The three values are inputs on the coping card, with the P1 values (1000 · 1500 · 2100) when absent, and they are tracked
like the other shape inputs. The geometry and the coping rebar read them from one CopingGeom: the U heights follow the
closed form (h1 − 2c) + h2·min(x_s, x_L0)/x_L0, which reproduces the P1 values. The side rows are assumed to keep their
position relative to the Level underside (명세 확인 필요). P1 results are unchanged; the full suite passes.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
Each block takes the skew of its bearing row against the perpendicular of its stretch axis (rowSkewDeg, from the bearing
azimuth). The blocks and pads are turned to that skew, and the S1/S2 bars are drawn in the block frame and turned with
it, so their lengths and embedments do not change. ② shows the row skew (P1: front −4.42°, back −3.11°). Approved
2026-10-23 with the drawing as reference.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
- A 열 is one row across the footing width; each has its own count along the
length. Default floor((L − 1400) / 2250) + 1 per 열, as in spec §4.6.
- Counts are validated: one per 열, whole numbers 2–30. Spacing below the
2250 mm minimum is shown as a warning, not refused (the plan's 6본 → 5@1800
example).
- PierInput gains an optional pileRows; absent means the defaults, so existing
files and the P1 results are unchanged.
- Change tracking compares arrays by value; 열별 본수 can be reverted and
copied (copy item off by default).
- The footing card has −/+ per 열 with spacing, total, and the display string.
- Tests: defaults 4열 × 5본 = 20 and the 1단계 text; 6본 → 5@1800; limits;
model-level 21 piles.
- Not verified in a browser.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
- Footings, blindings and piles on a bent axis are placed in their stretch's
frame; 일체기초 is grouped per stretch, so a combined footing never crosses
the kink (separate footings, each aligned with its stretch).
- Footings, blindings and piles are trimmed at the mitre plane like the coping.
- The stage-2 refusal for bent foundations is removed; the Level-half-width
refusal for columns at the kink remains.
- Tests: T형 footing crossing the kink stays in stretch 0; 2주형 with columns
on both sides gives one footing per stretch, with mitre clipping in the scene.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
The earlier synthetic bend (IP3 at (6, 2)) put IP4 ahead of IP3 on the turned
line, so the axis folded back on itself. buildPier now refuses a kink behind
IP1 along IP1→IP2 or an IP3 behind the kink along the turned direction. Tests
use IP3 (9, −3.464), a valid 60° right turn with kink (7, 0).
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
- buildPier builds on buildAxis: each object carries its stretch k and a local
s from that stretch's base; coping parts are per stretch with the mitre plane
trimming the overlap in the scene (renderer.localClippingEnabled).
- Straight P1 output is unchanged (regression tests pass).
- Bent coping is supported for 현장타설말뚝 only; footings and piles on a bent
axis remain 미실시 until stage 3. Kink outside the coping and columns within
the Level half-width of the kink are refused.
- W03/W04 use coping coordinates (g).
- Tests: constructed 60° bend — world coordinates of bearings, blocks and the
column survive the stretch frames; mitre sides; scene mesh count; refusals.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
Sign convention approved: a right (clockwise) deflection is positive.
solveIp4 now rotates the IP1→IP2 direction by −θ. Test covers a +10°
right turn with IP4 at (5, 0).
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
- Front and back coping tops that differ by 5 mm or more in any segment are
drawn as two coping parts split at the midline between the bearing rows.
Tolerance 5 mm and midline position are the draft assumptions (Q1·Q2).
- Scene extrudes each coping part across its own width.
- solveIp4 computes IP4 as the intersection of the IP1→IP2 line with the
line through IP3 turned by the bend angle (positive = counter-clockwise,
sign convention to be confirmed). Bent coping geometry remains 미실시.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
- Columns closer than one footing length (10400) share a 일체기초 whose
length is the outer-column distance + 10400, centred between them (spec §4.6).
- Pile grid is computed from each footing's length (rows across 8150,
pile count along the length from (length − 1400) / 2250 + 1).
- Blinding concrete follows each combined footing.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
- Multi-column coping (2·3주형): underside between columns drops 300 below
Level with 300 × 300 haunches (spec §4.5, Q3 추천안).
- Steel pipe pile diameter 609.6 mm (spec §4.5, Q5 추천안).
- Direct foundation keeps the 100 mm blinding concrete (Q4 추천안, test added).
- W03: bearing centre closer than half a block width to a step boundary.
- W04: block footprint outside the coping plan.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
- parseWorkbook returns a report per sheet (table counts, issues, ok)
- sheets with E-level issues cannot be selected (spec section 2.3)
- pier input carries its source sheet name
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>