Commit Graph

6 Commits

Author SHA1 Message Date
6f1b1d9fa3 docs: add Phase Z implementation issue backlog
- Add docs/architecture/PHASE-Z-IMPLEMENTATION-ISSUE-BACKLOG.md
  as implementation issue inventory (28 issues + frontend pending)
  bridged from PHASE-Q-INSIGHT-TO-22STEP-MAP.md
- Sections: §1 22-step map (11) / §2 separate axis registry (9)
  / §3 audit §1 mapping correction (5) / §4 cleanup (3) /
  §5 frontend matching source pending
- Includes review loop workflow (Codex+Claude review thread) +
  8 labels + dependency convention (none/hard link/soft link)
- Register the new doc in PHASE-Z-ROADMAP.md §8
2026-05-12 17:03:13 +09:00
783f8ca1ec docs: add Phase Q insight to 22-step map
- Add docs/architecture/PHASE-Q-INSIGHT-TO-22STEP-MAP.md as
  implementation prereq lock (audit + frontend matching insight
  → 22-step pipeline mapping + Archive guardrail)
- Sections: §0 Purpose/Boundary (9 Archive markers) /
  §1 SoT Read Result / §2 22-step status & improvement map
  (23 rows × 7 columns, Block A/B/C subsections) /
  §3 Separate Axis Registry (9 axes) /
  §4 audit §1 Mapping Correction Candidates (5 catches) /
  §5 Cleanup Candidates (3) /
  §6 Frontend Matching Insight — Source Pending
- Register the new doc in PHASE-Z-ROADMAP.md §8 (frontend
  matching insight marked as source pending)
2026-05-12 15:40:14 +09:00
8fe16e9c04 docs: reorder Phase Q audit roadmap priorities
- Replace §4 placeholder with grouped priority table (↑ / 중 / ↓ / 별 axis)
- Add §4 verification guardrail (no MDX / frame hardcoding)
- Add A-2 / A-5 risk notes (catalog frame change allowed, fallback status semantics)
- Update PHASE-Z-ROADMAP.md §5 inline with audit-derived priorities
- Add §7-B mini summary table for 12 lens items and Step 16/17 retry axis
2026-05-12 14:03:55 +09:00
3b6d86a73c docs: start Phase Q audit and lock salvage policy
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-08 18:06:15 +09:00
0a9327c50c PHASE-Z-ROADMAP refactor — Codex 검토 안 + Step 22 정정
§1 상단에 lock phrase blockquote 추가:
  "현재 당장 할 일은 개발 진행이 아니라, 보고와 피드백을 위한
   PROCESS_OVERVIEW.html 프로토타입을 먼저 만드는 것이다."

§2 — 토픽별 6 영역 → axis 명 list (Step 5 보완 / 6-A / 7-conn /
     8-conn / Step 9 v0 / cleanup-1 / F29 / README / push 완료).
     CHANGE-LOG reference 로 추적성 확보.
§3 — Step 22 추정 % 20% → 10% (UI 미시작 정합).
     caveat 강화 (STATUS-BOARD 가 single source of truth 명시).
§4 — 큰 로드맵 7 단계 한 블록.
§5 — 우선순위 3 줄 분리 (1. 프로토타입 / 2. 보고 / 3. 복귀).
§6 — 보고용 프로토타입 계획 (포함 내용 / 목적) 별도 섹션.
§7 — Pipeline 복귀 후 Todo (MDX04 / 시각 점검 확장 / 어댑터 /
     MDX 정규화 / Step 21 / MDX01 02 검증) 별도 섹션.
§8 — 문서 역할 분담 표 (README / OVERVIEW / STATUS-BOARD /
     CHANGE-LOG / ROADMAP / PROCESS_OVERVIEW 6 문서).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-08 10:31:13 +09:00
473de6b3d0 PHASE-Z-ROADMAP.md 신설 — 진행 계획 + 세부 todo
문서 역할 분담:
- README        : 프로젝트 개요 + 큰 그림 (가끔 갱신)
- OVERVIEW      : 22 단계 도면 (구조 잠금)
- STATUS-BOARD  : 각 단계 정확한 상태 (자주 갱신)
- CHANGE-LOG    : 결정 변경 이력
- ROADMAP (신규): 진행 계획 + 당장 할 일 + 세부 todo (자주 갱신)

내용:
1. 현재 위치 (MDX03 정상 경로 통과)
2. 지금까지 완료한 작업 6 가지 영역
3. 22 단계 진행 수준 (추정 % 표 + STATUS-BOARD 단일 출처 caveat)
4. 큰 로드맵 7 단계
5. 세부 todo (5.1 보고용 프로토타입 우선 / 5.2~5.8 단계별)
6. 당장 실행 순서 (보고용 프로토타입 → 22 단계 정리 복귀)
7. 문서 역할 분담 표

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-08 10:25:59 +09:00