북 보은군]남일~보은2공구 수리티교 프리데크 생산 및 가설공정 시공사협의","2019-11-15 18:00:00",19-시공-15,출장,"[충북 보은군]남일~보은2공구 수리티교 프리데크 생산 및 가설공정 시공사협의","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M05510,"2019-11-16 07:25:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.48.21,NULL,NULL,004C8,,,
|
|
J16203,"2019-11-16 07:44:00",19-제조-03,a.품질검사,"북수원2 데크 생산관리, KS 점검준비","2019-11-16 18:55:00",19-제조-03,a.품질검사,"북수원2 데크 생산관리, KS 점검준비","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
J18208,"2019-11-17 07:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-17 21:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M05510,"2019-11-17 09:45:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.47.211,NULL,NULL,004C8,,,
|
|
J12202,"2019-11-18 07:00:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 검수","2019-11-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J18208,"2019-11-18 07:31:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-18 18:05:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-11-18 07:33:00",19-제조-02,a.생산관리,"왕림교,조령천교SPG(중앙경간) 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-11-18 07:38:00",19-제조-04,b.기계,"공장 내 보온작업과 거푸집 보수 및 강연선인입 실험체 제작","2019-11-19 06:57:00",19-제조-04,b.기계,"공장 내 보온작업과 거푸집 보수 및 강연선인입 실험체 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-11-18 07:41:00",19-시공-15,b.시공,"남일~보은2공구 수리티교 프리데크 생산 및 가설공정 시공검토","2019-11-18 18:12:00",19-시공-15,b.시공,"남일~보은2공구 수리티교 프리데크 생산 및 가설공정 시공검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
M02302,"2019-11-18 07:42:00",19-제조-02,a.생산관리,"KS 인증 심사 참여","2019-11-18 18:04:00",19-제조-02,a.생산관리,"KS 인증 심사 참여","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>업무 진행 확인 및 협의<|>03:00<|><br>19-제조-02<|>a.생산관리<|>PTC 분절거더 공장 검수 협의<|>00:30<|><br>",,
|
|
J11302,"2019-11-18 07:54:00",17-시공-10,g.기타,"현장관리비 정산 및 화성IC Ramp-A1교 가설계획서 작성","2019-11-18 18:03:00",17-시공-10,g.기타,"현장관리비 정산 및 화성IC Ramp-A1교 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J09102,"2019-11-18 07:54:00",19-계약-01,b.시공사,"서부내륙관련 포스코 본사 방문예정, 김포~파주 3공구 공릉천교 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-11-18 08:01:00",19-제조-03,a.품질검사,"KS 정기점검(한국생활 환경시험연구원, 정학교, 김태환))","2019-11-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
B15306,"2019-11-18 08:02:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-11-18 08:13:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-18 18:20:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-11-18 08:17:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-18 18:19:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-11-18 08:24:00",19-교영-22,d.기타,"공종단가비교표(동두천~연천2공구), DR개략공사비(만강~검단), 삼남1교 설계가 단가갱신, ERP (인트라넷) 입력 및 정리","2019-11-18 18:12:00",19-교영-22,d.기타,"공종단가비교표(동두천~연천2공구), DR개략공사비(만강~검단), 삼남1교 설계가 단가갱신, ERP (인트라넷) 입력 및 정리","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15302,"2019-11-18 08:26:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-18 20:35:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-18 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"19-교영-22<|>d.기타<|>도면 구조계산서 pdf작성<|>02:00<|><br>",1,
|
|
J15307,"2019-11-18 08:30:00",19-설계-08,c.도면,"구룡교 도면 수정","2019-11-18 21:31:00",19-설계-08,c.도면,"구룡교 도면 수정","2019-11-18 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10313,"2019-11-18 08:31:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-18 18:07:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18205,"2019-11-18 08:33:00",19-시공-20,g.기타,"보완요청사항(정착구 상세해석 모델링)","2019-11-18 20:50:00",19-시공-20,g.기타,"보완요청사항(정착구 상세해석 모델링)","2019-11-18 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-11-18 08:34:00",19-설계-09,b.구조계산,"경간구성 변경에 따른 빔배치 수정","2019-11-18 20:44:00",19-설계-09,b.구조계산,"경간구성 변경에 따른 빔배치 수정","2019-11-18 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J14306,"2019-11-18 08:34:00",19-관리-04,a.계약,"계약업무 외","2019-11-18 18:04:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-11-18 08:36:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-18 18:10:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15201,"2019-11-18 08:36:00",19-교영-21,c.설계사,"과업진행현황 파악 ","2019-11-18 18:11:00",19-교영-21,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-11-18 08:37:00",18-교영-01,c.설계사,.,"2019-11-18 18:12:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11305,"2019-11-18 08:37:00",19-설계-10,e.검토,"성과품 검토","2019-11-18 18:06:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07210,"2019-11-18 08:37:00",14-설계-32,h.기타,"산외교 솟음","2019-11-18 18:35:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J16202,"2019-11-18 08:38:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J07103,"2019-11-18 08:43:00",19-교영-01,d.기타,사업관리,"2019-11-18 18:13:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15202,"2019-11-18 08:44:00",19-설계-08,e.검토,"우산교 성과품 정리 및 발송","2019-11-18 20:34:00",17-설계-09,g.업무지원,"조령천교 기술검토반 검토사항 정리","2019-11-18 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
M05510,"2019-11-18 16:04:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-19 07:34:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.48.53,NULL,223.38.48.119,004C8,,,
|
|
J14101,"2019-11-18 08:50:00",16-시공-20,출장,한양,"2019-11-18 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-18 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-18 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-11-18 08:50:00",18-시공-03,출장,"왕림교 현장","2019-11-18 18:00:00",18-시공-03,출장,"왕림교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07202,"2019-11-19 06:57:00",19-제조-04,b.기계,"캔틸레버 브라켓 부착 거더 제작과 거푸집 보수 및 강연선인입 실험체 제작","2019-11-20 07:30:00",19-제조-04,b.기계,"캔틸레버 브라켓 부착 거더 제작과 거푸집 보수 및 강연선인입 실험체 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-11-19 07:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-19 17:56:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-11-19 07:31:00",19-제조-02,a.생산관리,"왕림교,조령천교SPG(중앙경간),생태통로1교 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-11-19 07:32:00",19-시공-25,b.시공,"1. 석현천교 및 용강IC교 현장 제작완료 보고서 및 정산서 작성
|
|
2.운곡교 정산서 작성 및 현장(피드백)보고서 작성
|
|
3. 런처 동영상 편집","2019-11-19 18:50:00",19-시공-25,b.시공,"1. 석현천교 및 용강IC교 현장 제작완료 보고서 및 정산서 작성
|
|
2.운곡교 정산서 작성 및 현장(피드백)보고서 작성
|
|
3. 런처 동영상 편집","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
M05510,"2019-11-19 07:34:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.48.119,NULL,NULL,004C8,,,
|
|
M02302,"2019-11-19 07:34:00",19-제조-02,a.생산관리,"RCP 프로그램 관련 협의 및 검토","2019-11-19 18:00:00",19-제조-02,a.생산관리,"RCP 프로그램 관련 협의 및 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>Pre-Deck 프로그램 검토 및 협의<|>02:30<|><br>19-제조-02<|>a.생산관리<|>관리자 업무분장 검토<|>02:00<|><br>",,
|
|
J14308,"2019-11-19 07:37:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J16203,"2019-11-19 07:47:00",19-제조-03,a.품질검사,"북수원2, 산외교, 생태수로5 데크 및 프리빔 생산관리. ks 지적사항 정리","2019-11-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-11-19 07:47:00",19-계약-01,b.시공사,"SK건설, 계룡건설 현장 방문예정, 김포~파주 3공구 공릉천교 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-11-19 08:01:00",19-시공-20,b.시공,"금년도 거더제작 예정분96본 제작공정 및 투입작업팀검토","2019-11-19 18:14:00",19-시공-20,b.시공,"금년도 거더제작 예정분96본 제작공정 및 투입작업팀검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J11302,"2019-11-19 08:04:00",17-시공-10,g.기타,"지경천교 크레인 가설검토 및 우산1교 가설검토","2019-11-19 20:35:00",17-시공-10,g.기타,"현장관리비 정산 및 화성IC Ramp-A1교 가설계획서 작성","2019-11-19 18:34:00",172.16.9.166,172.16.9.166,172.16.9.166,004E2,,1,
|
|
J08201,"2019-11-19 08:08:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-19 18:12:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-11-19 08:11:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-11-19 08:14:00",19-설계-10,e.검토,"성과품 검토","2019-11-19 18:09:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-11-19 08:21:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-19 17:50:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-11-19 08:29:00",17-설계-09,h.기타,"곡천교(안성~성남2공구) 계약관련 검토자료, 설계견적서(순창교)-피티씨요청, DR개략공사비(만강~검단), 삼남1교 설계가 단가갱신, ERP (인트라넷) 입력 및 정리","2019-11-19 18:06:00",17-설계-09,h.기타,"곡천교(안성~성남2공구) 계약관련 검토자료, 설계견적서(순창교)-피티씨요청, DR개략공사비(만강~검단), 삼남1교 설계가 단가갱신, ERP (인트라넷) 입력 및 정리","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15307,"2019-11-19 08:30:00",19-설계-08,c.도면,"구룡교 도면 수정","2019-11-19 18:18:00",19-설계-08,c.도면,"구룡교 도면 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J15302,"2019-11-19 08:31:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-19 18:03:00",17-설계-13,h.기타,"DR거더 표준도 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,19-교영-22<|>d.기타<|>영업지원<|>03:00<|><br>,,
|
|
J13201,"2019-11-19 08:31:00",19-설계-09,b.구조계산,"경간구성 변경에 따른 빔배치 수정","2019-11-19 18:15:00",19-설계-09,b.구조계산,"경간구성 변경에 따른 빔배치 수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15201,"2019-11-19 08:34:00",19-교영-06,c.설계사,"과업진행현황 파악 ","2019-11-19 18:04:00",19-교영-06,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14306,"2019-11-19 08:34:00",19-관리-04,a.계약,"계약업무 외","2019-11-19 18:04:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-11-19 08:35:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-19 18:06:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-11-19 08:35:00",18-교영-01,c.설계사,.,"2019-11-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J10301,"2019-11-19 08:36:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-19 18:33:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-11-19 08:37:00",17-설계-09,g.업무지원,"조령천교 기술검토반 검토사항 정리","2019-11-19 18:19:00",17-설계-09,g.업무지원,"조령천교 기술검토반 검토사항 정리","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"19-설계-08<|>e.검토<|>성과품 최종정리 및 가설계획도 작성<|>03:30<|><br>",,
|
|
J07210,"2019-11-19 08:38:00",14-설계-32,h.기타,"산외교 솟음","2019-11-19 18:15:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J18205,"2019-11-19 08:47:00",19-시공-20,g.기타,"보완요청사항(정착구 상세해석 모델링)","2019-11-19 18:06:00",19-시공-20,g.기타,"보완요청사항(정착구 상세해석 모델링)","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J10313,"2019-11-19 08:49:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J16203,"2019-11-20 08:50:00",19-교휴-01,교육,"레미콘 품질관리 기술세미나(KCL 주관)","2019-11-20 18:00:00",19-교휴-01,교육,"레미콘 품질관리 기술세미나(KCL 주관)","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J16203,"2019-11-21 08:50:00",19-교휴-01,교육,"레미콘 품질관리 기술세미나(KCL 주관)","2019-11-21 18:00:00",19-교휴-01,교육,"레미콘 품질관리 기술세미나(KCL 주관)","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J14101,"2019-11-19 08:50:00",16-시공-20,출장,한양,"2019-11-19 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-19 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-19 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-11-19 08:50:00",18-시공-03,출장,"왕림교 현장","2019-11-19 18:00:00",18-시공-03,출장,"왕림교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J07103,"2019-11-19 08:50:00",19-시공-22,출장,1공구현장+사업단,"2019-11-19 18:00:00",19-시공-22,출장,1공구현장+사업단,"0000-00-00 00:00:00",NULL,NULL,NULL,008C6,,,
|
|
J12202,"2019-11-19 08:50:00",17-시공-08,출장,"[대구광역시 현장]런처 안전심의(사업단 주관), 조립검수","2019-11-19 18:00:00",17-시공-08,출장,"[대구광역시 현장]런처 안전심의(사업단 주관), 조립검수","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M05510,"2019-11-20 07:17:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-21 07:23:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.48.223,NULL,223.38.47.51,004C8,,,
|
|
J07202,"2019-11-20 07:31:00",19-제조-04,b.기계,"캔틸레버 브라켓 부착 거더 제작과 거푸집 보수","2019-11-21 07:34:00",19-제조-04,b.기계,"캔틸레버 브라켓 부착 거더 제작과 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-11-20 07:31:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-20 22:15:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-20 18:39:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-11-20 07:34:00",19-제조-02,a.생산관리,"캔틸레버 프리덱 실험체 검토","2019-11-20 20:39:00",19-제조-02,a.생산관리,"캔틸레버 프리덱 실험체 검토","2019-11-20 18:39:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공장동내 사진촬영 및 직원면담<|>02:00<|><br>19-제조-02<|>a.생산관리<|>PTC 분절거더 현장확인 및 업무협의<|>02:00<|><br>19-제조-02<|>a.생산관리<|>공장홍보동영상(제품팀) 콘티작업<|>02:00<|><br>",1,
|
|
T04204,"2019-11-20 07:39:00",19-제조-02,a.생산관리,"왕림교,조령천교SPG(중앙경간),생태통로1교 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09102,"2019-11-20 07:40:00",19-계약-01,b.시공사,"두산건설, 포스코건설 현장 방문예정, 안성~세종 공구별 예상 시행가 등 : 교리교 외 3개교 계약 추진 중","2019-11-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J11302,"2019-11-20 07:42:00",17-시공-10,g.기타,"시화확장 제작장 검토 및 가설검토","2019-11-20 18:05:00",17-시공-10,g.기타,"시화확장 제작장 검토 및 가설검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18207,"2019-11-20 07:42:00",17-시공-08,b.시공,"런처가설계획 사업단 안전심의 예정에 따른 런처조립 및 제품심사 검토","2019-11-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.139,NULL,NULL,004C7,,,
|
|
J14308,"2019-11-20 07:47:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-20 18:01:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
B15306,"2019-11-20 08:12:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-11-20 08:13:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-20 18:01:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-11-20 08:16:00",19-설계-10,e.검토,"성과품 검토","2019-11-20 18:03:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10314,"2019-11-20 08:17:00",19-설계-08,h.기타,"우산1교외(화순동면~송광봉산) 설계견적서 및 내역서, 곡천교(안성~성남2공구) 계약관련 검토자료, DR개략공사비(만강~검단), ERP (인트라넷) 입력 및 정리","2019-11-20 18:34:00",19-설계-08,h.기타,"우산1교외(화순동면~송광봉산) 설계견적서 및 내역서, 곡천교(안성~성남2공구) 계약관련 검토자료, DR개략공사비(만강~검단), ERP (인트라넷) 입력 및 정리","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-11-20 08:23:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-20 18:26:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15302,"2019-11-20 08:24:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.173,NULL,NULL,008E4,,,
|
|
J09101,"2019-11-20 08:27:00",19-교영-01,c.설계사,"과업조사 외","2019-11-20 18:03:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J15307,"2019-11-20 08:27:00",18-설계-15,e.검토,"도면, 계산서 검토 및 수정","2019-11-20 18:03:00",18-설계-15,e.검토,"도면, 계산서 검토 및 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J18205,"2019-11-20 08:30:00",19-시공-20,g.기타,"보완요청사항(정착구 상세해석 모델링)","2019-11-20 18:02:00",19-시공-20,g.기타,"보완요청사항(정착구 상세해석 모델링)","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J13201,"2019-11-20 08:32:00",19-설계-09,b.구조계산,"BR1 모델링","2019-11-20 18:02:00",19-설계-09,b.구조계산,"경간구성 변경에 따른 빔배치 수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J07103,"2019-11-20 08:34:00",19-교영-01,d.기타,사업관리,"2019-11-20 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15201,"2019-11-20 08:35:00",19-교영-06,c.설계사,"과업진행현황 파악 ","2019-11-20 18:34:00",19-교영-06,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14306,"2019-11-20 08:38:00",19-관리-04,a.계약,"계약업무 외","2019-11-20 18:00:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07210,"2019-11-20 08:38:00",14-설계-32,h.기타,"산외교 솟음","2019-11-20 18:04:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10301,"2019-11-20 08:39:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-20 18:24:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-11-20 08:43:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-20 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J15202,"2019-11-20 08:47:00",17-설계-09,g.업무지원,"조령천교 기술검토반 검토사항 정리","2019-11-20 18:02:00",17-설계-09,g.업무지원,"조령천교 기술검토반 검토사항 정리","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"18-설계-12<|>e.검토<|>설계VE 수정사항 내용정리<|>02:00<|><br>",,
|
|
J17205,"2019-11-20 08:49:00",18-교영-01,c.설계사,.,"2019-11-20 18:02:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J16202,"2019-11-20 08:56:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-20 18:35:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J13308,"2019-11-20 08:50:00",19-교휴-06,경유,"경유(원흥2교 장비서류 제출로 인한 경유)","2019-11-20 18:03:00",19-시공-25,b.시공,"1. 석현천교 및 용강IC교 현장 제작완료 보고서 및 정산서 작성
|
|
2.운곡교 정산서 작성 및 현장(피드백)보고서 작성
|
|
3. 런처 동영상 편집","0000-00-00 00:00:00",172.16.8.170,NULL,172.16.8.170,004E3,,,
|
|
J14101,"2019-11-20 08:50:00",16-시공-20,출장,한양,"2019-11-20 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-20 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-20 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-11-20 08:50:00",18-시공-03,출장,"왕림교 현장","2019-11-20 18:00:00",18-시공-03,출장,"왕림교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-11-20 08:50:00",17-시공-08,출장,"[대구광역시 현장]런처 안전심의(사업단 주관), 조립검수","2019-11-20 18:00:00",17-시공-08,출장,"[대구광역시 현장]런처 안전심의(사업단 주관), 조립검수","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M05510,"2019-11-21 07:24:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.47.51,NULL,NULL,004C8,,,
|
|
J14308,"2019-11-21 07:27:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-21 21:44:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-21 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-11-21 07:30:00",17-시공-08,b.시공,"런처가설계획 사업단 안전심의 예정에 따른 런처조립 및 제품심사 검토","2019-11-21 18:08:00",17-시공-08,b.시공,"런처가설계획 사업단 안전심의 예정에 따른 런처조립 및 제품심사 검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
T04204,"2019-11-21 07:30:00",19-제조-02,a.생산관리,"왕림교,조령천교SPG(중앙경간),생태통로1교 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-21 21:02:00",19-제조-02,a.생산관리,"왕림교,조령천교SPG(중앙경간),생태통로1교 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-11-21 07:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J07202,"2019-11-21 07:35:00",19-제조-04,b.기계,"거더 거푸집 보수와 캔틸레버 브라켓 부착 거더 제작","2019-11-22 07:38:00",19-제조-04,b.기계,"거더 거푸집 보수와 캔틸레버 브라켓 부착 거더 제작","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-11-21 07:41:00",19-제조-02,a.생산관리,"프리캐스트 가로보 제작도 검토","2019-11-21 20:08:00",19-제조-02,a.생산관리,"프리캐스트 가로보 제작도 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공장 홍보동영상 콘티 작업<|>03:00<|><br>19-제조-02<|>a.생산관리<|>2층 식당 가구 이전<|>01:30<|><br>19-제조-02<|>a.생산관리<|>공장견학 동영상용 자료 수집(사진)<|>01:00<|><br>",,
|
|
J11302,"2019-11-21 07:49:00",17-시공-10,g.기타,"지경천교 가설검토 및 김포시 한강시네폴리스 진입도로 가설검토
|
|
북수원1,2교 2차인장계획서 작성","2019-11-21 20:38:00",17-시공-10,g.기타,"지경천교 가설검토 및 김포시 한강시네폴리스 진입도로 가설검토
|
|
북수원1,2교 2차인장계획서 작성","2019-11-21 18:37:00",172.16.9.166,172.16.9.166,172.16.9.166,004E2,,1,
|
|
J18206,"2019-11-21 08:06:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-21 18:10:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-11-21 08:09:00",19-설계-08,h.기타,"한옥마을 기반시설 조성사업 거더 설계견적서 및 내역서(특공), 계양교외2개소(한강시네폴리) 설계견적서 및 내역서(특공), 우산1교외(화순동면~송광봉산) 설계견적서 및 내역서","2019-11-21 20:32:00",19-설계-08,h.기타,"계양교외2개소(한강시네폴리) 설계견적서 및 내역서(특공), 한옥마을 기반시설 조성사업 거더 설계견적서 및 내역서(특공), 우산1교외(화순동면~송광봉산) 설계견적서 및 내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-11-21 08:15:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-21 18:27:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J07103,"2019-11-21 08:25:00",19-교영-01,d.기타,사업관리,"2019-11-21 18:09:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15302,"2019-11-21 08:25:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-21 18:05:00",17-설계-13,h.기타,"DR거더 표준도 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J13201,"2019-11-21 08:33:00",19-설계-09,b.구조계산,"BR1 모델링","2019-11-21 20:43:00",19-설계-09,b.구조계산,"BR1 모델링","2019-11-21 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J14306,"2019-11-21 08:36:00",19-관리-04,a.계약,"계약업무 외","2019-11-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J15201,"2019-11-21 08:36:00",19-교영-06,c.설계사,"과업진행현황 파악 ","2019-11-21 18:12:00",19-교영-06,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-11-21 08:36:00",19-설계-10,e.검토,"성과품 검토","2019-11-21 18:10:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10301,"2019-11-21 08:38:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-21 18:24:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-11-21 08:38:00",14-설계-32,h.기타,"산외교 솟음","2019-11-21 20:37:00",14-설계-32,h.기타,"산외교 솟음","2019-11-21 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15307,"2019-11-21 08:38:00",18-설계-15,e.검토,"도면, 계산서 검토 및 수정","2019-11-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.171,NULL,NULL,008E4,,,
|
|
J18205,"2019-11-21 08:38:00",19-시공-20,g.기타,"보완요청사항(정착구 상세해석 모델링)","2019-11-21 21:35:00",19-시공-20,g.기타,"보완요청사항(정착구 상세해석 모델링)","2019-11-21 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J16202,"2019-11-21 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-21 20:34:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-21 18:33:00",172.16.9.164,172.16.9.164,172.16.9.164,008E1,,,
|
|
J15202,"2019-11-21 08:40:00",17-설계-09,g.업무지원,"조령천교 기술검토반 검토사항 정리","2019-11-21 20:43:00",17-설계-09,g.업무지원,"조령천교 기술검토반 검토사항 정리","2019-11-21 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J09101,"2019-11-21 08:48:00",19-교영-01,c.설계사,"과업조사 외","2019-11-21 18:05:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,"19-교영-20<|>d.기타<|>60m Spliced Girder B/L 적용성 검토-해외자료조사<|>08:00<|><br>",,
|
|
J13308,"2019-11-21 08:50:00",19-교휴-06,경유,"경유(원흥2교 장비서류제출)","2019-11-21 20:39:00",19-시공-25,b.시공,"1. 신양교 투입준비
|
|
2. 11월 기성내역서 작성","2019-11-21 18:37:00",172.16.9.172,172.16.9.170,172.16.9.170,004E3,,1,
|
|
J10313,"2019-11-21 08:44:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-21 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J14101,"2019-11-21 08:50:00",16-시공-20,출장,한양,"2019-11-21 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-21 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-21 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-11-21 08:50:00",18-시공-03,출장,"왕림교 현장","2019-11-21 18:00:00",18-시공-03,출장,"왕림교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J09102,"2019-11-21 08:50:00",17-시공-07,출장,두산중공업,"2019-11-21 18:00:00",17-시공-07,출장,두산중공업,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-11-21 08:50:00",17-시공-08,출장,"세천2교 상신기공 출장","2019-11-21 18:00:00",17-시공-08,출장,"세천2교 상신기공 출장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J12202,"2019-11-22 06:40:00",17-시공-08,b.시공," 런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-11-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J14308,"2019-11-22 07:30:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-22 18:18:18",19-제조-02,a.생산관리,NULL,"2019-11-22 18:30:00",175.203.206.128,175.203.206.128,NULL,006E2,,,
|
|
J18208,"2019-11-22 07:37:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-22 18:16:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-11-22 07:38:00",19-제조-02,a.생산관리,"왕림교,조령천교SPG(중앙경간),생태통로1교, 신양교 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J16203,"2019-11-22 07:39:00",19-제조-03,a.품질검사,"수리티교, 산외교 데크 및 프리빔 생산, 레미콘 관리","2019-11-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J07202,"2019-11-22 07:39:00",19-제조-04,b.기계,"거더 거푸집 보수와 낙엽으로 인한 배수구 정리 및 세미나실 파티션 조립","2019-11-23 07:40:00",19-제조-04,b.기계,"거더 거푸집 보수와 낙엽으로 인한 배수구 정리 및 세미나실 파티션 조립","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-11-22 07:41:00",19-제조-02,a.생산관리,"프리캐스트 가로보 제작도 검토","2019-11-22 18:28:00",19-제조-02,a.생산관리,"프리캐스트 가로보 제작도 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|> 분절거더 제작 현장 협의 및 점검<|>02:30<|><br>19-제조-02<|>a.생산관리<|>공정 협의<|>02:00<|><br>19-제조-01<|>b.총무<|>신입사원 오리엔테이션 준비<|>01:00<|><br>",,
|
|
J13308,"2019-11-22 07:41:00",19-시공-25,b.시공,"1. 11월 기성내역서 작성
|
|
2. 신양교 및 도화육교 시공투입준비","2019-11-22 18:41:00",19-시공-25,b.시공,"1. 11월 기성내역서 작성
|
|
2. 신양교 및 도화육교 시공투입준비","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
J09102,"2019-11-22 07:43:00",19-계약-01,b.시공사,"KCC건설 본사 방문 예정, 북쌍교 예상 시행가 검토 등 : 교리교 외 4개교 계약 추진 중","2019-11-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-11-22 07:47:00",17-시공-08,b.시공,"런처가설계획 사업단 안전심의 예정에 따른 런처조립 및 제품심사 검토","2019-11-22 18:23:00",17-시공-08,b.시공,"런처가설계획 사업단 안전심의 예정에 따른 런처조립 및 제품심사 검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J17205,"2019-11-22 07:57:00",18-교영-01,c.설계사,.,"2019-11-22 18:02:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
B15306,"2019-11-22 08:04:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-11-22 08:14:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J18205,"2019-11-22 08:19:00",19-시공-20,g.기타,"보완요청사항(구조계산서 작성)","2019-11-22 18:04:00",19-시공-20,g.기타,"보완요청사항(정착구 상세해석 모델링)","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J18206,"2019-11-22 08:25:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-22 18:25:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15201,"2019-11-22 08:26:00",19-교영-06,c.설계사,"과업진행현황 파악 ","2019-11-22 18:35:00",19-교영-06,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15302,"2019-11-22 08:26:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-22 18:02:00",17-설계-13,h.기타,"DR거더 표준도 작성","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J14306,"2019-11-22 08:31:00",19-관리-04,a.계약,"계약업무 외","2019-11-22 18:14:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-11-22 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-22 18:37:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07103,"2019-11-22 08:33:00",19-교영-01,d.기타,사업관리,"2019-11-22 18:16:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10313,"2019-11-22 08:33:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-22 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J13201,"2019-11-22 08:34:00",19-설계-09,b.구조계산,"BR1 구조계산","2019-11-22 18:02:00",19-설계-09,b.구조계산,"BR1 구조계산","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J07210,"2019-11-22 08:35:00",14-설계-32,h.기타,"산외교 솟음","2019-11-22 18:03:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15202,"2019-11-22 08:36:00",17-설계-09,g.업무지원,"2차정착구 스트럿타이모델 작성","2019-11-22 18:03:00",17-설계-09,g.업무지원,"2차정착구 스트럿타이모델 작성","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J10301,"2019-11-22 08:38:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-22 18:40:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15307,"2019-11-22 08:39:00",18-설계-15,e.검토,"도면, 계산서 검토 및 수정","2019-11-22 18:04:00",18-설계-15,e.검토,"도면, 계산서 검토 및 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J09101,"2019-11-22 08:45:00",19-교영-01,c.설계사,"과업조사 외","2019-11-22 18:02:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,"19-교영-20<|>d.기타<|>60m Spliced Girder B/L 적용성 검토-해외자료조사<|>08:00<|><br>",,
|
|
J11302,"2019-11-22 08:47:00",17-시공-10,g.기타,"지경천교 가설검토 및 김포시 한강시네폴리스 진입도로 가설검토
|
|
북수원1,2교 2차인장계획서 작성","2019-11-22 21:36:00",17-시공-10,g.기타,"지경천교 가설검토 및 김포시 한강시네폴리스 진입도로 가설검토
|
|
북수원1,2교 2차인장계획서 작성","2019-11-22 18:32:00",172.16.9.166,172.16.9.170,172.16.9.166,004E2,,1,
|
|
J14101,"2019-11-22 08:50:00",16-시공-20,출장,한양,"2019-11-22 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-22 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-22 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-11-22 08:50:00",18-시공-03,출장,"왕림교 현장","2019-11-22 18:00:00",18-시공-03,출장,"왕림교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
M02302,"2019-11-23 07:37:00",19-제조-02,a.생산관리,"프리캐스트 가로보 제작도 검토","2019-11-23 16:02:00",19-제조-02,a.생산관리,"프리캐스트 가로보 제작도 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>관리부 면담<|>03:00<|><br>19-제조-02<|>a.생산관리<|>홍보동영상 콘티작업 정리<|>01:30<|><br>19-제조-02<|>a.생산관리<|>신입사원 오리엔테이션 관리<|>02:00<|><br>",1,
|
|
J07202,"2019-11-23 07:40:00",19-제조-04,b.기계,"거더 거푸집 보수와 야적장 정리","2019-11-23 15:48:00",19-제조-04,b.기계,"거더 거푸집 보수와 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-11-23 07:41:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-23 16:05:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J16203,"2019-11-23 07:44:00",19-제조-03,a.품질검사,"수리티교, 산외교 데크 및 프리빔 생산, 레미콘 관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,1,
|
|
T04204,"2019-11-23 08:04:00",19-제조-02,a.생산관리,"왕림교,생태통로1교, 신양교 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-23 16:05:00",19-제조-02,a.생산관리,"왕림교,생태통로1교, 신양교 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J10313,"2019-11-23 08:43:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-23 12:11:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,1,
|
|
M05510,"2019-11-23 09:54:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-24 13:19:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.47.253,NULL,223.38.48.210,004C8,,,
|
|
M05510,"2019-11-24 13:19:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.48.210,NULL,NULL,004C8,,,
|
|
J12202,"2019-11-25 06:38:00",17-시공-08,b.시공," 런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-11-25 18:09:00",17-시공-08,b.시공," 런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
T04204,"2019-11-25 07:30:00",19-제조-02,a.생산관리,"왕림교,생태통로1교, 신양교 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-11-25 07:31:00",19-제조-04,b.기계,"거더 거푸집 보수와 야적장 정리","2019-11-26 06:51:00",19-제조-04,b.기계,"거더 거푸집 보수와 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-11-25 07:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-25 21:40:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-25 18:50:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J14308,"2019-11-25 07:35:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-25 22:13:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-25 18:50:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J11302,"2019-11-25 07:37:00",17-시공-10,g.기타,"지경천교 가설검토 및 김포시 한강시네폴리스 진입도로 가설검토
|
|
북수원1,2교 2차인장계획서 작성","2019-11-25 18:54:00",17-시공-10,g.기타,"지경천교 가설검토 및 김포시 한강시네폴리스 진입도로 가설검토
|
|
북수원1,2교 2차인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18207,"2019-11-25 07:42:00",19-시공-20,b.시공,"금년도 예산처리를위한 공정만회대책 작업팀 추가투입진행검토","2019-11-25 18:26:00",19-시공-20,b.시공,"금년도 예산처리를위한 공정만회대책 작업팀 추가투입진행검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
M02302,"2019-11-25 07:43:00",19-제조-02,a.생산관리,"프리캐스트 가로보 제작도 검토","2019-11-25 19:15:00",19-제조-02,a.생산관리,"프리캐스트 가로보 제작도 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>Cantilever Pre-Deck 브라켓 시험체 계획<|>02:30<|><br>19-제조-02<|>a.생산관리<|>Pre-Deck 그라우트 댐 지지 시험체 계획<|>03:00<|><br>19-제조-02<|>a.생산관리<|>조령천교 철근 가공관련 상신기공 협의<|>01:00<|><br>",1,
|
|
J09102,"2019-11-25 07:48:00",19-계약-01,b.시공사,"계룡건설 현장 방문 예정, 안성~세종 1,5,9,오송 예상 계약가 검토 등 : 교리교 외 4개교 계약 추진 중","2019-11-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-11-25 08:12:00",19-시공-25,b.시공,"1. 11월 기성내역서 작성
|
|
2. 신양교 및 도화육교 시공투입준비","2019-11-25 18:25:00",19-시공-25,b.시공,"1. 11월 기성내역서 작성
|
|
2. 신양교 및 도화육교 시공투입준비","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
J18206,"2019-11-25 08:14:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-25 18:07:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-11-25 08:16:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
B15306,"2019-11-25 08:19:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-11-25 08:20:00",19-설계-08,h.기타,"계양교외2개소(한강시네폴리) 설계견적서 및 내역서(특공), 한옥마을 기반시설 조성사업 거더 설계견적서 및 내역서(특공), 우산1교외(화순동면~송광봉산) 설계견적서 및 내역서","2019-11-25 18:41:00",19-설계-08,h.기타,"계양교외2개소(한강시네폴리) 설계견적서 및 내역서(특공), 한옥마을 기반시설 조성사업 거더 설계견적서 및 내역서(특공), 우산1교외(화순동면~송광봉산) 설계견적서 및 내역서","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15307,"2019-11-25 08:27:00",18-설계-15,e.검토,"도면, 계산서 검토 및 수정","2019-11-25 18:00:00",18-설계-15,e.검토,"도면, 계산서 검토 및 수정","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J14306,"2019-11-25 08:35:00",19-관리-04,a.계약,"계약업무 외","2019-11-25 18:07:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J17205,"2019-11-25 08:35:00",18-교영-01,c.설계사,.,"2019-11-25 18:30:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11305,"2019-11-25 08:35:00",19-설계-10,e.검토,"성과품 검토","2019-11-25 18:07:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07103,"2019-11-25 08:35:00",19-교영-01,d.기타,사업관리,"2019-11-25 18:12:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15201,"2019-11-25 08:36:00",19-교영-06,c.설계사,"과업진행현황 파악 ","2019-11-25 18:05:00",19-교영-06,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15302,"2019-11-25 08:36:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-25 20:33:00",17-설계-13,h.기타,"DR거더 표준도 작성","2019-11-25 18:31:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J07210,"2019-11-25 08:37:00",14-설계-32,h.기타,"산외교 솟음","2019-11-25 18:02:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10301,"2019-11-25 08:38:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-25 18:10:00",18-시공-12,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-11-25 08:39:00",19-설계-09,b.구조계산,"BR1 구조계산","2019-11-25 21:35:00",19-설계-09,b.구조계산,"BR1 구조계산","2019-11-25 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J15202,"2019-11-25 08:40:00",19-설계-06,e.검토,"도림1육교 특허공법 관련 공문발송 요청서 작성
|
|
","2019-11-25 20:59:00",19-설계-06,e.검토,"도림1육교 특허공법 관련 공문발송 요청서 작성
|
|
","2019-11-25 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J09101,"2019-11-25 08:41:00",19-교영-01,c.설계사,"과업조사 외","2019-11-25 18:06:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,"19-교영-20<|>d.기타<|>60m Spliced Girder B/L 적용성 검토<|>06:00<|><br>19-교영-01<|>d.기타<|>60m Nodular Girder 고속도로표준폭원 거더배치 검토<|>02:00<|><br>",,
|
|
J10313,"2019-11-25 08:42:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-25 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18205,"2019-11-25 08:42:00",19-시공-20,g.기타,"보완요청사항(구조계산서 작성)","2019-11-25 21:33:00",19-시공-20,g.기타,"보완요청사항(구조계산서 작성)","2019-11-25 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J10315,"2019-11-25 10:01:00",19-시공-23,b.시공,"제작 및 가설검토","2019-11-25 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.147,NULL,NULL,004C7,,,
|
|
J16203,"2019-11-25 08:20:00",19-제조-03,a.품질검사,"오전 가산2교 데크 재하시;험(KCL, 오전) 후 출근","2019-11-25 22:47:00",19-제조-03,a.품질검사,"오전 가산2교 데크 재하시;험(KCL, 오전) 후 출근","2019-11-25 19:23:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14101,"2019-11-25 08:50:00",16-시공-20,출장,한양,"2019-11-25 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-25 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-25 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M05510,"2019-11-26 06:48:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.35.29,NULL,NULL,004C8,,,
|
|
J12202,"2019-11-26 06:49:00",17-시공-08,b.시공," 런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-11-26 18:07:00",17-시공-08,b.시공," 런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-11-26 06:52:00",19-제조-04,b.기계,"동절기 거더 물빼기 작업 및 거더 거푸집 보수와 PTC 거더 콘크리트 운반 지원","2019-11-26 18:40:00",19-제조-04,b.기계,"동절기 거더 물빼기 작업 및 거더 거푸집 보수와 PTC 거더 콘크리트 운반 지원","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-11-26 07:30:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-26 18:04:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-11-26 07:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-26 19:24:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J09102,"2019-11-26 07:37:00",19-계약-01,b.시공사,"안성~세종 1,5,9,오송, 새만금~전주 5공구 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","2019-11-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
T04204,"2019-11-26 07:41:00",19-제조-02,a.생산관리,"왕림교,생태통로1교, 신양교 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-11-26 07:43:00",19-제조-02,a.생산관리,"배차신청 방법 기획안 작성","2019-11-26 20:07:00",19-제조-02,a.생산관리,"배차신청 방법 기획안 작성","2019-11-26 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>2층 식당 준비 및 식당주인 면담<|>01:30<|><br>19-제조-02<|>a.생산관리<|>ERP 검토 및 연도별 생산량 파악<|>02:30<|><br>",,
|
|
J18207,"2019-11-26 07:47:00",17-시공-08,b.시공,"거더 가설방법 변경에따른 추가투입비 처리방안검토","2019-11-26 18:12:00",17-시공-08,b.시공,"거더 가설방법 변경에따른 추가투입비 처리방안검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J16203,"2019-11-26 07:49:00",19-제조-03,a.품질검사,"산외교, 수리티교 데크 및 켄틸레버 생산관리 및 레미콘 관리","2019-11-26 21:00:00",19-제조-03,a.품질검사,"산외교, 수리티교 데크 및 켄틸레버 생산관리 및 레미콘 관리","2019-11-26 19:02:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J11302,"2019-11-26 07:59:00",17-시공-10,g.기타,"지경천교 가설검토 및 수리티교, 왕림교 가로보 프리데크 시공계획서 작성","2019-11-26 20:42:00",17-시공-10,g.기타,"지경천교 가설검토 및 수리티교, 왕림교 가로보 프리데크 시공계획서 작성","2019-11-26 18:40:00",172.16.9.166,172.16.9.166,172.16.9.166,004E2,,1,
|
|
J07103,"2019-11-26 08:04:00",19-교영-01,d.기타,사업관리,"2019-11-26 18:16:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18206,"2019-11-26 08:09:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-26 17:19:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J08201,"2019-11-26 08:18:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-26 18:18:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-11-26 08:18:00",19-설계-08,h.기타,"우산1교외(화순동면~송광봉산) 설계견적서 및 내역서, 계양교외2개소(한강시네폴리) 설계견적서 및 내역서(특공), 한옥마을 기반시설 조성사업 거더 설계견적서 및 내역서(특공)","2019-11-26 18:05:00",19-설계-08,h.기타,"우산1교외(화순동면~송광봉산) 설계견적서 및 내역서, 계양교외2개소(한강시네폴리) 설계견적서 및 내역서(특공), 한옥마을 기반시설 조성사업 거더 설계견적서 및 내역서(특공)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
B15306,"2019-11-26 08:19:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-11-26 08:26:00",18-설계-15,e.검토,"도면, 계산서 검토 및 수정","2019-11-26 21:33:00",18-설계-15,e.검토,"도면, 계산서 검토 및 수정","2019-11-26 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J17205,"2019-11-26 08:26:00",18-교영-01,c.설계사,.,"2019-11-26 21:32:00",18-교영-01,c.설계사,.,"2019-11-26 18:33:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J15302,"2019-11-26 08:28:00",18-설계-12,c.도면,"ve내용 도면수정","2019-11-26 18:05:00",18-설계-12,c.도면,"ve내용 도면수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,"17-설계-08<|>e.검토<|>설계도서 검토 변경 수정<|>03:00<|><br>",,
|
|
J13308,"2019-11-26 08:30:00",19-시공-25,b.시공,"1. 11월 기성내역서 작성
|
|
2. 신양교 및 도화육교 시공투입준비","2019-11-26 18:09:00",19-시공-25,b.시공,"1. 11월 기성내역서 작성
|
|
2. 신양교 및 도화육교 시공투입준비","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
J18205,"2019-11-26 08:32:00",17-시공-08,g.기타,"런처관련 안전심의 결과 답변자료 작성","2019-11-26 21:47:00",17-시공-08,g.기타,"런처관련 안전심의 결과 답변자료 작성","2019-11-26 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07210,"2019-11-26 08:37:00",14-설계-32,h.기타,"산외교 솟음","2019-11-26 18:10:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15202,"2019-11-26 08:37:00",19-설계-06,e.검토,"도림1육교 특허공법 관련 공문발송 요청서 작성
|
|
","2019-11-26 18:01:00",19-설계-06,e.검토,"도림1육교 특허공법 관련 공문발송 요청서 작성
|
|
","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,"18-설계-12<|>f.보고서 및 시방서<|>시방서 작성<|>02:30<|><br>",,
|
|
J15201,"2019-11-26 08:39:00",19-교영-06,c.설계사,"과업진행현황 파악 ","2019-11-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J11305,"2019-11-26 08:40:00",19-설계-10,e.검토,"성과품 검토","2019-11-26 18:05:00",19-설계-10,e.검토,"성과품 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J13201,"2019-11-26 08:40:00",19-설계-09,b.구조계산,"경간구성 변경에 따른 빔배치 수정","2019-11-26 21:23:00",19-설계-09,b.구조계산,"경간구성 변경에 따른 빔배치 수정","2019-11-26 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J10313,"2019-11-26 08:42:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-26 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16202,"2019-11-26 08:47:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J14306,"2019-11-26 08:48:00",19-관리-04,a.계약,"계약업무 외","2019-11-26 13:16:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J09101,"2019-11-26 08:52:00",19-교영-01,c.설계사,"과업조사 외","2019-11-26 18:02:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,"19-교영-20<|>d.기타<|>60m Spliced Girder B/L 적용성 검토서 작성<|>08:00<|><br>",,
|
|
J14101,"2019-11-26 08:50:00",16-시공-20,출장,한양,"2019-11-26 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-26 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-26 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10301,"2019-11-26 08:50:00",19-시공-16,출장,"[경북 안동시 경북도청]토일1지구 하천재해예방사업 [원천3교,하토교,어란교] 선급금 관련 정산협의","2019-11-26 18:00:00",19-시공-16,출장,"[경북 안동시 경북도청]토일1지구 하천재해예방사업 [원천3교,하토교,어란교] 선급금 관련 정산협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M05510,"2019-11-27 06:43:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-28 12:47:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.35.100,NULL,223.38.35.254,004C8,,,
|
|
J12202,"2019-11-27 06:54:00",17-시공-08,b.시공," 런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-11-27 18:11:00",17-시공-08,b.시공," 런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J14308,"2019-11-27 07:21:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-27 21:16:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-27 18:37:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,,
|
|
J07202,"2019-11-27 07:36:00",19-제조-04,b.기계,"일반대기(면제) 환경기술인 교육 참석 및 거더 거푸집 보수","2019-11-28 07:34:00",19-제조-04,b.기계,"일반대기(면제) 환경기술인 교육 참석 및 거더 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-11-27 07:39:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-27 21:16:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-11-27 07:41:00",19-제조-02,a.생산관리,"왕림교,생태통로1교, 신양교 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J13308,"2019-11-27 07:44:00",19-시공-25,b.시공,"1. 11월 기성내역서 작성
|
|
2. 신양교 및 도화육교 시공투입준비","2019-11-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.170,NULL,NULL,004E3,,,
|
|
M02302,"2019-11-27 07:45:00",19-제조-02,a.생산관리,"야적장 계획 변경 검토","2019-11-27 18:28:00",19-제조-02,a.생산관리,"야적장 계획 변경 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>Pre-Deck 볼트지지 철물 검토<|>02:30<|><br>19-제조-02<|>a.생산관리<|>야적장 배치 검토<|>02:00<|><br>19-제조-02<|>a.생산관리<|>Pre-Deck 프로그램 검토<|>01:30<|><br>",,
|
|
J09102,"2019-11-27 07:46:00",19-계약-01,b.시공사,"대우건설, 강산건설, 한신공영 현장 방문, 새만금~전주 5공구 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","2019-11-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-11-27 08:03:00",19-시공-23,b.시공,"제작 및 가설검토","2019-11-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.147,NULL,NULL,004C7,,,
|
|
J16203,"2019-11-27 08:05:00",19-제조-03,a.품질검사,"고강도 배합설계시험. 섬유 첨가 배합시험(실크로드 연구소)","2019-11-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J08201,"2019-11-27 08:08:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-27 18:28:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-11-27 08:17:00",19-설계-09,"a.계획 및 협의","교량 계획 협의","2019-11-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J18206,"2019-11-27 08:23:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-27 18:12:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15302,"2019-11-27 08:24:00",18-설계-12,c.도면,"ve내용 도면수정","2019-11-27 20:33:00",18-설계-12,c.도면,"ve내용 도면수정","2019-11-27 18:32:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,"17-설계-08<|>c.도면<|>설계감리용 도면변경<|>07:00<|><br>",1,
|
|
J15307,"2019-11-27 08:30:00",18-설계-15,e.검토,"도면, 계산서 검토 및 수정","2019-11-27 21:30:00",18-설계-15,e.검토,"도면, 계산서 검토 및 수정","2019-11-27 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,"19-설계-09<|>c.도면<|>거더 도면 작성<|>05:00<|><br>",1,
|
|
J16202,"2019-11-27 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-27 18:23:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J18205,"2019-11-27 08:32:00",17-시공-08,g.기타,"런처관련 안전심의 결과 답변자료 작성","2019-11-27 21:30:00",17-시공-08,g.기타,"런처관련 안전심의 결과 답변자료 작성","2019-11-27 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-11-27 08:32:00",19-설계-09,b.구조계산,"BR3~BR7 모델링 및 반력","2019-11-27 21:03:00",19-설계-09,b.구조계산,"경간구성 변경에 따른 빔배치 수정","2019-11-27 18:32:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J07103,"2019-11-27 08:36:00",19-교영-01,d.기타,사업관리,"2019-11-27 18:09:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
B15306,"2019-11-27 08:37:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J17205,"2019-11-27 08:37:00",18-교영-01,c.설계사,.,"2019-11-27 20:38:00",18-교영-01,c.설계사,.,"2019-11-27 18:35:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J15201,"2019-11-27 08:37:00",19-교영-06,c.설계사,"과업진행현황 파악 ","2019-11-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J14306,"2019-11-27 08:38:00",19-관리-04,a.계약,"계약업무 외","2019-11-27 18:00:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J09101,"2019-11-27 08:38:00",19-교영-01,c.설계사,"과업조사 외","2019-11-27 18:09:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,"19-교영-20<|>d.기타<|>60m Spliced Girder B/L 적용성 검토-동종업체 자료조사<|>08:00<|><br>",,
|
|
J10313,"2019-11-27 08:39:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-27 18:12:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J07210,"2019-11-27 08:40:00",14-설계-32,h.기타,"산외교 솟음","2019-11-27 20:38:00",14-설계-32,h.기타,"산외교 솟음","2019-11-27 18:32:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J10301,"2019-11-27 08:42:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-27 19:26:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15202,"2019-11-27 08:43:00",18-설계-12,"f.보고서 및 시방서","공사 시방서 작성
|
|
","2019-11-27 21:03:00",18-설계-12,"f.보고서 및 시방서","공사 시방서 작성
|
|
","2019-11-27 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,"18-설계-12<|>b.구조계산<|>2차정착구 스트럿타이 모델<|>04:00<|><br>18-설계-12<|>b.구조계산<|>현장기술검토반 지적사항 답변서 작성<|>02:00<|><br>",1,
|
|
J10314,"2019-11-27 08:30:00",14-설계-08,h.기타,"교량1교(부산에코델타시티4구간) 설계견적서 및 내역서, 공릉천교외 7개소(김포~파주3공구) 시행견적서, 지경천교 (포항~영덕 3공구) 크레인 가설공사비 검토, Nodular거더 형식별 공사비검토","2019-11-27 18:22:00",14-설계-08,h.기타,"교량1교(부산에코델타시티4구간) 설계견적서 및 내역서, 공릉천교외 7개소(김포~파주3공구) 시행견적서, 지경천교 (포항~영덕 3공구) 크레인 가설공사비 검토, Nodular거더 형식별 공사비검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14101,"2019-11-27 08:50:00",16-시공-20,출장,한양,"2019-11-27 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11202,"2019-11-27 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","2019-11-27 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 2,3차 인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18207,"2019-11-27 08:50:00",17-시공-08,출장,"런처가설 방법 변경에따른 추가공사비 협조요청","2019-11-27 18:00:00",17-시공-08,출장,"런처가설 방법 변경에따른 추가공사비 협조요청","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-11-28 06:29:00",17-시공-08,b.시공," 런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-11-28 18:07:00",17-시공-08,b.시공," 런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-11-28 07:35:00",19-제조-04,b.기계,"성주대교 주두부 가설밴트 하차 및 거더 거푸집 보수","2019-11-29 07:38:00",19-제조-04,b.기계,"성주대교 주두부 가설밴트 하차 및 거더 거푸집 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-11-28 07:36:00",19-제조-02,a.생산관리,"왕림교,생태통로1교, 신양교 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","2019-11-28 21:18:00",19-제조-02,a.생산관리,"왕림교,생태통로1교, 신양교 철근 가공, 산외교,동림교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-11-28 07:39:00",19-시공-20,b.시공,"스플라이스거더 제작공정 작업팀투입 및 예산집행점검","2019-11-28 18:18:00",19-시공-20,b.시공,"스플라이스거더 제작공정 작업팀투입 및 예산집행점검","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J09102,"2019-11-28 07:41:00",19-계약-01,b.시공사,"김포~파주 3공구, 새만금~전주 5공구 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","2019-11-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
M02302,"2019-11-28 07:43:00",19-제조-02,a.생산관리,"분절거더 생산시스템 검토","2019-11-28 20:52:00",19-제조-02,a.생산관리,"분절거더 생산시스템 검토","2019-11-28 18:44:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>프리캐스트 가로보 (H=300) 제작도 작성<|>04:00<|><br>19-제조-02<|>a.생산관리<|>공장 야적장 LAYOUT 검토 및 협의<|>02:00<|><br>",1,
|
|
J14308,"2019-11-28 07:45:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-28 22:11:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-28 18:44:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18208,"2019-11-28 07:46:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-28 21:16:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-28 18:44:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-11-28 07:48:00",19-제조-03,a.품질검사,"수리티교, 산외교 데크 및 프리빔 생산관리, 레미콘 관리","2019-11-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J11302,"2019-11-28 07:54:00",17-시공-10,g.기타,"지경천교 가설검토 및 수리티교, 왕림교 가로보 프리데크 시공계획서 작성","2019-11-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E2,,,
|
|
J13308,"2019-11-28 07:54:00",19-시공-25,b.시공,"1. 11월 기성내역서 작성
|
|
2. 신양교 및 도화육교 시공투입준비","2019-11-28 18:07:00",19-시공-25,b.시공,"1. 11월 기성내역서 작성
|
|
2. 신양교 및 도화육교 시공투입준비","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
J11305,"2019-11-28 08:08:00",19-설계-09,"a.계획 및 협의","교량 계획 협의","2019-11-28 18:05:00",19-설계-09,"a.계획 및 협의","교량 계획 협의","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-11-28 08:08:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-28 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10315,"2019-11-28 08:10:00",15-설계-12,"a.계획 및 협의","제작 및 가설협의자료 작성","2019-11-28 18:03:00",15-설계-12,"a.계획 및 협의","제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J08201,"2019-11-28 08:19:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-28 18:27:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10314,"2019-11-28 08:22:00",16-설계-21,h.기타,"공릉천교외 7개소(김포~파주3공구) 시행견적서, 지경천교 (포항~영덕 3공구) 크레인 가설공사비 검토, Nodular거더 형식별 공사비검토","2019-11-28 18:03:00",16-설계-21,h.기타,"공릉천교외 7개소(김포~파주3공구) 시행견적서, 지경천교 (포항~영덕 3공구) 크레인 가설공사비 검토, Nodular거더 형식별 공사비검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-11-28 08:25:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-11-28 18:06:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15302,"2019-11-28 08:27:00",18-설계-12,c.도면,"설계VE 설계감리 수정","2019-11-28 18:01:00",14-설계-36,b.구조계산,"광교1,2,3교 변경","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15202,"2019-11-28 08:30:00",18-설계-12,"f.보고서 및 시방서","공사 시방서 작성
|
|
","2019-11-28 21:15:00",18-설계-12,"f.보고서 및 시방서","공사 시방서 작성
|
|
","2019-11-28 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10313,"2019-11-28 08:30:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-28 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J07103,"2019-11-28 08:33:00",19-교영-01,d.기타,사업관리,"2019-11-28 18:18:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J13201,"2019-11-28 08:33:00",19-설계-09,b.구조계산,"BR3~BR7 모델링 및 반력","2019-11-28 18:16:00",19-설계-09,b.구조계산,"경간구성 변경에 따른 빔배치 수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15307,"2019-11-28 08:34:00",19-설계-09,c.도면,"거더 도면 작성","2019-11-28 21:31:00",19-설계-09,c.도면,"거더 도면 작성","2019-11-28 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J14306,"2019-11-28 08:34:00",19-관리-04,a.계약,"계약업무 외","2019-11-28 18:01:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15201,"2019-11-28 08:35:00",19-교영-06,c.설계사,"과업진행현황 파악 ","2019-11-28 18:05:00",19-교영-06,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J18205,"2019-11-28 08:36:00",17-시공-08,g.기타,"런처관련 안전심의 결과 답변자료 작성","2019-11-28 21:31:00",17-시공-08,g.기타,"런처관련 안전심의 결과 답변자료 작성","2019-11-28 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J17205,"2019-11-28 08:37:00",18-교영-01,c.설계사,.,"2019-11-28 20:31:00",18-교영-01,c.설계사,.,"2019-11-28 18:30:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J16202,"2019-11-28 08:38:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-28 18:15:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J10301,"2019-11-28 08:40:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-28 18:14:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-11-28 08:42:00",14-설계-32,h.기타,"산외교 솟음","2019-11-28 20:57:00",14-설계-32,h.기타,"산외교 솟음","2019-11-28 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J11202,"2019-11-28 08:50:00",19-시공-02,b.시공,공사관리,"2019-11-28 18:24:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J09101,"2019-11-28 08:53:00",19-교영-01,c.설계사,"과업조사 외","2019-11-28 18:03:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
M05510,"2019-11-28 12:47:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-29 07:14:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.35.254,NULL,223.38.35.212,004C8,,,
|
|
J14101,"2019-11-28 08:50:00",16-시공-20,출장,한양,"2019-11-28 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-11-29 06:32:00",17-시공-08,b.시공," 런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-11-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
M05510,"2019-11-29 07:15:00",17-시공-07,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-11-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.35.212,NULL,NULL,004C8,,,
|
|
T04204,"2019-11-29 07:29:00",19-제조-02,a.생산관리,"신양교,왕림교,조령천교(측경간) 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-11-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14308,"2019-11-29 07:34:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-29 21:41:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-11-29 19:00:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J07202,"2019-11-29 07:38:00",19-제조-04,b.기계,"동절기 거더 물빼기 작업과 성주대교 주두부 가설밴트 하차","2019-11-30 07:53:00",19-제조-04,b.기계,"동절기 거더 물빼기 작업과 성주대교 주두부 가설밴트 하차","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-11-29 07:39:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-29 21:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-29 19:00:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-11-29 07:43:00",19-시공-20,b.시공,"스플라이스거더 제작공정 작업팀투입 및 예산집행점검","2019-11-29 18:12:00",19-시공-20,b.시공,"스플라이스거더 제작공정 작업팀투입 및 예산집행점검","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
M02302,"2019-11-29 07:44:00",19-제조-02,a.생산관리,"분절거더 생산시스템 검토","2019-11-29 11:30:00",19-제조-02,a.생산관리,"분절거더 생산시스템 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-11-29 07:46:00",19-계약-01,b.시공사,"상리동~새방골, 김포~파주 3공구 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","2019-11-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-11-29 07:47:00",19-제조-03,a.품질검사,"수리티교, 산외교 데크 및 프리빔 생산관리, 레미콘 관리","2019-11-29 20:41:00",19-제조-03,a.품질검사,"수리티교, 산외교 데크 및 프리빔 생산관리, 레미콘 관리","2019-11-29 18:37:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J10315,"2019-11-29 08:04:00",15-설계-12,"a.계획 및 협의","제작 및 가설협의자료 작성","2019-11-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.147,NULL,NULL,004C7,,,
|
|
J11302,"2019-11-29 08:14:00",17-시공-10,g.기타,"왕림교 2차가설 가설검토, 세천2교 외측거더 가설검토","2019-11-29 20:34:00",17-시공-10,g.기타,"왕림교 2차가설 가설검토, 세천2교 외측거더 가설검토","2019-11-29 18:31:00",172.16.9.166,172.16.9.166,172.16.9.166,004E2,,1,
|
|
J11305,"2019-11-29 08:17:00",19-설계-09,"a.계획 및 협의","교량 계획 협의","2019-11-29 18:08:00",19-설계-09,"a.계획 및 협의","교량 계획 협의","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10301,"2019-11-29 08:17:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-11-29 18:19:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J08201,"2019-11-29 08:18:00",19-설계-10,"a.계획 및 협의",업무협의,"2019-11-29 18:21:00",19-설계-10,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15307,"2019-11-29 08:19:00",19-설계-09,c.도면,"거더 도면 작성","2019-11-29 18:02:00",19-설계-09,c.도면,"거더 도면 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
B15306,"2019-11-29 08:21:00",19-관리-02,e.기타,"비서업무 외 ","2019-11-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-11-29 08:25:00",19-교영-01,d.기타,사업관리,"2019-11-29 18:11:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J13201,"2019-11-29 08:34:00",19-설계-09,b.구조계산,"BR8~BR13 빔배치 수정","2019-11-29 18:23:00",19-설계-09,b.구조계산,"BR8모델링 및 반력","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J10313,"2019-11-29 08:36:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-11-29 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J15201,"2019-11-29 08:37:00",19-교영-21,c.설계사,"과업진행현황 파악 ","2019-11-29 18:04:00",19-교영-21,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-11-29 08:37:00",18-교영-01,c.설계사,.,"2019-11-29 18:02:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J16202,"2019-11-29 08:38:00",19-교영-01,c.설계사,신규사업현황조사,"2019-11-29 18:10:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07210,"2019-11-29 08:39:00",14-설계-32,h.기타,"산외교 솟음","2019-11-29 18:03:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J18205,"2019-11-29 08:40:00",17-시공-08,g.기타,"런처관련 안전심의 결과 답변자료 작성","2019-11-29 18:09:00",17-시공-08,g.기타,"런처관련 안전심의 결과 답변자료 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J09101,"2019-11-29 08:43:00",19-교영-01,c.설계사,"과업조사 외","2019-11-29 18:03:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J14306,"2019-11-29 08:50:00",19-교휴-06,경유,"경유(기술인협회(이동주BJ 신양교 현장대리인 경력신고))","2019-11-29 18:00:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J14101,"2019-11-29 08:50:00",16-시공-20,출장,한양,"2019-11-29 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J07202,"2019-11-30 07:54:00",19-제조-04,b.기계,"생태수로 #1, 도화육교 거푸집 그라인더 작업","2019-11-30 15:53:00",19-제조-04,b.기계,"생태수로 #1, 도화육교 거푸집 그라인더 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-11-30 08:20:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-11-30 15:53:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M05510,"2019-11-30 10:39:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-01 07:58:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.36.251,NULL,223.38.36.143,004C8,,,
|
|
J14308,"2019-11-30 11:13:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
M05510,"2019-12-01 07:59:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.36.143,NULL,NULL,004C8,,,
|
|
J12202,"2019-12-02 07:01:00",17-시공-08,b.시공," 런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-12-02 18:07:00",17-시공-08,b.시공," 런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J14308,"2019-12-02 07:28:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-02 18:26:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-12-02 07:31:00",19-제조-02,a.생산관리,"신양교,왕림교,조령천교(측경간) 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-12-02 07:37:00",19-제조-04,b.기계,"생태수로 #1 거푸집 그라인더 페인트 도색 작업","2019-12-03 07:32:00",19-제조-04,b.기계,"생태수로 #1 거푸집 그라인더 페인트 도색 작업","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-12-02 07:40:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J16203,"2019-12-02 07:41:00",19-제조-03,a.품질검사,"수리티교, 산외교 데크 및 프리빔 생산관리, 레미콘 관리","2019-12-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J10315,"2019-12-02 07:52:00",18-시공-12,b.시공,"제작장 및 가설검토","2019-12-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.147,NULL,NULL,004C7,,,
|
|
M02302,"2019-12-02 07:54:00",19-제조-02,a.생산관리,"분절거더 생산시스템 검토","2019-12-02 20:49:00",19-제조-02,a.생산관리,"분절거더 생산시스템 검토","2019-12-02 18:45:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,,1,
|
|
J09102,"2019-12-02 07:55:00",19-계약-01,b.시공사,"한옥마을 북쌍교 예상 시행가, 상리동~새방골 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","2019-12-02 18:03:00",19-계약-01,b.시공사,"한옥마을 북쌍교 예상 시행가, 상리동~새방골 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.9.145,NULL,172.16.9.145,004C7,,,
|
|
J18207,"2019-12-02 07:57:00",19-시공-20,b.시공,"스플라이스거더 제작공정 작업팀투입 및 예산집행점검","2019-12-02 18:24:00",19-시공-20,b.시공,"스플라이스거더 제작공정 작업팀투입 및 예산집행점검","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
B15306,"2019-12-02 08:10:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-12-02 08:16:00",19-교영-01,d.기타,사업관리,"2019-12-02 18:14:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18206,"2019-12-02 08:19:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-02 18:14:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15201,"2019-12-02 08:24:00",19-교영-21,c.설계사,"과업진행현황 파악 ","2019-12-02 18:05:00",19-교영-21,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15302,"2019-12-02 08:25:00",18-설계-12,c.도면,"설계ve 설계감리 수정","2019-12-02 20:32:00",18-설계-12,c.도면,"설계ve 설계감리 수정","2019-12-02 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
M05510,"2019-12-02 08:26:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-03 16:33:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.36.91,NULL,223.38.35.233,004C8,,,
|
|
J10314,"2019-12-02 08:26:00",15-설계-12,h.기타,"지경천교 (포항~영덕 3공구) 크레인 가설공사비 검토, Nodular거더 형식별 공사비검토","2019-12-02 18:08:00",15-설계-12,h.기타,"지경천교 (포항~영덕 3공구) 크레인 가설공사비 검토, Nodular거더 형식별 공사비검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J14306,"2019-12-02 08:31:00",19-관리-04,a.계약,"계약업무 외","2019-12-02 13:16:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-12-02 08:32:00",19-시공-02,b.시공,공사관리,"2019-12-02 18:23:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J10301,"2019-12-02 08:33:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-02 18:23:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11305,"2019-12-02 08:35:00",19-설계-09,"a.계획 및 협의","교량 계획 협의","2019-12-02 18:07:00",19-설계-09,"a.계획 및 협의","교량 계획 협의","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15307,"2019-12-02 08:37:00",19-설계-09,c.도면,"거더 도면 작성","2019-12-02 21:30:00",19-설계-09,c.도면,"거더 도면 작성","2019-12-02 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10313,"2019-12-02 08:38:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-12-02 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J13201,"2019-12-02 08:40:00",19-설계-09,b.구조계산,"BR8모델링 및 반력","2019-12-02 20:55:00",19-설계-09,b.구조계산,"BR8모델링 및 반력","2019-12-02 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J15202,"2019-12-02 08:44:00",18-설계-12,"f.보고서 및 시방서","공사 시방서 작성
|
|
","2019-12-02 21:01:00",18-설계-12,"f.보고서 및 시방서","공사 시방서 작성
|
|
","2019-12-02 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J09101,"2019-12-02 08:46:00",19-교영-01,c.설계사,"과업조사 외","2019-12-02 18:10:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J16202,"2019-12-02 08:47:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-02 18:21:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-12-02 08:30:00",18-교영-01,c.설계사,.,"2019-12-02 20:32:00",18-교영-01,c.설계사,.,"2019-12-02 18:30:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J07210,"2019-12-02 12:43:00",14-설계-32,h.기타,"산외교 솟음","2019-12-02 18:03:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J14101,"2019-12-02 08:50:00",16-시공-20,출장,한양,"2019-12-02 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-12-02 08:50:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 면보수","2019-12-02 18:00:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 면보수","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J14101,"2019-11-01 08:50:00",16-시공-20,출장,한양,"2019-11-01 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-11-11 08:50:00",17-시공-10,출장,"[대구 달성구 하빈면]성주대교 균열조사 및 세천2교 현장 근무","2019-11-11 18:00:00",17-시공-10,출장,"[대구 달성구 하빈면]성주대교 균열조사 및 세천2교 현장 근무","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
T04204,"2019-11-14 08:50:00",19-제조-02,출장,"[금곡교(남양주),감이교(하남),화성IC R-A1교,자안2교(화성)]거더 동파방지 물빼기 작업","2019-11-14 18:00:00",19-제조-02,출장,"[금곡교(남양주),감이교(하남),화성IC R-A1교,자안2교(화성)]거더 동파방지 물빼기 작업","0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J18207,"2019-12-03 07:27:00",18-시공-03,b.시공,"거더제작관련 제작장부지 검토","2019-12-03 18:36:00",18-시공-03,b.시공,"거더제작관련 제작장부지 검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J07202,"2019-12-03 07:32:00",19-제조-04,b.기계,"왕림교 거푸집 보수와 그라인더 및 페인트 도색","2019-12-04 07:34:00",19-제조-04,b.기계,"왕림교 거푸집 보수와 그라인더 및 페인트 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-12-03 07:35:00",19-제조-02,a.생산관리,"신양교,왕림교,조령천교(측경간) 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-03 21:01:00",19-제조-02,a.생산관리,"신양교,왕림교,조령천교(측경간) 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-12-03 07:38:00",19-계약-01,b.시공사,"한신공영 현장방문 예정, 한옥마을 북쌍교 예상 시행가 등 : 교리교 외 4개교 계약 추진 중","2019-12-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J14308,"2019-12-03 07:45:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-03 21:47:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-03 19:00:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-12-03 07:47:00",19-제조-03,a.품질검사,"공장검수(석현천교, 용강IC),
|
|
수리티교, 산외교 데크 및 프리빔 생산관리, 레미콘 관리","2019-12-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
B15306,"2019-12-03 08:11:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-03 18:59:00",19-관리-02,e.기타,"비서업무 외 ","0000-00-00 00:00:00",172.16.9.176,NULL,172.16.9.176,004E5,,,
|
|
J15201,"2019-12-03 08:13:00",19-교영-21,c.설계사,"과업진행현황 파악 ","2019-12-03 18:01:00",19-교영-21,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J09101,"2019-12-03 08:15:00",19-교영-01,c.설계사,"과업조사 외","2019-12-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.144,NULL,NULL,008C7,"19-교영-01<|>d.기타<|>Nodular거더 횡배치검토<|>06:00<|><br>",,
|
|
J18206,"2019-12-03 08:22:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-03 18:00:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J07103,"2019-12-03 08:22:00",19-교영-01,d.기타,사업관리,"2019-12-03 18:21:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10314,"2019-12-03 08:24:00",18-설계-03,h.기타,"장동교(순천벌교-주암3공구) 시행견적서, Nodular거더 형식별 공사비검토, 지경천교 (포항~영덕 3공구) 크레인 가설공사비 검토","2019-12-03 18:02:00",18-설계-03,h.기타,"장동교(순천벌교-주암3공구) 시행견적서, Nodular거더 형식별 공사비검토, 지경천교 (포항~영덕 3공구) 크레인 가설공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J16202,"2019-12-03 08:30:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-03 18:16:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-12-03 08:33:00",18-설계-12,"f.보고서 및 시방서","VE지적사항 정리","2019-12-03 18:36:00",18-설계-12,"f.보고서 및 시방서","VE지적사항 정리","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J17205,"2019-12-03 08:34:00",18-교영-01,c.설계사,.,"2019-12-03 18:01:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J14306,"2019-12-03 08:35:00",19-관리-04,a.계약,"계약업무 외","2019-12-03 18:02:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15307,"2019-12-03 08:35:00",19-설계-09,c.도면,"거더 도면 작성","2019-12-03 21:30:00",19-설계-09,c.도면,"거더 도면 작성","2019-12-03 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J10313,"2019-12-03 08:36:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-12-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J10301,"2019-12-03 08:38:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J18205,"2019-12-03 08:39:00",19-시공-20,g.기타,"검토서 답변 자료 작성","2019-12-03 21:37:00",19-시공-20,g.기타,"검토서 답변 자료 작성","2019-12-03 18:31:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J13201,"2019-12-03 08:40:00",19-설계-09,b.구조계산,"BR8모델링 및 반력","2019-12-03 20:32:00",19-설계-09,b.구조계산,"BR8모델링 및 반력","2019-12-03 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J07210,"2019-12-03 08:40:00",14-설계-32,h.기타,"산외교 솟음","2019-12-03 18:10:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15301,"2019-12-03 08:46:00",16-시공-20,b.시공,공무,"2019-12-03 19:00:00",16-시공-20,b.시공,공무,"0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J18208,"2019-12-03 08:47:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-03 18:00:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M05510,"2019-12-03 16:34:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-03 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.35.233,NULL,NULL,004C8,,,
|
|
J15302,"2019-12-03 08:26:00",18-설계-12,c.도면,"설계ve 설계감리 수정","2019-12-03 18:07:00",18-설계-12,c.도면,"설계ve 설계감리 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J14101,"2019-12-03 08:50:00",16-시공-20,출장,한양,"2019-12-03 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-12-03 08:50:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 면보수","2019-12-03 18:00:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 면보수","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J11305,"2019-12-03 08:50:00",17-시공-08,출장,현장사무실,"2019-12-03 18:00:00",17-시공-08,출장,현장사무실,"0000-00-00 00:00:00",NULL,NULL,NULL,008C7,,,
|
|
M02302,"2019-12-03 08:50:00",19-제조-02,출장,[한맥빌딩]임원회의,"2019-12-03 18:00:00",19-제조-02,출장,[한맥빌딩]임원회의,"0000-00-00 00:00:00",NULL,NULL,NULL,006C8,,,
|
|
J11202,"2019-12-03 08:50:00",18-시공-15,출장,"[경기도 고양시]원흥2교 단부 철근 용접 관리","2019-12-03 18:00:00",18-시공-15,출장,"[경기도 고양시]원흥2교 단부 철근 용접 관리","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J12202,"2019-12-03 08:50:00",17-시공-08,출장,"[대구 광역시]2차 안전심의 답변서 관련 보고 및 런처 제품심사 ","2019-12-03 18:00:00",17-시공-08,출장,"[대구 광역시]2차 안전심의 답변서 관련 보고 및 런처 제품심사 ","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J10315,"2019-12-03 08:50:00",15-설계-12,출장,"지경천교 제작 및 가설","2019-12-03 18:00:00",15-설계-12,출장,"지경천교 제작 및 가설","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J14308,"2019-12-04 07:28:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-04 18:18:18",19-제조-02,a.생산관리,NULL,"2019-12-04 18:35:00",175.203.206.128,175.203.206.128,NULL,006E2,,1,
|
|
J18208,"2019-12-04 07:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-04 19:36:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-04 18:57:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,,
|
|
J07202,"2019-12-04 07:35:00",19-제조-04,b.기계,"신양교 거푸집 보수와 그라인더 작업 및 야적장 정리","2019-12-05 07:34:00",19-제조-04,b.기계,"신양교 거푸집 보수와 그라인더 작업 및 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-12-04 07:35:00",19-제조-02,a.생산관리,"Pre-Deck BOM 셈플","2019-12-04 18:12:00",19-제조-02,a.생산관리,"Pre-Deck BOM 셈플","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>사장님 면담 및 업무협의<|>03:00<|><br>19-제조-02<|>a.생산관리<|>staddle carrier 관련업체 면담 및 협의<|>02:00<|><br>",,
|
|
T04204,"2019-12-04 07:37:00",19-제조-02,a.생산관리,"조령천교(측경간),신양교,왕림교 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J16203,"2019-12-04 07:43:00",19-제조-03,a.품질검사,"수리티교, 산외교 데크 및 프리빔 생산관리, 레미콘 관리","2019-12-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J09102,"2019-12-04 07:47:00",19-계약-01,b.시공사,"대림산업, SK건설 현장방문 예정, 한옥마을 북쌍교 예상 시행가 등 : 교리교 외 4개교 계약 추진 중","2019-12-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-12-04 07:48:00",17-시공-08,b.시공,"크레인거더가설을위한 토공작업 공사비예산집행검토","2019-12-04 18:20:00",17-시공-08,b.시공,"크레인거더가설을위한 토공작업 공사비예산집행검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J11305,"2019-12-04 08:14:00",19-설계-09,e.검토,"계획 검토","2019-12-04 21:38:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-12-04 08:20:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-12-04 08:20:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-04 18:07:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15302,"2019-12-04 08:26:00",18-설계-15,e.검토,"설계ve 수정","2019-12-04 20:40:00",18-설계-15,e.검토,"설계ve 수정","2019-12-04 18:31:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J10314,"2019-12-04 08:27:00",19-교영-01,d.기타,"Nodular거더 형식별 공사비검토, 거더 표준내역작업, 지경천교 (포항~영덕 3공구) 크레인 가설공사비 검토","2019-12-04 18:09:00",19-교영-01,d.기타,"Nodular거더 형식별 공사비검토, 거더 표준내역작업, 지경천교 (포항~영덕 3공구) 크레인 가설공사비 검토","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J16202,"2019-12-04 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-04 18:11:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J13201,"2019-12-04 08:34:00",19-설계-09,b.구조계산,"BR9모델링 및 반력","2019-12-04 18:00:00",19-설계-09,b.구조계산,"BR9모델링 및 반력","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J14306,"2019-12-04 08:35:00",19-관리-04,a.계약,"계약업무 외","2019-12-04 18:41:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-12-04 08:37:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-04 18:04:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15201,"2019-12-04 08:37:00",19-교영-22,c.설계사,"과업진행현황 파악 ","2019-12-04 18:06:00",19-교영-22,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15307,"2019-12-04 08:38:00",19-설계-09,b.구조계산,"바닥판 계산서 작성","2019-12-04 18:00:00",19-설계-09,b.구조계산,"바닥판 계산서 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J18205,"2019-12-04 08:38:00",19-시공-20,g.기타,"검토서 답변 자료 작성","2019-12-04 21:38:00",19-시공-20,g.기타,"검토서 답변 자료 작성","2019-12-04 19:32:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J07210,"2019-12-04 08:41:00",14-설계-32,h.기타,"산외교 솟음","2019-12-04 20:57:00",14-설계-32,h.기타,"산외교 솟음","2019-12-04 18:31:00",172.16.9.162,172.16.9.155,172.16.9.162,008E1,,1,
|
|
J11202,"2019-12-04 08:44:00",19-시공-02,b.시공,공사관리,"2019-12-04 18:12:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J09101,"2019-12-04 08:46:00",19-교영-01,c.설계사,"과업조사 외","2019-12-04 20:38:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J15301,"2019-12-04 08:47:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","2019-12-04 18:16:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15202,"2019-12-04 09:01:00",18-설계-12,"f.보고서 및 시방서","VE지적사항 정리","2019-12-04 21:38:00",18-설계-12,"f.보고서 및 시방서","VE지적사항 정리","2019-12-04 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10313,"2019-12-04 08:50:00",19-교휴-06,경유,경유(병원),"2019-12-04 18:00:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
M05510,"2019-12-04 13:59:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-04 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.36.90,NULL,NULL,004C8,,,
|
|
J14101,"2019-12-04 08:50:00",16-시공-20,출장,한양,"2019-12-04 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-12-04 08:50:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 면보수","2019-12-04 18:00:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 면보수","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J12202,"2019-12-04 08:50:00",17-시공-08,출장,"[대구 광역시]2차 안전심의 답변서 관련 보고 및 런처 제품심사 ","2019-12-04 18:00:00",17-시공-08,출장,"[대구 광역시]2차 안전심의 답변서 관련 보고 및 런처 제품심사 ","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18208,"2019-12-05 07:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J18207,"2019-12-05 07:29:00",17-시공-08,b.시공,"크레인거더가설을위한 런처장비 제품심사예정","2019-12-05 18:04:00",17-시공-08,b.시공,"크레인거더가설을위한 런처장비 제품심사예정","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
T04204,"2019-12-05 07:29:00",19-제조-02,a.생산관리,"조령천교(측경간),신양교,왕림교 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-05 20:29:00",19-제조-02,a.생산관리,"조령천교(측경간),신양교,왕림교 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-12-05 07:30:00",19-제조-02,a.생산관리,"프리캐스트 가로보 shop","2019-12-05 18:05:00",19-제조-02,a.생산관리,"프리캐스트 가로보 shop","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>Pre-Deck 프로그램 샘플 테스트 및 오류사항 확인<|>04:30<|><br>19-제조-02<|>a.생산관리<|>확대회의<|>01:00<|><br>",,
|
|
J07202,"2019-12-05 07:34:00",19-제조-04,b.기계,"신양교 거푸집 보수와 그라인더 작업 및 야적장 정리","2019-12-06 07:37:00",19-제조-04,b.기계,"신양교 거푸집 보수와 그라인더 작업 및 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-12-05 07:43:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J16203,"2019-12-05 07:44:00",19-제조-03,a.품질검사,"수리티교, 산외교 데크 및 켄틸레버 생산관리, 레미콘 관리","2019-12-05 20:49:00",19-제조-03,a.품질검사,"수리티교, 산외교 데크 및 켄틸레버 생산관리, 레미콘 관리","2019-12-05 18:46:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-12-05 07:47:00",19-계약-01,b.시공사,"2019년 설계반영, 공사수주, 매출 1차 정리, 명덕교 외 3개교 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","2019-12-05 18:10:00",19-계약-01,b.시공사,"2019년 설계반영, 공사수주, 매출 1차 정리, 명덕교 외 3개교 예상 계약가 등 : 교리교 외 4개교 계약 추진 중","0000-00-00 00:00:00",172.16.9.145,NULL,172.16.9.145,004C7,,,
|
|
J10315,"2019-12-05 07:55:00",17-시공-07,b.시공,"주천2교 가설계획서 작정","2019-12-05 18:07:00",17-시공-07,b.시공,"주천2교 가설계획서 작정","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J11305,"2019-12-05 08:11:00",19-설계-09,e.검토,"계획 검토","2019-12-05 18:04:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J11302,"2019-12-05 08:14:00",19-시공-07,g.기타,"인장계획서 작성 및 세천2교 외측거더 크레인 가설위치 검토","2019-12-05 18:07:00",19-시공-07,g.기타,"인장계획서 작성 및 세천2교 외측거더 크레인 가설위치 검토","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
B15306,"2019-12-05 08:15:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J10314,"2019-12-05 08:23:00",19-교영-01,d.기타,"예상공사수주현황조사(2020년도), Nodular거더 형식별 공사비검토, 거더 표준내역작업","2019-12-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J09101,"2019-12-05 08:24:00",19-교영-01,c.설계사,"과업조사 외","2019-12-05 18:02:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J18206,"2019-12-05 08:25:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-05 18:06:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15302,"2019-12-05 08:27:00",18-설계-15,e.검토,"설계ve 수정","2019-12-05 20:49:00",18-설계-15,e.검토,"설계ve 수정","2019-12-05 18:31:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J07103,"2019-12-05 08:30:00",19-교영-01,d.기타,사업관리,"2019-12-05 18:05:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15307,"2019-12-05 08:30:00",19-설계-09,b.구조계산,"바닥판 계산서 작성","2019-12-05 18:02:00",19-설계-09,b.구조계산,"바닥판 계산서 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J15202,"2019-12-05 08:30:00",19-설계-12,b.구조계산,모델링,"2019-12-05 21:31:00",19-설계-12,b.구조계산,모델링,"2019-12-05 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J17205,"2019-12-05 08:33:00",18-교영-01,c.설계사,.,"2019-12-05 21:33:00",18-교영-01,c.설계사,.,"2019-12-05 18:30:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J07210,"2019-12-05 08:34:00",14-설계-32,h.기타,"산외교 솟음","2019-12-05 18:06:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15201,"2019-12-05 08:37:00",19-교영-22,c.설계사,"과업진행현황 파악 ","2019-12-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J16202,"2019-12-05 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J14306,"2019-12-05 08:39:00",19-관리-04,a.계약,"계약업무 외","2019-12-05 18:07:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J13201,"2019-12-05 08:40:00",19-설계-09,b.구조계산,"BR10모델링 및 반력","2019-12-05 21:24:00",19-설계-09,b.구조계산,"BR10모델링 및 반력","2019-12-05 18:31:00",172.16.9.165,172.16.9.155,172.16.9.165,008E2,,1,
|
|
J18205,"2019-12-05 08:41:00",17-설계-05,h.기타,"검토서 답변 자료 작성","2019-12-05 21:36:00",17-설계-05,h.기타,"검토서 답변 자료 작성","2019-12-05 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J10301,"2019-12-05 08:42:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J15301,"2019-12-05 08:50:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","2019-12-05 18:05:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-12-05 14:02:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-05 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.36.155,NULL,NULL,004C8,,,
|
|
J14101,"2019-12-05 08:50:00",16-시공-20,출장,한양,"2019-12-05 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-12-05 08:50:00",17-시공-08,출장,"[대구 광역시]2차 안전심의 답변서 관련 보고 및 런처 제품심사 ","2019-12-05 18:00:00",17-시공-08,출장,"[대구 광역시]2차 안전심의 답변서 관련 보고 및 런처 제품심사 ","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11202,"2019-12-05 08:50:00",19-시공-25,출장,"[경북 영덕]신양교 제작 투입 준비","2019-12-05 18:00:00",19-시공-25,출장,"[경북 영덕]신양교 제작 투입 준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M05510,"2019-12-06 07:21:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-07 10:29:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.40.244,NULL,223.38.40.51,004C8,,,
|
|
J14308,"2019-12-06 07:28:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-06 20:50:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-06 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-12-06 07:31:00",19-제조-02,a.생산관리,"조령천교(측경간),경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-06 21:03:00",19-제조-02,a.생산관리,"조령천교(측경간),경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-12-06 07:34:00",17-시공-08,b.시공,"크레인거더가설을위한 런처장비 제품심사결과 보안 및가설준비","2019-12-06 17:59:00",17-시공-08,b.시공,"크레인거더가설을위한 런처장비 제품심사결과 보안 및가설준비","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
M02302,"2019-12-06 07:37:00",19-제조-02,a.생산관리,"프리캐스트 가로보 shop","2019-12-06 18:00:00",19-제조-02,a.생산관리,"프리캐스트 가로보 shop","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>분절거더 제작 시스템 검토<|>04:30<|><br>19-제조-02<|>a.생산관리<|>원가분석 검토<|>01:30<|><br>",,
|
|
J07202,"2019-12-06 07:37:00",19-제조-04,b.기계,"신양교 거푸집 보수와 그라인더 작업 및 야적장 정리","2019-12-07 09:59:00",19-제조-04,b.기계,"신양교 거푸집 보수와 그라인더 작업 및 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-12-06 07:39:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-06 12:00:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J16203,"2019-12-06 07:45:00",19-제조-03,a.품질검사,"수리티교, 산외교 데크 및 켄틸레버 생산관리, 레미콘 관리","2019-12-06 22:27:00",19-제조-03,a.품질검사,"수리티교, 산외교 데크 및 켄틸레버 생산관리, 레미콘 관리","2019-12-06 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J09102,"2019-12-06 07:47:00",19-계약-01,b.시공사,"코오롱글로벌 본사, 포스코건설 현장 방문 예정, 2019년 설계반영, 공사수주, 매출 1차 분석 등 : 교리교 외 4개교 계약 추진 중","2019-12-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J10315,"2019-12-06 08:03:00",18-시공-12,b.시공,"3차분 제작장 검토","2019-12-06 18:02:00",18-시공-12,b.시공,"3차분 제작장 검토","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J11305,"2019-12-06 08:22:00",19-설계-09,e.검토,"계획 검토","2019-12-06 18:05:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-12-06 08:22:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-06 18:19:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J17207,"2019-12-06 08:22:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","2019-12-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.94,NULL,NULL,004C6,,,
|
|
B15306,"2019-12-06 08:23:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18209,"2019-12-06 08:23:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","2019-12-06 18:06:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","0000-00-00 00:00:00",172.16.9.65,NULL,172.16.9.65,004E2,,,
|
|
J19301,"2019-12-06 08:25:00",14-구연-01,c.실행,"Nodular Girder 단위공정표 및 m별 실행 작성","2019-12-06 18:04:00",14-구연-01,c.실행,"Nodular Girder 단위공정표 및 m별 실행 작성","0000-00-00 00:00:00",61.98.205.242,NULL,172.16.9.42,008E2,,,
|
|
J13201,"2019-12-06 08:26:00",19-설계-09,b.구조계산,"BR13모델링 및 반력","2019-12-06 18:02:00",19-설계-09,b.구조계산,"BR13모델링 및 반력","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15302,"2019-12-06 08:28:00",18-설계-15,e.검토,"설계ve 수정","2019-12-06 18:02:00",18-설계-15,e.검토,"설계ve 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15301,"2019-12-06 08:29:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","2019-12-06 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.172,NULL,NULL,004E4,,,
|
|
J16202,"2019-12-06 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-06 18:15:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15202,"2019-12-06 08:32:00",19-설계-12,b.구조계산,모델링,"2019-12-06 18:02:00",19-설계-12,b.구조계산,모델링,"0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J15307,"2019-12-06 08:33:00",19-설계-09,b.구조계산,"바닥판 계산서 작성","2019-12-06 18:01:00",19-설계-09,b.구조계산,"바닥판 계산서 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J07103,"2019-12-06 08:33:00",19-교영-01,d.기타,사업관리,"2019-12-06 18:23:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15201,"2019-12-06 08:34:00",19-교영-22,c.설계사,"과업진행현황 파악 ","2019-12-06 18:01:00",19-교영-22,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-12-06 08:35:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-12-06 18:01:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J07210,"2019-12-06 08:37:00",14-설계-32,h.기타,"산외교 솟음","2019-12-06 18:05:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J08201,"2019-12-06 08:39:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-06 18:07:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J14306,"2019-12-06 08:42:00",19-관리-04,a.계약,"계약업무 외","2019-12-06 18:21:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-12-06 08:43:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-06 18:23:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J09101,"2019-12-06 08:48:00",19-교영-01,c.설계사,"과업조사 외","2019-12-06 18:23:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J18205,"2019-12-06 08:49:00",17-설계-05,h.기타,"검토서 답변 자료 작성","2019-12-06 18:05:00",17-설계-05,h.기타,"검토서 답변 자료 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,008E2,,,
|
|
J17205,"2019-12-06 08:50:00",18-교영-01,c.설계사,.,"2019-12-06 18:03:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J14101,"2019-12-06 08:50:00",16-시공-20,출장,한양,"2019-12-06 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-12-06 08:50:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 면보수","2019-12-06 18:00:00",17-시공-10,출장,"[경북 성주군 선남면 선원리]성주대교 면보수","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J12202,"2019-12-06 08:50:00",17-시공-08,출장,"[대구 광역시]2차 안전심의 답변서 관련 보고 및 런처 제품심사 ","2019-12-06 18:00:00",17-시공-08,출장,"[대구 광역시]2차 안전심의 답변서 관련 보고 및 런처 제품심사 ","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11202,"2019-12-06 08:50:00",19-시공-25,출장,"[경북 영덕]신양교 제작 투입 준비","2019-12-06 18:00:00",19-시공-25,출장,"[경북 영덕]신양교 제작 투입 준비","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
T04204,"2019-12-07 07:37:00",19-제조-02,a.생산관리,"조령천교(측경간),경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-07 16:01:00",19-제조-02,a.생산관리,"조령천교(측경간),경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J14308,"2019-12-07 07:44:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-07 16:01:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J16203,"2019-12-07 07:51:00",19-제조-02,a.생산관리,"레미콘 생산설비 믹서수리 및 보수","2019-12-07 16:15:00",19-제조-02,a.생산관리,"레미콘 생산설비 믹서수리 및 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E1,,1,
|
|
J10313,"2019-12-07 08:57:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","2019-12-07 14:27:00",19-제조-01,b.총무,"생산직 직원 급여, 월 마감","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J07202,"2019-12-07 10:00:00",19-제조-04,b.기계,"배치플랜트 믹서기 수리","2019-12-07 15:51:00",19-제조-04,b.기계,"배치플랜트 믹서기 수리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-12-07 10:29:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.40.51,NULL,NULL,004C8,,,
|
|
J12202,"2019-12-09 06:47:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-12-09 18:05:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J07202,"2019-12-09 07:00:00",19-제조-04,b.기계,"지경천교 앵커 설치 출장","2019-12-10 07:35:00",19-제조-04,b.기계,"지경천교 앵커 설치 출장","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J11302,"2019-12-09 07:26:00",17-시공-07,g.기타,"주천2교 가설계획서 및 인장계획서 작성","2019-12-09 18:02:00",17-시공-07,g.기타,"주천2교 가설계획서 및 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
T04204,"2019-12-09 07:27:00",19-제조-02,a.생산관리,"조령천교(측경간),경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-09 20:43:00",19-제조-02,a.생산관리,"조령천교(측경간),경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-12-09 07:38:00",19-제조-03,a.품질검사,"산외교, 수리티교 데크, 켄틸레버 생산관리, 레미콘 관리","2019-12-09 22:48:00",19-제조-03,a.품질검사,"산외교, 수리티교 데크, 켄틸레버 생산관리, 레미콘 관리","2019-12-09 18:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J14308,"2019-12-09 07:38:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-09 20:47:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-09 18:39:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-12-09 07:45:00",19-제조-02,a.생산관리,"분절거더 표준도 검토","2019-12-09 18:03:00",19-제조-02,a.생산관리,"프리캐스트 가로보 shop","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공장 야적장 현황 조사 및 협의<|>04:00<|><br>19-제조-02<|>a.생산관리<|>분절거더 피복 검토 및 협의<|>03:00<|><br>",,
|
|
J09102,"2019-12-09 07:51:00",19-계약-01,b.시공사,"2019년 설계반영, 공사수주, 매출 분석, 2020년 공사수주 계획 등 : 교리교 외 4개교 계약 추진 중","2019-12-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-12-09 07:54:00",19-시공-25,b.시공,"거더제작을위한 작업팀 및 제작지원","2019-12-09 18:44:00",19-시공-25,b.시공,"거더제작을위한 작업팀 및 제작지원","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J13308,"2019-12-09 08:00:00",19-시공-25,b.시공,"1. 도화육교 현장 정산
|
|
2. 석현천교 용강IC교 제작완료 보고서 작성
|
|
3. 기성 외","2019-12-09 18:02:00",19-시공-25,b.시공,"1. 도화육교 현장 정산
|
|
2. 석현천교 용강IC교 제작완료 보고서 작성
|
|
3. 기성 외","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
J17207,"2019-12-09 08:04:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","2019-12-09 18:20:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
B15306,"2019-12-09 08:10:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18209,"2019-12-09 08:19:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","2019-12-09 18:07:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","0000-00-00 00:00:00",172.16.9.65,NULL,172.16.9.65,004E2,,,
|
|
J19301,"2019-12-09 08:24:00",14-구연-01,c.실행,"Nodular Girder 켄틸레버 바닥판 비교 및 검토","2019-12-09 18:05:00",14-구연-01,c.실행,"Nodular Girder 켄틸레버 바닥판 비교 및 검토","0000-00-00 00:00:00",61.98.205.242,NULL,61.98.205.242,008E2,,,
|
|
J10314,"2019-12-09 08:25:00",19-설계-08,h.기타,"우산1교외1개소(화순동명~송광봉산) 설계견적서 및 내역서, 예상공사수주현황조사(2020년도), Nodular거더 형식별 공사비검토, 거더 표준내역작업","2019-12-09 18:09:00",19-설계-08,h.기타,"우산1교외1개소(화순동명~송광봉산) 설계견적서 및 내역서, 예상공사수주현황조사(2020년도), Nodular거더 형식별 공사비검토, 거더 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J07103,"2019-12-09 08:25:00",19-교영-01,d.기타,사업관리,"2019-12-09 18:24:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15302,"2019-12-09 08:25:00",19-설계-12,h.기타,빔배치,"2019-12-09 20:34:00",19-설계-12,h.기타,빔배치,"2019-12-09 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J18206,"2019-12-09 08:26:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-09 18:19:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10301,"2019-12-09 08:27:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-09 18:49:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J18205,"2019-12-09 08:31:00",17-설계-05,h.기타,"검토서 답변 자료 작성","2019-12-09 21:46:00",17-설계-05,h.기타,"검토서 답변 자료 작성","2019-12-09 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J08201,"2019-12-09 08:31:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J13201,"2019-12-09 08:33:00",19-설계-09,b.구조계산,"BR1모델링 및 반력","2019-12-09 20:44:00",19-설계-09,b.구조계산,"BR1모델링 및 반력","2019-12-09 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J15201,"2019-12-09 08:34:00",19-교영-22,c.설계사,"과업진행현황 파악 ","2019-12-09 18:05:00",19-교영-22,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-12-09 08:34:00",18-교영-01,c.설계사,.,"2019-12-09 20:31:00",18-교영-01,c.설계사,.,"2019-12-09 18:30:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J11305,"2019-12-09 08:35:00",19-설계-09,e.검토,"계획 검토","2019-12-09 18:07:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J07210,"2019-12-09 08:35:00",14-설계-32,h.기타,"산외교 솟음","2019-12-09 18:07:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-12-09 08:38:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-09 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J16202,"2019-12-09 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-09 18:32:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J11202,"2019-12-09 08:41:00",19-시공-02,b.시공,공사관리,"2019-12-09 18:37:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15202,"2019-12-09 08:43:00",19-설계-12,b.구조계산,모델링,"2019-12-09 21:33:00",19-설계-12,b.구조계산,모델링,"2019-12-09 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J15307,"2019-12-09 08:46:00",19-설계-09,b.구조계산,"슬래브 일반도 작성","2019-12-09 21:30:00",19-설계-09,b.구조계산,"슬래브 일반도 작성","2019-12-09 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J09101,"2019-12-09 08:47:00",19-교영-01,c.설계사,"과업조사 외","2019-12-09 18:26:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J15301,"2019-12-09 13:56:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","2019-12-09 18:04:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14101,"2019-12-09 08:50:00",16-시공-20,출장,한양,"2019-12-09 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-12-10 06:19:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-12-10 18:06:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J17207,"2019-12-10 07:24:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","2019-12-10 18:30:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
J14308,"2019-12-10 07:30:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J18208,"2019-12-10 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J18207,"2019-12-10 07:34:00",19-시공-25,b.시공,"거더제작을위한 작업팀 및 제작지원","2019-12-10 18:00:00",19-시공-25,b.시공,"거더제작을위한 작업팀 및 제작지원","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J07202,"2019-12-10 07:36:00",19-제조-04,b.기계,"거더 거푸집 보수와 공장동 전등 교체","2019-12-11 07:35:00",19-제조-04,b.기계,"거더 거푸집 보수와 공장동 전등 교체","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J09102,"2019-12-10 07:44:00",19-계약-01,b.시공사,"고려개발, 한화건설 방문예정, 2019년 설계반영, 공사수주, 매출 분석, 2020년 공사수주 계획 등 : 교리교 외 4개교 계약 추진 중","2019-12-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-12-10 07:44:00",19-제조-03,a.품질검사,"산외교, 수리티교 데크, 켄틸레버 생산관리, 레미콘 관리","2019-12-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
M02302,"2019-12-10 07:48:00",19-제조-02,a.생산관리,"분절거더 표준도 검토","2019-12-10 18:00:00",19-제조-02,a.생산관리,"분절거더 표준도 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-12-10 08:00:00",19-시공-25,b.시공,"1. 도화육교 현장 정산
|
|
2. 석현천교 용강IC교 제작완료 보고서 작성
|
|
3. 기성 외","2019-12-10 18:14:00",19-시공-25,b.시공,"1. 도화육교 현장 정산
|
|
2. 석현천교 용강IC교 제작완료 보고서 작성
|
|
3. 기성 외","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
J10315,"2019-12-10 08:05:00",18-시공-12,b.시공,"3차분 제작 및 가설협의자료 작성","2019-12-10 18:03:00",18-시공-12,b.시공,"3차분 제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J18209,"2019-12-10 08:18:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","2019-12-10 18:21:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","0000-00-00 00:00:00",172.16.9.65,NULL,172.16.9.65,004E2,,,
|
|
B15306,"2019-12-10 08:20:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J07103,"2019-12-10 08:20:00",19-교영-01,d.기타,사업관리,"2019-12-10 18:20:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11302,"2019-12-10 08:21:00",17-시공-07,g.기타,"주천2교 가설계획서 및 인장계획서 작성","2019-12-10 18:03:00",17-시공-07,g.기타,"주천2교 가설계획서 및 인장계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J08201,"2019-12-10 08:22:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-10 18:20:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-12-10 08:22:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-10 12:54:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J10314,"2019-12-10 08:26:00",18-설계-16,h.기타,"예상공사수주현황조사(2020년도), 상방림교(안흥~방림2) 시행견적서, 우산1교외1개소(화순동명~송광봉산) 설계견적서 및 내역서, 거더 표준내역작업","2019-12-10 18:03:00",18-설계-16,h.기타,"상방림교(안흥~방림2) 시행견적서, 우산1교외1개소(화순동명~송광봉산) 설계견적서 및 내역서, 예상공사수주현황조사(2020년도), 거더 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J19301,"2019-12-10 08:27:00",14-구연-01,c.실행,"Nodular Girder 켄틸레버 바닥판 비교 및 검토,
|
|
높이조절볼트를 이용한 프리덱 설치 시험계획서 작성","2019-12-10 18:05:00",14-구연-01,c.실행,"Nodular Girder 켄틸레버 바닥판 비교 및 검토,
|
|
높이조절볼트를 이용한 프리덱 설치 시험계획서 작성","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J11305,"2019-12-10 08:27:00",19-설계-09,e.검토,"계획 검토","2019-12-10 18:03:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15302,"2019-12-10 08:28:00",18-설계-12,c.도면,"설계ve 설계감리 도면 수정","2019-12-10 18:01:00",18-설계-12,c.도면,"설계ve 설계감리 도면 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15307,"2019-12-10 08:32:00",19-설계-09,b.구조계산,"슬래브 일반도 작성","2019-12-10 18:00:00",19-설계-09,b.구조계산,"슬래브 일반도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J15201,"2019-12-10 08:36:00",19-교영-22,c.설계사,"과업진행현황 파악 ","2019-12-10 18:01:00",19-교영-22,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-12-10 08:36:00",18-교영-01,c.설계사,.,"2019-12-10 21:32:00",18-교영-01,c.설계사,.,"2019-12-10 18:30:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J13201,"2019-12-10 08:36:00",19-설계-09,b.구조계산,"BR2모델링 및 반력","2019-12-10 20:52:00",19-설계-09,b.구조계산,"BR2모델링 및 반력","2019-12-10 18:35:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J14306,"2019-12-10 08:36:00",19-관리-04,a.계약,"계약업무 외","2019-12-10 18:02:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-12-10 08:37:00",19-시공-02,b.시공,공사관리,"2019-12-10 18:15:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J07210,"2019-12-10 08:37:00",14-설계-32,h.기타,"산외교 솟음","2019-12-10 18:21:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J09101,"2019-12-10 08:38:00",19-교영-01,c.설계사,"과업조사 외","2019-12-10 18:06:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J18205,"2019-12-10 08:40:00",17-시공-08,g.기타,"런처(Front, Rear Support) 안전 검토","2019-12-10 21:31:00",17-시공-08,g.기타,"런처(Front, Rear Support) 안전 검토","2019-12-10 18:30:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J10301,"2019-12-10 08:40:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-10 18:20:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-12-10 08:41:00",19-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","2019-12-10 18:00:00",19-제조-01,b.총무,"생산직 급여 명세서, 운영비 데이터베이스 입력, 근태현황 확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16202,"2019-12-10 08:45:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-10 18:05:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15301,"2019-12-10 08:52:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","2019-12-10 18:07:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J15202,"2019-12-10 08:59:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-10 20:51:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-10 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
M05510,"2019-12-10 14:24:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-10 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.40.249,NULL,NULL,004C8,,,
|
|
J14101,"2019-12-10 08:50:00",16-시공-20,출장,한양,"2019-12-10 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-12-11 06:43:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-12-11 18:14:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J16203,"2019-12-11 07:04:00",19-제조-03,a.품질검사,"산외교, 수리티교 데크, 켄틸레버 생산관리, 레미콘 관리","2019-12-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J17207,"2019-12-11 07:08:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","2019-12-11 18:50:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
J10315,"2019-12-11 07:32:00",18-시공-12,b.시공,"3차분 제작 및 가설협의자료 작성","2019-12-11 18:03:00",18-시공-12,b.시공,"3차분 제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
M02302,"2019-12-11 07:35:00",19-제조-02,a.생산관리,"분절거더 제작장 검토","2019-12-11 18:53:00",19-제조-02,a.생산관리,"분절거더 제작장 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>김회성 이사 면담<|>02:00<|><br>19-제조-02<|>a.생산관리<|>표용암 부장 면담<|>02:00<|><br>19-제조-02<|>a.생산관리<|>박종석 차장 면담<|>01:00<|><br>",,
|
|
T04204,"2019-12-11 07:36:00",19-제조-02,a.생산관리,"조령천교(측경간),경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-12-11 07:36:00",19-제조-04,b.기계,"가설밴트 이적 및 경비실 후면 뚜껑설치와 각재 정리","2019-12-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-12-11 07:40:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-11 12:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18207,"2019-12-11 07:40:00",17-시공-08,b.시공,"런처가설준비작업 토공 및 런처 보강작업 지원","2019-12-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.139,NULL,NULL,004C7,,,
|
|
J14308,"2019-12-11 07:41:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J10314,"2019-12-11 08:12:00",19-교영-22,d.기타,"철도교(동두천~연천2공구) 검토자료, 상방림교(안흥~방림2) 시행견적서, DR거더 형고별 교량현황 리스트작업, 예상공사수주현황조사(2020년도), 거더 표준내역작업","2019-12-11 18:04:00",19-교영-22,d.기타,"철도교(동두천~연천2공구) 검토자료, 상방림교(안흥~방림2) 시행견적서, DR거더 형고별 교량현황 리스트작업, 예상공사수주현황조사(2020년도), 거더 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18209,"2019-12-11 08:18:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","2019-12-11 18:48:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","2019-12-11 18:34:00",172.16.9.65,172.16.9.65,172.16.9.65,004E2,,,
|
|
J08201,"2019-12-11 08:19:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-11 20:38:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-12-11 08:19:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J09101,"2019-12-11 08:21:00",19-교영-01,c.설계사,"과업조사 외","2019-12-11 18:05:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J11305,"2019-12-11 08:22:00",19-설계-09,e.검토,"계획 검토","2019-12-11 18:48:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15302,"2019-12-11 08:27:00",18-설계-12,c.도면,"설계ve 설계감리 도면 수정","2019-12-11 20:34:00",18-설계-12,c.도면,"설계ve 설계감리 도면 수정","2019-12-11 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J19301,"2019-12-11 08:27:00",14-구연-01,c.실행,"Nodular Girder m별 실행 작성","2019-12-11 18:18:00",14-구연-01,c.실행,"Nodular Girder m별 실행 작성","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J15307,"2019-12-11 08:29:00",19-설계-09,b.구조계산,"슬래브 일반도 작성","2019-12-11 18:01:00",19-설계-09,b.구조계산,"슬래브 일반도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J16202,"2019-12-11 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-11 18:03:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
M05510,"2019-12-11 08:32:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.40.199,NULL,NULL,004C8,,,
|
|
J17205,"2019-12-11 08:33:00",18-교영-01,c.설계사,.,"2019-12-11 21:34:00",18-교영-01,c.설계사,.,"2019-12-11 18:31:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J13201,"2019-12-11 08:34:00",19-설계-09,b.구조계산,"모델링 및 반력검토","2019-12-11 18:00:00",19-설계-09,b.구조계산,"모델링 및 반력검토","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J14306,"2019-12-11 08:34:00",19-관리-04,a.계약,"계약업무 외","2019-12-11 18:27:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J07103,"2019-12-11 08:35:00",19-교영-01,d.기타,사업관리,"2019-12-11 18:16:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J10301,"2019-12-11 08:38:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-11 18:20:00",19-시공-20,d.자재," 공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J07210,"2019-12-11 08:38:00",14-설계-32,h.기타,"산외교 솟음","2019-12-11 18:12:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-12-11 08:41:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-11 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18205,"2019-12-11 08:41:00",17-시공-08,g.기타,"런처(Front, Rear Support) 안전 검토","2019-12-11 21:38:00",17-시공-08,g.기타,"런처(Front, Rear Support) 안전 검토","2019-12-11 18:31:00",61.98.205.243,61.98.205.243,61.98.205.243,008E2,,1,
|
|
J15202,"2019-12-11 08:41:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-11 18:34:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J15201,"2019-12-11 08:43:00",19-교영-22,c.설계사,"과업진행현황 파악 ","2019-12-11 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J15301,"2019-12-11 08:48:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","2019-12-11 18:15:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J11202,"2019-12-11 08:59:00",19-시공-02,b.시공,공사관리,"2019-12-11 18:11:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18206,"2019-12-11 08:30:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-11 17:40:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J14101,"2019-12-11 08:50:00",16-시공-20,출장,한양,"2019-12-11 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J13308,"2019-12-11 08:50:00",18-시공-15,출장,"[일산]원흥2교 3차 강연선 삽입","2019-12-11 18:00:00",18-시공-15,출장,"[일산]원흥2교 3차 강연선 삽입","0000-00-00 00:00:00",NULL,NULL,NULL,004E3,,,
|
|
J09102,"2019-12-11 08:50:00",19-계약-01,출장,두산건설,"2019-12-11 18:00:00",19-계약-01,출장,두산건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J11302,"2019-12-11 08:50:00",19-시공-07,출장,"[충북 증평군 증평읍 용강리 1087]석현천교, 용강IC교 1차인장","2019-12-11 18:00:00",19-시공-07,출장,"[충북 증평군 증평읍 용강리 1087]석현천교, 용강IC교 1차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J12202,"2019-12-12 07:17:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-12-12 18:05:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J17207,"2019-12-12 07:20:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.94,NULL,NULL,004C6,,,
|
|
J14308,"2019-12-12 07:22:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,1,
|
|
J18208,"2019-12-12 07:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J10315,"2019-12-12 07:32:00",18-시공-12,b.시공,"3차분 제작 및 가설협의자료 작성","2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.147,NULL,NULL,004C7,,,
|
|
T04204,"2019-12-12 07:33:00",19-제조-02,a.생산관리,"조령천교(측경간),경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-12-12 07:36:00",19-제조-04,b.기계,"가설밴트 이적 및 거더 거푸집 보수","2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,"19-제조-04<|>b.기계<|>12월 근로자 안전화 구입<|>01:00<|><br>",,
|
|
M02302,"2019-12-12 07:38:00",19-제조-02,a.생산관리,"Pre-Deck 프로그램 검토 및 협의","2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,"19-제조-02<|>a.생산관리<|>Pre-Deck 프로그램용 RCP/BOM 양식 작성<|>05:00<|><br>19-제조-02<|>a.생산관리<|>PTC 거더 철근 검토 및 협의<|>02:00<|><br>",,
|
|
J16203,"2019-12-12 07:40:00",19-제조-03,a.품질검사,"산외교, 수리티교 데크, 켄틸레버 생산관리, 레미콘 관리","2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
M05510,"2019-12-12 07:40:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-13 17:35:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.39.94,NULL,223.38.40.70,004C8,,,
|
|
J18207,"2019-12-12 07:42:00",19-시공-20,b.시공,"거더제작 측경간 중앙경간 면보수 및 균열보수 관련 시공사 발주처 협의","2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.139,NULL,NULL,004C7,,,
|
|
J10314,"2019-12-12 08:15:00",18-설계-16,h.기타,"상방림교(안흥~방림2) 시행견적서, 철도교(동두천~연천2공구) 검토자료, DR거더 형고별 교량현황 리스트작업, 예상공사수주현황조사(2020년도), 거더 표준내역작업","2019-12-12 18:04:00",18-설계-16,h.기타,"상방림교(안흥~방림2) 시행견적서, 철도교(동두천~연천2공구) 검토자료, DR거더 형고별 교량현황 리스트작업, 예상공사수주현황조사(2020년도), 거더 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J11305,"2019-12-12 08:15:00",19-설계-09,e.검토,"계획 검토","2019-12-12 18:06:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18209,"2019-12-12 08:17:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","2019-12-12 18:09:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","0000-00-00 00:00:00",172.16.9.65,NULL,172.16.9.65,004E2,,,
|
|
J08201,"2019-12-12 08:18:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J07103,"2019-12-12 08:21:00",19-교영-01,d.기타,사업관리,"2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
B15306,"2019-12-12 08:23:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15302,"2019-12-12 08:27:00",18-설계-12,c.도면,"설계ve 설계감리 도면 수정","2019-12-12 20:34:00",18-설계-12,c.도면,"설계ve 설계감리 도면 수정","2019-12-12 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J19301,"2019-12-12 08:28:00",14-구연-01,c.실행,"Nodular Girder 공법별 양생 비교,
|
|
경첩볼트를 이용한 높이조절 시험시공 계획서 작성","2019-12-12 18:08:00",14-구연-01,c.실행,"Nodular Girder 공법별 양생 비교,
|
|
경첩볼트를 이용한 높이조절 시험시공 계획서 작성","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J18206,"2019-12-12 08:28:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-12 18:18:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J15202,"2019-12-12 08:30:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-12 18:02:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J13201,"2019-12-12 08:33:00",19-설계-09,b.구조계산,"모델링 및 반력검토","2019-12-12 20:40:00",19-설계-09,b.구조계산,"모델링 및 반력검토","2019-12-12 18:30:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J11202,"2019-12-12 08:33:00",19-시공-02,b.시공,공사관리,"2019-12-12 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J15307,"2019-12-12 08:35:00",19-설계-09,b.구조계산,"슬래브 일반도 작성","2019-12-12 21:30:00",19-설계-09,b.구조계산,"슬래브 일반도 작성","2019-12-12 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J16202,"2019-12-12 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-12 18:16:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J18205,"2019-12-12 08:40:00",17-시공-08,g.기타,"런처(Front, Rear Support) 안전 검토","2019-12-12 18:05:00",17-시공-08,g.기타,"런처(Front, Rear Support) 안전 검토","0000-00-00 00:00:00",61.98.205.243,NULL,172.16.9.167,008E2,,,
|
|
J10313,"2019-12-12 08:43:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-12 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J09101,"2019-12-12 08:43:00",19-교영-01,c.설계사,"과업조사 외","2019-12-12 18:17:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J17205,"2019-12-12 08:44:00",18-교영-01,c.설계사,.,"2019-12-12 21:33:00",18-교영-01,c.설계사,.,"2019-12-12 18:31:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J07210,"2019-12-12 08:45:00",14-설계-32,h.기타,"산외교 솟음","2019-12-12 19:49:00",14-설계-32,h.기타,"산외교 솟음","2019-12-12 19:32:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,,
|
|
J15301,"2019-12-12 08:53:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","2019-12-12 18:13:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14306,"2019-12-12 08:35:00",19-관리-04,a.계약,"계약업무 외","2019-12-12 18:01:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J14101,"2019-12-12 08:50:00",16-시공-20,출장,한양,"2019-12-12 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J13308,"2019-12-12 08:50:00",18-시공-15,출장,"[일산]원흥2교 3차 강연선 삽입","2019-12-12 18:00:00",18-시공-15,출장,"[일산]원흥2교 3차 강연선 삽입","0000-00-00 00:00:00",NULL,NULL,NULL,004E3,,,
|
|
J11302,"2019-12-12 08:50:00",19-시공-07,출장,"[충북 증평군 증평읍 용강리 1087]석현천교, 용강IC교 1차인장","2019-12-12 18:00:00",19-시공-07,출장,"[충북 증평군 증평읍 용강리 1087]석현천교, 용강IC교 1차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J10301,"2019-12-12 08:50:00",19-제조-04,출장,"[당진공장]자재정리 관련 협의","2019-12-12 18:00:00",19-제조-04,출장,"[당진공장]자재정리 관련 협의","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J09102,"2019-12-12 08:50:00",19-계약-01,경유,"SK건설(안성구리 2공구)","2019-12-12 18:00:00",19-계약-01,경유,"SK건설(안성구리 2공구)","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J17207,"2019-12-13 06:32:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","2019-12-13 18:04:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
J10315,"2019-12-13 07:33:00",18-시공-12,b.시공,"3차분 제작 및 가설협의자료 작성","2019-12-13 18:00:00",18-시공-12,b.시공,"3차분 제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J18207,"2019-12-13 07:47:00",19-시공-20,b.시공,"거더에어포케 곰보 보수시행 및 소성수축균열 보수계획서검토","2019-12-13 18:03:00",19-시공-20,b.시공,"거더에어포케 곰보 보수시행 및 소성수축균열 보수계획서검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J09102,"2019-12-13 07:47:00",19-계약-01,b.시공사,"2020년 공사수주 계획 분석,상방림교 예상 계약가 등 : 곡천교 외 3개교 계약 추진 중","2019-12-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J10314,"2019-12-13 08:07:00",17-설계-09,h.기타,"곡천교(안성~성남2공구) 시행견적서, 상방림교(안흥~방림2) 시행견적서, 철도교(동두천~연천2공구) 검토자료, 예상공사수주현황조사(2020년도), 거더 표준내역작업","2019-12-13 18:03:00",17-설계-09,h.기타,"곡천교(안성~성남2공구) 시행견적서, 상방림교(안흥~방림2) 시행견적서, 철도교(동두천~연천2공구) 검토자료, 예상공사수주현황조사(2020년도), 거더 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-12-13 08:13:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-13 18:26:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-12-13 08:16:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-13 18:03:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J18209,"2019-12-13 08:20:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","2019-12-13 18:45:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","0000-00-00 00:00:00",172.16.9.65,NULL,172.16.9.65,004E2,,,
|
|
B15306,"2019-12-13 08:24:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15302,"2019-12-13 08:27:00",18-설계-12,c.도면,"설계ve 설계감리 도면 수정","2019-12-13 18:03:00",18-설계-12,c.도면,"설계ve 설계감리 도면 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J19301,"2019-12-13 08:28:00",14-구연-01,c.실행,"Nodular Girder 공법별 양생 비교,
|
|
Nodular Girder m별 수량분개 및 실행 작성","2019-12-13 18:08:00",14-구연-01,c.실행,"Nodular Girder 공법별 양생 비교,
|
|
Nodular Girder m별 수량분개 및 실행 작성","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J18205,"2019-12-13 08:31:00",17-시공-08,g.기타,"런처(Front, Rear Support) 안전 검토","2019-12-13 18:05:00",17-시공-08,g.기타,"런처(Front, Rear Support) 안전 검토","0000-00-00 00:00:00",172.16.9.167,NULL,172.16.9.167,008E2,,,
|
|
J07103,"2019-12-13 08:32:00",19-교영-01,d.기타,사업관리,"2019-12-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.142,NULL,NULL,008C6,,,
|
|
J15307,"2019-12-13 08:33:00",19-설계-09,b.구조계산,"슬래브 일반도 작성","2019-12-13 18:00:00",19-설계-09,b.구조계산,"슬래브 일반도 작성","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J11305,"2019-12-13 08:34:00",19-설계-09,e.검토,"계획 검토","2019-12-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.148,NULL,NULL,008C7,,,
|
|
J09101,"2019-12-13 08:35:00",19-교영-01,c.설계사,"과업조사 외","2019-12-13 18:05:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J07210,"2019-12-13 08:39:00",14-설계-32,h.기타,"산외교 솟음","2019-12-13 18:03:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J14306,"2019-12-13 08:41:00",19-관리-04,a.계약,"계약업무 외","2019-12-13 18:01:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-12-13 08:41:00",19-시공-02,b.시공,공사관리,"2019-12-13 18:02:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J17205,"2019-12-13 08:42:00",18-교영-01,c.설계사,.,"2019-12-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J15201,"2019-12-13 08:42:00",19-교영-22,c.설계사,"과업진행현황 파악 ","2019-12-13 18:02:00",19-교영-22,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J15301,"2019-12-13 08:47:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","2019-12-13 18:00:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J10301,"2019-12-13 08:48:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-13 18:01:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-12-13 08:30:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-13 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J18208,"2019-12-13 07:30:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-13 20:44:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-13 18:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-12-13 07:30:00",19-제조-02,a.생산관리,"분절거더 제작장 검토","2019-12-13 20:41:00",19-제조-02,a.생산관리,"분절거더 제작장 검토","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>Pre-Deck 지지...<|>03:30<|><br>",1,
|
|
J14308,"2019-12-13 07:30:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업 - SHOP Drawing - SHOP 프로그램 변수 작업","2019-12-13 20:48:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업 - SHOP Drawing - SHOP 프로그램 변수 작업","2019-12-13 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J16203,"2019-12-13 07:30:00",19-제조-03,a.품질검사,"산외교, 수리티교 데크, 켄틸레버 생산관리, 레미콘 관리","2019-12-13 18:18:18",NULL,NULL,"산외교, 수리티교 데크, 켄틸레버 생산관리, 레미콘 관리","0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
T04204,"2019-12-13 07:30:00",19-제조-02,a.생산관리,"조령천교(측경간),경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-13 20:48:00",19-제조-02,a.생산관리,"조령천교(측경간),경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-12-13 07:30:00",19-제조-04,b.기계,"왕림교와 생태수로 3교 거푸집 보수와 수리티교 프리덱 상차","2019-12-13 18:18:18",NULL,NULL,"왕림교와 생태수로 3교 거푸집 보수와 수리티교 프리덱 상차","0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M05510,"2019-12-13 17:36:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-13 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.40.70,NULL,NULL,004C8,,,
|
|
J14101,"2019-12-13 08:50:00",16-시공-20,출장,한양,"2019-12-13 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J11302,"2019-12-13 08:50:00",19-시공-07,출장,"[충북 증평군 증평읍 용강리 1087]석현천교, 용강IC교 1차인장","2019-12-13 18:00:00",19-시공-07,출장,"[충북 증평군 증평읍 용강리 1087]석현천교, 용강IC교 1차인장","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J14308,"2019-12-14 07:10:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-14 16:07:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
M05510,"2019-12-14 07:11:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.39.236,NULL,NULL,004C8,,,
|
|
J18208,"2019-12-14 07:31:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-14 16:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
T04204,"2019-12-14 07:31:00",19-제조-02,a.생산관리,"경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-14 16:30:00",19-제조-02,a.생산관리,"경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-12-14 07:33:00",19-제조-02,a.생산관리,"공장관리 및 업무보고","2019-12-14 16:50:00",19-제조-02,a.생산관리,"공장관리 및 업무보고","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
J10313,"2019-12-14 08:40:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-14 13:42:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J17205,"2019-12-14 11:54:00",18-교영-01,c.설계사,.,"2019-12-14 16:57:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J12202,"2019-12-16 06:13:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-12-16 18:06:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
M05510,"2019-12-16 06:31:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.39.176,NULL,NULL,004C8,,,
|
|
J14308,"2019-12-16 07:31:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-16 18:02:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-12-16 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-16 21:02:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-16 18:41:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
T04204,"2019-12-16 07:34:00",19-제조-02,a.생산관리,"경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-12-16 07:39:00",19-제조-04,b.기계,"샛돌 4교 거푸집 보수와 야적장 정리","2019-12-17 07:36:00",19-제조-04,b.기계,"샛돌 4교 거푸집 보수와 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J16203,"2019-12-16 07:40:00",19-제조-03,a.품질검사,"산외교, 수리티교 데크, 켄틸레버 생산관리, 레미콘 관리","2019-12-16 21:04:00",19-제조-03,a.품질검사,"산외교, 수리티교 데크, 켄틸레버 생산관리, 레미콘 관리","2019-12-16 19:03:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J13308,"2019-12-16 07:41:00",19-시공-25,b.시공,"1. 도화육교 제작완료 보고서 작성
|
|
2. 2019년 품질안전 관리 보고서 작성 외","2019-12-16 18:07:00",19-시공-25,b.시공,"1. 도화육교 제작완료 보고서 작성
|
|
2. 2019년 품질안전 관리 보고서 작성 외","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
M02302,"2019-12-16 07:44:00",19-제조-02,a.생산관리,"공무팀 직원 면담 및 계약직 근로계약서 작성","2019-12-16 20:50:00",19-제조-02,a.생산관리,"곰무팀 직원 면담 및 계약직 근로계약서 작성","2019-12-16 18:40:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>야적장 포장 작업 협의<|>00:30<|><br>19-제조-02<|>a.생산관리<|>제작팀 업무 인수작업<|>04:00<|><br>",1,
|
|
J09102,"2019-12-16 07:59:00",19-계약-01,b.시공사,"2020년 공사수주 계획 분석,상방림교 예상 계약가 등 : 곡천교 외 3개교 계약 추진 중","2019-12-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J18207,"2019-12-16 08:10:00",19-관리-04,g.기타,"현장기성수급관리 및 세천2교 런처장비정비 격월제준비","2019-12-16 18:09:00",19-관리-04,g.기타,"현장기성수급관리 및 세천2교 런처장비정비 격월제준비","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
B15306,"2019-12-16 08:12:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-16 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J08201,"2019-12-16 08:18:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-16 21:50:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J18206,"2019-12-16 08:19:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-16 18:09:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J18209,"2019-12-16 08:19:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","2019-12-16 18:05:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","0000-00-00 00:00:00",172.16.9.65,NULL,172.16.9.65,004E2,,,
|
|
J10315,"2019-12-16 08:25:00",18-시공-12,b.시공,"3차분 제작 및 가설협의자료 작성","2019-12-16 18:05:00",18-시공-12,b.시공,"3차분 제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J10314,"2019-12-16 08:26:00",15-시공-41,g.기타,"남진교(고성죽계~마산진전2) 시행견적서(정산), 동화천교외1개소(임실~장수) 설계견적서 및 내역서(특정공법심의), 상방림교(안흥~방림2) 시행견적서, 예상공사수주현황조사(2020년도), 거더 표준내역작업","2019-12-16 18:02:00",15-시공-41,g.기타,"남진교(고성죽계~마산진전2) 시행견적서(정산), 동화천교외1개소(임실~장수) 설계견적서 및 내역서(특정공법심의), 상방림교(안흥~방림2) 시행견적서, 예상공사수주현황조사(2020년도), 거더 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J17207,"2019-12-16 08:26:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","2019-12-16 13:46:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
J15202,"2019-12-16 08:26:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-16 20:48:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-16 18:31:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J15302,"2019-12-16 08:28:00",18-설계-12,c.도면,"설계ve 설계감리 도면 수정","2019-12-16 20:42:00",18-설계-12,c.도면,"설계ve 설계감리 도면 수정","2019-12-16 18:38:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J19301,"2019-12-16 08:29:00",14-구연-01,c.실행,"도하4교 도면검토 및 시공 적합여부 검토","2019-12-16 18:05:00",14-구연-01,c.실행,"도하4교 도면검토 및 시공 적합여부 검토","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J18205,"2019-12-16 08:32:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-16 21:22:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-16 19:09:00",172.16.9.167,172.16.9.167,172.16.9.167,008E2,,1,
|
|
J07103,"2019-12-16 08:35:00",19-교영-01,d.기타,사업관리,"2019-12-16 18:12:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J13201,"2019-12-16 08:35:00",19-설계-09,b.구조계산,"슬래브 수량산출","2019-12-16 20:53:00",19-설계-09,b.구조계산,"슬래브 수량산출","2019-12-16 18:38:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J17205,"2019-12-16 08:36:00",18-교영-01,c.설계사,.,"2019-12-16 18:11:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J11305,"2019-12-16 08:37:00",19-설계-09,e.검토,"계획 검토","2019-12-16 19:28:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J15201,"2019-12-16 08:37:00",19-교영-22,c.설계사,"과업진행현황 파악 ","2019-12-16 18:02:00",19-교영-22,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-12-16 08:38:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-16 18:04:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J07210,"2019-12-16 08:40:00",14-설계-32,h.기타,"산외교 솟음","2019-12-16 18:02:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J15307,"2019-12-16 08:40:00",19-설계-09,b.구조계산,"거더 수량 산출","2019-12-16 21:32:00",19-설계-09,b.구조계산,"거더 수량 산출","2019-12-16 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J15301,"2019-12-16 08:47:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","2019-12-16 18:10:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14306,"2019-12-16 08:48:00",19-관리-04,a.계약,"계약업무 외","2019-12-16 18:05:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-12-16 08:49:00",19-시공-02,b.시공,공사관리,"2019-12-16 18:12:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J09101,"2019-12-16 08:58:00",19-교영-01,c.설계사,"과업조사 외","2019-12-16 18:20:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J15206,"2019-12-16 17:05:00",18-시공-20,g.기타,"- 공사준공에 따른 변경 실행예산서 작성
|
|
- 하도급(지에스건설) 변경계약서 작성","2019-12-16 18:14:00",18-시공-20,g.기타,"- 공사준공에 따른 변경 실행예산서 작성
|
|
- 하도급(지에스건설) 변경계약서 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,004C8,,,
|
|
J14101,"2019-12-16 08:50:00",16-시공-20,출장,한양,"2019-12-16 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-12-17 06:29:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-12-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J14308,"2019-12-17 07:23:00",19-제조-02,a.생산관리," - RCP 철근 절단 프로그램 변수 작업
|
|
- SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
","2019-12-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J18208,"2019-12-17 07:34:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-17 21:20:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-17 18:33:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
M02302,"2019-12-17 07:35:00",19-제조-02,a.생산관리,"철근팀 직원 면담 및 계약직 근로계약서 작성","2019-12-17 21:20:00",19-제조-02,a.생산관리,"철근팀 직원 면담 및 계약직 근로계약서 작성","2019-12-17 19:31:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공시체 강도 확인 및 온도 확인<|>01:00<|><br>19-제조-02<|>a.생산관리<|>상차표 작성 및 재고 확인<|>00:30<|><br>",1,
|
|
J07202,"2019-12-17 07:37:00",19-제조-04,b.기계,"샛돌 4교 거푸집 보수와 야적장 정리","2019-12-18 07:34:00",19-제조-04,b.기계,"샛돌 4교 거푸집 보수와 야적장 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-12-17 07:37:00",19-제조-02,a.생산관리,"경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09102,"2019-12-17 07:40:00",19-계약-01,b.시공사,"2020년 공사수주 계획 분석,검단천교, 상방림교 예상 계약가 등 : 곡천교 외 3개교 계약 추진 중","2019-12-17 18:02:00",19-계약-01,b.시공사,"2020년 공사수주 계획 분석,검단천교, 상방림교 예상 계약가 등 : 곡천교 외 3개교 계약 추진 중","0000-00-00 00:00:00",172.16.9.145,NULL,172.16.9.145,004C7,,,
|
|
J13308,"2019-12-17 07:41:00",19-시공-25,b.시공,"1. 도화육교 제작완료 보고서 작성
|
|
2. 2019년 품질안전 관리 보고서 작성 외","2019-12-17 18:04:00",19-시공-25,b.시공,"1. 도화육교 제작완료 보고서 작성
|
|
2. 2019년 품질안전 관리 보고서 작성 외","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
J18207,"2019-12-17 07:41:00",19-시공-20,g.기타,"스플라이스거더 중앙부 측경간부 균열보수기술검토및 보수계획서제출. 세천2교 런처장비 이동 장비작동상태 점검","2019-12-17 18:13:00",19-시공-20,g.기타,"스플라이스거더 중앙부 측경간부 균열보수기술검토및 보수계획서제출. 세천2교 런처장비 이동 장비작동상태 점검","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J16203,"2019-12-17 07:48:00",19-제조-03,a.품질검사,"산외교, 수리티교 데크, 켄틸레버 생산관리, 레미콘 관리","2019-12-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J15302,"2019-12-17 07:56:00",18-설계-12,c.도면,"설계ve 설계감리 도면 수정","2019-12-17 18:02:00",18-설계-12,c.도면,"설계ve 설계감리 도면 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,"17-설계-09<|>e.검토<|>조령천교 거더수량검토<|>02:00<|><br>",,
|
|
B15306,"2019-12-17 08:05:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15307,"2019-12-17 08:10:00",19-설계-09,b.구조계산,"가로보 계산서 검토","2019-12-17 21:30:00",19-설계-09,b.구조계산,"가로보 계산서 검토","2019-12-17 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J08201,"2019-12-17 08:11:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-17 18:14:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J17207,"2019-12-17 08:12:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","2019-12-17 18:12:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
J15206,"2019-12-17 08:12:00",18-시공-20,g.기타,"- 옥산교 출장 (기성 청구서 날인)
|
|
- 품의서 작성 (실행예산 제1회 변경 승인/
|
|
하도급(지에스건설) 제2회 변경 계약 승인)
|
|
- 광역철도 급행정차역 승강장안전문 안양역 외 8개역
|
|
승강장 보수보강공사 (대표사 한일건설 실행예산 작성분
|
|
검토)","2019-12-17 17:33:00",18-시공-20,g.기타,"- 옥산교 출장 (기성 청구서 날인)
|
|
- 품의서 작성 (실행예산 제1회 변경 승인/
|
|
하도급(지에스건설) 제2회 변경 계약 승인)
|
|
- 광역철도 급행정차역 승강장안전문 안양역 외 8개역
|
|
승강장 보수보강공사 (대표사 한일건설 실행예산 작성분
|
|
검토)","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,004C8,,,
|
|
J18206,"2019-12-17 08:16:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-17 17:02:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J09101,"2019-12-17 08:17:00",19-교영-01,c.설계사,"과업조사 외","2019-12-17 18:11:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J18205,"2019-12-17 08:19:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-17 18:04:00",17-설계-05,h.기타,"기술검토서 작성","0000-00-00 00:00:00",172.16.9.167,NULL,172.16.9.167,008E2,,,
|
|
J10315,"2019-12-17 08:20:00",18-시공-12,b.시공,"3차분 제작 및 가설협의자료 작성","2019-12-17 18:06:00",18-시공-12,b.시공,"3차분 제작 및 가설협의자료 작성","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J15202,"2019-12-17 08:22:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-17 20:47:00",18-설계-12,b.구조계산,"설계VE 지적사항 수정","2019-12-17 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10314,"2019-12-17 08:23:00",19-교영-01,d.기타,"동화천교외1개소(임실~장수) 설계견적서 및 내역서(특정공법심의), 상방림교(안흥~방림2) 시행견적서, 예상공사수주현황조사(2020년도), 거더 표준내역작업","2019-12-17 18:02:00",19-교영-01,d.기타,"동화천교외1개소(임실~장수) 설계견적서 및 내역서(특정공법심의), 상방림교(안흥~방림2) 시행견적서, 예상공사수주현황조사(2020년도), 거더 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J13201,"2019-12-17 08:23:00",19-설계-09,b.구조계산,"슬래브 수량산출","2019-12-17 20:48:00",19-설계-09,b.구조계산,"슬래브 수량산출","2019-12-17 18:31:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J15301,"2019-12-17 08:25:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","2019-12-17 18:08:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J18209,"2019-12-17 08:25:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","2019-12-17 18:03:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","0000-00-00 00:00:00",172.16.9.65,NULL,172.16.9.65,004E2,,,
|
|
J15201,"2019-12-17 08:27:00",19-교영-22,c.설계사,"과업진행현황 파악 ","2019-12-17 18:01:00",19-교영-22,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J19301,"2019-12-17 08:29:00",14-구연-01,c.실행,"도하4교 도면검토 및 시공 적합여부 검토","2019-12-17 18:05:00",14-구연-01,c.실행,"도하4교 도면검토 및 시공 적합여부 검토","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J16202,"2019-12-17 08:31:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-17 18:06:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07103,"2019-12-17 08:32:00",19-교영-01,d.기타,사업관리,"2019-12-17 18:12:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J11305,"2019-12-17 08:35:00",19-설계-09,e.검토,"계획 검토","2019-12-17 18:07:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J11302,"2019-12-17 08:39:00",19-시공-07,g.기타,"세천2교 가설 검토","2019-12-17 18:04:00",19-시공-07,g.기타,"가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J07210,"2019-12-17 08:42:00",14-설계-32,h.기타,"산외교 솟음","2019-12-17 20:46:00",14-설계-32,h.기타,"산외교 솟음","2019-12-17 18:30:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J10313,"2019-12-17 08:42:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-17 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E4,,,
|
|
J14306,"2019-12-17 08:42:00",19-관리-04,a.계약,"계약업무 외","2019-12-17 18:02:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-12-17 08:45:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-17 18:08:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J14101,"2019-12-17 08:50:00",16-시공-20,출장,한양,"2019-12-17 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J18208,"2019-12-18 07:29:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-18 20:50:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-18 18:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,,
|
|
M02302,"2019-12-18 07:30:00",19-제조-02,a.생산관리,"제작팀 직원 면담 및 계약직 근로계약서 작성","2019-12-18 20:54:00",19-제조-02,a.생산관리,"제작팀 직원 면담 및 계약직 근로계약서 작성","2019-12-18 19:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공시체 강도 확인 및 온도 확인 <|>01:00<|><br>",,
|
|
J16203,"2019-12-18 07:31:00",19-제조-03,a.품질검사,"동림교 가로보 면 보수","2019-12-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J14308,"2019-12-18 07:34:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산관리
|
|
","2019-12-18 18:03:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산관리
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J07202,"2019-12-18 07:35:00",19-제조-04,b.기계,"샛돌 4교 거푸집 그라인더와 페인트 도색","2019-12-19 07:35:00",19-제조-04,b.기계,"샛돌 4교 거푸집 그라인더와 페인트 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-12-18 07:35:00",19-제조-02,a.생산관리,"경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J15206,"2019-12-18 07:55:00",18-시공-20,g.기타,"- 당진화력 준공 자료 작성
|
|
- 광역철도 급행정차역 승강장안전문 안양역 외 8개역
|
|
승강장 보수보강공사 (대표사 한일건설 실행예산 작성분
|
|
검토)","2019-12-18 18:05:00",18-시공-20,g.기타,"- 당진화력 준공 자료 작성
|
|
- 광역철도 급행정차역 승강장안전문 안양역 외 8개역
|
|
승강장 보수보강공사 (대표사 한일건설 실행예산 작성분
|
|
검토)","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,004C8,,,
|
|
J13308,"2019-12-18 08:04:00",19-시공-25,b.시공,"1. 도화육교 제작완료 보고서 작성
|
|
2. 2019년 품질안전 관리 보고서 작성 외","2019-12-18 18:02:00",19-시공-25,b.시공,"1. 도화육교 제작완료 보고서 작성
|
|
2. 2019년 품질안전 관리 보고서 작성 외","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
B15306,"2019-12-18 08:10:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J11305,"2019-12-18 08:14:00",19-설계-09,e.검토,"계획 검토","2019-12-18 18:07:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18206,"2019-12-18 08:19:00",16-시공-20,b.시공,상부슬래브시공방안검토,"2019-12-18 10:43:00",16-시공-20,b.시공,상부슬래브시공방안검토,"0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J18205,"2019-12-18 08:19:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-18 18:08:00",17-설계-05,h.기타,"기술검토서 작성","0000-00-00 00:00:00",172.16.9.167,NULL,172.16.9.167,008E2,,,
|
|
J08201,"2019-12-18 08:21:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-18 18:11:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15202,"2019-12-18 08:22:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-18 18:10:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J19301,"2019-12-18 08:23:00",14-구연-01,c.실행,"nodular girder m별 실행 작성","2019-12-18 18:05:00",14-구연-01,c.실행,"nodular girder m별 실행 작성","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J11302,"2019-12-18 08:25:00",19-시공-07,g.기타,"석현천교,용강IC교 가설계획서 작성, 용접이음가로보 수량 산출","2019-12-18 18:13:00",19-시공-07,g.기타,"석현천교,용강IC교 가설계획서 작성, 용접이음가로보 수량 산출","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J17207,"2019-12-18 08:26:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","2019-12-18 18:05:00",14-구연-01,c.실행,"화동화력 저탄장 옥내화 검토","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
J18207,"2019-12-18 08:26:00",17-시공-08,b.시공," 세천2교 런처장비 이동 장비작동상태 점검 ,품질및안전사고 대책 처리방안 검토","2019-12-18 18:11:00",17-시공-08,b.시공," 세천2교 런처장비 이동 장비작동상태 점검 ,품질및안전사고 대책 처리방안 검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J15302,"2019-12-18 08:28:00",14-설계-36,b.구조계산,"광교1,2,3교 계산서 작성","2019-12-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.173,NULL,NULL,008E4,,,
|
|
J16202,"2019-12-18 08:32:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-18 18:09:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07103,"2019-12-18 08:33:00",19-교영-01,d.기타,사업관리,"2019-12-18 18:10:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15201,"2019-12-18 08:36:00",19-교영-22,c.설계사,"과업진행현황 파악 ","2019-12-18 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J09101,"2019-12-18 08:37:00",19-교영-01,c.설계사,"과업조사 외","2019-12-18 18:10:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J13201,"2019-12-18 08:38:00",19-설계-09,b.구조계산,"슬래브 수량산출","2019-12-18 18:07:00",19-설계-09,b.구조계산,"슬래브 수량산출","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15307,"2019-12-18 08:38:00",19-설계-09,b.구조계산,"도면 및 계산서 검토, 수량 집계","2019-12-18 18:01:00",19-설계-09,b.구조계산,"도면 및 계산서 검토, 수량 집계","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J10313,"2019-12-18 08:38:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-18 18:02:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J07210,"2019-12-18 08:39:00",14-설계-32,h.기타,"산외교 솟음","2019-12-18 18:11:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J17205,"2019-12-18 08:39:00",18-교영-01,c.설계사,.,"2019-12-18 18:16:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J14306,"2019-12-18 08:44:00",19-관리-04,a.계약,"계약업무 외","2019-12-18 18:42:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-12-18 08:45:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-18 18:07:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J11202,"2019-12-18 08:45:00",19-시공-02,b.시공,공사관리,"2019-12-18 18:07:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J15301,"2019-12-18 08:51:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","2019-12-18 18:03:00",16-시공-20,b.시공,"자재 거래명세서 검토
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절거더) 자재공급원 3부 준비","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-12-18 13:44:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-19 08:58:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.53.54,NULL,223.38.53.24,,,,
|
|
J14101,"2019-12-18 08:50:00",16-시공-20,출장,한양,"2019-12-18 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-12-18 08:50:00",17-시공-08,출장,"[대구광역시]세천2교 런처가설 준비사항 점검","2019-12-18 18:00:00",17-시공-08,출장,"[대구광역시]세천2교 런처가설 준비사항 점검","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J09102,"2019-12-18 08:50:00",19-계약-01,출장,남양건설,"2019-12-18 18:00:00",19-계약-01,출장,남양건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J14308,"2019-12-19 07:23:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산관리
|
|
","2019-12-19 20:37:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산관리
|
|
","2019-12-19 18:30:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18208,"2019-12-19 07:32:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-19 18:13:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J07202,"2019-12-19 07:35:00",19-제조-04,b.기계,"샛돌 4교 거푸집 페인트 도색","2019-12-20 12:56:00",19-제조-04,b.기계,"샛돌 4교 거푸집 페인트 도색","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-12-19 07:39:00",19-제조-02,a.생산관리,"제작팀 직원 면담 및 계약직 근로계약서 작성","2019-12-19 18:01:00",19-제조-02,a.생산관리,"제작팀 직원 면담 및 계약직 근로계약서 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공시체 강도 확인 및 온도 확인 <|>01:00<|><br>",,
|
|
T04204,"2019-12-19 07:43:00",19-제조-02,a.생산관리,"경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18207,"2019-12-19 07:44:00",19-시공-19,g.기타,"공동도급이행공사 전체실행예산검토 세천2교 런처장비 이동 장비작동상태 점검 ,품질및안전사고 대책 처리방안 검토","2019-12-19 18:28:00",19-시공-19,g.기타,"공동도급이행공사 전체실행예산검토 세천2교 런처장비 이동 장비작동상태 점검 ,품질및안전사고 대책 처리방안 검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J09102,"2019-12-19 07:44:00",19-계약-01,b.시공사,"대림산업, 계룡건설 현장방문 예정, 2020년 설계반영, 공사수주 계획 분석 등 : 곡천교 외 3개교 계약 추진 중","2019-12-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-12-19 07:59:00",19-제조-03,a.품질검사,"동림교 가로보 면 보수","2019-12-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J11305,"2019-12-19 08:13:00",19-설계-09,e.검토,"계획 검토","2019-12-19 18:12:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-12-19 08:14:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J13308,"2019-12-19 08:15:00",19-시공-25,b.시공,"1. 2019년 품질안전 관리 보고서 작성 외
|
|
2. 12월 기성 청구서 작성 외","2019-12-19 18:10:00",19-시공-25,b.시공,"1. 2019년 품질안전 관리 보고서 작성 외
|
|
2. 12월 기성 청구서 작성 외","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
J18209,"2019-12-19 08:18:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","2019-12-19 18:05:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","0000-00-00 00:00:00",172.16.9.65,NULL,172.16.9.65,004E2,,,
|
|
J08201,"2019-12-19 08:18:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-19 18:04:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11302,"2019-12-19 08:19:00",19-시공-07,g.기타,"석현천교,용강IC교 가설계획서 작성, 용접이음가로보 수량 산출","2019-12-19 18:20:00",19-시공-07,g.기타,"석현천교,용강IC교 가설계획서 작성, 용접이음가로보 수량 산출","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18205,"2019-12-19 08:20:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-19 20:43:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-19 18:30:00",172.16.9.167,172.16.9.167,172.16.9.167,008E2,,1,
|
|
J19301,"2019-12-19 08:25:00",14-구연-01,c.실행,"양생 및 과솟음 관련 개선사항 ","2019-12-19 18:07:00",14-구연-01,c.실행,"양생 및 과솟음 관련 개선사항 ","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J15202,"2019-12-19 08:25:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-19 20:33:00",18-설계-12,b.구조계산,"설계VE 지적사항 수정","2019-12-19 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J10314,"2019-12-19 08:26:00",18-설계-16,h.기타,"Dr.Wide Flange Girder(동두천-연천 2공구) 설계견적서(특정공법), 상방림교(안흥~방림2) 시행견적서, 예상공사수주현황조사(2020년도), 거더 표준내역작업","2019-12-19 18:14:00",19-교영-22,d.기타,"Dr.Wide Flange Girder(동두천-연천 2공구) 설계견적서(특정공법), 상방림교(안흥~방림2) 시행견적서, 예상공사수주현황조사(2020년도), 거더 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J15206,"2019-12-19 08:27:00",19-시공-19,g.기타,"- 실행예산 검토","2019-12-19 18:03:00",19-시공-19,g.기타,"- 실행예산 검토","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,004C8,,,
|
|
J17207,"2019-12-19 08:29:00",14-구연-01,c.실행,"노듈러 거더 개선","2019-12-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.94,NULL,NULL,004C6,,,
|
|
J15302,"2019-12-19 08:29:00",14-설계-36,b.구조계산,"광교1,2,3교 계산서 작성","2019-12-19 20:34:00",14-설계-36,b.구조계산,"광교1,2,3교 계산서 작성","2019-12-19 18:31:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J07103,"2019-12-19 08:31:00",19-교영-01,d.기타,사업관리,"2019-12-19 18:17:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J09101,"2019-12-19 08:32:00",19-교영-01,c.설계사,"과업조사 외","2019-12-19 18:28:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J15307,"2019-12-19 08:33:00",19-설계-09,b.구조계산,"도면 및 계산서 검토, 수량 집계","2019-12-19 21:02:00",19-설계-09,b.구조계산,"도면 및 계산서 검토, 수량 집계","2019-12-19 18:31:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J07210,"2019-12-19 08:33:00",14-설계-32,h.기타,"산외교 솟음","2019-12-19 20:35:00",14-설계-32,h.기타,"산외교 솟음","2019-12-19 18:31:00",172.16.9.162,172.16.9.162,172.16.9.162,008E1,,1,
|
|
J15201,"2019-12-19 08:34:00",19-교영-23,c.설계사,"과업진행현황 파악 ","2019-12-19 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J10313,"2019-12-19 08:36:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-19 18:02:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11202,"2019-12-19 08:39:00",19-시공-02,b.시공,공사관리,"2019-12-19 18:27:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J16202,"2019-12-19 08:40:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-19 18:20:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-12-19 08:41:00",18-교영-01,c.설계사,.,"2019-12-19 20:39:00",18-교영-01,c.설계사,.,"2019-12-19 18:30:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J14306,"2019-12-19 08:44:00",19-관리-04,a.계약,"계약업무 외","2019-12-19 18:07:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10301,"2019-12-19 08:48:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-19 18:25:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J13201,"2019-12-19 08:48:00",19-설계-09,b.구조계산,"계산서 작성","2019-12-19 18:14:00",19-설계-09,b.구조계산,"계산서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15301,"2019-12-19 08:53:00",16-시공-20,b.시공,"마성교 자재 공급원승인서 작성 (케이티에이)
|
|
안종기팀 정산서 작성
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절) 자재공급원 3부 발송","2019-12-19 18:20:00",16-시공-20,b.시공,"마성교 자재 공급원승인서 작성 (케이티에이)
|
|
안종기팀 정산서 작성
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절) 자재공급원 3부 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-12-19 08:59:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-20 09:54:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.53.24,NULL,223.38.54.204,004C8,,,
|
|
J14101,"2019-12-19 08:50:00",16-시공-20,출장,한양,"2019-12-19 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-12-19 08:50:00",17-시공-08,출장,"[대구광역시]세천2교 런처가설 준비사항 점검","2019-12-19 18:00:00",17-시공-08,출장,"[대구광역시]세천2교 런처가설 준비사항 점검","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J18206,"2019-12-19 08:50:00",16-시공-20,출장,산외교/세천2교,"2019-12-19 18:00:00",16-시공-20,출장,산외교/세천2교,"0000-00-00 00:00:00",NULL,NULL,NULL,001C5,,,
|
|
J14308,"2019-12-20 07:13:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산관리
|
|
","2019-12-20 18:03:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산관리
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J09102,"2019-12-20 07:36:00",19-계약-01,b.시공사,"새방교, 대벌교 입찰가, 2020년 설계반영, 공사수주 계획 분석 등 : 곡천교 외 3개교 계약 추진 중","2019-12-20 18:03:00",19-계약-01,b.시공사,"새방교, 대벌교 입찰가, 2020년 설계반영, 공사수주 계획 분석 등 : 곡천교 외 3개교 계약 추진 중","0000-00-00 00:00:00",172.16.9.145,NULL,172.16.9.145,004C7,,,
|
|
J16203,"2019-12-20 07:37:00",19-제조-03,a.품질검사,"왕림교, 산외교, 석현천교, 데크 및 생태수로4 프리빔 생산","2019-12-20 21:51:00",19-제조-03,a.품질검사,"왕림교, 산외교, 석현천교, 데크 및 생태수로4 프리빔 생산","2019-12-20 18:43:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
T04204,"2019-12-20 07:38:00",19-제조-02,a.생산관리,"경안천교, 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J18208,"2019-12-20 07:40:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-20 20:34:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-20 18:36:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J18207,"2019-12-20 07:44:00",17-시공-08,g.기타,"11월거더제작및가설 전현장 원가투입비검토 세천2교 런처장비 이동 장비작동상태 점검 첫가설 26일예정","2019-12-20 18:00:00",17-시공-08,g.기타,"11월거더제작및가설 전현장 원가투입비검토 세천2교 런처장비 이동 장비작동상태 점검 첫가설 26일예정","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J13308,"2019-12-20 07:48:00",19-시공-25,b.시공,"1. 2019년 품질안전 관리 보고서 작성 외
|
|
2. 12월 기성 청구서 작성 외","2019-12-20 18:01:00",19-시공-25,b.시공,"1. 2019년 품질안전 관리 보고서 작성 외
|
|
2. 12월 기성 청구서 작성 외","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
M02302,"2019-12-20 07:48:00",19-제조-02,a.생산관리,"제작팀 직원 면담 및 계약직 근로계약서 작성","2019-12-20 19:33:00",19-제조-02,a.생산관리,"제작팀 직원 면담 및 계약직 근로계약서 작성","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공시체 강도 확인 및 온도 확인 <|>01:00<|><br>",,
|
|
J08201,"2019-12-20 08:11:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J10301,"2019-12-20 08:15:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-20 18:01:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J18209,"2019-12-20 08:17:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","2019-12-20 18:01:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","0000-00-00 00:00:00",172.16.9.65,NULL,172.16.9.65,004E2,,,
|
|
J10314,"2019-12-20 08:19:00",19-교영-22,d.기타,"Dr.Wide Flange Girder(동두천-연천 2공구) 설계견적서(특정공법), 사직교(성남~사직) 설계견적서 및 내역서(특정공법), 상방림교(안흥~방림2) 시행견적서, 예상공사수주현황조사(2020년도), 거더 표준내역작업","2019-12-20 18:03:00",19-교영-22,d.기타,"Dr.Wide Flange Girder(동두천-연천 2공구) 설계견적서(특정공법), 사직교(성남~사직) 설계견적서 및 내역서(특정공법), 상방림교(안흥~방림2) 시행견적서, 예상공사수주현황조사(2020년도), 거더 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J18206,"2019-12-20 08:19:00",16-시공-20,g.기타,"산외교 상부 시공방안, 실정보고 검토","2019-12-20 18:04:00",16-시공-20,g.기타,"산외교 상부 시공방안, 실정보고 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
B15306,"2019-12-20 08:19:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15202,"2019-12-20 08:21:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-20 18:02:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J16202,"2019-12-20 08:22:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-20 18:03:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J17205,"2019-12-20 08:23:00",18-교영-01,c.설계사,.,"2019-12-20 18:01:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J17207,"2019-12-20 08:23:00",14-구연-01,c.실행,"노듈러 거더 개선","2019-12-20 18:00:00",14-구연-01,c.실행,"노듈러 거더 개선","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
J15206,"2019-12-20 08:24:00",19-시공-27,"a.계약,기성","- 선금 청구서 제출","2019-12-20 19:57:00",19-시공-27,"a.계약,기성","- 선금 청구서 제출","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,004C8,,,
|
|
J15302,"2019-12-20 08:26:00",18-설계-12,c.도면,"거더 도면 수정","2019-12-20 18:02:00",18-설계-12,c.도면,"거더 도면 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,"14-설계-36<|>b.구조계산<|>처짐량 계산<|>03:00<|><br>18-설계-12<|>h.기타<|>거더 표준도 의견 취합 정리<|>03:00<|><br>",,
|
|
J11302,"2019-12-20 08:27:00",19-시공-07,g.기타,"석현천교,용강IC교 가설계획서 작성, 용접이음가로보 수량 산출","2019-12-20 18:00:00",19-시공-07,g.기타,"석현천교,용강IC교 가설계획서 작성, 용접이음가로보 수량 산출","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J19301,"2019-12-20 08:29:00",14-구연-01,c.실행,"양생 및 과솟음 관련 개선사항 ","2019-12-20 18:01:00",14-구연-01,c.실행,"양생 및 과솟음 관련 개선사항 ","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J07103,"2019-12-20 08:31:00",19-교영-01,d.기타,사업관리,"2019-12-20 18:01:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18205,"2019-12-20 08:32:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-20 18:02:00",17-설계-05,h.기타,"기술검토서 작성","0000-00-00 00:00:00",172.16.9.167,NULL,172.16.9.167,008E2,,,
|
|
J13201,"2019-12-20 08:33:00",19-설계-09,b.구조계산,"계산서 작성","2019-12-20 18:01:00",19-설계-09,b.구조계산,"계산서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J07210,"2019-12-20 08:39:00",14-설계-32,h.기타,"산외교 솟음","2019-12-20 18:01:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J10313,"2019-12-20 08:42:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-20 18:22:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11305,"2019-12-20 08:43:00",19-설계-09,e.검토,"계획 검토","2019-12-20 18:01:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J11202,"2019-12-20 08:44:00",19-시공-02,b.시공,공사관리,"2019-12-20 18:00:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J09101,"2019-12-20 08:48:00",19-교영-01,c.설계사,"과업조사 외","2019-12-20 18:01:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J14306,"2019-12-20 08:55:00",19-관리-04,a.계약,"계약업무 외","2019-12-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.175,NULL,NULL,004E4,,,
|
|
J15301,"2019-12-20 08:56:00",16-시공-20,b.시공,"마성교 자재 공급원승인서 작성 (케이티에이)
|
|
안종기팀 정산서 작성
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절) 자재공급원 3부 발송","2019-12-20 18:00:00",16-시공-20,b.시공,"마성교 자재 공급원승인서 작성 (케이티에이)
|
|
안종기팀 정산서 작성
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절) 자재공급원 3부 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-12-20 09:55:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-21 11:58:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.54.204,NULL,223.38.53.170,004C8,,,
|
|
J07202,"2019-12-20 12:56:00",19-제조-04,b.기계,"샛돌 4교 거푸집 상차 및 각재 출하","2019-12-20 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J14101,"2019-12-20 08:50:00",16-시공-20,출장,한양,"2019-12-20 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-12-20 08:50:00",17-시공-08,출장,"[대구광역시]세천2교 런처가설 준비사항 점검","2019-12-20 18:00:00",17-시공-08,출장,"[대구광역시]세천2교 런처가설 준비사항 점검","0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
M05510,"2019-12-21 11:59:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.53.170,NULL,NULL,004C8,,,
|
|
J12202,"2019-12-23 07:06:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-12-23 18:03:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
T04204,"2019-12-23 07:30:00",19-제조-02,a.생산관리,"경안천교(측경간) 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J07202,"2019-12-23 07:34:00",19-제조-04,b.기계,"배수로 정리와 야적장 및 거푸집 청소","2019-12-24 07:35:00",19-제조-04,b.기계,"배수로 정리와 야적장 및 거푸집 청소","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18208,"2019-12-23 07:37:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-23 18:00:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
M02302,"2019-12-23 07:37:00",19-제조-02,a.생산관리,"제작팀 업무 인수","2019-12-23 18:01:00",19-제조-02,a.생산관리,"제작팀 업무 인수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>사장님 면담<|>01:30<|><br>19-제조-02<|>a.생산관리<|>공시체 강도 확인 및 온도 확인<|>01:00<|><br>",1,
|
|
J09102,"2019-12-23 07:39:00",19-계약-01,b.시공사,"포스코건설 방문예정, 새방교, 대벌교 입찰가, 2020년 설계반영, 공사수주 계획 분석 등 : 곡천교 외 3개교 계약 추진 중","2019-12-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J11302,"2019-12-23 07:55:00",19-시공-07,g.기타,"석현천교,용강IC교 가설계획서 작성, 용접이음가로보 수량 산출","2019-12-23 18:18:00",19-시공-07,g.기타,"석현천교,용강IC교 가설계획서 작성, 용접이음가로보 수량 산출","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J18207,"2019-12-23 07:56:00",17-시공-08,g.기타,"11월거더제작및가설 전현장 원가투입비검토 세천2교 런처장비 이동 장비작동상태 점검 가설 26일예정","2019-12-23 18:06:00",17-시공-08,g.기타,"11월거더제작및가설 전현장 원가투입비검토 세천2교 런처장비 이동 장비작동상태 점검 가설 26일예정","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
M05510,"2019-12-23 08:04:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.54.19,NULL,NULL,004C8,,,
|
|
J08201,"2019-12-23 08:08:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-23 18:12:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10315,"2019-12-23 08:11:00",17-설계-04,"a.계획 및 협의","가설협의 자료 작성","2019-12-23 18:03:00",17-설계-04,"a.계획 및 협의","가설협의 자료 작성","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J17205,"2019-12-23 08:14:00",18-교영-01,c.설계사,.,"2019-12-23 21:08:00",18-교영-01,c.설계사,.,"2019-12-23 18:30:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J13308,"2019-12-23 08:16:00",19-시공-25,b.시공,"1. 2019년 품질안전 관리 보고서 작성 외
|
|
2. 12월 기성 청구서 작성 외","2019-12-23 18:06:00",19-시공-25,b.시공,"1. 2019년 품질안전 관리 보고서 작성 외
|
|
2. 12월 기성 청구서 작성 외","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
B15306,"2019-12-23 08:19:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-23 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18209,"2019-12-23 08:20:00",14-구연-01,c.실행,"4분기 성과발표 준비","2019-12-23 21:12:00",14-구연-01,c.실행,"4분기 성과발표 준비","2019-12-23 18:30:00",172.16.9.65,172.16.9.65,172.16.9.65,004E2,,1,
|
|
J10314,"2019-12-23 08:21:00",19-교영-01,d.기타,"상방림교(안흥~방림2) 시행견적서, 사직교(성남~사직) 설계견적서 및 내역서(특정공법), 거더 표준내역작업","2019-12-23 18:07:00",19-교영-01,d.기타,"상방림교(안흥~방림2) 시행견적서, 사직교(성남~사직) 설계견적서 및 내역서(특정공법), 거더 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J13201,"2019-12-23 08:25:00",19-설계-09,b.구조계산,"계산서 작성","2019-12-23 20:55:00",19-설계-09,b.구조계산,"계산서 작성","2019-12-23 18:31:00",172.16.9.165,172.16.9.165,172.16.9.165,008E2,,1,
|
|
J18206,"2019-12-23 08:25:00",16-시공-20,g.기타,"산외교 상부 시공방안, 실정보고 검토","2019-12-23 18:18:00",16-시공-20,g.기타,"산외교 상부 시공방안, 실정보고 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J19301,"2019-12-23 08:27:00",14-구연-01,c.실행,"양생 및 과솟음 관련 개선사항 ","2019-12-23 18:36:00",14-구연-01,c.실행,"양생 및 과솟음 관련 개선사항 ","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J17207,"2019-12-23 08:29:00",14-구연-01,c.실행,"노듈러 거더 개선","2019-12-23 18:07:00",14-구연-01,c.실행,"노듈러 거더 개선","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
J07103,"2019-12-23 08:32:00",19-교영-01,d.기타,사업관리,"2019-12-23 18:10:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15307,"2019-12-23 08:33:00",19-설계-09,b.구조계산,"도면 및 계산서 검토, 수량 집계","2019-12-23 21:30:00",19-설계-09,b.구조계산,"도면 및 계산서 검토, 수량 집계","2019-12-23 18:30:00",172.16.9.171,172.16.9.171,172.16.9.171,008E4,,1,
|
|
J15206,"2019-12-23 08:34:00",15-시공-14,"a.계약,기성"," - 원청사(백선건설) 기성(직접 지급) 청구서 날인","2019-12-23 17:48:00",15-시공-14,"a.계약,기성"," - 원청사(백선건설) 기성(직접 지급) 청구서 날인","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,004C8,,,
|
|
J15302,"2019-12-23 08:35:00",18-설계-12,c.도면,"거더 도면 수정","2019-12-23 20:33:00",18-설계-12,c.도면,"거더 도면 수정","2019-12-23 18:30:00",172.16.9.173,172.16.9.173,172.16.9.173,008E4,,1,
|
|
J15201,"2019-12-23 08:35:00",19-교영-23,c.설계사,"과업진행현황 파악 ","2019-12-23 18:03:00",19-교영-23,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-12-23 08:36:00",19-설계-09,e.검토,"계획 검토","2019-12-23 18:05:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J16202,"2019-12-23 08:36:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-23 18:08:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J18205,"2019-12-23 08:39:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-23 21:13:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-23 18:31:00",172.16.9.167,172.16.9.167,172.16.9.167,008E2,,1,
|
|
J15202,"2019-12-23 08:40:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-23 21:19:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-23 18:30:00",172.16.9.155,172.16.9.155,172.16.9.155,008E1,,1,
|
|
J07210,"2019-12-23 08:40:00",14-설계-32,h.기타,"산외교 솟음","2019-12-23 18:02:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J14306,"2019-12-23 08:41:00",19-관리-04,a.계약,"계약업무 외","2019-12-23 18:29:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J10313,"2019-12-23 08:44:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-23 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J10301,"2019-12-23 08:44:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-23 18:06:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J15301,"2019-12-23 08:46:00",16-시공-20,b.시공,"마성교 자재 공급원승인서 작성 (케이티에이)
|
|
안종기팀 정산서 작성
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절) 자재공급원 3부 발송","2019-12-23 19:00:00",16-시공-20,b.시공,"마성교 자재 공급원승인서 작성 (케이티에이)
|
|
안종기팀 정산서 작성
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절) 자재공급원 3부 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J09101,"2019-12-23 08:50:00",19-교영-01,c.설계사,"과업조사 외","2019-12-23 18:17:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J14101,"2019-12-23 08:50:00",16-시공-20,출장,한양,"2019-12-23 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-12-24 06:52:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-12-24 18:04:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J13308,"2019-12-24 07:32:00",19-시공-25,b.시공,"1. 2019년 품질안전 관리 보고서 작성 외
|
|
2. 12월 기성 청구서 작성 외","2019-12-24 18:02:00",19-시공-25,b.시공,"1. 2019년 품질안전 관리 보고서 작성 외
|
|
2. 12월 기성 청구서 작성 외","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
J16203,"2019-12-24 07:35:00",19-제조-03,a.품질검사,"왕림교 공장검수,
|
|
왕림교, 산외교, 석현천교, 데크 및 켄틸레버 생산, 품질관리","2019-12-24 22:00:00",19-제조-03,a.품질검사,"왕림교 공장검수,
|
|
왕림교, 산외교, 석현천교, 데크 및 켄틸레버 생산, 품질관리","2019-12-24 18:34:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J07202,"2019-12-24 07:35:00",19-제조-04,b.기계,"철근팀 콤프레샤 교체와 거푸집 보수","2019-12-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-12-24 07:37:00",19-제조-02,a.생산관리,"제작팀 업무 인수","2019-12-24 18:02:00",19-제조-02,a.생산관리,"제작팀 업무 인수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,"19-제조-02<|>a.생산관리<|>공시체 강도확인 및 온도 확인<|>01:00<|><br>19-제조-02<|>a.생산관리<|>분절거더 시스템 검토<|>03:00<|><br>19-제조-02<|>a.생산관리<|>Pre-Deck 프로그램 검토 및 협의<|>02:00<|><br>",,
|
|
J18207,"2019-12-24 07:42:00",19-시공-25,b.시공,"11월거더제작및가설 전현장 원가투입비검토 세천2교 런처장비 이동 장비작동상태 점검 가설 26일예정","2019-12-24 18:00:00",19-시공-25,b.시공,"11월거더제작및가설 전현장 원가투입비검토 세천2교 런처장비 이동 장비작동상태 점검 가설 26일예정","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J09102,"2019-12-24 07:42:00",19-계약-01,b.시공사,"Pre-Deck관련 유성산업 방문예정, 2020년 설계반영, 공사수주 계획 분석 등 : 곡천교 외 3개교 계약 추진 중","2019-12-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
T04204,"2019-12-24 07:42:00",19-제조-02,a.생산관리,"경안천교(측경간,중앙경간) 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J11302,"2019-12-24 07:52:00",19-시공-07,g.기타,"두계천교 가설검토 제작장 검토
|
|
성주대교 보수계획서 제출
|
|
세천2교 용접이음가로보 수량산출","2019-12-24 18:02:00",19-시공-07,g.기타,"두계천교 가설검토 제작장 검토
|
|
성주대교 보수계획서 제출
|
|
세천2교 용접이음가로보 수량산출","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J08201,"2019-12-24 08:09:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-24 18:05:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
B15306,"2019-12-24 08:20:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J15202,"2019-12-24 08:22:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-24 18:03:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","0000-00-00 00:00:00",172.16.9.155,NULL,172.16.9.155,008E1,,,
|
|
J11305,"2019-12-24 08:22:00",19-설계-09,e.검토,"계획 검토","2019-12-24 18:03:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J18209,"2019-12-24 08:23:00",14-구연-01,c.실행,"4분기 성과발표 준비","2019-12-24 18:08:00",14-구연-01,c.실행,"4분기 성과발표 준비","0000-00-00 00:00:00",172.16.9.65,NULL,172.16.9.65,004E2,,,
|
|
J19301,"2019-12-24 08:25:00",14-구연-01,c.실행,"양생 및 과솟음 관련 개선사항 ","2019-12-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.42,NULL,NULL,008E2,,,
|
|
J07103,"2019-12-24 08:26:00",19-교영-01,d.기타,사업관리,"2019-12-24 18:04:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15206,"2019-12-24 08:26:00",18-시공-20,g.기타," - 12월 공사현황 보고서 작성
|
|
- 준공현장 보고서 작성","2019-12-24 18:01:00",18-시공-20,g.기타," - 12월 공사현황 보고서 작성
|
|
- 준공현장 보고서 작성","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,004C8,,,
|
|
J15302,"2019-12-24 08:30:00",18-설계-12,c.도면,"거더 도면 수정","2019-12-24 18:03:00",18-설계-12,c.도면,"거더 도면 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,"17-설계-09<|>c.도면<|>이음장 작성<|>03:00<|><br>",,
|
|
J17205,"2019-12-24 08:27:00",18-교영-01,c.설계사,.,"2019-12-24 20:35:00",18-교영-01,c.설계사,.,"2019-12-24 18:30:00",172.16.9.180,172.16.9.180,172.16.9.180,008E2,,,
|
|
J07210,"2019-12-24 08:30:00",14-설계-32,h.기타,"산외교 솟음","2019-12-24 18:07:00",14-설계-32,h.기타,"산외교 솟음","0000-00-00 00:00:00",172.16.9.162,NULL,172.16.9.162,008E1,,,
|
|
J17207,"2019-12-24 08:30:00",14-구연-01,c.실행,"노듈러 거더 개선","2019-12-24 18:21:00",14-구연-01,c.실행,"노듈러 거더 개선","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
J18206,"2019-12-24 08:31:00",16-시공-20,g.기타,"산외교 상부 시공방안, 실정보고 검토","2019-12-24 18:09:00",16-시공-20,g.기타,"산외교 상부 시공방안, 실정보고 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J13201,"2019-12-24 08:33:00",19-설계-09,b.구조계산,"계산서 작성","2019-12-24 18:04:00",19-설계-09,b.구조계산,"계산서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15201,"2019-12-24 08:35:00",19-교영-23,c.설계사,"과업진행현황 파악 ","2019-12-24 18:00:00",19-교영-23,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J14306,"2019-12-24 08:36:00",19-관리-04,a.계약,"계약업무 외","2019-12-24 18:00:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J15307,"2019-12-24 08:37:00",19-설계-12,b.구조계산,"반력 계산","2019-12-24 14:59:00",19-설계-12,b.구조계산,"반력 계산","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J10301,"2019-12-24 08:38:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.158,NULL,NULL,004E1,,,
|
|
J10313,"2019-12-24 08:41:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-24 18:02:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J16202,"2019-12-24 08:47:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-24 18:05:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J09101,"2019-12-24 08:48:00",19-교영-01,c.설계사,"과업조사 외","2019-12-24 18:05:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J15301,"2019-12-24 08:57:00",16-시공-20,b.시공,"마성교 자재 공급원승인서 작성 (케이티에이)
|
|
안종기팀 정산서 작성
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절) 자재공급원 3부 발송","2019-12-24 18:07:00",16-시공-20,b.시공,"마성교 자재 공급원승인서 작성 (케이티에이)
|
|
안종기팀 정산서 작성
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절) 자재공급원 3부 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
M05510,"2019-12-24 09:19:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-24 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.54.103,NULL,NULL,004C8,,,
|
|
J14101,"2019-12-24 08:50:00",16-시공-20,출장,한양,"2019-12-24 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J14308,"2019-12-26 07:30:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산관리
|
|
","2019-12-26 18:02:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산관리
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
J18208,"2019-12-26 07:36:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-26 18:01:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-12-26 07:36:00",19-제조-02,a.생산관리,"경안천교(측경간,중앙경간) 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J16203,"2019-12-26 07:38:00",19-제조-03,a.품질검사,"왕림교, 산외교, 데크 및 켄틸레버, 생태수로4 프리빔, 생산, 품질관리","2019-12-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J07202,"2019-12-26 07:40:00",19-제조-04,b.기계,"거푸집(H2.6) 보수와 스플라이스 H빔 산소절단","2019-12-27 07:35:00",19-제조-04,b.기계,"거푸집(H2.6) 보수와 스플라이스 H빔 산소절단","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M02302,"2019-12-26 07:42:00",19-제조-02,a.생산관리,"제작팀 업무 인수","2019-12-26 18:00:00",19-제조-02,a.생산관리,"제작팀 업무 인수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-12-26 07:45:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-27 11:07:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.54.184,NULL,223.38.53.15,004C8,,,
|
|
J08201,"2019-12-26 08:10:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-26 18:03:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J10301,"2019-12-26 08:11:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-26 18:22:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J18206,"2019-12-26 08:12:00",16-시공-20,g.기타,"산외교 상부 시공방안, 실정보고 검토","2019-12-26 17:17:00",16-시공-20,g.기타,"산외교 상부 시공방안, 실정보고 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11305,"2019-12-26 08:14:00",19-설계-09,e.검토,"계획 검토","2019-12-26 18:07:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J10315,"2019-12-26 08:15:00",19-시공-13,b.시공,"가설및 제작협의","2019-12-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.147,NULL,NULL,004C7,,,
|
|
B15306,"2019-12-26 08:19:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18209,"2019-12-26 08:19:00",14-구연-01,c.실행,"4분기 성과발표 준비","2019-12-26 23:42:00",14-구연-01,c.실행,"4분기 성과발표 준비","2019-12-26 18:43:00",172.16.9.65,172.16.9.65,172.16.9.65,004E2,,1,
|
|
J17207,"2019-12-26 08:25:00",14-구연-01,c.실행,"노듈러 거더 개선","2019-12-26 18:02:00",14-구연-01,c.실행,"노듈러 거더 개선","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
J15302,"2019-12-26 08:27:00",18-설계-12,c.도면,"거더 도면 수정","2019-12-26 18:03:00",18-설계-12,c.도면,"거더 도면 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15202,"2019-12-26 08:28:00",18-설계-12,b.구조계산,"VE 및 설계감리 지적사항 반영","2019-12-26 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.155,NULL,NULL,008E1,,1,
|
|
J10314,"2019-12-26 08:28:00",18-교영-23,d.기타,"사직교(성남~사직) 설계견적서 및 내역서(특정공법), 거더 표준내역작업","2019-12-26 18:06:00",18-교영-23,d.기타,"사직교(성남~사직) 설계견적서 및 내역서(특정공법), 거더 표준내역작업","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J19301,"2019-12-26 08:29:00",14-구연-01,c.실행,"양생 및 과솟음 관련 개선사항 ","2019-12-26 23:44:00",14-구연-01,c.실행,"양생 및 과솟음 관련 개선사항 ","2019-12-26 18:48:00",172.16.9.42,172.16.9.42,172.16.9.42,008E2,,,
|
|
J13201,"2019-12-26 08:31:00",19-설계-09,b.구조계산,"계산서 작성","2019-12-26 18:05:00",19-설계-09,b.구조계산,"계산서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J15201,"2019-12-26 08:33:00",19-교영-23,c.설계사,"과업진행현황 파악 ","2019-12-26 18:02:00",19-교영-23,c.설계사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J10313,"2019-12-26 08:34:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-26 18:01:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J11202,"2019-12-26 08:37:00",19-시공-02,b.시공,공사관리,"2019-12-26 18:18:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
J18205,"2019-12-26 08:37:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-26 20:38:00",17-설계-05,h.기타,"기술검토서 작성","0000-00-00 00:00:00",172.16.9.167,NULL,172.16.9.167,008E2,,,
|
|
J16202,"2019-12-26 08:38:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-26 18:08:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J07103,"2019-12-26 08:38:00",19-교영-01,d.기타,사업관리,"2019-12-26 18:13:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J15307,"2019-12-26 08:40:00",19-설계-12,b.구조계산,"반력 계산","2019-12-26 18:03:00",19-설계-12,b.구조계산,"반력 계산","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J17205,"2019-12-26 08:40:00",18-교영-01,c.설계사,.,"2019-12-26 18:05:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J09101,"2019-12-26 08:50:00",19-교영-01,c.설계사,"과업조사 외","2019-12-26 18:10:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J14101,"2019-12-26 08:50:00",16-시공-20,출장,한양,"2019-12-26 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J09102,"2019-12-26 08:50:00",19-계약-01,출장,두산건설,"2019-12-26 18:00:00",19-계약-01,출장,두산건설,"0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J12202,"2019-12-26 08:50:00",17-시공-08,출장,[대구광역시]런처가설,"2019-12-26 18:00:00",17-시공-08,출장,[대구광역시]런처가설,"0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11302,"2019-12-26 08:50:00",17-시공-10,출장,"[대구시 달성군]성주대교 면보수","2019-12-26 18:00:00",17-시공-10,출장,"[대구시 달성군]성주대교 면보수","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J13308,"2019-12-26 08:50:00",19-교휴-06,경유,"경유(원흥2교 강연선삽입 인수/인계(이태준ES))","2019-12-26 18:00:00",19-교휴-06,경유,"경유(원흥2교 강연선삽입 인수/인계(이태준ES))","0000-00-00 00:00:00",NULL,NULL,NULL,004E3,,,
|
|
J18207,"2019-12-27 07:28:00",17-시공-08,b.시공,"11월거더제작및가설 전현장 원가투입비검토 세천2교 런처장비 가설 ","2019-12-27 18:13:00",17-시공-08,b.시공,"11월거더제작및가설 전현장 원가투입비검토 세천2교 런처장비 가설 ","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J18208,"2019-12-27 07:33:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-27 22:22:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-27 18:53:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J07202,"2019-12-27 07:35:00",19-제조-04,b.기계,"거푸집(H2.6) 보수와 스플라이스 H빔 산소절단","2019-12-28 07:31:00",19-제조-04,b.기계,"거푸집(H2.6) 보수와 스플라이스 H빔 산소절단","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
T04204,"2019-12-27 07:37:00",19-제조-02,a.생산관리,"경안천교(측경간,중앙경간) 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-12-27 07:37:00",19-제조-02,a.생산관리,"제작팀 업무 인수","2019-12-27 20:56:00",19-제조-02,a.생산관리,"제작팀 업무 인수","2019-12-27 19:32:00",175.203.206.128,175.203.206.128,175.203.206.128,006C8,,1,
|
|
J14308,"2019-12-27 07:38:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산관리
|
|
","2019-12-27 22:23:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산관리
|
|
","2019-12-27 18:52:00",175.203.206.128,175.203.206.128,175.203.206.128,006E2,,1,
|
|
J09102,"2019-12-27 07:40:00",19-계약-01,b.시공사,"양포교, 문경3교 예상 계약가 등 : 검단천교 외 3개교 계약 추진 중","2019-12-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J13308,"2019-12-27 07:43:00",19-시공-24,b.시공,"1. 19년 12월 기성 신청 및 정리
|
|
2. 2020년 예정공정표 작성 및 결산
|
|
","2019-12-27 18:03:00",19-시공-24,b.시공,"1. 19년 12월 기성 신청 및 정리
|
|
2. 2020년 예정공정표 작성 및 결산
|
|
","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
J16203,"2019-12-27 07:43:00",19-제조-03,a.품질검사,"왕림교재하시험, 산외교,출장(공장반입자재 확인)","2019-12-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J08201,"2019-12-27 08:13:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-27 18:05:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J11305,"2019-12-27 08:13:00",19-설계-09,e.검토,"계획 검토","2019-12-27 12:25:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
B15306,"2019-12-27 08:17:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18209,"2019-12-27 08:18:00",14-구연-01,c.실행,"4분기 성과발표","2019-12-27 19:10:00",14-구연-01,c.실행,"4분기 성과발표","0000-00-00 00:00:00",172.16.9.65,NULL,172.16.9.65,004E2,,,
|
|
J10314,"2019-12-27 08:19:00",19-교영-01,d.기타,"거더 표준내역작업, 사직교(성남~사직) 설계견적서 및 내역서(특정공법)","2019-12-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.154,NULL,NULL,004E1,,,
|
|
J17207,"2019-12-27 08:23:00",14-구연-01,c.실행,"노듈러 거더 개선","2019-12-27 19:10:00",14-구연-01,c.실행,"노듈러 거더 개선","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
J15302,"2019-12-27 08:25:00",18-설계-12,c.도면,"거더 도면 수정","2019-12-27 18:02:00",18-설계-12,c.도면,"거더 도면 수정","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J19301,"2019-12-27 08:27:00",14-구연-01,c.실행,"양생 및 과솟음 관련 개선사항 ","2019-12-27 19:08:00",14-구연-01,c.실행,"양생 및 과솟음 관련 개선사항 ","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J15307,"2019-12-27 08:29:00",19-설계-12,b.구조계산,"반력 계산","2019-12-27 18:00:00",19-설계-12,b.구조계산,"반력 계산","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J11302,"2019-12-27 08:30:00",17-설계-04,h.기타,"r가설검토, 가설계획서 작성","2019-12-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E2,,,
|
|
J10315,"2019-12-27 08:30:00",19-시공-13,b.시공,"가설및 제작협의","2019-12-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.147,NULL,NULL,004C7,,,
|
|
J07103,"2019-12-27 08:30:00",19-교영-01,d.기타,사업관리,"2019-12-27 18:05:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
J18205,"2019-12-27 08:33:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-27 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.167,NULL,NULL,008E2,,,
|
|
J14306,"2019-12-27 08:38:00",19-관리-04,a.계약,"계약업무 외","2019-12-27 18:02:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J16202,"2019-12-27 08:39:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-27 18:04:00",19-교영-01,c.설계사,신규사업현황조사,"0000-00-00 00:00:00",172.16.9.164,NULL,172.16.9.164,008E1,,,
|
|
J15201,"2019-12-27 08:42:00",19-교영-20,b.시공사,"과업진행현황 파악 ","2019-12-27 18:04:00",19-교영-20,b.시공사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J17205,"2019-12-27 08:42:00",18-교영-01,c.설계사,.,"2019-12-27 18:05:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J10301,"2019-12-27 08:42:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","2019-12-27 18:05:00",19-시공-20,d.자재,"공사 시행계획 검토,일반공사 수시 입찰 및 확인현장별 거푸집 검토 및 쏠플레이트 검토현장별 공사시행 계획서 작성 및 준비현장별 거더 제작,인장,가설 품의서 작성현장별 자재, 장비, 기타 품의서 작성현장별 외주,직영 월별 정산출금전표 작성 ","0000-00-00 00:00:00",172.16.9.158,NULL,172.16.9.158,004E1,,,
|
|
J10313,"2019-12-27 08:47:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","2019-12-27 18:00:00",19-제조-01,b.총무,"운영비 데이터베이스 입력, 임금 데이터베이스 입력,업체별 거래명세서 입력,근태현황확인","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E4,,,
|
|
J13201,"2019-12-27 08:48:00",18-설계-12,c.도면,"지산교 도면,수량 수정","2019-12-27 18:02:00",18-설계-12,c.도면,"지산교 도면,수량 수정","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J09101,"2019-12-27 08:59:00",19-교영-01,c.설계사,"과업조사 외","2019-12-27 13:03:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
M05510,"2019-12-27 11:08:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-28 12:32:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.53.15,NULL,223.38.53.151,004C8,,,
|
|
J14101,"2019-12-27 08:50:00",16-시공-20,출장,한양,"2019-12-27 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-12-27 08:50:00",17-시공-08,출장,[대구광역시]런처가설,"2019-12-27 18:00:00",17-시공-08,출장,[대구광역시]런처가설,"0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J15206,"2019-12-27 08:50:00",18-시공-15,출장,"[서울특별시 경기도 고양시 덕양구]스플라이스 거더 2차 강연선 삽입 및 헤드 웨찌 설치 현장 지원","2019-12-27 18:00:00",18-시공-15,출장,"[서울특별시 경기도 고양시 덕양구]스플라이스 거더 2차 강연선 삽입 및 헤드 웨찌 설치 현장 지원","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|
|
J14308,"2019-12-28 07:25:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산관리
|
|
","2019-12-28 16:00:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- SHOP 프로그램 변수 작업
|
|
- 생산관리
|
|
","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,1,
|
|
J07202,"2019-12-28 07:32:00",19-제조-04,b.기계,"거푸집(H2.0) 보수와 야적장 정리 및 청소","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
M02302,"2019-12-28 07:37:00",19-제조-02,a.생산관리,"제작팀 업무 인수","2019-12-28 16:53:00",19-제조-02,a.생산관리,"제작팀 업무 인수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,1,
|
|
T04204,"2019-12-28 07:40:00",19-제조-02,a.생산관리,"경안천교(측경간,중앙경간) 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-28 15:59:00",19-제조-02,a.생산관리,"경안천교(측경간,중앙경간) 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
M05510,"2019-12-28 12:33:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-29 09:11:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",223.38.53.151,NULL,223.38.54.142,004C8,,,
|
|
M05510,"2019-12-29 09:12:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","0000-00-00 00:00:00",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.54.142,NULL,NULL,004C8,,,
|
|
J12202,"2019-12-30 06:24:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-12-30 18:02:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","0000-00-00 00:00:00",172.16.9.156,NULL,172.16.9.156,004E1,,,
|
|
J11302,"2019-12-30 07:19:00",17-설계-04,h.기타,"r가설검토, 가설계획서 작성","2019-12-30 18:02:00",17-설계-04,h.기타,"r가설검토, 가설계획서 작성","0000-00-00 00:00:00",172.16.9.166,NULL,172.16.9.166,004E2,,,
|
|
J14308,"2019-12-30 07:28:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- 생산관리
|
|
","2019-12-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J18208,"2019-12-30 07:35:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-30 18:05:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006E2,,,
|
|
T04204,"2019-12-30 07:36:00",19-제조-02,a.생산관리,"경안천교(측경간,중앙경간) 철근 가공, 산외교 등 프리덱 가로보 철근가공 생산","2019-12-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006C8,,,
|
|
J09102,"2019-12-30 07:37:00",19-계약-01,b.시공사,"2020년 설계반영, 공사수두 분석, 양포교, 문경3교 예상 계약가 등 : 검단천교 외 3개교 계약 추진 중","2019-12-30 18:04:00",19-계약-01,b.시공사,"2020년 설계반영, 공사수두 분석, 양포교, 문경3교 예상 계약가 등 : 검단천교 외 3개교 계약 추진 중","0000-00-00 00:00:00",172.16.9.145,NULL,172.16.9.145,004C7,,,
|
|
J15206,"2019-12-30 07:39:00",19-시공-27,g.기타,"- 하수관로 설치공사 수의계약 사유서 및
|
|
수의계약 대상공사 평가표 작성
|
|
(추정설계가:121,500,000원x낙찰율 86.745%= 도급예상105백만원)
|
|
","2019-12-30 18:03:00",19-시공-27,g.기타,"- 하수관로 설치공사 수의계약 사유서 및
|
|
수의계약 대상공사 평가표 작성
|
|
(추정설계가:121,500,000원x낙찰율 86.745%= 도급예상105백만원)
|
|
","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,004C8,,,
|
|
J11202,"2019-12-30 08:46:00",19-시공-02,b.시공,공사관리,"2019-12-30 18:02:00",19-시공-02,b.시공,공사관리,"0000-00-00 00:00:00",172.16.9.159,NULL,172.16.9.159,004E1,,,
|
|
M02302,"2019-12-30 07:40:00",19-제조-02,a.생산관리,"제작팀 업무 인수","2019-12-30 18:05:00",19-제조-02,a.생산관리,"제작팀 업무 인수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-12-30 07:40:00",19-제조-04,b.기계,"천막창고 정리와 거푸집(H2.0) 보수","2019-12-31 07:35:00",19-제조-04,b.기계,"천막창고 정리와 거푸집(H2.0) 보수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J13308,"2019-12-30 07:40:00",19-시공-24,b.시공,"1. 19년 12월 기성 신청 및 정리
|
|
2. 2020년 예정공정표 작성 및 결산
|
|
","2019-12-30 18:01:00",19-시공-24,b.시공,"1. 19년 12월 기성 신청 및 정리
|
|
2. 2020년 예정공정표 작성 및 결산
|
|
","0000-00-00 00:00:00",172.16.9.170,NULL,172.16.9.170,004E3,,,
|
|
J10315,"2019-12-30 08:07:00",19-시공-13,b.시공,"가설및 제작검토","2019-12-30 18:01:00",19-시공-13,b.시공,"가설및 제작검토","0000-00-00 00:00:00",172.16.9.147,NULL,172.16.9.147,004C7,,,
|
|
J07103,"2019-12-30 08:09:00",19-교영-01,d.기타,사업관리,"2019-12-30 18:04:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
B15306,"2019-12-30 08:11:00",19-관리-02,e.기타,"비서업무 외 ","2019-12-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.176,NULL,NULL,004E5,,,
|
|
J18206,"2019-12-30 08:12:00",16-시공-20,g.기타,"산외교 상부 시공방안, 실정보고 검토","2019-12-30 18:07:00",16-시공-20,g.기타,"산외교 상부 시공방안, 실정보고 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J16203,"2019-12-30 08:19:00",19-제조-03,a.품질검사,"산외교, 왕림교 재하시험 및 생태수로4 프리빔 생산관리. 레미콘 관리","2019-12-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E1,,,
|
|
J18209,"2019-12-30 08:20:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","2019-12-30 18:03:00",14-구연-01,c.실행,"노듈러 거더 개선사항 검토","0000-00-00 00:00:00",172.16.9.65,NULL,172.16.9.65,004E2,,,
|
|
J10314,"2019-12-30 08:20:00",19-교영-01,d.기타,"거더 표준내역작업, 사직교(성남~사직) 설계견적서 및 내역서(특정공법)","2019-12-30 18:06:00",19-교영-01,d.기타,"거더 표준내역작업, 사직교(성남~사직) 설계견적서 및 내역서(특정공법)","0000-00-00 00:00:00",172.16.9.154,NULL,172.16.9.154,004E1,,,
|
|
J08201,"2019-12-30 08:20:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-30 18:03:00",19-설계-12,"a.계획 및 협의",업무협의,"0000-00-00 00:00:00",172.16.9.151,NULL,172.16.9.151,008C8,,,
|
|
J15302,"2019-12-30 08:27:00",17-설계-13,b.구조계산,"구안천교 긴장력 변경","2019-12-30 18:04:00",17-설계-13,b.구조계산,"구안천교 긴장력 변경","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J19301,"2019-12-30 08:30:00",14-구연-01,c.실행,"nodular girder m별 실행작성","2019-12-30 18:02:00",14-구연-01,c.실행,"nodular girder m별 실행작성","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J18205,"2019-12-30 08:30:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-30 18:06:00",17-설계-05,h.기타,"기술검토서 작성","0000-00-00 00:00:00",172.16.9.167,NULL,172.16.9.167,008E2,,,
|
|
J15201,"2019-12-30 08:34:00",19-교영-20,b.시공사,"과업진행현황 파악 ","2019-12-30 18:01:00",19-교영-20,b.시공사,"과업진행현황 파악 ","0000-00-00 00:00:00",172.16.9.150,NULL,172.16.9.150,008C8,,,
|
|
J11305,"2019-12-30 08:34:00",19-설계-09,e.검토,"계획 검토","2019-12-30 18:02:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J13201,"2019-12-30 08:34:00",19-설계-08,"f.보고서 및 시방서","보고서 작성","2019-12-30 18:06:00",19-설계-08,"f.보고서 및 시방서","보고서 작성","0000-00-00 00:00:00",172.16.9.165,NULL,172.16.9.165,008E2,,,
|
|
J17205,"2019-12-30 08:48:00",18-교영-01,c.설계사,.,"2019-12-30 18:11:00",18-교영-01,c.설계사,.,"0000-00-00 00:00:00",172.16.9.180,NULL,172.16.9.180,008E2,,,
|
|
J15301,"2019-12-30 08:48:00",16-시공-20,b.시공,"마성교 자재 공급원승인서 작성 (케이티에이)
|
|
안종기팀 정산서 작성
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절) 자재공급원 3부 발송","2019-12-30 18:42:00",16-시공-20,b.시공,"마성교 자재 공급원승인서 작성 (케이티에이)
|
|
안종기팀 정산서 작성
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절) 자재공급원 3부 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14306,"2019-12-30 08:48:00",19-관리-04,a.계약,"계약업무 외","2019-12-30 18:02:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J09101,"2019-12-30 08:51:00",19-교영-01,c.설계사,"과업조사 외","2019-12-30 18:01:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
M05510,"2019-12-30 09:03:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-30 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.53.247,NULL,NULL,004C8,,,
|
|
J18207,"2019-12-30 07:48:00",17-시공-08,b.시공,"11월거더제작및가설 전현장 원가투입비검토 세천2교 런처장비 가설 ","2019-12-30 18:05:00",17-시공-08,b.시공,"11월거더제작및가설 전현장 원가투입비검토 세천2교 런처장비 가설 ","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J14101,"2019-12-30 08:50:00",16-시공-20,출장,한양,"2019-12-30 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-12-31 06:42:00",17-시공-08,b.시공,"런쳐 제작 및 구조계산, 빔런쳐 투입현장 구조검토, 런쳐가설공법 준비자료, 기타현장 구조검토, 런쳐 안전인증등 ","2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.156,NULL,NULL,004E1,,,
|
|
J14308,"2019-12-31 07:20:00",19-제조-02,a.생산관리," - SHOP Drawing
|
|
- 생산관리
|
|
","2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
J18208,"2019-12-31 07:28:00",19-제조-02,a.생산관리,"생산관리 및 Shop DWG","2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",175.203.206.128,NULL,NULL,006E2,,,
|
|
M02302,"2019-12-31 07:30:00",19-제조-02,a.생산관리,"제작팀 업무 인수","2019-12-31 15:58:00",19-제조-02,a.생산관리,"제작팀 업무 인수","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J07202,"2019-12-31 07:35:00",19-제조-04,b.기계,"야적장과 공장동 및 천막창고 정리","2019-12-31 15:39:00",19-제조-04,b.기계,"야적장과 공장동 및 천막창고 정리","0000-00-00 00:00:00",175.203.206.128,NULL,175.203.206.128,006C8,,,
|
|
J18207,"2019-12-31 07:37:00",16-시공-20,b.시공,"산외교원가투입 실정보고에산 및2020년 공시예산검토","2019-12-31 16:12:00",16-시공-20,b.시공,"산외교원가투입 실정보고에산 및2020년 공시예산검토","0000-00-00 00:00:00",172.16.9.139,NULL,172.16.9.139,004C7,,,
|
|
J09102,"2019-12-31 07:43:00",19-계약-01,b.시공사,"2020년 설계반영, 공사수두 분석, 양포교, 문경3교 예상 계약가 등 : 검단천교 외 3개교 계약 추진 중","2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.145,NULL,NULL,004C7,,,
|
|
J16203,"2019-12-31 07:46:00",19-제조-03,a.품질검사,"산외교 데크 및 생태수로4 프리빔 생산 및 레미콘 관리","2019-12-31 21:20:00",19-제조-03,a.품질검사,"산외교 데크 및 생태수로4 프리빔 생산 및 레미콘 관리","2019-12-31 18:39:00",175.203.206.128,175.203.206.128,175.203.206.128,006E1,,1,
|
|
J17207,"2019-12-31 08:06:00",14-구연-01,c.실행,"노듈러 거더 개선","2019-12-31 16:58:00",14-구연-01,c.실행,"노듈러 거더 개선","0000-00-00 00:00:00",172.16.9.94,NULL,172.16.9.94,004C6,,,
|
|
J11305,"2019-12-31 08:09:00",19-설계-09,e.검토,"계획 검토","2019-12-31 16:00:00",19-설계-09,e.검토,"계획 검토","0000-00-00 00:00:00",172.16.9.148,NULL,172.16.9.148,008C7,,,
|
|
J08201,"2019-12-31 08:10:00",19-설계-12,"a.계획 및 협의",업무협의,"2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.151,NULL,NULL,008C8,,,
|
|
J15206,"2019-12-31 08:14:00",18-시공-20,g.기타,"- 12월 공사현황보고서 작성 ","2019-12-31 16:03:00",18-시공-20,g.기타,"- 12월 공사현황보고서 작성 ","0000-00-00 00:00:00",61.98.205.243,NULL,61.98.205.243,004C8,,,
|
|
J10315,"2019-12-31 08:16:00",19-시공-13,b.시공,"가설및 제작검토","2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.147,NULL,NULL,004C7,,,
|
|
J13308,"2019-12-31 08:25:00",19-시공-24,b.시공,"1. 19년 12월 기성 신청 및 정리
|
|
2. 2020년 예정공정표 작성 및 결산
|
|
","2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.170,NULL,NULL,004E3,,,
|
|
J18206,"2019-12-31 08:25:00",16-시공-20,g.기타,"산외교 상부 시공방안, 실정보고 검토","2019-12-31 16:58:00",16-시공-20,g.기타,"산외교 상부 시공방안, 실정보고 검토","0000-00-00 00:00:00",172.16.9.179,NULL,172.16.9.179,001C5,,,
|
|
J11302,"2019-12-31 08:25:00",17-설계-04,h.기타,"r가설검토, 가설계획서 작성","2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.166,NULL,NULL,004E2,,,
|
|
J19301,"2019-12-31 08:27:00",14-구연-01,c.실행,"nodular girder m별 실행작성","2019-12-31 16:50:00",14-구연-01,c.실행,"nodular girder m별 실행작성","0000-00-00 00:00:00",172.16.9.42,NULL,172.16.9.42,008E2,,,
|
|
J15302,"2019-12-31 08:28:00",17-설계-13,b.구조계산,"구안천교 긴장력 변경","2019-12-31 16:02:00",17-설계-13,b.구조계산,"구안천교 긴장력 변경","0000-00-00 00:00:00",172.16.9.173,NULL,172.16.9.173,008E4,,,
|
|
J15307,"2019-12-31 08:29:00",19-설계-12,b.구조계산,"반력 계산","2019-12-31 16:02:00",19-설계-12,b.구조계산,"반력 계산","0000-00-00 00:00:00",172.16.9.171,NULL,172.16.9.171,008E4,,,
|
|
J07103,"2019-12-31 08:30:00",19-교영-01,d.기타,사업관리,"2019-12-31 17:00:00",19-교영-01,d.기타,사업관리,"0000-00-00 00:00:00",172.16.9.142,NULL,172.16.9.142,008C6,,,
|
|
M05510,"2019-12-31 08:32:00",18-시공-03,b.시공,"거더제작
|
|
시공관리,안전관리,품질관리","2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",223.38.53.253,NULL,NULL,004C8,,,
|
|
J18205,"2019-12-31 08:32:00",17-설계-05,h.기타,"기술검토서 작성","2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.167,NULL,NULL,008E2,,,
|
|
J13201,"2019-12-31 08:33:00",19-설계-12,b.구조계산,"옥성교 반력산출","2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.165,NULL,NULL,008E2,,,
|
|
J15201,"2019-12-31 08:33:00",19-교영-20,b.시공사,"과업진행현황 파악 ","2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.150,NULL,NULL,008C8,,,
|
|
J16202,"2019-12-31 08:37:00",19-교영-01,c.설계사,신규사업현황조사,"2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.164,NULL,NULL,008E1,,,
|
|
J09101,"2019-12-31 08:39:00",19-교영-01,c.설계사,"과업조사 외","2019-12-31 16:01:00",19-교영-01,c.설계사,"과업조사 외","0000-00-00 00:00:00",172.16.9.144,NULL,172.16.9.144,008C7,,,
|
|
J17205,"2019-12-31 08:40:00",18-교영-01,c.설계사,.,"2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.180,NULL,NULL,008E2,,,
|
|
J14306,"2019-12-31 08:44:00",19-관리-04,a.계약,"계약업무 외","2019-12-31 16:16:00",19-관리-04,a.계약,"계약업무 외","0000-00-00 00:00:00",172.16.9.175,NULL,172.16.9.175,004E4,,,
|
|
J11202,"2019-12-31 08:45:00",19-시공-02,b.시공,공사관리,"2019-12-31 18:18:18",NULL,NULL,NULL,"0000-00-00 00:00:00",172.16.9.159,NULL,NULL,004E1,,,
|
|
J15301,"2019-12-31 08:59:00",16-시공-20,b.시공,"마성교 자재 공급원승인서 작성 (케이티에이)
|
|
안종기팀 정산서 작성
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절) 자재공급원 3부 발송","2019-12-31 16:04:00",16-시공-20,b.시공,"마성교 자재 공급원승인서 작성 (케이티에이)
|
|
안종기팀 정산서 작성
|
|
하토교 어란교(피티씨) 원청3교(장헌,분절) 자재공급원 3부 발송","0000-00-00 00:00:00",172.16.9.172,NULL,172.16.9.172,004E4,,,
|
|
J14101,"2019-12-31 08:50:00",16-시공-20,출장,한양,"2019-12-31 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J10315,"2019-12-04 08:50:00",18-시공-03,출장,"왕림교 현장","2019-12-04 18:00:00",18-시공-03,출장,"왕림교 현장","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J10315,"2019-12-18 08:50:00",18-시공-12,출장,"포스코 건설","2019-12-18 18:00:00",18-시공-12,출장,"포스코 건설","0000-00-00 00:00:00",NULL,NULL,NULL,004C7,,,
|
|
J16203,"2019-12-23 08:50:00",19-제조-03,출장,"[조령천교(안성)]콘크리트 배합 및 물량확인","2019-12-23 18:00:00",19-제조-03,출장,"[조령천교(안성)]콘크리트 배합 및 물량확인","0000-00-00 00:00:00",NULL,NULL,NULL,006E1,,,
|
|
J14101,"2019-12-25 08:50:00",16-시공-20,출장,한양,"2019-12-25 18:00:00",16-시공-20,출장,한양,"0000-00-00 00:00:00",NULL,NULL,NULL,004C6,,,
|
|
J12202,"2019-12-25 08:50:00",17-시공-08,출장,[대구광역시]런처가설,"2019-12-25 18:00:00",17-시공-08,출장,[대구광역시]런처가설,"0000-00-00 00:00:00",NULL,NULL,NULL,004E1,,,
|
|
J11302,"2019-12-25 08:50:00",17-시공-10,출장,"[대구시 달성군]성주대교 면보수","2019-12-25 18:00:00",17-시공-10,출장,"[대구시 달성군]성주대교 면보수","0000-00-00 00:00:00",NULL,NULL,NULL,004E2,,,
|
|
J15206,"2019-12-26 08:50:00",18-시공-15,출장,"[서울특별시 경기도 고양시 덕양구]스플라이스 거더 2차 강연선 삽입 및 헤드 웨찌 설치 현장 지원","2019-12-26 18:00:00",18-시공-15,출장,"[서울특별시 경기도 고양시 덕양구]스플라이스 거더 2차 강연선 삽입 및 헤드 웨찌 설치 현장 지원","0000-00-00 00:00:00",NULL,NULL,NULL,004C8,,,
|