- scripts/build_solids.py: B-rep solids from standard section 03-001 (rev2, approved 2026-10-21) - lining per 지보패턴 run (independently selectable), excavation band per run - road surface (계획고, 280 mm) with per-station superelevation; base/invert ASSUMED - side drains (box minus pipe), H/I boxes = 공동구 (assumed); 시설한계 50 mm as reference wires only - staged run (4 GB RAM / 180 s per call); STEP and GLB from the same B-rep - model/tunnel_solids.glb, model/tunnel_solids_meta.json, data/verify_solids.json - viewer/index.html: solids, pattern and component toggles, click readout, no development text - STEP (84.6 MB) and model/parts/ are git-ignored; the STEP is generated locally by the script Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01A5Cun3RHQKna9qxE6ybZ4A
6 lines
68 B
Plaintext
6 lines
68 B
Plaintext
data/*.tmp
|
|
__pycache__/
|
|
*.pyc
|
|
model/parts/
|
|
model/tunnel_solids.step
|