--- name: project-pyeonggang1-modeling-standard description: 평강1교 P1 pier DXF drawings are the house baseline standard for structure and rebar modeling to be reused across future bridge projects in this Rhino-MCP workflow metadata: node_type: memory type: project originSessionId: 3f00c5a2-89d3-4ff6-bce0-294eebc0a639 modified: 2026-09-16T06:54:22.530Z --- The user's current Rhino modeling ("교각 모델링 연습.3dm" / "평강1교 test.3dm" — P1 pier: cap, column, cast-in-place pile, rebar cages C1–C11 in 1CYCLE/2CYCLE groups) is being built from the two 평강1교 DXF drawings described in [[reference-pyeonggang1-dxf]]. **Why:** the user stated that once this pier model is finished, the same base drawing content (layer conventions, bar-shape/number block system, cap/column/pile geometry rules, rebar cycle grouping, coupler/spacer/tie-bar detailing conventions) will be reused as the standard for structure and rebar modeling on *other* (future, different-bridge) projects — not just this one. **How to apply:** when a future project asks for pier/column/pile structure or rebar modeling in Rhino, treat the 평강1교 drawing conventions as the default template unless the new project's own drawings say otherwise — e.g. the `CSBSHPE-*` bar shape codes, `CSBNUM1` bar numbering, 1CYCLE/2CYCLE rebar layer split, C.T.C tie/cross-tie spacing pattern, coupler and shape-holding-rebar (형상유지철근) notes. Confirm with the user whether the new project supplies its own DXF (in which case that takes precedence) or whether to carry over 평강1교's conventions wholesale.