Commit Graph
8 Commits
Author SHA1 Message Date
ypshimandClaude Haiku 5.5 b3533b69df feat(rebar): rebar strength per 규격 prefix as inputs on ③ (D SD300, H SD400, S SD500)
fyH and fyS become a grade per prefix (D · H · S), chosen from SD300 · SD400 · SD500. The defaults are the P1 values, so
the P1 results do not change. Each bar takes its grade from its 규격 (fyOf). The 철근표 has a 강도 column. Older files
that stored fyH / fyS are read into the grade map. Only fck is still an assumed value (I02). Approved 2026-10-23.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-23 09:51:36 +09:00
ypshim a2317caf6c feat(rebar): add downward 90° hooks (135 mm) to P6 crossties in 3D rebar model 2026-10-22 17:45:22 +09:00
ypshimandClaude Haiku 5.5 1074fdf428 feat(view): shear-segment table for 2·3주형 on the ③ coping tab
The segment table lists each column's Level and the segments between columns
(추천안, Q-K2), so a 2주형 shows 좌 경사 3, Level 1 9, Level 2 9, 기둥 사이 1 18,
우 경사 3. One column is unchanged.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 12:22:04 +09:00
ypshimandClaude Haiku 5.5 13318e9393 feat(core): rebar for 2·3주형 — shear bars per column, column bars per column (plan)
- Coping §9: C10 at each column centre (@300, k_max as for one column), C9 / C11
  outside, and the gaps between columns filled @250 from both C10 groups with the
  remaining length shared evenly (추천안, Q-K2). One column gives the T형 result.
- Column bars and couplers repeat per column (P1 230 × 2 for 2주형, × 3 for 3주형).
- Footings: each footing's bars are summed per name; the longest length governs.
- C14 is kept as the T형 layout with an RB-M01 note (per-column rule open, Q-K11).
- Tests: counts for 2주형 and 3주형; T형 unchanged; too-close columns refused.
- Not yet: the ③ shear-segment table for multi columns (still single column), the
  C14 per column, and a drawing for multi columns. Not verified in a browser.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 12:20:49 +09:00
ypshimandClaude Haiku 5.5 8ac5d2973c feat(view): 전단철근 구간 표 on the ③ coping tab (시안 ③)
- Segments of C9 (좌 경사), C10 (Level), C11 (우 경사): first and last bar in
  metres, spacing, count, and bar number. From the bar positions (코핑철근.md §3).
- Test: 0.300–4.550 (18 @250), 4.800–7.200 (9 @300), 7.450–11.700 (18 @250).
- Not verified in a browser.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 12:17:12 +09:00
ypshimandClaude Haiku 5.5 1c6194cd48 feat(core): cap bars of C9–C11 and piece count (추천안 for Q-K5)
- Recommended l_cap = h − 100 (top cover), so l_cap stays below h (RB-K04).
  Cap length = 1740 + 2·l_cap. The shear rows show U and cap ranges.
- Piece count 6 per position (3 closed stirrups × U + cap): C9 + C10 + C11 gives
  270 pieces, as in the document.
- P1/P2 per-line pieces are shown from the document (기둥철근.md §3.2).
- Tests: cap length and the 270 check.
- Not verified in a browser.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 11:38:28 +09:00
ypshimandClaude Haiku 5.5 5641bbe265 feat(core): lengths for coping, column and the B2 split (추천안)
- Coping: C9/C10 lower U = 1740 + 2h with h linear along the slope and 2300 on
  the Level (3522 / 6098 / 6249 / 6340 from the document); C12 (3717–10183),
  C13 11746, C14 3447.5, C15 3852, C16 4070.
- Column: P3 = C_t + 1.3·l_d(H19) lap (추천안 for Q-C6, lap 1146.6), P5 = C_t.
- Footing: B2 13646 is split into two pieces at a splice with 1.3·l_d(S25,
  SD500) (추천안 for Q-B6), piece ≈ 7776 each.
- Not done: C9/C11 cap (삿갓) lengths (Q-K5 open), P1/P2 per-line pieces.
- Tests against the document values; P1 summary updated.
- Not verified in a browser.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 11:37:08 +09:00
ypshimandClaude Haiku 5.5 b962cf1a1c feat(core): bearing-block drawing check and coping rebar C3 (plan C2·C3)
- Drawing check (spec §6.3): an integrated 2500 × 1200 block gives 18@125 = 2250
  along (ends 50 + 75) and 7@125 = 875 across (ends 162.5).
- C3 coping rebar, from RAG/코핑철근.md (2026-10-22 final):
  - C10: 9 bars @300 at 4800–7200 (k_max 4, beyond the Level edge).
  - C9 / C11: 18 bars each @250 outward, ends at 300 and 11700 (end gap 300).
  - Refuses a coping too short for C9 (RB-K01).
  - Side bars C12 5 rows / C13 2 rows at the 42.538 break; C14 38 bars;
    C15 11 bars, C16 22 bars.
- spec §6.4 is older than 코핑철근.md (C10/C9/C11 layout, C12 row count, C14
  dimensions). This follows the final document; spec §6.4 needs an update.
- Not yet: C1–C8 main bars (shape and lengths), the C12/C13 bar lengths and
  shapes, the drawing check of the coping sheet, and the ③ screen.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 11:08:27 +09:00