feat: integrate dashboard modules and document history
This commit is contained in:
4
.gitignore
vendored
4
.gitignore
vendored
@@ -8,4 +8,6 @@ backend/data/
|
|||||||
uploads/
|
uploads/
|
||||||
snapshots/
|
snapshots/
|
||||||
node_modules/
|
node_modules/
|
||||||
|
incoming-files/*.Zone.Identifier
|
||||||
|
*:Zone.Identifier
|
||||||
|
incoming-files/~$*
|
||||||
|
|||||||
@@ -8,8 +8,8 @@
|
|||||||
<link rel="preconnect" href="https://fonts.gstatic.com" crossorigin />
|
<link rel="preconnect" href="https://fonts.gstatic.com" crossorigin />
|
||||||
<link href="https://fonts.googleapis.com/css2?family=Pretendard:wght@400;600;700;900&display=swap" rel="stylesheet" />
|
<link href="https://fonts.googleapis.com/css2?family=Pretendard:wght@400;600;700;900&display=swap" rel="stylesheet" />
|
||||||
<script src="https://cdn.tailwindcss.com"></script>
|
<script src="https://cdn.tailwindcss.com"></script>
|
||||||
<link rel="stylesheet" href="/legacy/static/common.css?v=20260325-9" />
|
<link rel="stylesheet" href="/legacy/static/common.css?v=20260326-02" />
|
||||||
<link rel="stylesheet" href="/legacy/static/organization.css?v=20260325-9" />
|
<link rel="stylesheet" href="/legacy/static/organization.css?v=20260326-02" />
|
||||||
</head>
|
</head>
|
||||||
<body>
|
<body>
|
||||||
<input type="file" id="upload-excel" class="hidden" accept=".xlsx, .csv" />
|
<input type="file" id="upload-excel" class="hidden" accept=".xlsx, .csv" />
|
||||||
@@ -60,6 +60,6 @@
|
|||||||
</div>
|
</div>
|
||||||
</div>
|
</div>
|
||||||
|
|
||||||
<script src="/legacy/static/organization.js?v=20260325-9"></script>
|
<script src="/legacy/static/organization.js?v=20260326-02"></script>
|
||||||
</body>
|
</body>
|
||||||
</html>
|
</html>
|
||||||
|
|||||||
@@ -32,6 +32,48 @@ CREATE TABLE IF NOT EXISTS members (
|
|||||||
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
);
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS member_overrides (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
employee_id TEXT NOT NULL UNIQUE,
|
||||||
|
name TEXT NOT NULL DEFAULT '',
|
||||||
|
company TEXT,
|
||||||
|
rank TEXT,
|
||||||
|
role TEXT,
|
||||||
|
department TEXT,
|
||||||
|
grp TEXT,
|
||||||
|
division TEXT,
|
||||||
|
team TEXT,
|
||||||
|
cell TEXT,
|
||||||
|
work_status TEXT,
|
||||||
|
work_time TEXT,
|
||||||
|
phone TEXT,
|
||||||
|
email TEXT,
|
||||||
|
seat_label TEXT,
|
||||||
|
photo_url TEXT,
|
||||||
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS member_retirements (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
employee_id TEXT,
|
||||||
|
name TEXT NOT NULL,
|
||||||
|
note TEXT NOT NULL DEFAULT '',
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
UNIQUE (name)
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS member_aliases (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
alias_name TEXT NOT NULL UNIQUE,
|
||||||
|
canonical_name TEXT NOT NULL,
|
||||||
|
employee_id TEXT,
|
||||||
|
note TEXT NOT NULL DEFAULT '',
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
CREATE TABLE IF NOT EXISTS seat_maps (
|
CREATE TABLE IF NOT EXISTS seat_maps (
|
||||||
id SERIAL PRIMARY KEY,
|
id SERIAL PRIMARY KEY,
|
||||||
name TEXT NOT NULL,
|
name TEXT NOT NULL,
|
||||||
@@ -76,11 +118,252 @@ CREATE TABLE IF NOT EXISTS seat_slots (
|
|||||||
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
UNIQUE (seat_map_id, slot_key)
|
UNIQUE (seat_map_id, slot_key)
|
||||||
);
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS integration_import_batches (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
source_key TEXT NOT NULL UNIQUE,
|
||||||
|
source_name TEXT NOT NULL,
|
||||||
|
source_path TEXT NOT NULL,
|
||||||
|
imported_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
row_count INTEGER NOT NULL DEFAULT 0,
|
||||||
|
meta_json JSONB NOT NULL DEFAULT '{}'::jsonb
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS integration_raw_organization_rows (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
batch_id INTEGER NOT NULL REFERENCES integration_import_batches(id) ON DELETE CASCADE,
|
||||||
|
row_index INTEGER NOT NULL,
|
||||||
|
row_json JSONB NOT NULL,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS integration_raw_mh_rows (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
batch_id INTEGER NOT NULL REFERENCES integration_import_batches(id) ON DELETE CASCADE,
|
||||||
|
row_index INTEGER NOT NULL,
|
||||||
|
row_json JSONB NOT NULL,
|
||||||
|
row_values_json JSONB NOT NULL DEFAULT '[]'::jsonb,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS integration_raw_mh_pm_rows (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
batch_id INTEGER NOT NULL REFERENCES integration_import_batches(id) ON DELETE CASCADE,
|
||||||
|
row_index INTEGER NOT NULL,
|
||||||
|
row_values_json JSONB NOT NULL DEFAULT '[]'::jsonb,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS integration_raw_payment_rows (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
batch_id INTEGER NOT NULL REFERENCES integration_import_batches(id) ON DELETE CASCADE,
|
||||||
|
row_index INTEGER NOT NULL,
|
||||||
|
row_json JSONB NOT NULL,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS integration_projects (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
project_code TEXT NOT NULL UNIQUE,
|
||||||
|
project_name TEXT NOT NULL,
|
||||||
|
display_name TEXT NOT NULL DEFAULT '',
|
||||||
|
intranet_name TEXT NOT NULL DEFAULT '',
|
||||||
|
business_area TEXT NOT NULL DEFAULT '',
|
||||||
|
business_subarea TEXT NOT NULL DEFAULT '',
|
||||||
|
project_nature TEXT NOT NULL DEFAULT '',
|
||||||
|
main_category TEXT NOT NULL DEFAULT '',
|
||||||
|
middle_category TEXT NOT NULL DEFAULT '',
|
||||||
|
sub_category TEXT NOT NULL DEFAULT '',
|
||||||
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS integration_project_aliases (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
project_id INTEGER NOT NULL REFERENCES integration_projects(id) ON DELETE CASCADE,
|
||||||
|
alias_name TEXT NOT NULL,
|
||||||
|
alias_type TEXT NOT NULL DEFAULT 'name',
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
UNIQUE (project_id, alias_name, alias_type)
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS integration_project_category_mappings (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
source_key TEXT NOT NULL DEFAULT 'ptj_csv',
|
||||||
|
project_name TEXT NOT NULL,
|
||||||
|
normalized_project_key TEXT NOT NULL,
|
||||||
|
mapped_d1 TEXT NOT NULL DEFAULT '',
|
||||||
|
mapped_d2 TEXT NOT NULL DEFAULT '',
|
||||||
|
mapped_d3 TEXT NOT NULL DEFAULT '',
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
UNIQUE (source_key, normalized_project_key)
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS integration_project_pm_assignments (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
project_id INTEGER NOT NULL REFERENCES integration_projects(id) ON DELETE CASCADE,
|
||||||
|
member_id INTEGER REFERENCES members(id) ON DELETE SET NULL,
|
||||||
|
pm_name TEXT NOT NULL,
|
||||||
|
source_label TEXT NOT NULL DEFAULT 'mh_sheet2',
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
UNIQUE (project_id, source_label)
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS integration_work_logs (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
work_date DATE NOT NULL,
|
||||||
|
employee_id TEXT NOT NULL,
|
||||||
|
member_id INTEGER REFERENCES members(id) ON DELETE SET NULL,
|
||||||
|
member_name TEXT NOT NULL,
|
||||||
|
title TEXT NOT NULL DEFAULT '',
|
||||||
|
team_category TEXT NOT NULL DEFAULT '',
|
||||||
|
team_name TEXT NOT NULL DEFAULT '',
|
||||||
|
user_state TEXT NOT NULL DEFAULT '',
|
||||||
|
shift_hours NUMERIC(10, 2) NOT NULL DEFAULT 0,
|
||||||
|
weekend_late_flag TEXT NOT NULL DEFAULT '',
|
||||||
|
review_status TEXT NOT NULL DEFAULT '',
|
||||||
|
source_row_index INTEGER NOT NULL DEFAULT 0,
|
||||||
|
raw_batch_id INTEGER REFERENCES integration_import_batches(id) ON DELETE SET NULL,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
UNIQUE (work_date, employee_id, source_row_index)
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS integration_work_log_segments (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
work_log_id INTEGER NOT NULL REFERENCES integration_work_logs(id) ON DELETE CASCADE,
|
||||||
|
slot_name TEXT NOT NULL,
|
||||||
|
project_id INTEGER REFERENCES integration_projects(id) ON DELETE SET NULL,
|
||||||
|
project_code TEXT NOT NULL DEFAULT '',
|
||||||
|
project_name TEXT NOT NULL DEFAULT '',
|
||||||
|
business_type TEXT NOT NULL DEFAULT '',
|
||||||
|
activity_code TEXT NOT NULL DEFAULT '',
|
||||||
|
hours NUMERIC(10, 2) NOT NULL DEFAULT 0,
|
||||||
|
overtime_hours_raw NUMERIC(10, 2) NOT NULL DEFAULT 0,
|
||||||
|
overtime_hours_adjusted NUMERIC(10, 2) NOT NULL DEFAULT 0,
|
||||||
|
is_overtime BOOLEAN NOT NULL DEFAULT FALSE,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS integration_vouchers (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
accounting_company TEXT NOT NULL DEFAULT '',
|
||||||
|
claim_date DATE,
|
||||||
|
issue_date DATE,
|
||||||
|
issue_month TEXT NOT NULL DEFAULT '',
|
||||||
|
account_code TEXT NOT NULL DEFAULT '',
|
||||||
|
management_account_code TEXT NOT NULL DEFAULT '',
|
||||||
|
account_name TEXT NOT NULL DEFAULT '',
|
||||||
|
project_id INTEGER REFERENCES integration_projects(id) ON DELETE SET NULL,
|
||||||
|
project_code TEXT NOT NULL DEFAULT '',
|
||||||
|
project_name TEXT NOT NULL DEFAULT '',
|
||||||
|
display_project_name TEXT NOT NULL DEFAULT '',
|
||||||
|
intranet_project_name TEXT NOT NULL DEFAULT '',
|
||||||
|
business_area TEXT NOT NULL DEFAULT '',
|
||||||
|
business_subarea TEXT NOT NULL DEFAULT '',
|
||||||
|
planning_dev_sales TEXT NOT NULL DEFAULT '',
|
||||||
|
main_category TEXT NOT NULL DEFAULT '',
|
||||||
|
middle_category TEXT NOT NULL DEFAULT '',
|
||||||
|
sub_category TEXT NOT NULL DEFAULT '',
|
||||||
|
department_name TEXT NOT NULL DEFAULT '',
|
||||||
|
team_name TEXT NOT NULL DEFAULT '',
|
||||||
|
customer_name TEXT NOT NULL DEFAULT '',
|
||||||
|
summary_text TEXT NOT NULL DEFAULT '',
|
||||||
|
debit_supply_amount NUMERIC(14, 2) NOT NULL DEFAULT 0,
|
||||||
|
credit_supply_amount NUMERIC(14, 2) NOT NULL DEFAULT 0,
|
||||||
|
expense_amount NUMERIC(14, 2) NOT NULL DEFAULT 0,
|
||||||
|
income_amount NUMERIC(14, 2) NOT NULL DEFAULT 0,
|
||||||
|
voucher_type TEXT NOT NULL DEFAULT '',
|
||||||
|
project_nature TEXT NOT NULL DEFAULT '',
|
||||||
|
raw_batch_id INTEGER REFERENCES integration_import_batches(id) ON DELETE SET NULL,
|
||||||
|
source_row_index INTEGER NOT NULL DEFAULT 0,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE SCHEMA IF NOT EXISTS auth;
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS auth.users (
|
||||||
|
id BIGSERIAL PRIMARY KEY,
|
||||||
|
username TEXT NOT NULL UNIQUE,
|
||||||
|
password_hash TEXT NOT NULL,
|
||||||
|
display_name TEXT NOT NULL,
|
||||||
|
role TEXT NOT NULL DEFAULT 'admin',
|
||||||
|
member_id INTEGER NULL REFERENCES members(id) ON DELETE SET NULL,
|
||||||
|
is_active BOOLEAN NOT NULL DEFAULT TRUE,
|
||||||
|
created_from TEXT NOT NULL DEFAULT 'manual',
|
||||||
|
last_login_at TIMESTAMPTZ,
|
||||||
|
password_changed_at TIMESTAMPTZ,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS auth.sessions (
|
||||||
|
id UUID PRIMARY KEY,
|
||||||
|
user_id BIGINT NOT NULL REFERENCES auth.users(id) ON DELETE CASCADE,
|
||||||
|
expires_at TIMESTAMPTZ NOT NULL,
|
||||||
|
revoked_at TIMESTAMPTZ,
|
||||||
|
ip_address INET,
|
||||||
|
user_agent TEXT,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS auth.login_audit_logs (
|
||||||
|
id BIGSERIAL PRIMARY KEY,
|
||||||
|
username TEXT NOT NULL,
|
||||||
|
user_id BIGINT NULL REFERENCES auth.users(id) ON DELETE SET NULL,
|
||||||
|
success BOOLEAN NOT NULL,
|
||||||
|
failure_reason TEXT,
|
||||||
|
ip_address INET,
|
||||||
|
user_agent TEXT,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
"""
|
"""
|
||||||
|
|
||||||
MIGRATION_SQL = """
|
MIGRATION_SQL = """
|
||||||
ALTER TABLE members ADD COLUMN IF NOT EXISTS employee_id TEXT;
|
ALTER TABLE members ADD COLUMN IF NOT EXISTS employee_id TEXT;
|
||||||
ALTER TABLE members ADD COLUMN IF NOT EXISTS sort_order INTEGER NOT NULL DEFAULT 0;
|
ALTER TABLE members ADD COLUMN IF NOT EXISTS sort_order INTEGER NOT NULL DEFAULT 0;
|
||||||
|
CREATE TABLE IF NOT EXISTS member_overrides (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
employee_id TEXT NOT NULL UNIQUE,
|
||||||
|
name TEXT NOT NULL DEFAULT '',
|
||||||
|
company TEXT,
|
||||||
|
rank TEXT,
|
||||||
|
role TEXT,
|
||||||
|
department TEXT,
|
||||||
|
grp TEXT,
|
||||||
|
division TEXT,
|
||||||
|
team TEXT,
|
||||||
|
cell TEXT,
|
||||||
|
work_status TEXT,
|
||||||
|
work_time TEXT,
|
||||||
|
phone TEXT,
|
||||||
|
email TEXT,
|
||||||
|
seat_label TEXT,
|
||||||
|
photo_url TEXT,
|
||||||
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS member_retirements (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
employee_id TEXT,
|
||||||
|
name TEXT NOT NULL,
|
||||||
|
note TEXT NOT NULL DEFAULT '',
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
UNIQUE (name)
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS member_aliases (
|
||||||
|
id SERIAL PRIMARY KEY,
|
||||||
|
alias_name TEXT NOT NULL UNIQUE,
|
||||||
|
canonical_name TEXT NOT NULL,
|
||||||
|
employee_id TEXT,
|
||||||
|
note TEXT NOT NULL DEFAULT '',
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
ALTER TABLE seat_positions ADD COLUMN IF NOT EXISTS seat_map_id INTEGER REFERENCES seat_maps(id) ON DELETE CASCADE;
|
ALTER TABLE seat_positions ADD COLUMN IF NOT EXISTS seat_map_id INTEGER REFERENCES seat_maps(id) ON DELETE CASCADE;
|
||||||
ALTER TABLE seat_positions ADD COLUMN IF NOT EXISTS seat_slot_id INTEGER;
|
ALTER TABLE seat_positions ADD COLUMN IF NOT EXISTS seat_slot_id INTEGER;
|
||||||
ALTER TABLE seat_positions ADD COLUMN IF NOT EXISTS row_index INTEGER NOT NULL DEFAULT 0;
|
ALTER TABLE seat_positions ADD COLUMN IF NOT EXISTS row_index INTEGER NOT NULL DEFAULT 0;
|
||||||
@@ -136,14 +419,61 @@ BEGIN
|
|||||||
END IF;
|
END IF;
|
||||||
END $$;
|
END $$;
|
||||||
|
|
||||||
|
DO $$
|
||||||
|
BEGIN
|
||||||
|
IF NOT EXISTS (
|
||||||
|
SELECT 1
|
||||||
|
FROM information_schema.columns
|
||||||
|
WHERE table_name = 'integration_raw_mh_rows' AND column_name = 'row_values_json'
|
||||||
|
) THEN
|
||||||
|
ALTER TABLE integration_raw_mh_rows
|
||||||
|
ADD COLUMN row_values_json JSONB NOT NULL DEFAULT '[]'::jsonb;
|
||||||
|
END IF;
|
||||||
|
END $$;
|
||||||
|
|
||||||
|
DROP INDEX IF EXISTS seat_positions_map_cell_idx;
|
||||||
CREATE UNIQUE INDEX IF NOT EXISTS seat_positions_map_cell_idx
|
CREATE UNIQUE INDEX IF NOT EXISTS seat_positions_map_cell_idx
|
||||||
ON seat_positions (seat_map_id, row_index, col_index)
|
ON seat_positions (seat_map_id, row_index, col_index)
|
||||||
WHERE seat_map_id IS NOT NULL;
|
WHERE seat_map_id IS NOT NULL
|
||||||
|
AND seat_slot_id IS NULL;
|
||||||
|
|
||||||
|
CREATE UNIQUE INDEX IF NOT EXISTS member_overrides_employee_id_idx
|
||||||
|
ON member_overrides (employee_id);
|
||||||
|
|
||||||
|
CREATE UNIQUE INDEX IF NOT EXISTS member_retirements_name_idx
|
||||||
|
ON member_retirements (name);
|
||||||
|
|
||||||
|
CREATE UNIQUE INDEX IF NOT EXISTS member_aliases_alias_name_idx
|
||||||
|
ON member_aliases (alias_name);
|
||||||
|
|
||||||
CREATE UNIQUE INDEX IF NOT EXISTS seat_positions_slot_idx
|
CREATE UNIQUE INDEX IF NOT EXISTS seat_positions_slot_idx
|
||||||
ON seat_positions (seat_slot_id)
|
ON seat_positions (seat_slot_id)
|
||||||
WHERE seat_slot_id IS NOT NULL;
|
WHERE seat_slot_id IS NOT NULL;
|
||||||
|
|
||||||
|
CREATE UNIQUE INDEX IF NOT EXISTS integration_raw_organization_rows_batch_row_idx
|
||||||
|
ON integration_raw_organization_rows (batch_id, row_index);
|
||||||
|
|
||||||
|
CREATE UNIQUE INDEX IF NOT EXISTS integration_raw_mh_rows_batch_row_idx
|
||||||
|
ON integration_raw_mh_rows (batch_id, row_index);
|
||||||
|
|
||||||
|
CREATE UNIQUE INDEX IF NOT EXISTS integration_raw_mh_pm_rows_batch_row_idx
|
||||||
|
ON integration_raw_mh_pm_rows (batch_id, row_index);
|
||||||
|
|
||||||
|
CREATE UNIQUE INDEX IF NOT EXISTS integration_raw_payment_rows_batch_row_idx
|
||||||
|
ON integration_raw_payment_rows (batch_id, row_index);
|
||||||
|
|
||||||
|
CREATE INDEX IF NOT EXISTS integration_work_logs_employee_idx
|
||||||
|
ON integration_work_logs (employee_id, work_date);
|
||||||
|
|
||||||
|
CREATE INDEX IF NOT EXISTS integration_work_log_segments_project_idx
|
||||||
|
ON integration_work_log_segments (project_code, project_name);
|
||||||
|
|
||||||
|
CREATE INDEX IF NOT EXISTS integration_vouchers_project_idx
|
||||||
|
ON integration_vouchers (project_code, project_name);
|
||||||
|
|
||||||
|
CREATE UNIQUE INDEX IF NOT EXISTS integration_project_category_mappings_key_idx
|
||||||
|
ON integration_project_category_mappings (source_key, normalized_project_key);
|
||||||
|
|
||||||
DO $$
|
DO $$
|
||||||
BEGIN
|
BEGIN
|
||||||
IF NOT EXISTS (
|
IF NOT EXISTS (
|
||||||
@@ -157,6 +487,58 @@ BEGIN
|
|||||||
FOREIGN KEY (seat_slot_id) REFERENCES seat_slots(id) ON DELETE CASCADE;
|
FOREIGN KEY (seat_slot_id) REFERENCES seat_slots(id) ON DELETE CASCADE;
|
||||||
END IF;
|
END IF;
|
||||||
END $$;
|
END $$;
|
||||||
|
|
||||||
|
CREATE SCHEMA IF NOT EXISTS auth;
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS auth.users (
|
||||||
|
id BIGSERIAL PRIMARY KEY,
|
||||||
|
username TEXT NOT NULL UNIQUE,
|
||||||
|
password_hash TEXT NOT NULL,
|
||||||
|
display_name TEXT NOT NULL,
|
||||||
|
role TEXT NOT NULL DEFAULT 'admin',
|
||||||
|
member_id INTEGER NULL REFERENCES members(id) ON DELETE SET NULL,
|
||||||
|
is_active BOOLEAN NOT NULL DEFAULT TRUE,
|
||||||
|
created_from TEXT NOT NULL DEFAULT 'manual',
|
||||||
|
last_login_at TIMESTAMPTZ,
|
||||||
|
password_changed_at TIMESTAMPTZ,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS auth.sessions (
|
||||||
|
id UUID PRIMARY KEY,
|
||||||
|
user_id BIGINT NOT NULL REFERENCES auth.users(id) ON DELETE CASCADE,
|
||||||
|
expires_at TIMESTAMPTZ NOT NULL,
|
||||||
|
revoked_at TIMESTAMPTZ,
|
||||||
|
ip_address INET,
|
||||||
|
user_agent TEXT,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS auth.login_audit_logs (
|
||||||
|
id BIGSERIAL PRIMARY KEY,
|
||||||
|
username TEXT NOT NULL,
|
||||||
|
user_id BIGINT NULL REFERENCES auth.users(id) ON DELETE SET NULL,
|
||||||
|
success BOOLEAN NOT NULL,
|
||||||
|
failure_reason TEXT,
|
||||||
|
ip_address INET,
|
||||||
|
user_agent TEXT,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
ALTER TABLE auth.users ADD COLUMN IF NOT EXISTS role TEXT NOT NULL DEFAULT 'admin';
|
||||||
|
ALTER TABLE auth.users ADD COLUMN IF NOT EXISTS member_id INTEGER NULL REFERENCES members(id) ON DELETE SET NULL;
|
||||||
|
ALTER TABLE auth.users ADD COLUMN IF NOT EXISTS is_active BOOLEAN NOT NULL DEFAULT TRUE;
|
||||||
|
ALTER TABLE auth.users ADD COLUMN IF NOT EXISTS created_from TEXT NOT NULL DEFAULT 'manual';
|
||||||
|
ALTER TABLE auth.users ADD COLUMN IF NOT EXISTS last_login_at TIMESTAMPTZ;
|
||||||
|
ALTER TABLE auth.users ADD COLUMN IF NOT EXISTS password_changed_at TIMESTAMPTZ;
|
||||||
|
ALTER TABLE auth.sessions ADD COLUMN IF NOT EXISTS revoked_at TIMESTAMPTZ;
|
||||||
|
ALTER TABLE auth.sessions ADD COLUMN IF NOT EXISTS ip_address INET;
|
||||||
|
ALTER TABLE auth.sessions ADD COLUMN IF NOT EXISTS user_agent TEXT;
|
||||||
|
ALTER TABLE auth.login_audit_logs ADD COLUMN IF NOT EXISTS user_id BIGINT NULL REFERENCES auth.users(id) ON DELETE SET NULL;
|
||||||
|
ALTER TABLE auth.login_audit_logs ADD COLUMN IF NOT EXISTS failure_reason TEXT;
|
||||||
|
ALTER TABLE auth.login_audit_logs ADD COLUMN IF NOT EXISTS ip_address INET;
|
||||||
|
ALTER TABLE auth.login_audit_logs ADD COLUMN IF NOT EXISTS user_agent TEXT;
|
||||||
"""
|
"""
|
||||||
|
|
||||||
|
|
||||||
|
|||||||
1995
backend/app/main.py
1995
backend/app/main.py
File diff suppressed because it is too large
Load Diff
@@ -47,6 +47,7 @@ services:
|
|||||||
- ./DashBoard-organization.html:/app/legacy/DashBoard-organization.html:ro
|
- ./DashBoard-organization.html:/app/legacy/DashBoard-organization.html:ro
|
||||||
- ./DashBoard-organization-backup.html:/app/legacy/DashBoard-organization-backup.html:ro
|
- ./DashBoard-organization-backup.html:/app/legacy/DashBoard-organization-backup.html:ro
|
||||||
- ./legacy/static:/app/legacy/static:ro
|
- ./legacy/static:/app/legacy/static:ro
|
||||||
|
- ./incoming-files:/app/incoming-files:ro
|
||||||
- uploads_data:/data/uploads
|
- uploads_data:/data/uploads
|
||||||
restart: unless-stopped
|
restart: unless-stopped
|
||||||
healthcheck:
|
healthcheck:
|
||||||
|
|||||||
359
docs/AUTH_DB_DESIGN.md
Normal file
359
docs/AUTH_DB_DESIGN.md
Normal file
@@ -0,0 +1,359 @@
|
|||||||
|
# Auth DB Design
|
||||||
|
|
||||||
|
## Goal
|
||||||
|
|
||||||
|
현재 조직도 업무 데이터와 로그인 데이터를 분리한다.
|
||||||
|
|
||||||
|
분리 원칙:
|
||||||
|
- 업무 데이터는 기존 `public.members`, `seat_maps`, `seat_positions` 중심으로 유지
|
||||||
|
- 인증/권한 데이터는 별도 `auth` 스키마로 분리
|
||||||
|
- 로그인 사용자는 필요할 때만 `members.id` 와 연결
|
||||||
|
|
||||||
|
이 방식이면 비밀번호, 세션, 감사로그를 업무 데이터와 분리해서 관리할 수 있고,
|
||||||
|
엑셀 임포트로 `members` 가 갱신돼도 인증 체계가 직접 흔들리지 않는다.
|
||||||
|
|
||||||
|
## Scope
|
||||||
|
|
||||||
|
이번 설계의 대상:
|
||||||
|
- 사용자 계정
|
||||||
|
- 비밀번호 해시
|
||||||
|
- 세션
|
||||||
|
- 역할과 권한
|
||||||
|
- 로그인 감사로그
|
||||||
|
- 사용자와 조직 구성원 연결
|
||||||
|
|
||||||
|
이번 설계에서 제외:
|
||||||
|
- SSO 연동
|
||||||
|
- OAuth/OpenID Connect
|
||||||
|
- MFA
|
||||||
|
- 비밀번호 재설정 메일 발송
|
||||||
|
|
||||||
|
## Recommended Structure
|
||||||
|
|
||||||
|
권장 구조는 "같은 PostgreSQL, 다른 스키마" 이다.
|
||||||
|
|
||||||
|
- 업무 스키마: `public`
|
||||||
|
- 인증 스키마: `auth`
|
||||||
|
|
||||||
|
초기 운영에서는 DB 인스턴스를 분리하지 않아도 된다.
|
||||||
|
대신 아래 원칙은 바로 적용한다.
|
||||||
|
|
||||||
|
- 애플리케이션 계정도 가능하면 읽기/쓰기 범위를 분리
|
||||||
|
- 인증 관련 쿼리는 `auth.*` 만 접근
|
||||||
|
- 업무 API 는 `public.*` 중심으로 접근
|
||||||
|
|
||||||
|
## Core Tables
|
||||||
|
|
||||||
|
### `auth.users`
|
||||||
|
|
||||||
|
로그인 가능한 계정의 기준 테이블.
|
||||||
|
|
||||||
|
주요 컬럼:
|
||||||
|
- `id BIGSERIAL PRIMARY KEY`
|
||||||
|
- `username TEXT NOT NULL UNIQUE`
|
||||||
|
- `password_hash TEXT NOT NULL`
|
||||||
|
- `display_name TEXT NOT NULL`
|
||||||
|
- `email TEXT`
|
||||||
|
- `status TEXT NOT NULL DEFAULT 'active'`
|
||||||
|
- `member_id INTEGER NULL REFERENCES public.members(id) ON DELETE SET NULL`
|
||||||
|
- `last_login_at TIMESTAMPTZ`
|
||||||
|
- `password_changed_at TIMESTAMPTZ`
|
||||||
|
- `created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()`
|
||||||
|
- `updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW()`
|
||||||
|
|
||||||
|
상태값 권장:
|
||||||
|
- `active`
|
||||||
|
- `locked`
|
||||||
|
- `disabled`
|
||||||
|
|
||||||
|
원칙:
|
||||||
|
- `username` 는 로그인 식별자
|
||||||
|
- `member_id` 는 선택 연결
|
||||||
|
- 구성원이 퇴사하거나 엑셀에서 빠져도 계정 자체는 바로 삭제하지 않음
|
||||||
|
|
||||||
|
### `auth.roles`
|
||||||
|
|
||||||
|
권한 묶음 정의.
|
||||||
|
|
||||||
|
주요 컬럼:
|
||||||
|
- `id BIGSERIAL PRIMARY KEY`
|
||||||
|
- `code TEXT NOT NULL UNIQUE`
|
||||||
|
- `name TEXT NOT NULL`
|
||||||
|
- `description TEXT`
|
||||||
|
|
||||||
|
초기 권장 역할:
|
||||||
|
- `super_admin`
|
||||||
|
- `org_admin`
|
||||||
|
- `viewer`
|
||||||
|
|
||||||
|
### `auth.user_roles`
|
||||||
|
|
||||||
|
사용자와 역할의 다대다 연결.
|
||||||
|
|
||||||
|
주요 컬럼:
|
||||||
|
- `user_id BIGINT NOT NULL REFERENCES auth.users(id) ON DELETE CASCADE`
|
||||||
|
- `role_id BIGINT NOT NULL REFERENCES auth.roles(id) ON DELETE CASCADE`
|
||||||
|
- `created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()`
|
||||||
|
- `PRIMARY KEY (user_id, role_id)`
|
||||||
|
|
||||||
|
### `auth.permissions`
|
||||||
|
|
||||||
|
세분화된 권한 코드 정의.
|
||||||
|
|
||||||
|
주요 컬럼:
|
||||||
|
- `id BIGSERIAL PRIMARY KEY`
|
||||||
|
- `code TEXT NOT NULL UNIQUE`
|
||||||
|
- `name TEXT NOT NULL`
|
||||||
|
- `description TEXT`
|
||||||
|
|
||||||
|
초기 권장 권한:
|
||||||
|
- `member.read`
|
||||||
|
- `member.write`
|
||||||
|
- `member.import`
|
||||||
|
- `seatmap.read`
|
||||||
|
- `seatmap.write`
|
||||||
|
- `photo.upload`
|
||||||
|
- `admin.user.manage`
|
||||||
|
|
||||||
|
### `auth.role_permissions`
|
||||||
|
|
||||||
|
역할과 권한의 다대다 연결.
|
||||||
|
|
||||||
|
주요 컬럼:
|
||||||
|
- `role_id BIGINT NOT NULL REFERENCES auth.roles(id) ON DELETE CASCADE`
|
||||||
|
- `permission_id BIGINT NOT NULL REFERENCES auth.permissions(id) ON DELETE CASCADE`
|
||||||
|
- `created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()`
|
||||||
|
- `PRIMARY KEY (role_id, permission_id)`
|
||||||
|
|
||||||
|
### `auth.sessions`
|
||||||
|
|
||||||
|
서버 세션 저장 테이블.
|
||||||
|
|
||||||
|
주요 컬럼:
|
||||||
|
- `id UUID PRIMARY KEY`
|
||||||
|
- `user_id BIGINT NOT NULL REFERENCES auth.users(id) ON DELETE CASCADE`
|
||||||
|
- `refresh_token_hash TEXT`
|
||||||
|
- `issued_at TIMESTAMPTZ NOT NULL DEFAULT NOW()`
|
||||||
|
- `expires_at TIMESTAMPTZ NOT NULL`
|
||||||
|
- `revoked_at TIMESTAMPTZ`
|
||||||
|
- `ip_address INET`
|
||||||
|
- `user_agent TEXT`
|
||||||
|
- `created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()`
|
||||||
|
|
||||||
|
원칙:
|
||||||
|
- 브라우저 쿠키에는 세션 식별자만 저장
|
||||||
|
- 토큰 자체를 평문으로 DB에 저장하지 않음
|
||||||
|
- 만료와 강제 로그아웃을 DB에서 통제 가능하게 함
|
||||||
|
|
||||||
|
### `auth.login_audit_logs`
|
||||||
|
|
||||||
|
로그인 시도와 결과 기록.
|
||||||
|
|
||||||
|
주요 컬럼:
|
||||||
|
- `id BIGSERIAL PRIMARY KEY`
|
||||||
|
- `username TEXT NOT NULL`
|
||||||
|
- `user_id BIGINT NULL REFERENCES auth.users(id) ON DELETE SET NULL`
|
||||||
|
- `success BOOLEAN NOT NULL`
|
||||||
|
- `failure_reason TEXT`
|
||||||
|
- `ip_address INET`
|
||||||
|
- `user_agent TEXT`
|
||||||
|
- `created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()`
|
||||||
|
|
||||||
|
용도:
|
||||||
|
- 로그인 실패 추적
|
||||||
|
- 계정 잠금 기준 판단
|
||||||
|
- 보안 감사 대응
|
||||||
|
|
||||||
|
## Relationship To Current `members`
|
||||||
|
|
||||||
|
핵심은 `auth.users.member_id -> public.members.id` 연결이다.
|
||||||
|
|
||||||
|
의미:
|
||||||
|
- 로그인 계정과 조직도 인원을 분리한다
|
||||||
|
- 로그인하지 않는 구성원은 `members` 에만 있어도 된다
|
||||||
|
- 외부 관리자 계정은 `member_id` 없이 운영할 수 있다
|
||||||
|
|
||||||
|
권장 규칙:
|
||||||
|
- 일반 사내 사용자는 `employee_id` 기준으로 계정-구성원 연결
|
||||||
|
- 엑셀 동기화 시 `members.id` 유지가 중요하므로 이미 반영한 비교 기반 동기화 방식을 유지
|
||||||
|
- `member_id` 연결이 끊긴 계정은 자동 삭제하지 말고 관리자 검토 대상으로 둔다
|
||||||
|
|
||||||
|
## Login Flow
|
||||||
|
|
||||||
|
### 1. 로그인 요청
|
||||||
|
|
||||||
|
입력:
|
||||||
|
- `username`
|
||||||
|
- `password`
|
||||||
|
|
||||||
|
처리:
|
||||||
|
- `auth.users` 에서 `username` 조회
|
||||||
|
- `status != active` 이면 거부
|
||||||
|
- `password_hash` 검증
|
||||||
|
- 성공 시 `auth.sessions` 생성
|
||||||
|
- `auth.login_audit_logs` 기록
|
||||||
|
|
||||||
|
응답 권장:
|
||||||
|
- 사용자 기본 정보
|
||||||
|
- 역할 목록
|
||||||
|
- 권한 목록
|
||||||
|
- 세션 만료 시각
|
||||||
|
|
||||||
|
### 2. 인증 확인
|
||||||
|
|
||||||
|
각 보호 API 요청 시:
|
||||||
|
- 세션 쿠키 또는 Bearer 토큰 확인
|
||||||
|
- `auth.sessions` 조회
|
||||||
|
- 만료/폐기 여부 확인
|
||||||
|
- 사용자 상태와 역할 재검증
|
||||||
|
|
||||||
|
### 3. 로그아웃
|
||||||
|
|
||||||
|
처리:
|
||||||
|
- 현재 세션의 `revoked_at` 업데이트
|
||||||
|
- 클라이언트 쿠키 제거
|
||||||
|
|
||||||
|
## Authorization Model
|
||||||
|
|
||||||
|
초기에는 RBAC 기반으로 충분하다.
|
||||||
|
|
||||||
|
권장 역할별 범위:
|
||||||
|
|
||||||
|
`super_admin`
|
||||||
|
- 사용자 관리
|
||||||
|
- 권한 관리
|
||||||
|
- 조직도/사진/자리배치 전체 수정
|
||||||
|
|
||||||
|
`org_admin`
|
||||||
|
- 조직도 조회/수정
|
||||||
|
- 엑셀 임포트
|
||||||
|
- 사진 업로드
|
||||||
|
- 자리배치 수정
|
||||||
|
|
||||||
|
`viewer`
|
||||||
|
- 조직도 조회
|
||||||
|
- 자리배치 조회
|
||||||
|
|
||||||
|
API 보호 예시:
|
||||||
|
- `GET /api/members`: `member.read`
|
||||||
|
- `POST /api/members/import`: `member.import`
|
||||||
|
- `POST /api/uploads/profile-photo`: `photo.upload`
|
||||||
|
- `PUT /api/seat-maps/{seat_map_id}/layout`: `seatmap.write`
|
||||||
|
- 사용자 관리 API: `admin.user.manage`
|
||||||
|
|
||||||
|
## Password Policy
|
||||||
|
|
||||||
|
비밀번호는 평문 저장 금지.
|
||||||
|
|
||||||
|
권장:
|
||||||
|
- `Argon2id` 우선
|
||||||
|
- 대안으로 `bcrypt`
|
||||||
|
|
||||||
|
추가 원칙:
|
||||||
|
- 첫 구현부터 해시 알고리즘 버전 정보 포함
|
||||||
|
- 비밀번호 변경 시 `password_changed_at` 갱신
|
||||||
|
- 실패 횟수 기반 잠금은 앱 로직 또는 별도 컬럼으로 확장 가능
|
||||||
|
|
||||||
|
## Migration Plan
|
||||||
|
|
||||||
|
### Phase 1
|
||||||
|
|
||||||
|
인증 스키마와 기본 테이블만 추가.
|
||||||
|
|
||||||
|
작업:
|
||||||
|
- `CREATE SCHEMA IF NOT EXISTS auth`
|
||||||
|
- `auth.users`
|
||||||
|
- `auth.roles`
|
||||||
|
- `auth.user_roles`
|
||||||
|
- `auth.permissions`
|
||||||
|
- `auth.role_permissions`
|
||||||
|
- `auth.sessions`
|
||||||
|
- `auth.login_audit_logs`
|
||||||
|
|
||||||
|
이 단계에서는 기존 `/api/mock-login` 유지 가능.
|
||||||
|
|
||||||
|
### Phase 2
|
||||||
|
|
||||||
|
관리자 1명 이상을 수동 생성하고 실제 로그인 API 추가.
|
||||||
|
|
||||||
|
권장 추가 API:
|
||||||
|
- `POST /api/auth/login`
|
||||||
|
- `POST /api/auth/logout`
|
||||||
|
- `GET /api/auth/me`
|
||||||
|
|
||||||
|
### Phase 3
|
||||||
|
|
||||||
|
기존 프론트엔드의 mock 로그인 제거.
|
||||||
|
|
||||||
|
변경 대상:
|
||||||
|
- [frontend/public/app.js](/home/hyunho/projects/mh-dashboard-organization/frontend/public/app.js)
|
||||||
|
- [backend/app/main.py](/home/hyunho/projects/mh-dashboard-organization/backend/app/main.py)
|
||||||
|
- [backend/app/config.py](/home/hyunho/projects/mh-dashboard-organization/backend/app/config.py)
|
||||||
|
|
||||||
|
### Phase 4
|
||||||
|
|
||||||
|
권한 기반으로 API 보호 적용.
|
||||||
|
|
||||||
|
우선순위:
|
||||||
|
1. 쓰기 API 보호
|
||||||
|
2. 업로드 API 보호
|
||||||
|
3. 읽기 API 권한 정리
|
||||||
|
|
||||||
|
## Recommended SQL Skeleton
|
||||||
|
|
||||||
|
```sql
|
||||||
|
CREATE SCHEMA IF NOT EXISTS auth;
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS auth.users (
|
||||||
|
id BIGSERIAL PRIMARY KEY,
|
||||||
|
username TEXT NOT NULL UNIQUE,
|
||||||
|
password_hash TEXT NOT NULL,
|
||||||
|
display_name TEXT NOT NULL,
|
||||||
|
email TEXT,
|
||||||
|
status TEXT NOT NULL DEFAULT 'active',
|
||||||
|
member_id INTEGER NULL REFERENCES public.members(id) ON DELETE SET NULL,
|
||||||
|
last_login_at TIMESTAMPTZ,
|
||||||
|
password_changed_at TIMESTAMPTZ,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
updated_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS auth.roles (
|
||||||
|
id BIGSERIAL PRIMARY KEY,
|
||||||
|
code TEXT NOT NULL UNIQUE,
|
||||||
|
name TEXT NOT NULL,
|
||||||
|
description TEXT
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS auth.user_roles (
|
||||||
|
user_id BIGINT NOT NULL REFERENCES auth.users(id) ON DELETE CASCADE,
|
||||||
|
role_id BIGINT NOT NULL REFERENCES auth.roles(id) ON DELETE CASCADE,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
PRIMARY KEY (user_id, role_id)
|
||||||
|
);
|
||||||
|
|
||||||
|
CREATE TABLE IF NOT EXISTS auth.sessions (
|
||||||
|
id UUID PRIMARY KEY,
|
||||||
|
user_id BIGINT NOT NULL REFERENCES auth.users(id) ON DELETE CASCADE,
|
||||||
|
refresh_token_hash TEXT,
|
||||||
|
issued_at TIMESTAMPTZ NOT NULL DEFAULT NOW(),
|
||||||
|
expires_at TIMESTAMPTZ NOT NULL,
|
||||||
|
revoked_at TIMESTAMPTZ,
|
||||||
|
ip_address INET,
|
||||||
|
user_agent TEXT,
|
||||||
|
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
|
||||||
|
);
|
||||||
|
```
|
||||||
|
|
||||||
|
## Operational Notes
|
||||||
|
|
||||||
|
- 엑셀 임포트는 계속 `public.members` 기준으로 처리
|
||||||
|
- 로그인 계정 생성은 엑셀 업로드와 분리
|
||||||
|
- 프로필 사진은 현재처럼 파일 저장 + `members.photo_url` 참조 유지 가능
|
||||||
|
- 감사로그와 세션은 삭제보다 보존 기간 정책으로 관리
|
||||||
|
|
||||||
|
## Decision
|
||||||
|
|
||||||
|
현재 프로젝트의 권장안은 아래 한 줄로 정리된다.
|
||||||
|
|
||||||
|
"로그인 DB는 `auth` 스키마로 분리하고, 업무 DB는 `public` 에 유지하며, 두 영역은 `auth.users.member_id` 로만 연결한다."
|
||||||
177
docs/DEVELOPMENT_HISTORY.md
Normal file
177
docs/DEVELOPMENT_HISTORY.md
Normal file
@@ -0,0 +1,177 @@
|
|||||||
|
# Development History
|
||||||
|
|
||||||
|
## Purpose
|
||||||
|
|
||||||
|
이 문서는 `total` 브랜치에서 진행한 통합 작업을 기능 단위로 정리한 개발 히스토리다.
|
||||||
|
목표는 다음 두 가지다.
|
||||||
|
|
||||||
|
- 지금까지 어떤 기능을 어떤 방식으로 붙였는지 빠르게 파악
|
||||||
|
- 이후 유지보수나 추가 개발 시, 왜 그렇게 구현했는지 추적 가능하게 하기
|
||||||
|
|
||||||
|
## 1. 대시보드 허브 통합
|
||||||
|
|
||||||
|
### 작업 내용
|
||||||
|
|
||||||
|
- `조직 현황`, `프로젝트별 분석`, `팀/개인별 분석`, `자리배치도`를 하나의 메인 허브에서 오갈 수 있도록 통합
|
||||||
|
- 공통 헤더, 로그인 정보, 탭 전환, 공통 기간 캘린더 구성
|
||||||
|
- `payment.html`, `mh.html`은 초기에는 iframe 연결 방식으로 편입
|
||||||
|
|
||||||
|
### 해결 방식
|
||||||
|
|
||||||
|
- 기존 화면을 새로 재개발하지 않고, 먼저 메인 허브 안에 편입
|
||||||
|
- 이후 데이터는 공통 API/DB 기준으로 전환하는 2단계 방식 채택
|
||||||
|
|
||||||
|
## 2. 조직현황 고도화
|
||||||
|
|
||||||
|
### 작업 내용
|
||||||
|
|
||||||
|
- 조직도 레거시 화면을 메인 허브에 연결
|
||||||
|
- 관리자/비관리자 모드 정리
|
||||||
|
- 구성원 상세 프로필 개선
|
||||||
|
- 프로필 사진 업로드 연동
|
||||||
|
- `재석위치` 카드 추가
|
||||||
|
|
||||||
|
### 해결 방식
|
||||||
|
|
||||||
|
- 레거시 조직도 화면은 유지하되 API를 통해 `members`를 읽는 구조로 전환
|
||||||
|
- 상세 프로필의 `재석위치`는 문자열이 아니라 실제 자리배치도 viewer preview를 붙이는 방식으로 변경
|
||||||
|
|
||||||
|
## 3. 자리배치도 기능 재구성
|
||||||
|
|
||||||
|
### 작업 내용
|
||||||
|
|
||||||
|
- `기술개발센터` 고정 도면 기준 자리배치도 viewer 구성
|
||||||
|
- 관리자 편집 화면과 비관리자 열람 화면 분리
|
||||||
|
- 조직도에서 `+` 버튼으로 자리배치도 진입
|
||||||
|
- 배치된 좌석의 이름/직급 라벨 표시
|
||||||
|
- 좌석 hover, 클릭, 자리 비우기, 미배치 목록 복귀 흐름 구현
|
||||||
|
|
||||||
|
### 해결 방식
|
||||||
|
|
||||||
|
- DXF 업로드 기반 편집을 그대로 밀기보다, 실제 업무에 맞는 고정 도면 중심 구조로 정리
|
||||||
|
- viewer 코드는 공통으로 쓰되, 화면은
|
||||||
|
- 관리자 편집
|
||||||
|
- 비관리자 열람
|
||||||
|
- 구성원 상세 preview
|
||||||
|
로 역할 분리
|
||||||
|
|
||||||
|
## 4. 자리배치도 저장 문제 해결
|
||||||
|
|
||||||
|
### 문제
|
||||||
|
|
||||||
|
- 관리자 화면에서는 배치가 된 것처럼 보여도 저장 후 조직도 상세 프로필에서는 `미배치`
|
||||||
|
- 비관리자 자리배치도에서도 배치 결과가 보이지 않음
|
||||||
|
|
||||||
|
### 원인
|
||||||
|
|
||||||
|
- `seat_positions_map_cell_idx (seat_map_id, row_index, col_index)` 유니크 인덱스가 슬롯 기반 도면에도 그대로 적용됨
|
||||||
|
- 고정 도면 배치는 실제로 `seat_slot_id` 기준 저장인데, 모든 배치가 `(row_index=0, col_index=0)`으로 들어가 충돌
|
||||||
|
- 그 결과 두 번째 좌석부터 `500 Internal Server Error`로 저장 실패
|
||||||
|
|
||||||
|
### 해결
|
||||||
|
|
||||||
|
- 슬롯 기반 도면에서는 `(seat_map_id, row_index, col_index)` 인덱스가 적용되지 않도록 수정
|
||||||
|
- `seat_positions` 저장 후 `members.seat_label`도 같이 동기화
|
||||||
|
- 조직도 iframe은 저장 완료 후 `seatmap-layout-updated` 메시지를 받아 cache를 비우고 재조회
|
||||||
|
|
||||||
|
### 결과
|
||||||
|
|
||||||
|
- 관리자 자리배치 저장이 실제 DB까지 반영됨
|
||||||
|
- 저장된 배치는 재접속 후에도 유지
|
||||||
|
- 조직현황 상세 프로필과 비관리자 자리배치도에서도 같은 배치를 읽을 수 있는 구조가 됨
|
||||||
|
|
||||||
|
## 5. 통합 DB 구축
|
||||||
|
|
||||||
|
### 작업 내용
|
||||||
|
|
||||||
|
- `organization.xlsx`
|
||||||
|
- `MH.xlsx`
|
||||||
|
- `payment.csv`
|
||||||
|
|
||||||
|
세 원본을 하나의 PostgreSQL 기준으로 적재
|
||||||
|
|
||||||
|
### 핵심 테이블
|
||||||
|
|
||||||
|
- `members`
|
||||||
|
- `seat_maps`
|
||||||
|
- `seat_slots`
|
||||||
|
- `seat_positions`
|
||||||
|
- `integration_raw_organization_rows`
|
||||||
|
- `integration_raw_mh_rows`
|
||||||
|
- `integration_raw_payment_rows`
|
||||||
|
- `integration_work_logs`
|
||||||
|
- `integration_work_log_segments`
|
||||||
|
- `integration_vouchers`
|
||||||
|
- `integration_projects`
|
||||||
|
- `integration_project_category_mappings`
|
||||||
|
|
||||||
|
### 해결 방식
|
||||||
|
|
||||||
|
- 원본 보존용 raw 테이블과 운영용 표준 테이블을 분리
|
||||||
|
- 화면이 직접 파일을 읽지 않고, DB와 API를 통해 같은 데이터를 보도록 정리
|
||||||
|
|
||||||
|
## 6. 프로젝트별 분석 통합
|
||||||
|
|
||||||
|
### 작업 내용
|
||||||
|
|
||||||
|
- `opayment.html` 원본 기준으로 화면, 카테고리, 계산식 복원
|
||||||
|
- `payment.csv`와 `MH.xlsx`를 함께 쓰는 구조로 정리
|
||||||
|
- `payment.csv` 분류를 1순위, `ptj.csv` 프로젝트 매핑을 2순위로 적용
|
||||||
|
|
||||||
|
### 해결한 문제
|
||||||
|
|
||||||
|
- 연장근무 시간을 `실제`가 아니라 `가공` 기준으로 써야 원본과 총합이 맞음
|
||||||
|
- 프로젝트 분류는 `payment.csv`만으로 부족해 `ptj.csv` 보정이 필요
|
||||||
|
|
||||||
|
### 결과
|
||||||
|
|
||||||
|
- 총합과 대부분의 프로젝트 집계가 원본 `opayment` 기준에 가깝게 정렬됨
|
||||||
|
- 남은 차이는 소수점 또는 추가 매핑 보정 수준으로 축소
|
||||||
|
|
||||||
|
## 7. 팀/개인별 분석 통합
|
||||||
|
|
||||||
|
### 작업 내용
|
||||||
|
|
||||||
|
- `omh.html` 원본 기준으로 화면, 카테고리, 계산식 복원
|
||||||
|
- 업로드형이 아니라 통합 DB raw MH 데이터를 다시 공급하는 방식으로 전환
|
||||||
|
|
||||||
|
### 해결 방식
|
||||||
|
|
||||||
|
- 원본 `MH.xlsx` 시트 구조가 깨지지 않도록 row 배열 자체를 DB에 저장
|
||||||
|
- 팀별 진행 프로젝트 등 원본 계산식이 기대하는 입력 구조를 그대로 재현
|
||||||
|
|
||||||
|
## 8. 조직 데이터 운영 정리
|
||||||
|
|
||||||
|
### 작업 내용
|
||||||
|
|
||||||
|
- 이름 alias, 퇴사 제외, 조직 override를 코드 상수에서 제거
|
||||||
|
- DB 테이블 기반 운영으로 전환
|
||||||
|
|
||||||
|
### 운영 테이블
|
||||||
|
|
||||||
|
- `member_aliases`
|
||||||
|
- `member_retirements`
|
||||||
|
- `member_overrides`
|
||||||
|
|
||||||
|
### 결과
|
||||||
|
|
||||||
|
- 이름 치환, 퇴사 제외, 팀/직책 예외를 코드 수정 없이 DB에서 관리 가능
|
||||||
|
|
||||||
|
## 9. 외부 접속 설정
|
||||||
|
|
||||||
|
### 작업 내용
|
||||||
|
|
||||||
|
- WSL 내부 `0.0.0.0:8080` 바인딩 확인
|
||||||
|
- Windows host에서 `portproxy`와 방화벽 규칙으로 다른 PC 접속 가능하게 정리
|
||||||
|
|
||||||
|
### 유의사항
|
||||||
|
|
||||||
|
- Windows LAN IP 또는 WSL IP가 바뀌면 `portproxy`의 `connectaddress`는 다시 맞춰야 한다
|
||||||
|
- 운영 안정성을 위해 향후 자동화 스크립트화가 필요함
|
||||||
|
|
||||||
|
## Next Focus
|
||||||
|
|
||||||
|
- 프로젝트별 분석의 남은 소수점/분류 오차 정리
|
||||||
|
- 자리배치도 색상/조직 트리 등 추가 UX 기능 고도화
|
||||||
|
- 실제 인증 체계 전환
|
||||||
|
- 나머지 사무실 도면 추가
|
||||||
263
docs/INTEGRATION_DB_PLAN.md
Normal file
263
docs/INTEGRATION_DB_PLAN.md
Normal file
@@ -0,0 +1,263 @@
|
|||||||
|
# Integration DB Plan
|
||||||
|
|
||||||
|
## Goal
|
||||||
|
|
||||||
|
`organization.xlsx`, `MH.xlsx`, `payment.csv`를 하나의 통합 DB로 수용하고,
|
||||||
|
`조직 현황`, `프로젝트별 분석`, `팀/개인별 분석`, `자리배치도`가 같은 기준 데이터를 바라보도록 정리한다.
|
||||||
|
|
||||||
|
## Source Summary
|
||||||
|
|
||||||
|
### 1. `organization.xlsx`
|
||||||
|
|
||||||
|
용도:
|
||||||
|
- 인원 기본 정보
|
||||||
|
- 조직 구조
|
||||||
|
|
||||||
|
주요 컬럼:
|
||||||
|
- `name`
|
||||||
|
- `tag`
|
||||||
|
- `rank`
|
||||||
|
- `pos`
|
||||||
|
- `co`
|
||||||
|
- `cell`
|
||||||
|
- `team`
|
||||||
|
- `div`
|
||||||
|
- `gr`
|
||||||
|
- `part`
|
||||||
|
- `ph`
|
||||||
|
- `mail`
|
||||||
|
|
||||||
|
해석:
|
||||||
|
- `tag`는 사번 또는 내부 인원 식별자로 사용
|
||||||
|
- 조직 정보는 `part > gr > div > team > cell` 구조
|
||||||
|
|
||||||
|
### 2. `MH.xlsx`
|
||||||
|
|
||||||
|
용도:
|
||||||
|
- 일자별 인원 근무 실적
|
||||||
|
- 프로젝트별 투입 시간
|
||||||
|
- 연장근무 포함 세부 투입 슬롯
|
||||||
|
|
||||||
|
주요 컬럼:
|
||||||
|
- `근무일자`
|
||||||
|
- `팀 분류`
|
||||||
|
- `팀`
|
||||||
|
- `사원번호`
|
||||||
|
- `이름`
|
||||||
|
- `직책`
|
||||||
|
- `user_state`
|
||||||
|
- `시차시간`
|
||||||
|
- `메인업무/추가업무1~5/연장근무`
|
||||||
|
- `프로젝트 코드`
|
||||||
|
- `프로젝트명`
|
||||||
|
- `서브 코드`
|
||||||
|
- `근무시간`
|
||||||
|
|
||||||
|
추가 시트:
|
||||||
|
- `Sheet2`
|
||||||
|
- 프로젝트 코드와 PM 이름 매핑으로 추정
|
||||||
|
|
||||||
|
### 3. `payment.csv`
|
||||||
|
|
||||||
|
용도:
|
||||||
|
- 프로젝트별 수입/지출 전표
|
||||||
|
|
||||||
|
주요 컬럼:
|
||||||
|
- `프로젝트코드`
|
||||||
|
- `사업명`
|
||||||
|
- `사업명(표출PJT)`
|
||||||
|
- `사업명(인트라넷기준)`
|
||||||
|
- `사업분야`
|
||||||
|
- `세부분야`
|
||||||
|
- `부서명`
|
||||||
|
- `팀명`
|
||||||
|
- `거래처`
|
||||||
|
- `적요`
|
||||||
|
- `차변공급가`
|
||||||
|
- `대변공급가`
|
||||||
|
- `지출`
|
||||||
|
- `수입`
|
||||||
|
- `구분`
|
||||||
|
- `프로젝트성격`
|
||||||
|
|
||||||
|
## Recommended Model
|
||||||
|
|
||||||
|
### Raw Layer
|
||||||
|
|
||||||
|
원본을 그대로 적재하는 영역.
|
||||||
|
|
||||||
|
- `raw_organization_import`
|
||||||
|
- `raw_mh_import`
|
||||||
|
- `raw_payment_import`
|
||||||
|
|
||||||
|
원칙:
|
||||||
|
- 원본 행을 최대한 손대지 않고 저장
|
||||||
|
- 파일명, 업로드시각, 배치 ID 같이 저장
|
||||||
|
|
||||||
|
### Standard Layer
|
||||||
|
|
||||||
|
정규화된 운영 테이블.
|
||||||
|
|
||||||
|
#### Members
|
||||||
|
|
||||||
|
- `members`
|
||||||
|
- `id`
|
||||||
|
- `employee_id`
|
||||||
|
- `name`
|
||||||
|
- `company`
|
||||||
|
- `rank`
|
||||||
|
- `position`
|
||||||
|
- `phone`
|
||||||
|
- `email`
|
||||||
|
- `active`
|
||||||
|
|
||||||
|
#### Organization
|
||||||
|
|
||||||
|
- `org_units`
|
||||||
|
- `id`
|
||||||
|
- `unit_type`
|
||||||
|
- `name`
|
||||||
|
- `parent_id`
|
||||||
|
|
||||||
|
- `member_org_assignments`
|
||||||
|
- `id`
|
||||||
|
- `member_id`
|
||||||
|
- `part_name`
|
||||||
|
- `group_name`
|
||||||
|
- `division_name`
|
||||||
|
- `team_name`
|
||||||
|
- `cell_name`
|
||||||
|
- `effective_from`
|
||||||
|
- `effective_to`
|
||||||
|
|
||||||
|
#### Projects
|
||||||
|
|
||||||
|
- `projects`
|
||||||
|
- `id`
|
||||||
|
- `project_code`
|
||||||
|
- `project_name`
|
||||||
|
- `display_name`
|
||||||
|
- `intranet_name`
|
||||||
|
- `domain`
|
||||||
|
- `subdomain`
|
||||||
|
- `project_type`
|
||||||
|
- `project_nature`
|
||||||
|
|
||||||
|
- `project_aliases`
|
||||||
|
- `id`
|
||||||
|
- `project_id`
|
||||||
|
- `alias_type`
|
||||||
|
- `alias_value`
|
||||||
|
|
||||||
|
- `project_pm_assignments`
|
||||||
|
- `id`
|
||||||
|
- `project_id`
|
||||||
|
- `member_id`
|
||||||
|
- `source`
|
||||||
|
|
||||||
|
#### Work Logs
|
||||||
|
|
||||||
|
- `work_logs`
|
||||||
|
- `id`
|
||||||
|
- `member_id`
|
||||||
|
- `work_date`
|
||||||
|
- `team_category`
|
||||||
|
- `team_name`
|
||||||
|
- `user_state`
|
||||||
|
- `shift_hours`
|
||||||
|
- `late_flag`
|
||||||
|
|
||||||
|
- `work_log_segments`
|
||||||
|
- `id`
|
||||||
|
- `work_log_id`
|
||||||
|
- `project_id`
|
||||||
|
- `activity_code`
|
||||||
|
- `hours`
|
||||||
|
- `is_overtime`
|
||||||
|
- `slot_type`
|
||||||
|
|
||||||
|
#### Vouchers
|
||||||
|
|
||||||
|
- `vouchers`
|
||||||
|
- `id`
|
||||||
|
- `company_name`
|
||||||
|
- `request_date`
|
||||||
|
- `issue_date`
|
||||||
|
- `issue_month`
|
||||||
|
- `account_code`
|
||||||
|
- `management_account_code`
|
||||||
|
- `project_id`
|
||||||
|
- `department_name`
|
||||||
|
- `team_name`
|
||||||
|
- `customer_name`
|
||||||
|
- `summary`
|
||||||
|
- `debit_amount`
|
||||||
|
- `credit_amount`
|
||||||
|
- `expense_amount`
|
||||||
|
- `income_amount`
|
||||||
|
- `voucher_type`
|
||||||
|
- `project_nature`
|
||||||
|
- `note`
|
||||||
|
|
||||||
|
#### Reference
|
||||||
|
|
||||||
|
- `member_cost_rates`
|
||||||
|
- 직급별 표준 인건비
|
||||||
|
|
||||||
|
## Matching Rules
|
||||||
|
|
||||||
|
### Member Match
|
||||||
|
|
||||||
|
우선순위:
|
||||||
|
1. `MH.xlsx.사원번호`
|
||||||
|
2. `organization.xlsx.tag`
|
||||||
|
3. 이름 단독 매칭은 보조 규칙으로만 사용
|
||||||
|
|
||||||
|
원칙:
|
||||||
|
- `employee_id`가 있으면 그 값으로 병합
|
||||||
|
- 이름만 같은 경우 자동 병합 금지
|
||||||
|
|
||||||
|
### Project Match
|
||||||
|
|
||||||
|
우선순위:
|
||||||
|
1. `project_code`
|
||||||
|
2. `사업명(인트라넷기준)`
|
||||||
|
3. `사업명(표출PJT)`
|
||||||
|
4. `프로젝트명`
|
||||||
|
|
||||||
|
원칙:
|
||||||
|
- `project_code`를 정식 키로 사용
|
||||||
|
- 이름 차이는 `project_aliases`로 흡수
|
||||||
|
|
||||||
|
## Migration Strategy
|
||||||
|
|
||||||
|
### Phase 1
|
||||||
|
|
||||||
|
- `payment.html`, `mh.html`을 현재 대시보드 탭에 편입
|
||||||
|
- 기존 HTML 기능은 유지
|
||||||
|
- 파일은 backend route를 통해 iframe으로 연결
|
||||||
|
|
||||||
|
### Phase 2
|
||||||
|
|
||||||
|
- raw import 테이블 생성
|
||||||
|
- 원본 3종 import 스크립트 작성
|
||||||
|
- 파일별 업로드/재적재 배치 ID 관리
|
||||||
|
|
||||||
|
### Phase 3
|
||||||
|
|
||||||
|
- 표준 테이블 생성
|
||||||
|
- raw -> standard 정규화 파이프라인 작성
|
||||||
|
- 멤버/프로젝트 매핑 규칙 적용
|
||||||
|
|
||||||
|
### Phase 4
|
||||||
|
|
||||||
|
- `payment.html`, `mh.html`의 파일 직접 파싱 로직을 API 기반 조회로 전환
|
||||||
|
- 프론트는 공통 DB 기준으로만 동작
|
||||||
|
|
||||||
|
## Immediate Next Tasks
|
||||||
|
|
||||||
|
1. Postgres 스키마 초안 SQL 작성
|
||||||
|
2. `payment.csv` import 파서 작성
|
||||||
|
3. `MH.xlsx` import 파서 작성
|
||||||
|
4. `organization.xlsx` import 파서 작성
|
||||||
|
5. 멤버/프로젝트 중복 병합 규칙 구현
|
||||||
@@ -8,9 +8,16 @@ const logoutBtn = document.getElementById("logout-btn");
|
|||||||
const userBadge = document.getElementById("user-badge");
|
const userBadge = document.getElementById("user-badge");
|
||||||
const userPopover = document.getElementById("user-popover");
|
const userPopover = document.getElementById("user-popover");
|
||||||
const currentViewTitle = document.getElementById("current-view-title");
|
const currentViewTitle = document.getElementById("current-view-title");
|
||||||
|
const globalDateControls = document.getElementById("global-date-controls");
|
||||||
|
const globalStartDateInput = document.getElementById("global-start-date");
|
||||||
|
const globalEndDateInput = document.getElementById("global-end-date");
|
||||||
const navButtons = Array.from(document.querySelectorAll(".header-center [data-view]"));
|
const navButtons = Array.from(document.querySelectorAll(".header-center [data-view]"));
|
||||||
const organizationFrame = document.getElementById("organization-frame");
|
const organizationFrame = document.getElementById("organization-frame");
|
||||||
const organizationStage = document.getElementById("organization-stage");
|
const organizationStage = document.getElementById("organization-stage");
|
||||||
|
const projectFrame = document.getElementById("project-frame");
|
||||||
|
const projectStage = document.getElementById("project-stage");
|
||||||
|
const teamFrame = document.getElementById("team-frame");
|
||||||
|
const teamStage = document.getElementById("team-stage");
|
||||||
const seatMapAdminStage = document.getElementById("seatmap-admin-stage");
|
const seatMapAdminStage = document.getElementById("seatmap-admin-stage");
|
||||||
const seatMapReadonlyStage = document.getElementById("seatmap-readonly-stage");
|
const seatMapReadonlyStage = document.getElementById("seatmap-readonly-stage");
|
||||||
const emptyStage = document.getElementById("empty-stage");
|
const emptyStage = document.getElementById("empty-stage");
|
||||||
@@ -142,6 +149,11 @@ const seatMapState = {
|
|||||||
};
|
};
|
||||||
|
|
||||||
let currentView = "organization";
|
let currentView = "organization";
|
||||||
|
const globalDateState = {
|
||||||
|
loaded: true,
|
||||||
|
startDate: "2026-01-01",
|
||||||
|
endDate: "2026-01-31",
|
||||||
|
};
|
||||||
|
|
||||||
function getSession() {
|
function getSession() {
|
||||||
try {
|
try {
|
||||||
@@ -159,6 +171,71 @@ function clearSession() {
|
|||||||
sessionStorage.removeItem(sessionKey);
|
sessionStorage.removeItem(sessionKey);
|
||||||
}
|
}
|
||||||
|
|
||||||
|
function buildAuthHeaders(headers) {
|
||||||
|
const nextHeaders = new Headers(headers || {});
|
||||||
|
const token = getSession()?.token;
|
||||||
|
if (token && !nextHeaders.has("Authorization")) {
|
||||||
|
nextHeaders.set("Authorization", `Bearer ${token}`);
|
||||||
|
}
|
||||||
|
return nextHeaders;
|
||||||
|
}
|
||||||
|
|
||||||
|
function shouldShowGlobalDateControls() {
|
||||||
|
return currentView === "ledger" || currentView === "project" || currentView === "team" || currentView === "organization";
|
||||||
|
}
|
||||||
|
|
||||||
|
function syncGlobalDateControlVisibility() {
|
||||||
|
if (!globalDateControls) return;
|
||||||
|
globalDateControls.classList.toggle("hidden", !shouldShowGlobalDateControls());
|
||||||
|
}
|
||||||
|
|
||||||
|
function syncGlobalDateControlInputs() {
|
||||||
|
if (globalStartDateInput) globalStartDateInput.value = globalDateState.startDate || "";
|
||||||
|
if (globalEndDateInput) globalEndDateInput.value = globalDateState.endDate || "";
|
||||||
|
}
|
||||||
|
|
||||||
|
function getGlobalDateRangePayload() {
|
||||||
|
return {
|
||||||
|
source: "total-control",
|
||||||
|
type: "date-range",
|
||||||
|
startDate: globalDateState.startDate || "",
|
||||||
|
endDate: globalDateState.endDate || "",
|
||||||
|
};
|
||||||
|
}
|
||||||
|
|
||||||
|
function postGlobalDateRangeToFrame(frame) {
|
||||||
|
if (!frame?.contentWindow || !globalDateState.loaded) return;
|
||||||
|
frame.contentWindow.postMessage(getGlobalDateRangePayload(), window.location.origin);
|
||||||
|
}
|
||||||
|
|
||||||
|
function notifyEmbeddedTabActivated() {
|
||||||
|
if (currentView === "project" && projectFrame?.contentWindow) {
|
||||||
|
projectFrame.contentWindow.postMessage({ source: "total-control", type: "tab-activated", tab: "project" }, window.location.origin);
|
||||||
|
}
|
||||||
|
if (currentView === "team" && teamFrame?.contentWindow) {
|
||||||
|
teamFrame.contentWindow.postMessage({ source: "total-control", type: "tab-activated", tab: "mh" }, window.location.origin);
|
||||||
|
}
|
||||||
|
}
|
||||||
|
|
||||||
|
async function ensureGlobalDateRangeLoaded() {
|
||||||
|
if (globalDateState.loaded) return;
|
||||||
|
try {
|
||||||
|
const payload = await fetchJson("/api/integration/summary");
|
||||||
|
const work = payload?.date_ranges?.work || {};
|
||||||
|
const voucher = payload?.date_ranges?.voucher || {};
|
||||||
|
const starts = [work.min_work_date, voucher.min_voucher_date].filter(Boolean).sort();
|
||||||
|
const ends = [work.max_work_date, voucher.max_voucher_date].filter(Boolean).sort();
|
||||||
|
globalDateState.startDate = starts[0] ? String(starts[0]).slice(0, 10) : "";
|
||||||
|
globalDateState.endDate = ends.length ? String(ends[ends.length - 1]).slice(0, 10) : "";
|
||||||
|
globalDateState.loaded = true;
|
||||||
|
syncGlobalDateControlInputs();
|
||||||
|
postGlobalDateRangeToFrame(projectFrame);
|
||||||
|
postGlobalDateRangeToFrame(teamFrame);
|
||||||
|
} catch (error) {
|
||||||
|
console.error("공통 기간을 불러오지 못했습니다.", error);
|
||||||
|
}
|
||||||
|
}
|
||||||
|
|
||||||
function hideUserPopover() {
|
function hideUserPopover() {
|
||||||
userPopover?.classList.add("hidden");
|
userPopover?.classList.add("hidden");
|
||||||
}
|
}
|
||||||
@@ -1063,7 +1140,11 @@ function handleEmbeddedNavigationMessage(event) {
|
|||||||
}
|
}
|
||||||
|
|
||||||
async function fetchJson(url, options) {
|
async function fetchJson(url, options) {
|
||||||
const response = await fetch(resolveAppUrl(url), options);
|
const requestOptions = {
|
||||||
|
...options,
|
||||||
|
headers: buildAuthHeaders(options?.headers),
|
||||||
|
};
|
||||||
|
const response = await fetch(resolveAppUrl(url), requestOptions);
|
||||||
let payload = null;
|
let payload = null;
|
||||||
try {
|
try {
|
||||||
payload = await response.json();
|
payload = await response.json();
|
||||||
@@ -1220,6 +1301,9 @@ async function saveSeatLayout() {
|
|||||||
body: JSON.stringify({ placements: seatMapState.draftPlacements }),
|
body: JSON.stringify({ placements: seatMapState.draftPlacements }),
|
||||||
});
|
});
|
||||||
await loadSeatMapData(true);
|
await loadSeatMapData(true);
|
||||||
|
if (organizationFrame?.contentWindow) {
|
||||||
|
organizationFrame.contentWindow.postMessage({ type: "seatmap-layout-updated" }, window.location.origin);
|
||||||
|
}
|
||||||
setSeatMapStatus("자리배치를 저장했습니다.", "success");
|
setSeatMapStatus("자리배치를 저장했습니다.", "success");
|
||||||
} catch (error) {
|
} catch (error) {
|
||||||
setSeatMapStatus(error.message || "자리배치도 저장에 실패했습니다.", "error");
|
setSeatMapStatus(error.message || "자리배치도 저장에 실패했습니다.", "error");
|
||||||
@@ -1285,6 +1369,10 @@ function setActiveView(view) {
|
|||||||
if (currentViewTitle) {
|
if (currentViewTitle) {
|
||||||
currentViewTitle.textContent = viewLabels[currentView];
|
currentViewTitle.textContent = viewLabels[currentView];
|
||||||
}
|
}
|
||||||
|
syncGlobalDateControlVisibility();
|
||||||
|
if (shouldShowGlobalDateControls()) {
|
||||||
|
ensureGlobalDateRangeLoaded();
|
||||||
|
}
|
||||||
|
|
||||||
navButtons.forEach((button) => {
|
navButtons.forEach((button) => {
|
||||||
const active = button.dataset.view === currentView;
|
const active = button.dataset.view === currentView;
|
||||||
@@ -1293,12 +1381,22 @@ function setActiveView(view) {
|
|||||||
});
|
});
|
||||||
|
|
||||||
const isOrganization = currentView === "organization";
|
const isOrganization = currentView === "organization";
|
||||||
|
const isProject = currentView === "project";
|
||||||
|
const isTeam = currentView === "team";
|
||||||
const isSeatMapAdmin = currentView === "seatmap-admin";
|
const isSeatMapAdmin = currentView === "seatmap-admin";
|
||||||
const isSeatMapReadonly = currentView === "seatmap-readonly";
|
const isSeatMapReadonly = currentView === "seatmap-readonly";
|
||||||
if (organizationStage) {
|
if (organizationStage) {
|
||||||
organizationStage.hidden = !isOrganization;
|
organizationStage.hidden = !isOrganization;
|
||||||
organizationStage.style.display = isOrganization ? "flex" : "none";
|
organizationStage.style.display = isOrganization ? "flex" : "none";
|
||||||
}
|
}
|
||||||
|
if (projectStage) {
|
||||||
|
projectStage.hidden = !isProject;
|
||||||
|
projectStage.style.display = isProject ? "flex" : "none";
|
||||||
|
}
|
||||||
|
if (teamStage) {
|
||||||
|
teamStage.hidden = !isTeam;
|
||||||
|
teamStage.style.display = isTeam ? "flex" : "none";
|
||||||
|
}
|
||||||
if (seatMapAdminStage) {
|
if (seatMapAdminStage) {
|
||||||
seatMapAdminStage.hidden = !isSeatMapAdmin;
|
seatMapAdminStage.hidden = !isSeatMapAdmin;
|
||||||
seatMapAdminStage.style.display = isSeatMapAdmin ? "flex" : "none";
|
seatMapAdminStage.style.display = isSeatMapAdmin ? "flex" : "none";
|
||||||
@@ -1308,7 +1406,7 @@ function setActiveView(view) {
|
|||||||
seatMapReadonlyStage.style.display = isSeatMapReadonly ? "flex" : "none";
|
seatMapReadonlyStage.style.display = isSeatMapReadonly ? "flex" : "none";
|
||||||
}
|
}
|
||||||
if (emptyStage) {
|
if (emptyStage) {
|
||||||
const showEmpty = !isOrganization && !isSeatMapAdmin && !isSeatMapReadonly;
|
const showEmpty = !isOrganization && !isProject && !isTeam && !isSeatMapAdmin && !isSeatMapReadonly;
|
||||||
emptyStage.hidden = !showEmpty;
|
emptyStage.hidden = !showEmpty;
|
||||||
emptyStage.style.display = showEmpty ? "flex" : "none";
|
emptyStage.style.display = showEmpty ? "flex" : "none";
|
||||||
}
|
}
|
||||||
@@ -1317,9 +1415,22 @@ function setActiveView(view) {
|
|||||||
const frameSrc = organizationFrame.dataset.src || organizationFrame.src;
|
const frameSrc = organizationFrame.dataset.src || organizationFrame.src;
|
||||||
organizationFrame.src = resolveAppUrl(frameSrc);
|
organizationFrame.src = resolveAppUrl(frameSrc);
|
||||||
}
|
}
|
||||||
|
if (isProject && previousView !== "project" && projectFrame) {
|
||||||
|
const frameSrc = projectFrame.dataset.src || projectFrame.src;
|
||||||
|
projectFrame.src = resolveAppUrl(frameSrc);
|
||||||
|
} else if (isProject) {
|
||||||
|
postGlobalDateRangeToFrame(projectFrame);
|
||||||
|
}
|
||||||
|
if (isTeam && previousView !== "team" && teamFrame) {
|
||||||
|
const frameSrc = teamFrame.dataset.src || teamFrame.src;
|
||||||
|
teamFrame.src = resolveAppUrl(frameSrc);
|
||||||
|
} else if (isTeam) {
|
||||||
|
postGlobalDateRangeToFrame(teamFrame);
|
||||||
|
}
|
||||||
if (isSeatMapAdmin || isSeatMapReadonly) {
|
if (isSeatMapAdmin || isSeatMapReadonly) {
|
||||||
loadSeatMapData();
|
loadSeatMapData();
|
||||||
}
|
}
|
||||||
|
notifyEmbeddedTabActivated();
|
||||||
}
|
}
|
||||||
|
|
||||||
function renderAuth() {
|
function renderAuth() {
|
||||||
@@ -1329,7 +1440,7 @@ function renderAuth() {
|
|||||||
dashboardPanel.classList.toggle("hidden", !authenticated);
|
dashboardPanel.classList.toggle("hidden", !authenticated);
|
||||||
if (authenticated) {
|
if (authenticated) {
|
||||||
const displayName = session.user.display_name || "접속자";
|
const displayName = session.user.display_name || "접속자";
|
||||||
const rank = "-";
|
const rank = session.user.rank || "-";
|
||||||
const employeeId = session.user.username || "-";
|
const employeeId = session.user.username || "-";
|
||||||
userBadge.innerHTML = `<span class="user-chip-icon">◎</span><span class="user-chip-text"><strong>${escapeHtml(displayName)}</strong><em>${escapeHtml(rank)}</em></span><span class="user-chip-caret" aria-hidden="true">▾</span>`;
|
userBadge.innerHTML = `<span class="user-chip-icon">◎</span><span class="user-chip-text"><strong>${escapeHtml(displayName)}</strong><em>${escapeHtml(rank)}</em></span><span class="user-chip-caret" aria-hidden="true">▾</span>`;
|
||||||
userBadge.title = `${displayName} / -`;
|
userBadge.title = `${displayName} / -`;
|
||||||
@@ -1363,7 +1474,7 @@ if (loginForm) {
|
|||||||
loginMessage.textContent = "로그인 처리 중입니다.";
|
loginMessage.textContent = "로그인 처리 중입니다.";
|
||||||
const formData = new FormData(loginForm);
|
const formData = new FormData(loginForm);
|
||||||
try {
|
try {
|
||||||
const payload = await fetchJson("/api/mock-login", {
|
const payload = await fetchJson("/api/auth/login", {
|
||||||
method: "POST",
|
method: "POST",
|
||||||
body: formData,
|
body: formData,
|
||||||
});
|
});
|
||||||
@@ -1388,14 +1499,51 @@ if (userBadge) {
|
|||||||
}
|
}
|
||||||
|
|
||||||
if (logoutBtn) {
|
if (logoutBtn) {
|
||||||
logoutBtn.addEventListener("click", (event) => {
|
logoutBtn.addEventListener("click", async (event) => {
|
||||||
event.stopPropagation();
|
event.stopPropagation();
|
||||||
|
try {
|
||||||
|
await fetchJson("/api/auth/logout", {
|
||||||
|
method: "POST",
|
||||||
|
});
|
||||||
|
} catch {
|
||||||
|
// Ignore logout API errors and clear the local session regardless.
|
||||||
|
}
|
||||||
clearSession();
|
clearSession();
|
||||||
hideUserPopover();
|
hideUserPopover();
|
||||||
renderAuth();
|
renderAuth();
|
||||||
});
|
});
|
||||||
}
|
}
|
||||||
|
|
||||||
|
if (globalStartDateInput) {
|
||||||
|
globalStartDateInput.addEventListener("change", () => {
|
||||||
|
globalDateState.startDate = globalStartDateInput.value || "";
|
||||||
|
postGlobalDateRangeToFrame(projectFrame);
|
||||||
|
postGlobalDateRangeToFrame(teamFrame);
|
||||||
|
});
|
||||||
|
}
|
||||||
|
|
||||||
|
if (globalEndDateInput) {
|
||||||
|
globalEndDateInput.addEventListener("change", () => {
|
||||||
|
globalDateState.endDate = globalEndDateInput.value || "";
|
||||||
|
postGlobalDateRangeToFrame(projectFrame);
|
||||||
|
postGlobalDateRangeToFrame(teamFrame);
|
||||||
|
});
|
||||||
|
}
|
||||||
|
|
||||||
|
projectFrame?.addEventListener("load", () => {
|
||||||
|
postGlobalDateRangeToFrame(projectFrame);
|
||||||
|
if (currentView === "project") {
|
||||||
|
notifyEmbeddedTabActivated();
|
||||||
|
}
|
||||||
|
});
|
||||||
|
|
||||||
|
teamFrame?.addEventListener("load", () => {
|
||||||
|
postGlobalDateRangeToFrame(teamFrame);
|
||||||
|
if (currentView === "team") {
|
||||||
|
notifyEmbeddedTabActivated();
|
||||||
|
}
|
||||||
|
});
|
||||||
|
|
||||||
navButtons.forEach((button) => {
|
navButtons.forEach((button) => {
|
||||||
button.addEventListener("click", () => {
|
button.addEventListener("click", () => {
|
||||||
hideUserPopover();
|
hideUserPopover();
|
||||||
@@ -1549,6 +1697,7 @@ document.addEventListener("click", () => {
|
|||||||
|
|
||||||
window.addEventListener("message", handleEmbeddedNavigationMessage);
|
window.addEventListener("message", handleEmbeddedNavigationMessage);
|
||||||
|
|
||||||
|
syncGlobalDateControlInputs();
|
||||||
setActiveView(currentView);
|
setActiveView(currentView);
|
||||||
renderAuth();
|
renderAuth();
|
||||||
|
|
||||||
|
|||||||
@@ -8,7 +8,7 @@
|
|||||||
<link rel="preconnect" href="https://fonts.gstatic.com" crossorigin>
|
<link rel="preconnect" href="https://fonts.gstatic.com" crossorigin>
|
||||||
<link href="https://fonts.googleapis.com/css2?family=Pretendard:wght@400;600;700;900&display=swap" rel="stylesheet">
|
<link href="https://fonts.googleapis.com/css2?family=Pretendard:wght@400;600;700;900&display=swap" rel="stylesheet">
|
||||||
<link rel="stylesheet" href="/legacy/static/common.css">
|
<link rel="stylesheet" href="/legacy/static/common.css">
|
||||||
<link rel="stylesheet" href="/styles.css?v=20260325-11">
|
<link rel="stylesheet" href="/styles.css?v=20260326-01">
|
||||||
</head>
|
</head>
|
||||||
<body>
|
<body>
|
||||||
<section id="login-panel" class="login-screen">
|
<section id="login-panel" class="login-screen">
|
||||||
@@ -37,35 +37,60 @@
|
|||||||
|
|
||||||
<section id="dashboard-panel" class="dashboard-shell hidden">
|
<section id="dashboard-panel" class="dashboard-shell hidden">
|
||||||
<header class="dashboard-header">
|
<header class="dashboard-header">
|
||||||
<div class="brand-block">
|
<div class="header-left">
|
||||||
<p class="eyebrow">MH Dashboard</p>
|
<div class="brand-block">
|
||||||
<h2 id="current-view-title">조직 현황</h2>
|
<p class="eyebrow">MH Dashboard</p>
|
||||||
|
<h2 id="current-view-title">조직 현황</h2>
|
||||||
|
</div>
|
||||||
|
|
||||||
|
<div id="global-date-controls" class="header-date-controls hidden">
|
||||||
|
<span class="header-date-label">기간</span>
|
||||||
|
<label class="header-date-field">
|
||||||
|
<input id="global-start-date" type="date" aria-label="시작일">
|
||||||
|
</label>
|
||||||
|
<span class="header-date-sep">~</span>
|
||||||
|
<label class="header-date-field">
|
||||||
|
<input id="global-end-date" type="date" aria-label="종료일">
|
||||||
|
</label>
|
||||||
|
</div>
|
||||||
</div>
|
</div>
|
||||||
|
|
||||||
<div class="header-center">
|
<div class="header-right">
|
||||||
<button class="nav-pill" type="button" data-view="ledger">사업관리대장</button>
|
<div class="header-center">
|
||||||
<button class="nav-pill" type="button" data-view="project">프로젝트별 분석</button>
|
<button class="nav-pill" type="button" data-view="ledger">사업관리대장</button>
|
||||||
<button class="nav-pill" type="button" data-view="team">팀/개인별 분석</button>
|
<button class="nav-pill" type="button" data-view="project">프로젝트별 분석</button>
|
||||||
<button class="nav-pill active" type="button" data-view="organization">조직 현황</button>
|
<button class="nav-pill" type="button" data-view="team">팀/개인별 분석</button>
|
||||||
</div>
|
<button class="nav-pill active" type="button" data-view="organization">조직 현황</button>
|
||||||
|
</div>
|
||||||
|
|
||||||
<div class="header-actions">
|
<div class="header-actions">
|
||||||
<button id="user-badge" class="ghost-button ghost-button-soft user-chip" type="button"></button>
|
<button id="user-badge" class="ghost-button ghost-button-soft user-chip" type="button"></button>
|
||||||
<div id="user-popover" class="user-popover hidden"></div>
|
<div id="user-popover" class="user-popover hidden"></div>
|
||||||
<button id="logout-btn" class="ghost-button icon-button" type="button" title="로그아웃" aria-label="로그아웃">
|
<button id="logout-btn" class="ghost-button icon-button" type="button" title="로그아웃" aria-label="로그아웃">
|
||||||
<svg xmlns="http://www.w3.org/2000/svg" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round">
|
<svg xmlns="http://www.w3.org/2000/svg" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round">
|
||||||
<path d="M9 21H5a2 2 0 0 1-2-2V5a2 2 0 0 1 2-2h4"></path>
|
<path d="M9 21H5a2 2 0 0 1-2-2V5a2 2 0 0 1 2-2h4"></path>
|
||||||
<polyline points="16 17 21 12 16 7"></polyline>
|
<polyline points="16 17 21 12 16 7"></polyline>
|
||||||
<line x1="21" y1="12" x2="9" y2="12"></line>
|
<line x1="21" y1="12" x2="9" y2="12"></line>
|
||||||
</svg>
|
</svg>
|
||||||
</button>
|
</button>
|
||||||
|
</div>
|
||||||
</div>
|
</div>
|
||||||
</header>
|
</header>
|
||||||
|
|
||||||
<main class="dashboard-main">
|
<main class="dashboard-main">
|
||||||
<section id="organization-stage" class="main-stage">
|
<section id="organization-stage" class="main-stage">
|
||||||
<div class="stage-frame">
|
<div class="stage-frame">
|
||||||
<iframe id="organization-frame" src="/legacy/organization?v=20260325-11" data-src="/legacy/organization?v=20260325-11" title="조직도 메인 화면"></iframe>
|
<iframe id="organization-frame" src="/legacy/organization?v=20260326-02" data-src="/legacy/organization?v=20260326-02" title="조직도 메인 화면"></iframe>
|
||||||
|
</div>
|
||||||
|
</section>
|
||||||
|
<section id="project-stage" class="main-stage" hidden>
|
||||||
|
<div class="stage-frame">
|
||||||
|
<iframe id="project-frame" src="/integrations/payment" data-src="/integrations/payment" title="프로젝트별 분석 화면"></iframe>
|
||||||
|
</div>
|
||||||
|
</section>
|
||||||
|
<section id="team-stage" class="main-stage" hidden>
|
||||||
|
<div class="stage-frame">
|
||||||
|
<iframe id="team-frame" src="/integrations/mh" data-src="/integrations/mh" title="팀/개인별 분석 화면"></iframe>
|
||||||
</div>
|
</div>
|
||||||
</section>
|
</section>
|
||||||
<section id="seatmap-admin-stage" class="main-stage" hidden>
|
<section id="seatmap-admin-stage" class="main-stage" hidden>
|
||||||
@@ -175,6 +200,6 @@
|
|||||||
</main>
|
</main>
|
||||||
</section>
|
</section>
|
||||||
|
|
||||||
<script src="/app.js?v=20260325-11"></script>
|
<script src="/app.js?v=20260326-02"></script>
|
||||||
</body>
|
</body>
|
||||||
</html>
|
</html>
|
||||||
|
|||||||
@@ -180,12 +180,35 @@ body {
|
|||||||
backdrop-filter: blur(12px);
|
backdrop-filter: blur(12px);
|
||||||
}
|
}
|
||||||
|
|
||||||
|
.header-left,
|
||||||
|
.header-right,
|
||||||
.brand-block,
|
.brand-block,
|
||||||
.header-actions {
|
.header-actions {
|
||||||
position: relative;
|
position: relative;
|
||||||
z-index: 2;
|
z-index: 2;
|
||||||
}
|
}
|
||||||
|
|
||||||
|
.header-left {
|
||||||
|
display: flex;
|
||||||
|
align-items: center;
|
||||||
|
gap: 18px;
|
||||||
|
flex: 0 0 auto;
|
||||||
|
min-width: 0;
|
||||||
|
}
|
||||||
|
|
||||||
|
.header-right {
|
||||||
|
margin-left: auto;
|
||||||
|
display: flex;
|
||||||
|
align-items: center;
|
||||||
|
gap: 18px;
|
||||||
|
min-width: 0;
|
||||||
|
}
|
||||||
|
|
||||||
|
.brand-block {
|
||||||
|
flex: 0 0 auto;
|
||||||
|
width: 180px;
|
||||||
|
}
|
||||||
|
|
||||||
.dashboard-header .eyebrow {
|
.dashboard-header .eyebrow {
|
||||||
color: var(--color-accent);
|
color: var(--color-accent);
|
||||||
margin-bottom: 2px;
|
margin-bottom: 2px;
|
||||||
@@ -199,14 +222,13 @@ body {
|
|||||||
}
|
}
|
||||||
|
|
||||||
.header-center {
|
.header-center {
|
||||||
margin-left: auto;
|
|
||||||
margin-right: 48px;
|
|
||||||
display: inline-flex;
|
display: inline-flex;
|
||||||
justify-content: center;
|
justify-content: flex-end;
|
||||||
gap: 24px;
|
gap: 24px;
|
||||||
flex-wrap: nowrap;
|
flex-wrap: nowrap;
|
||||||
white-space: nowrap;
|
white-space: nowrap;
|
||||||
z-index: 1;
|
z-index: 1;
|
||||||
|
flex: 0 0 auto;
|
||||||
}
|
}
|
||||||
|
|
||||||
.nav-pill {
|
.nav-pill {
|
||||||
@@ -246,6 +268,48 @@ body {
|
|||||||
align-items: center;
|
align-items: center;
|
||||||
gap: 6px;
|
gap: 6px;
|
||||||
position: relative;
|
position: relative;
|
||||||
|
padding-left: 18px;
|
||||||
|
border-left: 1px solid #dbe2ea;
|
||||||
|
}
|
||||||
|
|
||||||
|
.header-date-controls {
|
||||||
|
display: inline-flex;
|
||||||
|
align-items: center;
|
||||||
|
gap: 8px;
|
||||||
|
margin-left: 0;
|
||||||
|
flex: 0 0 auto;
|
||||||
|
min-width: 0;
|
||||||
|
}
|
||||||
|
|
||||||
|
.header-date-label {
|
||||||
|
font-size: 12px;
|
||||||
|
font-weight: 800;
|
||||||
|
color: #64748b;
|
||||||
|
}
|
||||||
|
|
||||||
|
.header-date-field {
|
||||||
|
display: inline-flex;
|
||||||
|
align-items: center;
|
||||||
|
min-height: 36px;
|
||||||
|
padding: 0 10px;
|
||||||
|
border: 1px solid #dbe2ea;
|
||||||
|
border-radius: 999px;
|
||||||
|
background: #fff;
|
||||||
|
}
|
||||||
|
|
||||||
|
.header-date-field input {
|
||||||
|
border: 0;
|
||||||
|
background: transparent;
|
||||||
|
color: var(--color-text);
|
||||||
|
font-size: 12px;
|
||||||
|
font-weight: 700;
|
||||||
|
outline: none;
|
||||||
|
}
|
||||||
|
|
||||||
|
.header-date-sep {
|
||||||
|
color: #94a3b8;
|
||||||
|
font-size: 12px;
|
||||||
|
font-weight: 800;
|
||||||
}
|
}
|
||||||
|
|
||||||
.ghost-button {
|
.ghost-button {
|
||||||
@@ -1139,18 +1203,37 @@ body {
|
|||||||
justify-content: space-between;
|
justify-content: space-between;
|
||||||
}
|
}
|
||||||
|
|
||||||
|
.header-left,
|
||||||
|
.header-right {
|
||||||
|
width: 100%;
|
||||||
|
}
|
||||||
|
|
||||||
|
.header-right {
|
||||||
|
justify-content: space-between;
|
||||||
|
}
|
||||||
|
|
||||||
.header-center {
|
.header-center {
|
||||||
position: static;
|
position: static;
|
||||||
transform: none;
|
transform: none;
|
||||||
order: 3;
|
order: 2;
|
||||||
width: 100%;
|
width: auto;
|
||||||
justify-content: flex-start;
|
justify-content: flex-end;
|
||||||
margin-top: 8px;
|
margin-top: 8px;
|
||||||
overflow-x: auto;
|
overflow-x: auto;
|
||||||
}
|
}
|
||||||
|
|
||||||
.header-actions {
|
.header-actions {
|
||||||
flex-wrap: wrap;
|
flex-wrap: wrap;
|
||||||
|
padding-left: 0;
|
||||||
|
border-left: 0;
|
||||||
|
}
|
||||||
|
|
||||||
|
.header-date-controls {
|
||||||
|
order: 2;
|
||||||
|
width: auto;
|
||||||
|
justify-content: flex-start;
|
||||||
|
margin-left: 0;
|
||||||
|
margin-top: 8px;
|
||||||
}
|
}
|
||||||
|
|
||||||
.seatmap-content {
|
.seatmap-content {
|
||||||
|
|||||||
BIN
incoming-files/MH.xlsx
Normal file
BIN
incoming-files/MH.xlsx
Normal file
Binary file not shown.
3318
incoming-files/mh.html
Normal file
3318
incoming-files/mh.html
Normal file
File diff suppressed because it is too large
Load Diff
3308
incoming-files/omh.html
Normal file
3308
incoming-files/omh.html
Normal file
File diff suppressed because it is too large
Load Diff
1569
incoming-files/opayment.html
Normal file
1569
incoming-files/opayment.html
Normal file
File diff suppressed because it is too large
Load Diff
BIN
incoming-files/organization.xlsx
Normal file
BIN
incoming-files/organization.xlsx
Normal file
Binary file not shown.
865
incoming-files/payment.csv
Normal file
865
incoming-files/payment.csv
Normal file
@@ -0,0 +1,865 @@
|
|||||||
|
상신회사,청구일,발행일,발행월,계정코드,관리계정코드,각사 계정명,프로젝트코드,사업명,사업명(표출PJT),사업명(인트라넷기준),사업분야,세부분야,기획/개발/영업,대분류,중분류,소분류,부서명,팀명,거래처,적요,차변공급가,대변공급가,지출,수입,특이사항,구분,프로젝트성격,,,,,,,,,
|
||||||
|
바론,2025-12-08,2026-01-02,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"31,590",0,"31,590",0,X,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-08,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"31,590",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-05,2026-01-02,1월,10111101,REV-101,용역미수금(계산서발행),Y25040,보은국토 도로유지보수분야 통합건설사업관리용역(한맥/동성/동명)-인쇄편집,보은국토도로 사업관리,보은국토도로 사업관리,직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,(주)동성엔지니어링,보은국토도로유지보수분야통합건설사업관리용역(한맥/동성/동명)-인쇄편집,"1,815,000",0,0,"1,815,000",,수입,일반,,,,,,,,,
|
||||||
|
바론,2025-12-05,2026-01-02,1월,40110501,REV-101,개발수입,Y25040,보은국토 도로유지보수분야 통합건설사업관리용역(한맥/동성/동명)-인쇄편집,보은국토도로 사업관리,보은국토도로 사업관리,직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,(주)동성엔지니어링,보은국토도로유지보수분야통합건설사업관리용역(한맥/동성/동명)-인쇄편집,0,"1,650,000",0,0,,수입,일반,,,,,,,,,
|
||||||
|
바론,2025-12-05,2026-01-02,1월,20112901,LIA-101,매출세액,Y25040,보은국토 도로유지보수분야 통합건설사업관리용역(한맥/동성/동명)-인쇄편집,보은국토도로 사업관리,보은국토도로 사업관리,직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,(주)동성엔지니어링,"1,650,000*10%",0,"165,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-30,2026-01-02,1월,10111101,REV-101,용역미수금(계산서발행),Y25008,계양-강화간 고속도로 건설공사 기본설계단계 교량 BIM 설계(제5공구),계양~강화 고속도로(5공구),계양-강화 고속도로 건설 기본 및 실시(5공구),직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,(주)동해종합기술공사,계양-강화간고속도로건설공사기본설계단계교량BIM설계(제5공구),"28,500,000",0,0,"28,500,000",,수입,일반,,,,,,,,,
|
||||||
|
바론,2025-12-30,2026-01-02,1월,40110501,REV-101,개발수입,Y25008,계양-강화간 고속도로 건설공사 기본설계단계 교량 BIM 설계(제5공구),계양~강화 고속도로(5공구),계양-강화 고속도로 건설 기본 및 실시(5공구),직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,(주)동해종합기술공사,계양-강화간고속도로건설공사기본설계단계교량BIM설계(제5공구),0,"25,909,091",0,0,,수입,일반,,,,,,,,,
|
||||||
|
바론,2025-12-30,2026-01-02,1월,20112901,LIA-101,매출세액,Y25008,계양-강화간 고속도로 건설공사 기본설계단계 교량 BIM 설계(제5공구),계양~강화 고속도로(5공구),계양-강화 고속도로 건설 기본 및 실시(5공구),직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,(주)동해종합기술공사,"25,909,091*10%",0,"2,590,909",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-15,2026-01-02,1월,10111101,REV-101,용역미수금(계산서발행),Y25007,ERP시스템 구축,ERP시스템구축(한종),ERP(한국종합엔지니어링),직접매출,S/W판매,,매출,바론계약,판매,기술개발센터,,(주)한국종합엔지니어링,ERP시스템구축,"55,000,000",0,0,"55,000,000",,수입,일반,,,,,,,,,
|
||||||
|
바론,2025-12-15,2026-01-02,1월,40110501,REV-101,개발수입,Y25007,ERP시스템 구축,ERP시스템구축(한종),ERP(한국종합엔지니어링),직접매출,S/W판매,,매출,바론계약,판매,기술개발센터,,(주)한국종합엔지니어링,ERP시스템구축,0,"50,000,000",0,0,,수입,일반,,,,,,,,,
|
||||||
|
바론,2025-12-15,2026-01-02,1월,20112901,LIA-101,매출세액,Y25007,ERP시스템 구축,ERP시스템구축(한종),ERP(한국종합엔지니어링),직접매출,S/W판매,,매출,바론계약,판매,기술개발센터,,(주)한국종합엔지니어링,"50,000,000*10%",0,"5,000,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-29,2026-01-02,1월,10111101,REV-101,용역미수금(계산서발행),Y25067,EG-BIM 사용 계약,EG-BIM (파이프텍코리아),EG-BIM (파이프텍코리아),직접매출,S/W판매,,매출,바론계약,판매,기술개발센터,,파이프텍코리아,EG-BIM사용계약,"1,100,000",0,0,"1,100,000",,수입,일반,,,,,,,,,
|
||||||
|
바론,2025-12-29,2026-01-02,1월,40110601,REV-101,유지관리수입,Y25067,EG-BIM 사용 계약,EG-BIM (파이프텍코리아),EG-BIM (파이프텍코리아),직접매출,S/W판매,,매출,바론계약,판매,기술개발센터,,파이프텍코리아,EG-BIM사용계약,0,"1,000,000",0,0,,수입,일반,,,,,,,,,
|
||||||
|
바론,2025-12-29,2026-01-02,1월,20112901,LIA-101,매출세액,Y25067,EG-BIM 사용 계약,EG-BIM (파이프텍코리아),EG-BIM (파이프텍코리아),직접매출,S/W판매,,매출,바론계약,판매,기술개발센터,,파이프텍코리아,"1,000,000*10%",0,"100,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,총괄기획실 세미나 후 회식,0,"570,500",0,0,공통 → 인사교육,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,60115705,WF-101,복리후생비(회식대),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,총괄기획실 세미나 후 회식,"570,500",0,"570,500",0,공통 → 인사교육,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-22,2026-01-02,1월,60115903,WF-201,여비교통비(국내출장비),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,출장비,"30,400",0,"30,400",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-22,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,출장비 - 김원식,0,"30,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-26,2026-01-02,1월,60115903,WF-201,여비교통비(국내출장비),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,출장비,"106,200",0,"106,200",0,X,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-26,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,출장비 - 김원식,0,"106,200",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,총괄기획실,김원식,시내교통비,0,"44,900",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,50152705,WF-201,원가)여비교통비(시내교통비),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,총괄기획실,김원식,시내교통비,"44,900",0,"44,900",0,X,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,사장단회의 다과(1월 2일),0,"181,840",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-02,2026-01-07,1월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,국혜림,"바론 인감증명서, 등기부등본 발급수수료","6,000",0,"6,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,우편요금 반송 수수료,0,"2,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-05,2026-01-15,1월,60114398,OP-203,소모품비(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,국혜림,바론 입찰용 사용인감 제작,"78,800",0,"78,800",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,(주)교보문고,기술개발센터도서구매(12월),0,"253,260",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-05,2026-01-15,1월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,국혜림,"바론 입찰용 등기부등본, 인감증명서 발급","25,000",0,"25,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-26,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,솔루션통합팀,김지영A,외부인사 초청 세미나(유니스트 교수) 다과,0,"26,200",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-20,1월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,송파구청,바론 2026 등록면허세 납부(측량업),"27,000",0,"27,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-26,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,류원준,"노션 구독료(25.12~25.12, 사내가이드)",0,"187,420",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-20,1월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,송파구청,바론 2026 등록면허세 납부(정보통신공사업),"54,000",0,"54,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,류원준,마천사무실 주차 할인권 구매,0,"60,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-20,1월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,송파구청,바론 2026 등록면허세 납부(초경량비행장치업),"40,500",0,"40,500",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,SW 설치용 USB 오피스 파우치 구매(2개),0,"31,700",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-29,1월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,김윤재,법인 서류 등기,360,0,360,0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-02,1월,20111105,LIA-101,미지급금(KB국민카드),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,,국민카드(3866),스타벅스 기프트카드 구매,0,"1,000,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-29,1월,60114301,OP-203,소모품비(사무용품비),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,김윤재,날인용 도장(7개),"20,900",0,"20,900",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-16,2026-01-02,1월,10111101,REV-101,용역미수금(계산서발행),Y25042,예산국토 제2권역 도로유지보수사업 통합건설사업관리용역(한맥/동성/장맥)-인쇄/편집,예산국토 제2권역,예산국토 제2권역,직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,장맥ENG,예산국토제2권역도로유지보수사업통합건설사업관리용역(한맥/동성/장맥)-인쇄/편집,"1,512,500",0,0,"1,512,500",,수입,일반,,,,,,,,,
|
||||||
|
바론,2025-12-16,2026-01-02,1월,40110501,REV-101,개발수입,Y25042,예산국토 제2권역 도로유지보수사업 통합건설사업관리용역(한맥/동성/장맥)-인쇄/편집,예산국토 제2권역,예산국토 제2권역,직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,장맥ENG,예산국토제2권역도로유지보수사업통합건설사업관리용역(한맥/동성/장맥)-인쇄/편집,0,"1,375,000",0,0,,수입,일반,,,,,,,,,
|
||||||
|
바론,2025-12-16,2026-01-02,1월,20112901,LIA-101,매출세액,Y25042,예산국토 제2권역 도로유지보수사업 통합건설사업관리용역(한맥/동성/장맥)-인쇄/편집,예산국토 제2권역,예산국토 제2권역,직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,장맥ENG,"1,375,000*10%",0,"137,500",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-07,1월,60115903,WF-201,여비교통비(국내출장비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,정성호,출장비,"52,600",0,"52,600",0,X,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,정성호,출장비 - 정성호,0,"52,600",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"23,630",0,"23,630",0,X,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"23,630",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-05,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,(주)미래엔서해에너지,당진 숙소 임대 종료에 따른 도시가스 정산,0,"41,870",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-27,2026-01-29,1월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,김윤재,장헌산업 등기관련 인감증명서 수수료,"5,400",0,"5,400",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,김윤재,장헌 사내이사 서류 발급 수수료,"2,200",0,"2,200",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-02,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,국혜림,"바론 인감증명서, 등기부등본 발급수수료",0,"6,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-29,1월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,김윤재,"법인명변경/법인분할 등기 관련 서류 발급 수수료(인감증명서 4, 등본 2, 초본 2)","4,000",0,"4,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-19,2026-01-07,1월,60115903,WF-201,여비교통비(국내출장비),X21012,XR기반 건설 설계 혁신 시스템,XR기반 건설설계 혁신시스템,XR기반 건설설계 혁신시스템,직접매출,R&D,,매출,가족사 프로젝트,R&D,총괄기획실,경영기획팀,임민경,출장비,"24,000",0,"24,000",0,,출장비,R&D,,,,,,,,,
|
||||||
|
바론,2025-12-19,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X21012,XR기반 건설 설계 혁신 시스템,XR기반 건설설계 혁신시스템,XR기반 건설설계 혁신시스템,직접매출,R&D,,매출,가족사 프로젝트,R&D,총괄기획실,경영기획팀,임민경,출장비 - 임민경,0,"24,000",0,0,,제외,R&D,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,주완기,총괄기획실 외빈 선물용 와인 구매(5EA),0,"230,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
장헌산업,2026-01-22,2026-01-22,1월,831,OUT-201,지급수수료,X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,법무사 조수호,주식회사 장헌산업 상호변경 공과금납부,"465,000",,"465,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-30,2026-01-07,1월,60115903,WF-201,여비교통비(국내출장비),X25020,TOVA,TOVA,TOVA,S/W개발,교통,기획,비매출,S/W 개발,교통,총괄기획실,기술기획팀,황동환,출장비,"47,300",0,"47,300",0,X,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-30,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25020,TOVA,TOVA,TOVA,S/W개발,교통,,비매출,S/W 개발,교통,총괄기획실,기술기획팀,김원기,출장비 - 김원기,0,"39,300",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-30,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25020,TOVA,TOVA,TOVA,S/W개발,교통,,비매출,S/W 개발,교통,총괄기획실,기술기획팀,황동환,출장비 - 황동환,0,"8,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-07,1월,60115903,WF-201,여비교통비(국내출장비),X25037,ERP: 장헌산업,ERP:장헌산업,ERP: 장헌산업,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,총괄기획실,ERP기획팀,권오재,출장비,"190,040",0,"190,040",0,X,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25037,ERP: 장헌산업,ERP:장헌산업,ERP: 장헌산업,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,총괄기획실,ERP기획팀,류호성,출장비 - 류호성,0,"89,310",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25037,ERP: 장헌산업,ERP:장헌산업,ERP: 장헌산업,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,총괄기획실,ERP기획팀,권오재,출장비 - 권오재,0,"100,730",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민건강보험공단,25년 12월 4대보험료 (전체),0,"58,112,940",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-07,1월,50152527,HR-204,원가)복리후생비(산재보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,근로복지공단,25년 12월 4대보험료(산재보험/회사부담),"2,725,290",0,"2,725,290",0,X,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-07,1월,50152521,HR-202,원가)복리후생비(건강보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민건강보험공단,25년 12월 4대보험료(건강보험/회사부담),"12,218,640",0,"12,218,640",0,X,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-07,1월,20111505,HR-202,예수금(건강보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민건강보험공단,25년 12월 4대보험료(건강보험/직원부담),"12,218,640",0,"12,218,640",0,X,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-07,1월,50152521,HR-202,원가)복리후생비(건강보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민건강보험공단,25년 12월 4대보험료(요양보험/회사부담),"1,581,980",0,"1,581,980",0,X,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-07,1월,20111505,HR-202,예수금(건강보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민건강보험공단,25년 12월 4대보험료(요양보험),"1,581,980",0,"1,581,980",0,X,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-07,1월,50151719,HR-201,원가)세금과공과(국민연금),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민연금관리공단,25년 12월 4대보험료(국민연금/회사부담),"10,816,770",0,"10,816,770",0,X,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-07,1월,20111507,HR-201,예수금(국민연금),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민연금관리공단,25년 12월 4대보험료(국민연금/직원부담),"10,816,770",0,"10,816,770",0,X,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-07,1월,50152529,HR-203,원가)복리후생비(고용보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,근로복지공단,25년 12월 4대보험료(고용보험/회사부담),"3,467,490",0,"3,467,490",0,X,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-07,1월,20111509,HR-203,예수금(고용보험료(직원)),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,근로복지공단,25년 12월 4대보험료(고용보험/직원부담),"2,685,380",0,"2,685,380",0,X,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-09,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,인프라 BIM1팀,안효원,삼안 소속 경조금 선지급 (안효원 선임연구원 본인 결혼),0,"500,000",0,0,"공통 → 교육훈련,참석",제외,기타,,,,,,,,,
|
||||||
|
장헌산업,2026-01-27,2026-01-27,1월,831,OUT-201,지급수수료,X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,법무사 조수호,주식회사 장헌파트너스 분할 관련 공과금 납부,"6,680,000",,"6,680,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-12,1월,10111101,REV-101,용역미수금(계산서발행),Y25041,GAIA 기능 개선 계약,GAIA 기능 개선 계약,GAIA 기능 개선 계약,직접매출,S/W판매,,매출,바론계약,판매,기술개발센터,,(주)지오메카이엔지,GAIA앱 기능추가 개발,"3,850,000",0,0,"3,850,000",,수입,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-12,1월,40110501,REV-101,개발수입,Y25041,GAIA 기능 개선 계약,GAIA 기능 개선 계약,GAIA 기능 개선 계약,직접매출,S/W판매,,매출,바론계약,판매,기술개발센터,,(주)지오메카이엔지,GAIA앱 기능추가 개발,0,"3,500,000",0,0,,수입,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-12,1월,20112901,LIA-101,매출세액,Y25041,GAIA 기능 개선 계약,GAIA 기능 개선 계약,GAIA 기능 개선 계약,직접매출,S/W판매,,매출,바론계약,판매,기술개발센터,,(주)지오메카이엔지,"3,500,000*10%",0,"350,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-12,1월,10111101,REV-101,용역미수금(계산서발행),Y25041,GAIA 기능 개선 계약,GAIA 기능 개선 계약,GAIA 기능 개선 계약,직접매출,S/W판매,,매출,바론계약,판매,기술개발센터,,(주)지오메카이엔지,GAIA앱 기능추가 개발,0,"3,850,000",0,0,,수입,일반,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-12,1월,10110501,AST-101,보통예금,Y25041,GAIA 기능 개선 계약,GAIA 기능 개선 계약,GAIA 기능 개선 계약,직접매출,S/W판매,,매출,바론계약,판매,기술개발센터,,국민(주거래),GAIA앱 기능추가 개발,"3,850,000",0,0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-14,1월,20110101,LIA-101,외상매입금,Y25019,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구) 통합 스마트상황실 구축 및 운영,인주~염치(2공구)빅룸,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구),직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,,주식회사 비젼테크아이엔씨,서산-아산 건설사업단 대회의실 긴급 수리 비용,0,"253,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-14,1월,50151399,OP-203,원가)소모품비(기타),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,,대덕테크놀로지 주식회사,드론 사진측량 실무 프로젝트 수행을 위한 공구(드릴) 구매의 건,"754,909",0,"754,909",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-14,1월,10115301,AST-106,매입세액,Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,,대덕테크놀로지 주식회사,드론 사진측량 실무 프로젝트 수행을 위한 공구(드릴) 구매의 건,"75,491",0,"75,491",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-11,2026-01-14,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,류원준,소모품 (창고 물품보관용가방) 구입,0,"13,970",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-21,1월,50151399,OP-203,원가)소모품비(기타),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,,(주)코세코,드론 사진측량 실무 프로젝트 수행을 위한 장비 구매의 건,"349,910",0,"349,910",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-14,1월,20110101,LIA-101,외상매입금,Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,,대덕테크놀로지 주식회사,드론 사진측량 실무 프로젝트 수행을 위한 공구(드릴) 구매의 건,0,"830,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-21,1월,10115301,AST-106,매입세액,Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,,(주)코세코,드론 사진측량 실무 프로젝트 수행을 위한 장비 구매의 건,"34,990",0,"34,990",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-20,1월,50153199,IT-301,원가)지급수수료(기타),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,Infra Solution 개발팀,최정우,파견인력 변경 관련 서류 발급수수료,"47,400",0,"47,400",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-15,1월,20110101,LIA-101,외상매입금,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,몬스타 주식회사,인프라 BIM 1팀 측량 결과물 3D 모델링을 위한 워크스테이션 긴급 수리,0,"600,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2026-01-12,2026-01-14,1월,60114599,WF-105,도서인쇄비(기타),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,,,대산당진 시공BIM 수행/도서인쇄비,"306,240",,"306,240",0,,구매,일반,,,,,,,,,
|
||||||
|
한맥,2026-01-12,2026-01-14,1월,50151309,OP-203,원가)소모품비(안전관리장비),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,,,대산당진 시공BIM 안전장비 구매,"390,940",,"390,940",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-11,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,류원준,관리실 방문 음료,0,"47,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-14,1월,50153199,IT-301,원가)지급수수료(기타),Y25019,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구) 통합 스마트상황실 구축 및 운영,인주~염치(2공구)빅룸,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구),직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,,주식회사 비젼테크아이엔씨,서산-아산 건설사업단 대회의실 긴급 수리 비용,"230,000",0,"230,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,20110101,LIA-101,외상매입금,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),바론 대표전화 통신비 26년 01월,0,"23,780",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-14,1월,10115301,AST-106,매입세액,Y25019,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구) 통합 스마트상황실 구축 및 운영,인주~염치(2공구)빅룸,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구),직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,,주식회사 비젼테크아이엔씨,서산-아산 건설사업단 대회의실 긴급 수리 비용,"23,000",0,"23,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-21,1월,60116199,OP-204,통신비(기타),Y25019,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구) 통합 스마트상황실 구축 및 운영,인주~염치(2공구)빅룸,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구),직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,,SK브로드밴드(주),서산-아산 건설사업단 BIG ROOM VPN 26년 01월 결제의 건,"86,000",0,"86,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-21,1월,10115301,AST-106,매입세액,Y25019,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구) 통합 스마트상황실 구축 및 운영,인주~염치(2공구)빅룸,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구),직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,,SK브로드밴드(주),서산-아산 건설사업단 BIG ROOM VPN 26년 01월 결제의 건,"8,600",0,"8,600",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,70111501,REV-501,잡이익,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),바론 대표전화 통신비 26년 01월,0,8,0,0,,수입,일반,,,,,,,,,
|
||||||
|
바론,2026-01-05,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,국혜림,"바론 입찰용 사용인감 제작, 등기부등본 발급수수료",0,"103,800",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-09,1월,50152511,WF-106,원가)복리후생비(경조금),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,인프라 BIM1팀,안효원,삼안 소속 경조금 선지급 (안효원 선임연구원 본인 결혼),"500,000",0,"500,000",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-19,1월,60116399,IT-301,지급수수료(기타),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,임원 CHAT GPT 구독료(1월),"29,000",0,"29,000",0,공통 → 경영진,구매,기타,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-19,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,임원 CHAT GPT 구독료(1월),0,"29,000",0,0,공통 → 경영진,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-27,1월,60115798,WF-106,복리후생비(공통),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,,한상연,건강검진 비용 청구(한상연 부사장),"200,000",0,"200,000",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-19,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,업무 회의 후 식사,0,"55,000",0,0,공통 → 경영진,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-19,1월,60115705,WF-101,복리후생비(회식대),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,업무 회의 후 식사,"55,000",0,"55,000",0,공통 → 경영진,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,주식회사 헬셀,"KB 드론책임배상보험 신규 가입의 건(총 2건 / Matrice 300 RTK, Air2s)",0,"844,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-28,1월,60115798,WF-106,복리후생비(공통),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,,서울용한치과의원,임직원 건강검진(치아) 비용 정산의 건(센터 및 총괄 39명),"195,000",0,"195,000",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-20,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"32,240",0,"32,240",0,X,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"32,240",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/07),0,"59,100",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-01-29,1월,60116399,IT-301,지급수수료(기타),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,임원 AI 구독료(1월),"29,000",0,"29,000",0,공통 → 경영진,구매,기타,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-20,1월,20111105,LIA-101,미지급금(KB국민카드),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,,국민카드(3866),스타벅스 기프트카드 구매,0,"700,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-01-29,1월,60115798,WF-106,복리후생비(공통),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,,서울용한치과의원,임직원 건강검진(치아) 비용 정산의 건(바론소속 3명),"15,000",0,"15,000",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-20,1월,60115903,WF-201,여비교통비(국내출장비),X25059,ERP: 장헌,ERP:장헌,ERP: (주)장헌,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,총괄기획실,기술기획팀,김원기,출장비,"186,300",0,"186,300",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25059,ERP: 장헌,ERP:장헌,ERP: (주)장헌,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,총괄기획실,기술기획팀,김원기,출장비 - 김원기,0,"126,300",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25059,ERP: 장헌,ERP:장헌,ERP: (주)장헌,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,총괄기획실,기술기획팀,홍아름,출장비 - 홍아름,0,"30,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25059,ERP: 장헌,ERP:장헌,ERP: (주)장헌,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,총괄기획실,기술기획팀,김혜인,출장비 - 김혜인,0,"30,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-20,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"46,400",0,"46,400",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"46,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-20,1월,60115903,WF-201,여비교통비(국내출장비),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,류원준,출장비,"90,830",0,"90,830",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,류원준,출장비 - 류원준,0,"90,830",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-15,2026-01-20,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"36,470",0,"36,470",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-15,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"36,470",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,EG-BIM 각부서 실사용자와 개발자 미팅(삼안),0,"39,820",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-20,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,EG-BIM 각부서 실사용자와 개발자 미팅(삼안),"39,820",0,"39,820",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,송파구청,바론 2026 등록면허세 납부(측량업),0,"27,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-27,2026-01-29,1월,60116399,IT-301,지급수수료(기타),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,총괄기획실,경영기획팀,임민경,건설기술인 연회비(조용민) 경력증명서 2부(정희욱) 수수료,"23,000",0,"23,000",0,,구매,공통,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,송파구청,바론 2026 등록면허세 납부(정보통신공사업),0,"54,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2025-12-15,2026-01-08,1월,50152599,WF-106,원가)복리후생비(기타),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,,,2025년 건강검진비,"200,000",,"200,000",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,송파구청,바론 2026 등록면허세 납부(초경량비행장치업),0,"40,500",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2025-12-31,2026-01-05,1월,50152599,WF-106,원가)복리후생비(기타),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,총괄기획실,,,마천사무실/커피원두 구매_25년 12월,"660,000",,"660,000",0,X,구매,공통,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,개발소프트웨어 영업(01/9),0,"45,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2025-12-31,2026-01-05,1월,50151309,OP-203,원가)소모품비(안전관리장비),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,총괄기획실,,,마천사무실/페이퍼타올 구매(25년 12월),"140,800",,"140,800",0,X,구매,공통,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,류원준,시연행사 다과 구입,0,"50,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2025-12-31,2026-01-05,1월,50151101,OP-101,원가)지급임차료(월세),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,,,월세 : 대산-당진(제2공구) 시공BIM 용역 현장 직원 숙소 계약,"3,479,500",,"3,479,500",0,공통 → 대산당진BIM,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-20,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"39,290",0,"39,290",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"39,290",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/09),0,"52,300",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2026-01-07,2026-01-08,1월,50153103,OUT-102,원가)지급수수료(용역수수료),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,총괄기획실,,,기술개발센터 ADT캡스 월정료_26년 1월,"99,000",,"99,000",0,X,구매,공통,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,권혁진,"과천(삼안), 홍천(내경), 일산(서영)",0,"129,158",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-20,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,권혁진,"과천(삼안), 홍천(내경), 일산(서영)","129,158",0,"129,158",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/15),0,"22,200",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2026-01-08,2026-01-08,1월,60115707,WF-106,복리후생비(경조금),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,,,기술개발센터 안효원 선임연구원 결혼 축의금,"300,000",,"300,000",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
바론,2026-01-15,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,ERP기획팀,송대일,이지빔 도메인 연장 2건 (3년),0,"141,020",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2026-01-09,2026-01-14,1월,60116101,IT-401,"통신비(전화,TV,인터넷)",ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,총괄기획실,,,마천사무실/통신요금(26년 01월),"615,055",,"615,055",0,X,구매,공통,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-20,1월,20111109,LIA-101,미지급금(하나카드),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,매일경제신문사(매경이코노미),매일경제 구독료(12월),0,"25,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2025-12-31,2026-01-06,1월,60115707,WF-106,복리후생비(경조금),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,기술개발센터,,,정활상 부친상/중앙대장례식장1호실,"300,000",,"300,000",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-20,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"21,220",0,"21,220",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"21,220",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-20,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"29,960",0,"29,960",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"29,960",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-15,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25043,CivilEngineeringLab,CivilEngineeringLab,CivilEngineeringLab,기획/관리,기획&관리,,비매출,S/W 개발,운영S/W,총괄기획실,ERP기획팀,송대일,rightcivilengineering 도메인 구입(3년),0,"68,970",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115798,WF-106,복리후생비(공통),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 임직원 체력단련비(김흥제),"601,400",0,"601,400",0,,구매,공통,,,,,,,,,
|
||||||
|
바론,2026-01-15,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,기술기획팀,김원기,"문서자동화 기획 AI구입(chatGPT, NotebookLM)",0,"61,200",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-29,1월,60116199,OP-204,통신비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,SK텔레콤(주),12월 휴대폰 사용요금(최대선),"37,633",0,"37,633",0,,구매,공통,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-20,1월,20110101,LIA-101,외상매입금,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,씨앤피,11월 바론 명함 대금,0,"99,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-29,1월,10115301,AST-106,매입세액,OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,SK텔레콤(주),12월 휴대폰 사용요금(최대선),"3,762",0,"3,762",0,,구매,공통,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-29,1월,60116199,OP-204,통신비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,SK텔레콤(주),12월 휴대폰 사용요금(최대선),"102,885",0,"102,885",0,,구매,공통,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-20,1월,20110101,LIA-101,외상매입금,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),바론 ERP서버 인터넷 회선 통신비 26년 01월 결제의 건,0,"561,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-02,1월,50151399,OP-203,원가)소모품비(기타),X25028,문서관리시스템(PM),문서관리시스템(PM),문서관리시스템(PM),S/W개발,솔루션,개발,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,프로젝트마스터 클라우드 스토리지 12월 금액,"19,474",0,"19,474",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-02,1월,50152999,OP-204,원가)통신비(기타),X25028,문서관리시스템(PM),문서관리시스템(PM),문서관리시스템(PM),S/W개발,솔루션,개발,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,LTE 태블릿 통신비 청구(11월사용),"35,200",0,"35,200",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-20,1월,20110101,LIA-101,외상매입금,X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,기술개발센터,,The Intellicad Technology Consortium,EG-BIM 개발 및 사용을 위한 ITC (IntelliCAD) 로열티 지급의 건(외화),0,"51,569,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-02,2026-01-09,1월,50151399,OP-203,원가)소모품비(기타),X25028,문서관리시스템(PM),문서관리시스템(PM),문서관리시스템(PM),S/W개발,솔루션,개발,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,프로젝트마스터 클라우드 서버 12월 사용 금액,"290,556",0,"290,556",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-21,1월,20110101,LIA-101,외상매입금,Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,,(주)코세코,드론 사진측량 실무 프로젝트 수행을 위한 장비 구매의 건,0,"384,900",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,50151399,OP-203,원가)소모품비(기타),X25028,문서관리시스템(PM),문서관리시스템(PM),문서관리시스템(PM),S/W개발,솔루션,개발,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,프로젝트마스터 클라우드 스토리지 01월 금액,"23,705",0,"23,705",0,"원가)소모품비(기타) 코드가 두개임 50151309, 50151399 (하나로 통일 필요+계산을 위해 임의로 50151399로 변경)",구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-15,2026-01-20,1월,50151399,OP-203,원가)소모품비(기타),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,기술기획팀,김원기,"문서자동화 기획 AI구입(chatGPT, NotebookLM)","61,200",0,"61,200",0,원가)소모품비(기타) 코드가 두개임,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-21,1월,20110101,LIA-101,외상매입금,Y25019,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구) 통합 스마트상황실 구축 및 운영,인주~염치(2공구)빅룸,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구),직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,,SK브로드밴드(주),서산-아산 건설사업단 BIG ROOM VPN 26년 01월 결제의 건,0,"94,600",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2026-01-02,2026-01-08,1월,60114733,IT-301,경상시험연구비(지급수수료),X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,총괄기획실,,,스마트건설10/특허등록,"2,057,000",,"2,057,000",0,,구매,R&D,,,,,,,,,
|
||||||
|
한맥,2026-01-15,2026-01-15,1월,60114733,IT-301,경상시험연구비(지급수수료),X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,총괄기획실,,,스마트건설10/사무용품 구매,"1,469,050",,"1,469,050",0,,구매,R&D,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-21,1월,20110101,LIA-101,외상매입금,X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,구글클라우드 코리아 유한회사,구글클라우드 Ai 사용료(12월),0,"115,624",0,0,,제외,일반,,,,,,,,,
|
||||||
|
장헌산업,2026-01-15,2026-01-20,1월,823,OUT-101,연구개발비,X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,드림디포,스마트건설/사무용품 구매(일부법인지급),"937,530",,"937,530",0,관리계정=연구개발/ 실질은 비품,구매,R&D,,,,,,,,,
|
||||||
|
장헌산업,2026-01-20,2026-01-20,1월,823,OUT-101,연구개발비,X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,(사)국토교통과학기술진흥원,스마트건설/4분기(10월~12월) 부가세,"264,000",,"264,000",0,관리계정=연구개발/ 실질은 부가세,구매,R&D,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,20110101,LIA-101,외상매입금,X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,구글클라우드 코리아 유한회사,구글클라우드 Ai 사용료(11월),0,589,0,0,,제외,일반,,,,,,,,,
|
||||||
|
피티씨,2026-01-05,2026-01-15,1월,823,OUT-101,연구개발비,X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,드림디포거여점,[스마트건설] 12월 사무용품비(일부법인지급),"1,908,170",,"1,908,170",0,관리계정=연구개발/ 실질은 비품,구매,R&D,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,60115798,WF-106,복리후생비(공통),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,사장단회의 다과(1월 2일),"181,840",0,"181,840",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,20111109,LIA-101,미지급금(하나카드),X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,하나카드(6669),Ai셀 Cloudflare 사용료(12월),0,"8,375",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,60116399,IT-301,지급수수료(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,우편요금 반송 수수료,"2,400",0,"2,400",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,60110101,HR-101,급여(임.직원),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,총괄/장종찬,26년 1월 급여(바론),"388,889,600",0,"388,889,600",0,X,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,20111501,LIA-101,예수금(근로소득세),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,,26년1월 급여 근로소득세(바론),0,"29,627,210",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,20111503,LIA-101,예수금(근로소득주민세),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,,26년1월 급여 근로소득주민세(바론),0,"2,962,370",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,20111509,HR-203,예수금(고용보험료(직원)),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,,26년1월 급여 고용보험(바론),0,"3,260,540",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,20111505,HR-202,예수금(건강보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,,"26년1월 급여 의료보험(건강+요양, 바론)",0,"14,146,850",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,20111507,HR-201,예수금(국민연금),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,,26년1월 급여 국민연금(바론),0,"11,756,650",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,20111599,LIA-101,예수금(기타),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,,26년1월 식대 및 기타 공제(바론),0,"1,988,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,총괄/장종찬,26년1월 급여(바론),0,"325,147,580",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-22,2026-01-22,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,1월 업무관련 유류대,0,"311,750",0,0,공통 → 경영진,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-22,2026-01-22,1월,60115999,WF-201,여비교통비(기타),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,1월 업무관련 유류대,"311,750",0,"311,750",0,공통 → 경영진,출장비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-22,2026-01-22,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,업무 회의 후 식사,0,"27,000",0,0,공통 → 경영진,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-22,2026-01-22,1월,60115705,WF-101,복리후생비(회식대),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,업무 회의 후 식사,"27,000",0,"27,000",0,공통 → 경영진,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-22,1월,20110101,LIA-101,외상매입금,X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,주식회사 케이지에듀원,바론컨설턴트 2025년 법정필수 및 산업안전보건교육,0,"1,332,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,60114503,WF-105,도서인쇄비(도서구입비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,(주)교보문고,기술개발센터도서구매(12월),"253,260",0,"253,260",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-23,1월,10111101,REV-101,용역미수금(계산서발행),Y26008,2026 경영 및 기술지원 서비스(한맥기술),,,,,,,,,총괄기획실,,한맥기술,2026경영및기술지원서비스(한맥기술),"122,916,200",0,0,"122,916,200",,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-23,1월,40110401,REV-101,관리용역수입,Y26008,2026 경영 및 기술지원 서비스(한맥기술),,,,,,,,,총괄기획실,,한맥기술,2026경영및기술지원서비스(한맥기술),0,"111,742,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-23,1월,20112901,LIA-101,매출세액,Y26008,2026 경영 및 기술지원 서비스(한맥기술),,,,,,,,,총괄기획실,,한맥기술,"111,742,000*10%",0,"11,174,200",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2025-12-10,2026-01-23,1월,10111101,REV-101,용역미수금(계산서발행),Y25039,경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,경영및기술지원서비스(장헌산업),"28,270,000",0,0,"28,270,000",,수입,기타,,,,,,,,,
|
||||||
|
바론,2025-12-10,2026-01-23,1월,40110401,REV-101,관리용역수입,Y25039,경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,경영및기술지원서비스(장헌산업),0,"25,700,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2025-12-10,2026-01-23,1월,20112901,LIA-101,매출세액,Y25039,경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,"25,700,000*10%",0,"2,570,000",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-23,1월,10111101,REV-101,용역미수금(계산서발행),Y26011,2026 경영 및 기술지원 서비스(삼안),,,,,,,,,총괄기획실,,삼안,2026경영및기술지원서비스(삼안),"294,607,500",0,0,"294,607,500",,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-23,1월,40110401,REV-101,관리용역수입,Y26011,2026 경영 및 기술지원 서비스(삼안),,,,,,,,,총괄기획실,,삼안,2026경영및기술지원서비스(삼안),0,"267,825,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-23,1월,20112901,LIA-101,매출세액,Y26011,2026 경영 및 기술지원 서비스(삼안),,,,,,,,,총괄기획실,,삼안,"267,825,000*10%",0,"26,782,500",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-23,1월,10111101,REV-101,용역미수금(계산서발행),Y26011,2026 경영 및 기술지원 서비스(삼안),,,,,,,,,총괄기획실,,삼안,2026경영및기술지원서비스(삼안),0,"294,607,500",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-23,1월,10110501,AST-101,보통예금,Y26011,2026 경영 및 기술지원 서비스(삼안),,,,,,,,,총괄기획실,,국민(주거래),2026경영및기술지원서비스(삼안),"294,607,500",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-23,1월,10111101,REV-101,용역미수금(계산서발행),Y25039,경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,경영및기술지원서비스(장헌산업),0,"28,270,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-23,1월,10110501,AST-101,보통예금,Y25039,경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,국민(주거래),경영및기술지원서비스(장헌산업),"28,270,000",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-23,1월,10111101,REV-101,용역미수금(계산서발행),Y26008,2026 경영 및 기술지원 서비스(한맥기술),,,,,,,,,총괄기획실,,한맥기술,2026경영및기술지원서비스(한맥기술),0,"122,916,200",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-23,1월,10110501,AST-101,보통예금,Y26008,2026 경영 및 기술지원 서비스(한맥기술),,,,,,,,,총괄기획실,,국민(주거래),2026경영및기술지원서비스(한맥기술),"122,916,200",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-23,1월,10111101,REV-101,용역미수금(계산서발행),Y26012,2026 경영 및 기술지원 서비스(한라산업개발),,,,,,,,,총괄기획실,,한라산업개발,2026경영및기술지원서비스(한라산업개발),0,"10,285,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-23,1월,10110501,AST-101,보통예금,Y26012,2026 경영 및 기술지원 서비스(한라산업개발),,,,,,,,,총괄기획실,,국민(주거래),2026경영및기술지원서비스(한라산업개발),"10,285,000",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-23,1월,10111101,REV-101,용역미수금(계산서발행),Y26010,2026 경영 및 기술지원 서비스(피티씨),,,,,,,,,총괄기획실,,피티씨,2026경영및기술지원서비스(피티씨)1월,0,"23,760,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-23,1월,10110501,AST-101,보통예금,Y26010,2026 경영 및 기술지원 서비스(피티씨),,,,,,,,,총괄기획실,,국민(주거래),2026경영및기술지원서비스(피티씨)1월,"23,760,000",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-23,1월,10111101,REV-101,용역미수금(계산서발행),Y26013,한강교량 보수보강공사 감독권한대행등 건설사업관리용역(2공구)(도화30%)-인쇄/편집,한강교량 사업관리(2공구),한강교량 사업관리(2공구),직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,도화ENG,한강교량보수보강공사감독권한대행등건설사업관리용역(2공구)(도화30%)-인쇄/편집,0,"1,815,000",0,0,,수입,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-23,1월,10110501,AST-101,보통예금,Y26013,한강교량 보수보강공사 감독권한대행등 건설사업관리용역(2공구)(도화30%)-인쇄/편집,한강교량 사업관리(2공구),한강교량 사업관리(2공구),직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,국민(주거래),한강교량보수보강공사감독권한대행등건설사업관리용역(2공구)(도화30%)-인쇄/편집,"1,815,000",0,0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-23,1월,60115903,WF-201,여비교통비(국내출장비),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,최근혜,출장비,"82,000",0,"82,000",0,X,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-23,1월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,최근혜,출장비 - 최근혜,0,"82,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-23,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,노트북가방 구매(01/18),0,"100,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-26,2026-01-02,1월,60115798,WF-106,복리후생비(공통),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,솔루션통합팀,김지영A,외부인사 초청 세미나(유니스트 교수) 다과,"26,200",0,"26,200",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-23,1월,10111101,REV-101,용역미수금(계산서발행),Y26013,한강교량 보수보강공사 감독권한대행등 건설사업관리용역(2공구)(도화30%)-인쇄/편집,한강교량 사업관리(2공구),한강교량 사업관리(2공구),직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,도화ENG,한강교량보수보강공사감독권한대행등건설사업관리용역(2공구)(도화30%)-인쇄/편집,"1,815,000",0,0,"1,815,000",,수입,일반,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-23,1월,40110501,REV-101,개발수입,Y26013,한강교량 보수보강공사 감독권한대행등 건설사업관리용역(2공구)(도화30%)-인쇄/편집,한강교량 사업관리(2공구),한강교량 사업관리(2공구),직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,도화ENG,한강교량보수보강공사감독권한대행등건설사업관리용역(2공구)(도화30%)-인쇄/편집,0,"1,650,000",0,0,,수입,일반,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-23,1월,20112901,LIA-101,매출세액,Y26013,한강교량 보수보강공사 감독권한대행등 건설사업관리용역(2공구)(도화30%)-인쇄/편집,한강교량 사업관리(2공구),한강교량 사업관리(2공구),직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,도화ENG,"1,650,000*10%",0,"165,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-23,1월,10111101,REV-101,용역미수금(계산서발행),Y26010,2026 경영 및 기술지원 서비스(피티씨),,,,,,,,,총괄기획실,,피티씨,2026경영및기술지원서비스(피티씨)1월,"23,760,000",0,0,"23,760,000",,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-23,1월,40110401,REV-101,관리용역수입,Y26010,2026 경영 및 기술지원 서비스(피티씨),,,,,,,,,총괄기획실,,피티씨,2026경영및기술지원서비스(피티씨)1월,0,"21,600,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-23,1월,20112901,LIA-101,매출세액,Y26010,2026 경영 및 기술지원 서비스(피티씨),,,,,,,,,총괄기획실,,피티씨,"21,600,000*10%",0,"2,160,000",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-23,1월,10111101,REV-101,용역미수금(계산서발행),Y26012,2026 경영 및 기술지원 서비스(한라산업개발),,,,,,,,,총괄기획실,,한라산업개발,2026경영및기술지원서비스(한라산업개발),"10,285,000",0,0,"10,285,000",,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-23,1월,40110401,REV-101,관리용역수입,Y26012,2026 경영 및 기술지원 서비스(한라산업개발),,,,,,,,,총괄기획실,,한라산업개발,2026경영및기술지원서비스(한라산업개발),0,"9,350,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-23,1월,20112901,LIA-101,매출세액,Y26012,2026 경영 및 기술지원 서비스(한라산업개발),,,,,,,,,총괄기획실,,한라산업개발,"9,350,000*10%",0,"935,000",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-27,1월,20111103,LIA-101,미지급금(일반미지급),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,기술기획팀,김원기,통합로그인 회의 후 회식비,0,"154,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-27,1월,60115705,WF-101,복리후생비(회식대),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,기술기획팀,김원기,통합로그인 회의 후 회식비,"154,400",0,"154,400",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-27,2026-01-27,1월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민은행,퇴직연금(국민) 2026년 1월분 (43명),0,"18,331,070",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-27,2026-01-27,1월,60111101,HR-103,퇴직금,X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민은행,퇴직연금(국민) 2026년 1월분 (43명),"18,331,070",0,"18,331,070",0,X,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-01-27,1월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,신한은행,퇴직연금(신한) 2026년 1월분 (6명),0,"2,182,210",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-01-27,1월,60111101,HR-103,퇴직금,X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,신한은행,퇴직연금(신한) 2026년 1월분 (6명),"2,182,210",0,"2,182,210",0,X,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-27,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,,한상연,건강검진 비용 청구(한상연 부사장),0,"200,000",0,0,"공통 → 교육훈련,참석",제외,기타,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-02,1월,60114301,OP-203,소모품비(사무용품비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,류원준,마천사무실 주차 할인권 구매,"60,000",0,"60,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-28,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,,서울용한치과의원,임직원 건강검진(치아) 비용 정산의 건(센터 및 총괄 39명),0,"195,000",0,0,"공통 → 교육훈련,참석",제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-05,2026-01-07,1월,60113105,OP-103,수도광열비(상하수도),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,(주)미래엔서해에너지,11월 당진 숙소 도시가스 요금,"40,770",0,"40,770",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/15),0,"9,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-05,2026-01-07,1월,60113105,OP-103,수도광열비(상하수도),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,(주)미래엔서해에너지,12월 당진 숙소 도시가스 요금,"1,100",0,"1,100",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,김윤재,"법인 등기 관련 비용(도장, 등기)",0,"21,260",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-07,1월,60114398,OP-203,소모품비(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,주완기,총괄기획실 외빈 선물용 와인 구매(5EA),"230,000",0,"230,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-11,2026-01-14,1월,60114301,OP-203,소모품비(사무용품비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,류원준,소모품 (창고 물품보관용가방) 구입,"13,970",0,"13,970",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-22,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,SW 홍보목적 브로슈어 클리어파일 구매(100매),0,"21,700",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-15,1월,60113707,IT-205,수선비(전산),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,몬스타 주식회사,인프라 BIM 1팀 측량 결과물 3D 모델링을 위한 워크스테이션 긴급 수리,"545,455",0,"545,455",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,60115903,WF-201,여비교통비(국내출장비),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,김윤재,출장(당진 공장 등록 관련),"30,000",0,"30,000",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,김윤재,출장비 - 김윤재,0,"30,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,ERP기획팀,송대일,eg-bim 홈페이지 호스팅 업그레이드,0,"38,140",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-14,2026-01-15,1월,10115301,AST-106,매입세액,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,몬스타 주식회사,인프라 BIM 1팀 측량 결과물 3D 모델링을 위한 워크스테이션 긴급 수리,"54,545",0,"54,545",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,ERP기획팀,송대일,egbim 홈페이지 트래픽 초기화,0,"2,750",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-11,2026-01-15,1월,50152599,WF-106,원가)복리후생비(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,류원준,관리실 방문 음료,"47,000",0,"47,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,권혁진,한라대 ( 원주 ) : 강원 BIM 아카데미 강의지원,0,"168,330",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-01-29,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,권혁진,한라대 ( 원주 ) : 강원 BIM 아카데미 강의지원,"168,330",0,"168,330",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,임원 AI 구독료(1월),0,"29,000",0,0,공통 → 경영진,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60116199,OP-204,통신비(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),바론 대표전화 통신비 26년 01월,"1,626",0,"1,626",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-22,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,김우진,회계법인 업무미팅 후 식사,0,"15,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-22,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,김우진A,회계법인 업무미팅 후 식사,"15,000",0,"15,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-29,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"64,030",0,"64,030",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"64,030",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-29,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"25,120",0,"25,120",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"25,120",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"99,830",0,"99,830",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"99,830",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111105,LIA-101,미지급금(KB국민카드),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,국민카드(8824),12월 업무관련 교통비(김흥제),0,"568,000",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 교통비(김흥제),"108,000",0,"108,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 교통비(김흥제),"74,000",0,"74,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 교통비(김흥제),"10,000",0,"10,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 교통비(김흥제),"100,000",0,"100,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 교통비(김흥제),"5,000",0,"5,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 교통비(김흥제),"94,000",0,"94,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 교통비(김흥제),"48,000",0,"48,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 교통비(김흥제),"11,000",0,"11,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 교통비(김흥제),"118,000",0,"118,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/09),0,"6,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60116199,OP-204,통신비(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),바론 대표전화 단말기할부금(부가세대상),"22,000",0,"22,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,,서울용한치과의원,임직원 건강검진(치아) 비용 정산의 건(바론소속 3명),0,"15,000",0,0,"공통 → 교육훈련,참석",제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,10115301,AST-106,매입세액,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),공급가액*10%,162,0,162,0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-01-29,1월,20111109,LIA-101,미지급금(하나카드),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,매일경제신문사(매경이코노미),매일경제 구독료(26년 1월),0,"25,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-20,1월,50151999,OP-201,원가)보험료(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,주식회사 헬셀,"KB 드론책임배상보험 신규 가입의 건(총 2건 / Matrice 300 RTK, Air2s)","844,000",0,"844,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-01-29,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"21,440",0,"21,440",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"21,440",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,2026 강원 BIM 아카데미 강의 지원(원주),"87,920",0,"87,920",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,2026 강원 BIM 아카데미 강의 지원(원주),0,"87,920",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111105,LIA-101,미지급금(KB국민카드),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,국민카드(8824),12월 업무관련 식대(김흥제),0,"988,600",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 식대(김흥제),"200,000",0,"200,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 식대(김흥제),"61,000",0,"61,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 식대(김흥제),"161,000",0,"161,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 식대(김흥제),"35,500",0,"35,500",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 식대(김흥제),"14,100",0,"14,100",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 식대(김흥제),"67,000",0,"67,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 식대(김흥제),"250,000",0,"250,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,12월 업무관련 식대(김흥제),"200,000",0,"200,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-27,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,총괄기획실,경영기획팀,임민경,건설기술인 연회비(조용민) 경력증명서 2부(정희욱) 수수료,0,"23,000",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-20,1월,60114301,OP-203,소모품비(사무용품비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,류원준,시연행사 다과 구입,"50,000",0,"50,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,솔루션통합팀,김지영A,1월 총괄기획실 물품 및 다과 구매,0,"162,220",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-20,1월,60114501,WF-301,도서인쇄비(신문및정기간행물),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,매일경제신문사(매경이코노미),매일경제 구독료(12월),"25,000",0,"25,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111105,LIA-101,미지급금(KB국민카드),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,국민카드(8824),12월 임직원 체력단련비(김흥제),0,"601,400",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-20,1월,50151507,MK-101,원가)도서인쇄비(인쇄비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,씨앤피,11월 바론 명함 대금,"90,000",0,"90,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111109,LIA-101,미지급금(하나카드),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,하나카드(7726),12월 업무관련 유류대(최대선),0,"493,000",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,최대선,12월 업무관련 유류대(최대선),"71,000",0,"71,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,최대선,12월 업무관련 유류대(최대선),"72,000",0,"72,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,최대선,12월 업무관련 유류대(최대선),"114,000",0,"114,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,최대선,12월 업무관련 유류대(최대선),"76,000",0,"76,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,최대선,12월 업무관련 유류대(최대선),"76,000",0,"76,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,최대선,12월 업무관련 유류대(최대선),"84,000",0,"84,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-27,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,김윤재,장헌산업 등기관련 인감증명서 수수료,0,"5,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-20,1월,10115301,AST-106,매입세액,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,씨앤피,11월 바론 명함 대금,"9,000",0,"9,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111105,LIA-101,미지급금(KB국민카드),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,국민카드(8824),1월 업무관련 교통비(김흥제),0,"272,000",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 교통비(김흥제),"50,000",0,"50,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 교통비(김흥제),"5,000",0,"5,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 교통비(김흥제),"13,000",0,"13,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 교통비(김흥제),"7,000",0,"7,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 교통비(김흥제),"7,000",0,"7,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 교통비(김흥제),"50,000",0,"50,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 교통비(김흥제),"50,000",0,"50,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115999,WF-201,여비교통비(기타),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 교통비(김흥제),"90,000",0,"90,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,김윤재,장헌 사내이사 서류 발급 수수료,0,"2,200",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-20,1월,60116199,OP-204,통신비(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),바론 ERP서버 인터넷 회선 통신비 26년 01월 결제의 건,"510,000",0,"510,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111105,LIA-101,미지급금(KB국민카드),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,국민카드(8824),1월 업무관련 식대(김흥제),0,"1,717,300",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 식대(김흥제),"62,500",0,"62,500",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 식대(김흥제),"28,000",0,"28,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 식대(김흥제),"200,000",0,"200,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 식대(김흥제),"221,000",0,"221,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 식대(김흥제),"25,000",0,"25,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 식대(김흥제),"250,000",0,"250,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 식대(김흥제),"315,000",0,"315,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 식대(김흥제),"242,000",0,"242,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 식대(김흥제),"241,000",0,"241,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 식대(김흥제),"100,000",0,"100,000",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,김흥제,1월 업무관련 식대(김흥제),"32,800",0,"32,800",0,,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-29,1월,10111101,REV-101,용역미수금(계산서발행),Y25017,국도42호선 원주 흥업 사제 외 1개소 교차로 개선공사 실시설계용역(광터교차로) BIM 설계,국도42 원주~흥업,국도42호선 원주 흥업 사제 외 1개소 교차로 개선공사 실시설계용역(삼안),직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,(주)진화기술공사,국도42호선원주흥업사제외1개소교차로개선공사실시설계용역(광터교차로)BIM설,"14,520,000",0,0,"14,520,000",,수입,일반,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-29,1월,40110501,REV-101,개발수입,Y25017,국도42호선 원주 흥업 사제 외 1개소 교차로 개선공사 실시설계용역(광터교차로) BIM 설계,국도42 원주~흥업,국도42호선 원주 흥업 사제 외 1개소 교차로 개선공사 실시설계용역(삼안),직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,(주)진화기술공사,국도42호선원주흥업사제외1개소교차로개선공사실시설계용역(광터교차로)BIM설,0,"13,200,000",0,0,,수입,일반,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-29,1월,20112901,LIA-101,매출세액,Y25017,국도42호선 원주 흥업 사제 외 1개소 교차로 개선공사 실시설계용역(광터교차로) BIM 설계,국도42 원주~흥업,국도42호선 원주 흥업 사제 외 1개소 교차로 개선공사 실시설계용역(삼안),직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,(주)진화기술공사,"13,200,000*10%",0,"1,320,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,기술기획팀,홍아름,CEL회의 후 점심식대 (7명),0,"100,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,기술기획팀,홍아름,CEL회의 후 점심식대 (7명),"100,000",0,"100,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,김윤재,"법인명변경/법인분할 등기 관련 서류 발급 수수료(인감증명서 4, 등본 2, 초본 2)",0,"4,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-20,1월,10115301,AST-106,매입세액,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),바론 ERP서버 인터넷 회선 통신비 26년 01월 결제의 건,"51,000",0,"51,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),OBOBOB,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,SK텔레콤(주),12월 휴대폰 사용요금(최대선),0,"144,280",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-01-29,1월,60114501,WF-301,도서인쇄비(신문및정기간행물),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,매일경제신문사(매경이코노미),매일경제 구독료(26년 1월),"25,000",0,"25,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115798,WF-106,복리후생비(공통),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,솔루션통합팀,김지영A,1월 총괄기획실 물품 및 다과 구매,"162,220",0,"162,220",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,60114398,OP-203,소모품비(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,인프라 BIM1팀,안효원,GNSS 측량 테스트 안테나 구매,"300,500",0,"300,500",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-29,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"43,340",0,"43,340",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"43,340",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-29,1월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"28,350",0,"28,350",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"28,350",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-01-30,1월,10111101,REV-101,용역미수금(계산서발행),Y25017,국도42호선 원주 흥업 사제 외 1개소 교차로 개선공사 실시설계용역(광터교차로) BIM 설계,국도42 원주~흥업,국도42호선 원주 흥업 사제 외 1개소 교차로 개선공사 실시설계용역(삼안),직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,(주)진화기술공사,국도42호선원주흥업사제외1개소교차로개선공사실시설계용역(광터교차로)BIM설,0,"14,520,000",0,0,,수입,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-01-30,1월,10110501,AST-101,보통예금,Y25017,국도42호선 원주 흥업 사제 외 1개소 교차로 개선공사 실시설계용역(광터교차로) BIM 설계,국도42 원주~흥업,국도42호선 원주 흥업 사제 외 1개소 교차로 개선공사 실시설계용역(삼안),직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,국민(주거래),국도42호선원주흥업사제외1개소교차로개선공사실시설계용역(광터교차로)BIM설,"14,520,000",0,0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-02,2026-01-02,1월,20110101,LIA-101,외상매입금,X25055,GIS장비 개발,GIS 장비개발,GIS장비 개발,기획/관리,기획&관리,,비매출,기획/제안,기획,기술개발센터,,엔비텍,SatPointer 하드웨어 개발,0,"8,800,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2026-01-20,2026-01-20,1월,50151309,OP-203,원가)소모품비(안전관리장비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,,마천사무실/페이퍼타올 구매(25년 12월),"199,100",,"199,100",0,X,구매,일반,,,,,,,,,
|
||||||
|
삼안,2026-01-20,2026-01-20,1월,60114733,IT-301,경상시험연구비(지급수수료),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,드론배상책임보험 환급금 과다지급에 따른 차액 지급의 건,"101,000",,"101,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 기획그룹장,양병홍,12월 유류비,0,"125,000",0,0,공통 → 그룹장,제외,기타,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,60115903,WF-201,여비교통비(국내출장비),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 기획그룹장,양병홍,12월 유류비,"125,000",0,"125,000",0,공통 → 그룹장,출장비,기타,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,인프라 BIM1팀,안효원,GNSS 측량 테스트 안테나 구매,0,"300,500",0,0,,제외,일반,,,,,,,,,
|
||||||
|
삼안,2026-01-28,2026-01-27,1월,60114739,IT-201,경상시험연구비(소모품비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,기술개발센터/신사무실 커피원두 구매(1월_정기구매),"660,000",,"660,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 기획그룹장,양병홍,업무회의 후 식대,0,"185,300",0,0,공통 → 그룹장,제외,기타,,,,,,,,,
|
||||||
|
바론,2025-12-31,2026-01-02,1월,60115705,WF-101,복리후생비(회식대),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 기획그룹장,양병홍,업무회의 후 식대,"185,300",0,"185,300",0,공통 → 그룹장,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X25028,문서관리시스템(PM),문서관리시스템(PM),문서관리시스템(PM),S/W개발,솔루션,,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,프로젝트마스터 클라우드 스토리지 12월 청구금액,0,"19,474",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-26,2026-01-02,1월,60116399,IT-301,지급수수료(기타),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,류원준,"노션 구독료(25.12~25.12, 사내가이드)","187,420",0,"187,420",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-02,1월,20111103,LIA-101,미지급금(일반미지급),X25028,문서관리시스템(PM),문서관리시스템(PM),문서관리시스템(PM),S/W개발,솔루션,,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,통신비,0,"35,200",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-22,1월,60117301,WF-301,교육훈련비,X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,주식회사 케이지에듀원,바론컨설턴트 2025년 법정필수 및 산업안전보건교육,"1,332,000",0,"1,332,000",0,외주,외주,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25008,WayPrimal,WayPrimal,WayPrimal,S/W개발,도로,,비매출,S/W 개발,도로,기술개발센터,Infra Solution 개발팀,류한솔,InfraSolution 회식비,0,"499,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,60115705,WF-101,복리후생비(회식대),X25008,WayPrimal,WayPrimal,WayPrimal,S/W개발,도로,개발,비매출,S/W 개발,도로,기술개발센터,Infra Solution 개발팀,류한솔,InfraSolution 회식비,"499,000",0,"499,000",0,X,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-30,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25032,단가/공정 solution,단가/공정 solution,단가/공정 solution,S/W개발,솔루션,,비매출,S/W 개발,솔루션,기술개발센터,C.C.팀,정요한,팀 회식비,0,"333,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-30,2026-01-07,1월,60115705,WF-101,복리후생비(회식대),X25032,단가/공정 solution,단가/공정 solution,단가/공정 solution,S/W개발,솔루션,기획,비매출,S/W 개발,솔루션,기술개발센터,C.C.팀,정요한,Construction Control 팀 회식비,"333,000",0,"333,000",0,X,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-17,2026-01-07,1월,60115903,WF-201,여비교통비(국내출장비),25061,인천발 KTX 직결교량 시공,인천발 KTX 시공,인천발 KTX 직결교량 시공,직접매출,시공,,매출,가족사 프로젝트,시공,기술개발센터,프리팹 디비전장,심영표,출장비,"98,240",0,"98,240",0,X,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-17,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),25061,인천발 KTX 직결교량 시공,인천발 KTX 시공,인천발 KTX 직결교량 시공,직접매출,시공,,매출,가족사 프로젝트,시공,기술개발센터,프리팹 디비전장,심영표,출장비 - 심영표,0,"98,240",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25010,WayDraw,WayDraw,WayDraw,S/W개발,도로,,비매출,S/W 개발,도로,기술개발센터,Infra Solution 디비전장,김정훈,4분기 세미나 후 회식,0,"505,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,60115705,WF-101,복리후생비(회식대),X25010,WayDraw,WayDraw,WayDraw,S/W개발,도로,기획,비매출,S/W 개발,도로,기술개발센터,Infra Solution 디비전장,김정훈,4분기 세미나 후 회식,"505,000",0,"505,000",0,X,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-07,1월,60115903,WF-201,여비교통비(국내출장비),25061,인천발 KTX 직결교량 시공,인천발 KTX 시공,인천발 KTX 직결교량 시공,직접매출,시공,,매출,가족사 프로젝트,시공,기술개발센터,실물실증팀,이수문,출장비,"1,089,770",0,"1,089,770",0,X,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),25061,인천발 KTX 직결교량 시공,인천발 KTX 시공,인천발 KTX 직결교량 시공,직접매출,시공,,매출,가족사 프로젝트,시공,기술개발센터,실물실증팀,이수문,출장비 - 이수문,0,"1,089,770",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-02,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25030,GSIM,GSIM,GSIM,S/W개발,솔루션,,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,팀 회식비,0,"313,200",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-02,2026-01-07,1월,60115705,WF-101,복리후생비(회식대),X25030,GSIM,GSIM,GSIM,S/W개발,솔루션,개발,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,GSIM개발팀 회식비,"313,200",0,"313,200",0,X,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,60115903,WF-201,여비교통비(국내출장비),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,기술개발센터,인프라 BIM1팀,김이훈,출장비,"425,620",0,"425,620",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,기술개발센터,인프라 BIM1팀,안효원,출장비 - 안효원,0,"240,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,기술개발센터,인프라 BIM1팀,김이훈,출장비 - 김이훈,0,"185,620",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,Web Solution팀,한지아,Cursor AI Agent 사용료(디자인퍼블리싱),0,"137,666",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,50153199,IT-301,원가)지급수수료(기타),X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,Web Solution팀,한지아,Cursor AI Agent 사용료(디자인퍼블리싱),"137,666",0,"137,666",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25021,LifeLine-Water,LifeLine-Water,LifeLine-Water,S/W개발,수리/수문,,비매출,S/W 개발,수리/수문,기술개발센터,상하수도팀,박현수,팀 세미나 회의비,0,"42,200",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-07,1월,50154701,WF-103,원가)회의비,X25021,LifeLine-Water,LifeLine-Water,LifeLine-Water,S/W개발,수리/수문,기획,비매출,S/W 개발,수리/수문,기술개발센터,상하수도팀,박현수,물관리&단지설계개발 자체 세미나 회의비,"42,200",0,"42,200",0,X,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-26,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25022,강우강도산정 프로그램,강우강도산정 프로그램,강우강도산정 프로그램,S/W개발,수리/수문,,비매출,S/W 개발,수리/수문,기술개발센터,수자원팀,이은구,수자원팀 회식비,0,"95,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-26,2026-01-07,1월,60115705,WF-101,복리후생비(회식대),X25022,강우강도산정 프로그램,강우강도산정 프로그램,강우강도산정 프로그램,S/W개발,수리/수문,기획,비매출,S/W 개발,수리/수문,기술개발센터,수자원팀,이은구,꼬꼬잭치킨 거여마천점 수자원팀 회식비,"95,000",0,"95,000",0,X,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,60115903,WF-201,여비교통비(국내출장비),Z25058,서산~명천 도로건설공사 기본 및 실시설계,서산~명천 기본 및 실시설계,서산~명천 도로건설공사 기본 및 실시설계,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,인프라 BIM1팀,이배승,출장비,"96,264",0,"96,264",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-23,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),Z25058,서산~명천 도로건설공사 기본 및 실시설계,서산~명천 기본 및 실시설계,서산~명천 도로건설공사 기본 및 실시설계,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,인프라 BIM1팀,이배승,출장비 - 이배승,0,"96,264",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-26,2026-01-07,1월,20111103,LIA-101,미지급금(일반미지급),X25024,HmEG(HmDraw),HmEG(HmDraw),HmEG(HmDraw),S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,기술개발센터,그래픽스 개발팀,백승민,셀 회식비,0,"201,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-26,2026-01-07,1월,60115705,WF-101,복리후생비(회식대),X25024,HmEG(HmDraw),HmEG(HmDraw),HmEG(HmDraw),S/W개발,그래픽,개발,비매출,S/W 개발,그래픽&구조해석,기술개발센터,그래픽스 개발팀,백승민,HmEG셀 회식비,"201,000",0,"201,000",0,X,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-02,2026-01-09,1월,20111103,LIA-101,미지급금(일반미지급),X25028,문서관리시스템(PM),문서관리시스템(PM),문서관리시스템(PM),S/W개발,솔루션,,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,프로젝트마스터 클라우드 서버 12월 사용 금액,0,"290,556",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-29,1월,60116399,IT-301,지급수수료(기타),X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,,굿어스데이터 주식회사,센터 가상화서비스 12월 서비스 통합,"362,300",0,"362,300",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-30,2026-01-09,1월,60115903,WF-201,여비교통비(국내출장비),Y25008,계양-강화간 고속도로 건설공사 기본설계단계 교량 BIM 설계(제5공구),계양~강화 고속도로(5공구),계양-강화 고속도로 건설 기본 및 실시(5공구),직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,인프라 BIM2팀,표종진,출장비,"142,310",0,"142,310",0,X,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-30,2026-01-09,1월,20111103,LIA-101,미지급금(일반미지급),Y25008,계양-강화간 고속도로 건설공사 기본설계단계 교량 BIM 설계(제5공구),계양~강화 고속도로(5공구),계양-강화 고속도로 건설 기본 및 실시(5공구),직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,인프라 BIM2팀,표종진,출장비 - 표종진,0,"142,310",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2025-12-05,2026-01-09,1월,60115903,WF-201,여비교통비(국내출장비),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,인프라 BIM1팀,이광태,출장비,"60,000",0,"60,000",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-05,2026-01-09,1월,20111103,LIA-101,미지급금(일반미지급),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,인프라 BIM1팀,이광태,출장비,0,"60,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60115903,WF-201,여비교통비(국내출장비),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,한형관,차량유류대/업무협의,"397,000",0,"397,000",0,HSJ,출장비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,기술개발센터,,한형관,차량유류대/업무협의,0,"397,000",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60115903,WF-201,여비교통비(국내출장비),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,한형관,차량유류대/업무협의,"327,000",0,"327,000",0,HSJ,출장비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,기술개발센터,,한형관,차량유류대/업무협의,0,"327,000",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2025-12-22,2026-01-15,1월,60115903,WF-201,여비교통비(국내출장비),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,인프라 BIM1팀,이광태,출장비,"8,000",0,"8,000",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-22,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,인프라 BIM1팀,이광태,출장비 - 이광태,0,"8,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60115903,WF-201,여비교통비(국내출장비),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,인프라 BIM1팀,이광태,출장비,"16,000",0,"16,000",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,인프라 BIM1팀,이광태,출장비,0,"16,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,한형관,그룹장 업무협의 식대,"267,000",0,"267,000",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,기술개발센터,,한형관,그룹장 업무협의 식대,0,"267,000",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,한형관,Infra Solution팀 과업회의 식대,"283,800",0,"283,800",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,기술개발센터,,한형관,Infra Solution팀 과업회의 식대,0,"283,800",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,한형관,엔지니어링 개발그룹 성과회의 식대,"485,000",0,"485,000",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,기술개발센터,,한형관,엔지니어링 개발그룹 성과회의 식대,0,"485,000",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,한형관,Modeler셀 업무협의 식대,"309,000",0,"309,000",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,기술개발센터,,한형관,Modeler셀 업무협의 식대,0,"309,000",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60115903,WF-201,여비교통비(국내출장비),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,한형관,차량유류대/업무협의,"334,000",0,"334,000",0,HSJ,출장비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,기술개발센터,,한형관,차량유류대/업무협의,0,"334,000",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,한형관,Strana팀 업무협의 식대,"284,800",0,"284,800",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,기술개발센터,,한형관,Strana팀 업무협의 식대,0,"284,800",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,한형관,EG-BIM 셀 팀회식,"266,000",0,"266,000",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,기술개발센터,,한형관,EG-BIM 셀 팀회식,0,"266,000",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,60115903,WF-201,여비교통비(국내출장비),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,한형관,차량유류대/업무협의,"338,000",0,"338,000",0,HSJ,출장비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-15,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,기술개발센터,,한형관,차량유류대/업무협의,0,"338,000",0,0,,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 개발그룹장,장계석,업무회의 간 식대 및 음료대,0,"88,100",0,0,공통 → 그룹장,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-20,1월,50152507,WF-101,원가)복리후생비(회식대),X25002,KNGIL,KNGIL,KNGIL,S/W개발,기초조사및GIS,개발,비매출,S/W 개발,기초조사 및 GIS,기술개발센터,엔지니어링 개발그룹장,장계석,통합인증(회원관리) 회의 간 식대,"34,700",0,"34,700",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-20,1월,50152507,WF-101,원가)복리후생비(회식대),X25002,KNGIL,KNGIL,KNGIL,S/W개발,기초조사및GIS,개발,비매출,S/W 개발,기초조사 및 GIS,기술개발센터,엔지니어링 개발그룹장,장계석,통합인증(회원관리) 회의 간 음료대,"9,500",0,"9,500",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-20,1월,50152507,WF-101,원가)복리후생비(회식대),X25029,bCMf,bCMf,bCMf,S/W개발,솔루션,개발,비매출,S/W 개발,솔루션,기술개발센터,엔지니어링 개발그룹장,장계석,BCMF 회의 후 식사,"20,000",0,"20,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-20,1월,50152507,WF-101,원가)복리후생비(회식대),X25042,ERP: 바론,ERP:바론,ERP: 바론,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,엔지니어링 개발그룹장,장계석,산하종합기술 미팅 간 식대,"6,500",0,"6,500",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-20,1월,50152507,WF-101,원가)복리후생비(회식대),X25057,디지털 국토정보 기술개발사업 1핵심과제(삼안),디지털 국토정보(1핵심),디지털 국토정보 기술개발사업,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,저가형 GNSS 계약 간 음료대,"17,400",0,"17,400",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
바론,2025-12-22,2026-01-20,1월,60115903,WF-201,여비교통비(국내출장비),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,구조물계획팀,김일태,출장비,"16,500",0,"16,500",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-22,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,구조물계획팀,김일태,출장비 - 김일태,0,"16,500",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,Infra Solution 개발팀,최정우,서류 발급수수료,0,"47,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-29,1월,10115301,AST-106,매입세액,X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,,굿어스데이터 주식회사,"362,300*10%","36,230",0,"36,230",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-20,1월,20111103,LIA-101,미지급금(일반미지급),X25012,WallZainer,WallZainer,WallZainer,S/W개발,구조,,비매출,S/W 개발,구조물,기술개발센터,구조물 S/W개발팀,정계완,구조물SW개발팀 회식비,0,"103,600",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-07,2026-01-20,1월,60115705,WF-101,복리후생비(회식대),X25012,WallZainer,WallZainer,WallZainer,S/W개발,구조,개발,비매출,S/W 개발,구조물,기술개발센터,구조물 S/W개발팀,정계완,구조물SW개발팀 회식비,"103,600",0,"103,600",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-23,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 개발그룹장,장계석,업무회의 간 식대 및 음료대,0,"43,000",0,0,공통 → 그룹장,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-23,1월,50152507,WF-101,원가)복리후생비(회식대),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 개발그룹장,장계석,필리핀 지사장 업무회의 음료대,"5,000",0,"5,000",0,공통 → 그룹장,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-23,1월,50152507,WF-101,원가)복리후생비(회식대),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 개발그룹장,장계석,업무회의 간 식사,"32,000",0,"32,000",0,공통 → 그룹장,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-23,1월,50152507,WF-101,원가)복리후생비(회식대),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 개발그룹장,장계석,업무회의 간 음료대,"6,000",0,"6,000",0,공통 → 그룹장,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-22,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25053,수자원 해외사업,수자원 해외사업,수자원 해외사업,기획/관리,기획&관리,,비매출,기획/제안,기획,기술개발센터,수자원팀,이은구,수자원팀 인원 충원후 회식,0,"147,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-22,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),X25053,수자원 해외사업,수자원 해외사업,수자원 해외사업,기획/관리,기획&관리,,비매출,기획/제안,기획,기술개발센터,수자원팀,이은구,제일수산 수자원팀 회식비,"147,000",0,"147,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-22,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25038,ERP: PTC,ERP:PTC,ERP: PTC,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,Web Solution팀,김윤하,PTC안전 업무인수인계 후 식사,0,"36,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-22,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),X25038,ERP: PTC,ERP:PTC,ERP: PTC,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,Web Solution팀,김윤하,PTC안전 업무인수인계 후 식사,"36,000",0,"36,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25029,bCMf,bCMf,bCMf,S/W개발,솔루션,,비매출,S/W 개발,솔루션,기술개발센터,Web Solution팀,정명준,셀 회식,0,"65,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),X25029,bCMf,bCMf,bCMf,S/W개발,솔루션,개발,비매출,S/W 개발,솔루션,기술개발센터,Web Solution팀,정명준,BCMF 업무인수 인계 후 식사,"65,000",0,"65,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-27,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25009,WayConfirm,WayConfirm,WayConfirm,S/W개발,도로,,비매출,S/W 개발,도로,기술개발센터,Infra Solution 개발팀,이가연,인프라솔루션 비탈면셀 회식비,0,"120,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-27,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),X25009,WayConfirm,WayConfirm,WayConfirm,S/W개발,도로,개발,비매출,S/W 개발,도로,기술개발센터,Infra Solution 개발팀,이가연,인프라솔루션 비탈면셀 회식비,"120,000",0,"120,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-27,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25033,WatchBIM,WatchBIM,WatchBIM,S/W개발,도로,,비매출,S/W 개발,솔루션,기술개발센터,Infra Solution 개발팀,김재현,WatchBIM 셀 회식,0,"140,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-27,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),X25033,WatchBIM,WatchBIM,WatchBIM,S/W개발,도로,개발,비매출,S/W 개발,솔루션,기술개발센터,Infra Solution 개발팀,김재현,WatchBIM 셀 회식,"140,000",0,"140,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,60115903,WF-201,여비교통비(국내출장비),Y25004,"가평군하수관망계측시스템유지관리용역(프로그램 개발, 중앙제어실 및 서버유지관리)",가평군 하수관망시스템,가평군 하수관망 계측시스템 유지관리 용역,직접매출,콘텐츠제작,,매출,바론계약,기술용역,기술개발센터,Web Solution팀,이병권,출장비,"158,000",0,"158,000",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),Y25004,"가평군하수관망계측시스템유지관리용역(프로그램 개발, 중앙제어실 및 서버유지관리)",가평군 하수관망시스템,가평군 하수관망 계측시스템 유지관리 용역,직접매출,콘텐츠제작,,매출,바론계약,기술용역,기술개발센터,엔지니어링 개발그룹장,장계석,출장비 - 장계석,0,"36,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),Y25004,"가평군하수관망계측시스템유지관리용역(프로그램 개발, 중앙제어실 및 서버유지관리)",가평군 하수관망시스템,가평군 하수관망 계측시스템 유지관리 용역,직접매출,콘텐츠제작,,매출,바론계약,기술용역,기술개발센터,Web Solution팀,신지호,출장비 - 신지호,0,"113,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),Y25004,"가평군하수관망계측시스템유지관리용역(프로그램 개발, 중앙제어실 및 서버유지관리)",가평군 하수관망시스템,가평군 하수관망 계측시스템 유지관리 용역,직접매출,콘텐츠제작,,매출,바론계약,기술용역,기술개발센터,Web Solution팀,이병권,출장비 - 이병권,0,"9,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25028,문서관리시스템(PM),문서관리시스템(PM),문서관리시스템(PM),S/W개발,솔루션,,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,프로젝트마스터 클라우드 스토리지 01월 청구금액,0,"23,705",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2025-12-22,2026-01-08,1월,50153103,OUT-102,원가)지급수수료(용역수수료),X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,,,방화벽 유지보수 12월,"55,000",,"55,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25030,GSIM,GSIM,GSIM,S/W개발,솔루션,,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,통신비,0,"26,110",0,0,,제외,일반,,,,,,,,,
|
||||||
|
한맥,2025-12-23,2026-01-08,1월,50153103,OUT-102,원가)지급수수료(용역수수료),X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,,,통합 유지보수(서버외) 12월,"770,000",,"770,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25044,PQ시스템,PQ시스템,PQ시스템,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,Web Solution팀,신지호,PQ프로그램 개선 회의 음료,0,"10,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115705,WF-101,복리후생비(회식대),X25044,PQ시스템,PQ시스템,PQ시스템,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,Web Solution팀,신지호,PQ프로그램 개선 회의 음료,"10,000",0,"10,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-21,1월,50153199,IT-301,원가)지급수수료(기타),X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,구글클라우드 코리아 유한회사,구글클라우드 Ai 사용료(12월),"105,113",0,"105,113",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-21,1월,10115301,AST-106,매입세액,X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,구글클라우드 코리아 유한회사,구글클라우드 Ai 사용료(12월),"10,511",0,"10,511",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-19,2026-01-29,1월,20110101,LIA-101,외상매입금,X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,,굿어스데이터 주식회사,센터 가상화서비스 12월 서비스 통합,0,"398,530",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,대전 kickoff 미팅,0,"47,400",0,0,,제외,R&D,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,60115903,WF-201,여비교통비(국내출장비),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,대전 kickoff 미팅 간 교통비,"47,400",0,"47,400",0,,출장비,R&D,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 개발그룹장,장계석,업무미팅 간 식대,0,"111,600",0,0,공통 → 그룹장,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,50152507,WF-101,원가)복리후생비(회식대),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,대전 kickoff 미팅 간 음료대,"11,700",0,"11,700",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,50152507,WF-101,원가)복리후생비(회식대),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,ETRI 회의 및 식사,"47,100",0,"47,100",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,50152507,WF-101,원가)복리후생비(회식대),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,ETRI 회의 및 식사,"15,500",0,"15,500",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,50152507,WF-101,원가)복리후생비(회식대),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,ETRI 회의 및 식사,"32,300",0,"32,300",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,50152507,WF-101,원가)복리후생비(회식대),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 개발그룹장,장계석,유지보수 업체 미팅,"5,000",0,"5,000",0,공통 → 그룹장,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,50153199,IT-301,원가)지급수수료(기타),X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,구글클라우드 코리아 유한회사,구글클라우드 Ai 사용료(11월),535,0,535,0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,10115301,AST-106,매입세액,X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,구글클라우드 코리아 유한회사,구글클라우드 Ai 사용료(11월),54,0,54,0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-01-21,1월,50153199,IT-301,원가)지급수수료(기타),X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,Cloudflare Inc.,Ai셀 Cloudflare 사용료(12월),"8,375",0,"8,375",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-15,2026-01-20,1월,50153199,IT-301,원가)지급수수료(기타),X25043,CivilEngineeringLab,CivilEngineeringLab,CivilEngineeringLab,기획/관리,기획&관리,,비매출,S/W 개발,운영S/W,총괄기획실,ERP기획팀,송대일,rightcivilengineering 도메인 구입(3년),"68,970",0,"68,970",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-02,1월,50151301,OP-203,원가)소모품비(사무용품비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,SW 설치용 USB 오피스 파우치 구매(2개),"31,700",0,"31,700",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2025-12-24,2026-01-02,1월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,스타벅스 기프트카드 구매,"1,000,000",0,"1,000,000",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-20,1월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/07),"59,100",0,"59,100",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-01-20,1월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,스타벅스 기프트카드 구매,"700,000",0,"700,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-09,2026-01-20,1월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,개발소프트웨어 영업(01/09),"45,400",0,"45,400",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-12,2026-01-20,1월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/09),"52,300",0,"52,300",0,,구매,일반,,,,,,,,,
|
||||||
|
한맥,2026-01-13,2026-01-14,1월,60114744,WF-103,경상시험연구비(회의비(연구)),X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,총괄기획실,,,스마트건설10/회의 후 식대(12/02),"87,000",,"87,000",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
한맥,2026-01-13,2026-01-14,1월,60114744,WF-103,경상시험연구비(회의비(연구)),X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,총괄기획실,,,스마트건설10/회의 후 식대(12/23),"355,000",,"355,000",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
한맥,2026-01-13,2026-01-14,1월,60114744,WF-103,경상시험연구비(회의비(연구)),Y23113,실도로 기반 Lv4. 자율주행차량 운전능력 평가기술 개발,,,,,,,,,총괄기획실,,,실도로기반LV.4/회의 후 식대(12/12),"108,000",,"108,000",0,,복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-13,2026-01-14,1월,60114744,WF-103,경상시험연구비(회의비(연구)),Y23113,실도로 기반 Lv4. 자율주행차량 운전능력 평가기술 개발,,,,,,,,,총괄기획실,,,실도로기반LV.4/회의 후 식대(12/16),"218,000",,"218,000",0,,복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-13,2026-01-14,1월,60114744,WF-103,경상시험연구비(회의비(연구)),Y23113,실도로 기반 Lv4. 자율주행차량 운전능력 평가기술 개발,,,,,,,,,총괄기획실,,,실도로기반LV.4/회의 후 식대(12/23),"355,000",,"355,000",0,,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-01-20,1월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/15),"22,200",0,"22,200",0,,구매,일반,,,,,,,,,
|
||||||
|
한맥,2026-01-15,2026-01-15,1월,10113701,AST-104,선급금(일반),X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,총괄기획실,,,스마트건설10세부/부가세 환입(12월),"327,444",,0,"327,444",,수입,R&D,,,,,,,,,
|
||||||
|
한맥,2026-01-15,2026-01-15,1월,10113701,AST-104,선급금(일반),Y23113,실도로 기반 Lv4. 자율주행차량 운전능력 평가기술 개발,,,,,,,,,총괄기획실,,,실도로기반LV.4/부가세 환입(10~12월),"132,230",,0,"132,230",,수입,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-20,2026-01-20,1월,50152705,WF-201,원가)여비교통비(시내교통비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,,마천사무실/11월 주차정기권 일할계산분,0,,0,0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-15,2026-01-20,1월,50153199,IT-301,원가)지급수수료(기타),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,개발,비매출,S/W 개발,그래픽&구조해석,총괄기획실,ERP기획팀,송대일,이지빔 도메인 연장 2건 (3년),"141,020",0,"141,020",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-20,1월,10352101,IT-101,소프트웨어,X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,개발,비매출,S/W 개발,그래픽&구조해석,총괄기획실,,The Intellicad Technology Consortium,EG-BIM 개발 및 사용을 위한 ITC (IntelliCAD) 로열티 지급의 건(외화),"51,569,000",0,"51,569,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-23,1월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,노트북가방 구매(01/18),"100,000",0,"100,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-20,2026-01-29,1월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/15),"9,000",0,"9,000",0,,구매,일반,,,,,,,,,
|
||||||
|
한맥,2026-01-05,2026-01-14,1월,60115305,MK-201,접대비(경조금),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,기술개발센터,,,이종훈 아들결혼/26.1.11 일요일 12:30/영등포구 국회대로 612 더베르지,"500,000",,"500,000",0,"공통 → 교육훈련,참석",복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,지방도647호 대호대교/현장점검 후 회식,"283,000",,"283,000",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,모징지구 등 3개 지구단위계획 업무협의,"266,200",,"266,200",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,서산-명천 도로공사 팀회식,"65,000",,"65,000",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,새대천항 북방파제 부서회의,"265,200",,"265,200",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,서울남현 공공주택지구 현장점검,"284,000",,"284,000",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,2023년 아산 도시관리계획 업무협의,"241,000",,"241,000",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,용산국제업무지구 현장조사,"216,000",,"216,000",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,천안 에코밸리일반산단 진입도로 현장조사,"212,000",,"212,000",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,연산-두마 감리현장 업무협의,"153,000",,"153,000",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-09,2026-01-15,1월,60115705,WF-101,복리후생비(회식대),HSJHSJ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,새만금권역(지방하천) 기본기획 업무협의,"223,000",,"223,000",0,HSJ,복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-13,2026-01-15,1월,60115305,MK-201,접대비(경조금),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,기술개발센터,,,삼보 엄인섭사장 빙모상(전주삼성장례문화원 301호),"100,000",,"100,000",0,"공통 → 교육훈련,참석",복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-01-22,2026-01-23,1월,60115305,MK-201,접대비(경조금),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,기술개발센터,,,임명기 경조금,"100,000",,"100,000",0,"공통 → 교육훈련,참석",복리후생비,기타,,,,,,,,,
|
||||||
|
삼안,2026-01-09,2026-01-09,1월,20111539,LIA-102,예수금(연구비),X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,,스마트건설10세부 연구비 부가세 환급,"469,000",,0,"469,000",부가세환급(수입)을 구분하기위해 LIA-102코드로 변경,수입,R&D,,,,,,,,,
|
||||||
|
삼안,2026-01-09,2026-01-09,1월,20111539,LIA-102,예수금(연구비),X25057,디지털 국토정보 기술개발사업 1핵심과제(삼안),디지털 국토정보(1핵심),디지털 국토정보 기술개발사업,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,,디지털1핵심/연구비 부가세 환급(10월~12월),"682,394",,0,"682,394",부가세환급(수입)을 구분하기위해 LIA-102코드로 변경,수입,R&D,,,,,,,,,
|
||||||
|
삼안,2026-01-09,2026-01-09,1월,20111539,LIA-102,예수금(연구비),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,,2핵심/연구비 부가세 환급(10월~12월),"300,000",,0,"300,000",부가세환급(수입)을 구분하기위해 LIA-102코드로 변경,수입,R&D,,,,,,,,,
|
||||||
|
삼안,2026-01-19,2026-01-19,1월,20111539,LIA-102,예수금(연구비),X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,,스마트건설10세부 연구비 부가세 환급,"42,454",,0,"42,454",부가세환급(수입)을 구분하기위해 LIA-102코드로 변경,수입,R&D,,,,,,,,,
|
||||||
|
삼안,2026-01-19,2026-01-19,1월,20111539,LIA-102,예수금(연구비),X25057,디지털 국토정보 기술개발사업 1핵심과제(삼안),디지털 국토정보(1핵심),디지털 국토정보 기술개발사업,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,,디지털1핵심/연구비 부가세 환급(10월~12월),"48,380",,0,"48,380",부가세환급(수입)을 구분하기위해 LIA-102코드로 변경,수입,R&D,,,,,,,,,
|
||||||
|
바론,2026-01-22,2026-01-29,1월,50151301,OP-203,원가)소모품비(사무용품비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,SW 홍보목적 브로슈어 클리어파일 구매(100매),"21,700",0,"21,700",0,,구매,일반,,,,,,,,,
|
||||||
|
삼안,2026-01-22,2026-01-22,1월,20111539,LIA-102,예수금(연구비),X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,,스마트건설10세부 연구비 부가세 환급,"6,364",,0,"6,364",부가세환급(수입)을 구분하기위해 LIA-102코드로 변경,수입,R&D,,,,,,,,,
|
||||||
|
삼안,2026-01-22,2026-01-22,1월,20111539,LIA-102,예수금(연구비),X25057,디지털 국토정보 기술개발사업 1핵심과제(삼안),디지털 국토정보(1핵심),디지털 국토정보 기술개발사업,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,,디지털1핵심/연구비 부가세 환급(10월~12월),"45,411",,0,"45,411",부가세환급(수입)을 구분하기위해 LIA-102코드로 변경,수입,R&D,,,,,,,,,
|
||||||
|
삼안,2026-01-23,2026-01-23,1월,20111539,LIA-102,예수금(연구비),X25057,디지털 국토정보 기술개발사업 1핵심과제(삼안),디지털 국토정보(1핵심),디지털 국토정보 기술개발사업,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,,디지털1핵심/연구비 부가세 환급(10월~12월),"3,545",,0,"3,545",부가세환급(수입)을 구분하기위해 LIA-102코드로 변경,수입,R&D,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,50153199,IT-301,원가)지급수수료(기타),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,개발,비매출,S/W 개발,그래픽&구조해석,총괄기획실,ERP기획팀,송대일,eg-bim 홈페이지 호스팅 업그레이드,"38,140",0,"38,140",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-23,2026-01-29,1월,50153199,IT-301,원가)지급수수료(기타),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,개발,비매출,S/W 개발,그래픽&구조해석,총괄기획실,ERP기획팀,송대일,egbim 홈페이지 트래픽 초기화,"2,750",0,"2,750",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-01-29,1월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/09),"6,000",0,"6,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-02,2026-01-02,1월,50170199,OUT-102,원가)기술협력비(기타외주비),X25055,GIS장비 개발,GIS 장비개발,GIS장비 개발,기획/관리,기획&관리,,비매출,기획/제안,기획,기술개발센터,,엔비텍,SatPointer 하드웨어 개발,"8,000,000",0,"8,000,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-02,2026-01-02,1월,10115301,AST-106,매입세액,X25055,GIS장비 개발,GIS 장비개발,GIS장비 개발,기획/관리,기획&관리,,비매출,기획/제안,기획,기술개발센터,,엔비텍,SatPointer 하드웨어 개발,"800,000",0,"800,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-01-29,1월,50152999,OP-204,원가)통신비(기타),X25030,GSIM,GSIM,GSIM,S/W개발,솔루션,개발,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,LTE 태블릿 통신비 청구(12월사용),"26,110",0,"26,110",0,,구매,일반,,,,,,,,,
|
||||||
|
삼안,2026-01-28,2026-01-28,1월,60114739,IT-201,경상시험연구비(소모품비),X25024,HmEG(HmDraw),HmEG(HmDraw),HmEG(HmDraw),S/W개발,그래픽,개발,비매출,S/W 개발,그래픽&구조해석,기술개발센터,,,"(USD4,500*1,426.20)-소프트웨어 개발을 위한 ODA SDK 구매","6,417,900",,"6,417,900",0,X,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-02-05,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 기획그룹장,양병홍,1월 유류비,0,"160,000",0,0,공통 → 그룹장,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-02-05,2월,60115903,WF-201,여비교통비(국내출장비),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 기획그룹장,양병홍,1월 유류비,"160,000",0,"160,000",0,공통 → 그룹장,출장비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-02-05,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 기획그룹장,양병홍,업무회의 후 식대,0,"151,000",0,0,공통 → 그룹장,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-02-05,2월,60115705,WF-101,복리후생비(회식대),ZZZZZZ,공통(그룹장),공통(그룹장),공통(그룹장),기획/관리,공통,,공통,공통,공통,기술개발센터,엔지니어링 기획그룹장,양병홍,업무회의 후 식대,"151,000",0,"151,000",0,공통 → 그룹장,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-02-05,2월,60115903,WF-201,여비교통비(국내출장비),X25057,디지털 국토정보 기술개발사업 1핵심과제(삼안),디지털 국토정보(1핵심),디지털 국토정보 기술개발사업,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,이동원A,출장비,"76,800",0,"76,800",0,,출장비,R&D,,,,,,,,,
|
||||||
|
바론,2026-01-26,2026-02-05,2월,20111103,LIA-101,미지급금(일반미지급),X25057,디지털 국토정보 기술개발사업 1핵심과제(삼안),디지털 국토정보(1핵심),디지털 국토정보 기술개발사업,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,일반구조물 디비전장,이동원,출장비 - 이동원,0,"76,800",0,0,,제외,R&D,,,,,,,,,
|
||||||
|
바론,2026-01-30,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,기술개발센터,그래픽스 개발팀,김민성,"AI LLM SubScription 12월, 1월",0,"625,388",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-30,2026-02-06,2월,60116399,IT-301,지급수수료(기타),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,개발,비매출,S/W 개발,그래픽&구조해석,기술개발센터,그래픽스 개발팀,김민성,"AI LLM SubScription 12월, 1월","625,388",0,"625,388",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X25008,WayPrimal,WayPrimal,WayPrimal,S/W개발,도로,,비매출,S/W 개발,도로,공통,Infra Solution 개발팀,장용섭,"WayDraw, WayPrimal 파트 회식",0,"192,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-02-06,2월,60115705,WF-101,복리후생비(회식대),X25008,WayPrimal,WayPrimal,WayPrimal,S/W개발,도로,개발,비매출,S/W 개발,도로,공통,Infra Solution 개발팀,장용섭,"항아리보쌈 WayDraw, WayPrimal 파트 회식","192,000",0,"192,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X25028,문서관리시스템(PM),문서관리시스템(PM),문서관리시스템(PM),S/W개발,솔루션,,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,프로젝트마스터 클라우드 서버 1월 사용 금액,0,"167,818",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-02-06,2월,50151399,OP-203,원가)소모품비(기타),X25028,문서관리시스템(PM),문서관리시스템(PM),문서관리시스템(PM),S/W개발,솔루션,개발,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,프로젝트마스터 클라우드 서버 1월 사용 금액,"167,818",0,"167,818",0,계정코드 수정(50151309 확인불가),구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X25027,StrAna,StrAna,StrAna,S/W개발,구조해석,,비매출,S/W 개발,그래픽&구조해석,기술개발센터,Strana 개발팀,이호경,팀 회식비,0,"150,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-02-06,2월,60115705,WF-101,복리후생비(회식대),X25027,StrAna,StrAna,StrAna,S/W개발,구조해석,개발,비매출,S/W 개발,그래픽&구조해석,기술개발센터,Strana 개발팀,이호경,Strana 개발팀 회식비,"150,000",0,"150,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-04,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X25012,WallZainer,WallZainer,WallZainer,S/W개발,구조,,비매출,S/W 개발,구조물,기술개발센터,구조물 S/W개발팀,정계완,구조물SW개발팀 회식비,0,"161,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-04,2026-02-06,2월,60115705,WF-101,복리후생비(회식대),X25012,WallZainer,WallZainer,WallZainer,S/W개발,구조,개발,비매출,S/W 개발,구조물,기술개발센터,구조물 S/W개발팀,정계완,구조물SW개발팀 회식비,"161,400",0,"161,400",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25002,KNGIL,KNGIL,KNGIL,S/W개발,기초조사및GIS,,비매출,S/W 개발,기초조사 및 GIS,기술개발센터,천지인팀,손원일,팀회식비,0,"161,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-12,2월,60115705,WF-101,복리후생비(회식대),X25002,KNGIL,KNGIL,KNGIL,S/W개발,기초조사및GIS,개발,비매출,S/W 개발,기초조사 및 GIS,기술개발센터,천지인팀,손원일,단지설계셀 회식비,"161,000",0,"161,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25009,WayConfirm,WayConfirm,WayConfirm,S/W개발,도로,,비매출,S/W 개발,도로,기술개발센터,인프라 BIM2팀,이동호,팀 회식비,0,"221,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-12,2월,60115705,WF-101,복리후생비(회식대),X25009,WayConfirm,WayConfirm,WayConfirm,S/W개발,도로,기획,비매출,S/W 개발,도로,기술개발센터,인프라 BIM2팀,이동호,BIM2팀 회식비,"221,000",0,"221,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-03,2026-02-12,2월,60115903,WF-201,여비교통비(국내출장비),X25057,디지털 국토정보 기술개발사업 1핵심과제(삼안),디지털 국토정보(1핵심),디지털 국토정보 기술개발사업,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,,이동원A,출장비,"88,520",0,"88,520",0,,출장비,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-03,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25057,디지털 국토정보 기술개발사업 1핵심과제(삼안),디지털 국토정보(1핵심),디지털 국토정보 기술개발사업,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,일반구조물 디비전장,이동원,,0,"88,520",0,0,,제외,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-06,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,기술개발센터,,(재)건설기술교육원,건설기술인승급교육,0,"200,000",0,0,시공BIM → 교육훈련,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-06,2026-02-12,2월,50153301,WF-301,원가)교육훈련비,ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,기술개발센터,,(재)건설기술교육원,건설기술인승급교육,"200,000",0,"200,000",0,시공BIM → 교육훈련,구매,기타,,,,,,,,,
|
||||||
|
바론,2026-02-06,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,인프라 BIM1팀,황은식,경부선 철도사업 측량분야 수행 회의 후 저녁식사,0,"119,000",0,0,영수증(수도권) → 팀 기준,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-06,2026-02-12,2월,60115705,WF-101,복리후생비(회식대),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,인프라 BIM1팀,황은식,경부선 철도사업 측량분야 수행 회의 후 저녁식사,"119,000",0,"119,000",0,영수증(수도권) → 팀 기준,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-02-06,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,인프라 BIM1팀,황은식,경부선 드론측량 수행 관련 회의 후 식대,0,"35,500",0,0,영수증(수도권) → 팀 기준,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-06,2026-02-12,2월,60115705,WF-101,복리후생비(회식대),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,인프라 BIM1팀,황은식,경부선 드론측량 수행 관련 회의 후 식대,"35,500",0,"35,500",0,영수증(수도권) → 팀 기준,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-02-06,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25008,WayPrimal,WayPrimal,WayPrimal,S/W개발,도로,,비매출,S/W 개발,도로,기술개발센터,인프라 BIM1팀,황은식,BIM 1팀 Way셀 회식,0,"241,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-06,2026-02-12,2월,60115705,WF-101,복리후생비(회식대),X25008,WayPrimal,WayPrimal,WayPrimal,S/W개발,도로,기획,비매출,S/W 개발,도로,기술개발센터,인프라 BIM1팀,황은식,BIM 1팀 Way셀 회식,"241,000",0,"241,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-12,2월,60115903,WF-201,여비교통비(국내출장비),Z25059,울산~외곽순환 고속도로(1공구),울산외곽순환(1공구),울산~외곽순환 고속도로(1공구),직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,터널팀,이화영,출장비,"33,200",0,"33,200",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),Z25059,울산~외곽순환 고속도로(1공구),울산외곽순환(1공구),울산~외곽순환 고속도로(1공구),직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,터널팀,이화영,출장비,0,"33,200",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-03,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,Web Solution팀,이병권,업무미팅 간 식대,0,"8,500",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-03,2026-02-12,2월,50152507,WF-101,원가)복리후생비(회식대),X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,Web Solution팀,이병권,유지보수 업체 미팅,"8,500",0,"8,500",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,기술개발센터,,(재)건설기술교육원,건설기술인최초교육,0,"200,000",0,0,시공BIM → 교육훈련,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,50153301,WF-301,원가)교육훈련비,ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,기술개발센터,,(재)건설기술교육원,건설기술인최초교육,"200,000",0,"200,000",0,시공BIM → 교육훈련,구매,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,스마트건설팀,복진훈,스마트건설 사전점검 평가 후 회식,0,"505,000",0,0,,제외,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,60115705,WF-101,복리후생비(회식대),X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,스마트건설팀,복진훈,스마트건설 사전점검 평가 후 회식,"505,000",0,"505,000",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,스마트건설팀,복진훈,10세부 최종평가 사전점검 회의 후 점심식대,0,"113,000",0,0,,제외,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,60115705,WF-101,복리후생비(회식대),X25056,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,스마트건설팀,복진훈,10세부 최종평가 사전점검 회의 후 점심식대,"113,000",0,"113,000",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25008,WayPrimal,WayPrimal,WayPrimal,S/W개발,도로,,비매출,S/W 개발,도로,기술개발센터,인프라 BIM2팀,표종진,팀 회식비,0,"190,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-12,2월,60115705,WF-101,복리후생비(회식대),X25008,WayPrimal,WayPrimal,WayPrimal,S/W개발,도로,기획,비매출,S/W 개발,도로,기술개발센터,인프라 BIM2팀,표종진,BIM2팀 회식비,"190,000",0,"190,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25025,EG-BIM Modeler,EG-BIM Modeler,EG-BIM Modeler,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,기술개발센터,그래픽스 개발팀,김민성,팀장 회식비,0,"100,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-12,2월,60115705,WF-101,복리후생비(회식대),X25025,EG-BIM Modeler,EG-BIM Modeler,EG-BIM Modeler,S/W개발,그래픽,개발,비매출,S/W 개발,그래픽&구조해석,기술개발센터,그래픽스 개발팀,김민성,그래픽스개발팀 셀장 회식비,"100,000",0,"100,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,60115903,WF-201,여비교통비(국내출장비),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,이동원A,출장비,"172,710",0,"172,710",0,사전기획 → 경부선(평택-직지사),출장비,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,일반구조물 디비전장,이동원,출장비 - 이동원,0,"172,710",0,0,사전기획 → 경부선(평택-직지사),제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-03,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,쓰리디랩스 드론 실증관련 업무협의,0,"61,800",0,0,,제외,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-03,2026-02-12,2월,50152507,WF-101,원가)복리후생비(회식대),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,쓰리디랩스 드론 실증관련 업무협의 간 식대,"61,800",0,"61,800",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-13,2026-02-13,2월,20111103,LIA-101,미지급금(일반미지급),X25028,문서관리시스템(PM),문서관리시스템(PM),문서관리시스템(PM),S/W개발,솔루션,,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,팀 회식비,0,"347,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-13,2026-02-13,2월,60115705,WF-101,복리후생비(회식대),X25028,문서관리시스템(PM),문서관리시스템(PM),문서관리시스템(PM),S/W개발,솔루션,개발,비매출,S/W 개발,솔루션,기술개발센터,GSIM 개발팀,이호성,GSIM개발팀 회식비,"347,000",0,"347,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-13,2월,60115903,WF-201,여비교통비(국내출장비),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,하부구조팀,최창인,출장비,"146,828",0,"146,828",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-13,2월,20111103,LIA-101,미지급금(일반미지급),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,기술개발센터,하부구조팀,최창인,출장비 - 최창인,0,"146,828",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-20,2월,60116399,IT-301,지급수수료(기타),X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,,굿어스데이터 주식회사,센터 가상화서비스 01월 서비스 통합,"361,900",0,"361,900",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-20,2월,10115301,AST-106,매입세액,X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,,굿어스데이터 주식회사,"361,900*10%","36,190",0,"36,190",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-20,2월,20110101,LIA-101,외상매입금,X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,,굿어스데이터 주식회사,센터 가상화서비스 01월 서비스 통합,0,"398,090",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,기술개발센터,,(재)건설기술교육원,건설기술인승급교육,0,"200,000",0,0,시공BIM → 교육훈련,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,50153301,WF-301,원가)교육훈련비,ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,기술개발센터,,(재)건설기술교육원,건설기술인승급교육,"200,000",0,"200,000",0,시공BIM → 교육훈련,구매,기타,,,,,,,,,
|
||||||
|
바론,2026-02-13,2026-02-20,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,AbutZainer,AbutZainer,AbutZainer,S/W개발,구조,,비매출,S/W 개발,구조물,기술개발센터,하부구조팀,김승호,회식비 템플릿,0,"141,000",0,0,공통 → AbutZainer,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-13,2026-02-20,2월,60115705,WF-101,복리후생비(회식대),ZZZZZZ,AbutZainer,AbutZainer,AbutZainer,S/W개발,구조,기획,비매출,S/W 개발,구조물,기술개발센터,하부구조팀,김승호,깡돈식당 하부구조팀 회식비,"141,000",0,"141,000",0,공통 → AbutZainer,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-20,2월,60115903,WF-201,여비교통비(국내출장비),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,인프라 BIM1팀,김이훈,출장비,"147,490",0,"147,490",0,,출장비,기타,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-20,2월,20111103,LIA-101,미지급금(일반미지급),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,인프라 BIM1팀,김이훈,출장비 - 김이훈,0,"147,490",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-13,2026-02-20,2월,20111103,LIA-101,미지급금(일반미지급),X25027,StrAna,StrAna,StrAna,S/W개발,구조해석,,비매출,S/W 개발,그래픽&구조해석,기술개발센터,Strana 개발팀,이호경,팀 회식비,0,"132,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-13,2026-02-20,2월,60115705,WF-101,복리후생비(회식대),X25027,StrAna,StrAna,StrAna,S/W개발,구조해석,개발,비매출,S/W 개발,그래픽&구조해석,기술개발센터,Strana 개발팀,이호경,Strana 개발팀 회식비,"132,000",0,"132,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-13,2026-02-20,2월,20111103,LIA-101,미지급금(일반미지급),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,구글클라우드 코리아 유한회사,경부선 드론촬영 원본데이터 보관 목적 웹하드 구매,0,"59,500",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-13,2026-02-20,2월,60114398,OP-203,소모품비(기타),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,구글클라우드 코리아 유한회사,경부선 드론촬영 원본데이터 보관 목적 웹하드 구매,"59,500",0,"59,500",0,,구매,기타,,,,,,,,,
|
||||||
|
바론,2026-02-24,2026-02-25,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,경영지원부,,이용운,건강검진 비용 청구,0,"266,700",0,0,"공통 → 교육훈련,참석",제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-24,2026-02-25,2월,60115798,WF-106,복리후생비(공통),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,경영지원부,,이용운,건강검진 비용 청구,"266,700",0,"266,700",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
바론,2026-02-24,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25033,WatchBIM,WatchBIM,WatchBIM,S/W개발,도로,,비매출,S/W 개발,솔루션,기술개발센터,Infra Solution 개발팀,김재현,셀 회식비,0,"112,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-24,2026-02-27,2월,60115705,WF-101,복리후생비(회식대),X25033,WatchBIM,WatchBIM,WatchBIM,S/W개발,도로,개발,비매출,S/W 개발,솔루션,기술개발센터,Infra Solution 개발팀,김재현,셀 회식비,"112,000",0,"112,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25025,EG-BIM Modeler,EG-BIM Modeler,EG-BIM Modeler,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,기술개발센터,그래픽스 개발팀,이재원,팀 회식비,0,"164,500",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,60115705,WF-101,복리후생비(회식대),X25025,EG-BIM Modeler,EG-BIM Modeler,EG-BIM Modeler,S/W개발,그래픽,개발,비매출,S/W 개발,그래픽&구조해석,기술개발센터,그래픽스 개발팀,이재원,그래픽스 개발팀 Modeler셀 회식비,"164,500",0,"164,500",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2025-12-15,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),Y26017,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,엔지니어링 개발그룹장,장계석,출장 간 하이패스 비용,0,"26,500",0,0,가평+경부선 출장비 합산 청구 → 가평 근무기록(1/30) → 경부선 통합 청구,제외,기타,,,,,,,,,
|
||||||
|
바론,2025-12-15,2026-02-27,2월,60115903,WF-201,여비교통비(국내출장비),Y26017,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,엔지니어링 개발그룹장,장계석,출장 간 하이패스 비용,"26,500",0,"26,500",0,가평+경부선 출장비 합산 청구 → 가평 근무기록(1/30) → 경부선 통합 청구,출장비,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),Y26017,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,엔지니어링 개발그룹장,장계석,철도 드론 촬영 간 식대 및 음료대,0,"176,000",0,0,영수증 내역(충북) → 직지사,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,50152507,WF-101,원가)복리후생비(회식대),Y26017,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,엔지니어링 개발그룹장,장계석,철도 드론 촬영 간 식대,"2,000",0,"2,000",0,영수증 내역(충북) → 직지사,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,50152507,WF-101,원가)복리후생비(회식대),Y26017,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,엔지니어링 개발그룹장,장계석,철도 드론 촬영 간 식대,"81,000",0,"81,000",0,영수증 내역(충북) → 직지사,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,50152507,WF-101,원가)복리후생비(회식대),Y26017,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,엔지니어링 개발그룹장,장계석,철도 드론 촬영 간 식대,"24,000",0,"24,000",0,영수증 내역(충북) → 직지사,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,50152507,WF-101,원가)복리후생비(회식대),Y26017,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,엔지니어링 개발그룹장,장계석,철도 드론 촬영 간 식대,"69,000",0,"69,000",0,영수증 내역(충북) → 직지사,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,국토정보 2핵심 국토부 보고 간 교통비,0,"120,330",0,0,,제외,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,60115903,WF-201,여비교통비(국내출장비),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,국토정보 2핵심 국토부 보고 간 교통비,"120,330",0,"120,330",0,,출장비,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,국토정보 국토부 보고 간 식대 및 음료대,0,"36,800",0,0,,제외,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,50152507,WF-101,원가)복리후생비(회식대),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,국토정보 국토부 보고 간 식대,"10,000",0,"10,000",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,50152507,WF-101,원가)복리후생비(회식대),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,국토정보 국토부 보고 간 음료대,"17,500",0,"17,500",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,50152507,WF-101,원가)복리후생비(회식대),X25058,디지털 국토정보 기술개발사업 2핵심과제(삼안),디지털 국토정보(2핵심),국토정보 2핵심,직접매출,R&D,,매출,가족사 프로젝트,R&D,기술개발센터,엔지니어링 개발그룹장,장계석,국토정보 국토부 보고 간 음료대,"9,300",0,"9,300",0,,복리후생비,R&D,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,Web Solution팀,신지호,전산 유지보수 신규 업체 미팅 간 음료대,0,"7,200",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,50152507,WF-101,원가)복리후생비(회식대),X25046,전산운영관리,전산운영관리,전산운영관리,기획/관리,운영 S/W,,비매출,S/W 개발,운영S/W,기술개발센터,Web Solution팀,신지호,전산 유지보수 신규 업체 미팅 간 음료대,"7,200",0,"7,200",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25012,WallZainer,WallZainer,WallZainer,S/W개발,구조,,비매출,S/W 개발,구조물,기술개발센터,구조물 S/W개발팀,김세열,AI LLM 구독(초과분 API) 25년9월 ~ 26년1월 사용분,0,"522,590",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,60116399,IT-301,지급수수료(기타),X25012,WallZainer,WallZainer,WallZainer,S/W개발,구조,개발,비매출,S/W 개발,구조물,기술개발센터,구조물 S/W개발팀,김세열,AI LLM 구독(초과분 API) 25년9월 ~ 26년1월 사용분,"522,590",0,"522,590",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-27,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25029,bCMf,bCMf,bCMf,S/W개발,솔루션,,비매출,S/W 개발,솔루션,기술개발센터,Web Solution팀,김윤하,사업단 BCMF시연준비후 식사,0,"179,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-27,2026-02-27,2월,60115705,WF-101,복리후생비(회식대),X25029,bCMf,bCMf,bCMf,S/W개발,솔루션,개발,비매출,S/W 개발,솔루션,기술개발센터,Web Solution팀,김윤하,사업단 BCMF시연준비후 식사,"179,000",0,"179,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-02-02,2월,20110101,LIA-101,외상매입금,X25051,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,(주)지케이측량시스템,측량장비(GNSS) CHCNAV i85 구매의 건,0,"5,500,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-02-02,2월,50151399,OP-203,원가)소모품비(기타),X25051,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,(주)지케이측량시스템,측량장비(GNSS) CHCNAV i85 구매의 건,"5,000,000",0,"5,000,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-02-02,2월,10115301,AST-106,매입세액,X25051,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,(주)지케이측량시스템,측량장비(GNSS) CHCNAV i85 구매의 건,"500,000",0,"500,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-04,2026-02-04,2월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,월드번역통역,영문홍보물 제작을 위한 번역(가족사&바론브로슈어),0,"426,930",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-04,2026-02-04,2월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,월드번역통역,영문홍보물 제작을 위한 번역(가족사&바론브로슈어),"388,119",0,"388,119",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-04,2026-02-04,2월,10115301,AST-106,매입세액,X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,월드번역통역,"매입세액(388,119*0.1)","38,811",0,"38,811",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-02-05,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,협업증진팀,한승민,"1월 한맥 농구동호회 대관비 (2회분, 1/14, 28) / 대관장소 사정으로 2회분 동일 결제",0,"320,000",0,0,"공통 → 교육훈련,참석",제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-02-05,2월,60115798,WF-106,복리후생비(공통),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,협업증진팀,한승민,"1월 한맥 농구동호회 대관비 (2회분, 1/14, 28) / 대관장소 사정으로 2회분 동일 결제","320,000",0,"320,000",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-02-05,2월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,외부회의 음료,0,"35,100",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-02-05,2월,60115705,WF-101,복리후생비(회식대),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,외부회의 음료,"35,100",0,"35,100",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-02-05,2월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,외부식사 (건설기술인협회),0,"37,500",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-02-05,2월,60115705,WF-101,복리후생비(회식대),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,외부식사 (건설기술인협회),"37,500",0,"37,500",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-02-06,2월,60115903,WF-201,여비교통비(국내출장비),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,출장비,"8,000",0,"8,000",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-21,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,출장비 - 임민경,0,"8,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-03,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,김우진,(주)장헌산업 사업자등록 신청,0,"19,500",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-03,2026-02-06,2월,60115903,WF-201,여비교통비(국내출장비),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,김우진,(주)장헌산업 사업자등록 신청,"19,500",0,"19,500",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-02-06,2월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"30,960",0,"30,960",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-28,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"30,960",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-02-06,2월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"113,850",0,"113,850",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,권혁진,출장비 - 권혁진,0,"30,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-29,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"83,850",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-30,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/29),0,"65,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-30,2026-02-06,2월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/29),"65,000",0,"65,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-02-06,2월,60115903,WF-201,여비교통비(국내출장비),X26006,업무/사업관리,업무/사업관리,업무/사업관리,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,출장비,"8,000",0,"8,000",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X26006,업무/사업관리,업무/사업관리,업무/사업관리,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,임민경,출장비 - 임민경,0,"8,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-30,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,솔루션통합팀,김지영A,1월 총괄기획실 물품 및 다과 구매(추가),0,"58,128",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-30,2026-02-06,2월,60115798,WF-106,복리후생비(공통),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,솔루션통합팀,김지영A,1월 총괄기획실 물품 및 다과 구매(추가),"58,128",0,"58,128",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민건강보험공단,26년 1월 4대보험료 (전체),0,"62,685,600",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-06,2월,50152527,HR-204,원가)복리후생비(산재보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,근로복지공단,26년 1월 4대보험료(산재보험/회사부담),"3,083,300",0,"3,083,300",0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-06,2월,50152521,HR-202,원가)복리후생비(건강보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민건강보험공단,26년 1월 4대보험료(건강보험/회사부담),"12,661,000",0,"12,661,000",0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-06,2월,20111505,HR-202,예수금(건강보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민건강보험공단,26년 1월 4대보험료(건강보험/직원부담),"12,661,000",0,"12,661,000",0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-06,2월,50152521,HR-202,원가)복리후생비(건강보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민건강보험공단,26년 1월 4대보험료(요양보험/회사부담),"1,663,310",0,"1,663,310",0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-06,2월,20111505,HR-202,예수금(건강보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민건강보험공단,26년 1월 4대보험료(요양보험),"1,663,310",0,"1,663,310",0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-06,2월,50151719,HR-201,원가)세금과공과(국민연금),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민연금관리공단,26년 1월 4대보험료(국민연금/회사부담),"12,096,220",0,"12,096,220",0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-06,2월,20111507,HR-201,예수금(국민연금),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민연금관리공단,26년 1월 4대보험료(국민연금/직원부담),"12,096,220",0,"12,096,220",0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-06,2월,50152529,HR-203,원가)복리후생비(고용보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,근로복지공단,26년 1월 4대보험료(고용보험/회사부담),"3,808,750",0,"3,808,750",0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-06,2월,20111509,HR-203,예수금(고용보험료(직원)),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,근로복지공단,26년 1월 4대보험료(고용보험/직원부담),"2,952,490",0,"2,952,490",0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-04,2026-02-06,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,SW 설치용 USB구매 (16GB*10개),0,"79,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-04,2026-02-06,2월,60114301,OP-203,소모품비(사무용품비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,SW 설치용 USB구매 (16GB*10개),"79,000",0,"79,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-02-09,2월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,주완기,임원실 소형테이블 모니터 설치 부가 물품 구매,0,"142,290",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-02-09,2월,60114305,IT-201,소모품비(전산용품비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,주완기,미니PC 브라켓 구매,"16,500",0,"16,500",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-02-09,2월,60114305,IT-201,소모품비(전산용품비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,주완기,멀티탭 보관함 구매,"16,790",0,"16,790",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-02,2026-02-09,2월,60114305,IT-201,소모품비(전산용품비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,주완기,무선 마우스 구매(로지텍),"109,000",0,"109,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-10,2월,10111101,REV-101,용역미수금(계산서발행),Y25039,경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,경영및기술지원서비스(장헌산업),0,"28,270,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-10,2월,10110501,AST-101,보통예금,Y25039,경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,국민(주거래),경영및기술지원서비스(장헌산업),"28,270,000",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-10,2월,10111101,REV-101,용역미수금(계산서발행),Y26009,2026 경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,2026경영및기술지원서비스(장헌산업),0,"18,241,300",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-10,2월,10110501,AST-101,보통예금,Y26009,2026 경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,국민(주거래),2026경영및기술지원서비스(장헌산업),"18,241,300",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-10,2월,10111101,REV-101,용역미수금(계산서발행),Y26010,2026 경영 및 기술지원 서비스(피티씨),,,,,,,,,총괄기획실,,피티씨,2026경영및기술지원서비스(피티씨),0,"23,760,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-10,2월,10110501,AST-101,보통예금,Y26010,2026 경영 및 기술지원 서비스(피티씨),,,,,,,,,총괄기획실,,국민(주거래),2026경영및기술지원서비스(피티씨),"23,760,000",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-15,2026-02-10,2월,10111101,REV-101,용역미수금(계산서발행),Y26014,한강교량 보수보강공사 감독권한대행등 건설사업관리용역(2공구)(진우30%)-인쇄/편집,한강교량 사업관리(2공구),한강교량 사업관리(2공구),직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,(주)진우엔지니어링,한강교량보수보강공사감독권한대행등건설사업관리용역(2공구)(진우30%)-인쇄/편집,"1,815,000",0,0,"1,815,000",,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-15,2026-02-10,2월,40110501,REV-101,개발수입,Y26014,한강교량 보수보강공사 감독권한대행등 건설사업관리용역(2공구)(진우30%)-인쇄/편집,한강교량 사업관리(2공구),한강교량 사업관리(2공구),직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,(주)진우엔지니어링,한강교량보수보강공사감독권한대행등건설사업관리용역(2공구)(진우30%)-인쇄/편집,0,"1,650,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-15,2026-02-10,2월,20112901,LIA-101,매출세액,Y26014,한강교량 보수보강공사 감독권한대행등 건설사업관리용역(2공구)(진우30%)-인쇄/편집,한강교량 사업관리(2공구),한강교량 사업관리(2공구),직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,(주)진우엔지니어링,"1,650,000*10%",0,"165,000",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-10,2월,10111101,REV-101,용역미수금(계산서발행),Y26009,2026 경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,2026경영및기술지원서비스(장헌산업),"18,241,300",0,0,"18,241,300",,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-10,2월,40110401,REV-101,관리용역수입,Y26009,2026 경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,2026경영및기술지원서비스(장헌산업),0,"16,583,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-10,2월,20112901,LIA-101,매출세액,Y26009,2026 경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,"16,583,000*10%",0,"1,658,300",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-10,2월,10111101,REV-101,용역미수금(계산서발행),Y26010,2026 경영 및 기술지원 서비스(피티씨),,,,,,,,,총괄기획실,,피티씨,2026경영및기술지원서비스(피티씨),"23,760,000",0,0,"23,760,000",,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-10,2월,40110401,REV-101,관리용역수입,Y26010,2026 경영 및 기술지원 서비스(피티씨),,,,,,,,,총괄기획실,,피티씨,2026경영및기술지원서비스(피티씨),0,"21,600,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-10,2월,20112901,LIA-101,매출세액,Y26010,2026 경영 및 기술지원 서비스(피티씨),,,,,,,,,총괄기획실,,피티씨,"21,600,000*10%",0,"2,160,000",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-02-10,2월,10111101,REV-101,용역미수금(계산서발행),Y26009,2026 경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,2026경영및기술지원서비스(장헌산업),"18,241,300",0,0,"18,241,300",,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-02-10,2월,40110401,REV-101,관리용역수입,Y26009,2026 경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,2026경영및기술지원서비스(장헌산업),0,"16,583,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-01-13,2026-02-10,2월,20112901,LIA-101,매출세액,Y26009,2026 경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,"16,583,000*10%",0,"1,658,300",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-10,2월,10111101,REV-101,용역미수금(계산서발행),Y26014,한강교량 보수보강공사 감독권한대행등 건설사업관리용역(2공구)(진우30%)-인쇄/편집,한강교량 사업관리(2공구),한강교량 사업관리(2공구),직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,(주)진우엔지니어링,한강교량보수보강공사감독권한대행등건설사업관리용역(2공구)(진우30%)-인쇄/편집,0,"1,815,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-10,2월,10110501,AST-101,보통예금,Y26014,한강교량 보수보강공사 감독권한대행등 건설사업관리용역(2공구)(진우30%)-인쇄/편집,한강교량 사업관리(2공구),한강교량 사업관리(2공구),직접매출,콘텐츠제작,,매출,바론계약,콘텐츠 제작,기술개발센터,,국민(주거래),한강교량보수보강공사감독권한대행등건설사업관리용역(2공구)(진우30%)-인쇄/편집,"1,815,000",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2025-07-10,2026-02-11,2월,10111101,REV-101,용역미수금(계산서발행),Y25039,경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,경영및기술지원서비스(장헌산업),"28,270,000",0,0,"28,270,000",,수입,기타,,,,,,,,,
|
||||||
|
바론,2025-07-10,2026-02-11,2월,40110401,REV-101,관리용역수입,Y25039,경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,경영및기술지원서비스(장헌산업),0,"25,700,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2025-07-10,2026-02-11,2월,20112901,LIA-101,매출세액,Y25039,경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,"25,700,000*10%",0,"2,570,000",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-03,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,기술기획팀,최현호,경조금 (최현호 선임연구원 자녀 출생),0,"300,000",0,0,"공통 → 교육훈련,참석",제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-03,2026-02-12,2월,50152511,WF-106,원가)복리후생비(경조금),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,기술기획팀,최현호,경조금 (최현호 선임연구원 자녀 출생),"300,000",0,"300,000",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-12,2월,20111109,LIA-101,미지급금(하나카드),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,,하나카드(6669),SW 설치용 USB 대량 구매(4GB*100),0,"392,810",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-12,2월,50151301,OP-203,원가)소모품비(사무용품비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,SW 설치용 USB 대량 구매(4GB*100),"392,810",0,"392,810",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-04,2026-02-12,2월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"67,020",0,"67,020",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-04,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"67,020",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,법무사이승희사무소,바론 목적변경 취득세 및 기타 수수료,0,"67,240",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,법무사이승희사무소,바론 목적변경 취득세 및 기타 수수료,"67,240",0,"67,240",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,대한고주파,홍보 전단지 제작,0,"1,232,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,60114599,WF-105,도서인쇄비(기타),X25006,GAIA,GAIA,GAIA,S/W개발,기초조사및GIS,영업,비매출,S/W 개발,기초조사 및 GIS,총괄기획실,,대한고주파,GAIA (홍보전단지 제작),"210,000",0,"210,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,10115301,AST-106,매입세액,X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,대한고주파,"매입세액 (210,000*0.1)","21,000",0,"21,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,60114599,WF-105,도서인쇄비(기타),Y25013,iPipe 프로그램 구매 (CAD용),iPipe 프로그램 구매 (CAD용),iPipe 프로그램 구매 (CAD용),S/W개발,수리/수문,영업,비매출,S/W 개발,수리/수문,총괄기획실,,대한고주파,iPipeS (홍보전단지 제작),"210,000",0,"210,000",0,,구매,기타,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,10115301,AST-106,매입세액,X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,대한고주파,"매입세액 (210,000*0.1)","21,000",0,"21,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,60114599,WF-105,도서인쇄비(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,대한고주파,디자인포트폴리오 (홍보전단지 제작),"70,000",0,"70,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,10115301,AST-106,매입세액,X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,대한고주파,"매입세액 (70,000*0.1)","7,000",0,"7,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,60114599,WF-105,도서인쇄비(기타),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,,대한고주파,EG-BIM (홍보전단지 제작),"210,000",0,"210,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,10115301,AST-106,매입세액,X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,대한고주파,"매입세액 (210,000*0.1)","21,000",0,"21,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,60114599,WF-105,도서인쇄비(기타),X25002,KNGIL,KNGIL,KNGIL,S/W개발,기초조사및GIS,영업,비매출,S/W 개발,기초조사 및 GIS,총괄기획실,,대한고주파,KNGIL (홍보전단지 제작),"210,000",0,"210,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,10115301,AST-106,매입세액,X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,대한고주파,"매입세액 (210,000*0.1)","21,000",0,"21,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,60114599,WF-105,도서인쇄비(기타),X25020,TOVA,TOVA,TOVA,S/W개발,교통,영업,비매출,S/W 개발,교통,총괄기획실,,대한고주파,TOVQ (홍보전단지 제작),"210,000",0,"210,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,10115301,AST-106,매입세액,X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,대한고주파,"매입세액 (210,000*0.1)","21,000",0,"21,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"58,020",0,"58,020",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-09,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"58,020",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-12,2월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"189,900",0,"189,900",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,0,"189,900",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-06,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(02/04),0,"10,300",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-06,2026-02-12,2월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(02/04),"10,300",0,"10,300",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,20110101,LIA-101,외상매입금,Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,(주)경수,경부선 평택-직지사구간 실시설계 측량 분야(외주착수금),0,"26,950,000",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,50170199,OUT-102,원가)기술협력비(기타외주비),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,(주)경수,경부선 평택-직지사구간 실시설계 측량 분야(외주착수금),"24,500,000",0,"24,500,000",0,외주,외주,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,10115301,AST-106,매입세액,Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,(주)경수,경부선 평택-직지사구간 실시설계 측량 분야(외주착수금),"2,450,000",0,"2,450,000",0,외주,외주,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,20110101,LIA-101,외상매입금,Y26017,경부선 노량진-평택구간 작업자 이동통로 확보를 위한 기술조사 및 실시설계용역,경부선 (노량진-평택) 측량,경부선 노량진-평택구간 작업자 이동통로 확보를 위한 기술조사 및 실시설계용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,둠둠 주식회사,경부선 노량진~직지사구간 작업자 이동통로 확보 기술조사 및 실시설계용역(외주착수금),0,"25,575,000",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,50170199,OUT-102,원가)기술협력비(기타외주비),Y26017,경부선 노량진-평택구간 작업자 이동통로 확보를 위한 기술조사 및 실시설계용역,경부선 (노량진-평택) 측량,경부선 노량진-평택구간 작업자 이동통로 확보를 위한 기술조사 및 실시설계용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,둠둠 주식회사,경부선 노량진~직지사구간 작업자 이동통로 확보 기술조사 및 실시설계용역(외주착수금),"23,250,000",0,"23,250,000",0,외주,외주,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,10115301,AST-106,매입세액,Y26017,경부선 노량진-평택구간 작업자 이동통로 확보를 위한 기술조사 및 실시설계용역,경부선 (노량진-평택) 측량,경부선 노량진-평택구간 작업자 이동통로 확보를 위한 기술조사 및 실시설계용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,둠둠 주식회사,경부선 노량진~직지사구간 작업자 이동통로 확보 기술조사 및 실시설계용역(외주착수금),"2,325,000",0,"2,325,000",0,외주,외주,기타,,,,,,,,,
|
||||||
|
바론,2026-02-03,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/30),0,"24,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-03,2026-02-12,2월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(01/30),"24,000",0,"24,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,20110101,LIA-101,외상매입금,Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,둠둠 주식회사,경부선 평택~직지사구간 작업자 이동통로 확보 기술조사 및 실시설계용역(외주착수금),0,"9,762,500",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,50170199,OUT-102,원가)기술협력비(기타외주비),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,둠둠 주식회사,경부선 평택~직지사구간 작업자 이동통로 확보 기술조사 및 실시설계용역(외주착수금),"8,875,000",0,"8,875,000",0,외주,외주,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-12,2월,10115301,AST-106,매입세액,Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,기술개발센터,,둠둠 주식회사,경부선 평택~직지사구간 작업자 이동통로 확보 기술조사 및 실시설계용역(외주착수금),"887,500",0,"887,500",0,외주,외주,기타,,,,,,,,,
|
||||||
|
바론,2026-02-06,2026-02-12,2월,60115903,WF-201,여비교통비(국내출장비),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,최근혜,출장비,"79,760",0,"79,760",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-06,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,최근혜,출장비 - 최근혜,0,"79,760",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,국혜림,바론 입찰제출용 법인등기 발급 수수료,0,"10,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-12,2월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,국혜림,바론 입찰제출용 법인등기 발급 수수료,"10,000",0,"10,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-30,2026-02-12,2월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"48,640",0,"48,640",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-30,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"48,640",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-12,2월,20110101,LIA-101,외상매입금,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),바론 전화 통신비 26년 02월,0,"3,300",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-12,2월,60116199,OP-204,통신비(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),바론 전화 통신비 26년 02월,"3,000",0,"3,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-12,2월,10115301,AST-106,매입세액,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),공급가액*10%,300,0,300,0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,법무사이승희사무소,바론 목적변경등기(법무사수수료),0,"253,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-12,2월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,법무사이승희사무소,바론 목적변경등기(법무사수수료),"230,000",0,"230,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-12,2월,10115301,AST-106,매입세액,X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,법무사이승희사무소,"매입세액(230,000*0.1)","23,000",0,"23,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-12,2월,20111105,LIA-101,미지급금(KB국민카드),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민카드(3866),삼안 경영전략본부 회의 후 식사,0,"338,000",0,0,공통 → 인사교육,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-12,2월,60115705,WF-101,복리후생비(회식대),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,최근혜,삼안 경영전략본부 회의 후 식사,"338,000",0,"338,000",0,공통 → 인사교육,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,솔루션통합팀,권혁진,업무용 산업의 역군 서비스 이용료(1월),0,"99,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-12,2월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,솔루션통합팀,권혁진,업무용 산업의 역군 서비스 이용료(1월),"99,000",0,"99,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,기술기획팀,김원기,"기술기획팀 AI기획에 따른 AI결제(chatGPT, NotebookLM)",0,"61,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-12,2월,60114398,OP-203,소모품비(기타),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,기술기획팀,김원기,"기술기획팀 AI기획에 따른 AI결제(chatGPT, NotebookLM)","61,400",0,"61,400",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,기술기획팀,김원기,기술기획팀 점심 회식비(최현호 출산휴가),0,"200,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-12,2월,60115705,WF-101,복리후생비(회식대),X25051,사전기획,사전기획,사전기획,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,기술기획팀,김원기,기술기획팀 점심 회식비(최현호 출산휴가),"200,000",0,"200,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,권혁진,이지빔 영업(02/11) 수원&강남 단기 렌트카,0,"40,430",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-12,2월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,권혁진,이지빔 영업(02/11) 수원&강남 단기 렌트카,"40,430",0,"40,430",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-01-31,2026-02-12,2월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"87,460",0,"87,460",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-31,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"87,460",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-12,2월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,솔루션통합팀,김지영A,(주)장헌 브로슈어 당진 택배발송 비용,0,"12,100",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-05,2026-02-12,2월,50153199,IT-301,원가)지급수수료(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,솔루션통합팀,김지영A,(주)장헌 브로슈어 당진 택배발송 비용,"12,100",0,"12,100",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-13,2월,20110101,LIA-101,외상매입금,Y25019,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구) 통합 스마트상황실 구축 및 운영,인주~염치(2공구)빅룸,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구),직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,,SK브로드밴드(주),서산-아산 건설사업단 BIG ROOM VPN 26년 02월 결제의 건,0,"94,600",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-13,2월,60116199,OP-204,통신비(기타),Y25019,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구) 통합 스마트상황실 구축 및 운영,인주~염치(2공구)빅룸,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구),직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,,SK브로드밴드(주),서산-아산 건설사업단 BIG ROOM VPN 26년 02월 결제의 건,"86,000",0,"86,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-13,2월,10115301,AST-106,매입세액,Y25019,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구) 통합 스마트상황실 구축 및 운영,인주~염치(2공구)빅룸,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구),직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,,SK브로드밴드(주),서산-아산 건설사업단 BIG ROOM VPN 26년 02월 결제의 건,"8,600",0,"8,600",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-13,2월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,최근혜,외빈 선물 구매,0,"179,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-13,2월,60114398,OP-203,소모품비(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,최근혜,외빈 선물 구매,"100,000",0,"100,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-13,2월,60114398,OP-203,소모품비(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,최근혜,외빈 선물 구매,"79,000",0,"79,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-13,2월,20111103,LIA-101,미지급금(일반미지급),X25035,Domainer,Domainer,Domainer,S/W개발,솔루션,,비매출,S/W 개발,솔루션,총괄기획실,협업증진팀,성형일,협업증진팀 식대,0,"112,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-13,2월,60115705,WF-101,복리후생비(회식대),X25035,Domainer,Domainer,Domainer,S/W개발,솔루션,기획,비매출,S/W 개발,솔루션,총괄기획실,협업증진팀,성형일,팀 기획업무회의 후 식사,"112,000",0,"112,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-13,2월,20110101,LIA-101,외상매입금,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),바론 ERP서버 인터넷 회선 통신비 26년 02월 결제의 건,0,"561,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-13,2월,60116199,OP-204,통신비(기타),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),바론 ERP서버 인터넷 회선 통신비 26년 02월 결제의 건,"510,000",0,"510,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-13,2월,10115301,AST-106,매입세액,X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,SK브로드밴드(주),바론 ERP서버 인터넷 회선 통신비 26년 02월 결제의 건,"51,000",0,"51,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-13,2월,20111109,LIA-101,미지급금(하나카드),Y25019,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구) 통합 스마트상황실 구축 및 운영,인주~염치(2공구)빅룸,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구),직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,,하나카드(6669),서산-아산 건설사업단 화상회의 S/W(Zoom) 1년 구독의 건,0,"246,070",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-13,2월,50153199,IT-301,원가)지급수수료(기타),Y25019,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구) 통합 스마트상황실 구축 및 운영,인주~염치(2공구)빅룸,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구),직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,,Zoom Video Communications Inc.,서산-아산 건설사업단 화상회의 S/W(Zoom) 1년 구독의 건,"246,070",0,"246,070",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-13,2월,10111101,REV-101,용역미수금(계산서발행),Y26008,2026 경영 및 기술지원 서비스(한맥기술),,,,,,,,,총괄기획실,,한맥기술,2026경영및기술지원서비스(한맥기술)2월,"122,916,200",0,0,"122,916,200",,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-13,2월,40110401,REV-101,관리용역수입,Y26008,2026 경영 및 기술지원 서비스(한맥기술),,,,,,,,,총괄기획실,,한맥기술,2026경영및기술지원서비스(한맥기술)2월,0,"111,742,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-13,2월,20112901,LIA-101,매출세액,Y26008,2026 경영 및 기술지원 서비스(한맥기술),,,,,,,,,총괄기획실,,한맥기술,"111,742,000*10%",0,"11,174,200",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-13,2026-02-13,2월,10111101,REV-101,용역미수금(계산서발행),Y26008,2026 경영 및 기술지원 서비스(한맥기술),,,,,,,,,총괄기획실,,한맥기술,2026경영및기술지원서비스(한맥기술)2월,0,"122,916,200",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-13,2026-02-13,2월,10110501,AST-101,보통예금,Y26008,2026 경영 및 기술지원 서비스(한맥기술),,,,,,,,,총괄기획실,,국민(주거래),2026경영및기술지원서비스(한맥기술)2월,"122,916,200",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-19,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,임원 CHAT GPT 구독료(2월),0,"29,000",0,0,공통 → 경영진,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-19,2월,60116399,IT-301,지급수수료(기타),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,임원 CHAT GPT 구독료(2월),"29,000",0,"29,000",0,공통 → 경영진,구매,기타,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-19,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,2월 업무관련 유류대(장종찬사장),0,"324,500",0,0,공통 → 경영진,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-19,2월,60115999,WF-201,여비교통비(기타),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,2월 업무관련 유류대(장종찬사장),"324,500",0,"324,500",0,공통 → 경영진,출장비,기타,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,솔루션통합팀,권혁진,건설기술인 승급 ( 중급 : 스마트건설 - BIM ) 교육 ( 설계시공 > 안전관리 > 건설안전 ),0,"200,000",0,0,"공통 → 교육훈련,참석",제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,60117301,WF-301,교육훈련비,ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,솔루션통합팀,권혁진,건설기술인 승급 ( 중급 : 스마트건설 - BIM ) 교육 ( 설계시공 > 안전관리 > 건설안전 ),"200,000",0,"200,000",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,20111109,LIA-101,미지급금(하나카드),ZZZZZZ,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,하나카드(7726),1월 업무관련 식대(최대선),0,"380,000",0,0,공통 → OB,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,50152507,WF-101,원가)복리후생비(회식대),ZZZZZZ,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,최대선,1월 업무관련 식대(최대선),"380,000",0,"380,000",0,공통 → OB,복리후생비,공통,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,20111109,LIA-101,미지급금(하나카드),ZZZZZZ,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,하나카드(7726),1월 업무관련 유류대(최대선),0,"196,000",0,0,공통 → OB,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,60115999,WF-201,여비교통비(기타),ZZZZZZ,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,최대선,1월 업무관련 유류대(최대선),"66,000",0,"66,000",0,공통 → OB,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,60115999,WF-201,여비교통비(기타),ZZZZZZ,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,최대선,1월 업무관련 유류대(최대선),"60,000",0,"60,000",0,공통 → OB,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,60115999,WF-201,여비교통비(기타),ZZZZZZ,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,최대선,1월 업무관련 유류대(최대선),"70,000",0,"70,000",0,공통 → OB,출장비,공통,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,20111103,LIA-101,미지급금(일반미지급),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,시내교통비,0,"12,700",0,0,공통 → 대산당진BIM,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,50152705,WF-201,원가)여비교통비(시내교통비),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,업무협의,"12,700",0,"12,700",0,공통 → 대산당진BIM,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,권혁진,"업체방문 석식대 ( 바우컨설탄트, 총 6명 )",0,"189,100",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-19,2026-02-20,2월,60115705,WF-101,복리후생비(회식대),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,권혁진,"업체방문 석식대 ( 바우컨설탄트, 총 6명 )","189,100",0,"189,100",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-02-20,2월,60115903,WF-201,여비교통비(국내출장비),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,출장비,"93,200",0,"93,200",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-08,2026-02-20,2월,20111103,LIA-101,미지급금(일반미지급),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,출장비 - 김원식,0,"93,200",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-02-20,2월,60115903,WF-201,여비교통비(국내출장비),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,출장비,"113,300",0,"113,300",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-16,2026-02-20,2월,20111103,LIA-101,미지급금(일반미지급),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,출장비 - 김원식,0,"113,300",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-01-30,2026-02-20,2월,60115903,WF-201,여비교통비(국내출장비),Z25059,울산~외곽순환 고속도로(1공구),울산외곽순환(1공구),울산~외곽순환 고속도로(1공구),직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,출장비,"106,400",0,"106,400",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-01-30,2026-02-20,2월,20111103,LIA-101,미지급금(일반미지급),Z25059,울산~외곽순환 고속도로(1공구),울산외곽순환(1공구),울산~외곽순환 고속도로(1공구),직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,출장비 - 김원식,0,"106,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-20,2월,60115903,WF-201,여비교통비(국내출장비),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,출장비,"97,000",0,"97,000",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-12,2026-02-20,2월,20111103,LIA-101,미지급금(일반미지급),Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,총괄기획실,김원식,출장비 - 김원식,0,"97,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,20111103,LIA-101,미지급금(일반미지급),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,인프라 BIM1팀,김원기A,경부선 드론 기반 조사 촬영에 필요한 현장 운영비(전도금),0,"2,000,000",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,10114903,AST-105,전도금(가불금),Y26018,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역,경부선 (평택-직지사) 측량,경부선 평택-직지사구간 작업자 이동통로 확보 기술조사 및 실시설계 용역-드론촬영/현장조사자료작성,직접매출,기술용역계약,,매출,바론계약,기술용역,총괄기획실,인프라 BIM1팀,김원기A,경부선 드론 기반 조사 촬영에 필요한 현장 운영비(전도금),"2,000,000",0,"2,000,000",0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,60110101,HR-101,급여(임.직원),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,총괄/장종찬,2026년 2월 급여(바론),"393,784,100",0,"393,784,100",0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,20111503,LIA-101,예수금(근로소득주민세),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,,2025년 연말정산 (주민세),0,"-6,354,890",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,20111507,HR-201,예수금(국민연금),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,,김예슬 국민연금 정산,0,"-688,020",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,20111501,LIA-101,예수금(근로소득세),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,근로복지공단,2026년 2월 급여 근로소득세(바론),0,"26,421,200",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,20111503,LIA-101,예수금(근로소득주민세),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,근로복지공단,2026년 2월 급여 근로소득주민세(바론),0,"2,641,790",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,20111509,HR-203,예수금(고용보험료(직원)),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,고용노동부,2026년 2월 급여 고용보험(바론),0,"3,271,310",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,20111505,HR-202,예수금(건강보험료),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민건강보험공단,"2026년 2월 급여 의료보험(건강+요양, 바론)",0,"14,670,700",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,20111507,HR-201,예수금(국민연금),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민연금관리공단,2026년 2월 급여 국민연금(바론),0,"11,935,950",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,20111599,LIA-101,예수금(기타),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,,2026년 2월 식대 및 기타 공제(바론),0,"1,796,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,총괄/장종찬,2026년 2월 급여(바론),0,"403,645,110",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-23,2월,20111501,LIA-101,예수금(근로소득세),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,,2025년 연말정산 (소득세),0,"-63,555,450",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-20,2026-02-24,2월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,조태희,인재성장팀 회식비(2026년 2월),0,"126,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-20,2026-02-24,2월,60115705,WF-101,복리후생비(회식대),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,조태희,인재성장팀 회식비(2026년 2월),"126,000",0,"126,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-24,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,SK텔레콤(주),2월 휴대폰 사용요금(최대선),0,"144,330",0,0,공통 → OB,제외,공통,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-24,2월,60116199,OP-204,통신비(기타),ZZZZZZ,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,SK텔레콤(주),2월 휴대폰 사용요금(최대선),"37,633",0,"37,633",0,공통 → OB,구매,공통,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-24,2월,10115301,AST-106,매입세액,ZZZZZZ,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,SK텔레콤(주),2월 휴대폰 사용요금(최대선),"3,762",0,"3,762",0,공통 → OB,구매,공통,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-24,2월,60116199,OP-204,통신비(기타),ZZZZZZ,공통(OB),공통(OB),공통,기획/관리,공통,,공통,공통,공통,임원실,,SK텔레콤(주),2월 휴대폰 사용요금(최대선),"102,935",0,"102,935",0,공통 → OB,구매,공통,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-25,2월,10111101,REV-101,용역미수금(계산서발행),Y26012,2026 경영 및 기술지원 서비스(한라산업개발),,,,,,,,,총괄기획실,,한라산업개발,2026경영및기술지원서비스(한라산업개발),0,"10,285,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-25,2월,10110501,AST-101,보통예금,Y26012,2026 경영 및 기술지원 서비스(한라산업개발),,,,,,,,,총괄기획실,,국민(주거래),2026경영및기술지원서비스(한라산업개발),"10,285,000",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-24,2026-02-25,2월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민은행,퇴직연금(국민) 2026년 2월분 (44명),0,"19,360,430",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-24,2026-02-25,2월,60111101,HR-103,퇴직금,X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,국민은행,퇴직연금(국민) 2026년 2월분 (44명),"19,360,430",0,"19,360,430",0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-25,2월,20111103,LIA-101,미지급금(일반미지급),X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,신한은행,퇴직연금(신한) 2026년 2월분 (6명),0,"2,159,060",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-25,2월,60111101,HR-103,퇴직금,X26003,인사/교육,인사/교육,인사/교육,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,신한은행,퇴직연금(신한) 2026년 2월분 (6명),"2,159,060",0,"2,159,060",0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-25,2월,10111101,REV-101,용역미수금(계산서발행),Y26011,2026 경영 및 기술지원 서비스(삼안),,,,,,,,,총괄기획실,,삼안,2026경영및기술지원서비스(삼안)2월,"294,607,500",0,0,"294,607,500",,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-25,2월,40110401,REV-101,관리용역수입,Y26011,2026 경영 및 기술지원 서비스(삼안),,,,,,,,,총괄기획실,,삼안,2026경영및기술지원서비스(삼안)2월,0,"267,825,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-25,2월,20112901,LIA-101,매출세액,Y26011,2026 경영 및 기술지원 서비스(삼안),,,,,,,,,총괄기획실,,삼안,"267,825,000*10%",0,"26,782,500",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-25,2월,10111101,REV-101,용역미수금(계산서발행),Y26012,2026 경영 및 기술지원 서비스(한라산업개발),,,,,,,,,총괄기획실,,한라산업개발,2026경영및기술지원서비스(한라산업개발),"10,285,000",0,0,"10,285,000",,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-25,2월,40110401,REV-101,관리용역수입,Y26012,2026 경영 및 기술지원 서비스(한라산업개발),,,,,,,,,총괄기획실,,한라산업개발,2026경영및기술지원서비스(한라산업개발),0,"9,350,000",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-10,2026-02-25,2월,20112901,LIA-101,매출세액,Y26012,2026 경영 및 기술지원 서비스(한라산업개발),,,,,,,,,총괄기획실,,한라산업개발,"9,350,000*10%",0,"935,000",0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-25,2월,10111101,REV-101,용역미수금(계산서발행),Y26011,2026 경영 및 기술지원 서비스(삼안),,,,,,,,,총괄기획실,,삼안,2026경영및기술지원서비스(삼안)2월,0,"294,607,500",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-25,2월,10110501,AST-101,보통예금,Y26011,2026 경영 및 기술지원 서비스(삼안),,,,,,,,,총괄기획실,,국민(주거래),2026경영및기술지원서비스(삼안)2월,"294,607,500",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-26,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,업무 회의 후 식사,0,"37,000",0,0,공통 → 경영진,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-26,2월,60115705,WF-101,복리후생비(회식대),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,업무 회의 후 식사,"37,000",0,"37,000",0,공통 → 경영진,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-26,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,임원 AI 구독료(2월),0,"29,000",0,0,공통 → 경영진,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-26,2월,60116399,IT-301,지급수수료(기타),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,임원 AI 구독료(2월),"29,000",0,"29,000",0,공통 → 경영진,구매,기타,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-26,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,업무 회의 후 식사,0,"59,900",0,0,공통 → 경영진,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-26,2월,60115705,WF-101,복리후생비(회식대),ZZZZZZ,경영진,경영진,경영진,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,총괄기획실 사장,장종찬,업무 회의 후 식사,"59,900",0,"59,900",0,공통 → 경영진,복리후생비,기타,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,협업증진팀,한승민,"2월 한맥 농구동호회 대관비 (2회분, 2/11, 25)",0,"320,000",0,0,"공통 → 교육훈련,참석",제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-27,2월,60115798,WF-106,복리후생비(공통),ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,협업증진팀,한승민,"2월 한맥 농구동호회 대관비 (2회분, 2/11, 25)","320,000",0,"320,000",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-27,2월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"142,370",0,"142,370",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,권혁진,출장비 - 권혁진,0,"8,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-11,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"134,370",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-13,2026-02-27,2월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"69,920",0,"69,920",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-13,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"69,920",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,김우진,변리사 업무미팅 후 식사(IP 이전),0,"36,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,60115705,WF-101,복리후생비(회식대),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,김우진,변리사 업무미팅 후 식사(IP 이전),"36,000",0,"36,000",0,,복리후생비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-20,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(02/13),0,"34,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-20,2026-02-27,2월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(02/13),"34,000",0,"34,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-20,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(02/13),0,"3,400",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-20,2026-02-27,2월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(02/13),"3,400",0,"3,400",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,국혜림,바론 입찰제출용 법인인감증명서 발급수수료,0,"20,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-23,2026-02-27,2월,60116399,IT-301,지급수수료(기타),X26002,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,경영기획팀,국혜림,바론 입찰제출용 법인인감증명서 발급수수료,"20,000",0,"20,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,DB손해보험,바론컨설턴트 법인차량(168러 2890) 자동차보험 가입의 건,0,"743,590",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,60115103,OP-201,보험료(자동차보험료),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,DB손해보험,바론컨설턴트 법인차량(168러 2890) 자동차보험 가입의 건,"743,590",0,"743,590",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-24,2026-02-27,2월,60115903,WF-201,여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비,"111,950",0,"111,950",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-24,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,권혁진,출장비 - 권혁진,0,"30,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-24,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,출장비 - 염승호,0,"81,950",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(02/24),0,"34,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(02/24),"34,000",0,"34,000",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,디자인기획팀,신혜영,디자인팀 공용 피그마 사용료(2026.2월~2027.2월사용),0,"625,209",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,60114399,OP-203,소모품비(기타(공통)),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,디자인기획팀,신혜영,디자인팀 공용 피그마 사용료(2026.2월~2027.2월사용),"625,209",0,"625,209",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-27,2월,20111109,LIA-101,미지급금(하나카드),X25030,GSIM,GSIM,GSIM,S/W개발,솔루션,,비매출,S/W 개발,솔루션,기술개발센터,,하나카드(6669),GSIM팀 AWS 사용료(26년 1월),0,"182,932",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-27,2월,50153199,IT-301,원가)지급수수료(기타),X25030,GSIM,GSIM,GSIM,S/W개발,솔루션,개발,비매출,S/W 개발,솔루션,기술개발센터,,Amazon Web Services Inc.,GSIM팀 AWS 사용료(26년 1월),"182,932",0,"182,932",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-27,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(02/26),0,"31,700",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-27,2026-02-27,2월,60115798,WF-106,복리후생비(공통),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,염승호,이지빔 영업(02/26),"31,700",0,"31,700",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-27,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,건국대학교 강의 지원,0,"16,940",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-27,2026-02-27,2월,50152701,WF-201,원가)여비교통비(국내출장비),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,건국대학교 강의 지원,"16,940",0,"16,940",0,,출장비,일반,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,SW 홍보 브로슈어 업체 발송,0,"165,440",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-27,2월,60116399,IT-301,지급수수료(기타),X25026,EG-BIM Drawer,EG-BIM Drawer,EG-BIM Drawer,S/W개발,그래픽,영업,비매출,S/W 개발,그래픽&구조해석,총괄기획실,솔루션통합팀,김지영A,SW 홍보 브로슈어 업체 발송,"165,440",0,"165,440",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-27,2026-02-27,2월,10111101,REV-101,용역미수금(계산서발행),Y26009,2026 경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,장헌산업,2026경영및기술지원서비스(장헌산업),0,"18,241,300",0,0,,수입,기타,,,,,,,,,
|
||||||
|
바론,2026-02-27,2026-02-27,2월,10110501,AST-101,보통예금,Y26009,2026 경영 및 기술지원 서비스(장헌산업),,,,,,,,,총괄기획실,,국민(주거래),2026경영및기술지원서비스(장헌산업),"18,241,300",0,0,0,,제외,기타,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-27,2월,20111109,LIA-101,미지급금(하나카드),X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,하나카드(6669),Ai셀 Cloudflare 사용료(26년 1월),0,"8,319",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-27,2월,50153199,IT-301,원가)지급수수료(기타),X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,Cloudflare Inc.,Ai셀 Cloudflare 사용료(26년 1월),"8,319",0,"8,319",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-27,2월,20110101,LIA-101,외상매입금,X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,구글클라우드 코리아 유한회사,Ai셀 구글클라우드 Ai 사용료(26년 1월),0,"327,153",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-27,2월,50153199,IT-301,원가)지급수수료(기타),X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,구글클라우드 코리아 유한회사,Ai셀 구글클라우드 Ai 사용료(26년 1월),"297,412",0,"297,412",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-26,2026-02-27,2월,10115301,AST-106,매입세액,X25054,AI,AI,AI,기획/관리,기획&관리,,비매출,기획/제안,기획,총괄기획실,,구글클라우드 코리아 유한회사,Ai셀 구글클라우드 Ai 사용료(26년 1월),"29,741",0,"29,741",0,,구매,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,20111103,LIA-101,미지급금(일반미지급),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,주완기,기술개발센터 공용 무선 랜카드 구매,0,"34,000",0,0,,제외,일반,,,,,,,,,
|
||||||
|
바론,2026-02-25,2026-02-27,2월,60114301,OP-203,소모품비(사무용품비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,인재성장팀,주완기,기술개발센터 공용 무선 랜카드 구매,"34,000",0,"34,000",0,,구매,일반,,,,,,,,,
|
||||||
|
한맥,2026-02-10,2026-02-13,2월,50152599,WF-106,원가)복리후생비,ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,기술개발센터,,,방재보수교육 김승호 수석,"220,000",,"220,000",0,"공통 → 교육훈련,참석",구매,기타,,,,,,,,,
|
||||||
|
한맥,2026-02-19,2026-02-19,2월,10113701,AST-104,선급금,ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,기술개발센터,,,대학원등록금 기업분담금(급여차감예정),"528,500",,0,"528,500",장헌 전상현JM (명지대 등록금건) → 제외,수입,공통,,,,,,,,,
|
||||||
|
한맥,2026-02-26,2026-02-26,2월,60115305,MK-201,접대비,ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,기술개발센터,,,우종일 모친상/보훈병원장례식장,"100,000",,"100,000",0,"공통 → 교육훈련,참석",복리후생비,기타,,,,,,,,,
|
||||||
|
한맥,2026-02-05,2026-02-13,2월,50151101,OP-101,원가)지급임차료,Z25056,고속국도 제 30호 서산-영덕선(대산-당진) 건설공사 전환 및 시공 BIM 수행 용역(제 2공구),대산~당진(2공구) 시공BIM,대산~당진 시공2공구 시공BIM 수행,직접매출,내부BIM설계지원,,매출,가족사 프로젝트,BIM 설계,총괄기획실,,,월세(2월) : 대산-당진(제2공구) 시공BIM 용역 현장 직원 숙소,"370,000",,"370,000",0,,구매,일반,,,,,,,,,
|
||||||
|
한맥,2026-02-10,2026-02-13,2월,50153103,OUT-102,원가)지급수수료,ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,총괄기획실,,,마천사무실/1분기 카페트 청소,"308,000",,"308,000",0,,구매,공통,,,,,,,,,
|
||||||
|
한맥,2026-02-10,2026-02-13,2월,50153103,OUT-102,원가)지급수수료,ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,총괄기획실,,,기술개발센터 ADT캡스 월정료_26년 2월,"99,000",,"99,000",0,,구매,공통,,,,,,,,,
|
||||||
|
한맥,2026-02-11,2026-02-13,2월,50151109,OP-202,원가)지급임차료,ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,총괄기획실,,,마천사무실/정수기 4대 26년 2월 청구분,"137,400",,"137,400",0,,구매,공통,,,,,,,,,
|
||||||
|
한맥,2026-02-11,2026-02-13,2월,50152705,WF-201,원가)여비교통비,ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,총괄기획실,,,마천사무실/2월 주차정기권,"99,000",,"99,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
한맥,2026-02-11,2026-02-13,2월,60116101,IT-401,통신비,ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,총괄기획실,,,마천사무실/통신요금(26년 02월),"614,900",,"614,900",0,,구매,공통,,,,,,,,,
|
||||||
|
한맥,2026-02-11,2026-02-13,2월,50152705,WF-201,원가)여비교통비,ZZZZZZ,공통,공통(기타),공통,기획/관리,공통,,공통,공통,공통,총괄기획실,,,마천사무실/2월 주차정기권,"33,000",,"33,000",0,,출장비,공통,,,,,,,,,
|
||||||
|
한맥,2026-02-19,2026-02-23,2월,60114743,WF-103,경상시험연구비,ZZZZZZ,"교육훈련,참석","교육훈련, 참석","교육훈련,참석",기획/관리,공통,,공통,공통,공통,총괄기획실,,,기술개발센터 세미나 진행 관련 식사 및 다과 구입,"732,000",,"732,000",0,"공통 → 교육훈련,참석",복리후생비,기타,,,,,,,,,
|
||||||
|
삼안,2026-02-10,2026-01-29,1월,60114739,IT-201,경상시험연구비(소모품비),X26005,운영지원(총무),운영지원(총무),운영지원(총무),기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,기술개발센터,,,센터 소모품 및 다과 구매,"4,128,674",,"4,128,674",0,,구매,일반,,,,,,,,,
|
||||||
|
장헌산업,2025-12-16,2026-01-20,1월,823,OUT-201,연구개발비,20-교영-18,스마트건설기술개발사업 10과제(한맥/삼안/장헌/피티씨),스마트건설기술(10과제),스마트건설(10과제),직접매출,R&D,,매출,가족사 프로젝트,R&D,,,MDPI,스마트건설/MDPI 게재료(SCI),"4,870,413",,"4,870,413",0,,구매,R&D,,,,,,,,,
|
||||||
|
장헌산업,2026-01-30,2026-02-04,2월,831,OUT-201,지급수수료,26-관리-06,경영기획/전략,경영기획/전략,경영기획/전략,기획/관리,총괄기획실,,총괄기획실,총괄기획실,총괄기획실,총괄기획실,,법무사 조수호,주식회사 장헌파트너스 분할 관련 공과금 추가납부(공증료),"121,000",,"121,000",0,,구매,일반,,,,,,,,,
|
||||||
|
1598
incoming-files/payment.html
Normal file
1598
incoming-files/payment.html
Normal file
File diff suppressed because it is too large
Load Diff
90
incoming-files/ptj.csv
Normal file
90
incoming-files/ptj.csv
Normal file
@@ -0,0 +1,90 @@
|
|||||||
|
매출/비매출,분야,세부분야,프로젝트명,
|
||||||
|
매출,바론계약,판매,EG-BIM (파이프텍코리아),
|
||||||
|
매출,바론계약,판매,ERP(한국종합엔지니어링),
|
||||||
|
매출,바론계약,판매,GAIA 기능 개선 계약,
|
||||||
|
매출,바론계약,기술용역,계양-강화 고속도로 건설 기본 및 실시(5공구),
|
||||||
|
매출,바론계약,기술용역,국도42호선 원주 흥업 사제 외 1개소 교차로 개선공사 실시설계용역(삼안),
|
||||||
|
매출,바론계약,기술용역,인주-염치(제1공구) 회의 시스템 설치,
|
||||||
|
매출,바론계약,기술용역,고속국도 제32호 당진~청주선 인주~염치간 건설공사(제2공구),
|
||||||
|
매출,바론계약,기술용역,대산-당진 1공구 Conference Platform(BigRoom)구축,
|
||||||
|
매출,바론계약,기술용역,대산-당진 2공구 Conference Platform(BigRoom)구축,
|
||||||
|
매출,바론계약,기술용역,대산-당진 3-4공구 Conference Platform(BigRoom)구축,
|
||||||
|
매출,바론계약,기술용역,공학용 사이니지 시스템 구축,2월 추가
|
||||||
|
매출,바론계약,콘텐츠 제작,보은국토도로 사업관리,
|
||||||
|
매출,바론계약,콘텐츠 제작,한강교량 사업관리(2공구),
|
||||||
|
매출,바론계약,콘텐츠 제작,예산국토 제2권역,
|
||||||
|
매출,바론계약,콘텐츠 제작,가평군 하수관망 계측시스템 유지관리 용역,
|
||||||
|
매출,바론계약,콘텐츠 제작,PQ(지오메카이엔지),
|
||||||
|
매출,가족사 프로젝트,BIM 설계,대산~당진 시공2공구 시공BIM 수행,
|
||||||
|
매출,가족사 프로젝트,BIM 설계,서산~명천 도로건설공사 기본 및 실시설계,
|
||||||
|
매출,가족사 프로젝트,BIM 설계,울산~외곽순환 고속도로(1공구),
|
||||||
|
매출,가족사 프로젝트,BIM 설계,충남논산스마트팜 조감도,
|
||||||
|
매출,가족사 프로젝트,BIM 설계,원효대교북단 조감도,
|
||||||
|
매출,가족사 프로젝트,BIM 설계,사천시 향촌지구 우수유출저감시설 PQ 문서편집,
|
||||||
|
매출,가족사 프로젝트,시공,인천발 KTX 직결교량 시공,
|
||||||
|
매출,가족사 프로젝트,디자인,가족사 보고서 템플릿 제작_PQ,
|
||||||
|
매출,가족사 프로젝트,디자인,(주)삼안 2026년 경영기획서 편집디자인,2월 추가
|
||||||
|
매출,가족사 프로젝트,R&D,디지털 국토정보 기술개발사업,
|
||||||
|
매출,가족사 프로젝트,R&D,국토정보 2핵심,
|
||||||
|
매출,가족사 프로젝트,R&D,스마트건설(10과제),
|
||||||
|
매출,가족사 프로젝트,R&D,XR기반 건설설계 혁신시스템,
|
||||||
|
비매출,S/W 개발,기초조사 및 GIS,KNGIL,
|
||||||
|
비매출,S/W 개발,기초조사 및 GIS,GIS Mapper,
|
||||||
|
비매출,S/W 개발,기초조사 및 GIS,천지인,
|
||||||
|
비매출,S/W 개발,기초조사 및 GIS,Surveyor,
|
||||||
|
비매출,S/W 개발,기초조사 및 GIS,GAIA,
|
||||||
|
비매출,S/W 개발,도로,WayPrimal,
|
||||||
|
비매출,S/W 개발,도로,WayConfirm,
|
||||||
|
비매출,S/W 개발,도로,WayDraw,
|
||||||
|
비매출,S/W 개발,도로,WayShop,
|
||||||
|
비매출,S/W 개발,구조물,WallZainer,
|
||||||
|
비매출,S/W 개발,구조물,Bridge planner,
|
||||||
|
비매출,S/W 개발,구조물,AbutZainer,
|
||||||
|
비매출,S/W 개발,구조물,BriZainer-DR,
|
||||||
|
비매출,S/W 개발,구조물,BriZainer-Nodular,
|
||||||
|
비매출,S/W 개발,구조물,TunnelZainer,
|
||||||
|
비매출,S/W 개발,구조,BoxZainer,2월 추가
|
||||||
|
비매출,S/W 개발,교통,TOVA,
|
||||||
|
비매출,S/W 개발,수리/수문,LifeLine-Water,
|
||||||
|
비매출,S/W 개발,수리/수문,강우강도산정 프로그램,
|
||||||
|
비매출,S/W 개발,그래픽&구조해석,HmEG(HmDraw),
|
||||||
|
비매출,S/W 개발,그래픽&구조해석,EG-BIM Modeler,
|
||||||
|
비매출,S/W 개발,그래픽&구조해석,EG-BIM Drawer,
|
||||||
|
비매출,S/W 개발,그래픽&구조해석,StrAna,
|
||||||
|
비매출,S/W 개발,솔루션,문서관리시스템(PM),
|
||||||
|
비매출,S/W 개발,솔루션,bCMf,
|
||||||
|
비매출,S/W 개발,솔루션,GSIM,
|
||||||
|
비매출,S/W 개발,솔루션,CCP,
|
||||||
|
비매출,S/W 개발,솔루션,단가/공정 solution,
|
||||||
|
비매출,S/W 개발,솔루션,WatchBIM,
|
||||||
|
비매출,S/W 개발,솔루션,Twin Highway,
|
||||||
|
비매출,S/W 개발,솔루션,Domainer,
|
||||||
|
비매출,S/W 개발,솔루션,Cadaster,2월 추가
|
||||||
|
비매출,S/W 개발,운영S/W,입찰정보(용역/공사) 조회 시스템,
|
||||||
|
비매출,S/W 개발,운영S/W,ERP: 장헌산업,
|
||||||
|
비매출,S/W 개발,운영S/W,ERP: PTC,
|
||||||
|
비매출,S/W 개발,운영S/W,ERP: 한라,
|
||||||
|
비매출,S/W 개발,운영S/W,ERP: 삼안,
|
||||||
|
비매출,S/W 개발,운영S/W,ERP: 한맥,
|
||||||
|
비매출,S/W 개발,운영S/W,ERP: 바론,
|
||||||
|
비매출,S/W 개발,운영S/W,ERP: (주)장헌,
|
||||||
|
비매출,S/W 개발,운영S/W,ERP: 산하종합기술,
|
||||||
|
비매출,S/W 개발,운영S/W,CivilEngineeringLab,
|
||||||
|
비매출,S/W 개발,운영S/W,PQ시스템,
|
||||||
|
비매출,S/W 개발,운영S/W,BEPs,
|
||||||
|
비매출,S/W 개발,운영S/W,전산운영관리,
|
||||||
|
비매출,S/W 개발,운영S/W,한맥가족 배움터,
|
||||||
|
비매출,기획/제안,기획,사전기획,
|
||||||
|
비매출,기획/제안,기획,청용천교 업무지원,
|
||||||
|
비매출,기획/제안,기획,수자원 해외사업,
|
||||||
|
비매출,기획/제안,기획,AI,
|
||||||
|
비매출,기획/제안,기획,GIS장비 개발,
|
||||||
|
비매출,기획/제안,기획,프리캐스트 조립식 박스 교량,
|
||||||
|
비매출,기획/제안,기획,인덕원~동탄 복선전철 스마트상황실 구축 및 운영안,
|
||||||
|
비매출,기획/제안,기획,바론 SW 포탈,2월 추가
|
||||||
|
총괄기획실,총괄기획실,총괄기획실,경영기획/전략,
|
||||||
|
총괄기획실,총괄기획실,총괄기획실,인사/교육,
|
||||||
|
총괄기획실,총괄기획실,총괄기획실,운영지원(총무),
|
||||||
|
총괄기획실,총괄기획실,총괄기획실,업무/사업관리,
|
||||||
|
공통,공통,공통,"교육훈련,참석",
|
||||||
|
공통,공통,공통,공통,
|
||||||
|
@@ -1,6 +1,6 @@
|
|||||||
body {
|
body {
|
||||||
overflow-x: hidden;
|
overflow-x: hidden;
|
||||||
overflow-y: hidden;
|
overflow-y: auto;
|
||||||
}
|
}
|
||||||
|
|
||||||
.org-canvas {
|
.org-canvas {
|
||||||
@@ -420,8 +420,8 @@ body {
|
|||||||
align-items: start;
|
align-items: start;
|
||||||
}
|
}
|
||||||
|
|
||||||
.modal-form-grid > .col-span-1,
|
.modal-form-grid>.col-span-1,
|
||||||
.modal-form-grid > .col-span-2 {
|
.modal-form-grid>.col-span-2 {
|
||||||
min-width: 0;
|
min-width: 0;
|
||||||
}
|
}
|
||||||
|
|
||||||
@@ -544,21 +544,17 @@ body {
|
|||||||
border-radius: 16px;
|
border-radius: 16px;
|
||||||
border: 1px dashed #94a3b8;
|
border: 1px dashed #94a3b8;
|
||||||
background:
|
background:
|
||||||
linear-gradient(135deg, rgba(255,255,255,0.9), rgba(224,231,255,0.95)),
|
linear-gradient(135deg, rgba(255, 255, 255, 0.9), rgba(224, 231, 255, 0.95)),
|
||||||
repeating-linear-gradient(
|
repeating-linear-gradient(0deg,
|
||||||
0deg,
|
rgba(148, 163, 184, 0.12),
|
||||||
rgba(148,163,184,0.12),
|
rgba(148, 163, 184, 0.12) 1px,
|
||||||
rgba(148,163,184,0.12) 1px,
|
|
||||||
transparent 1px,
|
transparent 1px,
|
||||||
transparent 24px
|
transparent 24px),
|
||||||
),
|
repeating-linear-gradient(90deg,
|
||||||
repeating-linear-gradient(
|
rgba(148, 163, 184, 0.12),
|
||||||
90deg,
|
rgba(148, 163, 184, 0.12) 1px,
|
||||||
rgba(148,163,184,0.12),
|
|
||||||
rgba(148,163,184,0.12) 1px,
|
|
||||||
transparent 1px,
|
transparent 1px,
|
||||||
transparent 24px
|
transparent 24px);
|
||||||
);
|
|
||||||
display: flex;
|
display: flex;
|
||||||
align-items: center;
|
align-items: center;
|
||||||
justify-content: center;
|
justify-content: center;
|
||||||
@@ -997,9 +993,20 @@ body {
|
|||||||
}
|
}
|
||||||
|
|
||||||
@keyframes target-pulse {
|
@keyframes target-pulse {
|
||||||
0% { box-shadow: 0 0 0 0 rgba(79, 70, 229, 0.7); transform: scale(1); }
|
0% {
|
||||||
50% { box-shadow: 0 0 0 10px rgba(79, 70, 229, 0); transform: scale(1.05); }
|
box-shadow: 0 0 0 0 rgba(79, 70, 229, 0.7);
|
||||||
100% { box-shadow: 0 0 0 0 rgba(79, 70, 229, 0); transform: scale(1); }
|
transform: scale(1);
|
||||||
|
}
|
||||||
|
|
||||||
|
50% {
|
||||||
|
box-shadow: 0 0 0 10px rgba(79, 70, 229, 0);
|
||||||
|
transform: scale(1.05);
|
||||||
|
}
|
||||||
|
|
||||||
|
100% {
|
||||||
|
box-shadow: 0 0 0 0 rgba(79, 70, 229, 0);
|
||||||
|
transform: scale(1);
|
||||||
|
}
|
||||||
}
|
}
|
||||||
|
|
||||||
.search-target {
|
.search-target {
|
||||||
@@ -1098,4 +1105,4 @@ body {
|
|||||||
color: white;
|
color: white;
|
||||||
border-color: #4f46e5;
|
border-color: #4f46e5;
|
||||||
box-shadow: 0 4px 10px rgba(79, 70, 229, 0.2);
|
box-shadow: 0 4px 10px rgba(79, 70, 229, 0.2);
|
||||||
}
|
}
|
||||||
@@ -167,6 +167,11 @@ async function loadActiveSeatMapLayout(force = false) {
|
|||||||
}
|
}
|
||||||
}
|
}
|
||||||
|
|
||||||
|
function handleSeatMapLayoutUpdated() {
|
||||||
|
seatMapLayoutCache = null;
|
||||||
|
loadMembers().catch(() => { });
|
||||||
|
}
|
||||||
|
|
||||||
function getMemberSeatInfo(layout, memberId) {
|
function getMemberSeatInfo(layout, memberId) {
|
||||||
if (!layout || !memberId) {
|
if (!layout || !memberId) {
|
||||||
return null;
|
return null;
|
||||||
@@ -610,6 +615,16 @@ function openSeatMapView(event) {
|
|||||||
}
|
}
|
||||||
}
|
}
|
||||||
|
|
||||||
|
window.addEventListener('message', (event) => {
|
||||||
|
const data = event.data;
|
||||||
|
if (!data || typeof data !== 'object') {
|
||||||
|
return;
|
||||||
|
}
|
||||||
|
if (data.type === 'seatmap-layout-updated') {
|
||||||
|
handleSeatMapLayoutUpdated();
|
||||||
|
}
|
||||||
|
});
|
||||||
|
|
||||||
function triggerUpload(event) {
|
function triggerUpload(event) {
|
||||||
if (event) {
|
if (event) {
|
||||||
event.stopPropagation();
|
event.stopPropagation();
|
||||||
|
|||||||
@@ -25,6 +25,13 @@ server {
|
|||||||
proxy_set_header X-Forwarded-Proto $scheme;
|
proxy_set_header X-Forwarded-Proto $scheme;
|
||||||
}
|
}
|
||||||
|
|
||||||
|
location /integrations/ {
|
||||||
|
proxy_pass http://backend:8000;
|
||||||
|
proxy_set_header Host $host;
|
||||||
|
proxy_set_header X-Forwarded-For $proxy_add_x_forwarded_for;
|
||||||
|
proxy_set_header X-Forwarded-Proto $scheme;
|
||||||
|
}
|
||||||
|
|
||||||
location / {
|
location / {
|
||||||
proxy_pass http://frontend:80;
|
proxy_pass http://frontend:80;
|
||||||
proxy_set_header Host $host;
|
proxy_set_header Host $host;
|
||||||
|
|||||||
Reference in New Issue
Block a user