4da22adb43 feat(#90): IMP-56 u1-u19 catch-up before final close (post-u20 push fix)
Some checks failed
Multi-MDX Regression (IMP-91) / multi-mdx-regression (push) Failing after 20s
u1: text_overrides axis in user_overrides_io
u2: structure_overrides axis in user_overrides_io
u3: vite allowlist for new endpoints
u4: text_override_resolver
u5: Step 12 text_overrides apply in phase_z2_pipeline
u6: structure_override_resolver
u7: text_path_stamper
u8: SlideCanvas text-edit capture
u9: SlideCanvas structure-edit overlay
u10: userOverridesApi service extension
u11: designAgent types extension
u12: slidePlanUtils restore
u13: user_overrides endpoint tests
u14: user_overrides restore tests
u15: pipeline fallback tests
u16: edit-mode state + gating tests
u17: slide_base print mode CSS
u18: /api/connect endpoint (vite)
u19: /api/export endpoint (vite)

Recovery scope: 29 files (12 modified + 17 new). u20 already pushed in
9439575; this commit lands u1-u19 that were authored but not committed
before #90 was externally closed.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>