untracked files on main: dceb101 feat(#63): IMP-34 R1 donor capacity measured bound (u1+u2)

This commit is contained in:
kmlee1 committed 2026-05-21 22:07:41 +09:00
commit 8f085a28d3
3220 files changed
+985495

No files matched your search

@@ -0,0 +1 @@
[{"id": 21192, "html_url": "https://gitea.hmac.kr/Kyeongmin/C.E.L_Slide_test2/issues/57#issuecomment-21192", "pull_request_url": "", "issue_url": "https://gitea.hmac.kr/Kyeongmin/C.E.L_Slide_test2/issues/57", "user": {"id": 28, "login": "Kyeongmin", "login_name": "", "source_id": 0, "full_name": "이경민", "email": "kyeongmin@noreply.localhost", "avatar_url": "https://gitea.hmac.kr/avatars/d883a35f9197b080b2a0c535c3f9357dcd5c7d40b3c42bd8f40218cb94609a8e", "html_url": "https://gitea.hmac.kr/Kyeongmin", "language": "", "is_admin": false, "last_login": "0001-01-01T00:00:00Z", "created": "2025-12-30T10:51:04+09:00", "restricted": false, "active": false, "prohibit_login": false, "location": "", "website": "", "description": "", "visibility": "public", "followers_count": 0, "following_count": 0, "starred_repos_count": 1, "username": "Kyeongmin"}, "original_author": "", "original_author_id": 0, "body": "## [Claude #1] Stage 1 — Problem review\n\n### Root cause\n\nAfter #56 INTEGRATION-AUDIT-02 closed with `NEEDS_DOC_SYNC_FOLLOWUP` and the backlog rows for IMP-07 / IMP-16 were corrected (commit `101143e`), `docs/architecture/IMP-16-U2-WIRING-DESIGN.md` still presents itself as a future-binding contract gated on an active IMP-07 reverse path. The 3 \"Open items deferred until IMP-07 lands\" (L71–L73) read as resolvable, but per the audit IMP-07 is closed-as-no-runtime — so the deferred items are DORMANT, not pending-imminent. A reader landing on this doc has no signal that the audit reclassified the gate.\n\nThis issue is exactly recommended follow-up #1 of `INTEGRATION-AUDIT-02-REPORT.md` §6 (lines 142–152), which deliberately deferred the banner out of #56 because that audit forbade writes to `IMP-16-U2-WIRING-DESIGN.md` under its own u1 scope-lock.\n\n### File state (verified)\n\n- Target file: `D:\\ad-hoc\\kei\\design_agent\\docs\\architecture\\IMP-16-U2-WIRING-DESIGN.md`\n- Length: 75 lines\n- L1 = `# IMP-16-U2 — Phase Z verification wiring design (design-only)`\n- L2 = blank\n- L3 = `**Status**: design-only contract. ...` (existing Status paragraph — must remain verbatim)\n- L69–L75 = \"Open items deferred until IMP-07 lands\" block — must remain verbatim\n- Working tree clean on this file (last touched at `23ba8b6 feat(IMP-16): U1 H3 verification utility port + U2 wiring design`).\n\nInsertion point per issue body = \"immediately after the `# title` line, before the existing content\" → between L1 and L2/L3. A trailing blank line after the blockquote keeps Markdown separation from the existing `**Status**` paragraph.\n\n### Scope-lock\n\n**ONLY allowed file change:** `docs/architecture/IMP-16-U2-WIRING-DESIGN.md` — additive banner insert after L1.\n\n**Banner content (verbatim from issue body):**\n\n```markdown\n> **⚠️ STATUS UPDATE (2026-05-20, INTEGRATION-AUDIT-02)** — IMP-16 is reclassified\n> as `documented:dormant` and IMP-07 as `documented:no-runtime`. The 3 \"Open items\n> deferred until IMP-07 lands\" below remain dormant until IMP-07 reverse-path\n> actually lands runtime (no current plan).\n>\n> Resolution evidence: see `INTEGRATION-AUDIT-02-REPORT.md` Sections 3, 4, and 7\n> (final decision: `NEEDS_DOC_SYNC_FOLLOWUP`).\n>\n> Do NOT treat this design contract as actionable in current Phase Z runtime.\n```\n\n**Forbidden writes:**\n- `src/**`\n- `templates/**`\n- `tests/**`\n- `docs/architecture/PHASE-Z-IMPLEMENTATION-ISSUE-BACKLOG.md` (already corrected in #56 — `101143e`)\n- `docs/architecture/INTEGRATION-AUDIT-02-REPORT.md`\n- The existing body of `IMP-16-U2-WIRING-DESIGN.md` — Status paragraph (L3), gate clauses (L12–L16), per-step wiring contract (L18–L46), guardrails, rollback, and the \"Open items deferred until IMP-07 lands\" block (L69–L75) must remain byte-identical.\n\n### Guardrails (binding)\n\n1. **Banner is additive only.** `git diff docs/architecture/IMP-16-U2-WIRING-DESIGN.md` must show `+N / -0` (zero deletions). The verbatim \"Open items deferred until IMP-07 lands\" section stays as the historical contract.\n2. **No semantic edit of the contract.** Do not soften, hedge, or rephrase the existing \"Status\" paragraph or the L12–L16 gate clauses. The banner is the cross-reference; the original is the contract.\n3. **Markdown blockquote rendering.** Each banner line must begin with `> ` (or `>` for the empty separator line) so Gitea/GitHub render it as a visually distinct call-out.\n4. **No new anchors / no link rewrites.** The banner names `INTEGRATION-AUDIT-02-REPORT.md` as plain text (matches issue body verbatim); do not convert to a `[link](path)` form unless the issue text says so (it does not).\n5. **Trailing blank line after the banner** before the existing `**Status**` paragraph, to preserve Markdown block separation.\n6. **No tests touched.** This is a doc-only change. `pytest -q tests` must pass unchanged (the acceptance criterion is regression-only — the test suite has no coverage of this file).\n7. **English-only doc body change*Line truncated