The coping middle level is (Level underside + step top)/2. P3's top and P6's upper limit are this level, and e_top is the
step top minus it (P1: 1322, replacing the 1623 reverse-engineered value). On P1 P3 goes from 38 to 39 ties and P6 stays at
8 levels. With taper h2 = 3000 the middle level is 13275: P3 37 ties, P6 8 levels (32 bars), e_top 2072.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
A row can now carry pieces (length, count). C9, C10, C11 and C9·C11 사이 have U and 삿갓 pieces per position (3 loops each);
C12 and C13 have 일자 and ㄷ pieces per bar; P1 and P2 have their splice pieces, each counting all the bars. The
재료표 totals from the pieces, so no bar is left out. 개수 stays the 철근표 count; the piece count is kept beside it. The
삿갓 length h − 100 is an assumption (Q-K5) and is noted on the ④ screen.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
[보기] only switched the member tab. The alert now names its bar (RB-F08 → B2),
and [보기] switches to the member, highlights that row, and scrolls to it.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
- Material {fck, fyH, fyS}, defaults 27 / 400 / 500 as assumed values (I02).
The rebar calculations take the material: the C7/C8 splice, the P2 development
length, the P3 lap, and the B2 split use it instead of fixed numbers.
- ③ screen: 공통 설정 inputs with a note that the defaults are assumed (I02).
- Project file stores the material as an optional field; older files open with
the defaults.
- Tests: fck 27 → 35 shortens the laps by √(27/35); the C7 piece follows fck;
a non-default fy drops I02; the file round trip.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
- Coping: C9/C10 lower U = 1740 + 2h with h linear along the slope and 2300 on
the Level (3522 / 6098 / 6249 / 6340 from the document); C12 (3717–10183),
C13 11746, C14 3447.5, C15 3852, C16 4070.
- Column: P3 = C_t + 1.3·l_d(H19) lap (추천안 for Q-C6, lap 1146.6), P5 = C_t.
- Footing: B2 13646 is split into two pieces at a splice with 1.3·l_d(S25,
SD500) (추천안 for Q-B6), piece ≈ 7776 each.
- Not done: C9/C11 cap (삿갓) lengths (Q-K5 open), P1/P2 per-line pieces.
- Tests against the document values; P1 summary updated.
- Not verified in a browser.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
- B9 (확대기초철근 (1).md §9): H16 with the 135° stirrup hook, on the odd grid
(i_W = 1, 5, …), 16 rows, 20 per row (even rows start at i_L 1, odd at 3),
320 bars, length l_v 1750 + 2 × 189 ≈ 2128.
- The rebar summary now lists B9; the alert about B9 is gone. Positions and
hooks are the document's proposed rules (Q-B18, Q-B19), noted on the row.
- Tests: the document's B9 values; P1 summary has 320 and only the splice alert.
- Not verified in a browser.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
- Footing (확대기초철근 (1).md): grid counts from W and L, layer heights,
B1–B4 and B5–B8 counts and lengths (B2 13646, B6 11396), B10-1/B10-2,
B11 (60) and B12 (47) with their lengths. B9 is not computed yet.
- rebarSummary: one 철근표 per pier from the model (bearing, coping, column,
footing), with alerts: RB-F08 (B2 needs a splice, Q-B6), RB-F09 (B9 not
computed).
- ③ screen v1: stage nav button, member tabs (받침블럭 · 코핑 · 기둥 · 확대기초),
rebar table with 번호 · 규격 · 개수 · 길이 · 비고, alert list, and the open
questions (Q-B5, Q-B6, Q-C9). Drawings and the 강조 연동 are not in v1.
- Tests: footing values from the document; P1 summary totals; warnings.
- Not verified in a browser.
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>