- Material {fck, fyH, fyS}, defaults 27 / 400 / 500 as assumed values (I02).
The rebar calculations take the material: the C7/C8 splice, the P2 development
length, the P3 lap, and the B2 split use it instead of fixed numbers.
- ③ screen: 공통 설정 inputs with a note that the defaults are assumed (I02).
- Project file stores the material as an optional field; older files open with
the defaults.
- Tests: fck 27 → 35 shortens the laps by √(27/35); the C7 piece follows fck;
a non-default fy drops I02; the file round trip.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
- Nominal bar diameters (H29 28.6, S32 31.8, …) as used by the documents. With
them, C7/C8 l_s = 1.3·l_d(28.6, fck 27) = 1717.6, which is the document's 1717.
- C1–C8 (코핑철근.md §5): width layout 127 · 110.5 · 21@125 · 110.5 · 127 with 24
bars (12 + 12); heights 43.284 / 43.227 / 43.170; top bar lengths 12744 /
12629.6 / 12515.2; bottom pieces ≈ 7448.
- C4 (기둥철근.md): P1 r 875 and P2 r 843.2; couplers P1 +3/6/9/12 m, P2 +150;
230 + 230 main pieces and 368 couplers; tie radius 900.45; P3 38 at @300 from
2.340; P5 19 at @120; P4 8 at @120 from −0.060; P6 8 levels × 4 = 32, length
≈ 2071.
- Not yet: C4 interference checks (P4 vs B11, Q-C9), bar lengths of P3/P5/P4
and coupler shapes, the coping/column drawing checks, and the ③ screen.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>