ypshimandClaude Haiku 5.5 9e1e25f8fe feat(core,view): bent coping stage 3 — footings and piles in stretch frames
- Footings, blindings and piles on a bent axis are placed in their stretch's
  frame; 일체기초 is grouped per stretch, so a combined footing never crosses
  the kink (separate footings, each aligned with its stretch).
- Footings, blindings and piles are trimmed at the mitre plane like the coping.
- The stage-2 refusal for bent foundations is removed; the Level-half-width
  refusal for columns at the kink remains.
- Tests: T형 footing crossing the kink stays in stretch 0; 2주형 with columns
  on both sides gives one footing per stretch, with mitre clipping in the scene.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 09:38:01 +09:00
ypshimandClaude Haiku 5.5 5371932cca feat(core,view): bent coping stage 2 — mitred coping, stretch-local bearings, blocks and columns
- buildPier builds on buildAxis: each object carries its stretch k and a local
  s from that stretch's base; coping parts are per stretch with the mitre plane
  trimming the overlap in the scene (renderer.localClippingEnabled).
- Straight P1 output is unchanged (regression tests pass).
- Bent coping is supported for 현장타설말뚝 only; footings and piles on a bent
  axis remain 미실시 until stage 3. Kink outside the coping and columns within
  the Level half-width of the kink are refused.
- W03/W04 use coping coordinates (g).
- Tests: constructed 60° bend — world coordinates of bearings, blocks and the
  column survive the stretch frames; mitre sides; scene mesh count; refusals.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 09:22:57 +09:00
ypshimandClaude Haiku 5.5 d8944e9023 fix(core): clockwise-positive bend angle for IP4 (right turn when travelling IP1→IP2)
Sign convention approved: a right (clockwise) deflection is positive.
solveIp4 now rotates the IP1→IP2 direction by −θ. Test covers a +10°
right turn with IP4 at (5, 0).

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 09:13:54 +09:00
ypshimandClaude Haiku 5.5 d0fa9b94eb feat(core): lateral coping step (Q1·Q2) and IP4 bend-point solve (spec §4.1)
- Front and back coping tops that differ by 5 mm or more in any segment are
  drawn as two coping parts split at the midline between the bearing rows.
  Tolerance 5 mm and midline position are the draft assumptions (Q1·Q2).
- Scene extrudes each coping part across its own width.
- solveIp4 computes IP4 as the intersection of the IP1→IP2 line with the
  line through IP3 turned by the bend angle (positive = counter-clockwise,
  sign convention to be confirmed). Bent coping geometry remains 미실시.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 09:04:12 +09:00
ypshimandClaude Haiku 5.5 ad59c0c74d feat(core): 일체기초 footings for 2·3주형 with per-footing pile grid
- Columns closer than one footing length (10400) share a 일체기초 whose
  length is the outer-column distance + 10400, centred between them (spec §4.6).
- Pile grid is computed from each footing's length (rows across 8150,
  pile count along the length from (length − 1400) / 2250 + 1).
- Blinding concrete follows each combined footing.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 09:01:40 +09:00
ypshimandClaude Haiku 5.5 5466b3522e feat(core): haunch-and-Level-300 coping underside, steel pile 609.6, W03/W04 checks
- Multi-column coping (2·3주형): underside between columns drops 300 below
  Level with 300 × 300 haunches (spec §4.5, Q3 추천안).
- Steel pipe pile diameter 609.6 mm (spec §4.5, Q5 추천안).
- Direct foundation keeps the 100 mm blinding concrete (Q4 추천안, test added).
- W03: bearing centre closer than half a block width to a step boundary.
- W04: block footprint outside the coping plan.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 08:58:57 +09:00
ypshimandClaude Haiku 5.5 d963d8ed3c feat(core): parse P1 workbook and build T-type pier shape
- parse Excel input by header strings (pier, IP, bearing tables)
- DMS azimuth parser (E03), input validation (E01, E02)
- pure geometry: axis, bearings, stepped coping, column, footing, piles, blinding
- warnings W01, W02, W05, W07, I01
- regression tests against spec.md section 12 (P1)

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>