feat: axis-and-section skeleton GLB and three.js viewer (Task 7-8, skeleton LOD)
build_skeleton.py sweeps the confirmed standard section (R6982 inner, 300 mm lining, R7402 excavation, crown 6.615 m above road) along the centreline for 4+745..5+480, road = 계획고, ground = 지반고 band. Walls and invert are approximations and recorded in meta. Verified: inner radius identity, crown height, chord length 799.9 m for 4+700..5+500. Viewer uses three.js 0.160.0. Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01A5Cun3RHQKna9qxE6ybZ4A
This commit is contained in:
1 parent
6d44386fc2
commit
56243b51a3
6 files changed
+353
No files matched your search
Binary file not shown.
@@ -0,0 +1,33 @@
|
||||
{
|
||||
"model": "tunnel_skeleton.glb",
|
||||
"scope": "4745~5480 (4+745~5+480)",
|
||||
"units": "m",
|
||||
"origin_plan_xy": [
|
||||
151090.911,
|
||||
483688.46
|
||||
],
|
||||
"sources": {
|
||||
"centreline": "C0060302-001 CA-ALGN-STSM (side-tick midpoint)",
|
||||
"road_grade_B": "C0060302-002 CR-TABL-TEX2 (계획고=노면)",
|
||||
"GL_A": "C0060302-002 CR-TABL-TEX2 (지반고)",
|
||||
"section": "C0060303-001 CS-TABL-TEX1/2, CS-CONC-MAJR, CS-EXCV"
|
||||
},
|
||||
"approximations": [
|
||||
"walls vertical down to road; invert not modelled",
|
||||
"lining band thickness at walls is radial-consistent but not as-built",
|
||||
"centreline and grade linearly interpolated between nodes",
|
||||
"superelevation sign convention assumed (z += S/100 * x, x = left of tangent)"
|
||||
],
|
||||
"layers": [
|
||||
"lining_outer_R7282",
|
||||
"lining_inner_R6982",
|
||||
"excavation_R7402",
|
||||
"road_surface_계획고",
|
||||
"ground_GL_지반고"
|
||||
],
|
||||
"open": [
|
||||
"4+700~4+745 and 5+480~5+500 excluded ([미확정])",
|
||||
"pattern zones (03-003~008) pending Task 5",
|
||||
"lining details (04-004~009) pending Task 6"
|
||||
]
|
||||
}
|
||||
Reference in new issue