ypshimandClaude Haiku 5.5 b3533b69df feat(rebar): rebar strength per 규격 prefix as inputs on ③ (D SD300, H SD400, S SD500)
fyH and fyS become a grade per prefix (D · H · S), chosen from SD300 · SD400 · SD500. The defaults are the P1 values, so
the P1 results do not change. Each bar takes its grade from its 규격 (fyOf). The 철근표 has a 강도 column. Older files
that stored fyH / fyS are read into the grade map. Only fck is still an assumed value (I02). Approved 2026-10-23.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-23 09:51:36 +09:00
ypshim a2317caf6c feat(rebar): add downward 90° hooks (135 mm) to P6 crossties in 3D rebar model 2026-10-22 17:45:22 +09:00
ypshimandClaude Haiku 5.5 9ba7b55eab feat(core,view): ③ 공통 설정 — fck and fy as inputs (spec §6.2)
- Material {fck, fyH, fyS}, defaults 27 / 400 / 500 as assumed values (I02).
  The rebar calculations take the material: the C7/C8 splice, the P2 development
  length, the P3 lap, and the B2 split use it instead of fixed numbers.
- ③ screen: 공통 설정 inputs with a note that the defaults are assumed (I02).
- Project file stores the material as an optional field; older files open with
  the defaults.
- Tests: fck 27 → 35 shortens the laps by √(27/35); the C7 piece follows fck;
  a non-default fy drops I02; the file round trip.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 12:06:11 +09:00
ypshimandClaude Haiku 5.5 5cc166c2e1 feat(core): RB-C07 — delete P4 ties that interfere with the footing top bars
- A P4 is deleted when |z_P4 − z_bar| < (d_P4 + d_bar)/2 against B5 and B1
  (the 확대기초 top layer, from the 상면). B11/B12 are not checked (Q-C9 무시).
- The P6 crossties start from the first kept P4.
- Tests: the document's example keeps all 8; B5 moved to −70 deletes the P4 at
  −60; a P4 just outside the limit is kept.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 11:49:16 +09:00
ypshimandClaude Haiku 5.5 5641bbe265 feat(core): lengths for coping, column and the B2 split (추천안)
- Coping: C9/C10 lower U = 1740 + 2h with h linear along the slope and 2300 on
  the Level (3522 / 6098 / 6249 / 6340 from the document); C12 (3717–10183),
  C13 11746, C14 3447.5, C15 3852, C16 4070.
- Column: P3 = C_t + 1.3·l_d(H19) lap (추천안 for Q-C6, lap 1146.6), P5 = C_t.
- Footing: B2 13646 is split into two pieces at a splice with 1.3·l_d(S25,
  SD500) (추천안 for Q-B6), piece ≈ 7776 each.
- Not done: C9/C11 cap (삿갓) lengths (Q-K5 open), P1/P2 per-line pieces.
- Tests against the document values; P1 summary updated.
- Not verified in a browser.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 11:37:08 +09:00
ypshimandClaude Haiku 5.5 a403ab9641 feat(core): coping main bars C1–C8 (plan C3) and column rebar C4
- Nominal bar diameters (H29 28.6, S32 31.8, …) as used by the documents. With
  them, C7/C8 l_s = 1.3·l_d(28.6, fck 27) = 1717.6, which is the document's 1717.
- C1–C8 (코핑철근.md §5): width layout 127 · 110.5 · 21@125 · 110.5 · 127 with 24
  bars (12 + 12); heights 43.284 / 43.227 / 43.170; top bar lengths 12744 /
  12629.6 / 12515.2; bottom pieces ≈ 7448.
- C4 (기둥철근.md): P1 r 875 and P2 r 843.2; couplers P1 +3/6/9/12 m, P2 +150;
  230 + 230 main pieces and 368 couplers; tie radius 900.45; P3 38 at @300 from
  2.340; P5 19 at @120; P4 8 at @120 from −0.060; P6 8 levels × 4 = 32, length
  ≈ 2071.
- Not yet: C4 interference checks (P4 vs B11, Q-C9), bar lengths of P3/P5/P4
  and coupler shapes, the coping/column drawing checks, and the ③ screen.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>