Files
Pier_v1/tests
ypshimandClaude Haiku 5.5 9e1e25f8fe feat(core,view): bent coping stage 3 — footings and piles in stretch frames
- Footings, blindings and piles on a bent axis are placed in their stretch's
  frame; 일체기초 is grouped per stretch, so a combined footing never crosses
  the kink (separate footings, each aligned with its stretch).
- Footings, blindings and piles are trimmed at the mitre plane like the coping.
- The stage-2 refusal for bent foundations is removed; the Level-half-width
  refusal for columns at the kink remains.
- Tests: T형 footing crossing the kink stays in stretch 0; 2주형 with columns
  on both sides gives one footing per stretch, with mitre clipping in the scene.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-22 09:38:01 +09:00
..